US20160326837A1 - Dissolving Material Flow Control Device - Google Patents

Dissolving Material Flow Control Device Download PDF

Info

Publication number
US20160326837A1
US20160326837A1 US15/147,417 US201615147417A US2016326837A1 US 20160326837 A1 US20160326837 A1 US 20160326837A1 US 201615147417 A US201615147417 A US 201615147417A US 2016326837 A1 US2016326837 A1 US 2016326837A1
Authority
US
United States
Prior art keywords
control device
flow
flow control
sleeve
apertures
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US15/147,417
Inventor
Eddie Glenn Bowen
Anthony Thomas
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Superior Energy Services LLC
Original Assignee
Superior Energy Services LLC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Superior Energy Services LLC filed Critical Superior Energy Services LLC
Priority to US15/147,417 priority Critical patent/US20160326837A1/en
Assigned to SUPERIOR ENERGY SERVICES, LLC reassignment SUPERIOR ENERGY SERVICES, LLC ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: BOWEN, EDDIE GLENN, THOMAS, ANTHONY
Publication of US20160326837A1 publication Critical patent/US20160326837A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/06Valve arrangements for boreholes or wells in wells
    • E21B34/10Valve arrangements for boreholes or wells in wells operated by control fluid supplied from outside the borehole
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/06Valve arrangements for boreholes or wells in wells
    • E21B34/063Valve or closure with destructible element, e.g. frangible disc
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/12Packers; Plugs
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/06Valve arrangements for boreholes or wells in wells
    • E21B34/14Valve arrangements for boreholes or wells in wells operated by movement of tools, e.g. sleeve valves operated by pistons or wire line tools
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/02Subsoil filtering
    • E21B43/08Screens or liners
    • E21B2034/007
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B2200/00Special features related to earth drilling for obtaining oil, gas or water
    • E21B2200/06Sleeve valves

Definitions

  • valves In the oil and gas completions industry, a tubular string position within the wellbore will have various devices (often generically called “valves”) for controlling the flow of fluid between the interior and exterior of the tubular string.
  • One common form for such valves is a “sliding sleeve” valve, where an outer tubular member has a series of apertures and a concentric internal tubular sleeve is shifted to uncover the apertures (i.e., “open” the valve) or to cover the apertures (i.e., “close” the valve).
  • this sleeve is shifted between its open and closed position by a tool which is run into the wellbore (e.g., on coiled tubing) and which engages a profile on the internal surface of the sleeve.
  • FIG. 1 is a cross-section of a first embodiment of a flow control device of the present invention.
  • FIG. 2 is a cross-section of a second embodiment of a flow control device of the present invention.
  • FIG. 3A illustrates a first method of employing the flow control device described herein.
  • FIG. 3B illustrates a second method of employing the flow control device described herein.
  • the embodiment of the flow control device 1 seen in FIG. 1 is generally formed of a tubular housing 3 having a circumferential wall 5 and a central passage 4 .
  • each end of the housing will include a connector device 7 , e.g., threaded or some other coupling structure, to allow the flow control device (usually a series of flow control devices) to be integrated at the appropriate location(s) along the length of the tubular string being positioned in the wellbore.
  • the circumferential wall 5 will include a section 6 with at least one, and more commonly a plurality of, flow apertures 10 formed through the circumferential wall 5 .
  • the flow apertures 10 are a series of circular flow apertures 11 which are about 1 inch in diameter.
  • Section B-B seen in FIG. 1 is a cross-section through the apertures 11 .
  • the section 6 having the flow apertures 10 is a separable sub-component 9 connected the rest of housing 1 by threaded connection 13 .
  • FIG. 1 suggests how the apertures 11 will be filled with a “disappearing” or dissolving material 34 .
  • FIG. 1 illustrates only a few apertures 11 filled with dissolving material 34 , it will be understood that typically all, or substantially all, of the apertures 11 will be filled with dissolving material 34 .
  • a “dissolving” material can be any material which may initially act to plug apertures 11 under initially encountered wellbore conditions (e.g., pressure, temperature, pH, etc.), but will dissolve, degrade, or disintegrate under a second condition(s) (including extended time under initially existing wellbore conditions) to the point that fluid flow may be established through the apertures 11 .
  • the dissolving material should be capable of maintaining its integrity (i.e., blocking flow) at differential pressures of up to twelve thousand psi.
  • the dissolving material may be any number of materials including, but not limited to, dissolvable metals such as magnesium, aluminum (including alloys thereof), dissolvable polymeric materials, or other dissolvable polymers.
  • dissolvable metals such as magnesium, aluminum (including alloys thereof), dissolvable polymeric materials, or other dissolvable polymers.
  • Magnesium (Mg) either in elemental form or as an alloy, can serve as one preferred base material for dissolvable material 34 .
  • the dissolvable material 34 could be Mg alloys that combine other electrochemically active metals, including binary Mg—Zn, Mg—Al and Mg—Mn alloys, as well as tertiary Mg—Zn—Y and Mg—Al—X alloys, where X includes Zn, Mn, Si, Ca or Y, or a combination thereof.
  • Mg—Al—X alloys may include, by weight, up to about 85% Mg, up to about 15% Al and up to about 5% X.
  • These electrochemically active metals, including Mg, Al, Mn or Zn, or combinations thereof, may also include a rare earth element or combination of rare earth elements.
  • rare earth elements include Sc, Y, La, Ce, Pr, Nd, Fe, or Er, or a combination thereof. Where present, a rare earth element or combinations of rare earth elements may be present, by weight, in an amount of about 5% or less.
  • TervAlloyTM available from Terves, Inc.
  • Euclid, Ohio is a magnesium and aluminum nanocomposite disintegrating material designed to disintegrate (turn to powder) based on exposure to a controlled fluid (e.g., an electrolyte), or an electrical or thermal stimuli.
  • a controlled fluid e.g., an electrolyte
  • TervAlloyTM will disintegrate into very fine grained particles after a specified time in response to a controlled environmental stimulus.
  • a wide range of solvents may be employed as long as they are capable of reducing the dissolving material without excessive corrosion of downhole tubulars and equipment.
  • the solvent could be brines formed from NaCl, CaCl, NaBr, CaBr, caesium formates, sodium formates, etc.
  • the solvent could be any number of acids including various concentrations of hydrofluoric acid, hydrochloric acid, sulfuric acid, acetic acid, and other acids commonly used in the downhole environment.
  • the dissolvable material such as the above TervAlloyTM may be coated with a polymer that is unaffected by acids and brines found in the downhole environment where the material is to be used.
  • a solvent effective against the polymer e.g., hydrofluoric acid
  • the brine may be latent brine or additional brine which is circulated downhole.
  • Closing sleeve 20 Adjacent to the section 6 of apertures 10 is the closing sleeve 20 .
  • Closing sleeve 20 is a slidable sleeve having an outer diameter slightly smaller than the inner diameter of section 6 such that closing sleeve 20 travels into section 6 . Although a portion of the sleeve length is shown removed in the FIG. 1 illustration, the length of closing sleeve 20 will be sufficient to engage the sleeve seals 30 A and 30 B on each side of section 6 .
  • closing sleeve 20 will include a tool profile 26 allowing a conventional closing tool (e.g., a tool mounted on coil tubing or wireline) to engage the tool profile 26 and apply the force necessary to move closing sleeve 20 into the section 6 .
  • Closing sleeve 20 will also include a closing collet 22 having a series of collet fingers 23 .
  • collet fingers will be biased outward, but be configured to flex inward with the application of sufficient force.
  • the collet fingers are shown engaging the open collet profile 25 , which will require a first pulling force (for example, about 3000 to 4000 lbs) to move the collet fingers out of profile 25 .
  • closing sleeve 20 moves into its closed position blocking the apertures 11 , the collet fingers 23 will move into and engage the closed collet profile 24 .
  • the closed collet profile is configured such that a similar force is required to dislodge the collet fingers 23 from closed collet profile 24 .
  • the sleeve's engagement will seals 30 A and 30 B will form a fluid tight barrier preventing fluid communicating though the apertures 11 (i.e., in the case where the dissolvable material 34 has been dissolved from apertures 11 ).
  • seals 30 A and 30 B could be any number of conventional or future developed seals, in certain examples, seals 30 A and 30 B may be a bonded seal or an unipack seal, e.g., a seal formed from a mesh/rubber matrix.
  • FIG. 1 embodiment illustrates a single section 6 of flow apertures and a single closing sleeve 20 between two connector devices 7
  • FIG. 2 embodiment illustrates a single section 6 of flow apertures and a single closing sleeve 20 between two connector devices 7
  • FIG. 2 embodiment illustrates a single section 6 of flow apertures and a single closing sleeve 20 between two connector devices 7
  • FIG. 2 embodiment illustrates a single section 6 of flow apertures and a single closing sleeve 20 between two connector devices 7
  • FIG. 2 embodiment discussed below.
  • FIG. 2 illustrates a modification of the flow control device shown in FIG. 1 .
  • the flow apertures 10 are formed of elongated slots 12 .
  • the flow apertures in some instances may be circular, oval, or other shaped apertures.
  • the FIG. 2 embodiment utilizes an inner sleeve 35 formed of the dissolving material (or dissolving sleeve 35 ).
  • dissolving sleeve 35 material is formed from the TervAlloyTM specified above.
  • the thickness of dissolving sleeve 35 is approximately 3 ⁇ 8 inches.
  • FIG. 2 also shows a profile 36 formed on the inner surface of dissolving sleeve 35 . This profile is intended to aid in the tool assembly process. A gripping tool may engage profile 36 and assist in overcoming the tight tolerances encountered when inserting dissolving sleeve 35 within the tubular sections forming housing 2 .
  • the flow control device seen in FIGS. 1 and 2 may include well screens positioned over tubular housing 2 .
  • One such screen is represented schematically in FIG. 2 as screen section 45 .
  • Any number of convention or future developed well screens could be employed depending on wellbore conditions and the type/size of particles the screen is intended to block from entry through the flow apertures.
  • the screens could be slip-on wire jackets, direct wrap wire jackets, slip-on pre-pack filters, or woven mesh filters.
  • Example screen/filter opening sizes could be from 60 um to 500 um (or any sub-range there between).
  • many embodiments will be formed of a series of flow control devices 1 connected together under a continuous length of screen section.
  • a tubular string incorporating a series of flow control devices 1 will be run into the wellbore such that the flow control devices are positioned at the wellbore locations where communication exterior to the string is desired.
  • the dissolvable material is intact in the flow apertures (or the dissolving sleeves are in place) and the closing sleeves (i.e., nondissolving permanent sleeves) are in the open position.
  • Various downhole operations requiring an increase of fluid pressure internal to the tubular string may be carried out; for example, setting pressure activated packers incorporated into the string, or circulating while running in the hole without need of an inner string.
  • the pressure is within the central passage of the flow control device is increased in the range of about 7,500 to 15,000 about p.s.i. (or any sub-range therebetween).
  • the step of initially positioning the flow control device in the wellbore includes running the flow control device into the wellbore without a service tool (or any other type of inner tubular member) being positioned within the central passage of the flow control device's tubular housing.
  • a service tool or any other type of inner tubular member
  • These embodiments could be employed to carry out operations such as a single trip standalone screen application where the production assembly and sandface assembly are run and installed in a single trip using the dissolvable material as a barrier to flow.
  • This arrangement enables circulation of filter cake removal fluids, packer corrosion inhibitor fluids, and aides in fluid loss control while removing the BOP's and installing the wellhead.
  • packers may be set without the need of running a plug or any other isolation device by applying pressure against the dissolvable material prior to its degradation phase permitting activation of any downhole hydraulic device in the completion assembly as required.
  • a dissolving agent may be circulated into contact with the dissolving material for sufficient duration to remove or to sufficiently weaken the dissolving material within the flow apertures. For example, this may be achieved at the end of a gravel or frac pack using the inner service tool string on a multi-zone, single trip application; or it can be achieved using a smaller workstring run on a separate trip to circulate the solvent (dissolution fluid). This may involve a single solvent or more than one (e.g., one solvent to remove a protective coating and another to dissolve the underlying material) and thus involve separate trips to spot the different solvents. Once this is accomplished, fluid communication will be opened with the environment exterior to the tubular string. When the well operator desires to close off this fluid path, a closing tool is run downhole to engage and shift the closing sleeve into the closed position.
  • FIGS. 3A and 3B illustrate two nonlimiting examples of methods employing the above concepts.
  • FIG. 3A shows the wellbore 100 extending through a producing interval 120 with wellbore 100 being a “cased” wellbore including casing 105 and cement layer 110 .
  • the casing and cement layer have been perforated in order to establish communication with the producing interval.
  • a tubular string 75 including packers 60 , is positioned within the producing interval 120 .
  • the packers 60 could be any number of conventional or future developed packers which operate to isolate the wellbore annulus along the producing interval.
  • packers 60 may be pressure activated packers such as CompSetTM packers available from Superior Energy Services, LLC, Completion Services division, of Houston, Tex.
  • the tubular string includes a plurality of flow controls devices 1 such as described above in reference to FIG. 1 or 2 .
  • FIG. 3A illustrates three flow control devices positioned sequentially one after the other.
  • other embodiments could include other tubular sections (e.g., screen sections or joints) between the flow control devices 1 .
  • the tubular string is lowered into the wellbore until the packers 60 are positioned above and below the producing interval.
  • FIG. 3A there is no service tool, inner workstring, or other tubular member position in the central passage of the tubular string 75 as it is lowered into position.
  • the flow apertures in the flow control devices are still plugged with the dissolvable material and any number of down hole operations may be carried out.
  • the flow arrows in FIG. 3A suggest the circulation of fluid down the central passage of the tubular string and back up the annulus, it being understood that packers 60 are unset at this stage.
  • the lower end of the tubular string (not seen in FIG.
  • the dissolvable material in the flow apertures will be dissolved, e.g., by allowing existing wellbore fluids to degrade the dissolvable material over time.
  • the solvent will be circulated to or “spotted” in the area of the dissolvable plugs prior to setting the packers. Then the packers are promptly set before the solvent significantly affects the structural integrity of the plugs.
  • FIG. 3B shows a slightly different configuration of the tubular string.
  • the tubular string section within the production zone includes an flow control device 1 with at least one screen joint 50 above or below the flow control device.
  • screen joint means any suitable conventional or future developed screen section used in the oil and gas wells, typically formed by a section of base pipe with apertures and one or more layers of screen material overlaying the base pipe.
  • screen joint 50 could be the ProWeld TOPTM screen section available from Superior Energy Services, LLC, Completion Services division, of Houston, Tex.
  • the FIG. 3B embodiment is merely illustrative and other configurations could multiple screen joints above and/or below the flow control device 1 or multiple flow control devices 1 in combination with the screen joints. Since a wellbore may often be deviated or horizontal, “above” and “below” do not necessarily mean higher or lower in the vertical sense, but rather closer, along the wellbore path, to the surface or toe of the wellbore toe, respectively.
  • FIGS. 3A and 3B only illustrate one producing interval, it will be understood that there are often multiple producing intervals along the length of the wellbore.
  • Each interval could include a flow control arrangement such as seen in the figures with the packers separately isolating each interval.
  • the packers are set and intervals treated in succession, with operations conducted on the lowest interval first.
  • the flow control tools will provide fluid loss control for fluids circulated through the tools, i.e., prevent unintended loss of fluids into the formation
  • FIGS. 3A and 3B illustrate methods carried out in cased wellbores, it will be understood these methods could also be employed in uncased wellbores.

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Physical Or Chemical Processes And Apparatus (AREA)

Abstract

A flow control device formed of a tubular housing having a circumferential wall and a central passage. A plurality of flow apertures are formed through a section of the circumferential wall and a dissolvable material is positioned to block flow through the flow apertures. A closing sleeve capable of moving into a position to block flow through the flow apertures is also positioned within the housing.

Description

    CROSS REFERENCE TO RELATED APPLICATION
  • This application claims the benefit under 35 U.S.C. §119(e) of U.S. Provisional Application Ser. No. 62/157,834 filed May 6, 2015, which is incorporated by reference herein in its entirety.
  • BACKGROUND OF INVENTION
  • In the oil and gas completions industry, a tubular string position within the wellbore will have various devices (often generically called “valves”) for controlling the flow of fluid between the interior and exterior of the tubular string. One common form for such valves is a “sliding sleeve” valve, where an outer tubular member has a series of apertures and a concentric internal tubular sleeve is shifted to uncover the apertures (i.e., “open” the valve) or to cover the apertures (i.e., “close” the valve). Often, this sleeve is shifted between its open and closed position by a tool which is run into the wellbore (e.g., on coiled tubing) and which engages a profile on the internal surface of the sleeve.
  • Obviously, each trip running a tool in and out of the wellbore is a time consuming and costly action. Therefore, the oil and gas industry is always seeking more efficient ways to selectively open communication between the interior of the tubular string and the producing formation through which the wellbore extends.
  • BRIEF DESCRIPTION OF DRAWINGS
  • FIG. 1 is a cross-section of a first embodiment of a flow control device of the present invention.
  • FIG. 2 is a cross-section of a second embodiment of a flow control device of the present invention.
  • FIG. 3A illustrates a first method of employing the flow control device described herein.
  • FIG. 3B illustrates a second method of employing the flow control device described herein.
  • DETAILED DESCRIPTION OF SELECTED EMBODIMENTS
  • The embodiment of the flow control device 1 seen in FIG. 1 is generally formed of a tubular housing 3 having a circumferential wall 5 and a central passage 4. Typically, each end of the housing will include a connector device 7, e.g., threaded or some other coupling structure, to allow the flow control device (usually a series of flow control devices) to be integrated at the appropriate location(s) along the length of the tubular string being positioned in the wellbore. The circumferential wall 5 will include a section 6 with at least one, and more commonly a plurality of, flow apertures 10 formed through the circumferential wall 5. In FIG. 1, the flow apertures 10 are a series of circular flow apertures 11 which are about 1 inch in diameter. Naturally, the size of the circular apertures 11 could vary substantially and be shapes other than circles. Section B-B seen in FIG. 1 is a cross-section through the apertures 11. In the FIG. 1 embodiment, the section 6 having the flow apertures 10 is a separable sub-component 9 connected the rest of housing 1 by threaded connection 13.
  • FIG. 1 suggests how the apertures 11 will be filled with a “disappearing” or dissolving material 34. Although FIG. 1 illustrates only a few apertures 11 filled with dissolving material 34, it will be understood that typically all, or substantially all, of the apertures 11 will be filled with dissolving material 34. A “dissolving” material can be any material which may initially act to plug apertures 11 under initially encountered wellbore conditions (e.g., pressure, temperature, pH, etc.), but will dissolve, degrade, or disintegrate under a second condition(s) (including extended time under initially existing wellbore conditions) to the point that fluid flow may be established through the apertures 11. As a nonlimiting example, the dissolving material should be capable of maintaining its integrity (i.e., blocking flow) at differential pressures of up to twelve thousand psi.
  • The dissolving material may be any number of materials including, but not limited to, dissolvable metals such as magnesium, aluminum (including alloys thereof), dissolvable polymeric materials, or other dissolvable polymers. Magnesium (Mg), either in elemental form or as an alloy, can serve as one preferred base material for dissolvable material 34. For example, the dissolvable material 34 could be Mg alloys that combine other electrochemically active metals, including binary Mg—Zn, Mg—Al and Mg—Mn alloys, as well as tertiary Mg—Zn—Y and Mg—Al—X alloys, where X includes Zn, Mn, Si, Ca or Y, or a combination thereof. These Mg—Al—X alloys may include, by weight, up to about 85% Mg, up to about 15% Al and up to about 5% X. These electrochemically active metals, including Mg, Al, Mn or Zn, or combinations thereof, may also include a rare earth element or combination of rare earth elements. As used herein, rare earth elements include Sc, Y, La, Ce, Pr, Nd, Fe, or Er, or a combination thereof. Where present, a rare earth element or combinations of rare earth elements may be present, by weight, in an amount of about 5% or less. As a specific example, TervAlloy™ available from Terves, Inc. of Euclid, Ohio is a magnesium and aluminum nanocomposite disintegrating material designed to disintegrate (turn to powder) based on exposure to a controlled fluid (e.g., an electrolyte), or an electrical or thermal stimuli. TervAlloy™ will disintegrate into very fine grained particles after a specified time in response to a controlled environmental stimulus. A wide range of solvents may be employed as long as they are capable of reducing the dissolving material without excessive corrosion of downhole tubulars and equipment. As nonlimiting examples, the solvent could be brines formed from NaCl, CaCl, NaBr, CaBr, caesium formates, sodium formates, etc. Likewise, the solvent could be any number of acids including various concentrations of hydrofluoric acid, hydrochloric acid, sulfuric acid, acetic acid, and other acids commonly used in the downhole environment. In one embodiment, the dissolvable material such as the above TervAlloy™ may be coated with a polymer that is unaffected by acids and brines found in the downhole environment where the material is to be used. When it is desired to remove the dissolvable material, a solvent effective against the polymer (e.g., hydrofluoric acid) is circulated to remove the polymer coating, thus exposing the TervAlloy™ existing brines that will ultimately degrade it. The brine may be latent brine or additional brine which is circulated downhole.
  • Adjacent to the section 6 of apertures 10 is the closing sleeve 20. Closing sleeve 20 is a slidable sleeve having an outer diameter slightly smaller than the inner diameter of section 6 such that closing sleeve 20 travels into section 6. Although a portion of the sleeve length is shown removed in the FIG. 1 illustration, the length of closing sleeve 20 will be sufficient to engage the sleeve seals 30A and 30B on each side of section 6. In the illustrated embodiment, closing sleeve 20 will include a tool profile 26 allowing a conventional closing tool (e.g., a tool mounted on coil tubing or wireline) to engage the tool profile 26 and apply the force necessary to move closing sleeve 20 into the section 6. Closing sleeve 20 will also include a closing collet 22 having a series of collet fingers 23. As is well known in the art, collet fingers will be biased outward, but be configured to flex inward with the application of sufficient force. In FIG. 1, the collet fingers are shown engaging the open collet profile 25, which will require a first pulling force (for example, about 3000 to 4000 lbs) to move the collet fingers out of profile 25. Although not explicitly seen in the Figures, it can be envisioned how, as closing sleeve 20 moves into its closed position blocking the apertures 11, the collet fingers 23 will move into and engage the closed collet profile 24. The closed collet profile is configured such that a similar force is required to dislodge the collet fingers 23 from closed collet profile 24. As suggested above, once closing sleeve 20 is in the closed position, the sleeve's engagement will seals 30A and 30B will form a fluid tight barrier preventing fluid communicating though the apertures 11 (i.e., in the case where the dissolvable material 34 has been dissolved from apertures 11). Although seals 30A and 30B could be any number of conventional or future developed seals, in certain examples, seals 30A and 30B may be a bonded seal or an unipack seal, e.g., a seal formed from a mesh/rubber matrix.
  • Although the FIG. 1 embodiment illustrates a single section 6 of flow apertures and a single closing sleeve 20 between two connector devices 7, it will be understood that other embodiments could have multiple sets of flow aperture sections 6 with closing sleeves 20 positioned sequentially as a continuous tubular section with no intervening connector devices 7. This principle applies equally to the FIG. 2 embodiment discussed below.
  • FIG. 2 illustrates a modification of the flow control device shown in FIG. 1. In the FIG. 2 embodiment, the flow apertures 10 are formed of elongated slots 12. However, the flow apertures in some instances may be circular, oval, or other shaped apertures. Moreover, rather than the flow apertures 10 being directly filled with the dissolvable material, the FIG. 2 embodiment utilizes an inner sleeve 35 formed of the dissolving material (or dissolving sleeve 35). In one example, dissolving sleeve 35 material is formed from the TervAlloy™ specified above. In the example of the tubular housing 3 having an outer diameter of approximately 6 inches, the thickness of dissolving sleeve 35 is approximately ⅜ inches. However, the housing dimensions and sleeve thicknesses may vary considerably among different embodiments. In the FIG. 2 embodiment, the positioning of dissolving sleeve 35 acts to block closing sleeve 20 prior to the time dissolving sleeve 35 has been dissolved. Once dissolving sleeve 35 has been removed, then closing sleeve 20 may function in conjunction with seals 30 as described in FIG. 1 with respect to blocking flow through flow slots 12. FIG. 2 also shows a profile 36 formed on the inner surface of dissolving sleeve 35. This profile is intended to aid in the tool assembly process. A gripping tool may engage profile 36 and assist in overcoming the tight tolerances encountered when inserting dissolving sleeve 35 within the tubular sections forming housing 2.
  • In many contemplated uses, the flow control device seen in FIGS. 1 and 2 may include well screens positioned over tubular housing 2. One such screen is represented schematically in FIG. 2 as screen section 45. Any number of convention or future developed well screens could be employed depending on wellbore conditions and the type/size of particles the screen is intended to block from entry through the flow apertures. As one non-limiting examples, the screens could be slip-on wire jackets, direct wrap wire jackets, slip-on pre-pack filters, or woven mesh filters. Example screen/filter opening sizes could be from 60 um to 500 um (or any sub-range there between). Although not explicitly shown in the drawings, many embodiments will be formed of a series of flow control devices 1 connected together under a continuous length of screen section.
  • As one example of a contemplated use, a tubular string incorporating a series of flow control devices 1 will be run into the wellbore such that the flow control devices are positioned at the wellbore locations where communication exterior to the string is desired. At this point, the dissolvable material is intact in the flow apertures (or the dissolving sleeves are in place) and the closing sleeves (i.e., nondissolving permanent sleeves) are in the open position. Various downhole operations requiring an increase of fluid pressure internal to the tubular string may be carried out; for example, setting pressure activated packers incorporated into the string, or circulating while running in the hole without need of an inner string. In one example, the pressure is within the central passage of the flow control device is increased in the range of about 7,500 to 15,000 about p.s.i. (or any sub-range therebetween).
  • It will be understood that when the dissolvable material is in place in the flow apertures, there are no flow paths through the circumferential wall of the tubular housing, i.e., no flow paths from outside the tubular housing into the central passage (or from the central passage to the outside of the tubular housing). The absence of flow paths is not only in portion of the central passage in the immediate area of the flow apertures, but also portions of the central passage extending above or below the tubular housing along the tubular string.
  • As suggested above, there are certain embodiments where the step of initially positioning the flow control device in the wellbore includes running the flow control device into the wellbore without a service tool (or any other type of inner tubular member) being positioned within the central passage of the flow control device's tubular housing. These embodiments could be employed to carry out operations such as a single trip standalone screen application where the production assembly and sandface assembly are run and installed in a single trip using the dissolvable material as a barrier to flow. This arrangement enables circulation of filter cake removal fluids, packer corrosion inhibitor fluids, and aides in fluid loss control while removing the BOP's and installing the wellhead. Further, packers may be set without the need of running a plug or any other isolation device by applying pressure against the dissolvable material prior to its degradation phase permitting activation of any downhole hydraulic device in the completion assembly as required.
  • When it is desired to establish communication outside the tubular string, a dissolving agent may be circulated into contact with the dissolving material for sufficient duration to remove or to sufficiently weaken the dissolving material within the flow apertures. For example, this may be achieved at the end of a gravel or frac pack using the inner service tool string on a multi-zone, single trip application; or it can be achieved using a smaller workstring run on a separate trip to circulate the solvent (dissolution fluid). This may involve a single solvent or more than one (e.g., one solvent to remove a protective coating and another to dissolve the underlying material) and thus involve separate trips to spot the different solvents. Once this is accomplished, fluid communication will be opened with the environment exterior to the tubular string. When the well operator desires to close off this fluid path, a closing tool is run downhole to engage and shift the closing sleeve into the closed position.
  • FIGS. 3A and 3B illustrate two nonlimiting examples of methods employing the above concepts. FIG. 3A shows the wellbore 100 extending through a producing interval 120 with wellbore 100 being a “cased” wellbore including casing 105 and cement layer 110. The casing and cement layer have been perforated in order to establish communication with the producing interval. A tubular string 75, including packers 60, is positioned within the producing interval 120. The packers 60 could be any number of conventional or future developed packers which operate to isolate the wellbore annulus along the producing interval. In the FIG. 3A example, packers 60 may be pressure activated packers such as CompSet™ packers available from Superior Energy Services, LLC, Completion Services division, of Houston, Tex. Between packers 60, the tubular string includes a plurality of flow controls devices 1 such as described above in reference to FIG. 1 or 2. FIG. 3A illustrates three flow control devices positioned sequentially one after the other. However, other embodiments could include other tubular sections (e.g., screen sections or joints) between the flow control devices 1.
  • In operation, the tubular string is lowered into the wellbore until the packers 60 are positioned above and below the producing interval. As suggested in FIG. 3A, there is no service tool, inner workstring, or other tubular member position in the central passage of the tubular string 75 as it is lowered into position. At this point, the flow apertures in the flow control devices are still plugged with the dissolvable material and any number of down hole operations may be carried out. For example, the flow arrows in FIG. 3A suggest the circulation of fluid down the central passage of the tubular string and back up the annulus, it being understood that packers 60 are unset at this stage. When it is desired to set the packers, the lower end of the tubular string (not seen in FIG. 3A) is closed off by any conventional means such as a pressure operated valve or by dropping a ball which engages a ball seat. Thereafter, fluid in the tubular string's central passage may be raised to the degree necessary to set packers 60. In order to open the flow apertures in the flow control device, the dissolvable material in the flow apertures will be dissolved, e.g., by allowing existing wellbore fluids to degrade the dissolvable material over time. In cases where it is necessary to circulate an acid or other solvent in order to remove the dissolvable material, the solvent will be circulated to or “spotted” in the area of the dissolvable plugs prior to setting the packers. Then the packers are promptly set before the solvent significantly affects the structural integrity of the plugs.
  • FIG. 3B shows a slightly different configuration of the tubular string. In the FIG. 3B example, the tubular string section within the production zone includes an flow control device 1 with at least one screen joint 50 above or below the flow control device. As used herein, “screen joint” means any suitable conventional or future developed screen section used in the oil and gas wells, typically formed by a section of base pipe with apertures and one or more layers of screen material overlaying the base pipe. One example of screen joint 50 could be the ProWeld TOP™ screen section available from Superior Energy Services, LLC, Completion Services division, of Houston, Tex. Naturally, the FIG. 3B embodiment is merely illustrative and other configurations could multiple screen joints above and/or below the flow control device 1 or multiple flow control devices 1 in combination with the screen joints. Since a wellbore may often be deviated or horizontal, “above” and “below” do not necessarily mean higher or lower in the vertical sense, but rather closer, along the wellbore path, to the surface or toe of the wellbore toe, respectively.
  • Although FIGS. 3A and 3B only illustrate one producing interval, it will be understood that there are often multiple producing intervals along the length of the wellbore. Each interval could include a flow control arrangement such as seen in the figures with the packers separately isolating each interval. Typically, the packers are set and intervals treated in succession, with operations conducted on the lowest interval first. It can readily be seen that while the dissolvable plugs are in place, the flow control tools will provide fluid loss control for fluids circulated through the tools, i.e., prevent unintended loss of fluids into the formation Likewise, while FIGS. 3A and 3B illustrate methods carried out in cased wellbores, it will be understood these methods could also be employed in uncased wellbores.

Claims (20)

1-28. (canceled)
29. A flow control device comprising:
a. a tubular housing having a circumferential wall and a central passage;
b. a plurality of flow apertures formed through a section of the circumferential wall;
c. a dissolvable material positioned to block flow through the flow apertures; and
d. a closing sleeve capable of moving into a position to block flow through the flow apertures.
30. The flow control device of claim 29, wherein the dissolvable material is formed within the flow apertures.
31. The flow control device of claim 29, wherein the dissolvable material forms a dissolvable sleeve positioned to the interior of the circumferential wall.
32. The flow control device of claim 29, wherein the dissolvable sleeve has a sleeve wall with a thickness ranging between about ⅛ inch and about 1 inch.
33. The flow control device of claim 29, wherein the closing sleeve has an internal profile engageable by a service tool inserted into the housing's central passage.
34. The flow control device of claim 33, wherein the closing sleeve includes a holding collet for holding the closing sleeve in a closed position.
35. The flow control device of claim 34, wherein the tubular housing has an internal closing profile shaped to be engaged by fingers on the closing collet.
36. The flow control device of claim 35, wherein the fingers of the closing collet are configured to disengage from the closing profile when force is applied to the closing sleeve by a service tool moving within the tubular housing's central passage.
37. The flow control device of claim 29, wherein a sleeve seal is position on either side of a section of the circumferential wall having the flow apertures such that the sleeve seals engage the closing sleeve when the closing sleeve blocks the flow apertures.
38. The flow control device of claim 31, wherein the dissolvable sleeve is positioned to block the closing sleeve prior to it dissolving.
39. The flow control device of claim 38, wherein a screen encloses the tubular housing.
40. The flow control device of claim 38, wherein the dissolvable material is a magnesium and aluminum nanocomposite disintegrating material.
41. A method of selectively establishing a fluid communication between the interior and exterior of a tubular string positioned within a wellbore, the method comprising the steps of:
a. positioning within a wellbore a flow control device comprising:
i. a tubular housing having a circumferential wall and a central passage;
ii. a plurality of flow apertures formed through a section of the circumferential wall;
iii. a dissolvable material positioned to block flow through the flow apertures; and
iv. a closing sleeve capable of moving into a position to block flow through the flow apertures;
v. wherein the flow control device is run into the wellbore without a further tubular string or service tool being positioned within the central passage of the tubular housing
b. performing at least one downhole operation by increasing pressure in the tubular string while the dissolvable material blocks flow through the flow apertures;
c. dissolving the dissolvable material and thereby establishing fluid communication between an interior and exterior of the tubular string; and
d. wherein the central passage extends above the tubular housing along the tubular string and prior to the dissolving of the dissolvable material, there is no flow path through the circumferential wall from outside the tubular housing into the central passage.
42. The method of claim 41, wherein the step of increasing the pressure includes increasing the pressure in the range of about 7,500 to about 15,000 p.s.i.
43. The method of claim 41, wherein a screen encloses the tubular housing.
44. The method of claim 41, wherein the flow control device is position within a production interval of the wellbore and discrete screen sections are positioned above and below the flow control device within the production interval.
45. A method of carrying out completion operations within a wellbore having at least one producing interval, the method comprising the steps of:
a. positioning within the producing interval a tubular string including a flow control device and at least one screen joint above or below the flow control device, the flow control device comprising:
i. a tubular housing having a circumferential wall and a central passage;
ii. a plurality of flow apertures formed through a section of the circumferential wall;
iii. a dissolvable material positioned to block flow through the flow apertures; and
iv. a closing sleeve capable of moving into a position to block flow through the flow apertures;
v. wherein the positioning of the tubular string is carried out without a further tubular member being positioned within the central passage of the flow control device;
b. after step (a), circulating fluids through the central passage and back up an annulus of the wellbore; and
c. after step (b), increasing pressure within the central passage in order to set packers and isolate the annulus along the producing interval.
46. The method of claim 45, wherein at least one screen joint is positioned above the flow control device and at least one screen joint is positioned below the flow control device.
47. The method of claim 45, further comprising, before the step of setting the packers, spotting a solvent to the dissolvable material in the wellbore along the producing interval.
US15/147,417 2015-05-06 2016-05-05 Dissolving Material Flow Control Device Abandoned US20160326837A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US15/147,417 US20160326837A1 (en) 2015-05-06 2016-05-05 Dissolving Material Flow Control Device

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US201562157834P 2015-05-06 2015-05-06
US15/147,417 US20160326837A1 (en) 2015-05-06 2016-05-05 Dissolving Material Flow Control Device

Publications (1)

Publication Number Publication Date
US20160326837A1 true US20160326837A1 (en) 2016-11-10

Family

ID=57223338

Family Applications (1)

Application Number Title Priority Date Filing Date
US15/147,417 Abandoned US20160326837A1 (en) 2015-05-06 2016-05-05 Dissolving Material Flow Control Device

Country Status (1)

Country Link
US (1) US20160326837A1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20180334870A1 (en) * 2016-10-11 2018-11-22 Halliburton Energy Services, Inc. Dissolvable Protector Sleeve
WO2018215857A1 (en) * 2017-05-08 2018-11-29 Vlad Rozenblit Cementing stage collar with dissolvable elements
US20190040695A1 (en) * 2016-03-07 2019-02-07 Halliburton Energy Services, Inc. Sacrificial protector sleeve
CN111287711A (en) * 2018-12-07 2020-06-16 中国石油天然气股份有限公司 Well completion pipe string and sand prevention pipe string thereof
US11346180B2 (en) * 2017-12-04 2022-05-31 Welltec Oilfield Solutions Ag Downhole inflow production restriction device

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20190040695A1 (en) * 2016-03-07 2019-02-07 Halliburton Energy Services, Inc. Sacrificial protector sleeve
US10822888B2 (en) * 2016-03-07 2020-11-03 Halliburton Energy Services, Inc. Sacrificial protector sleeve
US20180334870A1 (en) * 2016-10-11 2018-11-22 Halliburton Energy Services, Inc. Dissolvable Protector Sleeve
US10450817B2 (en) * 2016-10-11 2019-10-22 Halliburton Energy Services, Inc. Dissolvable protector sleeve
WO2018215857A1 (en) * 2017-05-08 2018-11-29 Vlad Rozenblit Cementing stage collar with dissolvable elements
US20190010784A1 (en) * 2017-05-08 2019-01-10 Vlad Rozenblit Cementing Stage Collar with Dissolvable elements
US11346180B2 (en) * 2017-12-04 2022-05-31 Welltec Oilfield Solutions Ag Downhole inflow production restriction device
US11795779B2 (en) 2017-12-04 2023-10-24 Welltec Oilfield Solutions Ag Downhole inflow production restriction device
CN111287711A (en) * 2018-12-07 2020-06-16 中国石油天然气股份有限公司 Well completion pipe string and sand prevention pipe string thereof

Similar Documents

Publication Publication Date Title
US9033046B2 (en) Multi-zone fracturing and sand control completion system and method thereof
US8215409B2 (en) Method and apparatus for expanded liner extension using uphole expansion
US7575062B2 (en) Methods and devices for treating multiple-interval well bores
AU2007243920B2 (en) Wellbore method and apparatus for sand and inflow control during well operations
US20160326837A1 (en) Dissolving Material Flow Control Device
CA2705768C (en) Gravel packing apparatus utilizing diverter valves
US10053954B2 (en) Cementing a liner using reverse circulation
US9353584B2 (en) Permeable lost circulation drilling liner
AU2018230986B2 (en) Liner conveyed compliant screen system
US10465484B2 (en) Gravel packing system and method
US20150013982A1 (en) Fracturing valve
US10138708B2 (en) Remotely operated production valve
CA2952219C (en) Packer setting method using disintegrating plug
US11299965B2 (en) Completion systems and methods to complete a well
EP3310991A1 (en) Redressing method and redressed completion system

Legal Events

Date Code Title Description
AS Assignment

Owner name: SUPERIOR ENERGY SERVICES, LLC, LOUISIANA

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:BOWEN, EDDIE GLENN;THOMAS, ANTHONY;REEL/FRAME:038566/0799

Effective date: 20160506

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION