US20160108698A1 - Apparatus for Zonal Communication Interruption - Google Patents

Apparatus for Zonal Communication Interruption Download PDF

Info

Publication number
US20160108698A1
US20160108698A1 US14/520,189 US201414520189A US2016108698A1 US 20160108698 A1 US20160108698 A1 US 20160108698A1 US 201414520189 A US201414520189 A US 201414520189A US 2016108698 A1 US2016108698 A1 US 2016108698A1
Authority
US
United States
Prior art keywords
cement
diverters
diverter
tubular member
azimuthal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US14/520,189
Inventor
Jose Oliverio Alvarez
David A. Stiles
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US14/520,189 priority Critical patent/US20160108698A1/en
Publication of US20160108698A1 publication Critical patent/US20160108698A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • E21B33/14Methods or devices for cementing, for plugging holes, crevices or the like for cementing casings into boreholes
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • E21B33/138Plastering the borehole wall; Injecting into the formation
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/12Packers; Plugs
    • E21B33/124Units with longitudinally-spaced plugs for isolating the intermediate space
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/14Obtaining from a multiple-zone well

Definitions

  • the present disclosure broadly relates to well cementing and completions. More particularly, the present disclosure relates to an apparatus and method for providing zonal communication interruption.
  • cementing accomplishes the following purposes: zonal isolation, pressure isolation, casing corrosion protection, casing support and drilling fluid recovery.
  • a method for providing zonal communication interruption in a wellbore includes the steps of positioning a plurality of cement diverters axially along an outer surface of a tubular member, each cement diverter having an axial length and an azimuthal extension of less than 360°, wherein the azimuthal position of at least one cement diverter is axially rotated from an adjacent cement diverter; positioning the tubular member within the wellbore; and flowing cement into an annulus formed between an inner surface of the wellbore and the outer surface of the tubular member, wherein the positioning of the plurality of cement diverters provides zonal communication interruption about every 10 to 20 feet (about every 3.0 to about 6.1 meters) axially along the tubular member.
  • a first cement diverter of the plurality of cement diverters is positioned at a first distance from a first end of the tubular member.
  • a second cement diverter of the plurality of cement diverters is positioned at a second distance from a first end of the tubular member, the second distance greater than the first distance, the azimuthal position of the second cement diverter rotated by at least about 30° from the first cement diverter.
  • a third cement diverter of the plurality of cement diverters is positioned at a third distance from a first end of the tubular member, the third distance greater than the second distance, the azimuthal position of the third cement diverter rotated by at least about 30° from the second diverter segment.
  • a fourth cement diverter of the plurality of cement diverters is positioned at a fourth distance from a first end of the tubular member, the fourth distance greater than the third distance, the azimuthal position of the fourth cement diverter rotated by at least about 30° from the third cement diverter.
  • each cement diverter is rotated between about 30° and about 270° from an adjacent cement diverter. In some forms, the azimuthal position of each cement diverter is rotated between about 90° and about 180° from an adjacent cement diverter.
  • each of the plurality of cement diverters has an azimuthal extension of between about 35° and about 270°. In some forms, each of the plurality of cement diverters has an azimuthal extension of between about 90° and about 180°.
  • each of the plurality of cement diverters is between about two and about ten feet (about every 0.6 to about 3.0 meters) in length.
  • each of the plurality of cement diverters is axially spaced apart along the tubular member by about 3 to about 20 feet.
  • each of the plurality of cement diverters is swellable. In some forms, each of the plurality of cement diverters has a swellable coating applied thereto.
  • of the plurality of cement diverters is inflatable.
  • the wellbore comprises an inclined and/or horizontal section.
  • an apparatus for providing zonal communication interruption in a wellbore includes a tubular member having a plurality of cement diverters positioned axially along an outer surface of a tubular member, each cement diverter having an axial length and an azimuthal extension of less than 360°, wherein the azimuthal position of at least one cement diverter is axially rotated from an adjacent cement diverter and the positioning of the plurality of cement diverters is effective to provide zonal communication interruption about every 10 to 20 feet (about every 3.0 to about 6.1 meters) axially along the tubular member.
  • a first cement diverter of the plurality of cement diverters is positioned at a first distance from a first end of the tubular member.
  • a second cement diverter of the plurality of cement diverters is positioned at a second distance from a first end of the tubular member, the second distance greater than the first distance, the azimuthal position of the second cement diverter rotated by at least about 30° from the first cement diverter.
  • a third cement diverter of the plurality of cement diverters is positioned at a third distance from a first end of the tubular member, the third distance greater than the second distance, the azimuthal position of the third cement diverter rotated by at least about 30° from the second diverter segment.
  • a fourth cement diverter of the plurality of cement diverters is positioned at a fourth distance from a first end of the tubular member, the fourth distance greater than the third distance, the azimuthal position of the fourth cement diverter rotated by at least about 30° from the third cement diverter.
  • each cement diverter is rotated between about 30° and about 270° from an adjacent cement diverter. In some forms, the azimuthal position of each cement diverter is rotated between about 90° and about 180° from an adjacent cement diverter.
  • each of the plurality of cement diverters has an azimuthal extension of between about 35° and about 270°. In some forms, each of the plurality of cement diverters has an azimuthal extension of between about 90° and about 180°.
  • each of the plurality of cement diverters is between about two and about ten feet (about every 3.0 to about 6.1 meters) in length.
  • each of the plurality of cement diverters is axially spaced apart along the tubular member by about 3 to about 20 feet (about 0.9 to about 6.1 meters).
  • each of the plurality of cement diverters is swellable. In some forms, each of the plurality of cement diverters has a swellable coating applied thereto.
  • the plurality of cement diverters are part of the completion, forming protuberances radially extending from the outer surface of the tubular member or casing.
  • the plurality of cement diverters is inflatable.
  • the wellbore comprises an inclined and/or horizontal section.
  • a method of creating a wellbore in an underground formation includes the steps of drilling a borehole in the underground formation; installing a tubular member into the borehole, the tubular member having a plurality of cement diverters positioned axially along an outer surface of the tubular member, each cement diverter having an axial length and an azimuthal extension of less than 360°, wherein the azimuthal position of at least one cement diverter is axially rotated from an adjacent cement diverter; and flowing cement into an annulus formed between an inner surface of the wellbore and the outer surface of the tubular member, wherein the positioning of the plurality of cement diverters provides zonal communication interruption about every 10 to 20 feet (about every 3.0 to about 6.1 meters) axially along the tubular member.
  • a method of producing hydrocarbons from a production well of an underground formation includes the steps of installing a tubular member into a wellbore of an underground formation, the tubular member having a plurality of cement diverters positioned axially along an outer surface of the tubular member, each cement diverter having an axial length and an azimuthal extension of less than 360°, wherein the azimuthal position of at least one cement diverter is axially rotated from an adjacent cement diverter; flowing cement into an annulus formed between an inner surface of the wellbore and the outer surface of the tubular member to form a production well; and producing fluids containing hydrocarbons from the production well, wherein the positioning of the plurality of cement diverters provides zonal communication interruption about every 10 to 20 feet (about every 3.0 to about 6.1 meters) axially along the tubular member.
  • each cement diverter may be a 180 degree extension of a solid with a swellable elastomer on its outer surface.
  • the length of each cement diverter is between about two and ten feet (about every 3.0 to about 6.1 meters).
  • the cement diverters may be positioned about 3 to about 20 feet (about 0.9 to about 6.1 meters) apart along the tubular member.
  • a first cement diverter is rotated 180° from a second cement diverter.
  • a third cement diverter may be rotated 90° with respect to the second cement diverter and then the pattern is repeated. The result of this arrangement is to force slurry into small gaps, which in turn assures that there will be channel interruption every 10 to 20 feet (about every 3.0 to about 6.1 meters) in the worst case eccentricity scenario.
  • FIG. 1 presents a schematic plan view of an illustrative, non-exclusive example of an apparatus for providing zonal communication interruption in a wellbore, according to the present disclosure.
  • FIG. 2 presents a schematic end view of the illustrative, non-exclusive example of an apparatus for providing zonal communication interruption in a wellbore of FIG. 1 , according to the present disclosure.
  • FIG. 3 presents a cross-sectional view of a tubular forming an eccentric annulus within a borehole and its impact on cement placement and the creation of non-cement containing channels.
  • FIG. 4 presents a schematic cross-sectional view of an apparatus for providing zonal communication interruption in a wellbore, according to the present disclosure, and its effect on cement placement.
  • FIG. 5 presents another schematic cross-sectional view of an apparatus for providing zonal communication interruption in a wellbore, according to the present disclosure, and its effect on cement placement.
  • FIGS. 1, 2, 4 and 5 provide illustrative, non-exclusive examples of an apparatus for providing zonal communication interruption in a wellbore, according to the present disclosure, together with systems, and/or assemblies that may include, be associated with, be operatively attached to, and/or utilize such an apparatus for providing zonal communication interruption in a wellbore.
  • like numerals denote like, or similar, structures and/or features; and each of the illustrated structures and/or features may not be discussed in detail herein with reference to the figures.
  • each structure and/or feature may not be explicitly labeled in the figures; and any structure and/or feature that is discussed herein with reference to the figures may be utilized with any other structure and/or feature without departing from the scope of the present disclosure.
  • a wellbore, tubing or tubular member, or section or portion thereof when referring to a well, a wellbore, tubing or tubular member, or section or portion thereof, is meant that such well, wellbore, tubing or tubular member, or section thereof, is positioned or is to be positioned, so as to be substantially normal to a plane formed at the ground or surface level of the well or wellbore.
  • a wellbore, tubing or tubular member, or section or portion thereof when referring to a well, a wellbore, tubing or tubular member, or section or portion thereof, is meant that such well, wellbore, tubing or tubular member, or section thereof, is positioned, or is to be positioned, so as to deviate in direction from vertical and encompasses a well, a wellbore, tubing or tubular member, or section or portion thereof, extending in horizontally or in a horizontal direction.
  • a wellbore, tubing or tubular member, or section or portion thereof when referring to a well, a wellbore, tubing or tubular member, or section or portion thereof, is meant that such well, wellbore, tubing or tubular member, or section thereof, is positioned or is to be positioned, so as to travel along a plane substantially parallel to a plane formed tangentially at the ground or surface level of the well or wellbore.
  • zonal communication interruption when referring to a well, a wellbore, tubing or tubular member, or section or portion thereof, is meant that communication between one or more zones of a well, usually through micro-channels in a cement sheath, placed between a wellbore and a tubular member, is at least partially blocked or impeded with respect to flow. Such communication between one or more zones of a well may be due to the presence in the cement sheath of channels, micro-channels, annuli, or the like.
  • Apparatus 10 includes a tubular member 12 having a first end 14 and a second end 16 .
  • tubular member 12 includes a plurality of cement diverters 18 positioned axially along an outer surface 20 of tubular member 12 , each cement diverter 18 having an axial length L and an azimuthal extension E of less than 360°.
  • the azimuthal position P 1 of at least one cement diverter is axially rotated by an angle ⁇ from an adjacent cement diverter having an azimuthal position P 2 .
  • a first cement diverter 18 ′ of the plurality of cement diverters 18 is positioned at a first distance d 1 from the first end 14 of tubular member 12 .
  • a second cement diverter 18 ′′ of the plurality of cement diverters 18 may be positioned at a second distance d 2 from first end 14 of tubular member 12 .
  • second distance d 2 is greater than first distance d 1 .
  • the azimuthal position P 2 of the second cement diverter 18 ′′ is rotated by at least about 30° from the first cement diverter 18 ′.
  • a third cement diverter 18 ′′′ of the plurality of cement diverters 18 is positioned at a third distance d 3 from the first end 14 of tubular member 12 , the third distance d 3 greater than the second distance d 2 . Also, as shown in FIG. 2 , the azimuthal position P 3 of the third cement diverter 18 ′′′ is rotated by at least about 30° from the second diverter segment 18 ′′.
  • a fourth cement diverter 18 ′′′′ of the plurality of cement diverters 18 is positioned at a fourth distance d 4 from first end 14 of the tubular member 12 , the fourth distance d 4 greater than the third distance d 3 . Also, as shown in FIG. 2 , the azimuthal position P 4 of the fourth cement diverter 18 ′′′′ is rotated by at least about 30° from the third cement diverter 18 ′′′.
  • each cement diverter 18 is rotated between about 30° and about 270° from an adjacent cement diverter 18 . In some forms, the azimuthal position of each cement diverter 18 is rotated between about 90° and about 180° from an adjacent cement diverter 18 .
  • each of the plurality of cement diverters 18 has an azimuthal extension E of between about 35° and about 270°. In some forms, each of the plurality of cement diverters 18 has an azimuthal extension E of between about 90° and about 180°.
  • each of the plurality of cement diverters 18 has a length L between about two and about ten feet (about every 3.0 to about 6.1 meters) in length. In some forms, each of the plurality of cement diverters 18 has an axial spacing S along the tubular member of between about 3 to about 20 feet (about 0.9 to about 6.1 meters).
  • one or more of the plurality of cement diverters may be swellable. In some forms, one or more of the plurality of cement diverters 18 has a swellable coating applied thereto. In some forms, one or more of the plurality of cement diverters 18 may be of an inflatable design.
  • swellable materials have the characteristic of being able to move from a retracted position to an expanded position when exposed to the action of a triggering agent.
  • the triggering agent may be a fluid absorbed by the material that consequently swells.
  • the volume of the swellable material In its expanded position, the volume of the swellable material is greater than in its non-swollen position, which makes it able to fill adjacent spaces unoccupied prior to swelling and therefore seals fluid channels in its vicinity.
  • Swellable materials can be deployed downhole in their retracted position prior to swelling and activated downhole.
  • Suitable water-swellable materials include acrylic acid type polymers, carboxymethyl cellulose type polymers, highly swelling clay minerals, isobutylene maleic anhydride, polyethylene oxide polymers, polyvinyl alcohol cyclic acid anhydride graft copolymer, sodium bentonite (montmorillonite), starch polyacrylate acid graft copolymer, starch polyacrylonitrile graft copolymers, vinyl acetate-acrylate copolymers, and combination thereof. More generally, they can also include super absorbent polymers (SAPs) or hydrogels.
  • SAPs super absorbent polymers
  • Suitable hydrocarbon-swellable materials include natural rubber, polyisoprene rubber, vinyl acetate rubber, polychloroprene rubber, acrylonitrile butadiene rubber, hydrogenated acrylonitrile butadiene rubber, ethylene propylene diene monomer, ethylene propylene monomer rubber, polynorbornen, styrene butadiene rubber, styrene/propylene/diene monomer, brominated poly(isobutylene-co-4-methylstyrene) (BIMS), butyl rubber, chlorosulphonated polyethylenes, polyacrylate rubber, polyurethane, silicone rubber, brominated butyl rubber, chlorinated butyl rubber, chlorinated polyethylene, epichlorohydrin ethylene oxide copolymer, ethylene acrylate rubber, ethylene propylene diene terpolymer rubber, sulphonated polyethylene, fluoro silicone rubbers, fluoroelastomer, substituted sty
  • the operation of the apparatus 10 for providing zonal communication interruption in a wellbore will be described by reference to FIGS. 3-6 .
  • the purpose of the cement placed between the casing or tubular member and the wellbore wall in a hydrocarbon well is to provide mechanical support to the casing or tubular member and to ensure good annular zonal isolation.
  • the cement may fail in ensuring well integrity.
  • a subterranean formation 100 has a borehole 102 formed therein.
  • the borehole may comprise a vertical section and/or an inclined and/or horizontal section.
  • a casing or tubular member 104 is placed to consolidate the formation.
  • the eccentricity can be such that the cement 106 is not placed properly in an annulus 108 between the casing 104 and the borehole wall 110 .
  • the annulus 108 between the casing 104 and the formation 100 is only partly filled with the cement 106 , leaving a portion 112 of the annulus 108 not filled with cement.
  • the cement slurry will mainly go through the larger gaps, leaving channels in the small gap region.
  • a channel may form on top of the casing, where water separates (called free water).
  • micro-channels can appear either between the casing 112 and the cement 106 or between the formation 100 and the cement 106 .
  • bad drilling mud removal may occur while pumping the cement slurry in the annulus 108 , thereby leaving mud films either between the casing 104 and the cement 106 or between the cement 106 and the formation 100 . This results in fluid channeling and loss of zonal isolation.
  • Both types of micro-channels may also appear during the life of the cement due to the phenomenon of cement debonding.
  • Apparatus 200 includes a tubular member 212 and a plurality of cement diverters 218 positioned axially along an outer surface 220 of tubular member 212 , each cement diverter 218 having an axial length L and an azimuthal extension E of less than 360°.
  • each cement diverter 218 may have an azimuthal extension E of approximately less than 180° extension of a solid.
  • a swellable elastomer may be applied to the surface of each cement diverter 218 .
  • the length L of each cement diverter 218 may be about 2 to 10 feet (about every 3.0 to about 6.1 meters).
  • a spacing S between each cement diverter 218 may be about 3 to 20 feet (about 0.9 to about 6.1 meters), along the pipe and then another cement diverter 218 positioned, but, as shown in FIG. 5 , the next cement diverter 218 is rotated 180°.
  • another cement diverter 418 is positioned, this time, by way of example, but not of limitation, rotated 180° with respect to the previous cement diverter 418 , then the next one rotated 90°.
  • the pattern may be repeated.
  • the apparatus for providing zonal communication interruption in a wellbore then forces slurry into the small gaps, which in turn assures that there will be zonal communication interruption about every 10 to 20 feet (about every 3.0 to about 6.1 meters), in the worst case eccentricity/borehole quality scenario.
  • Minimax is a decision rule used in decision theory, game theory, statistics and philosophy for minimizing the possible loss of a worst case, maximum loss, scenario.
  • minmax is a decision rule used in decision theory, game theory, statistics and philosophy for minimizing the possible loss of a worst case, maximum loss, scenario.
  • Minimax theory has been extended to decisions where there is no other player, but where the consequences of decisions depend on unknown facts. For example, deciding to prospect for minerals entails a cost that will be wasted if the minerals are not present, but will bring major rewards if they are discovered.
  • One approach is to treat this as a game against nature, and using a similar mindset as Murphy's law, take an approach which minimizes the maximum expected loss, using the same techniques as in the two-person zero-sum games.
  • minimax decision making in contrast to decisions using expected value or expected utility, it makes no assumptions about the probabilities of various outcomes, just scenario analysis of what the possible outcomes are. It is thus robust to changes in the assumptions, as these other decision techniques are not.
  • a method for providing zonal communication interruption in a wellbore comprising: positioning a plurality of cement diverters axially along an outer surface of a tubular member, each cement diverter having an axial length and an azimuthal extension of less than 360°, wherein the azimuthal position of at least one cement diverter is axially rotated from an adjacent cement diverter; positioning the tubular member within the wellbore; and flowing cement into an annulus formed between an inner surface of the wellbore and the outer surface of the tubular member, wherein the positioning of the plurality of cement diverters provides zonal communication interruption about every 10 to 20 feet (about every 3.0 to about 6.1 meters) axially along the tubular member.
  • Also disclosed herein is a method of producing hydrocarbons from a production well of an underground formation, comprising the steps of: installing a tubular member into a wellbore of an underground formation, the tubular member having a plurality of cement diverters positioned axially along an outer surface of the tubular member, each cement diverter having an axial length and an azimuthal extension of less than 360°, wherein the azimuthal position of at least one cement diverter is axially rotated from an adjacent cement diverter; flowing cement into an annulus formed between an inner surface of the wellbore and the outer surface of the tubular member to form a production well; and producing fluids containing hydrocarbons from the production well, wherein the positioning of the plurality of cement diverters provides zonal communication interruption about every 10 to 20 feet (about every 3.0 to about 6.1 meters) axially along the tubular member.
  • the term “and/or” placed between a first entity and a second entity means one of (1) the first entity, (2) the second entity, and (3) the first entity and the second entity.
  • Multiple entities listed with “and/or” should be construed in the same manner, i.e., “one or more” of the entities so conjoined.
  • Other entities may optionally be present other than the entities specifically identified by the “and/or” clause, whether related or unrelated to those entities specifically identified.
  • a reference to “A and/or B,” when used in conjunction with open-ended language such as “comprising” may refer, in one embodiment, to A only (optionally including entities other than B); in another embodiment, to B only (optionally including entities other than A); in yet another embodiment, to both A and B (optionally including other entities).
  • These entities may refer to elements, actions, structures, steps, operations, values, and the like.
  • the phrase “at least one,” in reference to a list of one or more entities should be understood to mean at least one entity selected from any one or more of the entity in the list of entities, but not necessarily including at least one of each and every entity specifically listed within the list of entities and not excluding any combinations of entities in the list of entities.
  • This definition also allows that entities may optionally be present other than the entities specifically identified within the list of entities to which the phrase “at least one” refers, whether related or unrelated to those entities specifically identified.
  • “at least one of A and B” may refer, in one embodiment, to at least one, optionally including more than one, A, with no B present (and optionally including entities other than B); in another embodiment, to at least one, optionally including more than one, B, with no A present (and optionally including entities other than A); in yet another embodiment, to at least one, optionally including more than one, A, and at least one, optionally including more than one, B (and optionally including other entities).
  • each of the expressions “at least one of A, B and C,” “at least one of A, B, or C,” “one or more of A, B, and C,” “one or more of A, B, or C” and “A, B, and/or C” may mean A alone, B alone, C alone, A and B together, A and C together, B and C together, A, B and C together, and optionally any of the above in combination with at least one other entity.
  • adapted and “configured” mean that the element, component, or other subject matter is designed and/or intended to perform a given function.
  • the use of the terms “adapted” and “configured” should not be construed to mean that a given element, component, or other subject matter is simply “capable of” performing a given function but that the element, component, and/or other subject matter is specifically selected, created, implemented, utilized, programmed, and/or designed for the purpose of performing the function.
  • elements, components, and/or other recited subject matter that is recited as being adapted to perform a particular function may additionally or alternatively be described as being configured to perform that function, and vice versa.

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)

Abstract

A method for providing zonal communication interruption in a wellbore, comprising: positioning a plurality of cement diverters axially along an outer surface of a tubular member, each cement diverter having an axial length and an azimuthal extension of less than 360°, wherein the azimuthal position of at least one cement diverter is axially rotated from an adjacent cement diverter; positioning the tubular member within the wellbore; and flowing cement into an annulus formed between an inner surface of the wellbore and the outer surface of the tubular member, wherein the positioning of the plurality of cement diverters provides zonal communication interruption about every 10 to 20 feet (about every 3.0 to about 6.1 meters) axially along the tubular member. An apparatus for providing zonal communication interruption in a wellbore is also provided.

Description

    CROSS REFERENCE TO RELATED APPLICATIONS
  • This application claims the benefit of U.S. Provisional No. 61/914,735, filed Dec. 11, 2013, which is incorporated herein in its entirety for all purposes.
  • FIELD
  • The present disclosure broadly relates to well cementing and completions. More particularly, the present disclosure relates to an apparatus and method for providing zonal communication interruption.
  • BACKGROUND
  • After a section of a well is drilled, a metal casing is lowered and cement is pumped inside the casing. The cement then travels through the annulus between the formation rock and the external face of the casing and allowed to set in the annulus. Cementing accomplishes the following purposes: zonal isolation, pressure isolation, casing corrosion protection, casing support and drilling fluid recovery.
  • However, in many situations the cement does not perform as expected. This can cause the well to lose integrity, producing zonal communication that can have catastrophic results. Communication between zones is usually through micro channels in the cement. Examples of these situations include: cement slurry not placed properly within the annulus due to poor centralization, poor hole quality, inefficient mud removal, etc.; cement slurry contamination with formation fluids; and long term failure due to changes in pressure and/or temperature.
  • Current solutions to prevent micro channels include the use of centralizers, including bow springs, rigid centralizers and solid centralizers. Centralizer efficiency is dependent upon hole quality; so in the case of washouts, centralizer efficiency is greatly reduced. Another solution presently employed is the use of swellable packers: These are elastomeric rings placed within the annulus that swell to fill the gap space between casing and formation. However, like most current technologies, swellable packers can only address the micro channels between pipe and cement and not between cement and formation. Another current solution is the use of compressible cements, thixotropic cements, surfactant cements, etc.
  • Despite these solutions, there exists a need to address problems associated with imperfect zonal isolation. Therefore, what is needed is an improved method and apparatus for providing zonal communication interruption in a wellbore.
  • SUMMARY
  • In one aspect, disclosed is a method for providing zonal communication interruption in a wellbore. The method includes the steps of positioning a plurality of cement diverters axially along an outer surface of a tubular member, each cement diverter having an axial length and an azimuthal extension of less than 360°, wherein the azimuthal position of at least one cement diverter is axially rotated from an adjacent cement diverter; positioning the tubular member within the wellbore; and flowing cement into an annulus formed between an inner surface of the wellbore and the outer surface of the tubular member, wherein the positioning of the plurality of cement diverters provides zonal communication interruption about every 10 to 20 feet (about every 3.0 to about 6.1 meters) axially along the tubular member.
  • In some forms, a first cement diverter of the plurality of cement diverters is positioned at a first distance from a first end of the tubular member. In some forms, a second cement diverter of the plurality of cement diverters is positioned at a second distance from a first end of the tubular member, the second distance greater than the first distance, the azimuthal position of the second cement diverter rotated by at least about 30° from the first cement diverter.
  • In some forms, a third cement diverter of the plurality of cement diverters is positioned at a third distance from a first end of the tubular member, the third distance greater than the second distance, the azimuthal position of the third cement diverter rotated by at least about 30° from the second diverter segment. In some forms, a fourth cement diverter of the plurality of cement diverters is positioned at a fourth distance from a first end of the tubular member, the fourth distance greater than the third distance, the azimuthal position of the fourth cement diverter rotated by at least about 30° from the third cement diverter.
  • In some forms, the azimuthal position of each cement diverter is rotated between about 30° and about 270° from an adjacent cement diverter. In some forms, the azimuthal position of each cement diverter is rotated between about 90° and about 180° from an adjacent cement diverter.
  • In some forms, each of the plurality of cement diverters has an azimuthal extension of between about 35° and about 270°. In some forms, each of the plurality of cement diverters has an azimuthal extension of between about 90° and about 180°.
  • In some forms, each of the plurality of cement diverters is between about two and about ten feet (about every 0.6 to about 3.0 meters) in length.
  • In some forms, each of the plurality of cement diverters is axially spaced apart along the tubular member by about 3 to about 20 feet.
  • In some forms, each of the plurality of cement diverters is swellable. In some forms, each of the plurality of cement diverters has a swellable coating applied thereto.
  • In some forms, of the plurality of cement diverters is inflatable.
  • In some forms, the wellbore comprises an inclined and/or horizontal section.
  • In another aspect, disclosed is an apparatus for providing zonal communication interruption in a wellbore. The apparatus includes a tubular member having a plurality of cement diverters positioned axially along an outer surface of a tubular member, each cement diverter having an axial length and an azimuthal extension of less than 360°, wherein the azimuthal position of at least one cement diverter is axially rotated from an adjacent cement diverter and the positioning of the plurality of cement diverters is effective to provide zonal communication interruption about every 10 to 20 feet (about every 3.0 to about 6.1 meters) axially along the tubular member.
  • In some forms, a first cement diverter of the plurality of cement diverters is positioned at a first distance from a first end of the tubular member. In some forms, a second cement diverter of the plurality of cement diverters is positioned at a second distance from a first end of the tubular member, the second distance greater than the first distance, the azimuthal position of the second cement diverter rotated by at least about 30° from the first cement diverter.
  • In some forms, a third cement diverter of the plurality of cement diverters is positioned at a third distance from a first end of the tubular member, the third distance greater than the second distance, the azimuthal position of the third cement diverter rotated by at least about 30° from the second diverter segment. In some forms, a fourth cement diverter of the plurality of cement diverters is positioned at a fourth distance from a first end of the tubular member, the fourth distance greater than the third distance, the azimuthal position of the fourth cement diverter rotated by at least about 30° from the third cement diverter.
  • In some forms, the azimuthal position of each cement diverter is rotated between about 30° and about 270° from an adjacent cement diverter. In some forms, the azimuthal position of each cement diverter is rotated between about 90° and about 180° from an adjacent cement diverter.
  • In some forms, each of the plurality of cement diverters has an azimuthal extension of between about 35° and about 270°. In some forms, each of the plurality of cement diverters has an azimuthal extension of between about 90° and about 180°.
  • In some forms, each of the plurality of cement diverters is between about two and about ten feet (about every 3.0 to about 6.1 meters) in length.
  • In some forms, each of the plurality of cement diverters is axially spaced apart along the tubular member by about 3 to about 20 feet (about 0.9 to about 6.1 meters).
  • In some forms, each of the plurality of cement diverters is swellable. In some forms, each of the plurality of cement diverters has a swellable coating applied thereto.
  • In some forms, the plurality of cement diverters are part of the completion, forming protuberances radially extending from the outer surface of the tubular member or casing.
  • In some forms, the plurality of cement diverters is inflatable.
  • In some forms, the wellbore comprises an inclined and/or horizontal section.
  • In another aspect, disclosed is a method of creating a wellbore in an underground formation. The method includes the steps of drilling a borehole in the underground formation; installing a tubular member into the borehole, the tubular member having a plurality of cement diverters positioned axially along an outer surface of the tubular member, each cement diverter having an axial length and an azimuthal extension of less than 360°, wherein the azimuthal position of at least one cement diverter is axially rotated from an adjacent cement diverter; and flowing cement into an annulus formed between an inner surface of the wellbore and the outer surface of the tubular member, wherein the positioning of the plurality of cement diverters provides zonal communication interruption about every 10 to 20 feet (about every 3.0 to about 6.1 meters) axially along the tubular member.
  • In yet another aspect, disclosed is a method of producing hydrocarbons from a production well of an underground formation. The method includes the steps of installing a tubular member into a wellbore of an underground formation, the tubular member having a plurality of cement diverters positioned axially along an outer surface of the tubular member, each cement diverter having an axial length and an azimuthal extension of less than 360°, wherein the azimuthal position of at least one cement diverter is axially rotated from an adjacent cement diverter; flowing cement into an annulus formed between an inner surface of the wellbore and the outer surface of the tubular member to form a production well; and producing fluids containing hydrocarbons from the production well, wherein the positioning of the plurality of cement diverters provides zonal communication interruption about every 10 to 20 feet (about every 3.0 to about 6.1 meters) axially along the tubular member.
  • In one form, each cement diverter may be a 180 degree extension of a solid with a swellable elastomer on its outer surface. The length of each cement diverter is between about two and ten feet (about every 3.0 to about 6.1 meters). In one form, the cement diverters may be positioned about 3 to about 20 feet (about 0.9 to about 6.1 meters) apart along the tubular member. In one form, a first cement diverter is rotated 180° from a second cement diverter. In one form a third cement diverter may be rotated 90° with respect to the second cement diverter and then the pattern is repeated. The result of this arrangement is to force slurry into small gaps, which in turn assures that there will be channel interruption every 10 to 20 feet (about every 3.0 to about 6.1 meters) in the worst case eccentricity scenario.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1 presents a schematic plan view of an illustrative, non-exclusive example of an apparatus for providing zonal communication interruption in a wellbore, according to the present disclosure.
  • FIG. 2 presents a schematic end view of the illustrative, non-exclusive example of an apparatus for providing zonal communication interruption in a wellbore of FIG. 1, according to the present disclosure.
  • FIG. 3 presents a cross-sectional view of a tubular forming an eccentric annulus within a borehole and its impact on cement placement and the creation of non-cement containing channels.
  • FIG. 4 presents a schematic cross-sectional view of an apparatus for providing zonal communication interruption in a wellbore, according to the present disclosure, and its effect on cement placement.
  • FIG. 5 presents another schematic cross-sectional view of an apparatus for providing zonal communication interruption in a wellbore, according to the present disclosure, and its effect on cement placement.
  • DETAILED DESCRIPTION
  • FIGS. 1, 2, 4 and 5 provide illustrative, non-exclusive examples of an apparatus for providing zonal communication interruption in a wellbore, according to the present disclosure, together with systems, and/or assemblies that may include, be associated with, be operatively attached to, and/or utilize such an apparatus for providing zonal communication interruption in a wellbore. In FIGS. 1-5, like numerals denote like, or similar, structures and/or features; and each of the illustrated structures and/or features may not be discussed in detail herein with reference to the figures. Similarly, each structure and/or feature may not be explicitly labeled in the figures; and any structure and/or feature that is discussed herein with reference to the figures may be utilized with any other structure and/or feature without departing from the scope of the present disclosure.
  • In general, structures and/or features that are, or are likely to be, included in a given embodiment are indicated in solid lines in the figures, while optional structures and/or features are indicated in broken lines. However, a given embodiment is not required to include all structures and/or features that are illustrated in solid lines therein, and any suitable number of such structures and/or features may be omitted from a given embodiment without departing from the scope of the present disclosure.
  • By use of the term “vertical,” “vertically” or “vertical section,” when referring to a well, a wellbore, tubing or tubular member, or section or portion thereof, is meant that such well, wellbore, tubing or tubular member, or section thereof, is positioned or is to be positioned, so as to be substantially normal to a plane formed at the ground or surface level of the well or wellbore.
  • By use of the term “inclined” or “inclined section,” when referring to a well, a wellbore, tubing or tubular member, or section or portion thereof, is meant that such well, wellbore, tubing or tubular member, or section thereof, is positioned, or is to be positioned, so as to deviate in direction from vertical and encompasses a well, a wellbore, tubing or tubular member, or section or portion thereof, extending in horizontally or in a horizontal direction.
  • By use of the term “horizontal,” “horizontally” or “horizontal section,” when referring to a well, a wellbore, tubing or tubular member, or section or portion thereof, is meant that such well, wellbore, tubing or tubular member, or section thereof, is positioned or is to be positioned, so as to travel along a plane substantially parallel to a plane formed tangentially at the ground or surface level of the well or wellbore.
  • By use of the term “zonal communication interruption,” when referring to a well, a wellbore, tubing or tubular member, or section or portion thereof, is meant that communication between one or more zones of a well, usually through micro-channels in a cement sheath, placed between a wellbore and a tubular member, is at least partially blocked or impeded with respect to flow. Such communication between one or more zones of a well may be due to the presence in the cement sheath of channels, micro-channels, annuli, or the like.
  • Referring now to FIG. 1, a schematic plan view of an illustrative, non-exclusive example of an apparatus 10 for providing zonal communication interruption in a wellbore, according to the present disclosure, is presented. Apparatus 10 includes a tubular member 12 having a first end 14 and a second end 16. As shown, tubular member 12 includes a plurality of cement diverters 18 positioned axially along an outer surface 20 of tubular member 12, each cement diverter 18 having an axial length L and an azimuthal extension E of less than 360°. Referring to FIGS. 1 and 2, it may be seen that the azimuthal position P1 of at least one cement diverter is axially rotated by an angle θ from an adjacent cement diverter having an azimuthal position P2.
  • Still referring to FIG. 1, in some forms, a first cement diverter 18′ of the plurality of cement diverters 18 is positioned at a first distance d1 from the first end 14 of tubular member 12. Likewise, in some forms, a second cement diverter 18″ of the plurality of cement diverters 18 may be positioned at a second distance d2 from first end 14 of tubular member 12. As shown in FIG. 1, second distance d2 is greater than first distance d1. Also, as shown in FIG. 2, the azimuthal position P2 of the second cement diverter 18″ is rotated by at least about 30° from the first cement diverter 18′.
  • In some forms, a third cement diverter 18′″ of the plurality of cement diverters 18 is positioned at a third distance d3 from the first end 14 of tubular member 12, the third distance d3 greater than the second distance d2. Also, as shown in FIG. 2, the azimuthal position P3 of the third cement diverter 18′″ is rotated by at least about 30° from the second diverter segment 18″.
  • In some forms, a fourth cement diverter 18″″ of the plurality of cement diverters 18 is positioned at a fourth distance d4 from first end 14 of the tubular member 12, the fourth distance d4 greater than the third distance d3. Also, as shown in FIG. 2, the azimuthal position P4 of the fourth cement diverter 18″″ is rotated by at least about 30° from the third cement diverter 18′″.
  • Still referring to FIG. 2, in one form, the azimuthal position of each cement diverter 18 is rotated between about 30° and about 270° from an adjacent cement diverter 18. In some forms, the azimuthal position of each cement diverter 18 is rotated between about 90° and about 180° from an adjacent cement diverter 18.
  • In some forms, each of the plurality of cement diverters 18 has an azimuthal extension E of between about 35° and about 270°. In some forms, each of the plurality of cement diverters 18 has an azimuthal extension E of between about 90° and about 180°.
  • In some forms, each of the plurality of cement diverters 18 has a length L between about two and about ten feet (about every 3.0 to about 6.1 meters) in length. In some forms, each of the plurality of cement diverters 18 has an axial spacing S along the tubular member of between about 3 to about 20 feet (about 0.9 to about 6.1 meters).
  • To enhance the performance of cement diverters 18, one or more of the plurality of cement diverters may be swellable. In some forms, one or more of the plurality of cement diverters 18 has a swellable coating applied thereto. In some forms, one or more of the plurality of cement diverters 18 may be of an inflatable design.
  • As is well known to those skilled in the art, swellable materials have the characteristic of being able to move from a retracted position to an expanded position when exposed to the action of a triggering agent. The triggering agent may be a fluid absorbed by the material that consequently swells. In its expanded position, the volume of the swellable material is greater than in its non-swollen position, which makes it able to fill adjacent spaces unoccupied prior to swelling and therefore seals fluid channels in its vicinity. Swellable materials can be deployed downhole in their retracted position prior to swelling and activated downhole.
  • Suitable water-swellable materials include acrylic acid type polymers, carboxymethyl cellulose type polymers, highly swelling clay minerals, isobutylene maleic anhydride, polyethylene oxide polymers, polyvinyl alcohol cyclic acid anhydride graft copolymer, sodium bentonite (montmorillonite), starch polyacrylate acid graft copolymer, starch polyacrylonitrile graft copolymers, vinyl acetate-acrylate copolymers, and combination thereof. More generally, they can also include super absorbent polymers (SAPs) or hydrogels.
  • Suitable hydrocarbon-swellable materials include natural rubber, polyisoprene rubber, vinyl acetate rubber, polychloroprene rubber, acrylonitrile butadiene rubber, hydrogenated acrylonitrile butadiene rubber, ethylene propylene diene monomer, ethylene propylene monomer rubber, polynorbornen, styrene butadiene rubber, styrene/propylene/diene monomer, brominated poly(isobutylene-co-4-methylstyrene) (BIMS), butyl rubber, chlorosulphonated polyethylenes, polyacrylate rubber, polyurethane, silicone rubber, brominated butyl rubber, chlorinated butyl rubber, chlorinated polyethylene, epichlorohydrin ethylene oxide copolymer, ethylene acrylate rubber, ethylene propylene diene terpolymer rubber, sulphonated polyethylene, fluoro silicone rubbers, fluoroelastomer, substituted styrene acrylate copolymer and combination thereof.
  • The operation of the apparatus 10 for providing zonal communication interruption in a wellbore, according to the present disclosure, will be described by reference to FIGS. 3-6. The purpose of the cement placed between the casing or tubular member and the wellbore wall in a hydrocarbon well is to provide mechanical support to the casing or tubular member and to ensure good annular zonal isolation. However, due to poor cement placement and to stresses applied by both the casing and the formation, the cement may fail in ensuring well integrity.
  • Examples of zonal isolation problems will now be described. Referring to FIG. 3, a subterranean formation 100 has a borehole 102 formed therein. As may be appreciated, the borehole may comprise a vertical section and/or an inclined and/or horizontal section. A casing or tubular member 104 is placed to consolidate the formation. When the casing 104 is not centralized in the borehole 102, as shown in FIG. 3, the eccentricity can be such that the cement 106 is not placed properly in an annulus 108 between the casing 104 and the borehole wall 110. As a result, the annulus 108 between the casing 104 and the formation 100 is only partly filled with the cement 106, leaving a portion 112 of the annulus 108 not filled with cement. During placement the cement slurry will mainly go through the larger gaps, leaving channels in the small gap region.
  • In a horizontal well example, a channel may form on top of the casing, where water separates (called free water). As such, micro-channels can appear either between the casing 112 and the cement 106 or between the formation 100 and the cement 106. For example, bad drilling mud removal may occur while pumping the cement slurry in the annulus 108, thereby leaving mud films either between the casing 104 and the cement 106 or between the cement 106 and the formation 100. This results in fluid channeling and loss of zonal isolation. Both types of micro-channels may also appear during the life of the cement due to the phenomenon of cement debonding.
  • An even more complex zonal isolation problem results from cracks in the cement. Cracks develop due to cement ageing, seismologic activity in the formation or vibrations of the casing or pressure/temperature variation.
  • Referring now to FIG. 4, a schematic view of an apparatus 200 for providing zonal communication interruption in a wellbore 102 and its effect on cement placement will be described. In this case, again it will be difficult to center the casing in the wellbore 102, which will lead to a high degree of eccentricity. To address this issue, apparatus 200 is placed within the wellbore 102. Apparatus 200 includes a tubular member 212 and a plurality of cement diverters 218 positioned axially along an outer surface 220 of tubular member 212, each cement diverter 218 having an axial length L and an azimuthal extension E of less than 360°.
  • As shown in FIGS. 4 and 5, each cement diverter 218 may have an azimuthal extension E of approximately less than 180° extension of a solid. A swellable elastomer may be applied to the surface of each cement diverter 218. The length L of each cement diverter 218 may be about 2 to 10 feet (about every 3.0 to about 6.1 meters). A spacing S between each cement diverter 218 may be about 3 to 20 feet (about 0.9 to about 6.1 meters), along the pipe and then another cement diverter 218 positioned, but, as shown in FIG. 5, the next cement diverter 218 is rotated 180°.
  • In some forms, after another axial spacing of about 3 to 20 feet (about 0.9 to about 6.1 meters), another cement diverter 418 is positioned, this time, by way of example, but not of limitation, rotated 180° with respect to the previous cement diverter 418, then the next one rotated 90°. As may be appreciated by one of skill in the art, the pattern may be repeated. The apparatus for providing zonal communication interruption in a wellbore then forces slurry into the small gaps, which in turn assures that there will be zonal communication interruption about every 10 to 20 feet (about every 3.0 to about 6.1 meters), in the worst case eccentricity/borehole quality scenario.
  • By seeking to address the worst case eccentricity/borehole quality scenario, the apparatus for providing zonal communication interruption in a wellbore may be said to be designed using minimax principles for these adverse scenarios. Minimax, sometimes referred to as minmax, is a decision rule used in decision theory, game theory, statistics and philosophy for minimizing the possible loss of a worst case, maximum loss, scenario. Originally formulated for two-player, zero-sum game theory, covering both the cases where players take alternate moves and those where they make simultaneous moves, it has also been extended to more complex games and to general decision making in the presence of uncertainty.
  • Minimax theory has been extended to decisions where there is no other player, but where the consequences of decisions depend on unknown facts. For example, deciding to prospect for minerals entails a cost that will be wasted if the minerals are not present, but will bring major rewards if they are discovered. One approach is to treat this as a game against nature, and using a similar mindset as Murphy's law, take an approach which minimizes the maximum expected loss, using the same techniques as in the two-person zero-sum games.
  • A key feature of minimax decision making is being non-probabilistic: in contrast to decisions using expected value or expected utility, it makes no assumptions about the probabilities of various outcomes, just scenario analysis of what the possible outcomes are. It is thus robust to changes in the assumptions, as these other decision techniques are not.
  • Further, minimax only requires ordinal measurement (that outcomes be compared and ranked), not interval measurements (that outcomes include “how much better or worse”), and returns ordinal data, using only the modeled outcomes: the conclusion of a minimax analysis is: “this strategy is minimax, as the worst case is (outcome), which is less bad than any other strategy.” Compare to expected value analysis, whose conclusion is of the form: “this strategy yields E(X)=n.” Minimax thus can be used on ordinal data, and can be more transparent. Modeling a downhole completion case where micro-channels will be present due to casing eccentricity or poor borehole quality, and the various completion design approaches to deal with such issues, may be thought of in this manner.
  • As such, disclosed herein is a method for providing zonal communication interruption in a wellbore, comprising: positioning a plurality of cement diverters axially along an outer surface of a tubular member, each cement diverter having an axial length and an azimuthal extension of less than 360°, wherein the azimuthal position of at least one cement diverter is axially rotated from an adjacent cement diverter; positioning the tubular member within the wellbore; and flowing cement into an annulus formed between an inner surface of the wellbore and the outer surface of the tubular member, wherein the positioning of the plurality of cement diverters provides zonal communication interruption about every 10 to 20 feet (about every 3.0 to about 6.1 meters) axially along the tubular member.
  • Also disclosed herein is a method of producing hydrocarbons from a production well of an underground formation, comprising the steps of: installing a tubular member into a wellbore of an underground formation, the tubular member having a plurality of cement diverters positioned axially along an outer surface of the tubular member, each cement diverter having an axial length and an azimuthal extension of less than 360°, wherein the azimuthal position of at least one cement diverter is axially rotated from an adjacent cement diverter; flowing cement into an annulus formed between an inner surface of the wellbore and the outer surface of the tubular member to form a production well; and producing fluids containing hydrocarbons from the production well, wherein the positioning of the plurality of cement diverters provides zonal communication interruption about every 10 to 20 feet (about every 3.0 to about 6.1 meters) axially along the tubular member.
  • As used herein, the term “and/or” placed between a first entity and a second entity means one of (1) the first entity, (2) the second entity, and (3) the first entity and the second entity. Multiple entities listed with “and/or” should be construed in the same manner, i.e., “one or more” of the entities so conjoined. Other entities may optionally be present other than the entities specifically identified by the “and/or” clause, whether related or unrelated to those entities specifically identified. Thus, as a non-limiting example, a reference to “A and/or B,” when used in conjunction with open-ended language such as “comprising” may refer, in one embodiment, to A only (optionally including entities other than B); in another embodiment, to B only (optionally including entities other than A); in yet another embodiment, to both A and B (optionally including other entities). These entities may refer to elements, actions, structures, steps, operations, values, and the like.
  • As used herein, the phrase “at least one,” in reference to a list of one or more entities should be understood to mean at least one entity selected from any one or more of the entity in the list of entities, but not necessarily including at least one of each and every entity specifically listed within the list of entities and not excluding any combinations of entities in the list of entities. This definition also allows that entities may optionally be present other than the entities specifically identified within the list of entities to which the phrase “at least one” refers, whether related or unrelated to those entities specifically identified. Thus, as a non-limiting example, “at least one of A and B” (or, equivalently, “at least one of A or B,” or, equivalently “at least one of A and/or B”) may refer, in one embodiment, to at least one, optionally including more than one, A, with no B present (and optionally including entities other than B); in another embodiment, to at least one, optionally including more than one, B, with no A present (and optionally including entities other than A); in yet another embodiment, to at least one, optionally including more than one, A, and at least one, optionally including more than one, B (and optionally including other entities). In other words, the phrases “at least one,” “one or more,” and “and/or” are open-ended expressions that are both conjunctive and disjunctive in operation. For example, each of the expressions “at least one of A, B and C,” “at least one of A, B, or C,” “one or more of A, B, and C,” “one or more of A, B, or C” and “A, B, and/or C” may mean A alone, B alone, C alone, A and B together, A and C together, B and C together, A, B and C together, and optionally any of the above in combination with at least one other entity.
  • In the event that any patents, patent applications, or other references are incorporated by reference herein and define a term in a manner or are otherwise inconsistent with either the non-incorporated portion of the present disclosure or with any of the other incorporated references, the non-incorporated portion of the present disclosure shall control, and the term or incorporated disclosure therein shall only control with respect to the reference in which the term is defined and/or the incorporated disclosure was originally present.
  • As used herein the terms “adapted” and “configured” mean that the element, component, or other subject matter is designed and/or intended to perform a given function. Thus, the use of the terms “adapted” and “configured” should not be construed to mean that a given element, component, or other subject matter is simply “capable of” performing a given function but that the element, component, and/or other subject matter is specifically selected, created, implemented, utilized, programmed, and/or designed for the purpose of performing the function. It is also within the scope of the present disclosure that elements, components, and/or other recited subject matter that is recited as being adapted to perform a particular function may additionally or alternatively be described as being configured to perform that function, and vice versa.
  • INDUSTRIAL APPLICABILITY
  • The apparatus and methods disclosed herein are applicable to the oil and gas industry.
  • It is believed that the disclosure set forth above encompasses multiple distinct inventions with independent utility. While each of these inventions has been disclosed in its preferred form, the specific embodiments thereof as disclosed and illustrated herein are not to be considered in a limiting sense as numerous variations are possible. The subject matter of the inventions includes all novel and non-obvious combinations and subcombinations of the various elements, features, functions and/or properties disclosed herein. Similarly, where the claims recite “a” or “a first” element or the equivalent thereof, such claims should be understood to include incorporation of one or more such elements, neither requiring nor excluding two or more such elements.
  • It is believed that the following claims particularly point out certain combinations and subcombinations that are directed to one of the disclosed inventions and are novel and non-obvious. Inventions embodied in other combinations and subcombinations of features, functions, elements and/or properties may be claimed through amendment of the present claims or presentation of new claims in this or a related application. Such amended or new claims, whether they are directed to a different invention or directed to the same invention, whether different, broader, narrower, or equal in scope to the original claims, are also regarded as included within the subject matter of the inventions of the present disclosure.

Claims (50)

1. A method for providing zonal communication interruption in a wellbore, comprising:
(a) positioning a plurality of cement diverters axially along an outer surface of a tubular member, each cement diverter having an axial length and an azimuthal extension of less than 360°, wherein the azimuthal position of at least one cement diverter is axially rotated from an adjacent cement diverter;
(b) positioning the tubular member within the wellbore; and
(c) flowing cement into an annulus formed between an inner surface of the wellbore and the outer surface of the tubular member,
wherein the positioning of the plurality of cement diverters provides zonal communication interruption about every 10 to 20 feet (about every 3.0 to about 6.1 meters) axially along the tubular member.
2. The method of claim 1, wherein a first cement diverter of the plurality of cement diverters is positioned at a first distance from a first end of the tubular member.
3. The method of claim 2, wherein a second cement diverter of the plurality of cement diverters is positioned at a second distance from a first end of the tubular member, the second distance greater than the first distance, the azimuthal position of the second cement diverter rotated by at least about 30° from the first cement diverter.
4. The method of claim 3, wherein a third cement diverter of the plurality of cement diverters is positioned at a third distance from a first end of the tubular member, the third distance greater than the second distance, the azimuthal position of the third cement diverter rotated by at least about 30° from the second diverter segment.
5. The method of claim 4, wherein a fourth cement diverter of the plurality of cement diverters is positioned at a fourth distance from a first end of the tubular member, the fourth distance greater than the third distance, the azimuthal position of the fourth cement diverter rotated by at least about 30° from the third cement diverter.
6. The method of claim 1, wherein the azimuthal position of each cement diverter is rotated between about 30° and about 270° from an adjacent cement diverter.
7. The method of claim 6, wherein the azimuthal position of each cement diverter is rotated between about 90° and about 180° from an adjacent cement diverter.
8. The method of claim 1, wherein each of the plurality of cement diverters has an azimuthal extension of between about 35° and about 270°.
9. The method of claim 8, wherein each of the plurality of cement diverters has an azimuthal extension of between about 90° and about 180°.
10. The method of claim 1, wherein each of the plurality of cement diverters is between about two and about ten feet (about every 3.0 to about 6.1 meters) in length.
11. The method of claim 1, wherein each of the plurality of cement diverters is axially spaced apart along the tubular member by about 3 to about 20 feet (about 0.9 to about 6.1 meters).
12. The method of claim 1, wherein each of the plurality of cement diverters is swellable.
13. The method of claim 12, wherein each of the plurality of cement diverters has a swellable coating applied thereto.
14. The method of claim 12, wherein each of the plurality of cement diverters is inflatable.
15. The method of claim 1, wherein the wellbore comprises an inclined and/or horizontal section.
16. An apparatus for providing zonal communication interruption in a wellbore, comprising: a tubular member having a plurality of cement diverters positioned axially along an outer surface of a tubular member, each cement diverter having an axial length and an azimuthal extension of less than 360°, wherein the azimuthal position of at least one cement diverter is axially rotated from an adjacent cement diverter and the positioning of the plurality of cement diverters is effective to provide zonal communication interruption about every 10 to 20 feet (about every 3.0 to about 6.1 meters) axially along the tubular member.
17. The apparatus of claim 16, wherein a first cement diverter of the plurality of cement diverters is positioned at a first distance from a first end of the tubular member.
18. The apparatus of claim 17, wherein a second cement diverter of the plurality of cement diverters is positioned at a second distance from a first end of the tubular member, the second distance greater than the first distance, the azimuthal position of the second cement diverter rotated by at least about 30° from the first cement diverter.
19. The apparatus of claim 18, wherein a third cement diverter of the plurality of cement diverters is positioned at a third distance from a first end of the tubular member, the third distance greater than the second distance, the azimuthal position of the third cement diverter rotated by at least about 30° from the second diverter segment.
20. The apparatus of claim 19, wherein a fourth cement diverter of the plurality of cement diverters is positioned at a fourth distance from a first end of the tubular member, the fourth distance greater than the third distance, the azimuthal position of the fourth cement diverter rotated by at least about 30° from the third cement diverter.
21. The apparatus of claim 16, wherein the azimuthal position of each cement diverter is rotated between about 30° and about 270° from an adjacent cement diverter.
22. The apparatus of claim 21, wherein the azimuthal position of each cement diverter is rotated between about 90° and about 180° from an adjacent cement diverter.
23. The apparatus of claim 16, wherein each of the plurality of cement diverters has an azimuthal extension of between about 35° and about 270°.
24. The apparatus of claim 23, wherein each of the plurality of cement diverters has an azimuthal extension of between about 90° and about 180°.
25. The apparatus of claim 16, wherein each of the plurality of cement diverters is between about two and about ten feet (about every 3.0 to about 6.1 meters) in length.
26. The apparatus of claim 16, wherein each of the plurality of cement diverters is axially spaced apart along the tubular member by about 3 to about 20 feet (about 0.9 to about 6.1 meters).
27. The apparatus of claim 16, wherein each of the plurality of cement diverters is swellable.
28. The apparatus of claim 27, wherein each of the plurality of cement diverters has a swellable coating applied thereto.
29. The apparatus of claim 27, wherein each of the plurality of cement diverters is inflatable.
30. The apparatus of claim 16, wherein the wellbore comprises an inclined and/or horizontal section.
31. A method of creating a wellbore in an underground formation, comprising the steps of:
(a) drilling a borehole in the underground formation;
(b) installing a tubular member into the borehole, the tubular member having a plurality of cement diverters positioned axially along an outer surface of the tubular member, each cement diverter having an axial length and an azimuthal extension of less than 360°, wherein the azimuthal position of at least one cement diverter is axially rotated from an adjacent cement diverter; and
(c) flowing cement into an annulus formed between an inner surface of the wellbore and the outer surface of the tubular member,
wherein the positioning of the plurality of cement diverters provides zonal communication interruption about every 10 to 20 feet (about every 3.0 to about 6.1 meters) axially along the tubular member.
32. The method of claim 31, wherein the azimuthal position of each cement diverter is rotated between about 30° and about 270° from an adjacent cement diverter.
33. The method of claim 32, wherein the azimuthal position of each cement diverter is rotated between about 90° and about 180° from an adjacent cement diverter.
34. The method of claim 31, wherein each of the plurality of cement diverters has an azimuthal extension of between about 35° and about 270°.
35. The method of claim 34, wherein each of the plurality of cement diverters has an azimuthal extension of between about 90° and about 180°.
36. The method of claim 31, wherein each of the plurality of cement diverters is between about two and about ten feet (about every 3.0 to about 6.1 meters) in length.
37. The method of claim 31, wherein each of the plurality of cement diverters is axially spaced apart along the tubular member by about 3 to about 20 feet (about 0.9 to about 6.1 meters).
38. The method of claim 31, wherein each of the plurality of cement diverters is swellable.
39. The method of claim 38, wherein each of the plurality of cement diverters has a swellable coating applied thereto.
40. The method of claim 39, wherein each of the plurality of cement diverters is inflatable.
41. A method of producing hydrocarbons from a production well of an underground formation, comprising the steps of:
(a) installing a tubular member into a wellbore of an underground formation, the tubular member having a plurality of cement diverters positioned axially along an outer surface of the tubular member, each cement diverter having an axial length and an azimuthal extension of less than 360°, wherein the azimuthal position of at least one cement diverter is axially rotated from an adjacent cement diverter;
(b) flowing cement into an annulus formed between an inner surface of the wellbore and the outer surface of the tubular member to form a production well; and
(c) producing fluids containing hydrocarbons from the production well
wherein the positioning of the plurality of cement diverters provides zonal communication interruption about every 10 to 20 feet axially (about every 3.0 to about 6.1 meters) along the tubular member.
42. The method of claim 41, wherein the azimuthal position of each cement diverter is rotated between about 30° and about 270° from an adjacent cement diverter.
43. The method of claim 42, wherein the azimuthal position of each cement diverter is rotated between about 90° and about 180° from an adjacent cement diverter.
44. The method of claim 41, wherein each of the plurality of cement diverters has an azimuthal extension of between about 35° and about 270°.
45. The method of claim 44, wherein each of the plurality of cement diverters has an azimuthal extension of between about 90° and about 180°.
46. The method of claim 41, wherein each of the plurality of cement diverters is between about two and about ten feet (about every 3.0 to about 6.1 meters) in length.
47. The method of claim 41, wherein each of the plurality of cement diverters is axially spaced apart along the tubular member by about 3 to about 20 feet (about 0.9 to about 6.1 meters).
48. The method of claim 41, wherein each of the plurality of cement diverters is swellable.
49. The method of claim 48, wherein each of the plurality of cement diverters has a swellable coating applied thereto.
50. The method of claim 41, wherein the wellbore comprises an inclined and/or horizontal section.
US14/520,189 2013-12-11 2014-10-21 Apparatus for Zonal Communication Interruption Abandoned US20160108698A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US14/520,189 US20160108698A1 (en) 2013-12-11 2014-10-21 Apparatus for Zonal Communication Interruption

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US201361914735P 2013-12-11 2013-12-11
US14/520,189 US20160108698A1 (en) 2013-12-11 2014-10-21 Apparatus for Zonal Communication Interruption

Publications (1)

Publication Number Publication Date
US20160108698A1 true US20160108698A1 (en) 2016-04-21

Family

ID=55748630

Family Applications (1)

Application Number Title Priority Date Filing Date
US14/520,189 Abandoned US20160108698A1 (en) 2013-12-11 2014-10-21 Apparatus for Zonal Communication Interruption

Country Status (1)

Country Link
US (1) US20160108698A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20180135401A1 (en) * 2016-02-18 2018-05-17 Landmark Graphics Corporation Game theoretic control architecture for drilling system automation
US11286726B2 (en) * 2019-01-07 2022-03-29 Halliburton Energy Services, Inc. Method to attain full annular coverage during cementing or mud circulation

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100163252A1 (en) * 2007-04-06 2010-07-01 Loic Regnault De La Mothe Method and composition for zonal isolation of a well
US20130248187A1 (en) * 2012-03-21 2013-09-26 Saudi Arabian Oil Company Inflatable collar and downhole method for moving a coiled tubing string

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100163252A1 (en) * 2007-04-06 2010-07-01 Loic Regnault De La Mothe Method and composition for zonal isolation of a well
US20130248187A1 (en) * 2012-03-21 2013-09-26 Saudi Arabian Oil Company Inflatable collar and downhole method for moving a coiled tubing string

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
2010-03 Halliburton Brochure - Protech CRB *
2011 YouTube Excerpts - Halliburton Protech CRB *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20180135401A1 (en) * 2016-02-18 2018-05-17 Landmark Graphics Corporation Game theoretic control architecture for drilling system automation
US10669834B2 (en) * 2016-02-18 2020-06-02 Halliburton Energy Services, Inc. Game theoretic control architecture for drilling system automation
US11286726B2 (en) * 2019-01-07 2022-03-29 Halliburton Energy Services, Inc. Method to attain full annular coverage during cementing or mud circulation

Similar Documents

Publication Publication Date Title
US8689894B2 (en) Method and composition for zonal isolation of a well
EP3752704B1 (en) Curing a lost circulation zone in a wellbore
US20160108698A1 (en) Apparatus for Zonal Communication Interruption
Schnitzler et al. Buzios Presalt Wells: Delivering Intelligent Completion In Ultra-Deepwater Carbonate Reservoirs
Al-Sabea et al. Achieving Higher Productivity from Mishrif Reservoir with Multistage Completion Technology: Challenges, Solutions and Performance
Netichuk et al. Special features of casing running and cementing in ERD wells
Holt et al. Dynamic cementation improves wellbore construction and reduces the hazards of groundwater contamination in shale plays
Song et al. Investigating the benefits of rotating liner cementing and impact factors
US20160017686A1 (en) Swellable Elastomer Plug and Abandonment Swellable Plugs
CN111963071A (en) Well body structure that sleeve pipe level was extended
CN108119068B (en) Construction method and process pipe column for preventing casing damage
DK179178B1 (en) Swellguard er isolation tool
Agerbaek et al. Successful closure of zonal sand production with Silica Gel in a horizontal well
Guizada et al. Stimulating low permeability carbonate reservoirs by applying acid fracturing with open-hole multi-stage completions combining sliding sleeves and swellable packers for effective fracture placement
Darbe et al. Cement considerations for tight-gas completions
Al Haji et al. 15KPSI MSF System with Metal Expandable Open-Hole Packers; Making a Difference in Delivering Required Capabilities to Challenging Wells
Strickler et al. Cementing considerations for casing while drilling: case history
US11530582B2 (en) Casing strings and related methods of deployment in horizontal wells
Adawi et al. Innovative Techniques for Managing Sustained Annulus Pressure in Highly Fractured Carbonate Field
Stolyarov et al. Application of cemented multi-entry frac sleeves in multistage stimulation: A case study
TEODORIU et al. Can Geothermal Wells Go Cementless?
Rogers et al. Plug Setting Aid Retooled for Improved Downhole Slurry Placement Provides Greater Versatility to the Operator When Planning and Executing Section or Hole Abandonments
Rogers et al. Tailpipe Disconnects Ideal for Setting Cement Plugs in Complex Wellbores; Procedures and Case Histories Provided
Holt et al. Dynamic cementation: A solution to well integrity problems
Farley et al. Field Proven Solutions to the Challenges of Centralizing Solid Expandable Casing

Legal Events

Date Code Title Description
STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION