US20140250905A1 US14/194,846 US201414194846A US2014250905A1 US 20140250905 A1 US20140250905 A1 US 20140250905A1 US 201414194846 A US201414194846 A US 201414194846A US 2014250905 A1 US2014250905 A1 US 2014250905A1
Authority
US
United States
Prior art keywords
turbine
combustion
pressure
waste
supercharger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US14/194,846
Inventor
Ari Löytty
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of US20140250905A1 publication Critical patent/US20140250905A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K23/00Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids
    • F01K23/02Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled
    • F01K23/06Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K23/00Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids
    • F01K23/02Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled
    • F01K23/06Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle
    • F01K23/10Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle with exhaust fluid of one cycle heating the fluid in another cycle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K23/00Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids
    • F01K23/02Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled
    • F01K23/06Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle
    • F01K23/10Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle with exhaust fluid of one cycle heating the fluid in another cycle
    • F01K23/106Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle with exhaust fluid of one cycle heating the fluid in another cycle with water evaporated or preheated at different pressures in exhaust boiler
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F02COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
    • F02CGAS-TURBINE PLANTS; AIR INTAKES FOR JET-PROPULSION PLANTS; CONTROLLING FUEL SUPPLY IN AIR-BREATHING JET-PROPULSION PLANTS
    • F02C6/00Plural gas-turbine plants; Combinations of gas-turbine plants with other apparatus; Adaptations of gas- turbine plants for special use
    • F02C6/006Open cycle gas-turbine in which the working fluid is expanded to a pressure below the atmospheric pressure and then compressed to atmospheric pressure
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F02COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
    • F02CGAS-TURBINE PLANTS; AIR INTAKES FOR JET-PROPULSION PLANTS; CONTROLLING FUEL SUPPLY IN AIR-BREATHING JET-PROPULSION PLANTS
    • F02C6/00Plural gas-turbine plants; Combinations of gas-turbine plants with other apparatus; Adaptations of gas- turbine plants for special use
    • F02C6/18Plural gas-turbine plants; Combinations of gas-turbine plants with other apparatus; Adaptations of gas- turbine plants for special use using the waste heat of gas-turbine plants outside the plants themselves, e.g. gas-turbine power heat plants
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F02COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
    • F02CGAS-TURBINE PLANTS; AIR INTAKES FOR JET-PROPULSION PLANTS; CONTROLLING FUEL SUPPLY IN AIR-BREATHING JET-PROPULSION PLANTS
    • F02C7/00Features, components parts, details or accessories, not provided for in, or of interest apart form groups F02C1/00 - F02C6/00; Air intakes for jet-propulsion plants
    • F02C7/22Fuel supply systems
    • F02C7/224Heating fuel before feeding to the burner
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/14Combined heat and power generation [CHP]

Definitions

  • the invention relates to a method and apparatus for achieving a high efficiency in an open gas-turbine (combi) process.
  • a supercharger compresses air, which is burned with fuel in a combustion chamber, which is followed by a turbine and a waste-heat boiler, in which water of the secondary-process circulation is vaporized.
  • the secondary-process circulation there is normally a vapor process, which, in the newest large plants, uses reheating of the water vapor.
  • the water vapor condenses in a condenser into water, which is compressed by a pump to a maximum pressure, and preheated and vaporized in the waste-heat boiler. After the waste-heat boiler, the water vapor goes to the steam turbines of the process circulation.
  • water vapor is fed to the gas-turbine process, so that its implementation in practice is not a problem.
  • the efficiency can be raised, if the air and/or water vapor are preheated using the combustion gases, so that the exhaust temperature of the combustion gases from the turbine can be raised by means of the second combustion chamber.
  • existing combi processes incorporating two combustion chambers a higher efficiency is not achieved.
  • FIG. 4 in US application publication 20130227958 A1 shows the obvious implementation of the most significant manufacturer in the field, relating to a two-combustion-chamber process.
  • the invention meets the inventiveness requirements. This position is supported by common knowledge on the internet (Wikipedia's “combined cycle” article) and the endorsement of the invention by the acknowledged research institute MC Innoenergy, which is part of the European Institute of Innovation and Technology (EIT).
  • reheating of the water vapor of the secondary process takes place by means of waste heat—for example, by the waste heat of the combustion-gas supercharger.
  • the idea of the invention has also been expansion in the primary circulation to a pressure lower than atmospheric pressure at a high temperature, because the compression of the carbon dioxide arising in combustion after the removal of the water vapor arising in combustion takes a smaller amount of energy than the compression of oxygen would take.
  • the water vapor condenses at a lower temperature, so that the energy loss is smaller.
  • the inventive feature that the water vapor expands in a gas-turbine process at a very high temperature compared to that at which it expands in a low-pressure steam turbine. For these reasons, by means of the invention by far the highest efficiency in the world of a combi power plant is achieved. At a high outdoor temperature the invention is relatively even better compared to the present practice.
  • the minimum pressure is atmospheric pressure.
  • the combustion gases expand in the gas-turbine process to a pressure lower than atmospheric pressure, so that by means of the injection of water vapor more work is obtained, particularly at a pressure lower than atmospheric pressure, than would be obtained in a steam turbine while the compression of the combustion gases takes less energy than the compression of air would, because only a fraction of the oxygen in the air need be compressed to atmospheric pressure by the combustion-gas supercharger, and the compression of the carbon dioxide arising in combustion takes less energy than the compression of the air used in combustion would take.
  • the invention relates to a method according to Claim 1 for achieving a high efficiency in an open gas-turbine (combi) process, in which a supercharger compresses the air required for combustion, which is burned with a fuel in a first combustion chamber, which is followed by a first turbine, a second combustion chamber, a second turbine, preheating to a heat exchanger, and a waste-heat boiler, in the feed water of the secondary process is vaporized.
  • combi open gas-turbine
  • an existing open (or closed gas-turbine process) or STIG-process does not provide a solution to this, i.e. in none of these is a circulation substance compressed, from which the water vapor arising in combustion has been removed, thus reducing the energy requirement of the compression.
  • the combustion gases exhaust from the turbine to the surrounding atmospheric pressure.
  • the second turbine follows the second combustion chamber, so particularly the water vapor expands in the turbine to the end of its expansion at as high a temperature as possible.
  • the 0.5 bar referred to in the claims is not an optimum point and expansion taking place to about 0.2 bar, shown in Table 1, will lead to a greater efficiency.
  • the water vapor arising in combustion in an open (or closed) gas-turbine process or STIG process condenses into liquid at atmospheric pressure.
  • the water vapor arising in combustion condenses into liquid at a pressure lower than atmospheric pressure, so that the energy loss is smaller.
  • FIG. 1 shows the basic process of the invention.
  • the bleed of the higher pressure steam process will hereinafter be referred to as the primary bleed and the lower pressure bleed as the secondary bleed.
  • the secondary bleed is not essential in the process.
  • FIG. 2 shows a construction of the invention, in which the air coming from the supercharger is also preheated before the combustion chamber. Otherwise the process corresponds to FIG. 1 except in terms of the cooling of the second turbine ( 5 ).
  • Table 1 corresponds to state points of FIG. 2 . In the figures, the state points are numbered by adding the letter c after the number and the components mainly by only numbers.
  • FIG. 3 shows a process, in which the primary bleed is preheated in the waste-heat boiler ( 12 b ). I.e., the preheating heat exchanger ( 7 ) is part of the waste-heat boiler ( 12 b ). Otherwise the process corresponds to FIG. 1 .
  • FIG. 4 shows a process, in which the second turbine is two-part. Otherwise the process corresponds to FIG. 3 .
  • Table 2 corresponds to the state points of FIG. 4 .
  • FIG. 5 shows the second turbine, formed of two parallel turbines, of the gas-turbine process. Such is used in the low-pressure turbines of the steam process, in which the volume flows are large. Probably these would not yet be needed in, for example, a 200-MW plant according to the invention.
  • FIG. 6 shows a district-heating process according to the invention.
  • the condenser is replaced by heat exchanger connected to the district-heating network.
  • FIG. 7 shows a process, which corresponds to the existing so-called dual-pressure-level process.
  • FIG. 8 shows a process, in which additional air is brought from a supercharger to the second combustion chamber.
  • FIG. 9 corresponds to a process where the primary bleed of the secondary process can be 100% of the mass flow, so that a steam turbine and low-pressure steam turbine will not be needed.
  • FIG. 10 corresponds to a process, in which the primary bleed of the secondary process is 0% of the mass flow of the secondary process.
  • FIG. 11 corresponds to the process according to FIG. 6 , but with the district-heating water circulating in the opposite direction, and the process does not have secondary-process bleed.
  • FIG. 1 shows an open gas-turbine (combi) process, in which a supercharger ( 1 ) compresses air, which is burned with fuel in a first combustion chamber ( 2 ), which is followed by a first turbine ( 3 ), a second combustion chamber ( 4 ), a second turbine ( 5 ), and a preheating heat exchanger ( 7 ), in which primary bleed steam coming from the secondary process is preheated.
  • the combustion gases go from the preheating heat exchanger ( 7 ) to a waste-heat boiler ( 12 a, b ), in which the feed water of the secondary process is vaporized.
  • a waste-heat boiler 12 a, b
  • the water-heat boiler is shown in two parts ( 12 a, b ), though in reality it consists of a single heat exchanger.
  • Preheating of the maximum-pressure water takes place mainly in waste-heat boiler ( 12 a ) and vaporization and superheating mainly in waste-heat boiler ( 12 b ).
  • the combustion gases expand in the second turbine ( 5 ) to a pressure lower than that of the surrounding atmospheric pressure, when the combustion gases remaining after the precooler ( 13 ) and condensation and exhaust are compressed by a combustion-gas supercharger ( 6 ) to the surrounding atmospheric pressure.
  • the water vapor condenses in the condenser ( 10 ) into water, which is compressed by a pump ( 11 ) to a maximum pressure and is preheated and vaporized in the waste-heat boiler ( 12 a, b ).
  • the waste-heat boiler ( 12 a, b ) After the waste-heat boiler ( 12 a, b ), the water vapor goes to a combined high/medium-pressure turbine ( 14 a, b ), from where a primary bleed is taken, which is injected after the preheating heat exchanger ( 7 ) into the gas-turbine process after the supercharger ( 1 ).
  • the water-vapor high-pressure turbine can naturally be formed of a separate high-pressure ( 14 a ) and medium-pressure turbine ( 14 b ), in which case the primary bleed can be taken from between the high-pressure and the medium-pressure turbines.
  • the water vapor is intermediately reheated with the waste heat of the combustion-gas supercharger ( 6 ) in a heat exchanger ( 15 ).
  • the fuel is natural gas, which is preheated in the first fuel-preheating heat exchanger ( 8 ) and in the second fuel-preheating heat exchanger ( 9 ) by the waste heat from the combustion-gas supercharger ( 6 ) (in the case in the figure).
  • the precooler ( 13 ) there is no nominal pressure loss, because a relatively high pressure loss is used in the waste-heat boiler ( 12 a, b ) and, on the other hand, precooling can be implemented at the end of the waste-heat boiler by feeding water to the waste-heat boiler ( 12 a ). Because plenty of waste heat is obtained from the combustion-gas supercharger ( 6 ), in FIG.
  • some of the preheated water is taken after the waste-heat boiler ( 12 a ) and the decompression valve ( 17 ) to the water-vapor intermediate-reheating heat exchanger ( 15 ), in which the water vapor can be intermediately reheated.
  • cooling is taken to the first turbine ( 3 ) in the same way as the second turbine ( 5 ), i.e. about 10% of the mass flow bypasses the combustion chamber. In order to simplify the matter and the calculations, this is not shown in the figure.
  • the heat exchanger ( 15 ) is not necessarily required. Possible intermediate reheating of the water vapor of the secondary process then takes place in the waste-heat boiler ( 12 a ) or ( 12 b ).
  • FIG. 2 differs from FIG. 1 only in that air coming from the supercharger ( 1 ) is also preheated in the preheating heat exchanger ( 7 ). Naturally, also only some of the air coming from the supercharger ( 1 ) can be preheated, or the air coming from the supercharger need not, if wished, be heated, as is the case in the process according to FIG. 1 . There is a difference also in the cooling of the second turbine ( 5 ), which takes place partly by the secondary bleed of the water-vapor process. The values of the state points are shown as a table in Table 1.
  • FIG. 3 shows a process that is otherwise according to FIG. 1 , but in which waste-heat boiler ( 12 b ) acts as the preheating heat exchanger ( 7 ) of the primary bleed.
  • FIG. 4 shows a process, in which the second turbine ( 5 ) is formed of two consecutive turbines.
  • the reason for this is that the mean heat-input is raised by reducing the pressure ratio of the first turbine ( 3 ), when in practice the pressure ratio of the second turbine ( 5 ) becomes so great that it must be two-part. Otherwise, FIG. 4 does not differ from FIG. 1 , except that the waste-heat boiler acts as the preheating heat exchanger of the primary bleed, as in FIG. 3 .
  • the cooling of the second turbine ( 5 ) is according to FIG. 2 .
  • the values of the state points are shown in Table 2. Actually, the values shown in the tables, i.e. the pressure ratio of the second turbine ( 5 ), can be just about achieved with a plant according to FIG. 3 .
  • FIG. 5 can be compared to the low-pressure turbine of a steam power plant, in which two parallel turbines are used due to the large volume flows. It is possible that parallel combustion-gas superchargers ( 6 ) will also be needed.
  • FIG. 6 relates to a district-heating application of the invention.
  • a relatively higher electricity generating efficiency can be achieved as a district-heating plant, compared to an existing condensing power plant.
  • the condenser ( 10 ) is shown as a heat exchanger. Intermediate reheating is not required, so that 1-stage heating takes place in the heat exchanger ( 19 ). If the heat exchangers ( 19 ) and ( 10 ) are located in parallel, a higher final temperature of the district-heating water can be achieved. The heat of the precooler ( 13 ) can also be exploited, allowing utilization of the condensation heat of the water vapor.
  • the low-pressure circulation can first of all be vaporized at least partly also in the heat exchanger ( 15 ), and after that in the waste-heat boiler. This corresponds to the existing so-called dual-pressure-level process.
  • FIG. 8 relates to a construction, in which additional air is fed to the second combustion chamber. This is taken as bleed from the supercharger ( 1 ) and can, if necessary, be preheated according to the figure, or, for example, in the waste-heat boiler ( 12 b ). Naturally, additional air going to the oxygen-manufacturing process can also be taken as bleed from the supercharger ( 1 ).
  • FIG. 9 relates to the text of the final part of the description portion “the primary bleed of the secondary process can be 100% of the mass flow, in which case the steam turbine ( 14 b ) and the low-pressure steam turbine ( 16 ) will not be needed”.
  • the other extreme is a process, in which the primary bleed of the secondary process is 0% of the mass flow going to the secondary process's steam turbine ( 14 a ), i.e. there is no primary bleed in the process.
  • FIG. 10 relates to this case.
  • the primary bleed of the secondary process which is thus 100% of the mass flow coming from the steam turbine ( 14 a ), goes partly directly to the cooling of the first combustion chamber ( 2 ) and partly is preheated in the waste-heat boiler ( 12 b ) and in the heat exchanger ( 30 ) following it before the first combustion chamber ( 2 ).
  • the water vapor coming from the decompression valve ( 17 ) is preheated in the heat exchanger ( 15 ), after which it goes to cooling the second combustion chamber ( 4 ).
  • FIG. 9 corresponds to the process according to FIG. 1 .
  • the entire bleed can also be preheated in the waste-heat boiler ( 12 b ).
  • FIG. 10 corresponds to the opposite extreme to FIG. 9 , as in it the primary bleed of the secondary process is 0% of the mass flow coming from the steam turbine ( 14 a ). After the steam turbine ( 14 b ) in the secondary process the water vapor is reheated in the waste-heat boiler ( 12 a ). Otherwise, the process corresponds to FIG. 1 . Naturally, in the joint production of electricity/heat the most general solution is to omit reheating.
  • FIG. 11 differs from FIG. 6 mainly in the circulation direction of the district-heating water.
  • the condensation heat of the water vapor arising in combustion is then utilized in the heat exchanger ( 13 ), after which the district-heating water further heats in the heat exchanger ( 10 ), which is thus the secondary circulation condenser.
  • the district-heating water goes to the district-heating network, to which the district-heating water heating in the heat exchanger ( 19 ) is also connected.
  • the district-heating water could also go to the heat exchanger ( 19 ), in which case a slightly lower secondary-circulation minimum pressure can be used.
  • the secondary-process primary bleed mass flow is 0%.
  • Claim 5 presents the secondary process, i.e. the water-vapor process.
  • Reheating can take place in the heat exchanger ( 15 ) using the waste heat of the combustion-gas supercharger ( 6 ) or the heat exchanger ( 15 ) can be formed by waste-heat boiler ( 12 a ). If it is wished for reheating to take place at a high temperature, the heat exchanger ( 15 ) can be formed by waste-heat boiler ( 12 b ).
  • Claim 6 depicts a situation, in which the precooling of the combustion gases takes place in the final part of the waste-heat boiler ( 12 a ) by injecting water into the waste-heat boiler ( 12 a ).
  • the temperature deficit of the heat exchange can then be reduced, i.e. the initial temperature of the combustion-gas supercharger ( 6 ) reduced.
  • the particles will dissolve in the water vapor being injected.
  • a precooler ( 13 ) will not necessarily be required then.
  • water injection can also be made to the precooler ( 13 ).
  • precooling can also take place traditionally by heat transfer, by taking the cooling water to the heat exchanger ( 13 ) in such a way that it is not mixed with the combustion-gas flow.
  • the preheating of the fuel—for example, natural gas—described in claim 8 can naturally be implemented in many different ways wherever heat is available, without anything particularly inventive being related to it.
  • Claim 9 relates to a situation, in which, due to the low thermal value of the fuel, additional oxygen or air must be fed to the process.
  • a practical situation could be, for example, a power plant using two different fuels.
  • the fuel to be fed to the second combustion chamber ( 4 ) can be freely selected by the designers. Naturally, a mixture of the two fuels can also be fed to the same combustion chamber. If pure oxygen is fed to the process, the power requirement for its compression will naturally be lower if it is fed to latter, i.e. the second combustion chamber ( 4 ). It is sensible to take additional air that will possibly be fed to this combustion chamber as bleed from the supercharger ( 1 ). If necessary, air to be used in the manufacture of oxygen can also be taken as bleed from the supercharger ( 1 ).
  • Claim 11 depicts a practical situation, in which the waste-heat boiler ( 12 a, b ) consists of a single heat exchanger. For reasons of clarity, the waste-heat boiler is described in a separated form. In waste-heat boiler ( 12 a ), preheating of the water takes place and in waste-heat boiler ( 12 b ) the vaporization and reheating of the water.
  • the intermediate reheating of the water vapor of the secondary process, described in claim 13 can also be implemented in waste-heat boiler ( 12 a ).
  • waste-heat boiler ( 12 a ) This is an important additional invention, because reheating can then be carried out, in a way, with waste heat, because there is, in a way, surplus low-temperature energy. If it is wished that reheating will take place at a higher temperature, it will then take place in waste-heat boiler ( 12 b ).
  • the desired pressure level will naturally determine the turbine after which reheating takes place. Perhaps the most likely practical solution is, however, that reheating takes place using waste heat. In a district-heating plant, reheating may not necessarily be required.
  • reheating pressure will probably often be the pressure of the first combustion chamber ( 2 ), when primary bleed, which is led to the gas-turbine process, will be taken from the secondary circulation after reheating. If desired, the primary bleed can also be preheated.
  • the preheating of the additional air or oxygen described in the claims can also be performed in waste-heat boiler ( 12 b ).
  • the supercharger ( 1 ) will, in practice, be two-part, with possible intermediate cooling, which is described in claim 14 . In that case, three-stage combustion may be considered.
  • the primary bleed of the secondary process can naturally be led to any point after the supercharger ( 1 ), but at the latest to the beginning of the blades of the first turbine ( 3 ), which is described in claim 15 .
  • the combustion chamber ( 4 ) it may be possible to use a higher final temperature in the combustion chamber ( 4 ), because the pressure level is low. In that case, three combustion chambers may be necessary in the process.
  • the low pressure has the advantage of a smaller energy requirement for oxygen compression (gasification) in the gas-turbine process.
  • oxygen compression gasification
  • two or more fuels can be used in a power plant, for example, natural gas in a gaseous or liquid form, or gasified coal or hydrogen.
  • the secondary-process primary bleed can also be 100% of the mass flow, when the steam turbine ( 14 b ) and low-pressure steam turbine ( 16 ) will not be needed.

Abstract

Method and apparatus for achieving high efficiency in an open gas-turbine process, in which a supercharger compresses air, which is burned together with a fuel in a first combustion chamber, which is followed by a first turbine, a second combustion chamber, a second turbine, and a preheating heat exchanger, in which primary bleed water vapor coming from the secondary process, or a mixture of the aforementioned water vapor and air coming from the supercharger are preheated. From the heat exchanger the combustion gases go to a waste-heat boiler, in which the secondary-process feed water is vaporized. The combustion gases are expanded in the second turbine to a pressure 0.5 bar lower than that of the surrounding atmospheric pressure. The remaining combustion gases are compressed by a combustion-gas supercharger to the surrounding atmospheric pressure. After the low-pressure turbine the water vapor is condensed in a condenser into water, which is compressed by a pump to a maximum pressure and is preheated and vaporized in the waste-heat boiler. After the waste-heat boiler the water vapor goes to a combined high/medium-pressure turbine, from which a secondary-process primary bleed is taken, which is injected into the gas-turbine process after the preheating heat exchange after the supercharger and/or at the latest to the start of the blades of the first turbine.

Description

    FIELD OF INVENTION
  • The invention relates to a method and apparatus for achieving a high efficiency in an open gas-turbine (combi) process.
  • BACKGROUND OF INVENTION
  • In existing gas-turbine combi processes, a supercharger compresses air, which is burned with fuel in a combustion chamber, which is followed by a turbine and a waste-heat boiler, in which water of the secondary-process circulation is vaporized. In the secondary-process circulation there is normally a vapor process, which, in the newest large plants, uses reheating of the water vapor. In the secondary process, after a low-pressure turbine, the water vapor condenses in a condenser into water, which is compressed by a pump to a maximum pressure, and preheated and vaporized in the waste-heat boiler. After the waste-heat boiler, the water vapor goes to the steam turbines of the process circulation.
  • Using natural gas as the fuel, electricity is nowadays generally produced in a combined gas-turbine-steam power-plant process. Gasified coal is also beginning to be used as a fuel in these. A problem is the large energy requirement for compression and the wasting of a great deal of energy along with the condensation heat of the water vapor. Similarly, in the low-pressure range the efficiency of the water-vapor process is poor and there is no benefit from the second combustion chamber in the gas-turbine combi process. Similarly, the maximum pressure of the gas turbine limits the pressure ratio. At the present moment, the highest efficiency in the world for a combi power plant is 60.7% in the Irsching power plant completed in 2011. The next goal of the manufacturers of the Irsching plant is to achieve 61.5% in 2015, by increasing the initial values.
  • SUMMARY OF THE INVENTION
  • It is an object of embodiments of the invention to combine the expansion of the medium to a pressure that is lower than atmospheric pressure with the injection of water vapor into the gas-turbine process. In the STIG process, water vapor is fed to the gas-turbine process, so that its implementation in practice is not a problem. There is no existing open gas-turbine-steam-turbine process, in which the combustion gases expand in the primary-process turbine to a pressure lower than the ambient pressure and the combustion gases exhaust from the combustion-gas compressor in the gas-turbine process, to say nothing of injecting water vapor into such a process. By means of a second combustion chamber of the gas-turbine process, the efficiency can be raised, if the air and/or water vapor are preheated using the combustion gases, so that the exhaust temperature of the combustion gases from the turbine can be raised by means of the second combustion chamber. In existing combi processes incorporating two combustion chambers, a higher efficiency is not achieved.
  • The reason for this is not easy to determine, but closer investigation of the matter shows that the energy loss of the waste-heat boiler is great, because the exhaust temperature of the combustion gases after the second combustion chamber is high. This problem, i.e. the large energy loss of the waste-heat boiler of a two-combustion-chamber gas-turbine combi, is solved in the invention and no other invention representing the same type has solved this problem in a gas-turbine-steam-turbine COMBI plant containing two combustion chambers. Because the invention solves the problem relating to the waste-heat boiler of a two-combustion-chamber combi plant, it should be compared to other combined gas-turbine-steam-turbine combi power plants containing two combustion chambers.
  • The feeding of water vapor from a secondary-process bleed to such a process is also an inventive solution. Thus, by means of the invention, an efficiency higher than the highest efficiency of any gas-turbine combi plant in the world is achieved. The present highest efficiency is achieved using a single combustion chamber, so that the use of two combustion chambers is not a solution obvious to one skilled in the art, but depends on the totality. There is no reference to the invention in the literature, to say nothing of it actually existing, because the inventive idea has been presented only in the accompanying patent application. Naturally, nearly all inventions can be created by taking one feature from one solution, another from another, and so on. However, the invention contains sufficiently many simultaneous differences compared to any patent whatever for it to be inventive.
  • When compared to patent US 2001029732 A1 there is a difference in the pressure level of the waste-heat boiler after the second turbine (5). Compared to the invention's at least 0.5 bar less than atmospheric pressure practice, most constructions have a pressure level of less than 0.3-0.2 bar. In the US patent, “waste heat boiler 33 is not supercharged but operates at about atmospheric pressure”. Similarly, in a second U.S. Pat. No. 6,263,661 B1, “subatmospheric pressure (about 0.6 bar)”, in other words a different pressure range is in question. In addition, this US patent in question does not have a steam-turbine process. For its part, in patent JP 2000337108 A, only the carbon dioxide arising in combustion is finally pressurized. In addition, the circulation substance is not air, but instead oxygen is brought to the circulation process, i.e. it is a more complex plant. FIG. 4 in US application publication 20130227958 A1 shows the obvious implementation of the most significant manufacturer in the field, relating to a two-combustion-chamber process.
  • Thus, the invention meets the inventiveness requirements. This position is supported by common knowledge on the internet (Wikipedia's “combined cycle” article) and the endorsement of the invention by the acknowledged research institute MC Innoenergy, which is part of the European Institute of Innovation and Technology (EIT).
  • Furthermore, it is an aspect of certain embodiments of the invention that reheating of the water vapor of the secondary process takes place by means of waste heat—for example, by the waste heat of the combustion-gas supercharger.
  • Nowadays, it is sought to increase the maximum pressure in a gas-turbine process and it would not occur to anyone to reduce the pressure, because the efficiency of the components would possibly drop by 1-2 percentage units and volume flows would increase, when the price of the components would rise. However, in an example calculation, in a 0.2-bar gas-turbine process, i.e. one that has expanded to five times its volume, output of about 3-5-times is obtained with the same mass flow of air, because water vapor is fed to the process in the primary circulation and its expansion does not consume energy. The idea of the invention has also been expansion in the primary circulation to a pressure lower than atmospheric pressure at a high temperature, because the compression of the carbon dioxide arising in combustion after the removal of the water vapor arising in combustion takes a smaller amount of energy than the compression of oxygen would take. In addition, the water vapor condenses at a lower temperature, so that the energy loss is smaller. Further, reference is made to the inventive feature that the water vapor expands in a gas-turbine process at a very high temperature compared to that at which it expands in a low-pressure steam turbine. For these reasons, by means of the invention by far the highest efficiency in the world of a combi power plant is achieved. At a high outdoor temperature the invention is relatively even better compared to the present practice.
  • In existing open gas-turbine processes and the STIG process, the minimum pressure is atmospheric pressure. In the process according to the invention, the combustion gases expand in the gas-turbine process to a pressure lower than atmospheric pressure, so that by means of the injection of water vapor more work is obtained, particularly at a pressure lower than atmospheric pressure, than would be obtained in a steam turbine while the compression of the combustion gases takes less energy than the compression of air would, because only a fraction of the oxygen in the air need be compressed to atmospheric pressure by the combustion-gas supercharger, and the compression of the carbon dioxide arising in combustion takes less energy than the compression of the air used in combustion would take. The invention relates to a method according to Claim 1 for achieving a high efficiency in an open gas-turbine (combi) process, in which a supercharger compresses the air required for combustion, which is burned with a fuel in a first combustion chamber, which is followed by a first turbine, a second combustion chamber, a second turbine, preheating to a heat exchanger, and a waste-heat boiler, in the feed water of the secondary process is vaporized. The method according to the invention is characterized by:
      • expanding the combustion gases in the second turbine after the second combustion chamber to the end of the expansion stage and to the minimum pressure of the expansion of the primary process, i.e. to the pressure after the second turbine and to a pressure in the primary process of at least 0.5-bar lower that the surrounding atmospheric pressure;
      • condensing and removing the vapor arising in combustion, and other water vapor from the negative-pressure combustion gases, at the latest after the precooler following the negative-pressure waste-heat boiler;
      • pressurizing all the rest of the combustion gases, including the nitrogen of the air and the carbon dioxide arising in combustion, by a combustion-gas supercharger, into the surrounding atmosphere and out of the gas-turbine process;
      • condensing into a liquid the water vapor arising in combustion at a pressure lower than atmospheric pressure in the primary process;
      • taking water vapor from a primary bleed from the steam turbine of the secondary process, which is injected after the preheating heat exchanger to the gas-turbine process after the supercharger; and
      • bringing to the secondary process before the pump an amount of additional water at the same pressure, corresponding to the primary bleed of the secondary process.
  • In other words, an existing open (or closed gas-turbine process) or STIG-process does not provide a solution to this, i.e. in none of these is a circulation substance compressed, from which the water vapor arising in combustion has been removed, thus reducing the energy requirement of the compression. In existing gas-turbine processes, the combustion gases exhaust from the turbine to the surrounding atmospheric pressure. In addition, the second turbine follows the second combustion chamber, so particularly the water vapor expands in the turbine to the end of its expansion at as high a temperature as possible.
  • The 0.5 bar referred to in the claims is not an optimum point and expansion taking place to about 0.2 bar, shown in Table 1, will lead to a greater efficiency. Similarly, the water vapor arising in combustion in an open (or closed) gas-turbine process or STIG process condenses into liquid at atmospheric pressure. In the process according to the invention, the water vapor arising in combustion condenses into liquid at a pressure lower than atmospheric pressure, so that the energy loss is smaller.
  • Various embodiments of the invention are characterized by what is stated in the accompanying claims. In the following, the invention is described with more detailed examples, with reference to the accompanying drawings, in which
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1 shows the basic process of the invention. The bleed of the higher pressure steam process will hereinafter be referred to as the primary bleed and the lower pressure bleed as the secondary bleed. The secondary bleed is not essential in the process.
  • FIG. 2 shows a construction of the invention, in which the air coming from the supercharger is also preheated before the combustion chamber. Otherwise the process corresponds to FIG. 1 except in terms of the cooling of the second turbine (5). Table 1 corresponds to state points of FIG. 2. In the figures, the state points are numbered by adding the letter c after the number and the components mainly by only numbers.
  • FIG. 3 shows a process, in which the primary bleed is preheated in the waste-heat boiler (12 b). I.e., the preheating heat exchanger (7) is part of the waste-heat boiler (12 b). Otherwise the process corresponds to FIG. 1.
  • FIG. 4 shows a process, in which the second turbine is two-part. Otherwise the process corresponds to FIG. 3. Table 2 corresponds to the state points of FIG. 4.
  • FIG. 5 shows the second turbine, formed of two parallel turbines, of the gas-turbine process. Such is used in the low-pressure turbines of the steam process, in which the volume flows are large. Probably these would not yet be needed in, for example, a 200-MW plant according to the invention.
  • FIG. 6 shows a district-heating process according to the invention. In it, the condenser is replaced by heat exchanger connected to the district-heating network.
  • FIG. 7 shows a process, which corresponds to the existing so-called dual-pressure-level process.
  • FIG. 8 shows a process, in which additional air is brought from a supercharger to the second combustion chamber.
  • FIG. 9 corresponds to a process where the primary bleed of the secondary process can be 100% of the mass flow, so that a steam turbine and low-pressure steam turbine will not be needed.
  • FIG. 10 corresponds to a process, in which the primary bleed of the secondary process is 0% of the mass flow of the secondary process.
  • FIG. 11 corresponds to the process according to FIG. 6, but with the district-heating water circulating in the opposite direction, and the process does not have secondary-process bleed.
  • DETAILED DESCRIPTION OF EXEMPLARY EMBODIMENTS
  • FIG. 1 shows an open gas-turbine (combi) process, in which a supercharger (1) compresses air, which is burned with fuel in a first combustion chamber (2), which is followed by a first turbine (3), a second combustion chamber (4), a second turbine (5), and a preheating heat exchanger (7), in which primary bleed steam coming from the secondary process is preheated.
  • The combustion gases go from the preheating heat exchanger (7) to a waste-heat boiler (12 a, b), in which the feed water of the secondary process is vaporized. For reasons of clarity, the water-heat boiler is shown in two parts (12 a, b), though in reality it consists of a single heat exchanger. Preheating of the maximum-pressure water takes place mainly in waste-heat boiler (12 a) and vaporization and superheating mainly in waste-heat boiler (12 b). The combustion gases expand in the second turbine (5) to a pressure lower than that of the surrounding atmospheric pressure, when the combustion gases remaining after the precooler (13) and condensation and exhaust are compressed by a combustion-gas supercharger (6) to the surrounding atmospheric pressure.
  • In the secondary process, after the low-pressure turbine, the water vapor condenses in the condenser (10) into water, which is compressed by a pump (11) to a maximum pressure and is preheated and vaporized in the waste-heat boiler (12 a, b). After the waste-heat boiler (12 a, b), the water vapor goes to a combined high/medium-pressure turbine (14 a, b), from where a primary bleed is taken, which is injected after the preheating heat exchanger (7) into the gas-turbine process after the supercharger (1). The water-vapor high-pressure turbine can naturally be formed of a separate high-pressure (14 a) and medium-pressure turbine (14 b), in which case the primary bleed can be taken from between the high-pressure and the medium-pressure turbines. Before the low-pressure turbine (16), the water vapor is intermediately reheated with the waste heat of the combustion-gas supercharger (6) in a heat exchanger (15).
  • The fuel is natural gas, which is preheated in the first fuel-preheating heat exchanger (8) and in the second fuel-preheating heat exchanger (9) by the waste heat from the combustion-gas supercharger (6) (in the case in the figure). In the precooler (13) there is no nominal pressure loss, because a relatively high pressure loss is used in the waste-heat boiler (12 a, b) and, on the other hand, precooling can be implemented at the end of the waste-heat boiler by feeding water to the waste-heat boiler (12 a). Because plenty of waste heat is obtained from the combustion-gas supercharger (6), in FIG. 1 some of the preheated water is taken after the waste-heat boiler (12 a) and the decompression valve (17) to the water-vapor intermediate-reheating heat exchanger (15), in which the water vapor can be intermediately reheated. In practice, cooling is taken to the first turbine (3) in the same way as the second turbine (5), i.e. about 10% of the mass flow bypasses the combustion chamber. In order to simplify the matter and the calculations, this is not shown in the figure. Similarly, the heat exchanger (15) is not necessarily required. Possible intermediate reheating of the water vapor of the secondary process then takes place in the waste-heat boiler (12 a) or (12 b).
  • FIG. 2 differs from FIG. 1 only in that air coming from the supercharger (1) is also preheated in the preheating heat exchanger (7). Naturally, also only some of the air coming from the supercharger (1) can be preheated, or the air coming from the supercharger need not, if wished, be heated, as is the case in the process according to FIG. 1. There is a difference also in the cooling of the second turbine (5), which takes place partly by the secondary bleed of the water-vapor process. The values of the state points are shown as a table in Table 1.
  • FIG. 3 shows a process that is otherwise according to FIG. 1, but in which waste-heat boiler (12 b) acts as the preheating heat exchanger (7) of the primary bleed.
  • FIG. 4 shows a process, in which the second turbine (5) is formed of two consecutive turbines. The reason for this is that the mean heat-input is raised by reducing the pressure ratio of the first turbine (3), when in practice the pressure ratio of the second turbine (5) becomes so great that it must be two-part. Otherwise, FIG. 4 does not differ from FIG. 1, except that the waste-heat boiler acts as the preheating heat exchanger of the primary bleed, as in FIG. 3. Similarly, the cooling of the second turbine (5) is according to FIG. 2. The values of the state points are shown in Table 2. Actually, the values shown in the tables, i.e. the pressure ratio of the second turbine (5), can be just about achieved with a plant according to FIG. 3.
  • FIG. 5 can be compared to the low-pressure turbine of a steam power plant, in which two parallel turbines are used due to the large volume flows. It is possible that parallel combustion-gas superchargers (6) will also be needed.
  • FIG. 6 relates to a district-heating application of the invention. By means of the invention, a relatively higher electricity generating efficiency can be achieved as a district-heating plant, compared to an existing condensing power plant. The condenser (10) is shown as a heat exchanger. Intermediate reheating is not required, so that 1-stage heating takes place in the heat exchanger (19). If the heat exchangers (19) and (10) are located in parallel, a higher final temperature of the district-heating water can be achieved. The heat of the precooler (13) can also be exploited, allowing utilization of the condensation heat of the water vapor.
  • In FIG. 7, the low-pressure circulation can first of all be vaporized at least partly also in the heat exchanger (15), and after that in the waste-heat boiler. This corresponds to the existing so-called dual-pressure-level process.
  • FIG. 8 relates to a construction, in which additional air is fed to the second combustion chamber. This is taken as bleed from the supercharger (1) and can, if necessary, be preheated according to the figure, or, for example, in the waste-heat boiler (12 b). Naturally, additional air going to the oxygen-manufacturing process can also be taken as bleed from the supercharger (1).
  • FIG. 9 relates to the text of the final part of the description portion “the primary bleed of the secondary process can be 100% of the mass flow, in which case the steam turbine (14 b) and the low-pressure steam turbine (16) will not be needed”. Naturally, the other extreme is a process, in which the primary bleed of the secondary process is 0% of the mass flow going to the secondary process's steam turbine (14 a), i.e. there is no primary bleed in the process. FIG. 10 relates to this case.
  • In FIG. 9, the primary bleed of the secondary process, which is thus 100% of the mass flow coming from the steam turbine (14 a), goes partly directly to the cooling of the first combustion chamber (2) and partly is preheated in the waste-heat boiler (12 b) and in the heat exchanger (30) following it before the first combustion chamber (2). The water vapor coming from the decompression valve (17) is preheated in the heat exchanger (15), after which it goes to cooling the second combustion chamber (4). Additional air is taken to the second combustion chamber (4) from the supercharger (1) bleed, which is preheated in the heat exchanger (20) by the mass flow coming from the first turbine (3) and going to the heat exchanger (30). After this, the supercharger (1) bleed goes to the second combustion chamber (4) and the mass flow coming from the heat exchanger (30), used for cooling second turbine (5), is partly also used for cooling the second combustion chamber (4). Otherwise, FIG. 9 corresponds to the process according to FIG. 1. Naturally, the entire bleed can also be preheated in the waste-heat boiler (12 b).
  • FIG. 10 corresponds to the opposite extreme to FIG. 9, as in it the primary bleed of the secondary process is 0% of the mass flow coming from the steam turbine (14 a). After the steam turbine (14 b) in the secondary process the water vapor is reheated in the waste-heat boiler (12 a). Otherwise, the process corresponds to FIG. 1. Naturally, in the joint production of electricity/heat the most general solution is to omit reheating.
  • FIG. 11 differs from FIG. 6 mainly in the circulation direction of the district-heating water. In the process according to FIG. 11, the condensation heat of the water vapor arising in combustion is then utilized in the heat exchanger (13), after which the district-heating water further heats in the heat exchanger (10), which is thus the secondary circulation condenser. From the heat exchanger (10), the district-heating water goes to the district-heating network, to which the district-heating water heating in the heat exchanger (19) is also connected. Naturally, after the heat exchanger (10) the district-heating water could also go to the heat exchanger (19), in which case a slightly lower secondary-circulation minimum pressure can be used. This also differs from FIG. 6 in that the secondary-process primary bleed mass flow is 0%.
  • Claim 5 presents the secondary process, i.e. the water-vapor process. Reheating can take place in the heat exchanger (15) using the waste heat of the combustion-gas supercharger (6) or the heat exchanger (15) can be formed by waste-heat boiler (12 a). If it is wished for reheating to take place at a high temperature, the heat exchanger (15) can be formed by waste-heat boiler (12 b).
  • Claim 6 depicts a situation, in which the precooling of the combustion gases takes place in the final part of the waste-heat boiler (12 a) by injecting water into the waste-heat boiler (12 a). The temperature deficit of the heat exchange can then be reduced, i.e. the initial temperature of the combustion-gas supercharger (6) reduced. At the same time, the particles will dissolve in the water vapor being injected. A precooler (13) will not necessarily be required then. Of course, water injection can also be made to the precooler (13). Similarly, precooling can also take place traditionally by heat transfer, by taking the cooling water to the heat exchanger (13) in such a way that it is not mixed with the combustion-gas flow.
  • The preheating of the fuel—for example, natural gas—described in claim 8, can naturally be implemented in many different ways wherever heat is available, without anything particularly inventive being related to it.
  • Claim 9 relates to a situation, in which, due to the low thermal value of the fuel, additional oxygen or air must be fed to the process. A practical situation could be, for example, a power plant using two different fuels. The fuel to be fed to the second combustion chamber (4) can be freely selected by the designers. Naturally, a mixture of the two fuels can also be fed to the same combustion chamber. If pure oxygen is fed to the process, the power requirement for its compression will naturally be lower if it is fed to latter, i.e. the second combustion chamber (4). It is sensible to take additional air that will possibly be fed to this combustion chamber as bleed from the supercharger (1). If necessary, air to be used in the manufacture of oxygen can also be taken as bleed from the supercharger (1).
  • Claim 11 depicts a practical situation, in which the waste-heat boiler (12 a, b) consists of a single heat exchanger. For reasons of clarity, the waste-heat boiler is described in a separated form. In waste-heat boiler (12 a), preheating of the water takes place and in waste-heat boiler (12 b) the vaporization and reheating of the water.
  • The intermediate reheating of the water vapor of the secondary process, described in claim 13, can also be implemented in waste-heat boiler (12 a). This is an important additional invention, because reheating can then be carried out, in a way, with waste heat, because there is, in a way, surplus low-temperature energy. If it is wished that reheating will take place at a higher temperature, it will then take place in waste-heat boiler (12 b). The desired pressure level will naturally determine the turbine after which reheating takes place. Perhaps the most likely practical solution is, however, that reheating takes place using waste heat. In a district-heating plant, reheating may not necessarily be required. If reheating takes place in waste-heat boiler (12 b), then in practice the reheating pressure will probably often be the pressure of the first combustion chamber (2), when primary bleed, which is led to the gas-turbine process, will be taken from the secondary circulation after reheating. If desired, the primary bleed can also be preheated.
  • The preheating of the additional air or oxygen described in the claims can also be performed in waste-heat boiler (12 b).
  • All the example calculations are shown only to demonstrate the invention and naturally the values can be altered as desired.
  • Nowadays, it is sought to increase the maximum pressure, so that the supercharger (1) will, in practice, be two-part, with possible intermediate cooling, which is described in claim 14. In that case, three-stage combustion may be considered.
  • The primary bleed of the secondary process can naturally be led to any point after the supercharger (1), but at the latest to the beginning of the blades of the first turbine (3), which is described in claim 15.
  • Although in the Claims there is preheating of the primary bleed in the secondary process, there will, of course, not necessarily be any need to preheat, if this is desired. However, by preheating a higher efficiency will be achieved.
  • By means of the invention many advantages will be achieved compared to existing plants. Naturally a very high efficiency is the most significant of these. In a district-heating plant, the efficiency will be relatively even higher compared to existing plants. At the same time, particle emissions and emissions of nitrogen oxides and carbon dioxide are significantly lower than in existing plants. Present technology can be applied to separate them. Similarly, the expensive steam-process low-pressure turbine has a mass flow that is about one-half of existing ones. The reduction in efficiency when the outdoor temperature rises is also clearly less than in existing processes, because the relative energy requirement for compression is smaller in the process and cold seawater, for example from a depth of 50-100 meters, can be used in the precooling heat exchanger (13). Similarly, it may be possible to use a higher final temperature in the combustion chamber (4), because the pressure level is low. In that case, three combustion chambers may be necessary in the process. The low pressure has the advantage of a smaller energy requirement for oxygen compression (gasification) in the gas-turbine process. There is also a smaller heat surface in the waste-heat boiler, because the heat-transfer coefficient is great due to the large water-vapor content of the combustion gases and, on the other hand, the relative share of the steam process in electricity production is smaller. Regulation at part load is also easy, for example by altering the water-vapor feed-mass flow and the mass flow of air, as well as in many ways by applying existing technology. Existing technology can also be applied in terms of starting and running down, as well as in the shafting of superchargers and turbines. The rate of wear of turbine blades is also slower, because the relative share of particles is smaller due to the low pressure in the second turbine (5). Naturally, there can also be additional combustion in the waste-heat boiler. Similarly, the carbon dioxide arising in combustion can be separated from the process by applying existing technology. Similarly, the power requirement of the superchargers can be reduced by water injection and then by exploiting the condensation heat of the water vapor after the combustion-gas supercharger (6), for example in a district-heating process. The expansion energy of natural gas can also be exploited if necessary. Similarly, two or more fuels can be used in a power plant, for example, natural gas in a gaseous or liquid form, or gasified coal or hydrogen. Naturally, the secondary-process primary bleed can also be 100% of the mass flow, when the steam turbine (14 b) and low-pressure steam turbine (16) will not be needed.
  • The examples of embodiments of the invention are described only to illustrate the invention and do not form any restriction to the scope of protection of the invention, because the details, such as water treatment and the generator(s), which are not necessary in order to understand the invention, have been omitted for reasons of clarity. The invention is easy to modify in various ways without particular inventiveness. Thus, the invention is not limited to the structural forms described, but includes everything that can be included in the scope of the following claims.

Claims (23)

1. Method for achieving a high efficiency in an open gas-turbine (combi) process, in which a supercharger compresses the air required for combustion, which is burned with a fuel in a first combustion chamber, which is followed by a first turbine, a second combustion chamber, a second turbine, a preheating heat exchanger, and a waste-heat boiler, in which secondary-process feed water is vaporized, comprising the steps of:
expanding the combustion gases after the second combustion chamber in the second turbine to the end of the expansion stage, to the minimum pressure of the expansion of the primary process, and to a pressure in the primary process of at least 0.5 bar less than the surrounding atmospheric pressure;
condensing and removing water vapor arising in combustion and other water vapor from the negative-pressure combustion gases at the latest after the precooler following the waste-heat boiler;
pressurizing the whole final part of the combustion gases containing the nitrogen of the air and carbon dioxide arising in combustion by the combustion-gas supercharger into the surrounding atmosphere and out of the gas-turbine process;
condensing the water vapor arising in combustion in the primary process, into a liquid at a pressure lower than atmospheric pressure;
taking primary bleed water vapor from the secondary-process turbine and feeding it after the preheating heat exchanger into the gas-turbine process circulation after the supercharger; and
bringing an amount of additional water at the same pressure level, corresponding to the secondary-process primary bleed, to the secondary process before the pump.
2. Method according to claim 1, wherein the primary bleed water vapor coming from the secondary process is heated in the preheating heat exchanger.
3. Method according to claim 1, wherein the preheating heat exchanger is formed by the waste-heat boiler.
4. Method according to claim 1, wherein the second turbine is formed by two consecutive turbines.
5. Method according to claim 1, wherein in the secondary process, the water vapor is condensed into liquid in a condenser and is compressed by a pump to a maximum pressure and goes after that to the waste-heat boiler and expands in a high/medium-pressure steam turbine and is intermediately reheated in a heat exchanger and expands in a low-pressure steam turbine before the condenser.
6. Method according to claim 1, wherein the precooling of the combustion gases going to the combustion-gas supercharger takes place by water injected into the waste-heat boiler or precooler.
7. Method according to claim 1, wherein the gas-turbine process combustion-gas supercharger is formed of parallel superchargers and/or turbines.
8. Method according to claim 1, wherein natural gas or gasified coal is preheated in a first and second fuel preheating heat exchanger.
9. Method according to claim 1, wherein additional oxygen or air is fed to the desired point in the gas-turbine process from a supercharger bleed or an oxygen-manufacturing process.
10. Method according to claim 1, wherein the method is used in a district-heating/back-pressure plant in such a way that the district-heating water is heated as desired by combustion gases coming from the waste-heat boiler, together with condensing heat and/or waste heat leaving the heat exchanger.
11. Method according to claim 1, wherein the heat exchangers are connected to each other to form the waste-heat boiler.
12. Method according to claim 1, wherein the secondary process is a so-called dual-pressure process, in which water at a lower pressure is preheated and at least partly vaporized in the waste-heat boiler, after which it is combined with the steam circulation coming from the turbine before or after the heat exchanger.
13. Method according to claim 1, wherein reheating of the water vapor of the secondary process takes place in either of the waste-heat boilers, or by the waste heat of the combustion-gas supercharger in the heat exchanger at the desired pressure.
14. Method according to claim 1, wherein the supercharger is formed of two superchargers with possible intermediate cooling.
15. Method according to claim 1, wherein the bleed coming from the secondary process is fed to the combustion chamber.
16. Method according to claim 1, wherein the water vapor arising in combustion is removed from the process before or after the precooler.
17. Method according to claim 1, wherein the additional air or additional oxygen to be fed to the second combustion chamber is taken from a supercharger bleed or an oxygen-manufacturing process.
18. Method according to claim 1, wherein the preheating of the secondary process primary or secondary bleed takes place in the waste-heat boiler.
19. Method according to claim 1, wherein the cooling of the second turbine takes place by bleed taken from the supercharger so that the temperature of the mass flow used for cooling the second turbine can be altered.
20. Method according to claim 1, wherein, after the waste-heat boiler in the secondary circulation, part of the mass flow in the water-vapor circulation is separated and combined after a decompression valve with water vapor coming from the turbine.
21. Method according to claim 1, wherein the primary bleed of the secondary circulation is 0-100% of the mass flow going to the steam turbine.
22. Method according to claim 1, wherein the district-heating water is first heated in the heat exchanger, including the utilization of the condensation heat of the water vapor arising in combustion, after which it goes to the heat exchanger, which is the secondary-circulation condenser.
23. Method according to claim 1, wherein unburned oxygen also goes to the primary-process combustion-gas supercharger.
US14/194,846 2013-03-05 2014-03-03 Method and apparatus for achieving a high efficiency in an open gas-turbine (combi) process Abandoned US20140250905A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FI20130076 2013-03-05
FI20130076A FI127597B (en) 2013-03-05 2013-03-05 Method and apparatus for achieving a high efficiency in an open gas-turbine (combi) process

Publications (1)

Publication Number Publication Date
US20140250905A1 true US20140250905A1 (en) 2014-09-11

Family

ID=50490711

Family Applications (2)

Application Number Title Priority Date Filing Date
US14/194,846 Abandoned US20140250905A1 (en) 2013-03-05 2014-03-03 Method and apparatus for achieving a high efficiency in an open gas-turbine (combi) process
US14/197,252 Expired - Fee Related US9617875B2 (en) 2013-03-05 2014-03-05 Method and apparatus for achieving a high efficiency in an open gas-turbine (COMBI) process

Family Applications After (1)

Application Number Title Priority Date Filing Date
US14/197,252 Expired - Fee Related US9617875B2 (en) 2013-03-05 2014-03-05 Method and apparatus for achieving a high efficiency in an open gas-turbine (COMBI) process

Country Status (4)

Country Link
US (2) US20140250905A1 (en)
DE (1) DE102014003283A1 (en)
FI (1) FI127597B (en)
GB (2) GB201403729D0 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140250906A1 (en) * 2013-03-05 2014-09-11 Ari Löytty Method and apparatus for achieving a high efficiency in an open gas-turbine (combi) process
US9753435B2 (en) 2015-02-27 2017-09-05 Don Brewer Visual metronome application
CN109592028A (en) * 2017-10-02 2019-04-09 贝尔直升机德事隆公司 Hybrid power system for aircraft

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2546723B (en) * 2015-12-11 2021-06-02 Hieta Tech Limited Inverted brayton cycle heat engine
FI128283B (en) * 2017-05-17 2020-02-28 Systematic Power Method and equipment for utilizing waste heat from combustion gases of an internal combustion engine
IT201700108995A1 (en) * 2017-09-28 2019-03-28 Exergy Spa Plant and process for energy production
FR3087486B1 (en) * 2018-10-18 2022-08-12 Psa Automobiles Sa ASSEMBLY COMBINING A GAS TURBINE AND A HEAT TRANSFER FLUID CYCLE
FI20210068A1 (en) 2021-11-10 2023-05-11 Loeytty Ari Veli Olavi Method and apparatus for improving energy efficiency in current gas turbine combi plants

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000337108A (en) * 1999-05-27 2000-12-05 Mitsubishi Heavy Ind Ltd Carbon dioxide recovery type combined generating system
US6263661B1 (en) * 1997-02-17 2001-07-24 N.V. Kema System for power generation
US20010029732A1 (en) * 2000-01-13 2001-10-18 Rolf Bachmann Process for the recovery of water from the flue gas of a combined cycle power station, and combined cycle power station for performing the process
US20130227958A1 (en) * 2010-10-19 2013-09-05 Alstom Technology Ltd Method for operating a combined-cycle power plant with cogeneration, and a combined-cycle power plant for carrying out the method
EP2957731A1 (en) * 2014-06-18 2015-12-23 Alstom Technology Ltd Method for increasing the power of a combined-cycle power plant, and combined-cycle power plant for conducting said method

Family Cites Families (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3879616A (en) * 1973-09-17 1975-04-22 Gen Electric Combined steam turbine and gas turbine power plant control system
US4347711A (en) * 1980-07-25 1982-09-07 The Garrett Corporation Heat-actuated space conditioning unit with bottoming cycle
US4576124A (en) * 1984-10-25 1986-03-18 Westinghouse Electric Corp. Apparatus and method for fluidly connecting a boiler into pressurized steam feed line and combined-cycle steam generator power plant embodying the same
US5255507A (en) * 1992-05-04 1993-10-26 Ahlstrom Pyropower Corporation Combined cycle power plant incorporating atmospheric circulating fluidized bed boiler and gasifier
DE4333439C1 (en) * 1993-09-30 1995-02-02 Siemens Ag Device for cooling the refrigerant of a cooled gas turbine of a gas and steam turbine system
US5491971A (en) * 1993-12-23 1996-02-20 General Electric Co. Closed circuit air cooled gas turbine combined cycle
JP3681434B2 (en) * 1995-04-25 2005-08-10 重昭 木村 Cogeneration system and combined cycle power generation system
US5953900A (en) * 1996-09-19 1999-09-21 Siemens Westinghouse Power Corporation Closed loop steam cooled steam turbine
CA2289546A1 (en) * 1997-05-16 1998-11-26 Siemens Aktiengesellschaft Gas-and steam-turbine plant and method of cooling the coolant of the gas turbine of such a plan
EP0908602B1 (en) * 1997-10-06 2003-03-12 ALSTOM (Switzerland) Ltd Method of operating a combined power plant
DE19745272C2 (en) * 1997-10-15 1999-08-12 Siemens Ag Gas and steam turbine plant and method for operating such a plant
JP4126108B2 (en) * 1998-02-25 2008-07-30 三菱重工業株式会社 Gas turbine combined plant, operation method thereof, and gas turbine high temperature section steam cooling system
JP2000213372A (en) * 1999-01-21 2000-08-02 Ishikawajima Harima Heavy Ind Co Ltd Steam injection gas turbine
RU2170357C1 (en) * 2000-05-24 2001-07-10 Бекнев Виктор Сергеевич Method of enhancing economical efficiency of thermal and refrigerating combined plants
JP2001336428A (en) * 2000-05-26 2001-12-07 Ishikawajima Harima Heavy Ind Co Ltd Gas turbine power generation apparatus
US6442924B1 (en) * 2000-06-13 2002-09-03 General Electric Company Optimized steam turbine peaking cycles utilizing steam bypass and related process
US6651421B2 (en) * 2000-10-02 2003-11-25 Richard R. Coleman Coleman regenerative engine with exhaust gas water extraction
US20020073712A1 (en) * 2000-10-19 2002-06-20 Kopko William L. Subatmospheric gas-turbine engine
JP2003193865A (en) * 2001-12-27 2003-07-09 Kansai Tlo Kk Gas turbine power generation system, gas turbine power system, and starting method therefor
IL166089A0 (en) * 2002-07-20 2006-01-15 Idalex Technologies Inc Evaporative duplex counterheat exchanger
WO2006046976A2 (en) * 2004-06-14 2006-05-04 University Of Florida Research Foundation, Inc. Turbine system with exhaust gas recirculation and absorption refrigeration system
WO2011152049A1 (en) * 2010-06-03 2011-12-08 パナソニック株式会社 Gas turbine system
US8505309B2 (en) * 2011-06-14 2013-08-13 General Electric Company Systems and methods for improving the efficiency of a combined cycle power plant
FI127597B (en) * 2013-03-05 2018-09-28 Loeytty Ari Veli Olavi Method and apparatus for achieving a high efficiency in an open gas-turbine (combi) process
EP3030770A1 (en) * 2013-08-07 2016-06-15 Isentropic Limited Hybrid power generation system
US20150192037A1 (en) * 2014-01-06 2015-07-09 James H. Sharp Combined cycle plant fuel preheating arrangement
US9416685B2 (en) * 2014-01-06 2016-08-16 Siemens Energy, Inc. Auxillary steam generation arrangement for a combined cycle power plant

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6263661B1 (en) * 1997-02-17 2001-07-24 N.V. Kema System for power generation
JP2000337108A (en) * 1999-05-27 2000-12-05 Mitsubishi Heavy Ind Ltd Carbon dioxide recovery type combined generating system
US20010029732A1 (en) * 2000-01-13 2001-10-18 Rolf Bachmann Process for the recovery of water from the flue gas of a combined cycle power station, and combined cycle power station for performing the process
US20130227958A1 (en) * 2010-10-19 2013-09-05 Alstom Technology Ltd Method for operating a combined-cycle power plant with cogeneration, and a combined-cycle power plant for carrying out the method
EP2957731A1 (en) * 2014-06-18 2015-12-23 Alstom Technology Ltd Method for increasing the power of a combined-cycle power plant, and combined-cycle power plant for conducting said method
EP2957733A1 (en) * 2014-06-18 2015-12-23 Alstom Technology Ltd Method for increasing the power of a combined-cycle power plant, and combined-cycle power plant for conducting said method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140250906A1 (en) * 2013-03-05 2014-09-11 Ari Löytty Method and apparatus for achieving a high efficiency in an open gas-turbine (combi) process
US9617875B2 (en) * 2013-03-05 2017-04-11 Ari Löytty Method and apparatus for achieving a high efficiency in an open gas-turbine (COMBI) process
US9753435B2 (en) 2015-02-27 2017-09-05 Don Brewer Visual metronome application
CN109592028A (en) * 2017-10-02 2019-04-09 贝尔直升机德事隆公司 Hybrid power system for aircraft

Also Published As

Publication number Publication date
GB201403920D0 (en) 2014-04-16
GB2515600C (en) 2015-07-29
GB201403729D0 (en) 2014-04-16
GB2515600B (en) 2015-07-08
US9617875B2 (en) 2017-04-11
GB2515600A (en) 2014-12-31
DE102014003283A1 (en) 2014-09-11
FI127597B (en) 2018-09-28
US20140250906A1 (en) 2014-09-11
FI20130076A (en) 2014-09-06

Similar Documents

Publication Publication Date Title
US9617875B2 (en) Method and apparatus for achieving a high efficiency in an open gas-turbine (COMBI) process
US6684643B2 (en) Process for the operation of a gas turbine plant
CN108368750B (en) Using an Embedded CO2System and method for cyclic power generation
JP5759543B2 (en) Stoichiometric combustion with exhaust gas recirculation and direct contact coolers
US7458217B2 (en) System and method for utilization of waste heat from internal combustion engines
US9657604B2 (en) Cogeneration plant with a division module recirculating with a first combustion gas flow and separating carbon dioxide with a second combustion gas flow
US8464532B2 (en) Power systems and methods for high or medium initial temperature heat sources in medium and small scale power plants
CN105820842B (en) A kind of coal gasification supercritical CO2Cycle generating system
US5664411A (en) S cycle electric power system
EA023673B1 (en) Low emission power generation and hydrocarbon recovery system and method
CN108625990B (en) Natural gas oxygen-enriched combustion and transcritical CO2Cyclic coupled power generation system
EP2218889A2 (en) Gas turbine plant with preheated combustion air and corresponding operating method
US7980079B2 (en) Power systems and methods for high or medium initial temperature heat sources in medium and small scale power plants
JP2021179306A (en) Turbine system and method
US20160033128A1 (en) Power generation system and method to operate
Gou et al. A novel hybrid oxy-fuel power cycle utilizing solar thermal energy
US20230145545A1 (en) Method and apparatus for improving energy efficiency in existing gas turbine combined cycle plants
JP2001515556A (en) Hydrogen fuel power plant using heat transfer heat exchanger
JPS61201831A (en) Power generation method
CN101787930A (en) Thermal circulation process of gas turbine based on pure oxygen or oxygen-enriched combustion
Gou et al. An advanced zero emission power cycle with integrated low temperature thermal energy
Lee et al. Pressure energy recovery of LNG integrated with multi-stage feedwater fuel preheaters in a combined cycle power plant
JP2016519239A (en) Power generation system and operation method
Kotowicz et al. Thermodynamic analysis of the advanced zero emission power plant
Allam et al. Systems and methods for power production using nested CO2 cycles

Legal Events

Date Code Title Description
STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION