US20170036262A1 - Cold heading formed wedge for use in post tensioning concrete - Google Patents

Cold heading formed wedge for use in post tensioning concrete Download PDF

Info

Publication number
US20170036262A1
US20170036262A1 US14/944,793 US201514944793A US2017036262A1 US 20170036262 A1 US20170036262 A1 US 20170036262A1 US 201514944793 A US201514944793 A US 201514944793A US 2017036262 A1 US2017036262 A1 US 2017036262A1
Authority
US
United States
Prior art keywords
wire
wedge
cold heading
blank
strand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US14/944,793
Inventor
Felix Sorkin
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US14/944,793 priority Critical patent/US20170036262A1/en
Priority to EP16180573.4A priority patent/EP3127630B1/en
Priority to ES16180573T priority patent/ES2790660T3/en
Publication of US20170036262A1 publication Critical patent/US20170036262A1/en
Assigned to DIAMOND STATE VENTURES III LP, INDEPENDENT BANKERS CAPITAL FUND III, L.P. reassignment DIAMOND STATE VENTURES III LP SECURITY INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: SORKIN, FELIX
Assigned to GENERAL TECHNOLOGIES, INC., SORKIN, FELIX, GTI HOLDINGS, LLC, PRECISION-HAYES INTERNATIONAL, INC. reassignment GENERAL TECHNOLOGIES, INC. RELEASE BY SECURED PARTY (SEE DOCUMENT FOR DETAILS). Assignors: DIAMOND STATE VENTURES III LP, INDEPENDENT BANKERS CAPITAL FUND III, L.P.
Abandoned legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21KMAKING FORGED OR PRESSED METAL PRODUCTS, e.g. HORSE-SHOES, RIVETS, BOLTS OR WHEELS
    • B21K21/00Making hollow articles not covered by a single preceding sub-group
    • B21K21/08Shaping hollow articles with different cross-section in longitudinal direction, e.g. nozzles, spark-plugs
    • B21K21/10Shaping hollow articles with different cross-section in longitudinal direction, e.g. nozzles, spark-plugs cone-shaped or bell-shaped articles, e.g. insulator caps
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J5/00Methods for forging, hammering, or pressing; Special equipment or accessories therefor
    • B21J5/06Methods for forging, hammering, or pressing; Special equipment or accessories therefor for performing particular operations
    • B21J5/08Upsetting
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/16Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J9/00Forging presses
    • B21J9/02Special design or construction
    • B21J9/022Special design or construction multi-stage forging presses
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21KMAKING FORGED OR PRESSED METAL PRODUCTS, e.g. HORSE-SHOES, RIVETS, BOLTS OR WHEELS
    • B21K1/00Making machine elements
    • B21K1/76Making machine elements elements not mentioned in one of the preceding groups
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/08Members specially adapted to be used in prestressed constructions
    • E04C5/12Anchoring devices
    • E04C5/122Anchoring devices the tensile members are anchored by wedge-action

Definitions

  • the present disclosure relates generally to post-tensioned, pre-stressed concrete construction.
  • the present disclosure relates specifically to wedges for anchors for use therein.
  • Many structures are built using concrete, including, for instance, buildings, parking structures, apartments, condominiums, hotels, mixed-use buildings, casinos, hospitals, medical buildings, government buildings, research/academic institutions, industrial buildings, malls, bridges, pavement, tanks, reservoirs, silos, foundations, sports courts, and other structures.
  • Pre-stressed concrete is structural concrete in which internal stresses are introduced to reduce potential tensile stresses in the concrete resulting from applied loads. This can be accomplished by two methods—post-tensioned pre-stressing and pre-tensioned pre-stressing.
  • post-tensioning concrete the pre-stressing assembly is tensioned after the concrete has attained a specified strength.
  • the pre-stressing assembly commonly known as a tendon, may include for example and without limitation, anchorages, one or more strands, and sheathes or ducts. The strand is tensioned between anchors which are embedded in the concrete once the concrete has hardened.
  • the strand may be formed from a metal or composite or any suitable material exhibiting tensile strength which can be elongated including, for example and without limitation, reinforcing steel, single wire cable, or multi-wire cable.
  • the strand is typically fixedly coupled to a fixed anchorage positioned at one end of the tendon, the so-called “fixed end”, and is adapted to be stressed at the other anchor, the “stressing end” of the tendon.
  • the strand is generally held to each anchor by one or more wedges.
  • anchors include a tapered recess which, when the strand is placed under tension, cause the wedges to further engage the strand. Wedges are typically made of metal.
  • the present disclosure provides for a method for forming a wedge for post tensioning concrete.
  • the method may include providing a wire; feeding a portion of the wire into a cold heading apparatus; cold heading a portion of the wire to form at least one wedge blank; and finishing the wedge blank to form the wedge.
  • the present disclosure further provides for a method including providing a wire and feeding a portion of the wire into a cold heading apparatus.
  • the method also includes cold heading a portion of the wire to form at least one wedge blank and finishing the wedge blank to form the wedge.
  • the method includes providing an anchor for post tensioning concrete, threading a strand through the anchor, and positioning the wedge on the strand.
  • FIG. 1 depicts a cross section of an anchor having a wedge consistent with at least one embodiment of the present disclosure.
  • FIG. 2 depicts a block diagram of a cold heading procedure for forming wedges consistent with at least one embodiment of the present disclosure.
  • FIGS. 3A-D depict an overview of a cold heading process for forming wedges consistent with at least one embodiment of the present disclosure.
  • FIG. 1 depicts anchor 10 for use in post tensioning concrete.
  • Anchor 10 is adapted to receive and couple to strand 12 of tendon 14 .
  • strand 12 may be threaded through anchor 10 .
  • Strand 12 may be, for example and without limitation, mono-wire cable or multi-wire cable.
  • the axis parallel with the length of strand 12 will be referred to as the longitudinal axis of strand 12 .
  • Anchor 10 may include anchor body 16 adapted to retain the position of anchor 10 when positioned in formed concrete.
  • Anchor 10 may couple to strand 12 by the use of one or more wedges 100 .
  • Wedges 100 may be substantially wedge shaped and adapted to fit into a tapered recess 18 formed in anchor body 16 .
  • wedges 100 may be installed to the strand in a direction perpendicular to the longitudinal axis of the strand. Tension on strand 12 may cause wedges 100 to move into tapered recess 18 , applying a gripping force on strand 12 .
  • wedges 100 may be formed by cold heading.
  • FIG. 2 depicts a block diagram of a cold heading process.
  • Wire 101 is provided on spool 103 .
  • Wire 101 is fed by one or more drive wheels (not shown) into cold heading apparatus 105 .
  • cold heading apparatus 105 may include straightening apparatus 107 which may include a plurality of rollers adapted to straighten wire 101 as it enters cold heading apparatus 105 .
  • Wire 101 may be fed to forming dies 109 .
  • Forming dies 109 reshape a portion of wire 101 progressively into the final form of one or more wedge blanks 113 .
  • a portion of wire 101 is separated 111 from the rest of wire 101 , separating the one or more formed wedge blanks 113 .
  • FIGS. 3A-D depict the cold heading operation as a 3-step operation, but one having ordinary skill in the art with the benefit of this disclosure will understand that any number of operations may be undertaken to cold head wedge blanks 113 .
  • the following discussion is merely exemplary of a cold heading operation consistent with at least one embodiment of the present disclosure.
  • wire 101 is fed through forming die 109 a.
  • Wire portion 115 is formed between forming die 109 a and 109 b to initially reshape wire portion 115 .
  • a portion of wire 101 is separated from wire 101 at this stage by, for example, shear cutter 117 to be formed into wedge blank 113 .
  • forming dies 109 c, 109 d further refine the shape of wire portion 115 .
  • two wedge blanks 113 are formed simultaneously from wire portion 115 .
  • any number of wedge blanks 113 may be formed from wire portion 115 . As depicted in FIG.
  • forming dies 109 e, 109 f further refine the shape of wedge blanks 113 into the final cold headed form shown in FIG. 3D .
  • forming dies 109 a - f may operate by stamping, swaging, punching, forging, extruding, upsetting, or a combination thereof.
  • wedge blanks 113 may emerge from the cold heading process in a final form requiring no additional treatment.
  • wedge blanks 113 may be further processed as shown in FIG. 2 as further treatment 119 .
  • wedge blanks 113 may be tumbled or otherwise polished to improve their surface finish.
  • wedge blanks 113 may be given a surface treatment or may be heat treated, hardened, or tempered.
  • wedge blanks 113 may be further machined to, for example and without limitation, add grooves.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Reinforcement Elements For Buildings (AREA)
  • Forging (AREA)

Abstract

A wedge for use in post tensioning concrete is formed by cold heading. The cold heading operation may include providing a wire, feeding the end of the wire into a cold heading apparatus, cold heading the end of the wire to form at least one wedge blank, and finishing the wedge blank to form the wedge.

Description

    CROSS-REFERENCE TO RELATED APPLICATIONS
  • This application is a nonprovisional application which claims priority from U.S. provisional application No. 62/200,994, filed Aug. 4, 2015, which is hereby incorporated by reference in its entirety.
  • TECHNICAL FIELD/FIELD OF THE DISCLOSURE
  • The present disclosure relates generally to post-tensioned, pre-stressed concrete construction. The present disclosure relates specifically to wedges for anchors for use therein.
  • BACKGROUND OF THE DISCLOSURE
  • Many structures are built using concrete, including, for instance, buildings, parking structures, apartments, condominiums, hotels, mixed-use buildings, casinos, hospitals, medical buildings, government buildings, research/academic institutions, industrial buildings, malls, bridges, pavement, tanks, reservoirs, silos, foundations, sports courts, and other structures.
  • Pre-stressed concrete is structural concrete in which internal stresses are introduced to reduce potential tensile stresses in the concrete resulting from applied loads. This can be accomplished by two methods—post-tensioned pre-stressing and pre-tensioned pre-stressing. When post-tensioning concrete, the pre-stressing assembly is tensioned after the concrete has attained a specified strength. The pre-stressing assembly, commonly known as a tendon, may include for example and without limitation, anchorages, one or more strands, and sheathes or ducts. The strand is tensioned between anchors which are embedded in the concrete once the concrete has hardened. The strand may be formed from a metal or composite or any suitable material exhibiting tensile strength which can be elongated including, for example and without limitation, reinforcing steel, single wire cable, or multi-wire cable. The strand is typically fixedly coupled to a fixed anchorage positioned at one end of the tendon, the so-called “fixed end”, and is adapted to be stressed at the other anchor, the “stressing end” of the tendon. The strand is generally held to each anchor by one or more wedges. Typically, anchors include a tapered recess which, when the strand is placed under tension, cause the wedges to further engage the strand. Wedges are typically made of metal.
  • SUMMARY
  • The present disclosure provides for a method for forming a wedge for post tensioning concrete. The method may include providing a wire; feeding a portion of the wire into a cold heading apparatus; cold heading a portion of the wire to form at least one wedge blank; and finishing the wedge blank to form the wedge.
  • The present disclosure further provides for a method including providing a wire and feeding a portion of the wire into a cold heading apparatus. The method also includes cold heading a portion of the wire to form at least one wedge blank and finishing the wedge blank to form the wedge. The method includes providing an anchor for post tensioning concrete, threading a strand through the anchor, and positioning the wedge on the strand.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • The present disclosure is best understood from the following detailed description when read with the accompanying figures. It is emphasized that, in accordance with the standard practice in the industry, various features are not drawn to scale. In fact, the dimensions of the various features may be arbitrarily increased or reduced for clarity of discussion.
  • FIG. 1 depicts a cross section of an anchor having a wedge consistent with at least one embodiment of the present disclosure.
  • FIG. 2 depicts a block diagram of a cold heading procedure for forming wedges consistent with at least one embodiment of the present disclosure.
  • FIGS. 3A-D depict an overview of a cold heading process for forming wedges consistent with at least one embodiment of the present disclosure.
  • DETAILED DESCRIPTION
  • It is to be understood that the following disclosure provides many different embodiments, or examples, for implementing different features of various embodiments. Specific examples of components and arrangements are described below to simplify the present disclosure. These are, of course, merely examples and are not intended to be limiting. In addition, the present disclosure may repeat reference numerals and/or letters in the various examples. This repetition is for the purpose of simplicity and clarity and does not in itself dictate a relationship between the various embodiments and/or configurations discussed.
  • FIG. 1 depicts anchor 10 for use in post tensioning concrete. Anchor 10 is adapted to receive and couple to strand 12 of tendon 14. During installation, strand 12 may be threaded through anchor 10. Strand 12 may be, for example and without limitation, mono-wire cable or multi-wire cable. For the purposes of this disclosure, the axis parallel with the length of strand 12 will be referred to as the longitudinal axis of strand 12. Anchor 10 may include anchor body 16 adapted to retain the position of anchor 10 when positioned in formed concrete.
  • Anchor 10 may couple to strand 12 by the use of one or more wedges 100. Wedges 100 may be substantially wedge shaped and adapted to fit into a tapered recess 18 formed in anchor body 16. During use, wedges 100 may be installed to the strand in a direction perpendicular to the longitudinal axis of the strand. Tension on strand 12 may cause wedges 100 to move into tapered recess 18, applying a gripping force on strand 12.
  • In some embodiments, wedges 100 may be formed by cold heading. FIG. 2 depicts a block diagram of a cold heading process. Wire 101 is provided on spool 103. Wire 101 is fed by one or more drive wheels (not shown) into cold heading apparatus 105. In some embodiments, cold heading apparatus 105 may include straightening apparatus 107 which may include a plurality of rollers adapted to straighten wire 101 as it enters cold heading apparatus 105. Wire 101 may be fed to forming dies 109. Forming dies 109 reshape a portion of wire 101 progressively into the final form of one or more wedge blanks 113. At some point in the cold heading operation, a portion of wire 101 is separated 111 from the rest of wire 101, separating the one or more formed wedge blanks 113.
  • As depicted in FIGS. 3A-D, forming dies 109 a-f may be utilized to progressively reshape a portion of wire 101 by cold heading. FIGS. 3A-D depict the cold heading operation as a 3-step operation, but one having ordinary skill in the art with the benefit of this disclosure will understand that any number of operations may be undertaken to cold head wedge blanks 113. The following discussion is merely exemplary of a cold heading operation consistent with at least one embodiment of the present disclosure.
  • As depicted in FIG. 3A, wire 101 is fed through forming die 109 a. Wire portion 115 is formed between forming die 109 a and 109 b to initially reshape wire portion 115. In this embodiment, a portion of wire 101 is separated from wire 101 at this stage by, for example, shear cutter 117 to be formed into wedge blank 113. As depicted in FIG. 3B, forming dies 109 c, 109 d further refine the shape of wire portion 115. In this embodiment, two wedge blanks 113 are formed simultaneously from wire portion 115. One having ordinary skill in the art with the benefit of this disclosure will understand that any number of wedge blanks 113 may be formed from wire portion 115. As depicted in FIG. 3C, forming dies 109 e, 109 f further refine the shape of wedge blanks 113 into the final cold headed form shown in FIG. 3D. As understood by one having ordinary skill in the art with the benefit of this disclosure, forming dies 109 a-f may operate by stamping, swaging, punching, forging, extruding, upsetting, or a combination thereof.
  • In some embodiments, wedge blanks 113 may emerge from the cold heading process in a final form requiring no additional treatment. In some embodiments, wedge blanks 113 may be further processed as shown in FIG. 2 as further treatment 119. For example, in some embodiments, wedge blanks 113 may be tumbled or otherwise polished to improve their surface finish. In some embodiments, wedge blanks 113 may be given a surface treatment or may be heat treated, hardened, or tempered. In some embodiments, wedge blanks 113 may be further machined to, for example and without limitation, add grooves.
  • The foregoing outlines features of several embodiments so that a person of ordinary skill in the art may better understand the aspects of the present disclosure. Such features may be replaced by any one of numerous equivalent alternatives, only some of which are disclosed herein. One of ordinary skill in the art should appreciate that they may readily use the present disclosure as a basis for designing or modifying other processes and structures for carrying out the same purposes and/or achieving the same advantages of the embodiments introduced herein. One of ordinary skill in the art should also realize that such equivalent constructions do not depart from the spirit and scope of the present disclosure and that they may make various changes, substitutions, and alterations herein without departing from the spirit and scope of the present disclosure.

Claims (18)

1. A method for forming a wedge for post tensioning concrete comprising:
providing a wire;
feeding a portion of the wire into a cold heading apparatus;
cold heading a portion of the wire to form at least one wedge blank; and
finishing the wedge blank to form the wedge.
2. The method of claim 1, wherein cold heading a portion of the wire to form at least one wedge blank comprises:
feeding the portion of the wire between a first and second forming die;
reshaping the portion of the wire by the first and second forming die; and
separating the portion of the wire from the wire to form the at least one wedge blank.
3. The method of claim 2, wherein reshaping the portion of the wire by the first and second forming die comprises one or more of stamping, swaging, punching, forging, extruding, or upsetting the portion of the wire.
4. The method of claim 2, further comprising further reshaping the portion of the wire by a third and fourth forming die.
5. The method of claim 1, wherein finishing the wedge blank to form the wedge comprises one or more of tumbling, polishing, heat treating, hardening, tempering, grooving, or surface treating the wedge blank.
6. The method of claim 1, wherein the process of feeding the wire to the cold heading apparatus is performed by one or more drive wheels.
7. The method of claim 6, wherein the cold heading apparatus further includes a straightening apparatus, the straightening apparatus including a plurality of rollers.
8. The method of claim 1, wherein two wedge blanks are formed simultaneously.
9. The method of claim 1 further comprising machining the wedge blanks to form grooves.
10. A method comprising:
providing a wire;
feeding a portion of the wire into a cold heading apparatus;
cold heading a portion of the wire to form at least one wedge blank;
finishing the wedge blank to form the wedge;
providing an anchor for post tensioning concrete;
threading a strand through the anchor; and
positioning the wedge on the strand.
11. The method of claim 10, wherein positioning the wedge is on the strand is in a direction perpendicular to the longitudinal axis of the strand.
12. The method of claim 10, wherein cold heading a portion of the wire to form at least one wedge blank comprises:
feeding the portion of the wire between a first and second forming die;
reshaping the portion of the wire by the first and second forming die;
separating the portion of the wire from the wire to form the at least one wedge blank.
13. The method of claim 12, wherein reshaping the portion of the wire by the first and second forming die comprises one or more of stamping, swaging, punching, forging, extruding, or upsetting the portion of the wire.
14. The method of claim 12, further comprising further reshaping the portion of the wire by a third and fourth forming die.
15. The method of claim 10, wherein finishing the wedge blank to form the wedge comprises one or more of tumbling, polishing, heat treating, hardening, tempering, grooving, or surface treating the wedge blank.
16. The method of claim 10 further comprising moving the wedge into a tapered recess.
17. The method of claim 16 further comprising applying a gripping force using the wedges on the strand.
18. The method of claim 10, wherein the wedges have grooves.
US14/944,793 2015-08-04 2015-11-18 Cold heading formed wedge for use in post tensioning concrete Abandoned US20170036262A1 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
US14/944,793 US20170036262A1 (en) 2015-08-04 2015-11-18 Cold heading formed wedge for use in post tensioning concrete
EP16180573.4A EP3127630B1 (en) 2015-08-04 2016-07-21 Cold heading formed wedge for use in post tensioning concrete
ES16180573T ES2790660T3 (en) 2015-08-04 2016-07-21 Cold capping wedge for use in post-tensioned concrete

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US201562200994P 2015-08-04 2015-08-04
US14/944,793 US20170036262A1 (en) 2015-08-04 2015-11-18 Cold heading formed wedge for use in post tensioning concrete

Publications (1)

Publication Number Publication Date
US20170036262A1 true US20170036262A1 (en) 2017-02-09

Family

ID=57943390

Family Applications (1)

Application Number Title Priority Date Filing Date
US14/944,793 Abandoned US20170036262A1 (en) 2015-08-04 2015-11-18 Cold heading formed wedge for use in post tensioning concrete

Country Status (3)

Country Link
US (1) US20170036262A1 (en)
ES (1) ES2790660T3 (en)
WO (1) WO2017023350A1 (en)

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1931234A (en) * 1930-12-03 1933-10-17 Tomlinson I Moseley Wedge and method of making the same
US4590724A (en) * 1983-04-28 1986-05-27 Shinko Kosen Kogyo Kabushiki Kaisha Anchorage for steel wire strand for prestressed concrete
FR2781854B1 (en) * 1998-07-28 2000-10-13 Freyssinet Int Stup MONOBLOCK PIECE FOR THE PRODUCTION OF A CABLE ANCHORING Jaw, AND METHOD FOR MANUFACTURING SUCH A JIT
US6513287B1 (en) * 2000-09-05 2003-02-04 Felix L. Sorkin Apparatus for forming a dead-end anchorage of a post-tension system
US7726082B2 (en) * 2004-12-04 2010-06-01 Hayes Specialty Machining Ltd. Anchor wedge configuration for tendon anchors
US9126258B2 (en) * 2013-02-28 2015-09-08 Robert Rottinghaus Unitary connector pin formed by two-stage cold heading die

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
English translation of EP2151289 published on 2/10/2010 *

Also Published As

Publication number Publication date
WO2017023350A1 (en) 2017-02-09
ES2790660T3 (en) 2020-10-28

Similar Documents

Publication Publication Date Title
US9909315B2 (en) Wedge for post tensioning tendon
US7765752B2 (en) Anchor system with substantially longitudinally equal wedge compression
US7726082B2 (en) Anchor wedge configuration for tendon anchors
US2728978A (en) Method for pretensioning and anchoring reinforcements of concrete
EP3127630B1 (en) Cold heading formed wedge for use in post tensioning concrete
US20170036262A1 (en) Cold heading formed wedge for use in post tensioning concrete
CN103732333A (en) Post-forming method and apparatus
CN206418410U (en) A kind of compressor wire anchor system
US20170016231A1 (en) Compact anchor for post-tensioned concrete segment
JP6675753B2 (en) Processing method of magnesium or magnesium alloy
CN108885159B (en) Method for improving grain size uniformity in rolled alloy billets by Shear Enhanced Rolling (SER)
EP3118386B1 (en) Wedge for post tensioning tendon
KR101529170B1 (en) Method for loading Pre-flex load and pre-loading prestress
DE102016103668B3 (en) Soft and hard-cut motor vehicle component and method for its production
AU2013204419A2 (en) Indented tendons, processes of forming and uses thereof
JP2005264484A (en) Superhigh bending tenacious pc columnar member
NL2029732B1 (en) Prefabricated Prestressed Slab Externally Bonded to Ni-Ti-Nb Memory Alloy Fiber Wire and Construction Method Thereof
CN114737784B (en) Tensioning and reinforcing member for reinforcing ECC (error correction code) pretightening force by high-strength stainless steel stranded wire net and construction method thereof
KR920010159B1 (en) Production of wire rod for high-strength spiral hoop and high-strength spiral hoop
WO2016118064A1 (en) Dynamic rock bolt and method of manufacturing a tension bar in a dynamic rock bolt
RU2286223C1 (en) Plant for production of reinforcing bar steel
Brindis et al. Influence of the main technological variables of cyclical mechanic-thermal processing on the strain hardening of steel parts
DE919893C (en) Process for the production of prestressed or steel-string concrete
WO2021174252A9 (en) Apparatus, systems, and methods for post-tensioning anchorage
WO2010128973A1 (en) Anchor system with substantially longitudinally equal wedge compression

Legal Events

Date Code Title Description
STCV Information on status: appeal procedure

Free format text: ON APPEAL -- AWAITING DECISION BY THE BOARD OF APPEALS

AS Assignment

Owner name: DIAMOND STATE VENTURES III LP, ARKANSAS

Free format text: SECURITY INTEREST;ASSIGNOR:SORKIN, FELIX;REEL/FRAME:049517/0409

Effective date: 20181231

Owner name: INDEPENDENT BANKERS CAPITAL FUND III, L.P., TEXAS

Free format text: SECURITY INTEREST;ASSIGNOR:SORKIN, FELIX;REEL/FRAME:049517/0409

Effective date: 20181231

STCV Information on status: appeal procedure

Free format text: BOARD OF APPEALS DECISION RENDERED

AS Assignment

Owner name: GTI HOLDINGS, LLC, TEXAS

Free format text: RELEASE BY SECURED PARTY;ASSIGNORS:INDEPENDENT BANKERS CAPITAL FUND III, L.P.;DIAMOND STATE VENTURES III LP;REEL/FRAME:050274/0190

Effective date: 20190830

Owner name: PRECISION-HAYES INTERNATIONAL, INC., TEXAS

Free format text: RELEASE BY SECURED PARTY;ASSIGNORS:INDEPENDENT BANKERS CAPITAL FUND III, L.P.;DIAMOND STATE VENTURES III LP;REEL/FRAME:050274/0190

Effective date: 20190830

Owner name: GENERAL TECHNOLOGIES, INC., TEXAS

Free format text: RELEASE BY SECURED PARTY;ASSIGNORS:INDEPENDENT BANKERS CAPITAL FUND III, L.P.;DIAMOND STATE VENTURES III LP;REEL/FRAME:050274/0190

Effective date: 20190830

Owner name: SORKIN, FELIX, TEXAS

Free format text: RELEASE BY SECURED PARTY;ASSIGNORS:INDEPENDENT BANKERS CAPITAL FUND III, L.P.;DIAMOND STATE VENTURES III LP;REEL/FRAME:050274/0190

Effective date: 20190830

STCB Information on status: application discontinuation

Free format text: ABANDONED -- AFTER EXAMINER'S ANSWER OR BOARD OF APPEALS DECISION