US20160260036A1 - Risk assessment for drilling and well completion operations - Google Patents

Risk assessment for drilling and well completion operations Download PDF

Info

Publication number
US20160260036A1
US20160260036A1 US15/062,164 US201615062164A US2016260036A1 US 20160260036 A1 US20160260036 A1 US 20160260036A1 US 201615062164 A US201615062164 A US 201615062164A US 2016260036 A1 US2016260036 A1 US 2016260036A1
Authority
US
United States
Prior art keywords
risk
productive time
planned
parameter
drilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US15/062,164
Other languages
English (en)
Inventor
Richard B. Jones
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hartford Steam Boiler Inspection and Insurance Co
Original Assignee
Hartford Steam Boiler Inspection and Insurance Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hartford Steam Boiler Inspection and Insurance Co filed Critical Hartford Steam Boiler Inspection and Insurance Co
Priority to US15/062,164 priority Critical patent/US20160260036A1/en
Publication of US20160260036A1 publication Critical patent/US20160260036A1/en
Assigned to THE HARTFORD STEAM BOILER INSPECTION AND INSURANCE COMPANY reassignment THE HARTFORD STEAM BOILER INSPECTION AND INSURANCE COMPANY ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: JONES, RICHARD B.
Priority to US17/395,260 priority patent/US11521278B2/en
Priority to US18/075,378 priority patent/US20230237594A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/02Agriculture; Fishing; Mining
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B41/00Equipment or details not covered by groups E21B15/00 - E21B40/00
    • E21B41/0092Methods relating to program engineering, design or optimisation
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/08Measuring diameters or related dimensions at the borehole
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B2200/00Special features related to earth drilling for obtaining oil, gas or water
    • E21B2200/20Computer models or simulations, e.g. for reservoirs under production, drill bits
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B2200/00Special features related to earth drilling for obtaining oil, gas or water
    • E21B2200/22Fuzzy logic, artificial intelligence, neural networks or the like
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B44/00Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/26Storing data down-hole, e.g. in a memory or on a record carrier
    • GPHYSICS
    • G16INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS
    • G16CCOMPUTATIONAL CHEMISTRY; CHEMOINFORMATICS; COMPUTATIONAL MATERIALS SCIENCE
    • G16C10/00Computational theoretical chemistry, i.e. ICT specially adapted for theoretical aspects of quantum chemistry, molecular mechanics, molecular dynamics or the like

Definitions

  • the present invention generally relates to determining and predicting risk based on results from failures that originate from an operator's product and service delivery using a risk transfer model (RTM).
  • RTM risk transfer model
  • embodiments of the present invention include quantitatively assessing risk and reliability for drilling and well completion based upon a variety of parameters, such as non-productive time (NPT).
  • NPT non-productive time
  • drilling and completing hydrocarbon wells involve a complex process of drilling and other operations.
  • drilling operators When completing a hydrocarbon well, drilling operators typically run a variety of downhole monitoring equipment within the wellbore to improve well completion effectiveness and profitably.
  • drilling operators are bound to strict timelines and may gauge their performance using variety of performance metrics.
  • the drilling operators may need to exceed the performance metrics and/or complete the wells before the designed timeline. For instance, drilling operators may be evaluated on the performance metric nonproductive time or NPT.
  • the drilling operator may be required to pay a penalty equivalent to the damages caused by the excessive NPT.
  • the drilling operator may receive bonus compensation if the total NPT time falls under the specified threshold.
  • a method for assessing risk for well completion comprising: obtaining, using an input interface, a Below Rotary Table hours and a plurality of well-field parameters for one or more planned runs, determining, using at least one processor, one or more non-productive time values that correspond to the one or more planned runs based upon the well-field parameters, developing, using at least one processor, a non-productive time distribution and a Below Rotary Table distribution via one or more Monte Carlo trials; and outputting, using a graphic display, a risk transfer model results based on a total BRT hours from the Below Rotary Table and the non-productive time distribution produced from the one or more Monte Carlo trials.
  • an apparatus for estimating actual downtime from drilling operations using a risk transfer model comprising: a non-transitory memory, a processor coupled to the non-transitory memory, wherein the processor obtains computer executable instructions stored on a non-transitory memory that when executed by the processor causes the apparatus to perform the following: receive a plurality of field parameters that correspond to a plurality of planned runs via an input interface; determine a non-productive time risk for each of the planned runs based on the field parameters; generate a total non-productive time risk using one or more Monte Carlo trials; and output the total non-productive time risk via a user interface, wherein the number of Monte Carol trials is received via the input interface.
  • a system comprising: an input interface, an user interface, a processor coupled the input interface and the user interface, wherein the processor receives computer executable instructions stored on a memory that when executed by the processor causes the following: receive a plurality of field parameters that correspond to a plurality of planned runs via an input interface, determine a non-productive time risk for each of the planned runs based on the field parameters, generate a total non-productive time risk using one or more Monte Carlo trials, and output the total non-productive time risk via a user interface, wherein the number of Monte Carol trials is received via the input interface.
  • FIG. 1 is a schematic diagram of an embodiment of a RTM processing system
  • FIG. 2 illustrates an embodiment of the displayed RTM on the RTM processing system
  • FIG. 3 illustrates a “Country RM” tab used by the RTM
  • FIG. 4 illustrates an embodiment of the NPT event frequency, severity, and risk, by year, location, land and offshore
  • FIG. 5 illustrates an embodiment of running an RTM for 22 planned runs with 10,000 Monte Carlo trials
  • FIG. 6 illustrates an embodiment of the well completion time risk with a prescribed time deductible
  • FIG. 7 illustrates an embodiment of an amended distribution based on FIG. 5 that shows the 10 hours NPT deductible from FIG. 6 ;
  • FIG. 8 illustrates an embodiment of the well completion time risk with a prescribed time deductible and a time ceiling
  • FIG. 9 illustrates an embodiment of an updated distribution based on FIG. 5 that show the risk exposure the drilling operator is retaining.
  • FIG. 10 illustrates an embodiment of when the well completion time risk greater than the time ceiling.
  • the RTM may standardize key performance indicators that may be used to differentiate drilling operators' products and services in the marketplace.
  • the RTM may comprise a NPT parameter that indicates well failures from the product or service delivery of the drilling operator(s).
  • Other well failures such as failure operating outside specification, non-product or service delivery not impacted by the drilling operator(s), product relevant notification and in-house product functional failure may be omitted in assessing a drilling operator(s) NPT performance.
  • the RTM may be used to set and price insurance structures and coverage limitations.
  • the RTM may provide a more competitive edge in drilling operation tenders, promote continuous performance improvement in drilling operations, and generate operational key performance indicators that can be financially interpreted and measured by oil field personnel.
  • FIG. 1 is a schematic diagram of an embodiment of a RTM processing system 100 that may correspond to or may be part of a computer and/or any other computing device, such as a workstation, server, mainframe, super computer, and/or database.
  • the RTM processing system 100 includes a processor 102 , which may be also be referenced as a central processor unit (CPU).
  • the processor 102 may communicate (e.g., via a system bus) and/or provide instructions to other components within the RTM processing system 100 , such as the input interface 104 , output interface 106 , and/or memory 108 .
  • the processor 102 may include one or more multi-core processors and/or memory (e.g., cache memory) that function as buffers and/or storage for data.
  • processor 102 may be part of one or more other processing components, such as application specific integrated circuits (ASICs), field-programmable gate arrays (FPGAs), and/or digital signal processors (DSPs).
  • ASICs application specific integrated circuits
  • FPGAs field-programmable gate arrays
  • DSPs digital signal processors
  • FIG. 1 illustrates that processor 102 may be a single processor, processor 102 is not so limited and instead may represent a plurality of processors.
  • the processor 102 may be configured to implement any of the methods described herein.
  • FIG. 1 illustrates that the processor 102 may be operatively coupled to one or more input interfaces 104 configured to obtain drilling data for one or more wells sites and one or more output interfaces 106 configured to output and/or display the simulated RTM results, inputted drilling data, and/or other field drilling information.
  • the input interface 104 may be configured to obtain the drilling data via electrical, optical, and/or wireless connections using one or more communication protocols.
  • the input interface 104 may be a network interface that comprises a plurality of ports configured to receive and/or transmit data via a network.
  • the network may transmit the drilling data via wired links, wireless link, and/or logical links.
  • the input interface 104 may include keyboards, mice, universal serial bus (USB) interfaces, CD-ROMs, DVD-ROMs and/or onscreen input devices (e.g., onscreen keyboard).
  • the output interface 206 may include, but is not limited to a graphic display (e.g., monitors and display screens), a user interface, and/or an interface used to connect to a printing device configured to produce hard-copies of the generated results.
  • FIG. 1 also illustrates that memory 108 may be operatively coupled to processor 102 .
  • Memory 108 may be a non-transitory medium configured to store various types of data.
  • memory 108 may include one or more memory devices that comprise secondary storage, read-only memory (ROM), and/or random-access memory (RAM).
  • the secondary storage is typically comprised of one or more disk drives, optical drives, solid-state drives (SSDs), and/or tape drives and is used for non-volatile storage of data.
  • the secondary storage may be used to store overflow data if the allocated RAM is not large enough to hold all working data.
  • the secondary storage may also be used to store programs that are loaded into the RAM when such programs are selected for execution.
  • the ROM is used to store instructions and perhaps data that are read during program execution.
  • the ROM is a non-volatile memory device that typically has a small memory capacity relative to the larger memory capacity of the secondary storage.
  • the RAM is used to store volatile data and perhaps to store instructions.
  • the memory 108 may be used to house the instructions for carrying out various embodiments described herein.
  • the memory 108 may comprise a RTM module 110 that may be accessed and implemented by processor 102 .
  • RTM module 110 may be stored and accessed within memory embedded in processor 202 (e.g., cache memory).
  • the RTM module 110 may receive a variety of inputted information relating to field parameters for one or more wells and quantify risks associated with future well completions.
  • the RTM analysis may involve transforming acquired raw drilling data into a new data base where the actual run data is summed to produce a new data set where each record is a planned run.
  • the unit of exposure of risk for well construction may be identified as a “planned run.”
  • the term “planned run” is defined throughout this disclosure as how drilling operator(s) plan to drill a well.
  • a “planned run” may constitute a specific hole size, drilled length, dog leg (for directional drilling), and bottom hole assembly.
  • a drilling operation for completing a well may on average have about 5 planned runs because of the different hole or piping sizes.
  • An actual run corresponds to number of instances the drilling operators has to actually insert and remove a tool string when drilling a well.
  • a drilling operation may average more than 20 actual runs for jobs estimated with about 5 planned run. In practice more actual runs are compiled than the “planned run” because of equipment failures and various other situations that may require the drilling operator to stop drilling and pull the tool string out of the wellbore.
  • Non-productive time extends a drilling period but does not include or determine all of the actual drilling time.
  • Well planners may utilize previous field drilling experience and simulations to estimate how long each planned run will take in real hours assuming the drilling period has about zero NPT.
  • the estimated time for a planned run is referenced throughout this disclosure as Below Rotary Table (BRT) hours.
  • BRT hours is an estimate of how long a drilling operator may take to finish drilling that includes not just pure drilling time, but also tripping and logging time.
  • NPT extends the drilling period by adding the NPT risk distribution to the computed BRT hours to determine the total time for drilling, which includes the time for tool failures.
  • BRT hours may be the RTM's model output variable even though the RTM analysis is based on NPT. Uncertainty in BRT determination are addressed by the RTM analysis and will be discussed later in the disclosure.
  • Non-productive time for product or service delivery with influenced (PSDI) may be used as one of the main risk variables in well drilling operations.
  • the BRT distribution may be important regarding tenders from customers of drilling operators.
  • the tenders may be based on the time to drill a specific number of wells and not by individual run parameters.
  • the BRT distribution may be the dominant (and most complex) part of the time to well completion equation.
  • other elements of a well can be analyzed and considered using the RTM, such as completion (packer and liner setting) and artificial lift (pumping).
  • the RTM may comprises four field-based actuarial variables: hole size (inches), drilling depth (feet (ft.)), drilled length (ft.), and maximum dog leg.
  • Hole size may be a direct measurement based on contract specifications and/or the implementation plan regarding the size of the hole to be drilled for a well.
  • Drilling depth may be computed as the current maximum depth of a well, the drilled distance may correspond to the drilled length, and dog leg, which may be expressed in degrees/100 ft., may reference the maximum direction change for the planned run.
  • the field-based actuarial variables may be chosen due to their physical nature that makes them relatively easy to measure and also as variables that may be shown to influence NPT risk. Each variable may be categorized in a manner that reflects both the engineering exposure and the availability of data to suitably represent the risk characteristics. For example, Table 1 illustrates an example embodiment of category definitions that may be used in the RTM analysis:
  • the RTM's basic drilling information may be computed by “planned run.”
  • a user or analyst may enter raw drilling data for the planned BRT hours, the hole size, maximum depth, drilled length, dog leg category, and the bottom hole assembly configuration for each planned run.
  • the raw drilling data may be imported and/or downloaded from one or more pre-existing data files.
  • the data entered and/or obtained could be for a single well with multiple planned runs or runs planned to be executed for several wells. For example, a project plan for drilling four off shore wells in the United Kingdom may appear as shown in Table 2.
  • the RTM and/or user may convert the acquired raw drilling data into data used in the RTM data base.
  • FIG. 2 illustrates an example on how the raw data is converted and/or entered into the RTM.
  • the RTM or user enters the category numbers and other data only in the gray sections based on the acquired raw drilling data.
  • the corresponding labels are automatically completed in the columns with the blue headers to provide a visual check that the correct data is being entered.
  • the other columns are used by the RTM to access the corresponding NPT event frequency and severity distributions for the entered category sequences.
  • the RTM parameters or variables include hole size, depth, drilled length, and bottom hole assembly data supplied for each planned run.
  • the NPT event frequency may be a direct function of the bottom hole assembly configuration. Failure of this assembly may be the originating cause of NPT. For well drilling and construction, the probability of a failure of the bottom hole assembly configuration may drive NPT event frequency.
  • NPT severity may be computed to include modification factors for hole size, depth, drilled length and maximum dog leg. These factors are viewed as environmental factors which influence NPT risk. NPT severity may be a function of the time required to remove a failed bottom hole assembly and re-insert a new one. From the data, four statistically significant distributions may be determined, which will be discussed in more detail below. They are individually assigned to planned run sequence distributions as a function of their hole size, depth, and drilled length categories.
  • the maximum dog leg value may represent a risk modifier as a function of hole size and dog leg parameters.
  • NPT and BRT distributions may be statistically developed via a Monte Carlo method with the number of trials being supplied by the user as an input parameter.
  • a Monte Carlo method typically follows that pattern of determining a domain of possible inputs, generates inputs randomly from a probability distribution over the domain, perform a deterministic computation on the inputs, and aggregate the results.
  • each planned run is first tested to check for the occurrence of an NPT failure event of the run's bottom hole assembly.
  • the test outcome may be represented as binary with 0 for no failure and 1 for a failure.
  • the NPT severity distribution for each planed run may then be multiplied by the binary frequency function to compute the planned run NPT risk.
  • the NPT risk value may then be modified by factors to account for the specific hole size, depth, drilled length, and maximum dog leg values.
  • the product may be the risk adjusted NPT risk value for every planned run. After each planned run has been computed, the NPT risk values may be summed over the total set of runs under analysis to compute total NPT risk for one Monte Carlo trial. This method may continue to repeat itself as many times as specified by the user (e.g., user provides information on an input screen) and the statistical analysis of the Monte Carlo process forms the basis of output results.
  • the total BRT hours may be added to the NPT risk distribution to produce output statistics that have direct application to well completion times.
  • a matrix may be defined in the model reference section that introduces the dollar cost (or loss) per hour of NPT as a function of hole size, depth, and drilled length. This information is entered by the user based on the value of the wells being completed. For example, the NPT time and financial risk may be computed for each planned run and aggregated over all planned runs. The aggregate NPT value may then be added to the total BRT hours to produce the total time to well (or wells) completion distribution.
  • the produced output statistics from the FTM may not represent or account for specific local operating conditions.
  • the RTM may be adjusted to reflect three conditions: (1) The specific country or field; (2) The distribution of well risks that are land & off-shore; (3) and the future.
  • the RTM allows for about three risk modifiers to customize the results to these conditions.
  • the “Location” modifier may be a factor that is computed based on the analysis of the data shown in the RTM's “Country RM” tab, which is shown in FIG. 3 .
  • the user may initially select the country of interest and subsequently using an input interface (e.g., click on a run button) to update the plot within the RTM.
  • the numbers next to the country name represent the percentage of total records that are from each country. This information may inform the user about the general amount of data or drilling activity that has been performed in each country which implicitly relates to the statistical reliability of the risk frequency, severity, and risk results.
  • the graph's horizontal axis represents the NPT event frequency measured in terms of number of NPT events per planned run.
  • the vertical axis is the NPT event severity: average NPT duration per event in hours.
  • the curved lines on the plot are iso-risk contours. Along each line, the product of frequency and severity has the same value. The small boxes illustrate the value of each iso-risk contour.
  • the heavy dotted line may represent a Non-USA average (well sites located outside for a drilling operator) over the entire data range for a specified time range corresponding to the acquired raw data (e.g., from 2006 to 2014-Quarter 3).
  • the points show the NPT frequency, severity, and risk for each year for the selected country (e.g., United Kingdom in FIG. 3 ) for a drilling operator.
  • each point represents the annual average NPT performance for the selected country.
  • the general computational results can be customized to a specific country by taking the ratio of a particular year's risk value to the overall average: 3.16.
  • the iso-risk contour for the 2006 point can be computed by multiplying the 2006 coordinates together or via approximately by visually interpolating between the displayed iso-risk contours.
  • the RTM may display the precise coordinates by having the user placing the cursor over the interested point. In FIG. 3 , the coordinates are 26.6% and 32.29 which produce the iso-risk contour of 8.56.
  • the computed risk modifier may be the value entered on the RTM model input screen as the Country Risk Modifier shown in FIG. 2 .
  • the risk modifier may be about 1.56/3.16 or about 0.5
  • the Country Risk Multiplier may be approximately 1.0.
  • Trending the information output by the RTM into the future may include data generated beyond the arithmetic operations previously discussed above.
  • the plot can provide information on historical trends in frequency, points consistently moving left or right, severity—points moving consistently up or down, and risk points consistently moving diagonally.
  • the trend (or pattern) of the frequency, severity, and risk data is extrapolated and applying factors associated with operational data and having a performance improvement plan in place. For example, if there are robust training programs in place or comprehensive root cause activities, then the user can apply this knowledge to input, for example, that the future NPT will be 25% less than the current year's results.
  • the use of operational data along with the risk-based time performance results presented in the specialized graphic format provides a “real time” data-driven approach to estimate future NPT performance.
  • Field specific information inside a country may be extracted and formatted from one or more database and local operation reports so that it can be presented in the frequency-severity format used for the country risk multiplier in the RTM.
  • a process similar to the country risk multiplier development can be applied to compute a field risk modifier.
  • the field risk modifier factor may then be multiplied by the country risk multiplier to adjust the generalized model results to a specific country and field.
  • the general model results may combine land and offshore NPT performance risk.
  • the acquired drilling data may not specify operational type, and thus, may not separate land and off-shore operations from the location or country in the dataset.
  • the acquired drilling data may indicate that the majority of countries are dominated by one type of drilling so in most cases, and thus, computing the country (and field) multipliers may be sufficient to adjust the results to actual performance.
  • the acquire drilling data may specify land and off-shore operations and could be computed and applied similar to the country risk and field risk modifiers as discussed above.
  • the NPT event frequency, severity, and risk, by year, location, land and offshore as shown in FIG. 4 may include a trend (or pattern) information to assist the user in forecasting future NPT performance by operational location.
  • the RTM allows for the user to adjust the general results based on insights the users gain by combining the risk-based information with the user's operational knowledge.
  • the multiplier is set to unity by default. The user can change this factor by entering their choice in the land and off-shore cell on the input data screen as shown in FIG. 2 .
  • the Time “Trend” cell as shown in FIG. 2 of the input data screen is a free form element constructed for the user to add another adjustment factor to the generalized results based on future drilling operations data for the planned runs listed in the input data screen.
  • the Time “Trend” cell could also be used for the field multiplier previously discussed. Entering this value here helps document the run values for future reference in order to increase the user's understanding of how to apply the risk model for forecasting future NPT risk results.
  • NPT Time Risk( h, d, l, t ) k Prob Fail( BHAk )*max ⁇ Sev( h, d, l )*Dogleg( h, r ), Severity Limit ⁇ * CR*SH*TR (1)
  • Prob Fail(BHAk) represents the probability of failure of the BHA for planned run ‘k’
  • Sev(h, d, l) represents the NPT time severity distribution (e.g., one of four) assigned to the hole size, depth, and drilled length categories
  • Dogleg(h, r) represents the Dog leg modifier as a function of hole size and turn rate
  • Severity Limit represents the maximum value allowed for a single NPT event for all planned run severity calculations
  • CR represents Country risk modifier
  • SH represents Land/Off-shore risk modifier
  • TR represents Trend risk modifier.
  • the Severity Limit may be entered once at the beginning of an analysis and applies to all subsequent severity calculations.
  • the actual severity distributions may be by construction unbounded on the upper side. Consequently, they can produce NPT downtime values that may be relatively large for the actual situations being modeled as judged by the user. For example, suppose that for a specific planned run, the drilling operator's actual operational data (and therefore distribution fitted to this data) indicates that NPT event times could exceed 30 days. However, based on the logistic data and condition data associated with the specific set of wells under analysis, a user selection can be made to use a maximum value for any single run of 5 days. Setting this upper limit recognizing local logistic and operational environmental data is another way the user can make data input selections to customize the RTM to a specific set of conditions. By setting the Severity Limit to a relatively large number, such as about 9,999, the user can utilize the full variation of NPT values produced by the distributions constructed by the underlying NPT severity data.
  • the NPT financial risk may include an additional term, HourRate(h, d, l), to the NPT Time risk that converts NPT time to financial costs as shown in equation 2:
  • NPT Cost Risk( h, d, l, t ) k Prob Fail( BHAk )*max ⁇ Sev( h, d, l )*Dogleg( h, r ), Severity Limit ⁇ *CR*SH*TR* HourRate( h, d, l ) (2)
  • the cost structure is entered for each hole size, depth, and drilled length combination. As such, the RTM captures non-productive time value through drilling characteristics. With additional data, the RTM is capable of providing different valuation approaches for time to well completions.
  • the fundamental stochastic variables of the RTM are the above time and cost equations summed over all planned runs.
  • the total NPT time and cost risk over “N” planned runs for Monte Carlo trial “j” can be expressed as:
  • the statistical results of these two variables constitute the risk management and insurance model variables. Since the data necessary for the financial analysis formulation is incomplete at this time, the RTM's insurance analysis will be described only for the time variable. Since NPT extends the well completion time, we add the total BRT hours as computed in the model's input screen to equation (3) to produce the practical variable of interest: the distribution of time required to complete the wells as described by the planned runs.
  • the BRT slack percentage is a user selected input for the uncertainty in this number.
  • the BRT hours plus the percentage slack amount is plotted on the output risk plots for comparison of the BRT uncertainty with the NPT uncertainty produced from the model calculations.
  • BRT uncertainty may not be directly applied to the insurance analysis. Changes in BRT hours are not necessarily under the control of drilling operators since geological, climate, customer requirements, and several other factors can influence this time. However, drilling operators are typically accountable for schedule delays due to the failure of their products and services.
  • the insurance analysis contains four parts: (1) well completion time risk without insurance parameters; (2) well completion time risk with a prescribed time deductible; (3) well completion time risk with a prescribed time deductible and a time ceiling; and (4) well completion time risk greater than the time ceiling.
  • a common output format may be used for all parts to facilitate a common understanding of the risks associated with each element.
  • the format as shown in FIG. 5 may be modified depending on the insurance environment.
  • the insurance model features as shown in FIG. 5 may be based on the planned runs example depicted in FIG. 2 .
  • the set of 22 runs shown in FIG. 2 are for plans to drill about four wells. Actual tender analysis could consider significantly more or less wells and FIG. 2 is used to only to depict the RTM functionality.
  • FIG. 5 illustrates running the RTM for the 22 planned runs with 10,000 Monte Carlo trials.
  • the average and presented percentile statistics are common elements of risk management decision-making.
  • the black line in the plot depicts the entire NPT risk distribution as a cumulative distribution function. For example, the probability value associated with a BRT time of 1,540 hours has about a 90% chance that the total BRT hours will be less than or equal to 1,540 hours or a 10% chance BRT will exceed 1,540 hours.
  • the BRT slack is added to show the relative uncertainty upper limit of BRT hours computed to the BRT increase from NPT.
  • the plot may be used to form the basis for developing insurance parameters that produce the desired level of risk retained by a drilling operator and the amount of risk transferred to an insurer. The other legend components will be addressed below.
  • FIG. 6 illustrates the well completion time risk with a prescribed time deductible.
  • FIG. 6 illustrates the well completion time risk with a prescribed time deductible.
  • FIG. 6 illustrates the BRT, NPT-based risk distribution that the service provider is assuming by ensuring the total BRT for drilling the 4 wells with the 22 planned runs will be less than or equal to about 1,520 hours.
  • FIG. 7 illustrates an amended distribution based on FIG. 5 that shows the 1,520 hours BRT deductible from FIG. 6 .
  • FIG. 8 illustrates the well completion time risk with a prescribed time deductible and a time ceiling.
  • the plot in FIG. 8 shows that most of the risk is actually for BRT hours greater than 1,520 hours and this where insurance applies.
  • an insured floor may be placed at 1,540 hours. From the plot, there may be about a 10% chance that the total non-productive time for drilling the 4 wells would exceed this value.
  • Adding the insured floor or the service provider's risk assumed ceiling produces the plot shown in FIG. 8 and statistical results for the risk exposure they have retained between 1,520 and 1,540 hours.
  • FIG. 9 illustrates an updated distribution based on FIG. 5 that show the risk exposure the drilling operator is retaining. In FIG. 9 , this is represented between the blue and red solid vertical lines. The risk exposure is transferred to an insurer, which is to the right of the red vertical line.
  • FIG. 10 illustrates when the well completion time risk is greater than the time ceiling.
  • the last portion of the analysis displays the risk exposure transferred to an insurer in terms of insurance.
  • the results show that there may be a low probability of occurrence associated with experiencing NPT results in excess of total BRT hours of about 1,540. However, the potential for relatively large NPT (and therefore relatively large BRT hours) results does exist. Mitigating these low frequency-high severity events may be the purpose of the insurance.
  • RTM processing system 100 Programming and/or loading executable instructions onto memory 108 and processor 102 in order to transform the RTM processing system 100 into a particular machine or apparatus that utilizes the RTM is well known in the art.
  • the RTM processing system 100 may be implemented using macros within Microsoft Excel®.
  • Implementing instructions, real-time monitoring, and other functions by loading executable software into a computer can be converted to a hardware implementation by well-known design rules. For example, decisions between implementing a concept in software versus hardware may depend on a number of design choices that include stability of the design and numbers of units to be produced and issues involved in translating from the software domain to the hardware domain.
US15/062,164 2015-03-06 2016-03-06 Risk assessment for drilling and well completion operations Abandoned US20160260036A1 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
US15/062,164 US20160260036A1 (en) 2015-03-06 2016-03-06 Risk assessment for drilling and well completion operations
US17/395,260 US11521278B2 (en) 2015-03-06 2021-08-05 Method of predicting drilling and well operation
US18/075,378 US20230237594A1 (en) 2015-03-06 2022-12-05 Method of predicting drilling and well operation

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US201562129615P 2015-03-06 2015-03-06
US15/062,164 US20160260036A1 (en) 2015-03-06 2016-03-06 Risk assessment for drilling and well completion operations

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US17/395,260 Continuation US11521278B2 (en) 2015-03-06 2021-08-05 Method of predicting drilling and well operation

Publications (1)

Publication Number Publication Date
US20160260036A1 true US20160260036A1 (en) 2016-09-08

Family

ID=55661555

Family Applications (5)

Application Number Title Priority Date Filing Date
US15/556,101 Abandoned US20180047116A1 (en) 2015-03-06 2016-03-06 Risk assessment for drilling and well completion operations
US15/062,164 Abandoned US20160260036A1 (en) 2015-03-06 2016-03-06 Risk assessment for drilling and well completion operations
US17/395,260 Active US11521278B2 (en) 2015-03-06 2021-08-05 Method of predicting drilling and well operation
US17/395,284 Pending US20220058547A1 (en) 2015-03-06 2021-08-05 Method of determining performance of drilling and well operation
US18/075,378 Pending US20230237594A1 (en) 2015-03-06 2022-12-05 Method of predicting drilling and well operation

Family Applications Before (1)

Application Number Title Priority Date Filing Date
US15/556,101 Abandoned US20180047116A1 (en) 2015-03-06 2016-03-06 Risk assessment for drilling and well completion operations

Family Applications After (3)

Application Number Title Priority Date Filing Date
US17/395,260 Active US11521278B2 (en) 2015-03-06 2021-08-05 Method of predicting drilling and well operation
US17/395,284 Pending US20220058547A1 (en) 2015-03-06 2021-08-05 Method of determining performance of drilling and well operation
US18/075,378 Pending US20230237594A1 (en) 2015-03-06 2022-12-05 Method of predicting drilling and well operation

Country Status (9)

Country Link
US (5) US20180047116A1 (zh)
EP (2) EP3265647B1 (zh)
CN (2) CN115345409A (zh)
BR (1) BR112017019151B1 (zh)
CA (1) CA2978897A1 (zh)
NO (1) NO20171564A1 (zh)
RU (2) RU2740695C2 (zh)
SA (1) SA517382238B1 (zh)
WO (1) WO2016144842A1 (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110555674A (zh) * 2019-08-29 2019-12-10 森诺科技有限公司 一种油气田钻井现场智能安全管控系统
US20220195860A1 (en) * 2015-03-06 2022-06-23 The Hartford Steam Boiler Inspection And Insurance Company Method of predicting drilling and well operation
US11514383B2 (en) * 2019-09-13 2022-11-29 Schlumberger Technology Corporation Method and system for integrated well construction
US11514527B2 (en) 2017-07-27 2022-11-29 The Hartford Steam Boiler Inspection And Insurance Company Computer systems and computer-implemented methods utilizing sensor-driven dynamically adjustable feedback loops to manage equipment based risk on an asset specific level of energy data usage

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11585955B2 (en) 2021-05-20 2023-02-21 Saudi Arabian Oil Company Systems and methods for probabilistic well depth prognosis

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050209866A1 (en) * 2004-03-17 2005-09-22 Schlumberger Technology Corporation Method and apparatus and program storage device adapted for visualization of qualitative and quantitative risk assessment based on technical wellbore design and earth properties
US20050209912A1 (en) * 2004-03-17 2005-09-22 Schlumberger Technology Corporation Method system and program storage device for automatically calculating and displaying time and cost data in a well planning system using a Monte Carlo simulation software
US20070043662A1 (en) * 2005-08-19 2007-02-22 The Hartford Steam Boiler Inspection And Insurance Method of determining prior net benefit of obtaining additional risk data for insurance purposes via survey or other procedure
US20070199721A1 (en) * 2006-02-27 2007-08-30 Schlumberger Technology Corporation Well planning system and method
US20150081221A1 (en) * 2012-03-19 2015-03-19 Stefano Mancini Drilling system failure risk analysis method
US20150356450A1 (en) * 2013-10-25 2015-12-10 Landmark Graphics Corporation Real-Time Risk Prediction During Drilling Operations

Family Cites Families (45)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IE910209A1 (en) * 1990-02-28 1991-09-11 Union Oil Co Drag analysis method
JP2002288435A (ja) 2001-03-27 2002-10-04 Mitsubishi Heavy Ind Ltd 機械設備保守料設定システム及び機械設備保険料設定システム
JP2004005371A (ja) 2002-03-29 2004-01-08 Hitachi Ltd 家電機器監視装置及び家電保守サービスシステム
US7539625B2 (en) * 2004-03-17 2009-05-26 Schlumberger Technology Corporation Method and apparatus and program storage device including an integrated well planning workflow control system with process dependencies
US7653563B2 (en) * 2004-03-17 2010-01-26 Schlumberger Technology Corporation Method and apparatus and program storage device adapted for automatic qualitative and quantitative risk assessment based on technical wellbore design and earth properties
EA200800436A1 (ru) * 2005-07-27 2008-08-29 Эксонмобил Апстрим Рисерч Компани Моделирование скважины, связанное с добычей углеводородов из подземных формаций
US8311789B2 (en) * 2006-02-24 2012-11-13 Saudi Arabian Oil Company Monte Carlo simulation of well logging data
US8224690B2 (en) * 2007-07-19 2012-07-17 Hsb Solomon Associates Graphical risk-based performance measurement and benchmarking system and method
US20110161133A1 (en) * 2007-09-29 2011-06-30 Schlumberger Technology Corporation Planning and Performing Drilling Operations
US7660673B2 (en) * 2007-10-12 2010-02-09 Schlumberger Technology Corporation Coarse wellsite analysis for field development planning
BRPI0817402A2 (pt) * 2007-11-10 2019-09-24 Landmark Graphics Corp A Halliburton Company dispositivos e métodos para automação de fluxos de trabalho, adaptação e integração
US8255816B2 (en) * 2008-01-25 2012-08-28 Schlumberger Technology Corporation Modifying a magnified field model
US20090234623A1 (en) * 2008-03-12 2009-09-17 Schlumberger Technology Corporation Validating field data
US7861800B2 (en) * 2008-10-08 2011-01-04 Schlumberger Technology Corp Combining belief networks to generate expected outcomes
BRPI0914510B1 (pt) * 2008-10-14 2019-07-16 Prad Research And Development Limited Métodos para automatizar ou parcialmente automatizar a otimização de uma operação de perfuração automatizada ou parcialmente automatizada, sistema para automatizar ouparcialmente automatizar um processo, método para operar um equipamento de perfuração automatizado, método para controlar um processo automatizado para perfurar um furo de poço, e sistema de controle de perfuração
US8600556B2 (en) 2009-06-22 2013-12-03 Johnson Controls Technology Company Smart building manager
EP2467819A4 (en) * 2009-08-20 2013-04-03 Stamford Risk Analytics Llc RISK DETERMINATION / MEASURING SYSTEM AND RISK-BASED DECISION-ANALYSIS TOOL
US8527249B2 (en) * 2010-02-23 2013-09-03 Halliburton Energy Services, Inc. System and method for optimizing drilling speed
US8473435B2 (en) * 2010-03-09 2013-06-25 Schlumberger Technology Corporation Use of general bayesian networks in oilfield operations
AU2012223466B2 (en) 2011-02-28 2015-08-13 Emerson Electric Co. Residential solutions HVAC monitoring and diagnosis
US9045967B2 (en) * 2011-07-26 2015-06-02 Schlumberger Technology Corporation System and method for controlling and monitoring a drilling operation using refined solutions from a panistic inversion
US20150178865A1 (en) 2011-09-20 2015-06-25 The Trustees Of Columbia University In The City Of New York Total property optimization system for energy efficiency and smart buildings
CA2867327C (en) * 2012-04-25 2018-07-24 Halliburton Energy Services, Inc. Systems and methods for anonymizing and interpreting industrial activities as applied to drilling rigs
US8812331B2 (en) 2012-04-27 2014-08-19 Richard B. Jones Insurance product, rating and credit enhancement system and method for insuring project savings
US20130341093A1 (en) * 2012-06-21 2013-12-26 Stuart Inglis Jardine Drilling risk avoidance
US9501799B2 (en) 2012-11-08 2016-11-22 Hartford Fire Insurance Company System and method for determination of insurance classification of entities
CN105074128B (zh) * 2013-03-28 2018-12-07 普拉德研究及开发股份有限公司 自动钻机活动报告生成
SG11201508721UA (en) * 2013-05-29 2015-11-27 Landmark Graphics Corp Compiling drilling scenario data from disparate data sources
US20140358592A1 (en) 2013-05-31 2014-12-04 OneEvent Technologies, LLC Sensors for usage-based property insurance
US10915358B2 (en) 2013-09-30 2021-02-09 Schneider Electric USA, Inc. Systems and methods of data acquisition
WO2015060879A1 (en) * 2013-10-25 2015-04-30 Landmark Graphics Corporation Drilling engineering analysis roadmap builder
US10248920B2 (en) * 2013-11-13 2019-04-02 Schlumberger Technology Corporation Automatic wellbore activity schedule adjustment method and system
US20160253607A1 (en) * 2014-03-11 2016-09-01 Lu Xu Risk Measure-Based Decision Support Tool For Reservoir Development
WO2015138724A1 (en) * 2014-03-12 2015-09-17 Landmark Graphics Corporation Horizontal well design for field with naturally fractured reservoir
US9957781B2 (en) * 2014-03-31 2018-05-01 Hitachi, Ltd. Oil and gas rig data aggregation and modeling system
US9803475B2 (en) * 2014-04-09 2017-10-31 Weatherford Technology Holdings, Llc System and method for integrated wellbore stress, stability and strengthening analyses
US10067482B2 (en) 2014-05-16 2018-09-04 Emerson Climate Technologies Retail Solutions, Inc. Menu and firmware management for equipment
US10861110B2 (en) * 2014-08-04 2020-12-08 Schlumberger Technology Corporation Collaborative system and method for performing wellsite tasks
CN115345409A (zh) * 2015-03-06 2022-11-15 哈佛蒸汽锅炉检验和保险公司 用于钻井和完井操作的风险评估
US20170011318A1 (en) 2015-07-09 2017-01-12 Johnson Controls Technology Company Automated monitoring and service provider recommendation platform for hvac equipment
US10769735B2 (en) 2015-09-11 2020-09-08 Johnson Controls Technology Company Thermostat with user interface features
CN111328405B (zh) 2017-07-27 2023-08-29 哈佛蒸汽锅炉检验和保险公司 利用传感器驱动的动态可调整反馈回路来管理基于特定于资产的能量数据使用水平的装备风险
EP3682087B1 (en) * 2017-09-11 2023-11-29 Services Pétroliers Schlumberger Well planning system
US10590760B2 (en) * 2018-01-03 2020-03-17 Baker Hughes, A Ge Company, Llc Real-time monitoring of downhole dynamic events
US20200210954A1 (en) * 2018-12-31 2020-07-02 TraxID,LLC Heterogeneous Data Management Methodology and System

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050209866A1 (en) * 2004-03-17 2005-09-22 Schlumberger Technology Corporation Method and apparatus and program storage device adapted for visualization of qualitative and quantitative risk assessment based on technical wellbore design and earth properties
US20050209912A1 (en) * 2004-03-17 2005-09-22 Schlumberger Technology Corporation Method system and program storage device for automatically calculating and displaying time and cost data in a well planning system using a Monte Carlo simulation software
US20070043662A1 (en) * 2005-08-19 2007-02-22 The Hartford Steam Boiler Inspection And Insurance Method of determining prior net benefit of obtaining additional risk data for insurance purposes via survey or other procedure
US20070199721A1 (en) * 2006-02-27 2007-08-30 Schlumberger Technology Corporation Well planning system and method
US20150081221A1 (en) * 2012-03-19 2015-03-19 Stefano Mancini Drilling system failure risk analysis method
US20150356450A1 (en) * 2013-10-25 2015-12-10 Landmark Graphics Corporation Real-Time Risk Prediction During Drilling Operations

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20220195860A1 (en) * 2015-03-06 2022-06-23 The Hartford Steam Boiler Inspection And Insurance Company Method of predicting drilling and well operation
US11521278B2 (en) * 2015-03-06 2022-12-06 The Hartford Steam Boiler Inspection And Insurance Company Method of predicting drilling and well operation
US20230237594A1 (en) * 2015-03-06 2023-07-27 The Hartford Steam Boiler Inspection And Insurance Company Method of predicting drilling and well operation
US11514527B2 (en) 2017-07-27 2022-11-29 The Hartford Steam Boiler Inspection And Insurance Company Computer systems and computer-implemented methods utilizing sensor-driven dynamically adjustable feedback loops to manage equipment based risk on an asset specific level of energy data usage
CN110555674A (zh) * 2019-08-29 2019-12-10 森诺科技有限公司 一种油气田钻井现场智能安全管控系统
US11514383B2 (en) * 2019-09-13 2022-11-29 Schlumberger Technology Corporation Method and system for integrated well construction

Also Published As

Publication number Publication date
US20220195860A1 (en) 2022-06-23
CN107995983A (zh) 2018-05-04
EP3960983A1 (en) 2022-03-02
CN107995983B (zh) 2022-05-06
SA517382238B1 (ar) 2022-09-27
NO20171564A1 (en) 2017-09-29
WO2016144842A1 (en) 2016-09-15
RU2708301C2 (ru) 2019-12-05
RU2017134737A (ru) 2019-04-05
EP3265647B1 (en) 2021-02-24
RU2019137652A3 (zh) 2020-11-05
BR112017019151B1 (pt) 2023-01-31
RU2017134737A3 (zh) 2019-06-14
US20180047116A1 (en) 2018-02-15
RU2019137652A (ru) 2020-01-20
EP3265647A1 (en) 2018-01-10
RU2740695C2 (ru) 2021-01-19
CA2978897A1 (en) 2016-09-15
US20220058547A1 (en) 2022-02-24
US20230237594A1 (en) 2023-07-27
BR112017019151A2 (pt) 2018-07-31
CN115345409A (zh) 2022-11-15
US11521278B2 (en) 2022-12-06

Similar Documents

Publication Publication Date Title
US11521278B2 (en) Method of predicting drilling and well operation
US11836487B2 (en) Computer-implemented methods and systems for measuring, estimating, and managing economic outcomes and technical debt in software systems and projects
Bakhshi et al. An overview of budget contingency calculation methods in construction industry
US20170068761A1 (en) Computer-implemented impact analysis of energy facilities
US20080133427A1 (en) Collateralized Debt Obligation Evaluation System and Method
US11579322B2 (en) System and method for earthquake risk mitigation in building structures
JP2015222596A (ja) 将来の損失に関連する頻度を予測し、損失決定ユニットの関連する自動処理のためのシステム及び方法
Lopez-Nicolas et al. Economic risk assessment of drought impacts on irrigated agriculture
US20140278711A1 (en) Systems Engineering Lifecycle Cost Estimation
Tawfek et al. Assessment of the expected cost of quality (COQ) in construction projects in Egypt using artificial neural network model
EP2564366A1 (en) Risk assessment and mitigation planning system and method
Wall et al. Refining the definition of a geothermal exploration success rate
Buertey et al. Construction cost contingency estimating in Ghana: a review of work sections prone to scope changes
Kountur The likelihood value of residual risk estimation in the management of enterprise risk
Shamshiri et al. Project Phase–Based Contingency Adjustment Framework for Infrastructure Renewal Projects
Zausa et al. Enhanced post-well analyses by data integration over entire projects lifecycle
Kelliher et al. Operational Risk Working Party-Validating Operational Risk Models
Pleune Operational Risk Management
KR20230093886A (ko) 공공 대형 연구 인프라의 지속가능한 운영을 위한 비용 평가 방법 및 장치
Fan A new blueprint for new digital technology adoption in the mining industry using a systems thinking approach
Serag Change orders and productivity loss quantification using verifiable site data
Cruz Developing a framework for operational risk analytics
Trück et al. Handbook CATLoG: Climate adaptation decision support tool for local governments
Githae Wanyona et al. RISKS IN PROACTIVE BUDGET PREDICTION AN EMPIRICAL STUDY IN KENYA
Chherawala Model Risk Management in Credit Risk Models

Legal Events

Date Code Title Description
STPP Information on status: patent application and granting procedure in general

Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION

STPP Information on status: patent application and granting procedure in general

Free format text: NON FINAL ACTION MAILED

STPP Information on status: patent application and granting procedure in general

Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER

STPP Information on status: patent application and granting procedure in general

Free format text: NON FINAL ACTION MAILED

STPP Information on status: patent application and granting procedure in general

Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER

STPP Information on status: patent application and granting procedure in general

Free format text: FINAL REJECTION MAILED

AS Assignment

Owner name: THE HARTFORD STEAM BOILER INSPECTION AND INSURANCE COMPANY, CONNECTICUT

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:JONES, RICHARD B.;REEL/FRAME:051700/0377

Effective date: 20150309

STPP Information on status: patent application and granting procedure in general

Free format text: NON FINAL ACTION MAILED

STPP Information on status: patent application and granting procedure in general

Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER

STPP Information on status: patent application and granting procedure in general

Free format text: FINAL REJECTION MAILED

STPP Information on status: patent application and granting procedure in general

Free format text: NON FINAL ACTION MAILED

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION