US20160348457A1 - Oil Well Improvement System - Seabed Structural Assembly - Google Patents

Oil Well Improvement System - Seabed Structural Assembly Download PDF

Info

Publication number
US20160348457A1
US20160348457A1 US14/720,903 US201514720903A US2016348457A1 US 20160348457 A1 US20160348457 A1 US 20160348457A1 US 201514720903 A US201514720903 A US 201514720903A US 2016348457 A1 US2016348457 A1 US 2016348457A1
Authority
US
United States
Prior art keywords
well
equipment
pipe
seabed
assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US14/720,903
Inventor
Joe Spacek
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of US20160348457A1 publication Critical patent/US20160348457A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01SRADIO DIRECTION-FINDING; RADIO NAVIGATION; DETERMINING DISTANCE OR VELOCITY BY USE OF RADIO WAVES; LOCATING OR PRESENCE-DETECTING BY USE OF THE REFLECTION OR RERADIATION OF RADIO WAVES; ANALOGOUS ARRANGEMENTS USING OTHER WAVES
    • G01S7/00Details of systems according to groups G01S13/00, G01S15/00, G01S17/00
    • G01S7/02Details of systems according to groups G01S13/00, G01S15/00, G01S17/00 of systems according to group G01S13/00
    • G01S7/41Details of systems according to groups G01S13/00, G01S15/00, G01S17/00 of systems according to group G01S13/00 using analysis of echo signal for target characterisation; Target signature; Target cross-section
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B29/00Cutting or destroying pipes, packers, plugs, or wire lines, located in boreholes or wells, e.g. cutting of damaged pipes, of windows; Deforming of pipes in boreholes or wells; Reconditioning of well casings while in the ground
    • E21B29/002Cutting, e.g. milling, a pipe with a cutter rotating along the circumference of the pipe
    • E21B29/007Cutting, e.g. milling, a pipe with a cutter rotating along the circumference of the pipe with a radially-retracting cutter rotating outside the pipe
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/02Surface sealing or packing
    • E21B33/03Well heads; Setting-up thereof
    • E21B33/035Well heads; Setting-up thereof specially adapted for underwater installations
    • E21B33/0355Control systems, e.g. hydraulic, pneumatic, electric, acoustic, for submerged well heads
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/02Surface sealing or packing
    • E21B33/03Well heads; Setting-up thereof
    • E21B33/035Well heads; Setting-up thereof specially adapted for underwater installations
    • E21B33/037Protective housings therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/02Surface sealing or packing
    • E21B33/03Well heads; Setting-up thereof
    • E21B33/06Blow-out preventers, i.e. apparatus closing around a drill pipe, e.g. annular blow-out preventers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42BEXPLOSIVE CHARGES, e.g. FOR BLASTING, FIREWORKS, AMMUNITION
    • F42B15/00Self-propelled projectiles or missiles, e.g. rockets; Guided missiles
    • F42B15/01Arrangements thereon for guidance or control
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01SRADIO DIRECTION-FINDING; RADIO NAVIGATION; DETERMINING DISTANCE OR VELOCITY BY USE OF RADIO WAVES; LOCATING OR PRESENCE-DETECTING BY USE OF THE REFLECTION OR RERADIATION OF RADIO WAVES; ANALOGOUS ARRANGEMENTS USING OTHER WAVES
    • G01S13/00Systems using the reflection or reradiation of radio waves, e.g. radar systems; Analogous systems using reflection or reradiation of waves whose nature or wavelength is irrelevant or unspecified
    • G01S13/02Systems using reflection of radio waves, e.g. primary radar systems; Analogous systems
    • G01S13/04Systems determining presence of a target
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01SRADIO DIRECTION-FINDING; RADIO NAVIGATION; DETERMINING DISTANCE OR VELOCITY BY USE OF RADIO WAVES; LOCATING OR PRESENCE-DETECTING BY USE OF THE REFLECTION OR RERADIATION OF RADIO WAVES; ANALOGOUS ARRANGEMENTS USING OTHER WAVES
    • G01S13/00Systems using the reflection or reradiation of radio waves, e.g. radar systems; Analogous systems using reflection or reradiation of waves whose nature or wavelength is irrelevant or unspecified
    • G01S13/02Systems using reflection of radio waves, e.g. primary radar systems; Analogous systems
    • G01S13/06Systems determining position data of a target
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01SRADIO DIRECTION-FINDING; RADIO NAVIGATION; DETERMINING DISTANCE OR VELOCITY BY USE OF RADIO WAVES; LOCATING OR PRESENCE-DETECTING BY USE OF THE REFLECTION OR RERADIATION OF RADIO WAVES; ANALOGOUS ARRANGEMENTS USING OTHER WAVES
    • G01S15/00Systems using the reflection or reradiation of acoustic waves, e.g. sonar systems
    • G01S15/02Systems using the reflection or reradiation of acoustic waves, e.g. sonar systems using reflection of acoustic waves
    • G01S15/04Systems determining presence of a target
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01SRADIO DIRECTION-FINDING; RADIO NAVIGATION; DETERMINING DISTANCE OR VELOCITY BY USE OF RADIO WAVES; LOCATING OR PRESENCE-DETECTING BY USE OF THE REFLECTION OR RERADIATION OF RADIO WAVES; ANALOGOUS ARRANGEMENTS USING OTHER WAVES
    • G01S15/00Systems using the reflection or reradiation of acoustic waves, e.g. sonar systems
    • G01S15/02Systems using the reflection or reradiation of acoustic waves, e.g. sonar systems using reflection of acoustic waves
    • G01S15/06Systems determining the position data of a target
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01SRADIO DIRECTION-FINDING; RADIO NAVIGATION; DETERMINING DISTANCE OR VELOCITY BY USE OF RADIO WAVES; LOCATING OR PRESENCE-DETECTING BY USE OF THE REFLECTION OR RERADIATION OF RADIO WAVES; ANALOGOUS ARRANGEMENTS USING OTHER WAVES
    • G01S7/00Details of systems according to groups G01S13/00, G01S15/00, G01S17/00
    • G01S7/02Details of systems according to groups G01S13/00, G01S15/00, G01S17/00 of systems according to group G01S13/00
    • G01S7/38Jamming means, e.g. producing false echoes
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01SRADIO DIRECTION-FINDING; RADIO NAVIGATION; DETERMINING DISTANCE OR VELOCITY BY USE OF RADIO WAVES; LOCATING OR PRESENCE-DETECTING BY USE OF THE REFLECTION OR RERADIATION OF RADIO WAVES; ANALOGOUS ARRANGEMENTS USING OTHER WAVES
    • G01S7/00Details of systems according to groups G01S13/00, G01S15/00, G01S17/00
    • G01S7/52Details of systems according to groups G01S13/00, G01S15/00, G01S17/00 of systems according to group G01S15/00
    • G01S7/539Details of systems according to groups G01S13/00, G01S15/00, G01S17/00 of systems according to group G01S15/00 using analysis of echo signal for target characterisation; Target signature; Target cross-section
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01QANTENNAS, i.e. RADIO AERIALS
    • H01Q15/00Devices for reflection, refraction, diffraction or polarisation of waves radiated from an antenna, e.g. quasi-optical devices
    • H01Q15/14Reflecting surfaces; Equivalent structures
    • H01Q15/145Reflecting surfaces; Equivalent structures comprising a plurality of reflecting particles, e.g. radar chaff

Definitions

  • the Advanced MFWS differs by replacement the Production Valve Assembly with a unique manifold Domed Assembly (DA) structurally enclosing—reinforcing the well's sea-floor equipment.
  • the DA consists of a Dome Cylindrical Sidewall ( 21 ), a Dome Top ( 22 ), and the Dome Interior Plate ( 23 ).
  • the DA's lower section further includes Leveling Devices ( 24 ), Floor/Footing ( 25 ), & Vent Pipes ( 26 ).
  • the Dome Top ( 22 ) includes parallel well outputs for the Normal Capture Valve & Pipe ( 11 ) & the Pressure Relief/Diversion Valve & Pipe ( 10 ) (functionally identical to 11 & 10 on FIG. 1 ).
  • the Housing ( 41 ) includes a physical area ( 42 ) below the Access Valve ( 43 ) that incorporates the EPC.
  • the mechanical aspects of the EPC are shown on FIG. 3B .
  • the BOP Access Area ( 44 ) is shown as dashed lines.
  • AVA ( 7 ) & P-WIA ( 8 ) the Dome Interior Plate ( 23 ), PMA ( 31 ), OPA ( 32 ), Cable/Tube Access Hole & associated sealer ( 29 ) and AVA, P-WIA & DA control & monitor cables/tubes ( 45 ) are shown.
  • FIG. 6 is diagrammatic perspective & cross-sectional views of a matching/mating pair of the Coupling/De-Coupling Pipes.
  • RM&CU Remote Monitor and Control Unit
  • the RM&CU will provide the surface platform to sea-floor and in-well equipment man-machine monitor & control interface.
  • the RM&CU will include processing capability to provide operator recommendations and warnings, as well as an automatic mode to control the sea-floor and in-well equipment for critical/emergency situations.
  • specific operational displays, modes, functions or controls are not specified in detail at this time, it is assumed the RM&CU equipment (such as monitors, computers and interface devices) matching/exceeding the system requirements are commercially/off-the-shelf available.
  • the Re-Case End Pipe (R-CEP) is a pipe section smaller in diameter than the installed well pipe/casing in need of repair when the drill pipe is not in the well.
  • the top to upper third of the vertical beams are structurally attached to the seabed's equipment.
  • Major existing military type platform equipment that provides short range AAW, ASUW and ASW capability including such items as:
  • the Acoustic Corner Reflector is a simplistic passive decoy type device. It is basically composed of two flat acoustical reflective crossing plains (crossing in the center) at 90 degrees that reflects an acoustical signal back in the same angle it was received.
  • the ACR further includes a remote controlled element that rotates (from the center) one of the plains to form a dual flat surface.
  • the ACR is deployed with weighs on the sea-floor and/or tethered at different depths.
  • the processor also provides interface for the Display Monitor and Control Unit.
  • the processor further provides for sensor position and aspect calibration, operator training via simulation and historical operational recording.

Abstract

The parent patent—The Oil Well Improvement System—incorporates and integrates several different unique assemblies and subsystems that provides a cost effective disaster preventive system for offshore oil wells while concurrently providing the means to reduce the cost of the drilling processes.
The system modifies the sea-floor, in-well and platform equipment and processes.
This divisional patent—The Seabed Structural Assembly acts in concert with the Oil Well Improvement System to provide necessary mechanical/structural strength to the seabed well drilling equipment required for/during adverse natural/unnatural conditions.

Description

    CROSS-REFERENCE TO RELATED APPLICATIONS
  • The present utility patent application claims the benefit of provisional application No. 61/459,895 filed Dec. 20, 2010.
  • STATEMENT REGARDING FEDERALLY SPONSORED RESEARCH OR DEVELOPMENT
  • Not Applicable.
  • THE NAMES OF THE PARTIES TO A JOINT RESEARCH OR DEVELOPMENT
  • Not Applicable.
  • BACKGROUND OF THE INVENTION
  • 1. Field of the Invention
  • The present invention relates to disaster prevention system for offshore oil wells and in particular to a supplemental disaster preventive system to provide means to insure human, equipment and environmental safety and associated cost avoidance during the offshore well drilling process under all conceived/feasible accidents/failures conditions. The overall system design concept, related procedures/processes and many associated system components to provide major cost reduction benefits for the entire life cycle (drilling, completion, production and abandonment) for both accident/failure and normal/uneventful operations.
  • 2. Description of Related Art Including Information Disclosed Under 37 CFR 1.97 and 1.98
  • Shortly after the 2010 offshore oil well catastrophe in the Gulf of Mexico, it became obvious that British Petroleum (BP), the entire oil industry, and/or the US Government were unprepared to effectively stop the gushing oil or the means to clean it up.
  • Throughout the first two plus months of the disaster numerous re-sealing, capturing, clogging, killing and capping techniques were unsuccessfully attempted and several high risk/cost ‘normal’ well drilling processes were brought to light.
  • The successful 20 July re-seal, capture and cap ‘Rube Goldberg’/‘Kluge’ (said with admiration) was a simplistic but effective temporary solution for the catastrophic symptoms of the problem—where the primary operative phrase is ‘temporary solution for the catastrophic symptoms’.
  • The enormous somewhat/sometimes unquantifiable costs of the (or of a future) incident includes:
      • Human life
      • Environment
  • Drilling platform Well (the equipment and the associated labor and its potential production) Equipment and labor associated with the numerous re-seal, capture, and cap ‘quick fixes’ Equipment and labor associated with the relief/kill wells Gulf clean-up Tourist and fishing industry Local community Public opinion relating to the oil industry and the government Nation and international financial markets
  • The prior art ‘blowout prevender’ (BOP) is intended to close off the well in case of an uncontrolled/emergency condition (blowout). It's a multi mega-buck, multi-ton device installed on the seafloor having various means/methods, with the design intent of closing a well. The most technically difficult is if/when a pipe and/or pipes (drill, casing, etc.) are within the well. The BOP must ‘ram’ through the pipe(s) and close off the well. That seems difficult, but add the extreme water pressure and low temperatures, the more extreme oil pressure and high temperatures and the prior art BOP is likely not going to work. After the Macondo's well was finally closed, the BOP was pulled up and evaluated—it was functional but did not do the job.
  • As offshore oil drilling/production continues in the future it seems only rational that the government as well as oil industry itself would demand, as a prime priority the development of improved equipment/systems and processes.
  • Whatever the cause(s) (human neglect/error, equipment failure, etc.) of the 2010 oil well disaster and whatever means are developed to insure no such similar failure and/or related impacts reoccurs, there are potentially more likely and more damaging events—specifically natural disasters and (accidental or deliberate) human intervention that must also be addressed.
  • The focus of the ‘quick fix’ was to stop/control the symptoms of the immediate catastrophe—the gushing oil.
  • What is needed is an overall systems design and implementation approach that provides the means to reduce/eliminate the causes and impacts of any conceived/realistic threats to oil wells in the future and further provides more reliable, practical and cost effective means to accomplish the oil well drilling task.
  • BRIEF SUMMARY OF THE INVENTION
  • The primary design objective of the present invention was to provide an offshore oil well improvement system using an overall systems design and implementation approach that provides the means to reduce/eliminate the causes and impacts of any conceived/realistic threats to oil wells in the future and further provide more reliable, practical and cost effective means to accomplish oil well drilling.
  • As the present invention design evolved it became apparent that many related procedures/processes and many associated system components provide major cost reduction benefits for the oil well's entire life cycle (drilling, completion, production and abandonment) in either problem or normal operations.
  • The present invention is composed of two functional and physically integrated subsystems, the Multi-Function Well Subsystem (MFWS) and the Intrusion Detection and Response Subsystem (ID&RS).
  • The MFWS is presented in two basic configurations, the ‘Fundamental’ & the ‘Advanced’. Both configurations modify the sea-floor and in-well equipment to provide maintenance access and unique tools to provide the means to: cap the well, seal/re-seal the well, drill/re-drill the well, kill the well from the top, improve BOP reliability, add BOP functional redundancy, improve the cementing process, incorporate a sea-floor pressure relief/diversion function and improves the well's life cycle safety.
  • The Advanced MFWS includes a unique dome top cylindrical sidewall structure enclosing the well's sea-floor equipment providing improved structural strength as well as passive protection from natural/human induced disasters.
  • The ID&RS provides the means to detect, track and classify the 3D aspects of air/surface/sub-surface objects about a specific oil well or group of oil wells and provides the means to evaluate and eliminate threats.
  • As all elements are based on existing simplistic proven technology, the development cost risk is minimum.
  • As the system design includes a major focus on the physical implementation and operation, the implementation and operational cost risk is minimum
  • Considering the pure human and environmental safety, the pure dollar and cents (or multi-million/billion dollar) cost avoidance and/or the potential cost savings/reductions (for any or all such reasons) it is a significant understatement to suggest that features of the present invention should be integrated with other planned improvements, and incorporated on all oil wells.
  • BRIEF DESCRIPTION OF THE SEVERAL VIEWS OF THE DRAWINGS
  • These and other details of the present invention will be described in connection with the accompanying drawings, which are furnished only by way of illustration and not in limitation of the invention.
  • The drawings are intended to provide an introductory overview of major system/system elements that along with other unique system supporting devices are comprehensively defined in the ‘Detailed Description Of The Invention’.
  • FIG. 1 is a diagrammatic cross-sectional view of the Fundamental Multi-Function Well Subsystem (MFWS) showing a typical oil well's sea-floor equipment of a Stud (3), Marine Riser (4), BOP (5), Production Valve Assembly (6) and Well Pipe/Casing (2) sitting on the Sea-Floor (1). Connected to this ‘typical’ equipment is a ‘Normal’ Capture Valve & Associated pipe (11) going to a surface capture platform and a well drill & return pipe (9) ‘typically connected to (6) going to a surface drilling platform.
  • The drawing further depicts the addition of two additional items, an Adjunctive BOP/Valve Assembly (AVA) (7) and a Platform to Well Interface Assembly (P-WIA) (8) in series with the ‘typical’ well's interface of (6) & (9). These two units are further shown on FIGS. 3A & 3B and FIG. 4. These units provide functional redundancy of the BOP (using alternative, simplistic technology) to seal/close the well. Unit (8) provides the means to seal the drill pipe's exterior wall return flow path while unit (7) closes the entire well's flow path when there no obstruction (drill pipes, casings etc.) within the valve area of unit (7). Note the drawing does not depict the drill pipe, drill bit or various casings that may be going into the well from the drill platform during the drilling stage. When in use these would be feed through items (9, 8, 7, 6, 5, 4, 3 & 2). It is further noted that the full ‘functional redundancy of the BOP’ is not yet complete in that the BOP can (by intent but with poor reliability) ram through an obstruction and close the well. The full ‘functional redundancy’ is provided by one of two alternate means. The first is the Enclosed Pipe Cutter within (7) and the second is the remote Pipe Coupling/De-Coupling device as shown on FIG. 6. In either case the cut or de-coupled pipe must be extracted from the valve area of unit (7). Such would be accomplished via the drill platform or a Remote Operated Vehicle (ROV) lifting the pipe/casing or the addition of an internal pipe lifting device (not shown). FIG. 1 further shows a Pressure Relief/Diversion Valve & Pipe/Tube (10) on a parallel well output port of unit 6. This provides an input to the Pressure Relief/Diversion Assemble as shown on FIG. 5. This provides the means to safely protect a problem well & platform, the means to safely capture the well output and the means to safely reduce/eliminate the disastrous effects on the environment.
  • FIG. 2 is a diagrammatic cross-sectional view of the Advanced Multi-Function Well Subsystem (MFWS) in a similar fashion to FIG. 1. FIG. 1 begins showing a ‘typical’ oil well's sea-floor equipment of a Stud (3), Marine Riser (4), BOP (5) & Sea-Floor (1) (as identified on FIGS. 1 as 1, 2, 3, 4, & 5).
  • The Advanced MFWS differs by replacement the Production Valve Assembly with a unique manifold Domed Assembly (DA) structurally enclosing—reinforcing the well's sea-floor equipment. The DA consists of a Dome Cylindrical Sidewall (21), a Dome Top (22), and the Dome Interior Plate (23). The DA's lower section further includes Leveling Devices (24), Floor/Footing (25), & Vent Pipes (26). The Dome Top (22) includes parallel well outputs for the Normal Capture Valve & Pipe (11) & the Pressure Relief/Diversion Valve & Pipe (10) (functionally identical to 11 & 10 on FIG. 1). The DA upper section further includes a large ROV Access Port (27) that can be converted to the smaller port size of a normal BOP feed thru access by installing the Access Port Adaptor (APA) (28). Two sets of AVA's (8) & P-WIA's (7) are provided in series with the Normal Well Drill & Return Pipe (9). One set is connected to the BPO (5) via the BOP Output Adaptor (OPA) (32) and a Pipe Mounting Adaptor (PMA) (31). The other set is connected to the APA (28). The Dome Interior Plate (23) includes a Cable/Tube Access Hole and an associated Cable/Hole Sealer (29) (further shown on FIG. 3A). The interior area between the Dome Top (22) & Dome Interior Plate (23) and further enclosed by 28, 29, 31, 32, 10 & 11 is the Reservoir Area (30) sealed form the exterior sea water and is capable of holding well pressure.
  • FIG. 3A is a diagrammatic cross-sectional view of the Adjunctive BOP/Access Valve Assembly (AVA)-Housing with an Enclosed Pipe Cutter (EPC).
  • The Housing (41) includes a physical area (42) below the Access Valve (43) that incorporates the EPC. The mechanical aspects of the EPC are shown on FIG. 3B. As a general reference the BOP Access Area (44) is shown as dashed lines. As a specific reference to the Advanced MFWS relating to the lower (ref. FIG. 2) AVA (7) & P-WIA (8), the Dome Interior Plate (23), PMA (31), OPA (32), Cable/Tube Access Hole & associated sealer (29) and AVA, P-WIA & DA control & monitor cables/tubes (45) are shown. In the case of the Fundamental MFWS the AVA (7) is directly connected to the Production Valve Assembly (6) and the upper set of AVA (7) & P-WIA (8) of the Advanced MFWS directly connects to the APA (28) (ref. FIG. 2).
  • FIG. 3B is diagrammatic cross-sectional top view, at the EPC elevation depicting the mechanical aspects of the Adjunctive BOP/Access Valve Assembly (AVA) with EPC.
  • Item 51 is a flat circular/donut shaped turn-table connected to the AVA housing via ball bearings. Item 52 (in dashed lines) reference the BOP's access area depicting the required centered opening of item 51. Item 53 is the turn-table motor assembly consisting of a motor, gearing, encoder & associated housing. The motor housing is attached to the AVA housing. The motor shaft, gearing & encoder interface with the turn-table. An item 54 (in dashed lines) represents the AVA housing under the turn-table. Item 55's are six Lateral Drive Devices.
  • Items 56 are three circular saw blades each including a motor & tachometer. Items 57 are three wedges. Items 58 & 59 are details of items 55. Item 58 is the fixed member of item 55. It is affixed to the turn-table and includes a lateral drive motor, an encoder, slides & gearing. Item 59 is the lateral sliding member of item 55 and includes slides & gearing. The dashed lines at item 59 indicate this member at its extended position.
  • FIG. 4 is a diagrammatic cross-sectional view of the Platform to Well Interface Assembly (P-WIA).
  • Item 61 depicts the housing. Item 62 depicts the return flow opening/path. Item 63 is the remotely controlled by-pass valve allowing (return) flow around a sealed pipe outer wall to return. Items 64 are remotely controlled expandable ‘o’ ring gaskets capable of closing the area between the interior pipes outer sidewall and the AVA's housing (the return path). The dashed lines at items 64 show the said gasket expanded. Item 65 is a sample pipe within the P-WIA. Item 66 is a reference to the Normal Well Return Pipe going to the drill platform. This reference is applicable to the Fundamental MFWS & the upper P-WIA of the Advanced MFWS. The lower P-WIA of the Advanced MFWS is opened to the Reservoir. Item 67 (in dashed lines) is a reference to the BOP's access feed-thru area.
  • FIG. 5 is a diagrammatic cross-sectional view of the Pressure Relief/Diversion Assembly.
  • Item 71 is the Containment/Separator Tank. Although not shown it is assumed internal elements would provide enhanced oil-water-mud-gas separation beyond that obtained by a simplistic internally opened tank. Item 72 is the Ballast required to stabilize the tank to the Sea-Floor (1) as the tank takes on different elements (initially filled with sea water and latter replaced with mud, oil & gas). Items 10 &11 are references to the Pressure Relief/Diversion Valve and the pipe/tubing coming from the well as seen on FIGS. 1 & 2. This pipe/tube extends horizontal from the well's sea-floor equipment to a safe area where any possible release of oil/gas from the well will not impact the safety of the surface equipment or personnel. Item 73 is a composite of numerous controls and internal tank monitoring/sensors interfacing with the surface equipment. Items 77 are pipes/tubes to further divert and/or capture the tank's separated holdings. It is assumed the different separated outputs would go to different places (such as oil to a surface containment area or capture vehicle while the gas may be diverted to a further safer area father away from the oil containment/capture area). Items 74, 75 & 76 are remotely controlled valves. Item 74 is the Sea Water/Mud Valve and would initially be opened in conjunction with the Pressure Relief/Diversion Valve to allow the tank to extract its initial sea water and accept the wells output. As sensors indicate the tank no longer contains sea water/mud the valve would be closed. Item 75 is the Gas Valve. If gas is sensed within the tank this valve would be opened. Item 76 is the Oil Release Valve. As oil is sensed within the tank this valve would be opened.
  • FIG. 6 is diagrammatic perspective & cross-sectional views of a matching/mating pair of the Coupling/De-Coupling Pipes.
  • Items 81 are the upper end & lower end of the upper & lower coupling pipes. These ends have standard pipe to pipe coupling means. Item 82 (in dashed lines) indicates the inside wall. Item 84 is the smaller diameter upper pipe coupling surface that fits within the lower coupling pipe as indicated by the dashed lines of Item (90). Item 89 depicts a tapered the bottom portion of item 84 allowing it to initially align/fit into the lower section. Item 83 is the upper pipe's mounting flange & gasket that mates to the lower pipes mounting flange item 91. Item 92 is a unique threaded element in the interior sidewall of the lower pipe. The ‘unique’ threads have a stepping characteristic as shown on Detail ‘B’ item 93. The widths of the individual steps are slightly larger than the width of the remote controlled Spring Loaded Grabbing Device (SLGD), item 85. Items 85 are installed on the upper coupling pipe via Pivots (87) and normally extend out from the sidewall via its internal spring. When compressed the SLGD fits into the pipe's sidewall per item 88. Detail ‘A’, item 94 indicates a sloped mating (mating the slope of item 93) of the SLGP. As the upper & lower sections are joined the SLGDs compress into the sidewall and springs in & out of the different levels of the stepped threaded element. When the mounting flanges bottom-out the upper pipe is turned clockwise (where it ratchet into, further tightens and locks into the threaded—stepped element. The pipes de-couple via energizing the SLGD remote control mechanism, item 86 where the SLGD is pulled into its sidewall unlatching/freeing the two pipe sections.
  • DETAILED DESCRIPTION OF THE INVENTION
  • The system of the present invention comprises two functional and physically integrated subsystems, the Multi-Function Well Subsystem (MFWS) and the Intrusion Detection and Response Subsystem (ID&RS).
  • Both MFWS configurations (Fundamental and Advanced) utilize ‘other’ (not shown on Figures) unique support devices including:
  • Production Hard Cap (PHC)
  • Remote Monitor and Control Unit (RM&CU)
  • Re-Case End Pipe (R-CEP)
  • Re-Case Pipe (R-CP)
  • Bottom Kill End Pipe (BKEP)
  • Kill Pipe (KP)
  • Modified Conversion Float Valve (MCFV)
  • Modified Casing (MC)
  • Modified Reamer Shoe/Drill Shaft (MRS/DS)
  • Modified Drill Bit (MDB)
  • The Production Hard Cap (PHC) is a simplistic device. It is round as viewed from the top and has a mounting surface compatible with both the Production Valves and the Production Ports. The PHC is utilized to provide means to cap each individual unused Production Port and/or Valve.
  • The Remote Monitor and Control Unit (RM&CU) is a platform mounted specialized device associated with the Multi-Function Well Subsystem (MFWS).
  • The RM&CU will provide the surface platform to sea-floor and in-well equipment man-machine monitor & control interface. The RM&CU will include processing capability to provide operator recommendations and warnings, as well as an automatic mode to control the sea-floor and in-well equipment for critical/emergency situations. Although specific operational displays, modes, functions or controls are not specified in detail at this time, it is assumed the RM&CU equipment (such as monitors, computers and interface devices) matching/exceeding the system requirements are commercially/off-the-shelf available. The Re-Case End Pipe (R-CEP) is a pipe section smaller in diameter than the installed well pipe/casing in need of repair when the drill pipe is not in the well. It will have a remotely controlled initially closed bottom end valve, a remotely controlled expandable ‘o-ring’/gasket around its outer circumference near the closed end. It will further have a remotely controlled sidewall gate valve located slightly above the said gasket. Prior to installing the R-CEP the number of sections of Re-Casing Pipe (R-CP) required to repair the well must be determined. At a point above where the existing well pipe is in need of repair but below the BOP, a pair of remotely controlled Coupling/De-Coupling Pipes shall be joined, followed by additional sections of R-CP from above the bottom of the BPO to the surface platform. The R-CEP and R-CP would be lowered through the ‘normal outer/return drill pipe’ to the desired location. The R-CEP gasket would be energized sealing/closing/choking the pipe to pipe area. The sidewall remotely controlled gate valve will be opened and mud followed by concrete would be pumped directly into the re-casing pipe. The mud/concrete flows through the opened gate valve and into the pipe/casing in need of repair to seal the pipe to pipe/casing area. The concrete will flow through said area until cement is detected in the pipe to pipe area above the last (highest) section of well pipe that needed repair. The concrete pumping will stop, the sidewall gate valve will be closed and the concrete will be removed from the interior of the Re-Case Pipe. The bottom remotely controlled closed end valve will then be opened. The concrete is let to set between the pipe to pipe areas. The Re-Case Pipe (below the BOP and above the well pipe that require repair) will be uncoupled via the Coupling/De-Coupling Pipe (or will be cut and extracted).
  • The Re-Case Pipe (R-CP) is similar to the lowest section of the installed faulty well pipe/casing except:
  • Smaller in diameter.
  • Selected sections (the uppermost as a minimum) shall incorporate remotely monitored exterior pressure, oil, water, mud and concrete sensors.
  • The Bottom Kill End Pipe (BKEP) is similar to the R-CEP except:
  • The ‘initially’ closed bottom end will also have a permanently closed section above it.
  • The volume between the initially and permanently closed portions will contain pre-loaded ‘junk’, along with a remotely controlled means to open the bottom and release the ‘junk’.
  • The ‘junk’ will be of various size material, flexible, buoyant (in oil) and capable of withstanding well pressures and temperatures.
  • Will not include the remotely controlled circular hydraulic controlled gasket around its outer circumference near the closed end, but instead will include a large expandable remotely controlled end plug (similar to an expandable pipe plug). The ‘large’ plug will be capable of expanding to the diameter of the well bore. The large plug will be set below the well casing and the plug would be expanded. The initially closed bottom end will be opened releasing the junk further sealing/clogging/choking the well. Mud followed by concrete would be pumped through KP in a similar manner as the Re-Case Pipe except the concrete will also flow into the well bore and the concrete will not be evacuated from the pipes interior. The upper sections of pipe will be removed in a similar manner as the Re-Case Pipe.
  • The Kill Pipe (KP) is similar to the R-CP except the ‘selected sections’(the uppermost as a minimum) shall incorporate remotely monitored interior (as well as exterior) pressure, oil, water, mud and cement sensors.
  • The Modified Conversion Float Valve (MCFV) changes the release method/mechanism from the present dropped ball, semi obstructing the flow through a pipe holding the valve opened causing a delta pressure. When/if the delta pressure and flow meet a pre-selected criterion, the said pipe releases and converts the device to a one-way valve.
  • The modification converts the valve to an electrical remote controlled device—activating a solenoid. The opening valve will further be spring loaded and its opening will be sensed and reported and remotely monitored as flow-rate.
  • The Modified Casing (MC) incorporates remote controlled sidewall gate valves near the top of the casing. Although the MC is primarily intended for the lower most casing, it could be desirable for other casing sections as well. The said valves would be initially being held closed. Upon command the valves will allow one-way flow, from the pipe into the well-bore. This will allow cementing from the top of the casing to the bottom, reducing the required pressure and further provides a more positive void/bore fill.
  • The Modified Reamer Shoe/Drill Shaft (MRS/DS) modifications combine the functional elements of the R-CEP and the BKEP with the following alterations:
  • The ‘large’ ‘plug’ element of the BKEP is incorporated on the lower part of the shaft/collar slightly above the shoe or drill bit to seal/clog/choke the well bore to drill shaft/collar.
  • Incorporates a remotely controlled gate valve device internal to the pipe, just above the drill bit to restrict flow through the drill bit.
  • The remotely controlled ‘o-ring’ pipe to pipe sealing gasket around the pipes circumference incorporated on the R-CEP shall be re-located to above the controlled gate valve. The intent of the MRS/DS is:
  • Similar to the BKEP by providing the means to kill the well below the last pipe in the well bore, but with the reamer/drill shaft in the well.
  • Similar to the R-CEP by providing reliable means to re-case (specifically the pipe to pipe cementing process), but with the drill shaft/collar and/or the Reamer Shoe in the well
  • To provide improved reliable means to cement the last pipe to the well bore.
  • The ‘Fundamental’ MFWS provides maintenance access, redundancy, sea-floor pressure relief/diversion means and utilizing common unique and in-use apparatus and tools, used in conjunction with a newly devised oil well access to provide the means to:
  • Cap the well
  • Seal/re-seal the well
  • Drill/re-drill the well
  • Kill the well (at the bottom from the top)
  • Improve BOP(s) reliability
  • Improve means to end casing
  • Delta—the ‘Advanced’ MFWS includes all the features of the above and further includes a seabed structural improvement assembly installed around and attached to the well's seafloor equipment providing improved structural strength and protection from natural/human induced disaster.
  • The said assembly is proposed in two basic configurations. The first being an open framed vertically beamed assembly and the second an open cylindrical/conical (non-containment) assembly.
  • The first configuration, the open framed vertical beamed assembly configuration incorporates three or more beams that act as legs. The bottom of the legs are secured to the seabed, equally spaced and at a distance greater than the width of the seabed's equipment. The top of the legs are secured together with horizontal beams at a distance equal or less bottom the bottom of the legs, but not less than the distance that would obstruct operational accidents to the top of the seabed's equipment.
  • The top to upper third of the vertical beams are structurally attached to the seabed's equipment.
  • An option to this configuration includes enclosing vertical beam structure with sidewall cylindrical panels. The panels would include doors, vents and/or quick—connect removable means to ensure full operational access to the seabed equipment and where these ‘enclosing’ panels do not contain pressurized liquids/gases.
  • A further option to this configuration includes incorporating a pitched roof/domed top, but where the said top does not interfere with the well drilling operation access.
  • The second configuration, cylindrical/conical assembly configuration (also referred to as the dome assembly) is basically prefabricated version of the first configuration.
  • Either the Fundamental or Advanced MFWS configurations could be modified to include an additional Adjunctive BOP/Access Valve Assembly (AVA) installed below the BOP providing further redundancy.
  • MFWS Detail Design Notes/Information
  • The following describes the seabed structural improvement assembly in terms of the second dome option. Most of the described factors/characteristics are applicable to the open framed vertical being assembly configuration.
  • The dome's size is determined by the wells characteristics. The primary factor is the height of the wells above sea-floor equipment (Marine Riser and BOP and newly installed adaptors/assemblies—OPA, PMA, and AVA and P-WIA) followed by the margin of safety associated with the:
  • The lateral stability of the DA (diameter to height ratio).
  • The sidewall strength beyond that required to support the top members—where the ‘beyond’ is the strength to compensate for falling objects/underwater blasts
  • The height and width of the required maintenance area (ROV workspace) The overall ‘Dome Assembly’ size shall be as small as possible but its sidewall height shall be greater than the existing wells sea-floor equipment (Marine Riser and BOP)—(generic/ball-park height >60′). The sidewall diameter will provide lateral stability of the Dome Assembly and have a surface area compatible with all required dome top ports. (>two third the height, generic/ball-park diameter >40′) The initial (pre-cementing) weight of the Dome Assembly shall be slightly greater than the weight to sink it to the sea-floor, But if prior to its installation, the well head is opened and under pressure and can not be controlled/stopped, then weight must be added to overcome the well pressure. The added weight shall be determined assuming all top ports/valves opened (the said ports/valves would be opened during the normal installation/setting process). The top domed member (dome top and interior plate forming the reservoir) shall be made of material and joined in a manner to withstand greater than two times the wells' anticipated pressure. The cylindrical sidewall of the dome is fabricated with material and supporting braces capable of supporting the top (domed) structure and act as a concrete form to structurally connect the dome top section to a concrete floor pad. The center interior will include installation positioning/guide braces about the locations of Marine Riser, BOP and BOP Output Pipe Adaptor. The sidewall may be made of two or more vertical separable sections enabling sea-floor equipment changes for the completion-production phases (if/as desired). The exterior of the sidewalls will include a minimum of three horizontally extending ‘L’ brackets. The brackets will support remotely controlled leveling jacks capable of lifting/leveling the pre cemented Dome Assembly. The dome top to sidewall mechanical interface shall include lifting hooks/eye-bolts and shall be capable of supporting the DA's initial (pre-cemented) weight. After the DA is set (positioned and leveled) on the sea-floor, pressure relief vent pipes (approximately 3-4 feet long) will be vertically set in the sea-floor having the vent pipes be semi-evenly spaced in the floor and encompassing an area approximately five percent of the total sea-floor area, and a concrete floor (approximately 3 feet deep) will be poured (structurally connecting the Well Stud to the sidewall). The cylindrical sidewall will include an opening the size compatible with passing through a ‘typical’ off-shore oil well's ROV. The opening will be enclosed by a door. The door will include pressure relief/venting means allowing higher internal pressure to be released, while sealing the interior from higher external pressure. The center of the dome top will house a large access port. ‘Large’ is defined as the area capable of passing through a device the size of an ROV. The port will be initially used to access the interior of the dome during installation and latter for repair/replacement on assemblies within the dome. The exterior of this port area will include guide-pins and bolt studs to mechanically secure an Access Port Adaptor (APA). The APA reduces the port size and is used to connect various assemblies/adaptors for well pipe drilling, sealing repair and abandonment processes (killing), Off-center of the access port will include several production sized ports. The exterior of these ports will include the means to secure a Pressure Relief/Diversion Valve, Production Valves or Production Hard Caps. These mounting elements (pins and bolt studs) shall be identical (size, spacing and pattern) on all Production Ports. These ports/valves will be initially opened (as well as the Access Port) during the Dome Assembly (DA) installation (lowering and positioning). The ports/valves are initially used for pressure relief/venting and latter used for production—or will be capped. The Dome Assembly will include numerous standard (non-unique) remotely monitored/controlled equipment such as:
  • Levels.
  • Internal and external closed circuit T.V. (s) and associated lights.
  • Pressure sensors.
  • Oil, water and gas detectors
  • All assemblies/adaptors/tools shall include the following where applicable: Be made of material capable of withstanding greater than twice the well's pressure Supporting means compatible with lifting, lowering and positioning the unit from the surface platform and ROV(s) Top and bottom mounting surfaces' compatible (size and shape) with the units they physically interface with Top and bottom mounting hardware (bolt studs, guide-pins) and compatible (size and pattern) holes and captivated securing components with the units they physically interface with:
  • Mounted gaskets compatible with the size and shape of the unit and the unit it physically interface with
  • The means to remotely remove and replace all internal functional elements by a ROV(s)
  • Remotely controllable devices shall be designed using electrical, fiber-optics, mechanical, hydraulic and/or pneumatic means with connections compatible with a ROV(s) capability to install/remove.
  • There are many different ‘working’ pipe sizes and the expandable seals of the P-WIA will likely not be capable of handling, therefore different sized P-WIAs' or inserts must be provided.
  • Varying levels of pressure could be applied to the P-WIA's seals allowing for a fully opened, to fully a hard sealed, as well as intermediate levels allowing for rotating and vertical pipe movement as well as sequencing the said pressure from the upper & lower seals as the pipe joints pass thru the unit.
  • The functionally/performance of numerous MFWS unique equipment/tools require or would be enhanced with the addition of an ‘in-well’ monitoring & control interface. Numerous interface structures could be employed to provide this function. Although the intent of this document is to provided a ‘system level’ design the following is provided as design information/specifications/requirements for this interface as follows:
  • Design.
  • Embedded Fiber-Optic (FO) cable within the drill pipe sidewall.
  • Compression pipe to pipe FO connections.
  • Directly connect sensors and controlled devices attached to the drill pipe to the said cable.
  • Sensors and controlled devices not directly attached to the drill pipe interface via non-physical contact means of coded Light/IR/RF and/or acoustic interface devices (such as a garage door opener or ‘Easy-Pass’ type device).
  • Sensor and controlled devices powered by batteries.
  • Controlled devices using hydraulics would use battery power to activate (in-well) pumps with initial pressure equalization means.
  • Notes/Requirements:
  • The FO bandwidth is orders of magnitude greater than required (but provides a convenient bi-directional capability)
  • The sensors will include addresses (digital/frequency codes) capable of any future conceivable need.
  • The following define the minimum required simultaneous functionally, which basically defines/limits the requirements of the controlling/monitoring unit.
  • 25 discretes—yes/no (such as sensed gas)
  • 15 levels indicators with ten to the 5.sup.th dynamic range (such as well pressure)
  • 15 controls (such as turn on/off)
  • 15 control status/feedback
  • The sequence of operations of the Pipe Cutter Mechanism will be initiated by an operator at the Remote Monitor and Control Unit (RM&CU). In the automatic operational mode, after being ‘initiated’, an embedded micro-processor and program in the RM&CU will control and perform the cutting process described below. In a manual mode the operator will perform the steps below:
  • 1. An operator at the RM&CU will initiate a pipe cut defining a given size pipe.
  • 2. The Circular Saws and Lateral Drive Devices drives, with minimum torque contacts the pipe to confirm the designated pipe size. If different informs the operator.
  • 3. If the pipe designated is confirmed the proper size, the saw motors are turned on and laterally driven into the pipe until either the thickness of the pipe-wall is penetrated or the saw motor speed decreases greater than 20%. If the latter occurs see * (below).
  • 4. When the pipe-wall is penetrated, the Turn-Table Motor turns on and continues to cut the pipe until either the Turn-Table turns to where the pipe is cut by each saw 110 degrees or the saw motor speed decreases greater than 20%. If the latter occurs see * (below).
  • 5. When three saws have cut the pipe 110 degrees, Circular Saws and Lateral Drive Devices retract the saw blades and: The Turn-Table is positioned at 120 degrees.
  • 6. The Wedges' Lateral Drive Devices is activated pressing the wedges into the pipe cut.
  • 7. The Circular Saws' Lateral Drive Devices is again activated to drive the saw blade towards the pipe until either the thickness of the pipe-wall is penetrated and the pipe is fully cut or the saw motor speed decreases greater than 20%. If the latter occurs see * (below).
  • 8. Once the pipe is fully cut it must be extracted. If another pipe needs to be cut, the first pipe must be pulled clear of the pipe cutting lateral drive mechanism. *If any of the saws speed decreases greater than 20% from its unloaded speed, the appropriate drives will be backed-off until the no-load speed is obtained. The drives will then proceed to the continuing cutting process.
  • The objective of the Intrusion Detection and Response Subsystem (ID&RS) is to protect the surface and underwater oil well elements from deliberate human intervention. It is assumed a 3D restrictive zone will be established about an individual or group of oil wells.
  • The ID&RS provides the means to detect, track and classify the 3D aspects (bearing, range, and depth) of air/surface/sub-surface objects about a specific oil well or group of oil wells. It also provides the means to evaluate potential threats and ‘Hard and/or Soft Kill’ threats.
  • The ID&RS elements are identified in four categories as follows:
  • 1. Major existing military type platform equipment that provides short range AAW, ASUW and ASW capability including such items as:
  • Radars (search and fire control).
  • IFF
  • ESM
  • Sonar
  • Active and Passive Decoys (Acoustic, RF and IR).
  • Hard Kill Weapons (guns, missiles, torpedoes and depth charges). 2. Major existing military/commercial type equipment such as: LAMPS Helicopter
  • ROV s 3. Unique equipment such as:
  • Array(s) of sea surface tethered remotely controlled RF and IR generators/decoys.
  • Array(s) of below sea tethered remotely monitored Passive Acoustic Sensors (PAS) and a platform mounted PAS.
  • Remotely controlled acoustic generators/decoys and remotely controlled acoustic corner reflectors.
  • Interface, Processing and Display Monitor and Control.
  • 4. Trained Operator(s).
  • Many of the terms such as ‘short range’ and ‘weapons’ are quite subjective and since the primary threat is considered to be quite rudimentary the following are identified as design guidance:
  • A Radar (search, fire control and integrated IFF) capability such as the MK92 CAS.
  • Weapons such as the Standard Missile, Harpoon and Mk46 Torpedoes would work but have a significant over kill for the anticipated threat.
  • Hard Kill weapons could include such items as a MK15 CIWS, a 3″ gun, SUBROC and Helicopter launched depth charges and shoulder type fire and forget anti-air and anti-surface missiles.
  • ID&RS Detail Design Notes/Information
  • The acoustic sensors and arrays are conceptually based on USN ASUW and ASW detection and processing techniques. The subsurface piggy-back depth angle sensor and the related arrays depth determination is unique but based on the triangular processing of the bearing and range. It is anticipated the sensed ‘depth angle’ will be compromised by sea-floor and surface reflections/bounce, but it is assumed that integrating over time and averaging the three differently located sensors data will provide tangible results. The tracking, classification, threat analysis and threat response recommendations are also based on USN processing.
  • The RF, IR and acoustic generators and corner reflector(s), and their associated array, are conceptually based on USAF and USN air tactical counter-measures (stand-off jammers and gate stealers) and USN submarine counter-measures (decoys).
  • The Light Airborne Multi-Purpose System (LAMPS) operations are based on the USN LAMPS MK111 ASW and ASUW techniques.
  • The following describe a single well installation utilizing a USN or USCG Ship for the ‘Major existing military type platform equipment that provides short range AAW, ASUW and ASW capability’.
  • It is assumed alternative interfaces, operations and array configurations could be derived for well platform based equipment and/or multiple well implementations.
  • The Radar and associated IFF and Electromagnet (passive detection) Sensor (EMS) are the ‘eyes’ for above the surface, while the passive acoustic sensors are the ‘eyes’ for below the surface.
  • The acoustic sensor array provides subsurface and surface detection data and the means required to triangulate the sensors detections to determine Bearing, Range and Depth.
  • The outputs of the acoustic sensors* and control signals for all generators (RF, IR and acoustical) interface with (via cable) an Array Distribution Unit (ADU). The ADU (data/controls) interfaces (via cable) with to the Data and Signal Formatter (D&SF). D&/SF on a (oil well) platform digitizes and serializes the signals. The digitized and serialized signal is sent to the platforms RF Data Link and then the ship's RF Data Link. The data is then sent to the Processor where is processed for display monitoring and display interface, detection support (bearing, range and depth determination for acoustic contacts) and tracking, classification, threat analysis and related recommendations, as well as historical storage for air, surface and subsurface contacts.
  • The processed data and information is then sent to the Display Monitor and Control Unit. A trained Operator views/reviews the data and information and determines and initiates appropriate actions.
  • The processing will include an operator selectable auto threat-quick reaction ‘soft-kill’/decoy mode, allowing the program to automatically control the RF, IR, acoustical generators and corner reflectors.
  • The controls are sent to the appropriate selected unit(s) (specific sensor and/or generator) via the Processor, RF Data Link, Data Formatter, Array Distribution Unit and then to the appropriate unit. LAMPS Helicopter interfaces via its own data link.
  • If ROV actions are required, a stand alone interface, monitor and control system identical to the existing ROV's will be used.
  • If the Ship has a sonobuoy receiver system compatible with the number and type of sonobuoys in the array the sensors could directly (via RF) interface with the ship.
  • It is assumed the sensor (RADAR, IFF, and ESM etc.) and weapons on a USN or USCG Ship identified as short range AAW, ASUW and ASW capable would well serve this mission, particularly as supplemented.
  • The RF and IR Generators/Decoys are standard simplistic active noise or repeater source similar to numerous such devices used by the USN and USAF. The device shall be externally stimulated and controlled by the Processor to produce outputs capable of:
  • Being totally silent.
  • Producing broadband continuous wave frequencies over the entire spectrum of anticipated homing devices, at power levels greater than the anticipated homing device's transmitter.
  • Producing a controlled variable delayed pulsed repeater outputs compatible with the pulse-width and spectrum of an anticipated active pulsed homing device. The controlled variable delay shall have a minimum range from; <1 us to greater than 10 ms. The repeater will further have controlled power levels from a maximum equaling the anticipated power of a homing device's transmitter, to minimum power level of zero.
  • The Passive Acoustic Sensor (PAS) is derived from a modification of the standard AN/SSQ 53 Directional Frequency Analysis and Recording (DIFAR) Sonobuoy.
  • The low-tech modifications include:
  • Providing an external power source via cable (vs. internal battery power).
  • Removing the antenna output interface and utilize output via cable interface format.
  • Mounting two unit's piggy back on different axis (one producing bearing angle and the other depth angle).
  • Increase buoyancy to insure unit with attached cable (and attached Acoustic Generator has significant positive buoyancy.
  • The Acoustic Generator (AG) is a simplistic active acoustic noise source similar to numerous such devices used by the USN.
  • The device shall be externally stimulated and controlled by the Processor to produce outputs capable of:
  • Being totally silent.
  • Emulating the acoustic signature of an oil well's sea-floor and platform, with power levels equal to ten times the said well.
  • Producing broadband continuous wave acoustic frequencies over the entire spectrum of anticipated homing devices, at power levels greater than an anticipated homing device's transmitter.
  • Producing a controlled variable delayed pulsed repeater output compatible with the pulse-width and spectrum of an anticipated active pulsed homing device. The controlled variable delay shall have a minimum range from; less than 10 us to greater than 10 ms. The repeater will further have controlled power levels from a maximum equaling the anticipated power of a homing device's transmitter, to a minimum power level of zero.
  • The Acoustic Corner Reflector (ACR) is a simplistic passive decoy type device. It is basically composed of two flat acoustical reflective crossing plains (crossing in the center) at 90 degrees that reflects an acoustical signal back in the same angle it was received. The ACR further includes a remote controlled element that rotates (from the center) one of the plains to form a dual flat surface. The ACR is deployed with weighs on the sea-floor and/or tethered at different depths.
  • The PAS and AG units will be connected (via cable or be physically joined) and typically deployed in functional sets of three or four typically @ equal distance from each other and equal distance about a specific well (or in other functional sets about a group of wells).
  • Each of the PAS, AG and/or ACR units will be tethered from the sea-floor to pre-determined depths. The RF & IR generators will be tethered to the sea surface.
  • The said tethered cables could include various combinations of sensors/decoys. The sea-floor will hold the tethered cable with weights capable of insuring it does not change its position (depth, lat. and long.). The cable length from the tethered weight to the sea-floor to platform shall be the planned distance plus about one and a half times the sea depth (for future recovery/maintenance). A single (non-joined) AG will be mounted on the underside of the surface platform providing the means to calculate (via the processor) the exact position and aspect of the joined PAS and AG devices.
  • The ROV(s) is identical to such devices used by the oil industry for deep off-shore drilling but this unit's interface cables will be lengthened so it can travel greater than two miles from the platform. The ROV(s) provide the means to view, evaluate and move delayed fused under-sea explosives.
  • The Array Distribution Unit (ADU) function only acts as a convenient physical wire/cable distribution center.
  • The Data and Signal Formatter (D&SF) is an active electronic data and signal formatting device located on the platform.
  • The ‘formatting includes:
  • Analogue to Digital conversion
  • Digital to Analogue conversion
  • Multiplexing and De-multiplexing into and from a single serial digital data interface cable. The D&SF will have the minimum through-put capacity (bandwidth) to simultaneously handle:
  • From Sensors:
  • Acoustic outputs of eight type AN/SSQ-53 Sonobuoys.
  • Plus 50% (control, feedback, status, etc.).
  • To Sensors and Generators:
  • Approximately 25% of the ‘from sensors’ bandwidth
  • It is assumed devices matching/exceeding these requirements are available ‘off-the shelf’ (from Industry/US Government). The RF Data Link is a common device used by industry and the government. The device converts serial (cable media) electronic data/signals to RF for transmission to another location via an antenna and likewise receives RF and converts it to serial electronic data/signals.
  • The capacity (bandwidth) must be compatible with the required data/signals of the system, as identified for the D&SF.
  • It is assumed devices matching/exceeding these requirements are available ‘off’-the shelf (from Industry/US Government).
  • *The above assumes a separate in-place ship to helicopter (LAMPS) data link.
  • The Processor includes a computer and specialized computer programs. The Processor provides critical functions related to the surface/sub-subsurface objects:
  • Detection
  • Position
  • Tracking
  • Classification
  • Threat Analysis
  • Related recommendations
  • The processor also provides interface for the Display Monitor and Control Unit. The processor further provides for sensor position and aspect calibration, operator training via simulation and historical operational recording.
  • It is assumed the computers are in-place on the ship, or a computer matching/exceeding the required process capacity and speed are available ‘off-the shelf’ commercially.
  • The ‘specialized computer programs would have to be developed, but the USN utilizes similar functional software for their AAW, ASUW and ASW mission. If such were made available the development (time, cost and risk) would be reduced by an order of magnitude.
  • The Display Monitor and Control Unit (DM&CU) provides for the operator to system interface.
  • The Light Airborne Multi-Purpose System (LAMPS) is identical to that used by the USN for surface and sub-surface detection, localization and engagements.
  • Although specific operational displays, modes, functions or controls are not specified in detail at this time, it is assumed the DM&CU is in-place on the ship or a unit matching/exceeding the requirements is commercially available—large touch-screen monitor would well serve the all requirements.
  • It is understood that the preceding description is given merely by way of illustration and not in limitation of the invention and that various modifications may be made thereto without departing from the spirit of the invention as claimed.

Claims (6)

1) A structural cylindrical/conical sidewall assembly addition to offshore oil well's sea-floor equipment installed around offshore oil wells sea-floor equipment to improve the structural integrity of the well to prevent problems associated with natural and/or human induced threats to the mechanical stability of the seabed equipment incorporating; an opened top cylindrical/conical sidewall structure installed around the well's sea-floor equipment wherein the bottom sidewalls are structurally connected to the seabed, the upper ends are is structurally connected to the seabed drilling equipment at or above the upper third of the said equipment, the sidewalls provide operational access to the seabed equipment and wherein the sidewalls are opened to the seawater pressure and do not contain pressurized gas/oil from the well.
2) The structural cylindrical/conical sidewall assembly of claim 1) wherein the assembly further comprises a domed top section wherein the center of the said section incorporates an opening compatible with operational drilling access.
3) The structural cylindrical/conical sidewall assembly of claim 1) wherein the assembly further comprises a pitched roof top section wherein the center of the said section incorporates an opening compatible with operational drilling access.
4) An opened framed vertically beamed structural assembly addition to offshore oil well's sea-floor equipment installed around offshore oil wells sea-floor equipment to improve the structural integrity of the well to prevent problems associated with natural and/or human induced threats associated with the mechanical stability of the seabed equipment incorporating; a plurality of three equally spaced vertical beams around the sea-floor drilling equipment wherein the bottom of the vertical beams/legs of the assembly are equally spaced beyond the spud's footing and are secured to the seabed, the top of the vertical beams/legs of the assembly are structurally connected together and spaced at an equal distance or less than the legs bottoms, but not less than the access area required for drilling equipment's access, the vertical beams/legs of the assembly are structurally connected to the seabed drilling equipment at or above the upper third of the said equipment.
5) The opened framed vertically beamed structural assembly of claim 4) wherein the assembly further comprises concave sidewall panels attached to the vertical beams frame wherein the sidewall panels incorporate door(s) and/or quick disconnect means to access the seabed drilling equipment for maintenance and wherein the panels do not form a pressure sealing/encapsulating function around the seabed drilling equipment.
6) The opened framed vertically beamed structural assembly of claim 4) wherein the assembly further comprises a top panel(s) attached to the top of the vertical structure, wherein the panel(s) comprise a center opening compatible with operational drilling access wherein the center is elevated forming an opened pitched roof/dome structural element.
US14/720,903 2010-12-20 2015-05-25 Oil Well Improvement System - Seabed Structural Assembly Abandoned US20160348457A1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US201061459895P 2010-12-20 2010-12-20

Publications (1)

Publication Number Publication Date
US20160348457A1 true US20160348457A1 (en) 2016-12-01

Family

ID=46876349

Family Applications (4)

Application Number Title Priority Date Filing Date
US13/330,668 Expired - Fee Related US9085950B2 (en) 2010-12-20 2011-12-19 Oil well improvement system
US14/720,907 Abandoned US20160348458A1 (en) 2010-12-20 2015-05-25 Oil Well Improvement System - Pressure Relief, Diversion Capture & Recovery
US14/720,893 Active 2036-02-09 US9797994B2 (en) 2010-12-20 2015-05-25 Oil well improvement system—intrusion detection and respose subsystem
US14/720,903 Abandoned US20160348457A1 (en) 2010-12-20 2015-05-25 Oil Well Improvement System - Seabed Structural Assembly

Family Applications Before (3)

Application Number Title Priority Date Filing Date
US13/330,668 Expired - Fee Related US9085950B2 (en) 2010-12-20 2011-12-19 Oil well improvement system
US14/720,907 Abandoned US20160348458A1 (en) 2010-12-20 2015-05-25 Oil Well Improvement System - Pressure Relief, Diversion Capture & Recovery
US14/720,893 Active 2036-02-09 US9797994B2 (en) 2010-12-20 2015-05-25 Oil well improvement system—intrusion detection and respose subsystem

Country Status (1)

Country Link
US (4) US9085950B2 (en)

Families Citing this family (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9085950B2 (en) * 2010-12-20 2015-07-21 Joe Spacek Oil well improvement system
WO2012099841A2 (en) * 2011-01-18 2012-07-26 Noble Drilling Services Inc. Method for capping a well in the event of subsea blowout preventer failure
US8789607B2 (en) * 2011-03-21 2014-07-29 Henk H. Jelsma Method and apparatus for subsea wellhead encapsulation
US20150240605A1 (en) 2012-10-05 2015-08-27 Total Sa Containment system and a method for using said containment system
EP2948615A4 (en) * 2013-01-28 2017-01-18 Carrascal Ramirez, Liliana Method to control a blowout from an oil/gas well with a detachable capping device
US9798030B2 (en) * 2013-12-23 2017-10-24 General Electric Company Subsea equipment acoustic monitoring system
US20150363714A1 (en) * 2014-06-17 2015-12-17 Entic, Llc Business intelligence and analytics of energy consuming systems
US10662740B2 (en) 2016-04-14 2020-05-26 Downing Wellhead Equipment, Llc Valve apparatus
CA3075625A1 (en) 2017-09-12 2019-03-21 Downing Wellhead Equipment, Llc Installing multiple tubular strings through blowout preventer
CN107724989B (en) * 2017-10-11 2020-09-18 中国海洋石油集团有限公司 Air guide sleeve for preventing harm of shallow gas of ocean drilling
US10689938B2 (en) 2017-12-14 2020-06-23 Downing Wellhead Equipment, Llc Subterranean formation fracking and well workover
CN108459324B (en) * 2018-03-30 2019-07-23 马明勇 Water supply pipe blockage detector based on acoustics
CN108868740B (en) * 2018-04-28 2021-09-14 中国矿业大学 Cave pressure relief mining simulation test method for tectonic coal in-situ coal bed gas horizontal well
US11765131B2 (en) * 2019-10-07 2023-09-19 Schlumberger Technology Corporation Security system and method for pressure control equipment
CN110853475A (en) * 2019-11-25 2020-02-28 中国海洋石油集团有限公司 Deep sea drilling process pit shaft oil gas invasion simulation test device
CN113104711B (en) * 2021-03-18 2022-09-16 中铁五局集团第一工程有限责任公司 Braking type elevator for unfavorable geological construction
CN115324537A (en) * 2021-12-08 2022-11-11 盐城瑞德石化机械有限公司 Blowout-preventing oil exploitation equipment
CN117631076A (en) * 2024-01-23 2024-03-01 鼎实智能装备(青岛)有限公司 Coupling detection device and detection method thereof

Family Cites Families (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3664136A (en) * 1969-11-28 1972-05-23 Laval Claude C Collecting device for submarine oil leakage
US4283159A (en) * 1979-10-01 1981-08-11 Johnson Albert O Protective shroud for offshore oil wells
US4323118A (en) * 1980-02-04 1982-04-06 Bergmann Conrad E Apparatus for controlling and preventing oil blowouts
US5153366A (en) * 1988-12-23 1992-10-06 Hughes Aircraft Company Method for allocating and assigning defensive weapons against attacking weapons
US5050680A (en) * 1990-03-21 1991-09-24 Cooper Industries, Inc. Environmental protection for subsea wells
US6922145B2 (en) * 2002-05-29 2005-07-26 Gregory Hubert Piesinger Intrusion detection, tracking, and identification method and apparatus
US7245559B2 (en) * 2003-01-17 2007-07-17 Science Applications Incorporated Corporation Acoustic fence
US6813220B2 (en) * 2003-01-17 2004-11-02 Science Applications International Corporation Acoustic fence
US7921917B2 (en) * 2007-06-08 2011-04-12 Cameron International Corporation Multi-deployable subsea stack system
DK2081163T3 (en) * 2008-01-21 2012-02-13 Thales Nederland Bv Multiple Threats Security and Security System and Procedures for Specifying Them
GB0802936D0 (en) * 2008-02-18 2008-06-04 Curtis Thomas E Underwater Surveillance
DE102008046432A1 (en) * 2008-09-09 2010-03-11 Rheinmetall Waffe Munition Gmbh Apparatus and method for repelling objects approaching a ship under or on the water
US8195409B2 (en) * 2009-11-03 2012-06-05 The Trustees Of The Stevens Institute Of Technology Passive acoustic underwater intruder detection system
US20110315395A1 (en) * 2010-06-24 2011-12-29 Subsea IP Holdings LLC Method and apparatus for containing a defective blowout preventer (bop) stack using bopstopper assemblies having remotely controlled valves and heating elements
US20110315393A1 (en) * 2010-06-24 2011-12-29 Subsea IP Holdings LLC Method and apparatus for containing an undersea oil and/or gas spill caused by a defective blowout preventer (bop)
SG187116A1 (en) * 2010-07-21 2013-02-28 Marine Well Containment Company Marine well containment system and method
US8881829B2 (en) * 2010-10-07 2014-11-11 David B. Redden Backup wellhead blowout prevention system and method
US9085950B2 (en) * 2010-12-20 2015-07-21 Joe Spacek Oil well improvement system
US20120186822A1 (en) * 2011-01-20 2012-07-26 Research Foundation Of State University Of New York Modular pressure management oil spill containment system and method
RU2549153C1 (en) * 2011-05-23 2015-04-20 Ион Джиофизикал Корпорейшн Monitoring and protection against marine threat system
US8791791B2 (en) * 2012-06-13 2014-07-29 Benjamin Blumenthal Sea-based security arch for identifying shipping contraband
WO2014037569A2 (en) * 2012-09-07 2014-03-13 Total Sa A containment system and a method for using such containment system
US9651649B1 (en) * 2013-03-14 2017-05-16 The Trustees Of The Stevens Institute Of Technology Passive acoustic detection, tracking and classification system and method
US11574206B2 (en) * 2014-06-03 2023-02-07 The Security Oracle, Inc. Defense and denial method

Also Published As

Publication number Publication date
US20120241160A1 (en) 2012-09-27
US9797994B2 (en) 2017-10-24
US9085950B2 (en) 2015-07-21
US20160348458A1 (en) 2016-12-01
US20160349357A1 (en) 2016-12-01

Similar Documents

Publication Publication Date Title
US9085950B2 (en) Oil well improvement system
US20150337642A1 (en) Oil Well Improvement System - Well Monitor &amp; Control Subsystem
US9903179B2 (en) Enhanced hydrocarbon well blowout protection
EP2697477B1 (en) Capping stack and method for controlling a wellbore
CA2824883C (en) Method for capping a well in the event of subsea blowout preventer failure
CA2891750A1 (en) Dart detector for wellbore tubular cementation
US20110284237A1 (en) Drilling riser release method
US9347270B2 (en) Pre-positioned capping device and diverter
US10113382B2 (en) Enhanced hydrocarbon well blowout protection
US20220251920A1 (en) Station keeping and emergency disconnecting capability for a vessel connected to a subsea wellhead in shallow water
WO2002088516A1 (en) Subsea drilling riser disconnect system and method
AU2020261348A1 (en) Improved station keeping and emergency disconnecting capability for a vessel connected to a subsea wellhead in shallow water
Kozel Emergency operation of a subsea drilling blowout preventer

Legal Events

Date Code Title Description
STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION