US20150152720A1 - Method of producing viscous hydrocarbons by steam-assisted gravity drainage - Google Patents
Method of producing viscous hydrocarbons by steam-assisted gravity drainage Download PDFInfo
- Publication number
- US20150152720A1 US20150152720A1 US14/406,008 US201314406008A US2015152720A1 US 20150152720 A1 US20150152720 A1 US 20150152720A1 US 201314406008 A US201314406008 A US 201314406008A US 2015152720 A1 US2015152720 A1 US 2015152720A1
- Authority
- US
- United States
- Prior art keywords
- liner
- well bore
- injection well
- holes
- steam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000000034 method Methods 0.000 title claims description 36
- 229930195733 hydrocarbon Natural products 0.000 title claims description 20
- 150000002430 hydrocarbons Chemical class 0.000 title claims description 20
- 238000010796 Steam-assisted gravity drainage Methods 0.000 title claims description 18
- 238000002347 injection Methods 0.000 claims abstract description 135
- 239000007924 injection Substances 0.000 claims abstract description 135
- 239000007788 liquid Substances 0.000 claims abstract description 13
- 238000004519 manufacturing process Methods 0.000 claims description 17
- 239000012530 fluid Substances 0.000 claims description 15
- 239000004215 Carbon black (E152) Substances 0.000 claims description 12
- 238000011084 recovery Methods 0.000 claims description 10
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 10
- 239000002253 acid Substances 0.000 claims description 5
- 239000003921 oil Substances 0.000 description 23
- 238000009826 distribution Methods 0.000 description 15
- 239000000295 fuel oil Substances 0.000 description 8
- 238000010793 Steam injection (oil industry) Methods 0.000 description 6
- 238000012546 transfer Methods 0.000 description 5
- 238000004891 communication Methods 0.000 description 3
- 238000011161 development Methods 0.000 description 3
- 230000018109 developmental process Effects 0.000 description 3
- 238000003780 insertion Methods 0.000 description 3
- 230000037431 insertion Effects 0.000 description 3
- 239000004568 cement Substances 0.000 description 2
- 230000012447 hatching Effects 0.000 description 2
- 239000003208 petroleum Substances 0.000 description 2
- 239000011275 tar sand Substances 0.000 description 2
- 238000009834 vaporization Methods 0.000 description 2
- 230000008016 vaporization Effects 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 239000010426 asphalt Substances 0.000 description 1
- 238000009833 condensation Methods 0.000 description 1
- 230000005494 condensation Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 230000001483 mobilizing effect Effects 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 230000005514 two-phase flow Effects 0.000 description 1
- 238000009827 uniform distribution Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/24—Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
- E21B43/2406—Steam assisted gravity drainage [SAGD]
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/24—Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
- E21B43/2406—Steam assisted gravity drainage [SAGD]
- E21B43/2408—SAGD in combination with other methods
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/10—Setting of casings, screens, liners or the like in wells
Definitions
- the present invention relates to a method of producing viscous hydrocarbons by steam-assisted gravity drainage (SAGD), whereby steam is injected into a hydrocarbon reservoir by means of an injection well bore placed above a production well bore, so that heat is transferred from the steam to the reservoir fluids and thereby reduces the viscosity of hydrocarbons of the reservoir, thereby facilitating recovery of hydrocarbons by means of the production well bore, whereby a liner is introduced into the injection well bore so that it extends from a first part of the injection well bore to a second part of the injection well bore as a non-cemented liner, and whereby the steam is fed into the liner at the first part of the injection well bore and is injected into the hydrocarbon reservoir through a number of holes formed in a wall of the liner.
- SAGD steam-assisted gravity drainage
- Steam injection is a common thermal recovery technique for heavy oils, particularly in Canada, Venezuela, and in Oman.
- the main idea is that steam injected into the well bore condenses in the reservoir and transfers its heat of vaporization to the reservoir fluids. This results in a dramatic reduction in viscosity of the reservoir oil and makes economic recovery of even extra-heavy oil like bitumen possible.
- GB 2 053 328 discloses a thermal method for recovering normally immobile oil from a tar sand deposit, in which two wells are drilled horizontally into the deposit, an upper well for injection of heated fluid and a lower well for production of liquids.
- the injection well includes a casing having perforations along the horizontal section which are in communication with the tar sand deposit. Thermal communication is established between the wells.
- the wells are operated such that heated mobilized oil and steam flow without substantially mixing. Oil drains continuously by gravity to the production well where it is recovered.
- a slotted liner for both oil producer and steam injector.
- a slot can be thought of as a rectangular hole, which does not impose any significant pressure drop. Hence, its purpose is not to divert steam but merely to provide access for the steam to reach the reservoir. Unsurprisingly, most of the heat transfer takes place at the heel of the well bore.
- the object of the present invention is to provide improved steam distribution even along very long injection well bores.
- annular space is formed between the liner and the injection well bore in which annular space steam injected through the liner may travel along the outside of the liner and contact the injection well bore along the entire length of the liner, and the holes are distributed so that the total hole area per length unit of the liner is greater at the second part of the injection well bore than at the first part of the injection well bore and so that, during a start-up phase, initially, the steam enters the annular space only through holes near the first part of the injection well bore, and subsequently the steam gradually travels inside the liner in the direction of the second part of the injection well bore and thereby gradually enters the annular space through holes nearer and nearer the second part of the injection well bore, thereby gradually displacing liquid away from an upper part of the liner and away from an upper part of the annular space, so that, during the start-up phase, finally, steam contacts the injection well bore along at least substantially the entire length of the liner in the upper part of the annular space.
- an end opening of the liner located at the second part of the injection well bore is closed or at least substantially closed against the injection well bore, preferably by means of an end cap or the like.
- the end cap may itself be provided with holes for steam injection or drainage of well bore liquids.
- the end opening of the liner may alternatively be pressed against the end of the injection well bore, thereby at least substantially closing the end opening.
- steam is introduced into the liner only from the end at the first part of the injection well bore. Due to an improved steam distribution along the length of the injection well bore achieved during the start-up phase, it may be unnecessary to introduce steam from more than one end of the liner even during the entire normal operation phase, whereby complex tubing may be avoided.
- the first part of the injection well bore is the inner part at the heel of the injection well bore
- the second part of the injection well bore is the outer part at the toe of the injection well bore.
- the liner includes top holes pointing upwards for diverting the steam into the reservoir and bottom holes pointing downwards in order for condensed water and initial well bore liquids to escape from the liner. Thereby, a better separation between steam and well bore liquids may be achieved.
- the liner is inserted into the injection well bore by connecting a number of liner sections at random angular rotations in relation to each other, and each liner section includes at least one set of at least two holes arranged with a regular spacing in the circumferential direction of the liner section.
- each liner section includes at least one set of two holes arranged with a spacing of approximately 180 degrees in the circumferential direction of the liner section.
- the holes of the at least one set of at least two holes have corresponding or equal cross-sectional area.
- the cross-sectional area of the holes per length unit of the liner for top holes as well as for bottom holes may be well-controlled, even if the holes are pre-drilled before insertion of the liner sections into the injection well bore.
- all the holes included by each set of holes are arranged at the same length position of the liner section. This may further facilitate controlling the cross-sectional area of the holes per length unit of the liner for top holes as well as for bottom holes.
- the total hole area per length unit of the liner gradually increases from the first part of the injection well bore to the second part of the injection well bore. Thereby, an even better improved steam distribution along the length of the injection well bore may be achieved.
- the total hole area per length unit of the liner at a part of the second part of the injection well bore is at least 2 times, preferably at least 3 times and most preferred at least or about 4 times the total hole area per length unit of the liner at a part of the first part of the injection well bore.
- the holes in the liner has a diameter in the interval from about 0.5 mm to about 8 mm, and the distance between holes in the liner at the second part of the injection well bore is less than 12 metres (approximately 40 feet), preferably less than 9 metres (approximately 30 feet) and most preferred about 7.5 metres (approximately 25 feet), and the distance between holes in the liner at the first part of the injection well bore is more than 24 metres (approximately 80 feet), preferably more than 27 metres (approximately 90 feet) and most preferred about 30 metres (approximately 100 feet).
- the distance between holes in the liner at the second part of the injection well bore is less than 12 metres (approximately 40 feet), preferably less than 9 metres (approximately 30 feet) and most preferred about 7.5 metres (approximately 25 feet)
- the distance between holes in the liner at the first part of the injection well bore is more than 24 metres (approximately 80 feet), preferably more than 27 metres (
- the liner has a diameter of between about 2.5 cm (approximately 1 inch) to about 18 cm (approximately 7 inches).
- At least one hole is positioned at a top position of the liner, and at least one hole is positioned at a bottom position of the liner. This may further facilitate controlling the cross-sectional area of the holes per length unit of the liner for top holes as well as for bottom holes.
- acid is injected into the hydrocarbon reservoir by means of the injection well bore before that steam is injected into the hydrocarbon reservoir by means of the injection well bore.
- FIG. 1 is a side view illustration of a general well configuration for the known steam-assisted gravity drainage recovery technique
- FIG. 2 is an end view of the well configuration shown in FIG. 1 ,
- FIG. 3 illustrates a side view of a prior art SAGD injection well
- FIGS. 1 and 2 generally illustrate the well-known method of steam-assisted gravity drainage, whereby a production well bore 1 is placed just above the contact area 2 between the oil reservoir 3 and the aquifer 4 , and an injection well bore 5 is placed above the production well bore 1 .
- the production well bore 1 may be placed for instance 5 to 10 metres above the contact area 2 between the oil reservoir 3 and the aquifer 4 .
- the injection well bore 5 may for instance be placed 4 to 6 metres above the production well bore 1 .
- the steam travels upwards and forms a steam chamber 6 , so that heat is transferred to the oil reservoir 3 , thereby lowering the oil viscosity.
- the oil with resulting lowered viscosity can then more easily be produced by the production well bore 1 .
- FIG. 3 illustrates a prior art SAGD injection well bore 7 forming a heel 10 (at the inner part of the bore) and a toe 11 (at outer part of the bore).
- the heel 10 forms the bend between a vertical part 12 and a horizontal part 13 of the well bore 7 .
- Steam represented by the arrows, travels down the well bore 7 inside an open-ended tubing 8 and enters an open annulus 9 formed between the tubing 8 and the well bore 7 to contact the reservoir fluids. Most of the heat will be used when steam contacts reservoir fluids at the toe 11 of the well bore 7 , and gradually less heat will be available as the steam travels in the annulus 9 back towards the heel 10 .
- Ensuring that steam reaches the heel 10 of the well bore before condensing may limit the current completion length to about 1500 metres. If sufficient displacement of the fluids in the heel 10 of the well bore is not obtained, then the surrounding reservoir volumes will only be heated by conductance from the heated wellbore which reduces the economic value of the recovery project.
- the SAGD process generally takes place in three distinct phases: start-up, or circulation; normal SAGD operation; and wind down.
- the start-up is aimed at mobilizing the heavy oil close to and between the injection well bore 5 and the production well bore 1 to establish communication between the well bores.
- the most widely used method for start-up is circulating steam in both injection well bore and production well bore for as long as 90 days.
- Normal operation involves injecting steam and producing heavy oil to form the steam chamber 6 above the pair of well bores.
- This phase provides access to the maximum amount of resources within the drainage area and lasts as many years as necessary, so that the maximum amount of oil is recovered from the drainage volume.
- the wind down includes a series of operations aimed at reducing the amount of steam injected and using auxiliary operating patterns to maximize recovery.
- the prior art SAGD injection well bore 7 illustrated in FIG. 3 may suffer from poor steam distribution along the horizontal part 13 of the well bore 7 , in particular if said horizontal part 13 is relatively long.
- FIGS. 4 to 8 illustrate the start-up phase of the method of producing viscous hydrocarbons by steam-assisted gravity drainage (SAGD) according to the present invention at different time steps.
- SAGD steam-assisted gravity drainage
- the method according to the present invention seeks to achieve a controlled steam distribution along the entire well bore length (the length of the injection well bore as well as the length of the production well bore) by means of a non-cemented liner 20 inserted into an injection well bore 21 .
- the wall of the non-cemented liner 20 is provided with a limited number of holes 22 , 23 for steam injection from the liner 20 into the reservoir as well as escape of condensed water and the initial wellbore fluids from the liner 20 .
- the holes may be pre-drilled before insertion of the liner 20 into the well bore.
- the well bore 21 is configured as an open hole completion; however, if special demands may occur, the wall of the bore could be provided with a slotted liner, screen or similar in order to strengthen the bore, but still providing substantially free access to the wall of the bore.
- the holes 22 , 23 are distributed over the length of the liner 20 so that the total hole area per length unit of the liner 20 is greater at a second part 25 of the injection well bore 21 than at a first part 24 of the injection well bore 21 .
- This may be achieved either by providing holes regularly along the length of the liner, but larger holes at the second part 25 than at the first part 24 , or by providing holes of equal size along the liner, but more holes per length unit of the liner 20 at the second part 25 than at the first part 24 .
- the latter configuration is the one that is illustrated in FIGS. 4 to 8 .
- a combination of these configurations is possible. It may be preferred that the total hole area per length unit of the liner gradually increases from the first part 24 of the injection well bore 21 to the second part 25 of the injection well bore 21 .
- the holes 22 , 23 may be drilled in pairs of two, whereby a top hole 22 pointing upwards serves to divert the steam by imposing a pressure drop whereby a choke effect is created, and whereby a bottom hole 23 drilled oppositely and pointing downwards serves to enable condensed water and initial well bore fluids to escape from the liner 20 into the reservoir.
- holes 22 , 23 may also be positioned at other positions.
- at least some of the holes 22 , 23 are positioned at the top position of the liner 20 , and, preferably, at least some of the holes are positioned at the bottom position of the liner 20 .
- the liner 20 is preferably inserted into the newly drilled injection well bore 21 by connecting a number of liner sections at random angular rotations in relation to each other.
- Each liner section may include at least one set of at least two pre-drilled holes arranged with a regular spacing in the circumferential direction of the liner section.
- the holes are arranged in sets of holes positioned at the same length position of the liner 20 , whereby all holes of a set have corresponding cross-sectional area.
- top holes 22 and bottom holes 23 could have different cross-sectional area.
- the injection well bore 21 may be arranged in an oil reservoir above a production well bore in the same way as the injection well bore 5 illustrated in FIGS. 1 and 2 .
- the injection well bore 21 is in FIG. 4 shown at initial conditions prior to steam injection, whereby the injection well bore 21 is filled with liquids from the drilling process with a temperature approximately equal to the reservoir temperature.
- the upper circles symbolize the top holes 22 to be used for steam to exit the liner 20
- the lower circles represent bottom holes 23 to be used by the condensed water as well as the initial wellbore fluids.
- the curve shown below the injection well bore 21 illustrates the viscosity, ⁇ oil , of the oil in the immediate vicinity of the injection well bore 21 as a function of the length along the well bore, L, measured from a first end 29 of the injection well bore 21 in the direction of a second end 30 of the injection well bore 21 .
- the first end 29 of the injection well bore 21 is located at the first part 24 of the injection well bore 21
- the second end 30 of the injection well bore 21 is located at the second part 25 of the injection well bore 21 .
- Dotted parts of the curve illustrate the oil viscosity from the previous time step shown in the previous figure.
- first end 29 of the substantially horizontal injection well bore 21 is connected to a not shown substantially vertical well bore leading to the surface of the reservoir, corresponding to the prior art arrangement illustrated in FIG. 3 .
- a heel of the well bore is formed at the the first end 29
- the first part 24 of the injection well bore 21 forms the inner part
- the second part 25 forms the outer part.
- steam is preferably introduced into the liner 20 at the first end 29 of the well bore, however, by means of auxiliary tubing inside the liner 20 leading from the heel at the first part 24 to the second part 25 , steam could in fact be introduced at the second end 30 of the injection well bore instead of at the first end 29 .
- FIGS. 5 to 8 the direction of the flow of steam is illustrated by means of arrows.
- the oil viscosity in the near well bore region will decrease in the area contacted by the steam as the steam transfers its latent heat of vaporization to the heavy oil.
- the steam distribution along the liner during the start-up phase as illustrated in FIGS. 4 to 8 is a result of the above-described distribution of the total hole area pr. length unit of the liner 20 and may be fine-tuned by adjusting the rate with which the total hole area pr. length unit is increased along the length of the liner 20 .
- the holes 22 , 23 in the liner 20 may have a diameter in the interval from about 0.5 mm to about 8 mm, and the distance between holes 22 , 23 in the liner 20 at the second part 25 of the injection well bore 21 may be less than 12 metres (approximately 40 feet), preferably less than 9 metres (approximately 30 feet) and most preferred about 7.5 metres (approximately 25 feet), and the distance between holes 22 , 23 in the liner 20 at the first part 24 of the injection well bore 21 is more than 24 metres (approximately 80 feet), preferably more than 27 metres (approximately 90 feet) and most preferred about 30 metres (approximately 100 feet).
- the holes may have a constant diameter over the entire length of the liner 20 and the spacing between the holes in the longitudinal direction of the liner may vary.
- the diameter of the holes may vary over the length of the liner 20 and the spacing between the holes in the longitudinal direction of the liner may be constant. It is even possibly that both the diameter of the holes and said spacing between the holes vary over the length of the liner 20 .
- the hole diameter and the spacing between holes may be adjusted so that the total hole area per length unit of the liner at a part of the second part 25 of the injection well bore 21 may be at least 2 times, preferably at least 3 times and most preferred at least or about 4 times the total hole area per length unit of the liner at a part of the first part 24 of the injection well bore 21 .
- the liner 20 may typically have a diameter of between about 2.5 cm (approximately 1 inch) to about 18 cm (approximately 7 inches).
- coiled tubing may be used, and for instance of a diameter of approximately 4.4 cm (1.75 inches).
- An average hole area per length unit of the liner may be about 2.0 mm 2 /m for a length of the liner of approximately 1000 metres. For a longer liner, the average hole area per length unit of the liner may be smaller, probably around 0.5-1.0 mm 2 /m.
- the hole area per length unit of the liner may be from 60-70% of the average hole area per length unit of the liner at the heel (inner part) of the well to 130-140% of said average hole area at the toe (outer part) of the well.
- an increase from about 1,000 metres to some 2,000-3,000 metres per well is envisaged.
- An end opening of the liner 20 located at the second part 25 of the injection well bore 21 is preferably closed against the injection well bore 21 by means of an end cap 28 or the like.
- the end cap 28 could be provided with upper and/or lower holes for steam injection.
- steam is introduced into the liner 20 only from the first end 29 at the first part 24 of the injection well bore 21 , at least during the start-up phase.
- steam could possibly also be introduced from the second end 30 of the injection well bore 21 .
- Acid may be injected into the hydrocarbon reservoir by means of the injection well bore 21 before that steam is injected into the hydrocarbon reservoir by means of the injection well bore 21 .
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)
Abstract
A non-cemented liner (20) is introduced into an injection bore (21), steam is fed into the liner at a first bore part (24) and injected into the reservoir through holes (22, 23) in the liner distributed so that the total hole area per length unit of the liner is greater at a second part (25) than at the first part of the bore. Steam enters an annular space between liner and bore only through holes near first part of the bore and subsequently gradually travels inside the liner in direction of second bore part and gradually enters the annular space through holes nearer and nearer second bore part. Gradually liquid is displaced away from an upper liner part and an upper part of the annular space, so that steam contacts the bore along substantially the entire length of the liner in the upper part of the annular space.
Description
- The present invention relates to a method of producing viscous hydrocarbons by steam-assisted gravity drainage (SAGD), whereby steam is injected into a hydrocarbon reservoir by means of an injection well bore placed above a production well bore, so that heat is transferred from the steam to the reservoir fluids and thereby reduces the viscosity of hydrocarbons of the reservoir, thereby facilitating recovery of hydrocarbons by means of the production well bore, whereby a liner is introduced into the injection well bore so that it extends from a first part of the injection well bore to a second part of the injection well bore as a non-cemented liner, and whereby the steam is fed into the liner at the first part of the injection well bore and is injected into the hydrocarbon reservoir through a number of holes formed in a wall of the liner.
- Steam injection is a common thermal recovery technique for heavy oils, particularly in Canada, Venezuela, and in Oman. The main idea is that steam injected into the well bore condenses in the reservoir and transfers its heat of vaporization to the reservoir fluids. This results in a dramatic reduction in viscosity of the reservoir oil and makes economic recovery of even extra-heavy oil like bitumen possible.
-
GB 2 053 328 discloses a thermal method for recovering normally immobile oil from a tar sand deposit, in which two wells are drilled horizontally into the deposit, an upper well for injection of heated fluid and a lower well for production of liquids. The injection well includes a casing having perforations along the horizontal section which are in communication with the tar sand deposit. Thermal communication is established between the wells. The wells are operated such that heated mobilized oil and steam flow without substantially mixing. Oil drains continuously by gravity to the production well where it is recovered. - According to SPE 50429, Society of Petroleum Engineers, some operators in California have tried a different completion strategy where they cement the liner and then perforate the well to provide access to the reservoir through multiple zones. In an attempt to ensure that steam is distributed to all the zones and not just the first zone, a limited-entry technique has been used, implying that the size or area of the perforations has been specifically selected to limit the flow rate into a zone at a given injection pressure. However, as most of the annulus is now covered with cement, this design provides very little access to the reservoir.
- According to SPE 97922, Society of Petroleum Engineers, some operators choose a slotted liner for both oil producer and steam injector. A slot can be thought of as a rectangular hole, which does not impose any significant pressure drop. Hence, its purpose is not to divert steam but merely to provide access for the steam to reach the reservoir. Unsurprisingly, most of the heat transfer takes place at the heel of the well bore.
- A common problem with the above-mentioned completion techniques is that steam distribution along the injection wells is poor. Uniform development of the steam chamber remains one of the most critical challenges of the SAGD process because of its direct impact on heavy oil recovery. This means that the wells must be short and oil recovery suffers from inadequate transfer of heat from the steam to the heavy oil.
- The object of the present invention is to provide improved steam distribution even along very long injection well bores.
- In view of this object, an annular space is formed between the liner and the injection well bore in which annular space steam injected through the liner may travel along the outside of the liner and contact the injection well bore along the entire length of the liner, and the holes are distributed so that the total hole area per length unit of the liner is greater at the second part of the injection well bore than at the first part of the injection well bore and so that, during a start-up phase, initially, the steam enters the annular space only through holes near the first part of the injection well bore, and subsequently the steam gradually travels inside the liner in the direction of the second part of the injection well bore and thereby gradually enters the annular space through holes nearer and nearer the second part of the injection well bore, thereby gradually displacing liquid away from an upper part of the liner and away from an upper part of the annular space, so that, during the start-up phase, finally, steam contacts the injection well bore along at least substantially the entire length of the liner in the upper part of the annular space.
- Thereby, it may be ensured that liquid is eventually displaced entirely from even the second part of the injection well bore and at the same time it may be avoided that excessive quantities of steam is injected into the hydrocarbon reservoir at the first part of the injection well bore during the start-up phase, and consequently an improved steam distribution along the length of the injection well bore may eventually be achieved during the entire normal operation phase during which production of hydrocarbon takes place. Consequently, oil recovery may be increased as a result of improved transfer of heat from the steam to the heavy oil over the entire length of the well bore.
- In an embodiment, an end opening of the liner located at the second part of the injection well bore is closed or at least substantially closed against the injection well bore, preferably by means of an end cap or the like. Thereby, it may better be ensured that steam exits the liner through the holes as desired. However, the end cap may itself be provided with holes for steam injection or drainage of well bore liquids. The end opening of the liner may alternatively be pressed against the end of the injection well bore, thereby at least substantially closing the end opening.
- In an embodiment, steam is introduced into the liner only from the end at the first part of the injection well bore. Due to an improved steam distribution along the length of the injection well bore achieved during the start-up phase, it may be unnecessary to introduce steam from more than one end of the liner even during the entire normal operation phase, whereby complex tubing may be avoided.
- In an embodiment, the first part of the injection well bore is the inner part at the heel of the injection well bore, and the second part of the injection well bore is the outer part at the toe of the injection well bore. Thereby, steam may enter the liner at the inner part of the injection well bore, whereby auxiliary tubing inside the liner for the introduction of steam at the outer part of the injection well bore may be avoided.
- In an embodiment, the liner includes top holes pointing upwards for diverting the steam into the reservoir and bottom holes pointing downwards in order for condensed water and initial well bore liquids to escape from the liner. Thereby, a better separation between steam and well bore liquids may be achieved.
- In an embodiment, the liner is inserted into the injection well bore by connecting a number of liner sections at random angular rotations in relation to each other, and each liner section includes at least one set of at least two holes arranged with a regular spacing in the circumferential direction of the liner section. Thereby, as a large number of liner sections may be connected, it may be ensured that generally, over the length of the liner, some of the holes will point in more or less upward direction, and some of the holes will point in more or less downward direction, so that both steam diversion into the reservoir and drainage of liquids out of the liner may be facilitated.
- In a structurally advantageous embodiment, each liner section includes at least one set of two holes arranged with a spacing of approximately 180 degrees in the circumferential direction of the liner section.
- In an embodiment, the holes of the at least one set of at least two holes have corresponding or equal cross-sectional area. Thereby, the cross-sectional area of the holes per length unit of the liner for top holes as well as for bottom holes may be well-controlled, even if the holes are pre-drilled before insertion of the liner sections into the injection well bore.
- In an embodiment, all the holes included by each set of holes are arranged at the same length position of the liner section. This may further facilitate controlling the cross-sectional area of the holes per length unit of the liner for top holes as well as for bottom holes.
- In an embodiment, the total hole area per length unit of the liner gradually increases from the first part of the injection well bore to the second part of the injection well bore. Thereby, an even better improved steam distribution along the length of the injection well bore may be achieved.
- In an embodiment, the total hole area per length unit of the liner at a part of the second part of the injection well bore is at least 2 times, preferably at least 3 times and most preferred at least or about 4 times the total hole area per length unit of the liner at a part of the first part of the injection well bore. Thereby, a particular good steam distribution along the length of the injection well bore may be achieved.
- In an embodiment, the holes in the liner has a diameter in the interval from about 0.5 mm to about 8 mm, and the distance between holes in the liner at the second part of the injection well bore is less than 12 metres (approximately 40 feet), preferably less than 9 metres (approximately 30 feet) and most preferred about 7.5 metres (approximately 25 feet), and the distance between holes in the liner at the first part of the injection well bore is more than 24 metres (approximately 80 feet), preferably more than 27 metres (approximately 90 feet) and most preferred about 30 metres (approximately 100 feet). Thereby, an even better steam distribution along the length of the injection well bore may be achieved.
- In an embodiment, the liner has a diameter of between about 2.5 cm (approximately 1 inch) to about 18 cm (approximately 7 inches).
- In an embodiment, over a length of the liner of not more than 20 metres, preferably not more than 30 metres and most preferred not more than 35 metres, at least one hole is positioned at a top position of the liner, and at least one hole is positioned at a bottom position of the liner. This may further facilitate controlling the cross-sectional area of the holes per length unit of the liner for top holes as well as for bottom holes.
- In an embodiment, acid is injected into the hydrocarbon reservoir by means of the injection well bore before that steam is injected into the hydrocarbon reservoir by means of the injection well bore. Thereby, a significant advantage may be obtained, as the acid may generate long wormholes along the reservoir section of the well and thereby subsequently promote improved steam distribution.
- The invention will now be explained in more detail below by means of examples of embodiments with reference to the very schematic drawing, in which
-
FIG. 1 is a side view illustration of a general well configuration for the known steam-assisted gravity drainage recovery technique, -
FIG. 2 is an end view of the well configuration shown inFIG. 1 , -
FIG. 3 illustrates a side view of a prior art SAGD injection well, -
FIG. 4 is an illustration including a side view of an SAGD injection well according to the invention at initial conditions prior to steam injection at a point in time, t=t0, together with a curve showing viscosity of the oil along the length of the wellbore, -
FIG. 5 is an illustration corresponding to that ofFIG. 4 illustrating conditions at a point in time, t=t1, -
FIG. 6 is an illustration corresponding to that ofFIG. 4 illustrating conditions at a point in time, t=t2, -
FIG. 7 is an illustration corresponding to that ofFIG. 4 illustrating conditions at a point in time, t=t3, and -
FIG. 8 is an illustration corresponding to that ofFIG. 4 illustrating conditions at a point in time, t=t4>>t3. -
FIGS. 1 and 2 generally illustrate the well-known method of steam-assisted gravity drainage, whereby a production wellbore 1 is placed just above thecontact area 2 between the oil reservoir 3 and theaquifer 4, and an injection wellbore 5 is placed above the production well bore 1. The production well bore 1 may be placed forinstance 5 to 10 metres above thecontact area 2 between the oil reservoir 3 and theaquifer 4. The injection well bore 5 may for instance be placed 4 to 6 metres above the production well bore 1. The steam travels upwards and forms asteam chamber 6, so that heat is transferred to the oil reservoir 3, thereby lowering the oil viscosity. The oil with resulting lowered viscosity can then more easily be produced by the production well bore 1. - Accurate well placement is important for the success of this method. If the wells are too close to the oil-water contact, the oil production well bore will produce more water from the aquifer. On the other hand, if the well bores are positioned higher up in the reservoir, oil below the well bores will not be contacted with the steam and will therefore not be produced.
-
FIG. 3 illustrates a prior art SAGD injection well bore 7 forming a heel 10 (at the inner part of the bore) and a toe 11 (at outer part of the bore). Theheel 10 forms the bend between avertical part 12 and ahorizontal part 13 of the well bore 7. Steam, represented by the arrows, travels down the well bore 7 inside an open-endedtubing 8 and enters an open annulus 9 formed between thetubing 8 and the well bore 7 to contact the reservoir fluids. Most of the heat will be used when steam contacts reservoir fluids at thetoe 11 of the well bore 7, and gradually less heat will be available as the steam travels in the annulus 9 back towards theheel 10. Ensuring that steam reaches theheel 10 of the well bore before condensing may limit the current completion length to about 1500 metres. If sufficient displacement of the fluids in theheel 10 of the well bore is not obtained, then the surrounding reservoir volumes will only be heated by conductance from the heated wellbore which reduces the economic value of the recovery project. - The SAGD process generally takes place in three distinct phases: start-up, or circulation; normal SAGD operation; and wind down. The start-up is aimed at mobilizing the heavy oil close to and between the injection well bore 5 and the production well bore 1 to establish communication between the well bores. The most widely used method for start-up is circulating steam in both injection well bore and production well bore for as long as 90 days. Normal operation involves injecting steam and producing heavy oil to form the
steam chamber 6 above the pair of well bores. This phase provides access to the maximum amount of resources within the drainage area and lasts as many years as necessary, so that the maximum amount of oil is recovered from the drainage volume. Finally, the wind down includes a series of operations aimed at reducing the amount of steam injected and using auxiliary operating patterns to maximize recovery. - If the steam condenses before contacting the reservoir 3, the released heat will not lead to the desired oil viscosity reduction; instead it will be absorbed by the tubing steel of the open-ended
tubing 8. Effective development of areally extensive reservoirs requires long horizontal well bores, and the ability to deliver steam across the entire reservoir interval is of great importance for economic development of such reservoirs. The uniform distribution of steam is a challenge because of the large mobility contrast between the injected steam and the reservoir fluid having viscosity in the range of 0.1 to 1.0 million cP. Failure to fully displace the open annulus 9 to steam will prevent a uniform SAGD process across the exposed reservoir section and the contrast will grow with time as the injected steam provide even higher mobility in the better exposed areas. Therefore, the prior art SAGD injection well bore 7 illustrated inFIG. 3 may suffer from poor steam distribution along thehorizontal part 13 of the well bore 7, in particular if saidhorizontal part 13 is relatively long. -
FIGS. 4 to 8 illustrate the start-up phase of the method of producing viscous hydrocarbons by steam-assisted gravity drainage (SAGD) according to the present invention at different time steps. - The method according to the present invention seeks to achieve a controlled steam distribution along the entire well bore length (the length of the injection well bore as well as the length of the production well bore) by means of a
non-cemented liner 20 inserted into an injection well bore 21. The wall of thenon-cemented liner 20 is provided with a limited number ofholes liner 20 into the reservoir as well as escape of condensed water and the initial wellbore fluids from theliner 20. The holes may be pre-drilled before insertion of theliner 20 into the well bore. Preferably, the well bore 21 is configured as an open hole completion; however, if special demands may occur, the wall of the bore could be provided with a slotted liner, screen or similar in order to strengthen the bore, but still providing substantially free access to the wall of the bore. - The
holes liner 20 so that the total hole area per length unit of theliner 20 is greater at asecond part 25 of the injection well bore 21 than at afirst part 24 of the injection well bore 21. This may be achieved either by providing holes regularly along the length of the liner, but larger holes at thesecond part 25 than at thefirst part 24, or by providing holes of equal size along the liner, but more holes per length unit of theliner 20 at thesecond part 25 than at thefirst part 24. The latter configuration is the one that is illustrated inFIGS. 4 to 8 . Furthermore, a combination of these configurations is possible. It may be preferred that the total hole area per length unit of the liner gradually increases from thefirst part 24 of the injection well bore 21 to thesecond part 25 of the injection well bore 21. - The
holes top hole 22 pointing upwards serves to divert the steam by imposing a pressure drop whereby a choke effect is created, and whereby abottom hole 23 drilled oppositely and pointing downwards serves to enable condensed water and initial well bore fluids to escape from theliner 20 into the reservoir. However, although the figures illustrateholes liner 20, holes may also be positioned at other positions. Preferably, at least some of theholes liner 20, and, preferably, at least some of the holes are positioned at the bottom position of theliner 20. Furthermore, this should preferably be the case over a reasonable length of the liner, for instance such as 30 metres, in order to ensure regular steam diversion to the top of the injection well bore along the length of the bore as well as regular drainage of the bottom of theliner 20 along the length of the bore. - The
liner 20 is preferably inserted into the newly drilled injection well bore 21 by connecting a number of liner sections at random angular rotations in relation to each other. Each liner section may include at least one set of at least two pre-drilled holes arranged with a regular spacing in the circumferential direction of the liner section. Thereby, it may generally be ensured that, over a certain length of the liner, at least some holes will be positioned more or less at the top position of the liner, and that, over a certain length of the liner, at least some holes will be positioned more or less at the bottom position of the liner. - In order to control the distribution of the hole area per length unit of the injection liner, both for
top holes 22 directed upwards and intended for steam diversion and forbottom holes 23 directed downwards and intended for drainage, it may in the case of pre-drilled holes be preferred that the holes are arranged in sets of holes positioned at the same length position of theliner 20, whereby all holes of a set have corresponding cross-sectional area. - On the other hand, if the
holes liner 20 into the injection well bore 21, all of theholes 22 could just as well be drilled at least substantially at a top position of theliner 20, and similarly, all of theholes 23 could just as well be drilled at least substantially at a bottom position of theliner 20. Furthermore, in this case,top holes 22 andbottom holes 23 could have different cross-sectional area. -
FIG. 4 illustrates an SAGD injection well bore 21 according to the present invention at a point in time, t=t0. The injection well bore 21 may be arranged in an oil reservoir above a production well bore in the same way as the injection well bore 5 illustrated inFIGS. 1 and 2 . The injection well bore 21 is inFIG. 4 shown at initial conditions prior to steam injection, whereby the injection well bore 21 is filled with liquids from the drilling process with a temperature approximately equal to the reservoir temperature. The upper circles symbolize thetop holes 22 to be used for steam to exit theliner 20, whereas the lower circles representbottom holes 23 to be used by the condensed water as well as the initial wellbore fluids. - In
FIGS. 4 to 8 , the curve shown below the injection well bore 21 illustrates the viscosity, μoil, of the oil in the immediate vicinity of the injection well bore 21 as a function of the length along the well bore, L, measured from afirst end 29 of the injection well bore 21 in the direction of asecond end 30 of the injection well bore 21. Thefirst end 29 of the injection well bore 21 is located at thefirst part 24 of the injection well bore 21, and thesecond end 30 of the injection well bore 21 is located at thesecond part 25 of the injection well bore 21. Dotted parts of the curve illustrate the oil viscosity from the previous time step shown in the previous figure. - It is noted that the
first end 29 of the substantially horizontal injection well bore 21 is connected to a not shown substantially vertical well bore leading to the surface of the reservoir, corresponding to the prior art arrangement illustrated inFIG. 3 . Thereby, a heel of the well bore is formed at the thefirst end 29, and thefirst part 24 of the injection well bore 21 forms the inner part and thesecond part 25 forms the outer part. According to the present invention, steam is preferably introduced into theliner 20 at thefirst end 29 of the well bore, however, by means of auxiliary tubing inside theliner 20 leading from the heel at thefirst part 24 to thesecond part 25, steam could in fact be introduced at thesecond end 30 of the injection well bore instead of at thefirst end 29. - It is noted that in
FIGS. 5 to 8 , the direction of the flow of steam is illustrated by means of arrows. -
FIG. 5 depicts a snapshot in time during the start-up of the injection well bore 21 at a point in time, t=The steam (illustrated by less dense hatching) has traveled a certain distance into the liner from thefirst end 29 of the injection well bore 21 and into thefirst part 24 of the injection well bore 21. Due to a small hole size, a significant pressure drop is imposed across each hole, and critical flow governed by the speed of sound may develop across the hole. Therefore, regardless of possibly increased pump pressure, the same amount of flow will pass through the hole to anannular space 26 is formed between theliner 20 and the injection well bore 21. The remainder of the steam will stay inside theliner 20 and displace the liquid well bore fluids (illustrated by dense hatching) further towards anend 27 of the liner at thesecond part 25 of the injection well bore 21, whereby it exits theliner 20 out through thetop holes 22 further towards theend 27 and out through the bottom holes 23 along the entire length of the injection well bore 21. A certain amount of steam will condense inside the well bore; this condensed water will also escape into the reservoir primarily through the bottom holes 23. - The oil viscosity in the near well bore region will decrease in the area contacted by the steam as the steam transfers its latent heat of vaporization to the heavy oil.
- In
FIGS. 6 and 7 , the steam front has moved further down theliner 20 towards theend 27. The portion of steam which has entered theannular space 26 through the top holes 22 will propagate into the reservoir, but some of the steam will displace the liquids from the top to the bottom of theannular space 26. Therefore, with time, the top of theannular space 26 will be filled with steam, whereas the bottom of theannular space 26 will be filled with condensed water. - After sufficient time, as illustrated in
FIG. 8 , an equilibrium situation has been established. The original well bore fluids have been fully displaced from theliner 20, but two-phase flow will prevail; steam, with gas-phase properties will occupy the top part of the cross-sectional area of theline 20, whereas condensing vapor, with liquid-like properties will occupy the bottom of theliner 20, exiting the liner through the bottom holes 23 at a rate equal to the condensation rate. By now, the heat profile along the well may be as uniform as it can be and the oil viscosity near the well bore has been significantly reduced. - The steam distribution along the liner during the start-up phase as illustrated in
FIGS. 4 to 8 is a result of the above-described distribution of the total hole area pr. length unit of theliner 20 and may be fine-tuned by adjusting the rate with which the total hole area pr. length unit is increased along the length of theliner 20. For instance, theholes liner 20 may have a diameter in the interval from about 0.5 mm to about 8 mm, and the distance betweenholes liner 20 at thesecond part 25 of the injection well bore 21 may be less than 12 metres (approximately 40 feet), preferably less than 9 metres (approximately 30 feet) and most preferred about 7.5 metres (approximately 25 feet), and the distance betweenholes liner 20 at thefirst part 24 of the injection well bore 21 is more than 24 metres (approximately 80 feet), preferably more than 27 metres (approximately 90 feet) and most preferred about 30 metres (approximately 100 feet). Thereby, the holes may have a constant diameter over the entire length of theliner 20 and the spacing between the holes in the longitudinal direction of the liner may vary. Alternatively, the diameter of the holes may vary over the length of theliner 20 and the spacing between the holes in the longitudinal direction of the liner may be constant. It is even possibly that both the diameter of the holes and said spacing between the holes vary over the length of theliner 20. In any case, the hole diameter and the spacing between holes may be adjusted so that the total hole area per length unit of the liner at a part of thesecond part 25 of the injection well bore 21 may be at least 2 times, preferably at least 3 times and most preferred at least or about 4 times the total hole area per length unit of the liner at a part of thefirst part 24 of the injection well bore 21. - The
liner 20 may typically have a diameter of between about 2.5 cm (approximately 1 inch) to about 18 cm (approximately 7 inches). For instance, coiled tubing may be used, and for instance of a diameter of approximately 4.4 cm (1.75 inches). - An average hole area per length unit of the liner may be about 2.0 mm2/m for a length of the liner of approximately 1000 metres. For a longer liner, the average hole area per length unit of the liner may be smaller, probably around 0.5-1.0 mm2/m.
- The hole area per length unit of the liner may be from 60-70% of the average hole area per length unit of the liner at the heel (inner part) of the well to 130-140% of said average hole area at the toe (outer part) of the well. Regarding the length of the wells allowed by means of the invention, an increase from about 1,000 metres to some 2,000-3,000 metres per well is envisaged.
- The above-described distribution of the total hole area pr. length unit of the
liner 20 in fact results in that, during a start-up phase, initially, the steam enters theannular space 26 only throughholes 22 near thefirst part 24 of the injection well bore 21, and subsequently the steam gradually travels inside theliner 20 in the direction of thesecond part 25 of the injection well bore 21 and thereby gradually enters theannular space 26 throughholes 22 nearer and nearer thesecond part 25 of the injection well bore 21, thereby gradually displacing liquid away from an upper part of theliner 20 and away from an upper part of theannular space 26, so that, during the start-up phase, finally, steam contacts the injection well bore 21 along at least substantially the entire length of theliner 20 in the upper part of theannular space 26. - An end opening of the
liner 20 located at thesecond part 25 of the injection well bore 21 is preferably closed against the injection well bore 21 by means of anend cap 28 or the like. Theend cap 28 could be provided with upper and/or lower holes for steam injection. - According to the present invention, it is preferred that steam is introduced into the
liner 20 only from thefirst end 29 at thefirst part 24 of the injection well bore 21, at least during the start-up phase. However, at least during the entire normal operation phase, steam could possibly also be introduced from thesecond end 30 of the injection well bore 21. - Acid may be injected into the hydrocarbon reservoir by means of the injection well bore 21 before that steam is injected into the hydrocarbon reservoir by means of the injection well bore 21. Thereby, a significant advantage may be obtained, as the acid may generate long wormholes along the reservoir section of the well and thereby subsequently promote improved steam distribution.
Claims (20)
1. A method of producing viscous hydrocarbons by steam-assisted gravity drainage (SAGD), comprising:
injecting steam into a hydrocarbon reservoir via an injection well bore placed above a production well bore, so that heat is transferred from the steam to the reservoir fluids and thereby reduces the viscosity of hydrocarbons of the reservoir, thereby facilitating recovery of hydrocarbons via the production well bore, wherein a liner is introduced into the injection well bore so that it extends from a first part of the injection well bore to a second part of the injection well bore as a non-cemented liner, and wherein the steam is fed into the liner at the first part of the injection well bore and is injected into the hydrocarbon reservoir through a number of holes formed in a wall of the liner, wherein an annular space is formed between the liner and the injection well bore in which annular space steam injected through the liner may travel along the outside of the liner and contact the injection well bore along the entire length of the liner, and wherein the holes are distributed so that the total hole area per length unit of the liner is greater at the second part of the injection well bore than at the first part of the injection well bore and so that, during a start-up phase, initially, the steam enters the annular space only through holes near the first part of the injection well bore, and subsequently the steam gradually travels inside the liner in the direction of the second part of the injection well bore and thereby gradually enters the annular space through holes nearer and nearer the second part of the injection well bore, thereby gradually displacing liquid away from an upper part of the liner and away from an upper part of the annular space, so that, during the start-up phase, finally, steam contacts the injection well bore along at least substantially the entire length of the liner in the upper part of the annular space; and
injecting acid into the hydrocarbon reservoir via the injection well bore before that steam is injected into the hydrocarbon reservoir via the injection well bore.
2. The method according to claim 1 , wherein an end opening of the liner located at the second part of the injection well bore is closed or at least substantially closed against the injection well bore, preferably via an end cap or the like.
3. The method according to claim 1 , wherein steam is introduced into the liner only from the end at the first part of the injection well bore.
4. The method according to claim 1 , wherein the first part of the injection well bore is the inner part at the heel of the injection well bore, and wherein the second part of the injection well bore is the outer part at the toe of the injection well bore.
5. The method according to claim 1 , wherein the liner includes top holes pointing upwards for diverting the steam into the reservoir and bottom holes pointing downwards in order for condensed water and initial well bore fluids to escape from the liner.
6. The method according to claim 1 , wherein the liner is inserted into the injection well bore by connecting a number of liner sections at random angular rotation in relation to each other, and wherein each liner section includes at least one set of at least two holes arranged with a regular spacing in the circumferential direction of the liner section.
7. The method according to claim 6 , wherein each liner section includes at least one set of two holes arranged with a spacing of approximately 180 degrees in the circumferential direction of the liner section.
8. The method according to claim 6 , wherein the holes of the at least one set of at least two holes have corresponding or equal cross-sectional area.
9. The method according to claim 6 , wherein all the holes included by each set of holes are arranged at the same length position of the liner section.
10. The method according to claim 1 , wherein the total hole area per length unit of the liner gradually increases from the first part of the injection well bore to the second part of the injection well bore.
11. The method according to claim 1 , wherein the total hole area per length unit of the liner at a part of the second part of the injection well bore is at least 2 times, preferably at least 3 times and most preferred at least or about 4 times the total hole area per length unit of the liner at a part of the first part of the injection well bore.
12. The method according to claim 1 , wherein the holes in the liner has a diameter in the interval from about 0.5 mm to about 8 mm, and wherein the distance between holes in the liner at the second part of the injection well bore is less than 12 meters, preferably less than 9 meters and most preferred about 7.5 meters, and the distance between holes in the liner at the first part of the injection well bore is more than 24 meters, preferably more than 27 meters meters and most preferred about 30 meters meters.
13. The method according to claim 1 , wherein the liner has a diameter of between about 2.5 cm to about 18 cm.
14. The method according to claim 1 , wherein, over a length of the liner of not more than 20 metersmeters, preferably not more than 30 metersmeters and most preferred not more than 35 metersmeters, at least one hole is positioned at a top position of the liner, and at least one hole is positioned at a bottom position of the liner.
15. The method according to claim 2 , wherein steam is introduced into the liner only from the end at the first part of the injection well bore.
16. The method according to claim 7 , wherein the holes of the at least one set of at least two holes have corresponding or equal cross-sectional area.
17. The method according to claim 7 , wherein all the holes included by each set of holes are arranged at the same length position of the liner section.
18. The method according to claim 2 , wherein the first part of the injection well bore is the inner part at the heel of the injection well bore, and wherein the second part of the injection well bore is the outer part at the toe of the injection well bore.
19. The method according to claim 2 , wherein the liner includes top holes pointing upwards for diverting the steam into the reservoir and bottom holes pointing downwards in order for condensed water and initial well bore fluids to escape from the liner.
20. The method according to claim 2 , wherein the liner is inserted into the injection well bore by connecting a number of liner sections at random angular rotation in relation to each other, and wherein each liner section includes at least one set of at least two holes arranged with a regular spacing in the circumferential direction of the liner section.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US14/406,008 US20150152720A1 (en) | 2012-06-06 | 2013-06-06 | Method of producing viscous hydrocarbons by steam-assisted gravity drainage |
Applications Claiming Priority (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201261656156P | 2012-06-06 | 2012-06-06 | |
DKPA201270302 | 2012-06-06 | ||
DKPA201270302 | 2012-06-06 | ||
PCT/EP2013/061668 WO2013182635A1 (en) | 2012-06-06 | 2013-06-06 | A method of producing viscous hydrocarbons by steam-assisted gravity drainage |
US14/406,008 US20150152720A1 (en) | 2012-06-06 | 2013-06-06 | Method of producing viscous hydrocarbons by steam-assisted gravity drainage |
Publications (1)
Publication Number | Publication Date |
---|---|
US20150152720A1 true US20150152720A1 (en) | 2015-06-04 |
Family
ID=46762772
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US14/406,008 Abandoned US20150152720A1 (en) | 2012-06-06 | 2013-06-06 | Method of producing viscous hydrocarbons by steam-assisted gravity drainage |
Country Status (6)
Country | Link |
---|---|
US (1) | US20150152720A1 (en) |
EP (1) | EP2859182A1 (en) |
CA (1) | CA2875559A1 (en) |
DK (1) | DK201470794A1 (en) |
MX (1) | MX2014014843A (en) |
WO (1) | WO2013182635A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10920545B2 (en) * | 2016-06-09 | 2021-02-16 | Conocophillips Company | Flow control devices in SW-SAGD |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2526297A (en) * | 2014-05-20 | 2015-11-25 | Maersk Olie & Gas | Method for stimulation of the near-wellbore reservoir of a wellbore |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050167103A1 (en) * | 2003-10-06 | 2005-08-04 | Horner W. N. | Applications of waste gas injection into natural gas reservoirs |
US20070202452A1 (en) * | 2006-01-09 | 2007-08-30 | Rao Dandina N | Direct combustion steam generator |
US20090127091A1 (en) * | 1999-05-07 | 2009-05-21 | Ge Ionics, Inc. | Water Treatment Method for Heavy Oil Production |
US20090188661A1 (en) * | 2008-01-29 | 2009-07-30 | Dustin Bizon | Gravity drainage apparatus |
US20090294122A1 (en) * | 2006-05-24 | 2009-12-03 | Jens Henrik Hansen | Flow simulation in a well or pipe |
US20100012331A1 (en) * | 2006-12-13 | 2010-01-21 | Gushor Inc | Preconditioning An Oilfield Reservoir |
US20100300674A1 (en) * | 2009-06-02 | 2010-12-02 | Baker Hughes Incorporated | Permeability flow balancing within integral screen joints |
US20130081808A1 (en) * | 2011-09-30 | 2013-04-04 | Khalil Zeidani | Hydrocarbon recovery from bituminous sands with injection of surfactant vapour |
US20130098603A1 (en) * | 2011-10-21 | 2013-04-25 | Nexen Inc. | Steam Assisted Gravity Drainage Processes With The Addition of Oxygen Addition |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5141054A (en) * | 1991-03-13 | 1992-08-25 | Mobil Oil Corporation | Limited entry steam heating method for uniform heat distribution |
US20080251255A1 (en) * | 2007-04-11 | 2008-10-16 | Schlumberger Technology Corporation | Steam injection apparatus for steam assisted gravity drainage techniques |
US20100132946A1 (en) * | 2008-12-01 | 2010-06-03 | Matthew Robert George Bell | Method for the Enhancement of Injection Activities and Stimulation of Oil and Gas Production |
-
2013
- 2013-06-06 EP EP13727600.2A patent/EP2859182A1/en not_active Withdrawn
- 2013-06-06 WO PCT/EP2013/061668 patent/WO2013182635A1/en active Application Filing
- 2013-06-06 MX MX2014014843A patent/MX2014014843A/en unknown
- 2013-06-06 CA CA2875559A patent/CA2875559A1/en not_active Abandoned
- 2013-06-06 US US14/406,008 patent/US20150152720A1/en not_active Abandoned
-
2014
- 2014-12-17 DK DK201470794A patent/DK201470794A1/en not_active Application Discontinuation
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090127091A1 (en) * | 1999-05-07 | 2009-05-21 | Ge Ionics, Inc. | Water Treatment Method for Heavy Oil Production |
US20050167103A1 (en) * | 2003-10-06 | 2005-08-04 | Horner W. N. | Applications of waste gas injection into natural gas reservoirs |
US20070202452A1 (en) * | 2006-01-09 | 2007-08-30 | Rao Dandina N | Direct combustion steam generator |
US20090294122A1 (en) * | 2006-05-24 | 2009-12-03 | Jens Henrik Hansen | Flow simulation in a well or pipe |
US20100012331A1 (en) * | 2006-12-13 | 2010-01-21 | Gushor Inc | Preconditioning An Oilfield Reservoir |
US20090188661A1 (en) * | 2008-01-29 | 2009-07-30 | Dustin Bizon | Gravity drainage apparatus |
US20100300674A1 (en) * | 2009-06-02 | 2010-12-02 | Baker Hughes Incorporated | Permeability flow balancing within integral screen joints |
US20130081808A1 (en) * | 2011-09-30 | 2013-04-04 | Khalil Zeidani | Hydrocarbon recovery from bituminous sands with injection of surfactant vapour |
US20130098603A1 (en) * | 2011-10-21 | 2013-04-25 | Nexen Inc. | Steam Assisted Gravity Drainage Processes With The Addition of Oxygen Addition |
Non-Patent Citations (1)
Title |
---|
Schlumberger Oilfield Glossary entry for "Steam-assisted gravity drainage", accessed on 5/12/2017 via www.glossary.oilfield.slb.com * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10920545B2 (en) * | 2016-06-09 | 2021-02-16 | Conocophillips Company | Flow control devices in SW-SAGD |
Also Published As
Publication number | Publication date |
---|---|
DK201470794A1 (en) | 2015-02-02 |
MX2014014843A (en) | 2015-07-06 |
WO2013182635A1 (en) | 2013-12-12 |
EP2859182A1 (en) | 2015-04-15 |
CA2875559A1 (en) | 2013-12-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6039121A (en) | Enhanced lift method and apparatus for the production of hydrocarbons | |
US8905132B2 (en) | Establishing communication between well pairs in oil sands by dilation with steam or water circulation at elevated pressures | |
US9303500B2 (en) | Method for initiating circulation for steam assisted gravity drainage | |
US7422063B2 (en) | Hydrocarbon recovery from subterranean formations | |
US20070284107A1 (en) | Heavy Oil Recovery and Apparatus | |
US20060175061A1 (en) | Method for Recovering Hydrocarbons from Subterranean Formations | |
US9567842B2 (en) | Radial fishbone SAGD | |
US8607866B2 (en) | Method for accelerating start-up for steam assisted gravity drainage operations | |
US10550681B2 (en) | Bottom-up gravity-assisted pressure drive | |
US7090014B2 (en) | Process for sequentially applying SAGD to adjacent sections of a petroleum reservoir | |
US20160265327A1 (en) | Steam assisted gravity drainage with added oxygen ("sagdox") in deep reservoirs | |
WO1999067503A1 (en) | Convective heating startup for heavy oil recovery | |
US20130186623A1 (en) | Steam splitter | |
US20150152720A1 (en) | Method of producing viscous hydrocarbons by steam-assisted gravity drainage | |
CA2765812C (en) | Steam splitter | |
CA2888892C (en) | Non condensing gas management in sagd | |
US10584569B2 (en) | Electric heat and NGL startup for heavy oil | |
CA2889447C (en) | Cooperative multidirectional fluid injection and enhanced drainage length in thermal recovery of heavy oil | |
CA2833068C (en) | Bottom-up solvent-aided process and system for hydrocarbon recovery | |
Nasr et al. | Synergies of New Technologies-The Steam Assisted Gravity Drainage (SAGD) | |
CA2549782A1 (en) | Method for recovering hydrocarbons from subterranean formations | |
CA2549784A1 (en) | Hydrocarbon recovery from subterranean formations |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: MAERSK OLIE OG GAS A/S, DENMARK Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:MOGENSEN, KRISTIAN;HANSEN, JENS HENRIK;REEL/FRAME:036310/0124 Effective date: 20130603 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |