US20140224508A1 - Integral centraliser - Google Patents

Integral centraliser Download PDF

Info

Publication number
US20140224508A1
US20140224508A1 US14/099,569 US201314099569A US2014224508A1 US 20140224508 A1 US20140224508 A1 US 20140224508A1 US 201314099569 A US201314099569 A US 201314099569A US 2014224508 A1 US2014224508 A1 US 2014224508A1
Authority
US
United States
Prior art keywords
tubular body
prefabricated
mold
materials
projections
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US14/099,569
Inventor
Richard Ronald BAYNHAM
David Levie
Anatoly Baryshnikov
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Eni SpA
Original Assignee
Eni SpA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Eni SpA filed Critical Eni SpA
Priority to US14/099,569 priority Critical patent/US20140224508A1/en
Publication of US20140224508A1 publication Critical patent/US20140224508A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/24Guiding or centralising devices for drilling rods or pipes
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/10Wear protectors; Centralising devices, e.g. stabilisers
    • E21B17/1078Stabilisers or centralisers for casing, tubing or drill pipes
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/10Wear protectors; Centralising devices, e.g. stabilisers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/0013Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor using fillers dispersed in the moulding material, e.g. metal particles

Definitions

  • This application relates to tubular products of the type required by the oil and gas industry for use in recovery of an transporting of crude oil or gas, namely oil-country-tubular goods (OCTG), particularly a tubular product adapted to be inserted downhole in a centralized position.
  • OCTG oil-country-tubular goods
  • a typical centralizer takes the form of an open-ended substantially cylindrical hollow body to be attached as a close-fitting sleeve or collar around a tubular.
  • the body is provided with radially projecting parts such as ribbing or spaced apart blades so that fluid pathways are defined between the projecting parts permitting fluids to pass around the centralizer when it is located in the bore.
  • the projecting parts provide lands for engagement of downhole surfaces to provide a means of making the tubular stand-off to its intended centralised position.
  • the design of the projecting parts varies from axially aligned “vertical” blades through off-set-straight to helical or “spiral” patterns, and continuous or interrupted (slotted) blade designs often with bevelled ends.
  • the lands may be so designed that in situ downhole they are used to divert the tubular to follow a deviation in bore path, and so design specification for one centraliser may also differ in this respect from that of another centraliser.
  • centralisers Whilst numerous types of centralisers are known, the common purpose for a typical centraliser is that it is intended to be located on a tubular body such as casing, pipe, or similar conduit, or a tool to be installed in a bore hole, and is retained in a desired axial position on the tubular by fasteners, stop collars, welding, cementing, or by use of adhesive or simply frictional engagement over the tubular. Certain types of centralisers are of the “rotating” type which are fixed onto a tubular body to turn with the tubular, and others are of the “non-rotating” type which are axially retained on the tubular, but are equipped with roller devices so that when the lands thereof engage within the bore, the tubular will rotate within the centraliser.
  • the known centralisers are in the main made from metal, such as aluminium, steel, and zinc, typically nowadays by casting methods but possibly by extrusion, and recently special alloys have become popular for special purposes, e.g. zinc alloys and bronze alloys.
  • centralisers made of, or including plastics, e.g. durable plastic resins such as NYLON, and TEFLON.
  • plastics e.g. durable plastic resins such as NYLON, and TEFLON.
  • Use of special materials for the surfaces of the lands has been proposed, including zirconia, titania, alumina and metal carbides.
  • British patent publications in this field include: GB-A-2 016 063, GB-A-2 148 984, GB-A 2 148 985, GB-A-2 155 519, GB-A-2 171 436, GB-A-2 197 008, GB-A-2 201 176, GB-A-2 210 084, GB-A-2 210 085, GB-A-2 230 808, GB-A-2 241 009, GB-A-2 242 457, -GB-A-2 249 333, GB-A-2 252 118, GB-A-2 253 428, GB-A-2 272 233, GB-A-2 277 336, GB-A-2 282 615, GB-A-2 285 649, GB-A-2 290 331, GB-A-304 753, GB-A-2 316 422, GB-A-2 331 5
  • this invention seeks to provide improvements in the installation of tubulars for use in a well bore.
  • an object of the present invention is to obviate or mitigate at least some of the problems that have been observed with the provision of centralisers for tubulars as known in the prior art.
  • the invention provides according to a first aspect of the invention, a method of providing at least one projection on a tubular body, said projection having a predetermined form such as a blade, ribbing, or the like stand-off projection, by providing materials capable of being moulded, applying a mould to a tubular body, and moulding said materials using said mould onto said tubular body.
  • An advantage of this method is that it is thereby possible to provide whatever contours of shape or configuration are required for the centraliser by simply designing an appropriate mould cavity for the desired projecting stand-off parts. In this way, it is possible to obtain after the moulding operation upon the tubular the desired combination of raised parts such as blades, ribs, bands and correspondingly between such parts the required forms of fluid pathways in the form of channels, flutes etc. which define recesses with respect to lands formed by the outer surfaces of the projecting parts.
  • a tubular body having moulded thereto, in a predetermined position, at least one projection having a predetermined form such as a blade, ribbing, or the like stand-off projection.
  • the method comprises providing composite resin materials loaded with hard particles, and applying the materials directly to an exterior surface portion of a tubular body by means of a mould, and curing the resin materials to provide at least one projection of a predetermined size and shape conforming to the design of the mould pattern.
  • the mould comprises a plurality of cavities adapted to mould materials to a selected shape and size, said cavities being arranged in mould parts capable of being applied around a curved surface to enable a tubular body to have radially projecting parts moulded thereon.
  • the selective positioning of the mould permits selective location of stand-off parts on the tubular, and it is thereby possible to contemplate infinite variations for design of tubulars having integral centralising or stand-off structures.
  • Blades extending radially with respect to the longitudinal axis of a tubular may be provided at circumferentially mutually spaced positions uniformly around a tubular such that they are all generally within a discrete cylindrical centralising zone defined around the tubular.
  • the stand-off parts formed by moulding may be in staggered positions, for example, forming upon the tubular off-set or spiral arrangements of centralising or stand-off structures.
  • the invention enables a prefabricated tubular to be provided for subsequent use in the field, said prefabricated tubular being characterised by integral centraliser formations, said formations being formed as projections moulded directly onto the tubular body.
  • the tubular body with integral centraliser is preferably formed by providing a resin-ceramic composite material e.g. as powders, particles, fibrils, chopped fibres, beads or the like mouldable particulates, optionally including fillers or other moulding auxiliaries, and means for curing or setting the resin into a moulded form.
  • a resin-ceramic composite material e.g. as powders, particles, fibrils, chopped fibres, beads or the like mouldable particulates, optionally including fillers or other moulding auxiliaries, and means for curing or setting the resin into a moulded form.
  • the resin material may include bonding agents such as an adhesive or the like curable component, whilst other components to be mixed therewith, whenever moulding is to be carried out may include a hardener, accelerator or curing initiator.
  • the resin-ceramic composite material may also include a catalyst to initiate curing of the resin-ceramic composite.
  • the catalyst may be thermally activated.
  • the mixed materials may be chemically activated by a curing initiator.
  • the moulding operation may comprise applying an appropriately contoured moulding part to a tubular body, loading the mould with resin-ceramic materials in predetermined amounts to form the desired composite, suitably by injecting the materials into the mould, curing the materials in the mould, and removing the mould parts to leave the desired moulded part formed on the tubular body.
  • the composite forming materials may be appropriately mixed by use of a pre-calibrated mixing and dosing equipment.
  • the prefabricated tubular with integral moulded centraliser features obtainable according to the invention may be further treated after removal of the mould parts, e.g. by coating with resins, paints, or bonding of land surface finishing agents thereto.
  • a composite centraliser for installation on a tubular comprises a tubular core adapted to be installed on a tubular in a manner such as to permit rotation of the tubular within the core in use, said tubular core having moulded thereto, in a predetermined position, at least one projection having a predetermined form such as a blade, ribbing, or the like stand-off projection.
  • Such a composite centraliser is provided according to a further aspect of the invention, by a method comprising the selection of a tubular core suitable for installation around an OCTG tubular, and providing at least one projection on said tubular core, said projection having a predetermined form such as a blade, ribbing, or the like stand-off projection, by providing materials capable of being moulded, applying a mould to the tubular core, and moulding said materials using said mould onto said tubular core.
  • Such projections provide lands for surface engagement downhole.
  • the ability of the core to permit the OCTG tubular to rotate down-hole is achievable in an analogous fashion to the so-called “non-rotating” centralisers of the prior art, for example, by providing axial retention means to locate the composite centraliser upon the OCTG tubular, so that whenever the lands of the moulded projection(s) engage a surface within a bore-hole, the composite centraliser thereby becomes static and the OCTG tubular remains free to turn within the composite centraliser, and this may be facilitated by lubrication or roller device modifications according to the prior art.
  • the composite centraliser is installed by axially aligning the tubular with respect to the composite centraliser and inserting the end of the tubular into the core of the composite centraliser and working the centraliser along the outer surface of the tubular until it is located in the desired axial position.
  • FIG. 1 is a plan view of a mould part
  • FIG. 2 is a side view of hinged mould parts in an opened position
  • FIG. 3 is a section through a tubular around which the mould parts have been fastened
  • FIG. 4 is an isometric view of a finished prefabricated tubular with integral moulded centraliser features according to one possible embodiment (radial design).
  • FIG. 5 is an isometric view of a finished prefabricated tubular with integral moulded centraliser features according to another possible embodiment (spiral design).
  • a prefabricated tubular having appropriate integral centralising capability is formed in the following way.
  • An OCTG tubular e.g. a pipe 1 is prepared for application of centraliser parts by cleaning to remove possibly interfering contamination such as paint, grease, oil, dust etc.
  • a mould 2 having a plurality of suitable mould cavities 3 for forming projecting parts, e.g. radially extending blades 4 , is presented around the tubular at a suitable axial position and fastened directly against the exterior curved surface of the tubular to provide a tight fit sufficient to permit a successful moulding operation.
  • Various patterns of stand-off parts can be formed, e.g. as shown in FIGS. 4 (uniform radial positioning) and 5 (spiral configuration).
  • a moulding composition comprising composite resin materials loaded with hard particles is introduced into the mould cavities directly against the tubular wall, and the moulding operation is carried out to cure the Moulding composition.
  • the moulding composition in this case comprises a curable resin, ceramic particulate filler materials, including optional chopped carbon fibre materials.
  • the commercially available PROGUARD CRB can be considered suitable for this purpose.
  • the composite material here is provided pre-moulding as separate two-part raw material components for admixing for moulding whereby the whole can be reacted.
  • the reaction may be catalytically controlled such that the various components in the separated two parts of the composite material will not react until they are brought together under suitable moulding conditions.
  • the one part may include an activator, or initiator, or catalytic component required to promote, initiate or facilitate the reaction between the whole mixed composition.
  • the appropriate balance of components can be achieved in the mould by use of pre-calibrated mixing and dosing equipment.
  • the properly mixed and dosed composition cures rapidly in the mould which can then be released from around the tubular, leaving a pre-formed centraliser bonded or fused to the outer surface of the tubular.
  • the pre-fabricated tubular with integral centraliser features is installed and used as for the prior art tubular plus centraliser assemblies, except that the user totally avoids the on-site assembly work.
  • a further advantage is that the user is able to free up storage space normally reserved for the centraliser stock usually taking up deck space separately from the pipe rack.

Landscapes

  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Manufacturing & Machinery (AREA)
  • Dispersion Chemistry (AREA)
  • Chemical & Material Sciences (AREA)
  • Shaping Metal By Deep-Drawing, Or The Like (AREA)
  • Moulds, Cores, Or Mandrels (AREA)
  • Rigid Pipes And Flexible Pipes (AREA)
  • Vaporization, Distillation, Condensation, Sublimation, And Cold Traps (AREA)
  • Earth Drilling (AREA)
  • Physical Or Chemical Processes And Apparatus (AREA)

Abstract

A method of providing at least one projection (4) on a tubular body (1) of the type required by the oil and gas industry for use in recovery of and transporting of crude oil or gas, namely oil-country-tubular goods (OCTG), said projection (4) having a predetermined form such as a blade, ribbing, or the like stand-off projection, by providing materials capable of being moulded, applying a mould to a tubular (OCTG) body, and moulding said materials using said mould onto said tubular body (1).

Description

    CROSS-REFERENCE TO RELATED APPLICATIONS
  • This application is a continuation of U.S. Ser. No. 13/461,583 filed May 1, 2012, the entire content of which is incorporated herein by reference. U.S. Ser. No. 13/461,583 is a Continuation application of U.S. Ser. No. 10/524,371 filed Feb. 10, 2005, which is a National Stage of PCT Application No. PCT/IT02/00536 filed Aug. 12, 2002.
  • This application relates to tubular products of the type required by the oil and gas industry for use in recovery of an transporting of crude oil or gas, namely oil-country-tubular goods (OCTG), particularly a tubular product adapted to be inserted downhole in a centralized position.
  • The use of centralizing means for aligning a tubular product (hereinafter “tubular”) within a well bore is well known in the field. A typical centralizer (or centralizer) takes the form of an open-ended substantially cylindrical hollow body to be attached as a close-fitting sleeve or collar around a tubular. The body is provided with radially projecting parts such as ribbing or spaced apart blades so that fluid pathways are defined between the projecting parts permitting fluids to pass around the centralizer when it is located in the bore. The projecting parts provide lands for engagement of downhole surfaces to provide a means of making the tubular stand-off to its intended centralised position. The design of the projecting parts varies from axially aligned “vertical” blades through off-set-straight to helical or “spiral” patterns, and continuous or interrupted (slotted) blade designs often with bevelled ends. The lands may be so designed that in situ downhole they are used to divert the tubular to follow a deviation in bore path, and so design specification for one centraliser may also differ in this respect from that of another centraliser.
  • Whilst numerous types of centralisers are known, the common purpose for a typical centraliser is that it is intended to be located on a tubular body such as casing, pipe, or similar conduit, or a tool to be installed in a bore hole, and is retained in a desired axial position on the tubular by fasteners, stop collars, welding, cementing, or by use of adhesive or simply frictional engagement over the tubular. Certain types of centralisers are of the “rotating” type which are fixed onto a tubular body to turn with the tubular, and others are of the “non-rotating” type which are axially retained on the tubular, but are equipped with roller devices so that when the lands thereof engage within the bore, the tubular will rotate within the centraliser.
  • The known centralisers are in the main made from metal, such as aluminium, steel, and zinc, typically nowadays by casting methods but possibly by extrusion, and recently special alloys have become popular for special purposes, e.g. zinc alloys and bronze alloys. There have been also proposals for centralisers made of, or including plastics, e.g. durable plastic resins such as NYLON, and TEFLON. Use of special materials for the surfaces of the lands has been proposed, including zirconia, titania, alumina and metal carbides.
  • Reference may be made to the patent literature to obtain more details of the centralisers previously proposed for use in this industry. British patent publications in this field include: GB-A-2 016 063, GB-A-2 148 984, GB-A 2 148 985, GB-A-2 155 519, GB-A-2 171 436, GB-A-2 197 008, GB-A-2 201 176, GB-A-2 210 084, GB-A-2 210 085, GB-A-2 230 808, GB-A-2 241 009, GB-A-2 242 457, -GB-A-2 249 333, GB-A-2 252 118, GB-A-2 253 428, GB-A-2 272 233, GB-A-2 277 336, GB-A-2 282 615, GB-A-2 285 649, GB-A-2 290 331, GB-A-304 753, GB-A-2 316 422, GB-A-2 331 534, GB-A-2-329 209, and GB-A-2 339 584. Other patent publications, of which only a few are mentioned here include: EP-A-0 125 993, EP-A-O 143 219, EP-A-O 196 339, EP-A-O 410 729, EP-A-O 506 663, EP-A-O 512 154, EP-A-O 585 315, EP-A-0 671 546, EP-A-O 816 628, EP-A-O 830 492, EP-A-O 920 569, EP-A-O 996 811, EP-A-1 047 859, WO 91/05 093, WO 98/07953, WO 98/37 302, WO 98/37 881, WO 98/40 601, WO 98750669, WO 99/04132, WO 99/24690, WO 99/25949, WO 99/36660, WO 99/36661, WO 99/48443, WO 00/66874, U.S. Pat. No. 4,077,470, U.S. Pat. No. 4,363,360, U.S. Pat. No. 5,005,642, U.S. Pat. No. 5,095,981, U.S. Pat. No. 5,332,049, U.S. Pat. No. 5,335,723, U.S. Pat. No. 5,797,455, U.S. Pat. No. 5,810,100, U.S. Pat. No. 5,937,948, and U.S. Pat. No. 6,006,830.
  • It is observed that in practice many of the known centralisers have a preferred orientation for installation in service and are often marked with symbols e.g. arrows to aid the installer. Even so it is often the case that the centralisers are accidentally inverted during installation, and whilst in many cases this has no serious operational consequence, in the case of the more complex designs, incorrect installation can affect the passage of fluids past the centraliser and thus reduce performance.
  • As in most industries, time and labour represent an inevitable aspect of costs that ultimately affect operational viability and pricing of product to the consumer. Therefore, any improvements that can be made to reduce the time and or labour involved in on-site tasks have an economic impact on production. Improvements in this area can also provide improvements in efficiency and safety. These demands of time and labour against productivity are particularly acute in the-mineral oil and gas industries.
  • Accordingly, this invention seeks to provide improvements in the installation of tubulars for use in a well bore. Thus an object of the present invention is to obviate or mitigate at least some of the problems that have been observed with the provision of centralisers for tubulars as known in the prior art.
  • The invention provides according to a first aspect of the invention, a method of providing at least one projection on a tubular body, said projection having a predetermined form such as a blade, ribbing, or the like stand-off projection, by providing materials capable of being moulded, applying a mould to a tubular body, and moulding said materials using said mould onto said tubular body.
  • An advantage of this method is that it is thereby possible to provide whatever contours of shape or configuration are required for the centraliser by simply designing an appropriate mould cavity for the desired projecting stand-off parts. In this way, it is possible to obtain after the moulding operation upon the tubular the desired combination of raised parts such as blades, ribs, bands and correspondingly between such parts the required forms of fluid pathways in the form of channels, flutes etc. which define recesses with respect to lands formed by the outer surfaces of the projecting parts.
  • Thus according to another aspect of the invention, there is provided a tubular body, having moulded thereto, in a predetermined position, at least one projection having a predetermined form such as a blade, ribbing, or the like stand-off projection.
  • Preferably, the method comprises providing composite resin materials loaded with hard particles, and applying the materials directly to an exterior surface portion of a tubular body by means of a mould, and curing the resin materials to provide at least one projection of a predetermined size and shape conforming to the design of the mould pattern.
  • Preferably, the mould comprises a plurality of cavities adapted to mould materials to a selected shape and size, said cavities being arranged in mould parts capable of being applied around a curved surface to enable a tubular body to have radially projecting parts moulded thereon.
  • The selective positioning of the mould permits selective location of stand-off parts on the tubular, and it is thereby possible to contemplate infinite variations for design of tubulars having integral centralising or stand-off structures. Blades extending radially with respect to the longitudinal axis of a tubular, for example, may be provided at circumferentially mutually spaced positions uniformly around a tubular such that they are all generally within a discrete cylindrical centralising zone defined around the tubular. Alternatively, the stand-off parts formed by moulding may be in staggered positions, for example, forming upon the tubular off-set or spiral arrangements of centralising or stand-off structures.
  • Thus the invention enables a prefabricated tubular to be provided for subsequent use in the field, said prefabricated tubular being characterised by integral centraliser formations, said formations being formed as projections moulded directly onto the tubular body.
  • The tubular body with integral centraliser is preferably formed by providing a resin-ceramic composite material e.g. as powders, particles, fibrils, chopped fibres, beads or the like mouldable particulates, optionally including fillers or other moulding auxiliaries, and means for curing or setting the resin into a moulded form.
  • The resin material may include bonding agents such as an adhesive or the like curable component, whilst other components to be mixed therewith, whenever moulding is to be carried out may include a hardener, accelerator or curing initiator. The resin-ceramic composite material may also include a catalyst to initiate curing of the resin-ceramic composite. The catalyst may be thermally activated. Alternatively, the mixed materials may be chemically activated by a curing initiator.
  • The moulding operation may comprise applying an appropriately contoured moulding part to a tubular body, loading the mould with resin-ceramic materials in predetermined amounts to form the desired composite, suitably by injecting the materials into the mould, curing the materials in the mould, and removing the mould parts to leave the desired moulded part formed on the tubular body.
  • The composite forming materials may be appropriately mixed by use of a pre-calibrated mixing and dosing equipment.
  • The prefabricated tubular with integral moulded centraliser features obtainable according to the invention may be further treated after removal of the mould parts, e.g. by coating with resins, paints, or bonding of land surface finishing agents thereto.
  • According to a further aspect of the invention, a composite centraliser for installation on a tubular (OCTG) comprises a tubular core adapted to be installed on a tubular in a manner such as to permit rotation of the tubular within the core in use, said tubular core having moulded thereto, in a predetermined position, at least one projection having a predetermined form such as a blade, ribbing, or the like stand-off projection.
  • Such a composite centraliser is provided according to a further aspect of the invention, by a method comprising the selection of a tubular core suitable for installation around an OCTG tubular, and providing at least one projection on said tubular core, said projection having a predetermined form such as a blade, ribbing, or the like stand-off projection, by providing materials capable of being moulded, applying a mould to the tubular core, and moulding said materials using said mould onto said tubular core. Such projections provide lands for surface engagement downhole.
  • The ability of the core to permit the OCTG tubular to rotate down-hole is achievable in an analogous fashion to the so-called “non-rotating” centralisers of the prior art, for example, by providing axial retention means to locate the composite centraliser upon the OCTG tubular, so that whenever the lands of the moulded projection(s) engage a surface within a bore-hole, the composite centraliser thereby becomes static and the OCTG tubular remains free to turn within the composite centraliser, and this may be facilitated by lubrication or roller device modifications according to the prior art. The composite centraliser is installed by axially aligning the tubular with respect to the composite centraliser and inserting the end of the tubular into the core of the composite centraliser and working the centraliser along the outer surface of the tubular until it is located in the desired axial position.
  • One way of achieving performance of the invention will now be illustrated, by way of example only, with reference to the accompanying drawings in which:
  • FIG. 1 is a plan view of a mould part;
  • FIG. 2 is a side view of hinged mould parts in an opened position;
  • FIG. 3 is a section through a tubular around which the mould parts have been fastened;
  • FIG. 4 is an isometric view of a finished prefabricated tubular with integral moulded centraliser features according to one possible embodiment (radial design); and
  • FIG. 5 is an isometric view of a finished prefabricated tubular with integral moulded centraliser features according to another possible embodiment (spiral design).
  • A prefabricated tubular having appropriate integral centralising capability is formed in the following way.
  • An OCTG tubular, e.g. a pipe 1 is prepared for application of centraliser parts by cleaning to remove possibly interfering contamination such as paint, grease, oil, dust etc. A mould 2 having a plurality of suitable mould cavities 3 for forming projecting parts, e.g. radially extending blades 4, is presented around the tubular at a suitable axial position and fastened directly against the exterior curved surface of the tubular to provide a tight fit sufficient to permit a successful moulding operation. Various patterns of stand-off parts can be formed, e.g. as shown in FIGS. 4 (uniform radial positioning) and 5 (spiral configuration).
  • A moulding composition, comprising composite resin materials loaded with hard particles is introduced into the mould cavities directly against the tubular wall, and the moulding operation is carried out to cure the Moulding composition.
  • The moulding composition in this case comprises a curable resin, ceramic particulate filler materials, including optional chopped carbon fibre materials. The commercially available PROGUARD CRB can be considered suitable for this purpose.
  • The composite material here is provided pre-moulding as separate two-part raw material components for admixing for moulding whereby the whole can be reacted. The reaction may be catalytically controlled such that the various components in the separated two parts of the composite material will not react until they are brought together under suitable moulding conditions. Thus the one part may include an activator, or initiator, or catalytic component required to promote, initiate or facilitate the reaction between the whole mixed composition. The appropriate balance of components can be achieved in the mould by use of pre-calibrated mixing and dosing equipment.
  • The properly mixed and dosed composition cures rapidly in the mould which can then be released from around the tubular, leaving a pre-formed centraliser bonded or fused to the outer surface of the tubular.
  • In use the pre-fabricated tubular with integral centraliser features is installed and used as for the prior art tubular plus centraliser assemblies, except that the user totally avoids the on-site assembly work. A further advantage is that the user is able to free up storage space normally reserved for the centraliser stock usually taking up deck space separately from the pipe rack.

Claims (20)

1. A prefabricated tubular body for use downhole, comprising:
integral centralizer formations, said formations being formed as projections molded directly onto the tubular body from moldable materials comprising a curable resin, ceramic particulate filler materials, and chopped carbon fiber.
2. A prefabricated tubular body according to claim 1, wherein the tubular body is formed by providing a resin-ceramic composite material of one of powders, particles, fibrils, chopped fibers, or beads, including fillers or other molding auxiliaries, and means for curing or setting the resin into a molded form on the tubular body.
3. A prefabricated tubular body according to claim 2, wherein said means for curing or setting the resin comprises a mold, and the mold is utilized in a molded operation that comprises applying at least one appropriately contoured molding part of the mold to a tubular body, loading the mold with resin-ceramic materials in predetermined amounts to form a desired composite, by injecting the materials into the mold, curing the materials in the mold, and removing any mold part to leave a desired molded part formed on the tubular body.
4. A prefabricated tubular body according to claim 1, wherein after removal of the any mold part, the tubular body is coated with resins, paints, or land surface finishing agents.
5. A prefabricated tubular body according to claim 2, wherein after removal of the any mold part, the tubular body is coated with resins, paints, or land surface finishing agents.
6. A prefabricated tubular body according to claim 3, wherein after removal of the any mold part, the tubular body is coated with resins, paints, or land surface finishing agents.
7. A prefabricated tubular body according to claim 1, wherein the projections are located in uniform radial positions on the tubular body.
8. A prefabricated tubular body according to claim 1, wherein the projections are located in a spiral configuration on the tubular body.
9. A prefabricated tubular body according to claim 1, wherein the moldable materials comprise a catalyst to initiate curing of the curable resin.
10. A prefabricated tubular body according to claim 9, wherein the catalyst is thermally activated.
11. A prefabricated tubular body according to claim 1, wherein the curable resin is chemically activated by a curing initiator.
12. A prefabricated tubular body according to claim 1, wherein the curable resin, the ceramic particulate filler materials, and the chopped carbon fiber are mixed prior to being molded into the projections.
13. A prefabricated tubular body, comprising:
the tubular body; and
means for centralizing the tubular body downhole,
wherein the means for centralizing include chopped carbon fiber and are molded directly to an outside of the tubular body.
14. A prefabricated tubular body according to claim 13, wherein the means for centralizing include projections molded directly onto the tubular body from moldable materials comprising a curable resin, ceramic particulate filler materials, and the chopped carbon fiber.
15. A prefabricated tubular body system, comprising:
a well bore leading to oil or gas; and
the tubular body positioned in the well bore, wherein the tubular body includes integral centralizer formations, said formations being formed as projections molded directly onto the tubular body from moldable materials comprising a curable resin, ceramic particulate filler materials, chopped carbon fiber.
16. A prefabricated tubular body system according to claim 15, wherein the formations are in direct contact with the well bore to centralize the tubular body.
17. A method, comprising:
mixing a composite material including a curable resin, ceramic particulate filler materials, and chopped carbon fiber;
adapting a tubular body to be inserted in a well bore by attaching a mold to the tubular body;
injecting the composite material into the mold on the tubular body to form centralizer projections on the tubular body; and
inserting the tubular body in the well bore; and
rotating the tubular body such that the centralizer projections align the tubular body within the well bore.
18. The method according to claim 17, wherein the tubular body leads is an existing tubular body.
19. The method according to claim 17, wherein the well bore leads to oil or gas.
20. The method according to claim 17, wherein the centralizer projections are formed directly on an exterior surface of the tubular body.
US14/099,569 2002-08-12 2013-12-06 Integral centraliser Abandoned US20140224508A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US14/099,569 US20140224508A1 (en) 2002-08-12 2013-12-06 Integral centraliser

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
PCT/IT2002/000536 WO2004015238A1 (en) 2002-08-12 2002-08-12 Integral centraliser
US10/524,371 US20050224123A1 (en) 2002-08-12 2002-08-12 Integral centraliser
US13/461,583 US20130081802A1 (en) 2002-08-12 2012-05-01 Integral centraliser
US14/099,569 US20140224508A1 (en) 2002-08-12 2013-12-06 Integral centraliser

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
US13/461,583 Continuation US20130081802A1 (en) 2002-08-12 2012-05-01 Integral centraliser

Publications (1)

Publication Number Publication Date
US20140224508A1 true US20140224508A1 (en) 2014-08-14

Family

ID=31503929

Family Applications (3)

Application Number Title Priority Date Filing Date
US10/524,371 Abandoned US20050224123A1 (en) 2002-08-12 2002-08-12 Integral centraliser
US13/461,583 Abandoned US20130081802A1 (en) 2002-08-12 2012-05-01 Integral centraliser
US14/099,569 Abandoned US20140224508A1 (en) 2002-08-12 2013-12-06 Integral centraliser

Family Applications Before (2)

Application Number Title Priority Date Filing Date
US10/524,371 Abandoned US20050224123A1 (en) 2002-08-12 2002-08-12 Integral centraliser
US13/461,583 Abandoned US20130081802A1 (en) 2002-08-12 2012-05-01 Integral centraliser

Country Status (5)

Country Link
US (3) US20050224123A1 (en)
AU (1) AU2002341386A1 (en)
GB (1) GB2396877B (en)
NO (1) NO334912B1 (en)
WO (1) WO2004015238A1 (en)

Families Citing this family (51)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IT1319550B1 (en) * 2000-12-15 2003-10-20 Eni Spa METHOD FOR CENTRALIZATION OF COLUMNS FOR LEANPROFILE APPLICATIONS
US7882856B2 (en) * 2002-08-07 2011-02-08 Berry Jr E Wynn Separated sanitary and storm sewer system
DE20303596U1 (en) * 2003-03-05 2003-07-10 Tracto Technik Pipe guide adapter
GB2406591B (en) * 2003-09-17 2006-11-08 Karl Schmidt Centraliser formed from composite material for drill or production strings
EP2086762A2 (en) 2006-10-20 2009-08-12 Halliburton Energy Services, Inc. Swellable packer construction for continuous or segmented tubing
US20080106028A1 (en) * 2006-11-07 2008-05-08 Robert Michael Meadows Pick Tire for an Image Forming Device
AU2007346700B2 (en) 2007-02-06 2013-10-31 Halliburton Energy Services, Inc. Swellable packer with enhanced sealing capability
US8119047B2 (en) * 2007-03-06 2012-02-21 Wwt International, Inc. In-situ method of forming a non-rotating drill pipe protector assembly
US8297353B2 (en) * 2007-04-02 2012-10-30 Halliburton Energy Services, Inc. Use of micro-electro-mechanical systems (MEMS) in well treatments
US9879519B2 (en) 2007-04-02 2018-01-30 Halliburton Energy Services, Inc. Methods and apparatus for evaluating downhole conditions through fluid sensing
US9732584B2 (en) * 2007-04-02 2017-08-15 Halliburton Energy Services, Inc. Use of micro-electro-mechanical systems (MEMS) in well treatments
US8342242B2 (en) * 2007-04-02 2013-01-01 Halliburton Energy Services, Inc. Use of micro-electro-mechanical systems MEMS in well treatments
US8162050B2 (en) * 2007-04-02 2012-04-24 Halliburton Energy Services Inc. Use of micro-electro-mechanical systems (MEMS) in well treatments
US20110187556A1 (en) * 2007-04-02 2011-08-04 Halliburton Energy Services, Inc. Use of Micro-Electro-Mechanical Systems (MEMS) in Well Treatments
US8302686B2 (en) * 2007-04-02 2012-11-06 Halliburton Energy Services Inc. Use of micro-electro-mechanical systems (MEMS) in well treatments
US10358914B2 (en) 2007-04-02 2019-07-23 Halliburton Energy Services, Inc. Methods and systems for detecting RFID tags in a borehole environment
US8297352B2 (en) * 2007-04-02 2012-10-30 Halliburton Energy Services, Inc. Use of micro-electro-mechanical systems (MEMS) in well treatments
US8316936B2 (en) 2007-04-02 2012-11-27 Halliburton Energy Services Inc. Use of micro-electro-mechanical systems (MEMS) in well treatments
US9494032B2 (en) 2007-04-02 2016-11-15 Halliburton Energy Services, Inc. Methods and apparatus for evaluating downhole conditions with RFID MEMS sensors
US9194207B2 (en) 2007-04-02 2015-11-24 Halliburton Energy Services, Inc. Surface wellbore operating equipment utilizing MEMS sensors
US8291975B2 (en) * 2007-04-02 2012-10-23 Halliburton Energy Services Inc. Use of micro-electro-mechanical systems (MEMS) in well treatments
US9822631B2 (en) 2007-04-02 2017-11-21 Halliburton Energy Services, Inc. Monitoring downhole parameters using MEMS
US9200500B2 (en) 2007-04-02 2015-12-01 Halliburton Energy Services, Inc. Use of sensors coated with elastomer for subterranean operations
US7857078B2 (en) * 2007-05-29 2010-12-28 Baker Hughes Incorporated Cutting tools and methods of making the same
GB0719973D0 (en) * 2007-10-12 2007-11-21 Lively Glenn Downhole assembly
US8555961B2 (en) 2008-01-07 2013-10-15 Halliburton Energy Services, Inc. Swellable packer with composite material end rings
US7938202B2 (en) * 2008-04-24 2011-05-10 Wwt International, Inc. Rotating drill pipe protector attachment and fastener assembly
GB0815572D0 (en) * 2008-08-27 2008-10-01 Advanced Oilfield Composities Composite tubular product
EP2417324B1 (en) 2009-04-07 2017-05-17 Frank's International, Inc. Friction reducing wear band and method of coupling a wear band to a tubular
WO2011025488A1 (en) * 2009-08-27 2011-03-03 Halliburton Energy Services, Inc. Casing shoe
BRPI1006137A8 (en) * 2009-11-13 2017-10-03 Wwt Int Inc NON-ROTATIVE COATING CENTRALIZER
US8505624B2 (en) 2010-12-09 2013-08-13 Halliburton Energy Services, Inc. Integral pull-through centralizer
US8678096B2 (en) 2011-01-25 2014-03-25 Halliburton Energy Services, Inc. Composite bow centralizer
US8833446B2 (en) 2011-01-25 2014-09-16 Halliburton Energy Services, Inc. Composite bow centralizer
US8573296B2 (en) 2011-04-25 2013-11-05 Halliburton Energy Services, Inc. Limit collar
US9074430B2 (en) 2011-09-20 2015-07-07 Halliburton Energy Services, Inc. Composite limit collar
US9038738B2 (en) 2012-03-09 2015-05-26 Halliburton Energy Services, Inc. Composite centralizer with expandable elements
US8991487B2 (en) 2012-06-04 2015-03-31 Halliburton Energy Services, Inc. Pull through centralizer
US8960278B2 (en) 2012-06-04 2015-02-24 Halliburton Energy Services, Inc. Pull through centralizer
GB2506845B (en) 2012-09-05 2015-01-14 Advanced Composite Ind Ag Modified tubular
WO2014126481A2 (en) * 2013-02-15 2014-08-21 Geoffrey Neil Murray A stabiliser and wear resisting band for rotating drilling equipment pipe and tool joints
GB2514324B (en) * 2013-03-19 2015-12-23 Rsd2 Holding Ag Modified tubular
US20140345875A1 (en) 2013-05-21 2014-11-27 Halliburton Energy Services, Inc. Syntactic Foam Frac Ball and Methods of Using Same
WO2014189766A2 (en) 2013-05-21 2014-11-27 Halliburton Energy Services, Inc. Syntactic foam frac ball and methods of using same
GB2517167B (en) 2013-08-13 2020-01-15 Innovex Downhole Solutions Inc Centraliser
US9920412B2 (en) 2013-08-28 2018-03-20 Antelope Oil Tool & Mfg. Co. Chromium-free thermal spray composition, method, and apparatus
WO2017015727A1 (en) * 2015-07-30 2017-02-02 Strada Design Limited Well casing and well casing system and method
US10584553B2 (en) 2016-04-28 2020-03-10 Innovex Downhole Solutions, Inc. Integrally-bonded swell packer
WO2017214290A1 (en) * 2016-06-09 2017-12-14 Oil States Industries, Inc. Extension members for subsea riser stress joints
CN107747478B (en) * 2017-10-24 2023-10-20 山东大学 Composite sucker rod centralizer with pulley structure
US10895117B2 (en) 2018-12-28 2021-01-19 Saudi Arabian Oil Company Systems and methods for improved centralization and friction reduction using casing rods

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080236693A1 (en) * 2007-03-30 2008-10-02 Norman Everett Muzzy Exhaust pipe assembly

Family Cites Families (41)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2153787A (en) * 1937-07-16 1939-04-11 Goodrich Co B F Sucker-rod guard
US3485272A (en) * 1966-10-21 1969-12-23 Us Air Force High impact protective structure and method for manufacturing same
US3948575A (en) * 1974-10-24 1976-04-06 Rosser Eugene P Drill pipe and drill collar containing molded casing protector and method of protecting casing therewith
US4088185A (en) * 1974-12-13 1978-05-09 J. M. Huber Corporation Molded plastic paraffin scrapers and centralizers
US4146060A (en) * 1977-07-25 1979-03-27 Smith International, Inc. Drill pipe wear belt assembly
DE2809181B2 (en) 1978-03-03 1980-07-24 Guenter 4520 Melle Kreft Safety centering basket
US4280535A (en) * 1978-01-25 1981-07-28 Walker-Neer Mfg. Co., Inc. Inner tube assembly for dual conduit drill pipe
US4434125A (en) * 1982-03-12 1984-02-28 Smith International, Inc. Method for securing a wear sleeve about a drill pipe
CA1225328A (en) 1983-10-31 1987-08-11 Baker Oil Tools, Inc. Segmented concentric centralizer
US4531582A (en) 1983-10-31 1985-07-30 Baker Oil Tools, Inc. Well conduit centralizer
GB8403600D0 (en) 1984-02-10 1984-03-14 Drexel Oilfield Services Hk Casing pipe centralizer
CA1231642A (en) 1985-02-22 1988-01-19 Raymond F. Mikolajczyk Casing centralizer/stabilizer
FI80853C (en) * 1988-06-07 1990-08-10 Neste Oy PLASTBELAGT STAOLROER.
BR8700248A (en) 1986-10-30 1988-05-24 Raymond F Mikolajczyk COATING TUBE CENTER
US4759390A (en) * 1986-11-25 1988-07-26 Shaw Industries Ltd. Coated metal pipe having bending capability
GB2201176A (en) 1987-02-19 1988-08-24 Mueller Kurt Pipe centraliser
US4839204A (en) * 1987-05-19 1989-06-13 Yazaki Kakoh Co., Ltd. Resin coated metal pipe having a plane surface for a lightweight structure
US4793412A (en) 1987-09-21 1988-12-27 Intevep, S.A. Centralizer for a polished bar and/or a substance pump piston stem
GB2241009B (en) 1987-09-21 1992-03-04 Intevep Sa Sucker rod guide centraliser.
US4871020A (en) 1987-09-21 1989-10-03 Intevep, S.A. Sucker rod centralizer
US5179140A (en) * 1988-12-27 1993-01-12 Fiber Glass Systems, Inc. Filled resin compositions and articles made therefrom
US4909322A (en) 1989-04-26 1990-03-20 Davis-Lynch, Inc. Casing centralizer
US5036210A (en) * 1989-12-18 1991-07-30 Gas Research Institute Magnetically detectable plastic pipe
US5097870A (en) * 1990-03-15 1992-03-24 Conoco Inc. Composite tubular member with multiple cells
GB2242457A (en) 1990-03-27 1991-10-02 Petroleum Equipment Company Li Casing centralisers
USH1192H (en) 1990-10-26 1993-06-01 Exxon Production Research Company Low-torque centralizer
US5097905A (en) 1991-01-28 1992-03-24 Mobil Oil Corporation Centralizer for well casing
US5364909A (en) * 1992-07-23 1994-11-15 Arco Chemical Technology, L.P. Graft polymer compositions containing mono-amine functionalized polyoxyalkylene ethers
US5604266A (en) * 1992-10-15 1997-02-18 Ecomat, Inc. Cured unsaturated polyest-polyurethane highly filled resin materials and process for preparing them
US5503192A (en) * 1993-06-08 1996-04-02 Nibco Inc. Inductive welding of thermoplastic pipe
GB2282615A (en) * 1993-10-09 1995-04-12 Uwg Ltd Casing centraliser
AUPN559095A0 (en) * 1995-09-22 1995-10-19 Cherrington (Australia) Pty Ltd Pipe protector
US5902656A (en) * 1996-06-21 1999-05-11 Minnesota Mining And Manufacturing Company Dampers for internal applications and articles damped therewith
US6923631B2 (en) * 2000-04-12 2005-08-02 Advanced Energy Technology Inc. Apparatus for forming a resin impregnated flexible graphite sheet
US6561229B2 (en) * 2000-06-26 2003-05-13 Raymond L. Wellman Electrostatic charge neutralizing fume duct with continuous carbon fiber
GB0016145D0 (en) * 2000-06-30 2000-08-23 Brunel Oilfield Serv Uk Ltd Improvements in or relating to downhole tools
IT1319550B1 (en) * 2000-12-15 2003-10-20 Eni Spa METHOD FOR CENTRALIZATION OF COLUMNS FOR LEANPROFILE APPLICATIONS
DE10064334A1 (en) * 2000-12-21 2002-06-27 Degussa Polyamide multilayer
US6774305B2 (en) * 2001-06-18 2004-08-10 Raymond L. Wellman Self-grounding connector for joining end sections of fluid flow conduits and fabrication processes therefor
JP4043856B2 (en) * 2002-06-11 2008-02-06 矢崎化工株式会社 Resin-coated steel pipe with excellent mechanical strength such as slidability
EP1705050B1 (en) * 2005-03-24 2010-10-27 Ems-Chemie Ag Use of a conduit system for fluids including volatile components

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080236693A1 (en) * 2007-03-30 2008-10-02 Norman Everett Muzzy Exhaust pipe assembly

Also Published As

Publication number Publication date
NO20050695L (en) 2005-03-11
WO2004015238A1 (en) 2004-02-19
US20130081802A1 (en) 2013-04-04
GB0405749D0 (en) 2004-04-21
US20050224123A1 (en) 2005-10-13
GB2396877A (en) 2004-07-07
AU2002341386A1 (en) 2004-02-25
NO334912B1 (en) 2014-07-07
GB2396877B (en) 2006-04-19

Similar Documents

Publication Publication Date Title
US20140224508A1 (en) Integral centraliser
CA2872042C (en) Pull through centralizer
US20070131414A1 (en) Method for making centralizers for centralising a tight fitting casing in a borehole
AU2010319949B2 (en) Non-rotating casing centralizer
CA2871662C (en) Pull through centralizer
EP2649266B1 (en) Integral centralizer
US6666267B1 (en) Downhole tools
AU2002221874A1 (en) Method for centralising a tight fitting casing in a borehole
EP1047859A1 (en) Extruded casing centralizer
US20120267121A1 (en) Limit collar
AU2012312821B2 (en) Composite limit collar
WO2009047536A1 (en) Downhole tubular product

Legal Events

Date Code Title Description
STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION