US20160187911A1 - Systems and methods for optimizing energy and resource management for building systems - Google Patents
Systems and methods for optimizing energy and resource management for building systems Download PDFInfo
- Publication number
- US20160187911A1 US20160187911A1 US14/971,236 US201514971236A US2016187911A1 US 20160187911 A1 US20160187911 A1 US 20160187911A1 US 201514971236 A US201514971236 A US 201514971236A US 2016187911 A1 US2016187911 A1 US 2016187911A1
- Authority
- US
- United States
- Prior art keywords
- model
- data
- building
- energy
- rules
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000000034 method Methods 0.000 title claims abstract description 192
- 238000005457 optimization Methods 0.000 claims abstract description 45
- 230000000295 complement effect Effects 0.000 claims abstract description 10
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 50
- 238000010438 heat treatment Methods 0.000 claims description 41
- 238000001816 cooling Methods 0.000 claims description 40
- 238000009423 ventilation Methods 0.000 claims description 35
- 238000011160 research Methods 0.000 claims description 11
- 238000004458 analytical method Methods 0.000 claims description 8
- 238000004140 cleaning Methods 0.000 claims description 8
- 230000002159 abnormal effect Effects 0.000 claims description 7
- 238000007726 management method Methods 0.000 description 41
- 238000010586 diagram Methods 0.000 description 20
- 238000013500 data storage Methods 0.000 description 14
- 230000005611 electricity Effects 0.000 description 14
- 238000013459 approach Methods 0.000 description 12
- 230000004044 response Effects 0.000 description 11
- 239000000446 fuel Substances 0.000 description 10
- 238000013528 artificial neural network Methods 0.000 description 9
- 230000009467 reduction Effects 0.000 description 9
- 238000012544 monitoring process Methods 0.000 description 8
- 238000013439 planning Methods 0.000 description 8
- 239000005431 greenhouse gas Substances 0.000 description 7
- 238000012423 maintenance Methods 0.000 description 7
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 description 6
- 229910052799 carbon Inorganic materials 0.000 description 6
- 238000001514 detection method Methods 0.000 description 6
- 230000009471 action Effects 0.000 description 5
- 238000004422 calculation algorithm Methods 0.000 description 5
- 230000002547 anomalous effect Effects 0.000 description 4
- 238000004891 communication Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 4
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 4
- 238000003909 pattern recognition Methods 0.000 description 4
- 238000000513 principal component analysis Methods 0.000 description 4
- 238000012913 prioritisation Methods 0.000 description 4
- 238000004088 simulation Methods 0.000 description 4
- 230000015556 catabolic process Effects 0.000 description 3
- 238000004590 computer program Methods 0.000 description 3
- 230000002950 deficient Effects 0.000 description 3
- 238000006731 degradation reaction Methods 0.000 description 3
- 238000005286 illumination Methods 0.000 description 3
- 230000010354 integration Effects 0.000 description 3
- 230000007246 mechanism Effects 0.000 description 3
- YHXISWVBGDMDLQ-UHFFFAOYSA-N moclobemide Chemical compound C1=CC(Cl)=CC=C1C(=O)NCCN1CCOCC1 YHXISWVBGDMDLQ-UHFFFAOYSA-N 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 235000012206 bottled water Nutrition 0.000 description 2
- 230000001143 conditioned effect Effects 0.000 description 2
- 239000003651 drinking water Substances 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000005265 energy consumption Methods 0.000 description 2
- 239000000295 fuel oil Substances 0.000 description 2
- 230000006870 function Effects 0.000 description 2
- 230000002068 genetic effect Effects 0.000 description 2
- 230000006872 improvement Effects 0.000 description 2
- 238000005259 measurement Methods 0.000 description 2
- 239000003345 natural gas Substances 0.000 description 2
- 238000010248 power generation Methods 0.000 description 2
- 238000000611 regression analysis Methods 0.000 description 2
- 238000002922 simulated annealing Methods 0.000 description 2
- 230000002747 voluntary effect Effects 0.000 description 2
- 241000656145 Thyrsites atun Species 0.000 description 1
- 230000006978 adaptation Effects 0.000 description 1
- 230000003044 adaptive effect Effects 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 230000003750 conditioning effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 239000002826 coolant Substances 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000004146 energy storage Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000001914 filtration Methods 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 238000010801 machine learning Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 230000005855 radiation Effects 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 238000007619 statistical method Methods 0.000 description 1
- 238000012384 transportation and delivery Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05F—SYSTEMS FOR REGULATING ELECTRIC OR MAGNETIC VARIABLES
- G05F1/00—Automatic systems in which deviations of an electric quantity from one or more predetermined values are detected at the output of the system and fed back to a device within the system to restore the detected quantity to its predetermined value or values, i.e. retroactive systems
- G05F1/66—Regulating electric power
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B15/00—Systems controlled by a computer
- G05B15/02—Systems controlled by a computer electric
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05D—SYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES
- G05D23/00—Control of temperature
- G05D23/19—Control of temperature characterised by the use of electric means
- G05D23/1917—Control of temperature characterised by the use of electric means using digital means
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/20—Pc systems
- G05B2219/26—Pc applications
- G05B2219/2642—Domotique, domestic, home control, automation, smart house
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/80—Management or planning
- Y02P90/84—Greenhouse gas [GHG] management systems
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/80—Management or planning
- Y02P90/84—Greenhouse gas [GHG] management systems
- Y02P90/845—Inventory and reporting systems for greenhouse gases [GHG]
Definitions
- Embodiments of the invention described herein generally relate to optimizing the management of a building's energy and other key resources such as water, ventilation, etc. More specifically, embodiments of the present invention are directed towards systems and methods for utilizing predictive modeling to optimize a plurality of inputs representing a building's energy usage, water usage and other resource consumption.
- buildings consume a tremendous amount of natural resources and are a major contributor to the carbon footprint and water footprint of cities. There is a great opportunity to optimize the management of energy and water while meeting the needs of the multitude of different users of commercial and industrial buildings. From EPA 2009 data, buildings account for 39% of energy used, 68% of electricity consumed and 38% CO2 emissions. Building managers face significant pressures requiring them to efficiently manage energy consumption including corporate profit pressures coupled with increasing & volatile fuel costs, corporate sustainability top-down directives mandating carbon-reporting, GHG reductions, and usage of renewable energy sources, and building regulations mandating benchmarking and improvement programs.
- BMS building management system
- BAS building automation system
- the mode of operation of building resources is typically reactive management of heating, cooling ventilation and a portion of lighting based on schedule and reacting to set-points being exceeded.
- There is a significant opportunity for efficiency gains through shifting to proactive management based on demand forecasts and utilizing rich real-time data on building operation and disturbances such as weather, occupancy, etc.
- expanding the scope of proactive management from heating and cooling to a more complete integration of lighting controls and other building subsystems including a variety of technologies and strategies available for meeting customer comfort with less energy consumed.
- Another area of opportunity is for improved integration of the different approaches in use for energy management in a building, with facilities management often pursuing separate and sometimes conflicting strategies for energy efficiency programs to reduce base load/energy costs, demand response participation with both voluntary and mandatory commitments to utilities, use of on-site generation and storage technology, etc.
- energy efficiency programs to reduce base load/energy costs, demand response participation with both voluntary and mandatory commitments to utilities, use of on-site generation and storage technology, etc.
- Recently with the increasing number of energy management approaches in place there has been an increase in different priorities for energy management: reduce overall energy costs, reduce greenhouse gas emissions/carbon impact, increase use of on-site and renewable energy resources, and generate revenue from sale of energy or participation in demand response programs.
- technology There is an opportunity for technology to give customers a way to take a holistic view of the entire envelope of energy management approaches in place and use an objective analysis to incorporate business priorities to generate an integrated energy management strategy.
- the method receives a plurality of input values associated with a building or plurality of buildings.
- the method cleans the input values prior to constructing a thermal and electrical load model, wherein cleaning the input values prior to constructing a thermal and electrical load model comprises detecting abnormal data and invalid inputs.
- cleaning the input values prior to constructing a thermal and electrical load model further comprises interpolating invalid data points and performing principle component analysis of the data set.
- the method generates and optimizes an on-site generation model for variable and consistent on-site generation sources.
- the method then constructs a thermal and an electrical load model based on the inputs.
- the thermal and electrical load models are generated based on built and stored demand models for a plurality of subsystem categories, wherein the plurality of subsystem categories includes one or more of heating/cooling, ventilation, lighting, water, plug load, and data center demand models.
- the method then constructs an overall energy model, the overall energy model being based on the thermal and electrical load models and generates a plurality of demand models based on the constructed energy model.
- energy rules comprise client-defined rules/constraints, strategies and general rules and wherein the method further optimizes the models based on client-defined rules/constraints, strategies and strategies include rules for energy management specified by the building manager or owner.
- general rules include rules for optimizing building energy management include proprietary rules based on research, rules based on comparisons to peer benchmarks and rules derived by comparing research to manufacturer-supplied data.
- the method then optimizes the demand models using complex multivariate optimization techniques, wherein optimizing is based on usage data and energy rules. Finally, the method displays recommendations based on the optimized model or generating real-time, complementary control instructions based on the optimized model.
- the present invention is further directed towards a system for optimizing building energy usage.
- the system comprises a plurality of data sources containing a plurality of input values associated with a building or plurality of buildings.
- the system further comprises a forecasting and optimization engine operative to construct a thermal and an electrical load model based on the inputs; construct an overall energy model, the overall energy model being based on the thermal and electrical load models; and generate a plurality of demand models based on the constructed energy model.
- the system further comprises a data conditioner operative to clean the input values prior to constructing a thermal and electrical load model, wherein the data conditioner is operative to detect abnormal data and invalid inputs.
- the data conditioner is further operative to interpolate invalid data points and performing principle component analysis of the data set.
- the system is further operative to generate and optimize an on-site generation model for variable and consistent on-site generation sources.
- the system further comprises an optimization engine operative to optimize the demand models using complex multivariate optimization techniques, wherein optimizing is based on usage data and energy rules.
- the forecasting and optimization engine generates the thermal and electrical load models based on built and stored demand models for a plurality of subsystem categories.
- the plurality of subsystem categories includes heating/cooling, ventilation, lighting, water, plug load, and data center demand models.
- the system further comprises a graphical user interface operating on a client device operative to display recommendations based on the optimized model or generating real and an interface to building control systems operative to transmit complementary control instructions based on the optimized model, the determination based on client preferences.
- energy rules comprise client defined rules and strategies and general rules and wherein the optimizer further optimizes the models based on client defined rules and strategies include rules for energy management specified by the building manager or owner.
- general rules include rules for optimizing building energy management include proprietary rules based on research, rules based on comparisons to peer benchmarks and rules derived by comparing research to manufacturer-supplied data.
- FIG. 1 presents a block diagram illustrating a system 100 for monitoring one or more building control systems according to one embodiment of the present invention
- FIG. 2 presents a block diagram illustrating an analytical engine used for use in monitoring and communication with one or more building control systems to optimize the performance of building assets according to one embodiment of the present invention
- FIG. 3 presents a block diagram illustrating a forecasting and estimation engine according to one embodiment of the present invention
- FIG. 4 presents a block diagram illustrating an optimization engine according to one embodiment of the present invention
- FIG. 5 presents a flow diagram illustrating a method for cleaning input data according to one embodiment of the present invention
- FIG. 6 presents a flow diagram illustrating a method for generating predictive building subsystem demand models according to embodiment of the present invention
- FIG. 7 presents a flow diagram illustrating a method for creating an on-site generation model according to one embodiment of the present invention
- FIGS. 8A and 8B present a method for optimizing a demand model according to one embodiment of the present invention
- FIG. 9 presents a flow diagram illustrating a method for generating recommendations based on simulated scenarios according to one embodiment of the present invention.
- FIG. 10 presents a flow diagram illustrating a method for detecting faults in building control systems according to one embodiment of the present invention.
- FIG. 11 presents a flow diagram illustrating a method for predicting faults in building control systems according to one embodiment of the present invention.
- FIG. 1 presents a block diagram illustrating a system 100 for monitoring one or more building control systems according to one embodiment of the present invention.
- an analytical engine 108 interacts with external data source(s) 102 , real-time building data source(s) 104 , and historical data source(s) 106 and transmits information to and from user interface 110 and building control systems 112 .
- analytical engine 108 receives a plurality of data inputs from sources 102 , 104 , and 106 and performs various statistical analyses on the incoming data inputs, as will be discussed further herein.
- analytical engine 108 employs various machine-learning mechanisms to generate a predictive model based on the received data.
- Analytical engine 108 may further employ various optimization routines based on client-defined goals or constraints in order to optimize the generated predictive model.
- User interface 110 and building control systems 112 utilize the optimized model generated by analytical engine 108 .
- user interface 110 may provide various GUI representations of data or predictions gleaned from the predictive model generated by analytical engine 108 .
- user interface 110 may additionally combine real-time sensor reading or other data regarding the state of a given building or campus of buildings.
- the user interface 110 may provide an operator with data values and predictions to allow the operator to make informed decisions regarding changes in operation of building control systems 112 .
- the building control systems 112 may additionally interact with the predictive model generated by analytical engine 108 .
- the analytical engine 108 may transmit control instructions to the building control systems 112 .
- the analytical engine 108 may transmit such instructions using various protocols or interfaces as needed for various building subsystems (e.g., HVAC, lighting, water, etc.).
- the analytical engine 108 may transmit these instructions automatically to the systems, thus automating the building systems based on predictions formed from the generated model(s).
- the system 100 may allow the building owner/manager to automatically communicate with an energy supplier regarding on-site generation capabilities via an interface such as OpenADR.
- FIG. 2 presents a block diagram illustrating an analytical engine used for use in monitoring and communication with one or more building control systems to optimize the performance of building assets according to one embodiment of the present invention.
- the analytical engine 200 includes a plurality of data stores 202 - 212 including real-time building data storage 202 , real-time external data storage 204 , historical data storage 206 , on-site energy resources storage 208 , real-time energy availability storage 210 , and client energy approaches storage 212 .
- the storage modules 202 - 212 may comprise a plurality of components including equipment or sensors that generate data.
- real-time building data storage 202 stores various metrics relating to the current, or real-time, state of a given building, or campus of buildings.
- Real-time data may include such data such as supply air temperature data, outside air temperature data, water temperature data, heating & cooling medium (e.g., water, steam, etc.) pressure data, humidity data, air flow data, air pressure data, air quality data, CO 2 levels, lighting usage data, fuel or electricity consumption data, and water usage data.
- Real-time external data storage 204 may contain data such as environmental temperature data, solar position and irradiance data, wind speed data, and other weather data, as well as fuel oil rate data, natural gas rate data, electricity rate data, and other energy rate data.
- the real-time external data storage 204 may receive such data from external sources.
- Historical data storage 206 maintains historical data previously stored in real-time building data storage 202 and real-time external data storage 204 .
- historical data storage 206 may contain various historical data regarding the building or campus including, but not limited to building zone conditions (e.g., temperature, humidity, CO 2 ), occupancy history, HVAC conditions (e.g., temperature, humidity, air flow), weather conditions (e.g., solar radiation, temperature, humidity, wind speed) and energy rates.
- On-site energy resources storage 208 contains data relating to on-site energy generation (e.g., historical load profiles, system capacity limits, etc.) and on-site energy storage (e.g., historical storage profile data, system capacity limits, etc.).
- Real-time energy availability storage 210 contains data relating to the availability of energy such as the availability of the energy grid.
- Client energy approaches storage 212 may store data supplied by the client, as will be discussed further herein. Such data may comprise occupant comfort constraints, client energy management strategies (e.g., energy efficiency, demand response, demand management, renewable energy, on-site generate, and on-site storage strategies), and prioritized optimization criteria.
- forecasting and estimation engine 214 receives data from the data storage modules 202 - 212 and generates a demand model using predictive modeling, as will be discussed in more detail with respect to FIGS. 3 and 6 .
- forecasting and estimation engine 214 receives data from real-time external data storage 204 , historical data 206 , on-site energy resources storage 208 , real-time energy availability storage 210 , and client energy approaches 212 .
- forecasting and estimation engine 214 may additionally receive feedback from the optimization engine 216 in order to refine the generated demand models further.
- forecasting and estimation engine 214 may generate a plurality of demand models for each desired subsystem (e.g., heating, cooling, lighting, ventilation, water, plug load, data center, etc.).
- optimization engine 216 receives the models and attempts to optimize them.
- optimization engine 216 may utilize data from client energy approaches storage 212 , real-time external data storage 204 , and real-time building data storage 202 in order to further refine the models.
- the optimization engine 216 may attempt to meet targets for multiple optimization criteria simultaneously using prioritization of optimization criteria drawn from client energy approaches stored in 212 . For example, a given client may indicate that after occupant comfort constraints have been met that minimizing cost is the top priority for optimization and that minimizing greenhouse gas emissions/carbon impact is the second priority.
- the optimization engine 216 may try to optimize the demand models in order to minimize energy costs and minimize greenhouse gas but weighting energy cost minimization over greenhouse gas emissions minimization. Further discussion of the optimization method is discussed more fully with respect to FIGS. 8A and 8B .
- the system 200 further contains a fault detection and prediction module 218 , which may be operative to detect faults from sensor or equipment data and also predict such faults.
- fault detection and prediction module 218 may be operative to transmit data relating to detections and predictions to forecasting and estimation engine 214 to further refine the generated demand models, to the on-site energy resources 208 to refine information on availability of energy supply for later use in the optimization or to the building, or to the building control systems 112 to update building resource status. Fault detection and prediction is discussed more fully with respect to FIGS. 10 and 11 .
- the system 200 contains a planning module 220 . Planning module 220 may be operative to utilize the optimized demand models in determining an optimized response to a hypothetical demand scenario. The use of demand models with respect to planning is discussed more fully with respect to FIG. 9 .
- the analytical engine 214 is operative to receive real-time inputs and generate predictions based on the optimized demand models. For example, if the analytical engine 200 receives inputs stating that there is a change in temperature, the analytical engine 200 inputs the temperature changes into the appropriate demand model. In response, the analytical engine 200 may take a plurality of actions. In one embodiment, the analytical engine 200 may generate control instructions that may automatically adjust equipment settings and parameters. In this embodiment, the analytical engine 200 may interact directly with the building control systems 224 via an interface to the control systems 222 . The interface to the control systems 222 allows the analytical engine 200 to communicate with a plurality of disparate services (e.g., HVAC, lighting, etc.).
- a plurality of disparate services e.g., HVAC, lighting, etc.
- the analytical engine 200 may simply generate recommendations 226 and display such recommendations to an operator or building manager via a graphical user interface.
- the analytical engine 200 may utilize both automatic generation of control instructions and recommendations as determined by the building owner.
- the system 200 may allow the building owner/manager to automatically communicate with an energy supplier regarding on-site generation capabilities via an interface such as OpenADR.
- FIG. 3 presents a block diagram illustrating a forecasting and estimation engine according to one embodiment of the present invention.
- engine 300 contains a data conditioner module 302 .
- the data conditioner 302 receives input data, such as data from storage modules 202 - 212 .
- This data may comprise data relating to sensor or equipment readings within a building or campus of buildings.
- one input may comprise various lighting readings from within a specific zone (e.g., a room or group of rooms) within a building.
- the data conditioner 302 parses the received input data and cleans the input data. In one embodiment, cleaning the data may comprise detecting invalid or abnormal data. Methods for conditioning input data are discussed more fully with respect to FIG. 5 .
- the engine 200 sends the input data to thermal model generator 304 .
- the engine 200 sends input data to an appropriate model generator based on the subsystem being modeled.
- the engine 300 may be operative to determine a plurality of modeling parameters for specific areas. For example, the engine 300 may select the temperature and heating and cooling system data representing heating and cooling (such as temperatures, humidity, heating or cooling load). Additionally, the engine 300 may determine modeling parameters for ventilation (such as air changes, air flow, air quality), lighting (such as illumination, electricity), water (such as total water volume, potable water volume, domestic hot water (DHW) volume, make up water volume), plug load (such as electricity), and data centers (such as electricity).
- heating and cooling such as temperatures, humidity, heating or cooling load
- modeling parameters for ventilation such as air changes, air flow, air quality
- lighting such as illumination, electricity
- water such as total water volume, potable water volume, domestic hot water (DHW) volume, make up water volume
- plug load such as electricity
- data centers such as electricity
- thermal model generator 304 is operative to process a plurality of thermal inputs and generate a predictive model based on the inputs.
- a variety of techniques may be used in generating such the thermal model, and other models discussed herein, including, but not limited to, memory-based time-series regression analysis using ARIMA, ANN, SVM or other regression techniques, etc.
- the thermal model generator 304 aggregates building component data from the most granular data (e.g., specific HVAC equipment). The thermal model generator may additionally generate the model based on a granular building zone to be conditioned.
- the electrical load model generator 304 After generating the thermal model, the electrical load model generator 304 generates an electrical load model.
- the electrical load model comprises a predictive model generated similar to the thermal model that is, based on granular subsystem measurements.
- the engine 300 may then generate an energy demand model via energy demand model generator 308 .
- the demand model generator 308 may generate the energy demand model by combining the models generated by the thermal model generator 304 and electrical load model 306 .
- the demand model generator 308 analyzes the interactive effects and trade-offs between the thermal and electrical model.
- the engine 300 may include other model generators including, but not limited to, a ventilation model, water model, plug load model, and data center model.
- the on-site generation model generator 310 is operative to generate a predictive model based on a building or campuses on-site generation activities.
- the on-site generation model is based primarily on historical on-site power generation data and real-time, historical, weather forecast data.
- on-site storage model generator 312 is operative to generate a predictive storage model based on historical storage inflow/outflow data and capacity data. Methods for generating on-site generation and storage models are discussed more fully with respect to FIG. 7 .
- FIG. 4 presents a block diagram illustrating an optimization engine according to one embodiment of the present invention.
- an optimization engine 400 receives a plurality of un-optimized models 402 from the forecasting and estimation engine 300 . These un-optimized models 402 serve as inputs to the optimizer 404 .
- the optimizer 404 receives various constraints, strategies, and rules 406 - 412 that shape the optimization of the un-optimized models 402 .
- the system 400 may additionally store heuristics or statistics regarding the building or campus of building.
- energy management strategies 410 may comprise various strategies that the building manager or owner may wish to employ when optimizing the models.
- the building management may wish to achieve a specified energy cost reduction.
- the building management may wish to reduce greenhouse gas emissions/carbon impact by a target amount and utilize as much on-site power as percent of total power used as possible.
- constraints and objectives 412 may additionally be specified by the building management.
- the building management may specify various occupant comfort constraints such as temperature, humidity, and ventilation requirements.
- the management may set constraint that certain thresholds for various equipment not be exceeded or a general rule such as manufacturer-supplied input may create such a constraint.
- the optimizer 404 optimizes the received models 402 .
- the optimizer may use various optimization techniques including, but not limited to, nonlinear programming techniques including, but limited to, non-linear programming techniques including Genetic Algorithms, Simulated Annealing, Artificial Neural Networks, or other techniques or linear approximation techniques including Tailor series expansions or artificial neural networks (ANN).
- the optimizer 404 may output the optimized models to a storage module (not shown) for subsequent retrieval and usage. Additionally, the optimizer 404 may output the optimized model to the forecasting and estimation engine as feedback for subsequent model generation. Further details regarding the optimization of un-optimized models are discussed further with respect to FIG. 8 .
- FIG. 5 presents a flow diagram illustrating a method for cleaning input data according to one embodiment of the present invention.
- a method 500 receives building inputs, step 502 .
- building inputs may comprise environment and physical building characteristics (e.g., physical placement, solar placement, envelope, ventilation, number of windows, ratio of window to walls, etc.), building measurements, and disturbance in weather, occupancy, and rate/fuel price data.
- the method 500 then pre-processes the input data by filtering signal noise, step 504 .
- the method 500 then scans the remaining data points, step 506 .
- the method 500 first determines if there is abnormal data based on pattern recognition, step 508 .
- the method 500 may employ various pattern recognition algorithms in an attempt to identify data values that differ from the normal data values expected.
- the method 500 determines if there are any invalid input values due to faults in the sensors or building systems such as an air handling unit by employing fault detection techniques, step 510 .
- the method 500 may utilize a fault detection and prediction algorithm such as that illustrated in FIGS. 10 and 11 .
- step 508 or 510 detect anomalous data, the method will reject the data point, step 512 .
- the method 500 determines if there are any more data points left to be analyzed, step 514 . After scanning the data points, the method 500 additionally may interpolate the value of the rejected data points based on similar data, step 516 .
- the method 500 interpolates data for abnormal/anomalous data and data from a defective device. For example, a given building zone may have a plurality of sensors monitoring temperature. If all sensors other than defective sensor report temperatures within a limited range, the method 500 may interpolate the value from the defective sensor to be in line with the correct data from the other sensors. In alternative embodiments, the method 500 may not interpolate the value of data points and may simply reject noisy data points.
- the method After scanning the data points, rejecting anomalous data points, and interpolating data points, if desired, the method then performs principal component analysis of the data set, step 518 .
- the method 500 reduces the dimensionality to identify a feature set for the data points.
- the method 500 may use various PCA techniques known in the art for computing the feature set.
- FIG. 6 presents a flow diagram illustrating a method for generating predictive building subsystem demand models according to embodiment of the present invention.
- a method 600 receives input values, step 602 , and feedback from the optimizer, step 604 .
- input values may correspond to raw data from sensors, equipment, real-time external data, and other data sources as discussed previously.
- the method 600 receives feedback from the optimizer in order to further refine the demand model forecasts based on the optimized models.
- the feedback from the optimizer (step 604 ) together with the updated input values (step 602 ) provide adaptive learning about the building to improve the accuracy of future demand forecast predictions.
- the method 600 determines modeling parameters, step 606 , and builds and stores the demand models, step 608 .
- memory-based time-series regression analysis may employ analytical techniques such as ARIMA, ANN, SVM or other regression techniques to update the parameters of the demand model considering the history of the process, general energy rules (from knowledge base held in, for example, storage 408 ), a physical model of the subsystem (if available) and the new input values from 602 .
- the method 600 generates demand models for a plurality of discrete subsystems including, but not limited to ventilation, lighting, water, plug load, and data centers.
- step 608 we use the model parameters from step 606 to forecast the demand for each subsystem (including but not limited to lighting, water, ventilation, plug load and data center)
- the method 600 may generate parameters for heating/cooling (such as temperatures, humidity, heating or cooling load), ventilation (such as air changes, air flow, air quality), lighting (such as illumination, electricity), water (such as total water volume, potable water volume, domestic hot water (DHW) volume, make up water volume), plug load (such as electricity), and data centers (such as electricity).
- heating/cooling such as temperatures, humidity, heating or cooling load
- ventilation such as air changes, air flow, air quality
- lighting such as illumination, electricity
- water such as total water volume, potable water volume, domestic hot water (DHW) volume, make up water volume
- plug load such as electricity
- data centers such as electricity
- Steps 610 - 614 illustrate a method for generating demand models for heating and cooling subsystems.
- the method 600 first receives the subsystem demand models from 608 , then calculates a thermal model and electrical load model for each subsystem relevant to the overall energy demand model, step 610 .
- the method 600 may generate thermal and electrical load models for HVAC, ventilation, lighting, water, data center, and plug load systems as each system has an impact on the thermal and electrical load modeling.
- a variety of techniques may be used in generating such the thermal model, and other models discussed herein, including, but not limited to, memory-based time-series regression, ARIMA, ANN, SVM or other regression techniques.
- the method 600 updates the stored demand models for ventilation, lighting, water, plug load, and data centers based on the calculated thermal load model, step 616 .
- the method 600 constructs the overall building energy model based on the thermal and electrical load models, step 612 .
- constructing an overall building energy model comprises combining both the thermal and electrical load models to form a complete energy model for a given building/building complex or campus of buildings. Combining the thermal and electrical load models may be performed by a plurality of methods including, but not limited to, constructing a composite forecast using Bayesian techniques.
- the method 600 After creating the combined, overall building energy model, the method 600 generates the heating and cooling demand model, step 614 . In the illustrated example, the method 600 generates an appropriate demand model for heating and cooling systems based on the overall building energy model.
- the method 600 outputs specific subsystem demand models, step 618 .
- the specific subsystem demand models are based on the demand models generated in step 614 as well as retrieved and updated stored demand models, step 616 .
- the retrieved demand models may comprise demand models for lighting, ventilation, water, data center, and plug load while the generated demand models correspond to heating and cooling demand models.
- the method 600 may be utilized to generate (and potentially optimize) demand forecasts for a plurality of combinations of subsystems including but not limited to heating and cooling, lighting, water, ventilation, plug load, and data center subsystems.
- Some potential combinations include, but are not limited to: heating/cooling and light; heating/cooling, ventilation, and lighting; heating/cooling, lighting and water; heating/cooling, water; heating/cooling, ventilation, and water; heating/cooling, ventilation, lighting and water; heating/cooling, ventilation, lighting, plug load; heating/cooling, ventilation, lighting, plug load, water; water; heating/cooling, ventilation, dedicated data center EMS; all electrical demand across all building subsystems (H&C, lighting, ventilation, water, plug load, data center); heating/cooling, lighting, and plug load; heating/cooling, lighting, plug load, and water; heating/cooling, ventilation, lighting, dedicated data center EMS; heating/cooling, lighting, plug load EMS, dedicated data center EMS; or heating/cooling, ventilation, lighting, dedicated
- FIG. 7 presents a flow diagram illustrating a method for creating an on-site generation model according to one embodiment of the present invention.
- a method 700 receives modeling input data, step 702 .
- modeling input data comprises data such as historical on-site power generation data (e.g., power, time, and input fuel data), weather forecast data, sensor data, and historical weather, solar, or wind data.
- the method 700 classifies the system, step 704 .
- the method 700 classifies the system as variable or consistent generation based on the received inputs.
- classification of the system comprises the classification of the reliability, delivery, and presence of an input energy source.
- variable or consistent refers to the level of control an operator has on the input energy source of a system. For example, for weather-dependent systems (e.g., solar, wind, etc.), there is little control or consistency over the input energy source, thus the system may be considered variable.
- input energy is often available in regular cycles and can be predicted and planned for.
- generators that rely on a reliable fuel source or energy grid are considered consistent.
- the method 700 then inspects the classification, step 706 . If the method 700 classifies the on-site generation as variable the method 700 constructs a load predictive model, step 708 , and a consumption model, step 710 .
- constructing a load predictive model may employ various stochastic modeling techniques to model the received inputs into a load prediction model. Additionally, various modeling techniques described previously may be used in constructing the consumption and load predictive models.
- the method 700 may combine the two models by discounting the consumption model from the prediction model.
- the method 700 adjusts the models based on recent forecasts, step 712 . In the illustrated embodiment, adjusting the model on recent forecasts may update the model based on the most recent forecast, thus tuning the model to weight recent forecasts heavier than older, historical forecasts.
- the method 700 constructs the load predictive mode, step 714 .
- construction of the load predictive model may be accomplished by similar means as the predictive model generated for variable on-site generation sources.
- the method 700 then adjusts the model based on recent forecasts, step 716 , in a manner previous described with respect to variable on-site generation.
- the method 700 then creates a consumption model, step 720 , in a manner similar to that of variable on-site generation sources.
- the method 700 transmits the models to an optimization routine, step 722 .
- the model(s) may later be optimized according to a pre-defined optimization technique, as will be discussed with respect to FIGS. 8A and 8B .
- FIGS. 8A and 8B present a method for optimizing a demand model according to one embodiment of the present invention.
- a method 800 a collects client energy approaches, step 802 .
- client usage data may comprise occupant comfort constraints such as temperature, humidity, air quality, and illumination required.
- the method 800 a then retrieves the modeled demand forecasts, step 804 .
- the modeled demand forecasts are the output of the forecasting and estimation engine as discussed previously.
- the method 800 may retrieve demand forecasts for physical resources including energy (electricity and fuels), ventilation air, and water and the current state of the building or campus including subsystem demands including the heating demand, cooling demand, ventilation demand, lighting demand, water demand, data center demand and plug load demand.
- the method 800 a additionally retrieves existing client energy strategies and general rules, step 806 .
- the method 800 a may retrieve client energy efficiency strategies and targets that may be expressed in a variety of ways including the overall energy cost-savings target, the targeted reduction in electricity used in kWh, the targeted reduction in the amount of fuel oil used in gallons of MMBTU, and the targeted reduction in the amount of natural gas in therms or MMBTU.
- the method may retrieve a client's demand response program, or similar contract-based programs, participation goals that may be expressed in a variety of ways such as including the number of kilowatts or kilowatt hours curtailed and whether such curtailments are mandatory or voluntary and, if available, the resources in sequence to be used to meet curtailment targets. Additionally, the method may retrieve a client's demand management requirements that may be expressed in a variety of ways such as including the percent reduction in electricity usage in kilowatt hours during peak demand periods the kilowatts or percent reduction in maximum power demand in kilowatt during a billing cycle, and the resources in sequence to be used to meet curtailment targets.
- the method may retrieve a client's renewable energy usage targets including the percentage of total energy usage from renewable energy and the percentage of overall energy usage from on-site renewable energy. Additionally, the method may retrieve the client's amount of greenhouse gas emissions, such as measured in CO 2 E tons, as a reduction target for the building. Additionally, the method may retrieve general rules for optimizing building energy management include proprietary rules based on research, rules based on comparisons to peer benchmarks and rules derived by comparing research to manufacturer-supplied data.
- the method 800 a then optimizes the modeled demand forecasts using complex multivariate optimization using NLP approaches, step 808 .
- the method 800 a optimizes the received, modeled demand forecasts based on the previously described constraints and priorities.
- the method 800 a may use various optimization techniques including, but limited to, non-linear programming techniques including genetic algorithms, simulated annealing, artificial neural networks, or other techniques or linear approximation techniques including Tailor series expansions or artificial neural networks. Taking into account user inputs, optimization of the modeled demand forecasts may be performed based on a user defined prioritization of optimization criteria.
- the nonlinear programming techniques employed may attempt to find a solution space/set that satisfies all criteria simultaneously by weighting each optimization criterion according to user-defined prioritization.
- selection and weighting of optimization criteria may be sourced from general energy rules. Optimization criteria may include but are not limited to cost minimization (e.g., net of demand response revenue), greenhouse gas emissions/carbon impact minimization, maximization of on-site renewable energy used as a percent of total energy used, maximization of revenue from on-site generated energy, minimization of energy/fuel used and various occupant comfort criteria, which may also be set as constraints.
- some of the general business rules received in 408 may be used as constraints in the optimization.
- System-specific heuristics developed through learning from the building system received from studied systems may also be used to tune the optimization algorithm.
- a method 800 b receives the optimized model demand forecasts from FIG. 8A and determines whether or not new forecasting inputs have been received, step 802 .
- new forecasting inputs may correspond to the category of input values utilized by the forecasting and estimation engine. If the method 800 b determines that new forecasting inputs have been received, the method 800 b sends these data values to the forecasting and estimation model, step 804 . In the illustrated embodiment, sending these data values to the forecasting and estimation model allows the method to continually adjust the demand forecasts based on received events. In the illustrated embodiment, when the method 800 b receives new forecasting inputs method 600 may be re-executed to the new, incoming inputs.
- the method 800 b may reforecast for each new input. In alternative embodiments, the method 800 b may only reforecast for incoming data at predefined intervals or based on other criteria in order to reduce the amount of processing performed by the method 600 .
- an integrated energy management strategy may include recommendations for the operation of target systems including set-points and schedules, maintenance activities to restore building systems to peak functionality, and programs to participate in (e.g., demand response or similar contract-based programs).
- the integrated energy management strategy and recommendations may additionally be based on current conditions such that the integrated energy management strategy and recommendations allow the building or campus of building to take an optimized course of action based on client optimization priorities.
- the method 800 b determines that the client desires real-time control, step 808 , the method 800 b creates complementary control instructions for target building systems using the optimized model, step 812 , and provides non-real-time control recommendations, step 814 .
- the method 800 b may allow the building owner/manager to automatically communicate with an energy supplier for a variety of potential purposes including but not limited to participation in demand response programs (potentially through an interface such as OpenADR), communication with smart grid monitoring including power demand profile, on-site electricity generation capacity and amount of electricity for sale to the grid or community.
- the method 800 b may generate complementary control instructions specific to each building or campus subsystem such that the method 800 b may allow for real-time control of each subsystem. Additionally, the method 800 b may provide non-real-time recommendations to a building operator. For example, the method 800 b may provide recommendations to a GUI display or similar mechanism that enables an operator to view the recommendations and take appropriate action. In addition to generating complementary control instructions, the method 800 b sends the control instructions to the building control systems, step 816 . In the illustrated embodiment, sending control instructions to the building control systems may comprise transmitting the control instructions through interfaces such as BACnet, Modbus, and LonWorks, for example, and interfacing to proprietary architectures in areas for which no standards exist.
- interfaces such as BACnet, Modbus, and LonWorks
- the method 800 b may simply provide the optimized demand model to a recommendation module, step 810 .
- the method 800 b may provide recommendations to a GUI display or similar mechanism that enables an operator to view the recommendations and take appropriate action.
- FIG. 9 presents a flow diagram illustrating a method for generating recommendations based on simulated scenarios according to one embodiment of the present invention.
- a method 900 retrieves modeled demand forecasts, step 902 , and receives client constraint strategies, step 904 . Retrieval of modeled demand forecasts and client constraint strategies are discussed previously and are not repeated here for the sake of clarity.
- the method 900 simulates the building systems, step 906 .
- simulating the building systems may comprise varying specific parameters based on the type of simulation suggested and utilizing the demand forecasts to make predictions regarding the outcomes of such changes in variables.
- the method 900 after performing the simulation, compares the simulation outcomes, step 908 , and generates recommendations based on the comparison, step 910 .
- a particular client may utilize the method 900 for various planning strategies. For example, facilities management may enter into demand response contracts with a more precise estimate of the demand response opportunity and level of commitment that is feasible for their facility versus estimating based sole on past usage (often from utility bills). In another example, facilities management may more precisely plan the required fuel needed for purchasing fixed fuel contracts in advance of the season needed to minimize costs. The predictive demand forecasts will give the facilities management better information to purchase as close as possible to the needed amount of fuel thereby minimizing over purchase and minimizing under purchase that would require more expensive “spot” purchases.
- Facilities management may use predictive demand forecasts of water usage and pattern analysis to predict water usage and plan alternative strategies to minimize water usage contributing to a lower water footprint. Although this may reduce energy cost, energy consumption and GHG emissions/carbon footprint as well, the primary objective of such a planning effort is the reduction of water usage. Additionally, based on pattern recognition in the forecasting and estimation engine, new set-points can be proposed and facilities management/capital planning will be given the capability of doing a simple, “what if” analysis modeling alternate energy usage strategies for the different considered set-point options. In an alternative embodiment, facilities management will be able to evaluate the cost/benefit of potential capital improvements such as new lighting system, new boiler/chiller, new on-site generation/storage technologies, etc. based on predictive demand forecasts and simulation of alternative scenarios.
- FIG. 10 presents a flow diagram illustrating a method for detecting faults in building control systems according to one embodiment of the present invention.
- a method 1000 analyzes sensor data and equipment status data and detects anomalies, step 1002 .
- detecting anomalies may comprise classifying incoming data points using various classification techniques such as na ⁇ ve Bayes classification, SVM, or ANN, etc.
- the method 1000 then verifies the detected anomalies, step 1004 .
- the method 1000 may employ various pattern recognition techniques in order to verify that the identified anomalies are, in fact, anomalous.
- the method 1000 isolates the fault, step 1006 and determines if a fault was detected, step 1008 . If the method 1000 determines that a fault was not detected (e.g., a false positive), the method 1000 continues to monitor sensor data and equipment status data, step 1002 .
- the method 1000 determines if the data was received from a sensor, step 1008 . If the method 1000 determines that the data was received from a sensor, the method 1000 may discard the faulty data and interpolate the data to generate a correct reading, step 1012 . The method 1000 may then proceed to clean the data, FIG. 5 .
- the method 1000 may then determine if the data was received from on-site generate or storage subsystems, step 1014 . If the data is from on-site generate or storage subsystems, the method 1000 may update the supply forecasting model, step 1016 . In the illustrated embodiment, the method 1000 may employs methods for updating a forecasting model as have been discussed previously. If the method 1000 determines that the data is not from on-site generation or storage, the method 1000 may transmit the data regarding the non-availability of resources to the optimizer, step 1018 .
- the method 1000 transmits the data regarding the non-availability of resources to the optimizer in order to further optimize the existing optimized demand forecasts and to the building control system to update the availability of the building resource For example, if a given subsystem is unavailable or broken, the method 1000 may alert the optimizer that a given operational plan may not be achievable due to equipment or sensor failure.
- FIG. 11 presents a flow diagram illustrating a method for predicting faults in building mechanical, electrical and other systems according to one embodiment of the present invention.
- a method 1100 analyzes sensor data and equipment status data and generates trends on sensor and equipment status, step 1102 .
- the method 1100 attempts to detect patterns within the trend data, step 1104 . If degradation is not detected, step 1106 , the method continues to analyze sensor and equipment status data and generate trends on status of sensors and building equipment, step 1102 .
- a trend may be generated for a given interval range (e.g., 1 day, 1 week, etc.). Generating a trend may comprise of monitoring the data value of a give sensor/equipment over the interval.
- Detecting patterns in the trend data may comprise identifying recurring patterns in an interval range smaller than the trend interval range (e.g., lower lighting usage at night within a 24-hour trending interval).
- the method 1100 may detect degradation of trend data when the method 110 determines that current data falls below, or rises above, a pre-defined threshold associated with the trend data.
- the method 1100 determines whether degradation occurs, the method 1100 next determines whether failure is imminent, step 1108 . If failure is not imminent, the method 1100 updates the maintenance schedule based on the prediction, step 1100 . In the illustrated embodiment, updating the maintenance schedule based on the prediction utilizes a probabilistic model forecasting of expected future maintenance needed, 1112 . In the illustrated embodiment, the probabilistic model forecasting of expected future maintenance needed may be generated using similar techniques as discussed previously. In one embodiment, updating the maintenance schedule based on the prediction may comprise automatically updating an electronic schedule of routine maintenance to indicate the identified potential failure.
- the method 1100 may transmit an urgent alert to building management (not shown). The method 1100 may then determine if the failure is associated with a sensor, step 1114 . If the failure is associated with a sensor, the method 1116 discards the faulty data and may interpolate a new value, step 1116 . In the illustrated embodiment, discarding a faulty data value and interpolating may be accomplished by means previously discussed.
- the method 1100 may then determine if the data was received from on-site generate or storage subsystems, step 1118 . If the data is from on-site generate or storage subsystems, the method 1100 may update the supply forecasting model, step 1120 . In the illustrated embodiment, the method 1100 may employs methods for updating a forecasting model as have been discussed previously as well as notify the appropriate building control system. If the method 1100 determines that the failing equipment is not on-site generation or storage, the method 1100 may notify the appropriate building control system and the optimizer (see, e.g., FIG. 8 ) of the failure, step 1122 .
- FIGS. 1 through 11 are conceptual illustrations allowing for an explanation of the present invention. It should be understood that various aspects of the embodiments of the present invention could be implemented in hardware, firmware, software, or combinations thereof. In such embodiments, the various components and/or steps would be implemented in hardware, firmware, and/or software to perform the functions of the present invention. That is, the same piece of hardware, firmware, or module of software could perform one or more of the illustrated blocks (e.g., components or steps).
- computer software e.g., programs or other instructions
- data is stored on a machine readable medium as part of a computer program product, and is loaded into a computer system or other device or machine via a removable storage drive, hard drive, or communications interface.
- Computer programs also called computer control logic or computer readable program code
- processors controllers, or the like
- machine readable medium “computer program medium” and “computer usable medium” are used to generally refer to media such as a random access memory (RAM); a read only memory (ROM); a removable storage unit (e.g., a magnetic or optical disc, flash memory device, or the like); a hard disk; or the like.
- RAM random access memory
- ROM read only memory
- removable storage unit e.g., a magnetic or optical disc, flash memory device, or the like
- hard disk or the like.
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Automation & Control Theory (AREA)
- Business, Economics & Management (AREA)
- General Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Electromagnetism (AREA)
- Radar, Positioning & Navigation (AREA)
- Tourism & Hospitality (AREA)
- Health & Medical Sciences (AREA)
- Economics (AREA)
- General Health & Medical Sciences (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- General Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Air Conditioning Control Device (AREA)
Abstract
The present invention provides a method and system for optimizing building energy usage. The method comprising receiving a plurality of input values associated with a building or plurality of buildings. The method then constructs a thermal and an electrical load model based on the inputs and constructs an overall energy model, the overall energy model being based on the thermal and electrical load models. The method next generates a plurality of demand models and optimizes the demand models using complex multivariate optimization techniques, wherein optimizing is based on usage data and energy rules. Finally, the method displays recommendations based on the optimized model or generating real-time, complementary control instructions based on the optimized model, the determination based on client preferences.
Description
- A portion of the disclosure of this patent document contains material, which is subject to copyright protection. The copyright owner has no objection to the facsimile reproduction by anyone of the patent document or the patent disclosure, as it appears in the Patent and Trademark Office patent files or records, but otherwise reserves all copyright rights whatsoever.
- Embodiments of the invention described herein generally relate to optimizing the management of a building's energy and other key resources such as water, ventilation, etc. More specifically, embodiments of the present invention are directed towards systems and methods for utilizing predictive modeling to optimize a plurality of inputs representing a building's energy usage, water usage and other resource consumption.
- In the United States, buildings consume a tremendous amount of natural resources and are a major contributor to the carbon footprint and water footprint of cities. There is a great opportunity to optimize the management of energy and water while meeting the needs of the multitude of different users of commercial and industrial buildings. From EPA 2009 data, buildings account for 39% of energy used, 68% of electricity consumed and 38% CO2 emissions. Building managers face significant pressures requiring them to efficiently manage energy consumption including corporate profit pressures coupled with increasing & volatile fuel costs, corporate sustainability top-down directives mandating carbon-reporting, GHG reductions, and usage of renewable energy sources, and building regulations mandating benchmarking and improvement programs.
- The need for new automation solutions to aid in the optimum use of these natural resources is significant given the uneven state of current building automation, with estimates of approximately 14% of commercial buildings having a building management system (BMS) or building automation system (BAS) in place according to Pike Research. Where BMS or BAS systems are in place, the mode of operation of building resources is typically reactive management of heating, cooling ventilation and a portion of lighting based on schedule and reacting to set-points being exceeded. There is a significant opportunity for efficiency gains through shifting to proactive management based on demand forecasts and utilizing rich real-time data on building operation and disturbances such as weather, occupancy, etc. Also, expanding the scope of proactive management from heating and cooling to a more complete integration of lighting controls and other building subsystems including a variety of technologies and strategies available for meeting customer comfort with less energy consumed.
- Opportunities also exist to apply a proactive approach of predictive demand forecasts leading to optimization to additional areas such as water consumption planning/management, ensuring ventilation requirements are met (especially for areas such as labs that have more stringent or regulatory requirements) and management of ancillary plug load capacity, which may be broken out separately for the data center.
- Another area of opportunity is for improved integration of the different approaches in use for energy management in a building, with facilities management often pursuing separate and sometimes conflicting strategies for energy efficiency programs to reduce base load/energy costs, demand response participation with both voluntary and mandatory commitments to utilities, use of on-site generation and storage technology, etc. Together with the increasing number of energy management approaches in place there has been an increase in different priorities for energy management: reduce overall energy costs, reduce greenhouse gas emissions/carbon impact, increase use of on-site and renewable energy resources, and generate revenue from sale of energy or participation in demand response programs. There is an opportunity for technology to give customers a way to take a holistic view of the entire envelope of energy management approaches in place and use an objective analysis to incorporate business priorities to generate an integrated energy management strategy.
- Lastly there is an opportunity for the new energy management solutions envisioned to be supported by a software infrastructure that provides integration across disparate building monitoring and control systems (e.g. HVAC, lighting, plug load, etc.) and different real-time and historical data sources (e.g. weather data, rate and price data, occupancy data, peer building usage data, etc.) to enable real-time recommendations or control actions based on rich real-time data as well as planning based on predictive demand forecasts.
- The method receives a plurality of input values associated with a building or plurality of buildings. In one embodiment, the method cleans the input values prior to constructing a thermal and electrical load model, wherein cleaning the input values prior to constructing a thermal and electrical load model comprises detecting abnormal data and invalid inputs. In an alternative embodiment, cleaning the input values prior to constructing a thermal and electrical load model further comprises interpolating invalid data points and performing principle component analysis of the data set. In one embodiment, the method generates and optimizes an on-site generation model for variable and consistent on-site generation sources.
- The method then constructs a thermal and an electrical load model based on the inputs. In one embodiment, the thermal and electrical load models are generated based on built and stored demand models for a plurality of subsystem categories, wherein the plurality of subsystem categories includes one or more of heating/cooling, ventilation, lighting, water, plug load, and data center demand models. The method then constructs an overall energy model, the overall energy model being based on the thermal and electrical load models and generates a plurality of demand models based on the constructed energy model. In one embodiment, energy rules comprise client-defined rules/constraints, strategies and general rules and wherein the method further optimizes the models based on client-defined rules/constraints, strategies and strategies include rules for energy management specified by the building manager or owner. In an alternative embodiment, general rules include rules for optimizing building energy management include proprietary rules based on research, rules based on comparisons to peer benchmarks and rules derived by comparing research to manufacturer-supplied data.
- The method then optimizes the demand models using complex multivariate optimization techniques, wherein optimizing is based on usage data and energy rules. Finally, the method displays recommendations based on the optimized model or generating real-time, complementary control instructions based on the optimized model.
- The present invention is further directed towards a system for optimizing building energy usage. The system comprises a plurality of data sources containing a plurality of input values associated with a building or plurality of buildings. The system further comprises a forecasting and optimization engine operative to construct a thermal and an electrical load model based on the inputs; construct an overall energy model, the overall energy model being based on the thermal and electrical load models; and generate a plurality of demand models based on the constructed energy model.
- In one embodiment, the system further comprises a data conditioner operative to clean the input values prior to constructing a thermal and electrical load model, wherein the data conditioner is operative to detect abnormal data and invalid inputs. In an alternative embodiment, the data conditioner is further operative to interpolate invalid data points and performing principle component analysis of the data set. In one embodiment, the system is further operative to generate and optimize an on-site generation model for variable and consistent on-site generation sources.
- The system further comprises an optimization engine operative to optimize the demand models using complex multivariate optimization techniques, wherein optimizing is based on usage data and energy rules. In one embodiment, the forecasting and optimization engine generates the thermal and electrical load models based on built and stored demand models for a plurality of subsystem categories. In alternative embodiments, the plurality of subsystem categories includes heating/cooling, ventilation, lighting, water, plug load, and data center demand models.
- The system further comprises a graphical user interface operating on a client device operative to display recommendations based on the optimized model or generating real and an interface to building control systems operative to transmit complementary control instructions based on the optimized model, the determination based on client preferences. In one embodiment, energy rules comprise client defined rules and strategies and general rules and wherein the optimizer further optimizes the models based on client defined rules and strategies include rules for energy management specified by the building manager or owner. In another embodiment, general rules include rules for optimizing building energy management include proprietary rules based on research, rules based on comparisons to peer benchmarks and rules derived by comparing research to manufacturer-supplied data.
- The invention is illustrated in the figures of the accompanying drawings which are meant to be exemplary and not limiting, in which like references are intended to refer to like or corresponding parts, and in which:
-
FIG. 1 presents a block diagram illustrating asystem 100 for monitoring one or more building control systems according to one embodiment of the present invention; -
FIG. 2 presents a block diagram illustrating an analytical engine used for use in monitoring and communication with one or more building control systems to optimize the performance of building assets according to one embodiment of the present invention; -
FIG. 3 presents a block diagram illustrating a forecasting and estimation engine according to one embodiment of the present invention; -
FIG. 4 presents a block diagram illustrating an optimization engine according to one embodiment of the present invention; -
FIG. 5 presents a flow diagram illustrating a method for cleaning input data according to one embodiment of the present invention; -
FIG. 6 presents a flow diagram illustrating a method for generating predictive building subsystem demand models according to embodiment of the present invention; -
FIG. 7 presents a flow diagram illustrating a method for creating an on-site generation model according to one embodiment of the present invention; -
FIGS. 8A and 8B present a method for optimizing a demand model according to one embodiment of the present invention; -
FIG. 9 presents a flow diagram illustrating a method for generating recommendations based on simulated scenarios according to one embodiment of the present invention; -
FIG. 10 presents a flow diagram illustrating a method for detecting faults in building control systems according to one embodiment of the present invention; and -
FIG. 11 presents a flow diagram illustrating a method for predicting faults in building control systems according to one embodiment of the present invention. - In the following description, reference is made to the accompanying drawings that form a part hereof, and in which is shown by way of illustration specific embodiments in which the invention may be practiced. It is to be understood that other embodiments may be utilized and structural changes may be made without departing from the scope of the present invention.
-
FIG. 1 presents a block diagram illustrating asystem 100 for monitoring one or more building control systems according to one embodiment of the present invention. According to the embodiment thatFIG. 1 illustrates, ananalytical engine 108 interacts with external data source(s) 102, real-time building data source(s) 104, and historical data source(s) 106 and transmits information to and fromuser interface 110 andbuilding control systems 112. At a high level,analytical engine 108 receives a plurality of data inputs fromsources analytical engine 108 employs various machine-learning mechanisms to generate a predictive model based on the received data.Analytical engine 108 may further employ various optimization routines based on client-defined goals or constraints in order to optimize the generated predictive model. -
User interface 110 andbuilding control systems 112 utilize the optimized model generated byanalytical engine 108. In the illustrated embodiment,user interface 110 may provide various GUI representations of data or predictions gleaned from the predictive model generated byanalytical engine 108. In alternative embodiments,user interface 110 may additionally combine real-time sensor reading or other data regarding the state of a given building or campus of buildings. In the illustrated embodiment, theuser interface 110 may provide an operator with data values and predictions to allow the operator to make informed decisions regarding changes in operation ofbuilding control systems 112. - In addition to
user interface 110, thebuilding control systems 112 may additionally interact with the predictive model generated byanalytical engine 108. In one embodiment, theanalytical engine 108 may transmit control instructions to thebuilding control systems 112. Theanalytical engine 108 may transmit such instructions using various protocols or interfaces as needed for various building subsystems (e.g., HVAC, lighting, water, etc.). In one embodiment, theanalytical engine 108 may transmit these instructions automatically to the systems, thus automating the building systems based on predictions formed from the generated model(s). In alternative embodiments, thesystem 100 may allow the building owner/manager to automatically communicate with an energy supplier regarding on-site generation capabilities via an interface such as OpenADR. -
FIG. 2 presents a block diagram illustrating an analytical engine used for use in monitoring and communication with one or more building control systems to optimize the performance of building assets according to one embodiment of the present invention. In the illustrated embodiment, theanalytical engine 200 includes a plurality of data stores 202-212 including real-timebuilding data storage 202, real-timeexternal data storage 204,historical data storage 206, on-siteenergy resources storage 208, real-timeenergy availability storage 210, and client energy approachesstorage 212. Although illustrated as single storage modules, the storage modules 202-212 may comprise a plurality of components including equipment or sensors that generate data. - In the illustrated embodiment, real-time
building data storage 202 stores various metrics relating to the current, or real-time, state of a given building, or campus of buildings. Real-time data may include such data such as supply air temperature data, outside air temperature data, water temperature data, heating & cooling medium (e.g., water, steam, etc.) pressure data, humidity data, air flow data, air pressure data, air quality data, CO2 levels, lighting usage data, fuel or electricity consumption data, and water usage data. Real-timeexternal data storage 204 may contain data such as environmental temperature data, solar position and irradiance data, wind speed data, and other weather data, as well as fuel oil rate data, natural gas rate data, electricity rate data, and other energy rate data. In the illustrated embodiment, the real-timeexternal data storage 204 may receive such data from external sources.Historical data storage 206 maintains historical data previously stored in real-timebuilding data storage 202 and real-timeexternal data storage 204. In the illustrated embodiment,historical data storage 206 may contain various historical data regarding the building or campus including, but not limited to building zone conditions (e.g., temperature, humidity, CO2), occupancy history, HVAC conditions (e.g., temperature, humidity, air flow), weather conditions (e.g., solar radiation, temperature, humidity, wind speed) and energy rates. - On-site
energy resources storage 208 contains data relating to on-site energy generation (e.g., historical load profiles, system capacity limits, etc.) and on-site energy storage (e.g., historical storage profile data, system capacity limits, etc.). Real-timeenergy availability storage 210 contains data relating to the availability of energy such as the availability of the energy grid. Client energy approachesstorage 212 may store data supplied by the client, as will be discussed further herein. Such data may comprise occupant comfort constraints, client energy management strategies (e.g., energy efficiency, demand response, demand management, renewable energy, on-site generate, and on-site storage strategies), and prioritized optimization criteria. - In the illustrated embodiment, forecasting and
estimation engine 214 receives data from the data storage modules 202-212 and generates a demand model using predictive modeling, as will be discussed in more detail with respect toFIGS. 3 and 6 . In one embodiment, in order to generate demand models forecasting andestimation engine 214 receives data from real-timeexternal data storage 204,historical data 206, on-siteenergy resources storage 208, real-timeenergy availability storage 210, and client energy approaches 212. In addition to data from storage modules 202-212, forecasting andestimation engine 214 may additionally receive feedback from theoptimization engine 216 in order to refine the generated demand models further. In the illustrated embodiment, forecasting andestimation engine 214 may generate a plurality of demand models for each desired subsystem (e.g., heating, cooling, lighting, ventilation, water, plug load, data center, etc.). - After the forecasting and
estimation engine 214 generates the demand models,optimization engine 216 receives the models and attempts to optimize them. In the illustrated embodiment,optimization engine 216 may utilize data from client energy approachesstorage 212, real-timeexternal data storage 204, and real-timebuilding data storage 202 in order to further refine the models. In one embodiment, theoptimization engine 216 may attempt to meet targets for multiple optimization criteria simultaneously using prioritization of optimization criteria drawn from client energy approaches stored in 212. For example, a given client may indicate that after occupant comfort constraints have been met that minimizing cost is the top priority for optimization and that minimizing greenhouse gas emissions/carbon impact is the second priority. Based on this prioritization theoptimization engine 216 may try to optimize the demand models in order to minimize energy costs and minimize greenhouse gas but weighting energy cost minimization over greenhouse gas emissions minimization. Further discussion of the optimization method is discussed more fully with respect toFIGS. 8A and 8B . - The
system 200 further contains a fault detection andprediction module 218, which may be operative to detect faults from sensor or equipment data and also predict such faults. In the illustrated embodiment, fault detection andprediction module 218 may be operative to transmit data relating to detections and predictions to forecasting andestimation engine 214 to further refine the generated demand models, to the on-site energy resources 208 to refine information on availability of energy supply for later use in the optimization or to the building, or to thebuilding control systems 112 to update building resource status. Fault detection and prediction is discussed more fully with respect toFIGS. 10 and 11 . Additionally, thesystem 200 contains aplanning module 220.Planning module 220 may be operative to utilize the optimized demand models in determining an optimized response to a hypothetical demand scenario. The use of demand models with respect to planning is discussed more fully with respect toFIG. 9 . - After the
optimization engine 216 optimizes the demand models, theanalytical engine 214 is operative to receive real-time inputs and generate predictions based on the optimized demand models. For example, if theanalytical engine 200 receives inputs stating that there is a change in temperature, theanalytical engine 200 inputs the temperature changes into the appropriate demand model. In response, theanalytical engine 200 may take a plurality of actions. In one embodiment, theanalytical engine 200 may generate control instructions that may automatically adjust equipment settings and parameters. In this embodiment, theanalytical engine 200 may interact directly with thebuilding control systems 224 via an interface to thecontrol systems 222. The interface to thecontrol systems 222 allows theanalytical engine 200 to communicate with a plurality of disparate services (e.g., HVAC, lighting, etc.). Alternatively, theanalytical engine 200 may simply generaterecommendations 226 and display such recommendations to an operator or building manager via a graphical user interface. In an alternative embodiment, theanalytical engine 200 may utilize both automatic generation of control instructions and recommendations as determined by the building owner. In alternative embodiments, thesystem 200 may allow the building owner/manager to automatically communicate with an energy supplier regarding on-site generation capabilities via an interface such as OpenADR. -
FIG. 3 presents a block diagram illustrating a forecasting and estimation engine according to one embodiment of the present invention. In the illustrated embodiment,engine 300 contains adata conditioner module 302. In the illustrated embodiment, thedata conditioner 302 receives input data, such as data from storage modules 202-212. This data may comprise data relating to sensor or equipment readings within a building or campus of buildings. For example, one input may comprise various lighting readings from within a specific zone (e.g., a room or group of rooms) within a building. Thedata conditioner 302 parses the received input data and cleans the input data. In one embodiment, cleaning the data may comprise detecting invalid or abnormal data. Methods for conditioning input data are discussed more fully with respect toFIG. 5 . - After the data is conditioned, the
engine 200 sends the input data tothermal model generator 304. In alternative embodiments, theengine 200 sends input data to an appropriate model generator based on the subsystem being modeled. Before generating a thermal model, theengine 300 may be operative to determine a plurality of modeling parameters for specific areas. For example, theengine 300 may select the temperature and heating and cooling system data representing heating and cooling (such as temperatures, humidity, heating or cooling load). Additionally, theengine 300 may determine modeling parameters for ventilation (such as air changes, air flow, air quality), lighting (such as illumination, electricity), water (such as total water volume, potable water volume, domestic hot water (DHW) volume, make up water volume), plug load (such as electricity), and data centers (such as electricity). - In the illustrated embodiment,
thermal model generator 304 is operative to process a plurality of thermal inputs and generate a predictive model based on the inputs. A variety of techniques may be used in generating such the thermal model, and other models discussed herein, including, but not limited to, memory-based time-series regression analysis using ARIMA, ANN, SVM or other regression techniques, etc. In the illustrated embodiment, thethermal model generator 304 aggregates building component data from the most granular data (e.g., specific HVAC equipment). The thermal model generator may additionally generate the model based on a granular building zone to be conditioned. - After generating the thermal model, the electrical
load model generator 304 generates an electrical load model. The electrical load model comprises a predictive model generated similar to the thermal model that is, based on granular subsystem measurements. Theengine 300 may then generate an energy demand model via energydemand model generator 308. In the illustrated embodiment, thedemand model generator 308 may generate the energy demand model by combining the models generated by thethermal model generator 304 andelectrical load model 306. In the illustrated embodiment, thedemand model generator 308 analyzes the interactive effects and trade-offs between the thermal and electrical model. Although not illustrated, theengine 300 may include other model generators including, but not limited to, a ventilation model, water model, plug load model, and data center model. - In addition to the energy demand model, the on-site
generation model generator 310 is operative to generate a predictive model based on a building or campuses on-site generation activities. In the illustrated embodiment, the on-site generation model is based primarily on historical on-site power generation data and real-time, historical, weather forecast data. Additionally, on-sitestorage model generator 312 is operative to generate a predictive storage model based on historical storage inflow/outflow data and capacity data. Methods for generating on-site generation and storage models are discussed more fully with respect toFIG. 7 . -
FIG. 4 presents a block diagram illustrating an optimization engine according to one embodiment of the present invention. According to the embodiment thatFIG. 4 illustrates, anoptimization engine 400 receives a plurality ofun-optimized models 402 from the forecasting andestimation engine 300. Theseun-optimized models 402 serve as inputs to theoptimizer 404. In addition, theoptimizer 404 receives various constraints, strategies, and rules 406-412 that shape the optimization of theun-optimized models 402. In the illustrated embodiment, thesystem 400 may additionally store heuristics or statistics regarding the building or campus of building. - In the illustrated embodiment,
energy management strategies 410 may comprise various strategies that the building manager or owner may wish to employ when optimizing the models. For example, the building management may wish to achieve a specified energy cost reduction. Additionally, the building management may wish to reduce greenhouse gas emissions/carbon impact by a target amount and utilize as much on-site power as percent of total power used as possible. In conjunction withenergy management strategies 410, constraints and objectives 412 may additionally be specified by the building management. For example, the building management may specify various occupant comfort constraints such as temperature, humidity, and ventilation requirements. Additionally, the management may set constraint that certain thresholds for various equipment not be exceeded or a general rule such as manufacturer-supplied input may create such a constraint. - Based on the constraints, strategies, and rules 406-412, the
optimizer 404 optimizes the receivedmodels 402. In the illustrated embodiment, the optimizer may use various optimization techniques including, but not limited to, nonlinear programming techniques including, but limited to, non-linear programming techniques including Genetic Algorithms, Simulated Annealing, Artificial Neural Networks, or other techniques or linear approximation techniques including Tailor series expansions or artificial neural networks (ANN). Theoptimizer 404 may output the optimized models to a storage module (not shown) for subsequent retrieval and usage. Additionally, theoptimizer 404 may output the optimized model to the forecasting and estimation engine as feedback for subsequent model generation. Further details regarding the optimization of un-optimized models are discussed further with respect toFIG. 8 . -
FIG. 5 presents a flow diagram illustrating a method for cleaning input data according to one embodiment of the present invention. According to the embodiment thatFIG. 5 illustrates amethod 500 receives building inputs,step 502. In one embodiment, building inputs may comprise environment and physical building characteristics (e.g., physical placement, solar placement, envelope, ventilation, number of windows, ratio of window to walls, etc.), building measurements, and disturbance in weather, occupancy, and rate/fuel price data. - The
method 500 then pre-processes the input data by filtering signal noise,step 504. Themethod 500 then scans the remaining data points,step 506. Themethod 500 first determines if there is abnormal data based on pattern recognition,step 508. In the illustrated embodiment, themethod 500 may employ various pattern recognition algorithms in an attempt to identify data values that differ from the normal data values expected. Next, themethod 500 determines if there are any invalid input values due to faults in the sensors or building systems such as an air handling unit by employing fault detection techniques,step 510. In the illustrated embodiment, themethod 500 may utilize a fault detection and prediction algorithm such as that illustrated inFIGS. 10 and 11 . - If either
step step 512. Themethod 500 then determines if there are any more data points left to be analyzed,step 514. After scanning the data points, themethod 500 additionally may interpolate the value of the rejected data points based on similar data,step 516. In the illustrated embodiment, themethod 500 interpolates data for abnormal/anomalous data and data from a defective device. For example, a given building zone may have a plurality of sensors monitoring temperature. If all sensors other than defective sensor report temperatures within a limited range, themethod 500 may interpolate the value from the defective sensor to be in line with the correct data from the other sensors. In alternative embodiments, themethod 500 may not interpolate the value of data points and may simply reject noisy data points. - After scanning the data points, rejecting anomalous data points, and interpolating data points, if desired, the method then performs principal component analysis of the data set,
step 518. In performing the principal component analysis (PCA), themethod 500 reduces the dimensionality to identify a feature set for the data points. In the illustrated embodiment, themethod 500 may use various PCA techniques known in the art for computing the feature set. -
FIG. 6 presents a flow diagram illustrating a method for generating predictive building subsystem demand models according to embodiment of the present invention. According to the embodiment thatFIG. 6 illustrates, amethod 600 receives input values,step 602, and feedback from the optimizer,step 604. In the illustrated embodiment, input values may correspond to raw data from sensors, equipment, real-time external data, and other data sources as discussed previously. Additionally, themethod 600 receives feedback from the optimizer in order to further refine the demand model forecasts based on the optimized models. The feedback from the optimizer (step 604) together with the updated input values (step 602) provide adaptive learning about the building to improve the accuracy of future demand forecast predictions. - After receiving the input and feedback, the
method 600 determines modeling parameters,step 606, and builds and stores the demand models,step 608. In one embodiment ofstep 606, memory-based time-series regression analysis may employ analytical techniques such as ARIMA, ANN, SVM or other regression techniques to update the parameters of the demand model considering the history of the process, general energy rules (from knowledge base held in, for example, storage 408), a physical model of the subsystem (if available) and the new input values from 602. In the illustrated embodiment, themethod 600 generates demand models for a plurality of discrete subsystems including, but not limited to ventilation, lighting, water, plug load, and data centers. Instep 608, we use the model parameters fromstep 606 to forecast the demand for each subsystem (including but not limited to lighting, water, ventilation, plug load and data center) In this approach we build the demand forecast hierarchically going from the most granular to the aggregate model for each subsystem to produce the overall subsystem demand forecast for the entire building/building complex/campus. Themethod 600 determines the relevant parameters for each demand model. For example, themethod 600 may generate parameters for heating/cooling (such as temperatures, humidity, heating or cooling load), ventilation (such as air changes, air flow, air quality), lighting (such as illumination, electricity), water (such as total water volume, potable water volume, domestic hot water (DHW) volume, make up water volume), plug load (such as electricity), and data centers (such as electricity). - Steps 610-614 illustrate a method for generating demand models for heating and cooling subsystems. The
method 600 first receives the subsystem demand models from 608, then calculates a thermal model and electrical load model for each subsystem relevant to the overall energy demand model,step 610. For example, themethod 600 may generate thermal and electrical load models for HVAC, ventilation, lighting, water, data center, and plug load systems as each system has an impact on the thermal and electrical load modeling. A variety of techniques may be used in generating such the thermal model, and other models discussed herein, including, but not limited to, memory-based time-series regression, ARIMA, ANN, SVM or other regression techniques. In the illustrated embodiment, after generating the thermal model based on the demand models, themethod 600 updates the stored demand models for ventilation, lighting, water, plug load, and data centers based on the calculated thermal load model,step 616. - After generating the thermal and electrical load models and in addition to updating the received stored demand models, the
method 600 constructs the overall building energy model based on the thermal and electrical load models,step 612. In the illustrated embodiment, constructing an overall building energy model comprises combining both the thermal and electrical load models to form a complete energy model for a given building/building complex or campus of buildings. Combining the thermal and electrical load models may be performed by a plurality of methods including, but not limited to, constructing a composite forecast using Bayesian techniques. After creating the combined, overall building energy model, themethod 600 generates the heating and cooling demand model,step 614. In the illustrated example, themethod 600 generates an appropriate demand model for heating and cooling systems based on the overall building energy model. - Finally, the
method 600 outputs specific subsystem demand models,step 618. In the illustrated embodiment, the specific subsystem demand models are based on the demand models generated instep 614 as well as retrieved and updated stored demand models,step 616. In one embodiment, the retrieved demand models may comprise demand models for lighting, ventilation, water, data center, and plug load while the generated demand models correspond to heating and cooling demand models. - In the illustrated embodiment, the
method 600 may be utilized to generate (and potentially optimize) demand forecasts for a plurality of combinations of subsystems including but not limited to heating and cooling, lighting, water, ventilation, plug load, and data center subsystems. Examples of some potential combinations include, but are not limited to: heating/cooling and light; heating/cooling, ventilation, and lighting; heating/cooling, lighting and water; heating/cooling, water; heating/cooling, ventilation, and water; heating/cooling, ventilation, lighting and water; heating/cooling, ventilation, lighting, plug load; heating/cooling, ventilation, lighting, plug load, water; water; heating/cooling, ventilation, dedicated data center EMS; all electrical demand across all building subsystems (H&C, lighting, ventilation, water, plug load, data center); heating/cooling, lighting, and plug load; heating/cooling, lighting, plug load, and water; heating/cooling, ventilation, lighting, dedicated data center EMS; heating/cooling, lighting, plug load EMS, dedicated data center EMS; or heating/cooling, ventilation, lighting, plug load EMS, dedicated data center EMS. -
FIG. 7 presents a flow diagram illustrating a method for creating an on-site generation model according to one embodiment of the present invention. According to the embodimentFIG. 7 illustrates, amethod 700 receives modeling input data,step 702. In the illustrated embodiment, modeling input data comprises data such as historical on-site power generation data (e.g., power, time, and input fuel data), weather forecast data, sensor data, and historical weather, solar, or wind data. - After receiving the input data, the
method 700 classifies the system,step 704. In the illustrated embodiment, themethod 700 classifies the system as variable or consistent generation based on the received inputs. In the illustrated embodiment, classification of the system comprises the classification of the reliability, delivery, and presence of an input energy source. In the illustrated embodiment, variable or consistent refers to the level of control an operator has on the input energy source of a system. For example, for weather-dependent systems (e.g., solar, wind, etc.), there is little control or consistency over the input energy source, thus the system may be considered variable. However, input energy is often available in regular cycles and can be predicted and planned for. In contrast, generators that rely on a reliable fuel source or energy grid are considered consistent. - The
method 700 then inspects the classification,step 706. If themethod 700 classifies the on-site generation as variable themethod 700 constructs a load predictive model,step 708, and a consumption model,step 710. In the illustrated embodiment, constructing a load predictive model may employ various stochastic modeling techniques to model the received inputs into a load prediction model. Additionally, various modeling techniques described previously may be used in constructing the consumption and load predictive models. In the illustrated embodiment, themethod 700 may combine the two models by discounting the consumption model from the prediction model. After generating the models, themethod 700 adjusts the models based on recent forecasts,step 712. In the illustrated embodiment, adjusting the model on recent forecasts may update the model based on the most recent forecast, thus tuning the model to weight recent forecasts heavier than older, historical forecasts. - If the
method 700 determines that the on-site generation is consistent, themethod 700 constructs the load predictive mode,step 714. In the illustrated embodiment, construction of the load predictive model may be accomplished by similar means as the predictive model generated for variable on-site generation sources. Themethod 700 then adjusts the model based on recent forecasts,step 716, in a manner previous described with respect to variable on-site generation. Themethod 700 then creates a consumption model,step 720, in a manner similar to that of variable on-site generation sources. After the models are created as discussed above, themethod 700 transmits the models to an optimization routine,step 722. In the illustrated embodiment, the model(s) may later be optimized according to a pre-defined optimization technique, as will be discussed with respect toFIGS. 8A and 8B . -
FIGS. 8A and 8B present a method for optimizing a demand model according to one embodiment of the present invention. According to the embodiment thatFIG. 8A illustrates, amethod 800 a collects client energy approaches,step 802. In the illustrated embodiment, client usage data may comprise occupant comfort constraints such as temperature, humidity, air quality, and illumination required. - The
method 800 a then retrieves the modeled demand forecasts,step 804. In the illustrated embodiment, the modeled demand forecasts are the output of the forecasting and estimation engine as discussed previously. In the illustrated embodiment, the method 800 may retrieve demand forecasts for physical resources including energy (electricity and fuels), ventilation air, and water and the current state of the building or campus including subsystem demands including the heating demand, cooling demand, ventilation demand, lighting demand, water demand, data center demand and plug load demand. - The
method 800 a additionally retrieves existing client energy strategies and general rules,step 806. In the illustrated embodiment, themethod 800 a may retrieve client energy efficiency strategies and targets that may be expressed in a variety of ways including the overall energy cost-savings target, the targeted reduction in electricity used in kWh, the targeted reduction in the amount of fuel oil used in gallons of MMBTU, and the targeted reduction in the amount of natural gas in therms or MMBTU. Additionally, the method may retrieve a client's demand response program, or similar contract-based programs, participation goals that may be expressed in a variety of ways such as including the number of kilowatts or kilowatt hours curtailed and whether such curtailments are mandatory or voluntary and, if available, the resources in sequence to be used to meet curtailment targets. Additionally, the method may retrieve a client's demand management requirements that may be expressed in a variety of ways such as including the percent reduction in electricity usage in kilowatt hours during peak demand periods the kilowatts or percent reduction in maximum power demand in kilowatt during a billing cycle, and the resources in sequence to be used to meet curtailment targets. - Additionally, the method may retrieve a client's renewable energy usage targets including the percentage of total energy usage from renewable energy and the percentage of overall energy usage from on-site renewable energy. Additionally, the method may retrieve the client's amount of greenhouse gas emissions, such as measured in CO2E tons, as a reduction target for the building. Additionally, the method may retrieve general rules for optimizing building energy management include proprietary rules based on research, rules based on comparisons to peer benchmarks and rules derived by comparing research to manufacturer-supplied data.
- The
method 800 a then optimizes the modeled demand forecasts using complex multivariate optimization using NLP approaches,step 808. In the illustrated embodiment, themethod 800 a optimizes the received, modeled demand forecasts based on the previously described constraints and priorities. In the illustrated embodiment, themethod 800 a may use various optimization techniques including, but limited to, non-linear programming techniques including genetic algorithms, simulated annealing, artificial neural networks, or other techniques or linear approximation techniques including Tailor series expansions or artificial neural networks. Taking into account user inputs, optimization of the modeled demand forecasts may be performed based on a user defined prioritization of optimization criteria. In one embodiment, the nonlinear programming techniques employed may attempt to find a solution space/set that satisfies all criteria simultaneously by weighting each optimization criterion according to user-defined prioritization. In another embodiment, selection and weighting of optimization criteria may be sourced from general energy rules. Optimization criteria may include but are not limited to cost minimization (e.g., net of demand response revenue), greenhouse gas emissions/carbon impact minimization, maximization of on-site renewable energy used as a percent of total energy used, maximization of revenue from on-site generated energy, minimization of energy/fuel used and various occupant comfort criteria, which may also be set as constraints. In an embodiment, some of the general business rules received in 408 may be used as constraints in the optimization. System-specific heuristics developed through learning from the building system received from studied systems may also be used to tune the optimization algorithm. - According to the embodiment that
FIG. 8B illustrates, amethod 800 b receives the optimized model demand forecasts fromFIG. 8A and determines whether or not new forecasting inputs have been received,step 802. In the illustrated embodiment, new forecasting inputs may correspond to the category of input values utilized by the forecasting and estimation engine. If themethod 800 b determines that new forecasting inputs have been received, themethod 800 b sends these data values to the forecasting and estimation model,step 804. In the illustrated embodiment, sending these data values to the forecasting and estimation model allows the method to continually adjust the demand forecasts based on received events. In the illustrated embodiment, when themethod 800 b receives newforecasting inputs method 600 may be re-executed to the new, incoming inputs. In alternative embodiments, themethod 800 b may reforecast for each new input. In alternative embodiments, themethod 800 b may only reforecast for incoming data at predefined intervals or based on other criteria in order to reduce the amount of processing performed by themethod 600. - If the
method 800 b does not receive new forecasting inputs, themethod 800 b translates the optimized demand models into an integrated energy management strategy and recommendations,step 806. In one embodiment, an integrated energy management strategy may include recommendations for the operation of target systems including set-points and schedules, maintenance activities to restore building systems to peak functionality, and programs to participate in (e.g., demand response or similar contract-based programs). In the illustrated embodiment, the integrated energy management strategy and recommendations may additionally be based on current conditions such that the integrated energy management strategy and recommendations allow the building or campus of building to take an optimized course of action based on client optimization priorities. - If the
method 800 b determines that the client desires real-time control,step 808, themethod 800 b creates complementary control instructions for target building systems using the optimized model,step 812, and provides non-real-time control recommendations,step 814. In alternative embodiments, themethod 800 b may allow the building owner/manager to automatically communicate with an energy supplier for a variety of potential purposes including but not limited to participation in demand response programs (potentially through an interface such as OpenADR), communication with smart grid monitoring including power demand profile, on-site electricity generation capacity and amount of electricity for sale to the grid or community. - In the illustrated embodiment, the
method 800 b may generate complementary control instructions specific to each building or campus subsystem such that themethod 800 b may allow for real-time control of each subsystem. Additionally, themethod 800 b may provide non-real-time recommendations to a building operator. For example, themethod 800 b may provide recommendations to a GUI display or similar mechanism that enables an operator to view the recommendations and take appropriate action. In addition to generating complementary control instructions, themethod 800 b sends the control instructions to the building control systems,step 816. In the illustrated embodiment, sending control instructions to the building control systems may comprise transmitting the control instructions through interfaces such as BACnet, Modbus, and LonWorks, for example, and interfacing to proprietary architectures in areas for which no standards exist. - If the
method 800 b determines that the client does not desire real-time control, themethod 800 b may simply provide the optimized demand model to a recommendation module,step 810. For example, themethod 800 b may provide recommendations to a GUI display or similar mechanism that enables an operator to view the recommendations and take appropriate action. -
FIG. 9 presents a flow diagram illustrating a method for generating recommendations based on simulated scenarios according to one embodiment of the present invention. According to the embodimentFIG. 9 illustrates, amethod 900 retrieves modeled demand forecasts,step 902, and receives client constraint strategies,step 904. Retrieval of modeled demand forecasts and client constraint strategies are discussed previously and are not repeated here for the sake of clarity. - After receiving the modeled demand forecasts and client constraints/strategies, the
method 900 simulates the building systems,step 906. In the illustrated embodiment, simulating the building systems may comprise varying specific parameters based on the type of simulation suggested and utilizing the demand forecasts to make predictions regarding the outcomes of such changes in variables. Themethod 900, after performing the simulation, compares the simulation outcomes,step 908, and generates recommendations based on the comparison,step 910. - A particular client may utilize the
method 900 for various planning strategies. For example, facilities management may enter into demand response contracts with a more precise estimate of the demand response opportunity and level of commitment that is feasible for their facility versus estimating based sole on past usage (often from utility bills). In another example, facilities management may more precisely plan the required fuel needed for purchasing fixed fuel contracts in advance of the season needed to minimize costs. The predictive demand forecasts will give the facilities management better information to purchase as close as possible to the needed amount of fuel thereby minimizing over purchase and minimizing under purchase that would require more expensive “spot” purchases. - Facilities management may use predictive demand forecasts of water usage and pattern analysis to predict water usage and plan alternative strategies to minimize water usage contributing to a lower water footprint. Although this may reduce energy cost, energy consumption and GHG emissions/carbon footprint as well, the primary objective of such a planning effort is the reduction of water usage. Additionally, based on pattern recognition in the forecasting and estimation engine, new set-points can be proposed and facilities management/capital planning will be given the capability of doing a simple, “what if” analysis modeling alternate energy usage strategies for the different considered set-point options. In an alternative embodiment, facilities management will be able to evaluate the cost/benefit of potential capital improvements such as new lighting system, new boiler/chiller, new on-site generation/storage technologies, etc. based on predictive demand forecasts and simulation of alternative scenarios.
-
FIG. 10 presents a flow diagram illustrating a method for detecting faults in building control systems according to one embodiment of the present invention. According to the embodiment thatFIG. 10 illustrates, amethod 1000 analyzes sensor data and equipment status data and detects anomalies,step 1002. In the illustrated embodiment, detecting anomalies may comprise classifying incoming data points using various classification techniques such as naïve Bayes classification, SVM, or ANN, etc. - The
method 1000 then verifies the detected anomalies,step 1004. In the illustrated embodiment, themethod 1000 may employ various pattern recognition techniques in order to verify that the identified anomalies are, in fact, anomalous. Themethod 1000 isolates the fault,step 1006 and determines if a fault was detected,step 1008. If themethod 1000 determines that a fault was not detected (e.g., a false positive), themethod 1000 continues to monitor sensor data and equipment status data,step 1002. - If the
method 1000 determines that a fault was detected, themethod 1000 determines if the data was received from a sensor,step 1008. If themethod 1000 determines that the data was received from a sensor, themethod 1000 may discard the faulty data and interpolate the data to generate a correct reading,step 1012. Themethod 1000 may then proceed to clean the data,FIG. 5 . - If the
method 1000 determines that the data is not sensor data,step 1010, themethod 1000 may then determine if the data was received from on-site generate or storage subsystems,step 1014. If the data is from on-site generate or storage subsystems, themethod 1000 may update the supply forecasting model,step 1016. In the illustrated embodiment, themethod 1000 may employs methods for updating a forecasting model as have been discussed previously. If themethod 1000 determines that the data is not from on-site generation or storage, themethod 1000 may transmit the data regarding the non-availability of resources to the optimizer,step 1018. In the illustrated embodiment, themethod 1000 transmits the data regarding the non-availability of resources to the optimizer in order to further optimize the existing optimized demand forecasts and to the building control system to update the availability of the building resource For example, if a given subsystem is unavailable or broken, themethod 1000 may alert the optimizer that a given operational plan may not be achievable due to equipment or sensor failure. -
FIG. 11 presents a flow diagram illustrating a method for predicting faults in building mechanical, electrical and other systems according to one embodiment of the present invention. According to the embodimentFIG. 11 illustrates, amethod 1100 analyzes sensor data and equipment status data and generates trends on sensor and equipment status,step 1102. Themethod 1100 then attempts to detect patterns within the trend data,step 1104. If degradation is not detected,step 1106, the method continues to analyze sensor and equipment status data and generate trends on status of sensors and building equipment,step 1102. In the illustrated embodiment, a trend may be generated for a given interval range (e.g., 1 day, 1 week, etc.). Generating a trend may comprise of monitoring the data value of a give sensor/equipment over the interval. Detecting patterns in the trend data may comprise identifying recurring patterns in an interval range smaller than the trend interval range (e.g., lower lighting usage at night within a 24-hour trending interval). Themethod 1100 may detect degradation of trend data when themethod 110 determines that current data falls below, or rises above, a pre-defined threshold associated with the trend data. - If the
method 1100 determines that degradation occurs, themethod 1100 next determines whether failure is imminent,step 1108. If failure is not imminent, themethod 1100 updates the maintenance schedule based on the prediction,step 1100. In the illustrated embodiment, updating the maintenance schedule based on the prediction utilizes a probabilistic model forecasting of expected future maintenance needed, 1112. In the illustrated embodiment, the probabilistic model forecasting of expected future maintenance needed may be generated using similar techniques as discussed previously. In one embodiment, updating the maintenance schedule based on the prediction may comprise automatically updating an electronic schedule of routine maintenance to indicate the identified potential failure. - If failure is imminent, the
method 1100 may transmit an urgent alert to building management (not shown). Themethod 1100 may then determine if the failure is associated with a sensor,step 1114. If the failure is associated with a sensor, themethod 1116 discards the faulty data and may interpolate a new value,step 1116. In the illustrated embodiment, discarding a faulty data value and interpolating may be accomplished by means previously discussed. - If the
method 1100 determines that the data is not sensor data,step 1114, themethod 1100 may then determine if the data was received from on-site generate or storage subsystems,step 1118. If the data is from on-site generate or storage subsystems, themethod 1100 may update the supply forecasting model,step 1120. In the illustrated embodiment, themethod 1100 may employs methods for updating a forecasting model as have been discussed previously as well as notify the appropriate building control system. If themethod 1100 determines that the failing equipment is not on-site generation or storage, themethod 1100 may notify the appropriate building control system and the optimizer (see, e.g.,FIG. 8 ) of the failure,step 1122. -
FIGS. 1 through 11 are conceptual illustrations allowing for an explanation of the present invention. It should be understood that various aspects of the embodiments of the present invention could be implemented in hardware, firmware, software, or combinations thereof. In such embodiments, the various components and/or steps would be implemented in hardware, firmware, and/or software to perform the functions of the present invention. That is, the same piece of hardware, firmware, or module of software could perform one or more of the illustrated blocks (e.g., components or steps). - In software implementations, computer software (e.g., programs or other instructions) and/or data is stored on a machine readable medium as part of a computer program product, and is loaded into a computer system or other device or machine via a removable storage drive, hard drive, or communications interface. Computer programs (also called computer control logic or computer readable program code) are stored in a main and/or secondary memory, and executed by one or more processors (controllers, or the like) to cause the one or more processors to perform the functions of the invention as described herein. In this document, the terms “machine readable medium,” “computer program medium” and “computer usable medium” are used to generally refer to media such as a random access memory (RAM); a read only memory (ROM); a removable storage unit (e.g., a magnetic or optical disc, flash memory device, or the like); a hard disk; or the like.
- Notably, the figures and examples above are not meant to limit the scope of the present invention to a single embodiment, as other embodiments are possible by way of interchange of some or all of the described or illustrated elements. Moreover, where certain elements of the present invention can be partially or fully implemented using known components, only those portions of such known components that are necessary for an understanding of the present invention are described, and detailed descriptions of other portions of such known components are omitted so as not to obscure the invention. In the present specification, an embodiment showing a singular component should not necessarily be limited to other embodiments including a plurality of the same component, and vice-versa, unless explicitly stated otherwise herein. Moreover, applicants do not intend for any term in the specification or claims to be ascribed an uncommon or special meaning unless explicitly set forth as such. Further, the present invention encompasses present and future known equivalents to the known components referred to herein by way of illustration.
- The foregoing description of the specific embodiments so fully reveals the general nature of the invention that others can, by applying knowledge within the skill of the relevant art(s) (including the contents of the documents cited and incorporated by reference herein), readily modify and/or adapt for various applications such specific embodiments, without undue experimentation, without departing from the general concept of the present invention. Such adaptations and modifications are therefore intended to be within the meaning and range of equivalents of the disclosed embodiments, based on the teaching and guidance presented herein.
- While various embodiments of the present invention have been described above, it should be understood that they have been presented by way of example, and not limitation. It would be apparent to one skilled in the relevant art(s) that various changes in form and detail could be made therein without departing from the spirit and scope of the invention. Thus, the present invention should not be limited by any of the above-described exemplary embodiments, but should be defined only in accordance with the following claims and their equivalents.
Claims (20)
1. A method for optimizing building energy usage, the method comprising
receiving a plurality of input values associated with a building or plurality of buildings;
constructing a thermal and an electrical load model based on the inputs;
constructing an overall energy model, the overall energy model being based on the thermal and electrical load models;
generating a plurality of demand models based on the constructed energy model;
optimizing the demand models using complex multivariate optimization techniques, wherein optimizing is based on usage data and energy rules; and
displaying recommendations based on the optimized model or generating real-time, complementary control instructions based on the optimized model.
2. The method of claim 1 further comprising cleaning the input values prior to constructing a thermal and electrical load model.
3. The method of claim 2 wherein cleaning the input values prior to constructing a thermal and electrical load model comprises detecting abnormal data and invalid inputs.
4. The method of claim 3 wherein cleaning the input values prior to constructing a thermal and electrical load model further comprises interpolating invalid data points and performing principle component analysis of the data set.
5. The method of claim 1 further comprising generating and optimizing an on-site generation model for variable and consistent on-site generation sources.
6. The method of claim 1 wherein the thermal and electrical load models are generated based on built and stored demand models for a plurality of subsystem categories.
7. The method of claim 6 wherein the plurality of subsystem categories includes one or more of heating/cooling, ventilation, lighting, water, plug load, and data center demand models.
8. The method of claim 1 wherein energy rules comprise client-defined rules/constraints, strategies and general rules and wherein the method further optimizes the models based on client-defined rules/constraints, strategies and strategies include rules for energy management specified by the building manager or owner.
9. The method of claim 8 wherein general rules include rules for optimizing building energy management include proprietary rules based on research, rules based on comparisons to peer benchmarks and rules derived by comparing research to manufacturer-supplied data.
10. A system for optimizing building energy usage, the system comprising
a plurality of data sources containing a plurality of input values associated with a building or plurality of buildings;
a forecasting and optimization engine operative to:
construct a thermal and an electrical load model based on the inputs;
construct an overall energy model, the overall energy model being based on the thermal and electrical load models; and
generate a plurality of demand models based on the constructed energy model;
an optimization engine operative to optimize the demand models using complex multivariate optimization techniques, wherein optimizing is based on usage data and energy rules;
a graphical user interface operating on a client device operative to display recommendations based on the optimized model or generating real and an interface to building control systems operative to transmit complementary control instructions based on the optimized model, the determination based on client preferences.
11. The system of claim 10 further comprising a data conditioner operative to clean the input values prior to constructing a thermal and electrical load model.
12. The system of claim 11 wherein the data conditioner is operative to detect abnormal data and invalid inputs.
13. The system of claim 12 wherein the data conditioner is further operative to interpolate invalid data points and performing principle component analysis of the data set.
14. The system of claim 10 wherein the system is further operative to generate and optimize an on-site generation model for variable and consistent on-site generation sources.
15. The system of claim 10 wherein the forecasting and optimization engine generates the thermal and electrical load models based on built and stored demand models for a plurality of subsystem categories.
16. The system of claim 15 wherein the plurality of subsystem categories includes heating/cooling, ventilation, lighting, water, plug load, and data center demand models.
17. The system of claim 10 wherein energy rules comprise client defined rules and strategies and general rules and wherein the optimizer further optimizes the models based on client defined rules and strategies include rules for energy management specified by the building manager or owner.
18. The system of claim 17 wherein general rules include rules for optimizing building energy management include proprietary rules based on research, rules based on comparisons to peer benchmarks and rules derived by comparing research to manufacturer-supplied data.
19. A method for optimizing building energy usage, the method comprising
receiving a plurality of input values associated with a building or plurality of buildings;
constructing a thermal and an electrical load model based on the inputs;
constructing an overall energy model, the overall energy model being based on the thermal and electrical load models;
generating a plurality of demand models;
optimizing the demand models using complex multivariate optimization techniques, wherein optimizing is based on usage data and energy rules; and
displaying recommendations based on the optimized model or generating real-time, complementary control instructions based on the optimized model, the determination based on client preferences.
20. A method for optimizing building energy usage, the method comprising
receiving a plurality of input values associated with a building or plurality of buildings;
constructing a thermal model based on the inputs;
constructing an overall energy model, the overall energy model being based on the thermal model;
generating a plurality of demand models, the demand models representing a combination of subsystems wherein the combination of subsystems is selected from one of: heating and cooling and lighting; heating and cooling, lighting and water; heating and cooling, water; heating and cooling, ventilation, water; heating and cooling, ventilation, lighting and water; heating and cooling, ventilation, lighting, plug load; heating and cooling, ventilation, lighting, plug load, water; water; heating and cooling, ventilation, dedicated data center EMS; or all electrical demand across all building subsystems;
optimizing the demand models using complex multivariate optimization techniques, wherein optimizing is based on usage data and energy rules; and
displaying recommendations based on the optimized model or generating real-time, complementary control instructions based on the optimized model, the determination based on client preferences.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US14/971,236 US20160187911A1 (en) | 2011-03-07 | 2015-12-16 | Systems and methods for optimizing energy and resource management for building systems |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US13/042,377 US9244444B2 (en) | 2011-03-07 | 2011-03-07 | Systems and methods for optimizing energy and resource management for building systems |
US14/971,236 US20160187911A1 (en) | 2011-03-07 | 2015-12-16 | Systems and methods for optimizing energy and resource management for building systems |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US13/042,377 Continuation US9244444B2 (en) | 2011-03-07 | 2011-03-07 | Systems and methods for optimizing energy and resource management for building systems |
Publications (1)
Publication Number | Publication Date |
---|---|
US20160187911A1 true US20160187911A1 (en) | 2016-06-30 |
Family
ID=46796801
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US13/042,377 Expired - Fee Related US9244444B2 (en) | 2011-03-07 | 2011-03-07 | Systems and methods for optimizing energy and resource management for building systems |
US14/971,236 Abandoned US20160187911A1 (en) | 2011-03-07 | 2015-12-16 | Systems and methods for optimizing energy and resource management for building systems |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US13/042,377 Expired - Fee Related US9244444B2 (en) | 2011-03-07 | 2011-03-07 | Systems and methods for optimizing energy and resource management for building systems |
Country Status (5)
Country | Link |
---|---|
US (2) | US9244444B2 (en) |
AU (1) | AU2012225502A1 (en) |
CA (1) | CA2866723A1 (en) |
GB (1) | GB2502760A (en) |
WO (1) | WO2012122234A2 (en) |
Cited By (30)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20150168964A1 (en) * | 2013-12-12 | 2015-06-18 | Industrial Technology Research Institute | Controlling device and method for hvac system |
US20160131380A1 (en) * | 2014-11-10 | 2016-05-12 | Internal Air Flow Dynamics, Llc | Method and System for Eliminating Air Pockets, Eliminating Air Stratification, Minimizing Inconsistent Temperature, and Increasing Internal Air Turns |
US20170331287A1 (en) * | 2016-05-10 | 2017-11-16 | Conectric, Llc | Method and system for ranking control schemes optimizing peak loading conditions of built environment |
EP3343496A1 (en) * | 2016-12-28 | 2018-07-04 | Robotina d.o.o. | Method and system for energy management in a facility |
US10140401B1 (en) | 2011-07-25 | 2018-11-27 | Clean Power Research, L.L.C. | System and method for inferring a photovoltaic system configuration specification with the aid of a digital computer |
US10156554B1 (en) | 2015-02-25 | 2018-12-18 | Clean Power Research, L.L.C. | System and method for determining infiltration of a building through empirical testing using a CO2 concentration monitoring device |
US10197705B2 (en) | 2011-07-25 | 2019-02-05 | Clean Power Research, L.L.C. | System for correlating satellite imagery through bounded area variance for use in photovoltaic fleet output estimation |
US10203674B1 (en) * | 2015-02-25 | 2019-02-12 | Clean Power Research, L.L.C. | System and method for providing constraint-based heating, ventilation and air-conditioning (HVAC) system optimization with the aid of a digital computer |
US10309994B2 (en) | 2011-07-25 | 2019-06-04 | Clean Power Research, L.L.C. | Estimating photovoltaic energy through averaged irradiance observations with the aid of a digital computer |
US10332021B1 (en) | 2015-02-25 | 2019-06-25 | Clean Power Research, L.L.C. | System and method for estimating indoor temperature time series data of a building with the aid of a digital computer |
US10339232B1 (en) | 2015-02-25 | 2019-07-02 | Clean Power Research, L.L.C. | Computer-implemented system and method for modeling building heating energy consumption |
US10359206B1 (en) | 2016-11-03 | 2019-07-23 | Clean Power Research, L.L.C. | System and method for forecasting seasonal fuel consumption for indoor thermal conditioning with the aid of a digital computer |
US10409925B1 (en) | 2012-10-17 | 2019-09-10 | Clean Power Research, L.L.C. | Method for tuning photovoltaic power generation plant forecasting with the aid of a digital computer |
US10436942B2 (en) | 2011-07-25 | 2019-10-08 | Clean Power Research, L.L.C. | System and method for correlating point-to-point sky clearness for use in photovoltaic fleet output estimation with the aid of a digital computer |
US20190311283A1 (en) * | 2015-02-25 | 2019-10-10 | Clean Power Research, L.L.C. | System And Method For Estimating Periodic Fuel Consumption for Cooling Of a Building With the Aid Of a Digital Computer |
US10599747B1 (en) | 2011-07-25 | 2020-03-24 | Clean Power Research, L.L.C. | System and method for forecasting photovoltaic power generation system degradation |
US10651788B2 (en) | 2011-07-25 | 2020-05-12 | Clean Power Research, L.L.C. | System and method for net load-based inference of operational specifications of a photovoltaic power generation system with the aid of a digital computer |
US10663500B2 (en) | 2011-07-25 | 2020-05-26 | Clean Power Research, L.L.C. | System and method for estimating photovoltaic energy generation through linearly interpolated irradiance observations with the aid of a digital computer |
US10670477B2 (en) | 2014-02-03 | 2020-06-02 | Clean Power Research, L.L.C. | System and method for empirical-test-based estimation of overall thermal performance of a building with the aid of a digital computer |
US10719636B1 (en) | 2014-02-03 | 2020-07-21 | Clean Power Research, L.L.C. | Computer-implemented system and method for estimating gross energy load of a building |
US10747914B1 (en) | 2014-02-03 | 2020-08-18 | Clean Power Research, L.L.C. | Computer-implemented system and method for estimating electric baseload consumption using net load data |
US10789396B1 (en) | 2014-02-03 | 2020-09-29 | Clean Power Research, L.L.C. | Computer-implemented system and method for facilitating implementation of holistic zero net energy consumption |
US10797639B1 (en) * | 2011-07-25 | 2020-10-06 | Clean Power Research, L.L.C. | System and method for performing power utility remote consumer energy auditing with the aid of a digital computer |
US11068563B2 (en) | 2011-07-25 | 2021-07-20 | Clean Power Research, L.L.C. | System and method for normalized ratio-based forecasting of photovoltaic power generation system degradation with the aid of a digital computer |
US20220148102A1 (en) * | 2017-01-12 | 2022-05-12 | Johnson Controls Tyco IP Holdings LLP | Thermal energy production, storage, and control system with heat recovery chillers |
US11423199B1 (en) | 2018-07-11 | 2022-08-23 | Clean Power Research, L.L.C. | System and method for determining post-modification building balance point temperature with the aid of a digital computer |
US11620344B2 (en) | 2020-03-04 | 2023-04-04 | Honeywell International Inc. | Frequent item set tracking |
US11669757B2 (en) | 2019-01-30 | 2023-06-06 | International Business Machines Corporation | Operational energy consumption anomalies in intelligent energy consumption systems |
US11847617B2 (en) | 2017-02-07 | 2023-12-19 | Johnson Controls Tyco IP Holdings LLP | Model predictive maintenance system with financial analysis functionality |
US12124532B2 (en) | 2022-09-30 | 2024-10-22 | Clean Power Research, L.L.C. | System and method for degradation-based service prediction with the aid of a digital computer |
Families Citing this family (123)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9177084B2 (en) * | 2011-09-30 | 2015-11-03 | Autodesk, Inc. | Generating an analytical energy model |
CN102985882B (en) | 2010-05-05 | 2016-10-05 | 格林斯里弗斯有限公司 | For determining the heating optimal using method that multiple thermals source are heat sink with refrigeration system |
US9310403B2 (en) * | 2011-06-10 | 2016-04-12 | Alliance For Sustainable Energy, Llc | Building energy analysis tool |
US9310786B2 (en) | 2011-06-17 | 2016-04-12 | Siemens Industry, Inc. | Automated demand response scheduling to reduce electrical loads |
US9049078B2 (en) | 2011-08-31 | 2015-06-02 | Eneroc, Inc. | NOC-oriented control of a demand coordination network |
US9082294B2 (en) | 2011-09-14 | 2015-07-14 | Enernoc, Inc. | Apparatus and method for receiving and transporting real time energy data |
US20150178865A1 (en) * | 2011-09-20 | 2015-06-25 | The Trustees Of Columbia University In The City Of New York | Total property optimization system for energy efficiency and smart buildings |
WO2013043863A1 (en) * | 2011-09-20 | 2013-03-28 | The Trustees Of Columbia University In The City Of New York | Adaptive stochastic controller for energy efficiency and smart buildings |
CN103034179A (en) * | 2011-10-07 | 2013-04-10 | 爱思伟尔有限公司 | System and method for automatically controlling energy apparatus using energy modeling technique |
US9450408B2 (en) * | 2011-10-07 | 2016-09-20 | Siemens Corporation | Adaptive demand response based on distributed load control |
US9317026B2 (en) * | 2013-05-31 | 2016-04-19 | Patrick Andrew Shiel | Method for determining the unique natural thermal lag (NTL) of a building |
CN102419589B (en) * | 2011-12-31 | 2014-05-07 | 国家电网公司 | Intelligent power utilization system and method for district |
US9535411B2 (en) * | 2012-03-05 | 2017-01-03 | Siemens Aktiengesellschaft | Cloud enabled building automation system |
US10013725B2 (en) | 2012-04-02 | 2018-07-03 | Carrier Corporation | Architecture for energy management of multi customer multi time zone distributed facilities |
US9141912B2 (en) * | 2012-05-04 | 2015-09-22 | Intelligent Buildings, Llc | Building analytic device |
CN102969720B (en) * | 2012-11-01 | 2016-01-20 | 北京交通大学 | A kind of load Dynamic controlling that can apply in intelligent grid and analytical method |
EP2965019A4 (en) * | 2013-03-04 | 2017-01-11 | Greensleeves LLC | Energy management systems and methods of use |
US9436179B1 (en) | 2013-03-13 | 2016-09-06 | Johnson Controls Technology Company | Systems and methods for energy cost optimization in a building system |
US9852481B1 (en) * | 2013-03-13 | 2017-12-26 | Johnson Controls Technology Company | Systems and methods for cascaded model predictive control |
US10418833B2 (en) | 2015-10-08 | 2019-09-17 | Con Edison Battery Storage, Llc | Electrical energy storage system with cascaded frequency response optimization |
US9235657B1 (en) | 2013-03-13 | 2016-01-12 | Johnson Controls Technology Company | System identification and model development |
US9343903B2 (en) | 2013-03-14 | 2016-05-17 | Mark Hauenstein | Methods and systems architecture to virtualize energy functions and processes into a cloud based model |
US9454173B2 (en) * | 2013-05-22 | 2016-09-27 | Utility Programs And Metering Ii, Inc. | Predictive alert system for building energy management |
US9395712B2 (en) * | 2013-05-31 | 2016-07-19 | Patrick Andrew Shiel | Building energy usage reduction by automation of optimized plant operation times and sub-hourly building energy forecasting to determine plant faults |
US20140365017A1 (en) * | 2013-06-05 | 2014-12-11 | Jason Hanna | Methods and systems for optimized hvac operation |
US20140373074A1 (en) | 2013-06-12 | 2014-12-18 | Vivint, Inc. | Set top box automation |
WO2015013677A2 (en) * | 2013-07-26 | 2015-01-29 | The Trustees Of Columbia University In The City Of New York | Total property optimization system for energy efficiency and smart buildings |
US20150057820A1 (en) * | 2013-08-21 | 2015-02-26 | Fujitsu Limited | Building energy management optimization |
US10197338B2 (en) * | 2013-08-22 | 2019-02-05 | Kevin Hans Melsheimer | Building system for cascading flows of matter and energy |
EP3042129A4 (en) * | 2013-09-05 | 2017-06-21 | Greensleeves LLC | System for optimization of building heating and cooling systems |
EP2858015A1 (en) * | 2013-10-04 | 2015-04-08 | Building Research Establishment Ltd | System and method for simulation, control and performance monitoring of energy systems |
US10380705B2 (en) | 2013-10-30 | 2019-08-13 | Carrier Corporation | System and method for modeling of target infrastructure for energy management in distributed-facilities |
US20170325301A1 (en) * | 2013-11-03 | 2017-11-09 | Lightel Technologies, Inc. | Methods And Systems Of Proactive Monitoring And Metering Of Lighting Devices |
US9483735B2 (en) | 2013-11-13 | 2016-11-01 | International Business Machines Corporation | Computer-based extraction of complex building operation rules for products and services |
WO2015077754A1 (en) * | 2013-11-25 | 2015-05-28 | Siemens Corporation | A statistical approach to modeling and forecast of cchp energy and cooling demand and optimization cchp control setpoints |
US20150178421A1 (en) * | 2013-12-20 | 2015-06-25 | BrightBox Technologies, Inc. | Systems for and methods of modeling, step-testing, and adaptively controlling in-situ building components |
US10637240B2 (en) | 2014-01-24 | 2020-04-28 | Fujitsu Limited | Energy curtailment event implementation based on uncertainty of demand flexibility |
US20150213466A1 (en) * | 2014-01-24 | 2015-07-30 | Fujitsu Limited | Demand response aggregation optimization |
EP2903217B1 (en) * | 2014-01-30 | 2020-09-09 | Siemens Schweiz AG | Building automation method and system |
EP2911018A1 (en) * | 2014-02-24 | 2015-08-26 | Siemens Schweiz AG | Building automation system using a predictive model |
US20150268650A1 (en) * | 2014-03-24 | 2015-09-24 | Nec Laboratories America, Inc. | Power modeling based building demand management system |
US10115120B2 (en) | 2014-05-12 | 2018-10-30 | Fujitsu Limited | Dynamic demand response event assessment |
US9946972B2 (en) * | 2014-05-23 | 2018-04-17 | International Business Machines Corporation | Optimization of mixed-criticality systems |
DE102014210153B4 (en) * | 2014-05-28 | 2022-10-27 | Robert Bosch Gmbh | Method for operating a control unit of a heating system |
WO2015179978A1 (en) * | 2014-05-29 | 2015-12-03 | Shift Energy Inc. | Methods and system for reducing energy use in buildings |
DE102014010117A1 (en) * | 2014-07-08 | 2016-01-14 | Evohaus Gmbh | Forecasting and control system for the electricity purchase of households |
KR102336642B1 (en) * | 2014-08-21 | 2021-12-07 | 삼성전자 주식회사 | Method and apparatus for controlling temperature |
US9651929B2 (en) * | 2014-09-29 | 2017-05-16 | International Business Machines Corporation | HVAC system control integrated with demand response, on-site energy storage system and on-site energy generation system |
KR101641258B1 (en) * | 2014-10-10 | 2016-07-20 | 엘지전자 주식회사 | Central control apparatus for controlling facilities, facility control system comprising the same, and method for controlling facilities |
US9927467B2 (en) * | 2014-10-14 | 2018-03-27 | International Business Machines Corporation | Estimating energy savings from building management system point lists |
US10185345B2 (en) * | 2015-06-22 | 2019-01-22 | Solarcity Corporation | Systems and methods of home efficiency modeling |
US20160259869A1 (en) * | 2015-03-02 | 2016-09-08 | Ca, Inc. | Self-learning simulation environments |
US9977447B2 (en) | 2015-03-31 | 2018-05-22 | Enernoc, Inc. | Demand response dispatch system employing weather induced facility energy consumption characterizations |
US20160294185A1 (en) | 2015-03-31 | 2016-10-06 | Enernoc, Inc. | Energy brown out prediction system |
US20160291622A1 (en) | 2015-03-31 | 2016-10-06 | Enernoc, Inc. | System for weather induced facility energy consumption characterization |
US9904269B2 (en) | 2015-03-31 | 2018-02-27 | Enernoc, Inc. | Apparatus and method for demand coordination network control |
US10025338B2 (en) | 2015-03-31 | 2018-07-17 | Enernoc, Inc. | Demand response dispatch prediction system |
US11953865B2 (en) | 2015-04-23 | 2024-04-09 | Johnson Controls Tyco IP Holdings LLP | HVAC controller with predictive cost optimization |
US10761547B2 (en) * | 2015-04-23 | 2020-09-01 | Johnson Controls Technology Company | HVAC controller with integrated airside and waterside cost optimization |
US10578330B2 (en) * | 2015-06-21 | 2020-03-03 | Rajesh Ramnik Solanki | System for monitoring and controlling devices and method thereof |
JP6500663B2 (en) * | 2015-07-16 | 2019-04-17 | 株式会社リコー | INFORMATION PROCESSING SYSTEM, INFORMATION PROCESSING APPARATUS, PROGRAM, AND METHOD FOR EMBEDDING FAULT PREDICTION LOGIC |
JP6757915B2 (en) * | 2015-07-30 | 2020-09-23 | パナソニックIpマネジメント株式会社 | Information terminal control method and information system |
US10418832B2 (en) | 2015-10-08 | 2019-09-17 | Con Edison Battery Storage, Llc | Electrical energy storage system with constant state-of charge frequency response optimization |
US10554170B2 (en) | 2015-10-08 | 2020-02-04 | Con Edison Battery Storage, Llc | Photovoltaic energy system with solar intensity prediction |
US10222083B2 (en) | 2015-10-08 | 2019-03-05 | Johnson Controls Technology Company | Building control systems with optimization of equipment life cycle economic value while participating in IBDR and PBDR programs |
US10283968B2 (en) | 2015-10-08 | 2019-05-07 | Con Edison Battery Storage, Llc | Power control system with power setpoint adjustment based on POI power limits |
US10389136B2 (en) | 2015-10-08 | 2019-08-20 | Con Edison Battery Storage, Llc | Photovoltaic energy system with value function optimization |
US10250039B2 (en) | 2015-10-08 | 2019-04-02 | Con Edison Battery Storage, Llc | Energy storage controller with battery life model |
US10700541B2 (en) | 2015-10-08 | 2020-06-30 | Con Edison Battery Storage, Llc | Power control system with battery power setpoint optimization using one-step-ahead prediction |
US10197632B2 (en) | 2015-10-08 | 2019-02-05 | Taurus Des, Llc | Electrical energy storage system with battery power setpoint optimization using predicted values of a frequency regulation signal |
US10564610B2 (en) | 2015-10-08 | 2020-02-18 | Con Edison Battery Storage, Llc | Photovoltaic energy system with preemptive ramp rate control |
US10190793B2 (en) * | 2015-10-08 | 2019-01-29 | Johnson Controls Technology Company | Building management system with electrical energy storage optimization based on statistical estimates of IBDR event probabilities |
US10742055B2 (en) | 2015-10-08 | 2020-08-11 | Con Edison Battery Storage, Llc | Renewable energy system with simultaneous ramp rate control and frequency regulation |
US11210617B2 (en) | 2015-10-08 | 2021-12-28 | Johnson Controls Technology Company | Building management system with electrical energy storage optimization based on benefits and costs of participating in PDBR and IBDR programs |
US10222427B2 (en) | 2015-10-08 | 2019-03-05 | Con Edison Battery Storage, Llc | Electrical energy storage system with battery power setpoint optimization based on battery degradation costs and expected frequency response revenue |
US10241528B1 (en) | 2015-12-01 | 2019-03-26 | Energyhub, Inc. | Demand response technology utilizing a simulation engine to perform thermostat-based demand response simulations |
US10594153B2 (en) | 2016-07-29 | 2020-03-17 | Con Edison Battery Storage, Llc | Frequency response optimization control system |
US10778012B2 (en) | 2016-07-29 | 2020-09-15 | Con Edison Battery Storage, Llc | Battery optimization control system with data fusion systems and methods |
US20180048693A1 (en) * | 2016-08-09 | 2018-02-15 | The Joan and Irwin Jacobs Technion-Cornell Institute | Techniques for secure data management |
EP3291030A1 (en) * | 2016-09-01 | 2018-03-07 | Enervalis N.V. | Optimizing operation of hot water systems |
US9645596B1 (en) * | 2016-11-23 | 2017-05-09 | Advanced Microgrid Solutions, Inc. | Method and apparatus for facilitating the operation of an on-site energy storage system to co-optimize battery dispatch |
WO2018203862A1 (en) * | 2016-12-29 | 2018-11-08 | Yaşar Üni̇versi̇tesi̇ | Integrated building operation, design, optimization method |
WO2018122392A1 (en) * | 2016-12-30 | 2018-07-05 | Vito Nv | State of charge estimation of energy storage systems |
CN106845701B (en) * | 2017-01-11 | 2019-11-08 | 东南大学 | A kind of integrated energy system optimization method based on heat supply network and house thermal inertia |
US10409305B2 (en) | 2017-01-29 | 2019-09-10 | Trane International Inc. | HVAC system configuration and zone management |
US10746425B1 (en) | 2017-03-08 | 2020-08-18 | Energyhub, Inc. | Thermal modeling technology |
US10928835B2 (en) | 2017-03-27 | 2021-02-23 | Clearpath Robotics Inc. | Systems and methods for flexible manufacturing using self-driving vehicles |
US10885495B2 (en) | 2017-03-27 | 2021-01-05 | Clearpath Robotics Inc. | Systems and methods for autonomous provision replenishment |
US10706375B2 (en) * | 2017-03-29 | 2020-07-07 | Johnson Controls Technology Company | Central plant with asset allocator |
US11675322B2 (en) | 2017-04-25 | 2023-06-13 | Johnson Controls Technology Company | Predictive building control system with discomfort threshold adjustment |
US11371739B2 (en) | 2017-04-25 | 2022-06-28 | Johnson Controls Technology Company | Predictive building control system with neural network based comfort prediction |
US10845083B2 (en) | 2017-04-25 | 2020-11-24 | Johnson Controls Technology Company | Predictive building control system with neural network based constraint generation |
US11239660B2 (en) * | 2017-05-10 | 2022-02-01 | Korea Electronics Technology Institute | Demand response system and method for controlling devices to participate in demand response automatically |
US11271769B2 (en) | 2019-11-14 | 2022-03-08 | Johnson Controls Tyco IP Holdings LLP | Central plant control system with asset allocation override |
US11586163B2 (en) | 2017-06-09 | 2023-02-21 | Autodesk, Inc. | Predictive modelling and control for water resource infrastructure |
US10436470B2 (en) * | 2017-07-18 | 2019-10-08 | Abb Schweiz Ag | Rule-based load shedding algorithm for building energy management |
US10900686B2 (en) | 2017-07-28 | 2021-01-26 | Johnson Controls Technology Company | Central plant control system with time dependent deferred load |
GB2594034B (en) | 2017-07-28 | 2022-09-14 | Univ Florida State Res Found | Optimal control technology for distributed energy resources |
US10418811B2 (en) * | 2017-09-12 | 2019-09-17 | Sas Institute Inc. | Electric power grid supply and load prediction using cleansed time series data |
US10459412B2 (en) * | 2017-09-27 | 2019-10-29 | Ademco Inc. | Convergence structure for control and data analytics systems |
US10770897B1 (en) * | 2017-10-17 | 2020-09-08 | Energyhub, Inc. | Load reduction optimization |
US20190187635A1 (en) * | 2017-12-15 | 2019-06-20 | Midea Group Co., Ltd | Machine learning control of environmental systems |
KR102440233B1 (en) | 2017-12-20 | 2022-09-06 | 한국전자통신연구원 | IoT device plug-In method and device in data analysis based automation systems |
US10794609B2 (en) * | 2018-02-05 | 2020-10-06 | Mitsubishi Electric Research Laboratories, Inc. | Methods and systems for personalized heating, ventilation, and air conditioning |
WO2019199594A1 (en) | 2018-04-09 | 2019-10-17 | Carrier Corporation | Satisfaction measurement for smart buildings |
JP7104561B2 (en) * | 2018-05-31 | 2022-07-21 | 株式会社日立製作所 | Energy operation equipment and methods and systems |
US11016468B1 (en) * | 2018-06-12 | 2021-05-25 | Ricky Dale Barker | Monitoring system for use in industrial operations |
US11163271B2 (en) | 2018-08-28 | 2021-11-02 | Johnson Controls Technology Company | Cloud based building energy optimization system with a dynamically trained load prediction model |
US11159022B2 (en) | 2018-08-28 | 2021-10-26 | Johnson Controls Tyco IP Holdings LLP | Building energy optimization system with a dynamically trained load prediction model |
CN109767054A (en) * | 2018-11-22 | 2019-05-17 | 福建网能科技开发有限责任公司 | Efficiency cloud appraisal procedure and edge efficiency gateway based on deep neural network algorithm |
US11159046B1 (en) | 2018-12-21 | 2021-10-26 | Smart Wires Inc. | Dynamic computation and control of distributed assets at the edge of a power grid |
EP3739710B1 (en) | 2019-05-13 | 2022-06-29 | Siemens Schweiz AG | Control of photovoltaic systems |
CN110516867B (en) * | 2019-08-21 | 2022-02-11 | 广东电网有限责任公司 | Integrated learning load prediction method based on principal component analysis |
US12092348B2 (en) | 2019-09-03 | 2024-09-17 | Trane International Inc. | Chiller plant with dynamic surge avoidance |
US11248823B2 (en) | 2019-09-03 | 2022-02-15 | Trane International Inc. | Chiller plant with dynamic surge avoidance |
US11251620B2 (en) * | 2020-03-03 | 2022-02-15 | Caterpillar Inc. | Micro-grid site predictive control for multipower resource management with machine learning |
KR102164363B1 (en) * | 2020-06-16 | 2020-10-13 | (주)삼원씨앤지 | Intelligent system for building automatic control integrating bas and fms, and method for facility management using the system |
CN111950171B (en) * | 2020-07-03 | 2022-03-15 | 南京东博智慧能源研究院有限公司 | Backup configuration method for gas-thermal inertia backup participation park comprehensive energy system |
US11355937B2 (en) | 2020-09-22 | 2022-06-07 | Energy Hub, Inc. | Electrical grid control and optimization |
US11735916B2 (en) | 2020-09-22 | 2023-08-22 | Energyhub, Inc. | Autonomous electrical grid management |
US20230186217A1 (en) * | 2021-12-13 | 2023-06-15 | International Business Machines Corporation | Dynamically enhancing supply chain strategies based on carbon emission targets |
WO2023192281A1 (en) * | 2022-03-30 | 2023-10-05 | Nzero, Inc. | Systems and methods for tracking emissions |
CN116384843B (en) * | 2023-06-06 | 2023-09-12 | 广东鑫钻节能科技股份有限公司 | Energy efficiency evaluation model training method and monitoring method for digital energy nitrogen station |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100324962A1 (en) * | 2009-06-22 | 2010-12-23 | Johnson Controls Technology Company | Smart building manager |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7065416B2 (en) * | 2001-08-29 | 2006-06-20 | Microsoft Corporation | System and methods for providing automatic classification of media entities according to melodic movement properties |
US8417360B2 (en) * | 2001-08-10 | 2013-04-09 | Rockwell Automation Technologies, Inc. | System and method for dynamic multi-objective optimization of machine selection, integration and utilization |
US7894943B2 (en) * | 2005-06-30 | 2011-02-22 | Sloup Charles J | Real-time global optimization of building setpoints and sequence of operation |
US8977404B2 (en) * | 2008-09-08 | 2015-03-10 | Tendril Networks, Inc. | Collaborative energy benchmarking systems and methods |
KR20100089594A (en) * | 2009-02-04 | 2010-08-12 | 주식회사 한미파슨스건축사사무소 | Method for energy management of green building |
KR20100117409A (en) * | 2009-04-24 | 2010-11-03 | 성균관대학교산학협력단 | Building environmental control system and method through internet network |
KR20100128876A (en) * | 2009-05-29 | 2010-12-08 | 주식회사 한미파슨스건축사사무소 | Green energy management system for home |
US8359124B2 (en) * | 2009-11-05 | 2013-01-22 | General Electric Company | Energy optimization system |
CA2762395C (en) * | 2010-12-16 | 2018-09-04 | Lennox Industries Inc | Priority-based energy management |
-
2011
- 2011-03-07 US US13/042,377 patent/US9244444B2/en not_active Expired - Fee Related
-
2012
- 2012-03-07 CA CA2866723A patent/CA2866723A1/en not_active Abandoned
- 2012-03-07 GB GB1317721.7A patent/GB2502760A/en not_active Withdrawn
- 2012-03-07 AU AU2012225502A patent/AU2012225502A1/en not_active Abandoned
- 2012-03-07 WO PCT/US2012/028007 patent/WO2012122234A2/en active Application Filing
-
2015
- 2015-12-16 US US14/971,236 patent/US20160187911A1/en not_active Abandoned
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100324962A1 (en) * | 2009-06-22 | 2010-12-23 | Johnson Controls Technology Company | Smart building manager |
Cited By (67)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11487849B2 (en) | 2011-07-25 | 2022-11-01 | Clean Power Research, L.L.C. | System and method for degradation-based power grid operation with the aid of a digital computer |
US11238193B2 (en) | 2011-07-25 | 2022-02-01 | Clean Power Research, L.L.C. | System and method for photovoltaic system configuration specification inferrence with the aid of a digital computer |
US11068563B2 (en) | 2011-07-25 | 2021-07-20 | Clean Power Research, L.L.C. | System and method for normalized ratio-based forecasting of photovoltaic power generation system degradation with the aid of a digital computer |
US10803212B2 (en) | 2011-07-25 | 2020-10-13 | Clean Power Research, L.L.C. | System for inferring a photovoltaic system configuration specification with the aid of a digital computer |
US10797639B1 (en) * | 2011-07-25 | 2020-10-06 | Clean Power Research, L.L.C. | System and method for performing power utility remote consumer energy auditing with the aid of a digital computer |
US10140401B1 (en) | 2011-07-25 | 2018-11-27 | Clean Power Research, L.L.C. | System and method for inferring a photovoltaic system configuration specification with the aid of a digital computer |
US11333793B2 (en) | 2011-07-25 | 2022-05-17 | Clean Power Research, L.L.C. | System and method for variance-based photovoltaic fleet power statistics building with the aid of a digital computer |
US10197705B2 (en) | 2011-07-25 | 2019-02-05 | Clean Power Research, L.L.C. | System for correlating satellite imagery through bounded area variance for use in photovoltaic fleet output estimation |
US11934750B2 (en) | 2011-07-25 | 2024-03-19 | Clean Power Research, L.L.C. | System and method for photovoltaic system configuration specification modification with the aid of a digital computer |
US10309994B2 (en) | 2011-07-25 | 2019-06-04 | Clean Power Research, L.L.C. | Estimating photovoltaic energy through averaged irradiance observations with the aid of a digital computer |
US10663500B2 (en) | 2011-07-25 | 2020-05-26 | Clean Power Research, L.L.C. | System and method for estimating photovoltaic energy generation through linearly interpolated irradiance observations with the aid of a digital computer |
US11693152B2 (en) | 2011-07-25 | 2023-07-04 | Clean Power Research, L.L.C. | System and method for estimating photovoltaic energy through irradiance to irradiation equating with the aid of a digital computer |
US10651788B2 (en) | 2011-07-25 | 2020-05-12 | Clean Power Research, L.L.C. | System and method for net load-based inference of operational specifications of a photovoltaic power generation system with the aid of a digital computer |
US10627544B2 (en) | 2011-07-25 | 2020-04-21 | Clean Power Research, L.L.C. | System and method for irradiance-based estimation of photovoltaic fleet power generation with the aid of a digital computer |
US10599747B1 (en) | 2011-07-25 | 2020-03-24 | Clean Power Research, L.L.C. | System and method for forecasting photovoltaic power generation system degradation |
US10436942B2 (en) | 2011-07-25 | 2019-10-08 | Clean Power Research, L.L.C. | System and method for correlating point-to-point sky clearness for use in photovoltaic fleet output estimation with the aid of a digital computer |
US11476801B2 (en) * | 2011-07-25 | 2022-10-18 | Clean Power Research, L.L.C. | System and method for determining seasonal energy consumption with the aid of a digital computer |
US10740512B2 (en) | 2012-10-17 | 2020-08-11 | Clean Power Research, L.L.C. | System for tuning a photovoltaic power generation plant forecast with the aid of a digital computer |
US10409925B1 (en) | 2012-10-17 | 2019-09-10 | Clean Power Research, L.L.C. | Method for tuning photovoltaic power generation plant forecasting with the aid of a digital computer |
US9891636B2 (en) * | 2013-12-12 | 2018-02-13 | Industrial Technology Research Institute | Controlling device and method for HVAC system |
US20150168964A1 (en) * | 2013-12-12 | 2015-06-18 | Industrial Technology Research Institute | Controlling device and method for hvac system |
US11734476B2 (en) | 2014-02-03 | 2023-08-22 | Clean Power Research, L.L.C. | System and method for facilitating individual energy consumption reduction with the aid of a digital computer |
US12032884B2 (en) | 2014-02-03 | 2024-07-09 | Clean Power Research, L.L.C. | System and method for facilitating implementation of building equipment energy consumption reduction with the aid of a digital computer |
US11359978B2 (en) | 2014-02-03 | 2022-06-14 | Clean Power Research, L.L.C. | System and method for interactively evaluating energy-related investments affecting building envelope with the aid of a digital computer |
US10670477B2 (en) | 2014-02-03 | 2020-06-02 | Clean Power Research, L.L.C. | System and method for empirical-test-based estimation of overall thermal performance of a building with the aid of a digital computer |
US10719789B1 (en) | 2014-02-03 | 2020-07-21 | Clean Power Research, L.L.C. | Computer-implemented method for interactively evaluating personal energy-related investments |
US10719636B1 (en) | 2014-02-03 | 2020-07-21 | Clean Power Research, L.L.C. | Computer-implemented system and method for estimating gross energy load of a building |
US11954414B2 (en) | 2014-02-03 | 2024-04-09 | Clean Power Research, L.L.C. | System and method for building heating-modification-based gross energy load modeling with the aid of a digital computer |
US10747914B1 (en) | 2014-02-03 | 2020-08-18 | Clean Power Research, L.L.C. | Computer-implemented system and method for estimating electric baseload consumption using net load data |
US10789396B1 (en) | 2014-02-03 | 2020-09-29 | Clean Power Research, L.L.C. | Computer-implemented system and method for facilitating implementation of holistic zero net energy consumption |
US11651306B2 (en) | 2014-02-03 | 2023-05-16 | Clean Power Research, L.L.C. | System and method for building energy-related changes evaluation with the aid of a digital computer |
US11651123B2 (en) | 2014-02-03 | 2023-05-16 | Clean Power Research, L.L.C. | System and method for building heating and gross energy load modification modeling with the aid of a digital computer |
US11416658B2 (en) | 2014-02-03 | 2022-08-16 | Clean Power Research, L.L.C. | System and method for estimating always-on energy load of a building with the aid of a digital computer |
US11531936B2 (en) | 2014-02-03 | 2022-12-20 | Clean Power Research, L.L.C. | System and method for empirical electrical-space-heating-based estimation of overall thermal performance of a building |
US11409926B2 (en) | 2014-02-03 | 2022-08-09 | Clean Power Research, L.L.C. | System and method for facilitating building net energy consumption reduction with the aid of a digital computer |
US11361129B2 (en) | 2014-02-03 | 2022-06-14 | Clean Power Research, L.L.C. | System and method for building gross energy load change modeling with the aid of a digital computer |
US12051016B2 (en) | 2014-02-03 | 2024-07-30 | Clean Power Research, L.L.C. | System and method for personal energy-related changes payback evaluation with the aid of a digital computer |
US20160131380A1 (en) * | 2014-11-10 | 2016-05-12 | Internal Air Flow Dynamics, Llc | Method and System for Eliminating Air Pockets, Eliminating Air Stratification, Minimizing Inconsistent Temperature, and Increasing Internal Air Turns |
US10473348B2 (en) * | 2014-11-10 | 2019-11-12 | Internal Air Flow Dynamics, Llc | Method and system for eliminating air stratification via ductless devices |
US10963605B2 (en) | 2015-02-25 | 2021-03-30 | Clean Power Research, L.L.C. | System and method for building heating optimization using periodic building fuel consumption with the aid of a digital computer |
US11921478B2 (en) * | 2015-02-25 | 2024-03-05 | Clean Power Research, L.L.C. | System and method for estimating periodic fuel consumption for cooling of a building with the aid of a digital computer |
US12031965B2 (en) | 2015-02-25 | 2024-07-09 | Clean Power Research, L.L.C. | System and method for monitoring occupancy of a building using a CO2 concentration monitoring device |
US11047586B2 (en) | 2015-02-25 | 2021-06-29 | Clean Power Research, L.L.C. | System and method for aligning HVAC consumption with photovoltaic production with the aid of a digital computer |
US10156554B1 (en) | 2015-02-25 | 2018-12-18 | Clean Power Research, L.L.C. | System and method for determining infiltration of a building through empirical testing using a CO2 concentration monitoring device |
US10203674B1 (en) * | 2015-02-25 | 2019-02-12 | Clean Power Research, L.L.C. | System and method for providing constraint-based heating, ventilation and air-conditioning (HVAC) system optimization with the aid of a digital computer |
US10503847B2 (en) | 2015-02-25 | 2019-12-10 | Clean Power Research, L.L.C. | System and method for modeling building heating energy consumption with the aid of a digital computer |
US10467355B1 (en) | 2015-02-25 | 2019-11-05 | Clean Power Research, L.L.C. | Computer-implemented system and method for determining building thermal performance parameters through empirical testing |
US20190311283A1 (en) * | 2015-02-25 | 2019-10-10 | Clean Power Research, L.L.C. | System And Method For Estimating Periodic Fuel Consumption for Cooling Of a Building With the Aid Of a Digital Computer |
US11859838B2 (en) | 2015-02-25 | 2024-01-02 | Clean Power Research, L.L.C. | System and method for aligning HVAC consumption with renewable power production with the aid of a digital computer |
US11651121B2 (en) | 2015-02-25 | 2023-05-16 | Clean Power Research, L.L.C. | System and method for building cooling optimization using periodic building fuel consumption with the aid of a digital computer |
US10332021B1 (en) | 2015-02-25 | 2019-06-25 | Clean Power Research, L.L.C. | System and method for estimating indoor temperature time series data of a building with the aid of a digital computer |
US10354025B1 (en) | 2015-02-25 | 2019-07-16 | Clean Power Research L.L.C. | Computer-implemented system and method for evaluating a change in fuel requirements for heating of a building |
US10339232B1 (en) | 2015-02-25 | 2019-07-02 | Clean Power Research, L.L.C. | Computer-implemented system and method for modeling building heating energy consumption |
US20170331287A1 (en) * | 2016-05-10 | 2017-11-16 | Conectric, Llc | Method and system for ranking control schemes optimizing peak loading conditions of built environment |
US12031731B2 (en) | 2016-11-03 | 2024-07-09 | Clean Power Research, L.L.C. | System for plot-based building seasonal fuel consumption forecasting with the aid of a digital computer |
US11649978B2 (en) | 2016-11-03 | 2023-05-16 | Clean Power Research, L.L.C. | System for plot-based forecasting fuel consumption for indoor thermal conditioning with the aid of a digital computer |
US10359206B1 (en) | 2016-11-03 | 2019-07-23 | Clean Power Research, L.L.C. | System and method for forecasting seasonal fuel consumption for indoor thermal conditioning with the aid of a digital computer |
US11054163B2 (en) | 2016-11-03 | 2021-07-06 | Clean Power Research, L.L.C. | System for forecasting fuel consumption for indoor thermal conditioning with the aid of a digital computer |
US10823442B2 (en) | 2016-11-03 | 2020-11-03 | Clean Power Research , L.L.C. | System and method for forecasting fuel consumption for indoor thermal conditioning using thermal performance forecast approach with the aid of a digital computer |
EP3343496A1 (en) * | 2016-12-28 | 2018-07-04 | Robotina d.o.o. | Method and system for energy management in a facility |
US20220148102A1 (en) * | 2017-01-12 | 2022-05-12 | Johnson Controls Tyco IP Holdings LLP | Thermal energy production, storage, and control system with heat recovery chillers |
US12002121B2 (en) * | 2017-01-12 | 2024-06-04 | Tyco Fire & Security Gmbh | Thermal energy production, storage, and control system with heat recovery chillers |
US11847617B2 (en) | 2017-02-07 | 2023-12-19 | Johnson Controls Tyco IP Holdings LLP | Model predictive maintenance system with financial analysis functionality |
US11423199B1 (en) | 2018-07-11 | 2022-08-23 | Clean Power Research, L.L.C. | System and method for determining post-modification building balance point temperature with the aid of a digital computer |
US11669757B2 (en) | 2019-01-30 | 2023-06-06 | International Business Machines Corporation | Operational energy consumption anomalies in intelligent energy consumption systems |
US11620344B2 (en) | 2020-03-04 | 2023-04-04 | Honeywell International Inc. | Frequent item set tracking |
US12124532B2 (en) | 2022-09-30 | 2024-10-22 | Clean Power Research, L.L.C. | System and method for degradation-based service prediction with the aid of a digital computer |
Also Published As
Publication number | Publication date |
---|---|
WO2012122234A2 (en) | 2012-09-13 |
GB201317721D0 (en) | 2013-11-20 |
CA2866723A1 (en) | 2012-09-13 |
GB2502760A (en) | 2013-12-04 |
US20120232701A1 (en) | 2012-09-13 |
WO2012122234A9 (en) | 2013-01-31 |
US9244444B2 (en) | 2016-01-26 |
WO2012122234A3 (en) | 2012-12-27 |
AU2012225502A1 (en) | 2014-01-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9244444B2 (en) | Systems and methods for optimizing energy and resource management for building systems | |
US20200301408A1 (en) | Model predictive maintenance system with degradation impact model | |
US20200356087A1 (en) | Model predictive maintenance system with event or condition based performance | |
US11747800B2 (en) | Model predictive maintenance system with automatic service work order generation | |
US11209184B2 (en) | Control system for central energy facility with distributed energy storage | |
US10287988B2 (en) | Methods and systems for enhancing operation of power plant generating units and systems | |
US10534328B2 (en) | Methods and systems for enhancing control of power plant generating units | |
CA2976639C (en) | Building management system with electrical energy storage optimization based on statistical estimates of ibdr event probabilities | |
AU2016334359B2 (en) | Building control system with optimization of equipment life cycle economic value while participating in IBDR and PBDR programs | |
US11803174B2 (en) | Building management system for forecasting time series values of building variables | |
US11635751B2 (en) | Model predictive maintenance system with short-term scheduling | |
CN105939028B (en) | Method and system for enhancing control of power plant power generation units | |
US9945264B2 (en) | Methods and systems for enhancing control of power plant generating units | |
EP3026510B1 (en) | Methods and systems for enhancing control of power plant generating units | |
US20150178865A1 (en) | Total property optimization system for energy efficiency and smart buildings | |
EP2500787B1 (en) | Transparent models for large scale optimization and control | |
JP2020501491A (en) | System and method for dynamic energy storage system control | |
CN101807265A (en) | System and method for dynamic multi-objective optimization of machine selection, integration and utilization | |
WO2021026370A1 (en) | Model predictive maintenance system with degradation impact model | |
Lauro et al. | Model predictive control for building active demand response systems | |
US20230253787A1 (en) | Control system with multi-factor carbon emissions optimization | |
US12061005B2 (en) | Direct policy optimization for meeting room comfort control and energy management | |
WO2015013677A2 (en) | Total property optimization system for energy efficiency and smart buildings | |
US11886153B2 (en) | Building control system using reinforcement learning | |
WO2023154408A1 (en) | Control system with multi-factor and adaptive carbon emissions optimization |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |