US20140202699A1 - System and Method for Removing Debris from a Downhole Wellbore - Google Patents
System and Method for Removing Debris from a Downhole Wellbore Download PDFInfo
- Publication number
- US20140202699A1 US20140202699A1 US14/224,346 US201414224346A US2014202699A1 US 20140202699 A1 US20140202699 A1 US 20140202699A1 US 201414224346 A US201414224346 A US 201414224346A US 2014202699 A1 US2014202699 A1 US 2014202699A1
- Authority
- US
- United States
- Prior art keywords
- downhole
- removal tool
- debris removal
- fines
- debris
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000000034 method Methods 0.000 title claims abstract description 44
- 239000012530 fluid Substances 0.000 claims abstract description 93
- 230000015572 biosynthetic process Effects 0.000 claims abstract description 34
- 229930195733 hydrocarbon Natural products 0.000 claims description 36
- 239000004215 Carbon black (E152) Substances 0.000 claims description 35
- 150000002430 hydrocarbons Chemical class 0.000 claims description 35
- 239000003245 coal Substances 0.000 claims description 33
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 19
- 238000004891 communication Methods 0.000 claims description 18
- 238000001914 filtration Methods 0.000 claims description 6
- 238000000605 extraction Methods 0.000 claims description 5
- 238000007789 sealing Methods 0.000 claims description 5
- 239000007789 gas Substances 0.000 description 53
- 238000004519 manufacturing process Methods 0.000 description 8
- 238000009434 installation Methods 0.000 description 7
- 238000011084 recovery Methods 0.000 description 7
- 239000004576 sand Substances 0.000 description 6
- 238000003809 water extraction Methods 0.000 description 5
- 230000008569 process Effects 0.000 description 4
- 230000002708 enhancing effect Effects 0.000 description 3
- 239000007788 liquid Substances 0.000 description 3
- 230000008901 benefit Effects 0.000 description 2
- 239000004568 cement Substances 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000009825 accumulation Methods 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 125000001183 hydrocarbyl group Chemical group 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000037361 pathway Effects 0.000 description 1
- 239000011148 porous material Substances 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B27/00—Containers for collecting or depositing substances in boreholes or wells, e.g. bailers, baskets or buckets for collecting mud or sand; Drill bits with means for collecting substances, e.g. valve drill bits
- E21B27/005—Collecting means with a strainer
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/08—Screens or liners
- E21B43/086—Screens with preformed openings, e.g. slotted liners
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimising the spacing of wells
Definitions
- This invention relates, in general, to a system and method for removing debris from a downhole wellbore.
- Recovering hydrocarbon gas from downhole environments can be problematic.
- water in the wellbores oftentimes impedes the gas recovery process in a particular hydrocarbon bearing formation.
- one or more horizontally drilled wellbores are intersected or connected with one or more vertical wellbores that contain pumps for removing the water that collects in the wellbore system. After the water is removed through the vertical wellbores, then hydrocarbon gas can be recovered through the same vertical wellbores, for example.
- One problem associated with the de-watering process is that it creates a low bottom hole pressure in the downhole wellbore that causes fines and debris, drawn with the hydrocarbon gas, to accumulate in the horizontal wellbore.
- the horizontal wellbore accumulate enough fines or debris to severally restrict or block the flow of the hydrocarbon gas into the vertical wellbores causing a reduction in gas production.
- the fines or debris must be removed from the wellbore to restore the flow of hydrocarbon gas.
- fines and/or debris may restrict or block the flow of hydrocarbon gas through the vertical wellbores, which then may also need to be removed to restore production gas flows.
- the present invention disclosed herein is directed to a system and method for removing debris from a downhole wellbore (“downhole debris removal system”).
- the present invention is directed to a downhole debris removal tool, including a mandrel having an upper end and a lower end and a central passageway extending therebetween; a screen basket having an upper end and a lower end, the screen basket slidably disposed about the mandrel and operatable between an open position and a closed position; and a nose member having an upper end and a lower end and located substantially proximal to and in fluid communication with the lower end of the mandrel, the lower end of the nose member having one or more outlets for providing a stream of fluid therethrough.
- the lower end of the screen basket may include a flared end for sealing with the upper end of the nose member when in the closed position.
- the upper end of the screen basket may be in a sealed arrangement with the mandrel for creating an annular space between the inner surface of the screen basket and the outer surface of the mandrel for retaining fines and debris.
- the upper end of the nose member may terminate in an angular shoulder for sealing with the flared end of the lower end of the screen basket.
- the screen basket may include a plurality of screen openings sized to allow fluid to pass through while retaining fines and debris.
- the flared end may be a gage ring.
- the downhole debris removal tool may also include an upper sub connected to the upper end of the mandrel, the upper sub having a larger diameter than the mandrel for engaging with the upper end of the screen basket when in the open position.
- the present invention may be directed to a method for removing fines and debris from a downhole wellbore in a formation, including introducing a tubing string having a downhole debris removal tool disposed substantially near the lower end of the tubing string into the downhole wellbore; positioning the downhole debris removal tool substantially proximal to the fines and debris; circulating fluid through the downhole debris removal tool for disintegrating the fines and debris; and collecting the fines and debris in the downhole debris removal tool for removal out of the downhole wellbore.
- the disintegrating the fines and debris may include flowing a fluid under pressure through one or more outlets disposed through the end of the downhole debris removal tool. Also, the collecting the fines and debris may include filtering the fines and debris from the fluid through screens disposed about the downhole debris removal tool. Further, the method may include advancing distally the tubing string into the downhole wellbore.
- the introducing a tubing string having a downhole debris removal tool may further include flowing a fluid under pressure through one or more outlets disposed through the end of the downhole debris removal tool. Additionally, the positioning the downhole debris removal tool may include reversing direction of travel of the tubing string to create a larger distance between the downhole debris removal tool and the fines and debris. In yet another aspect, the collecting the fines and debris in the downhole debris removal tool may further include slidably closing the downhole debris removal tool to contain the fines and debris within the downhole debris removal tool.
- the present invention may be directed to a method for recovering hydrocarbon gas from a downhole wellbore in a formation, including providing one or more substantially lateral wellbores and one or more substantially vertical wellbores in fluid communication with one another in the formation; introducing a submersible pump into one or more of the one or more vertical wellbores; extracting water from the downhole wellbore through one or more of the substantially vertical wellbores; extracting the hydrocarbon gas from the downhole wellbore through one or more of the one or more substantially lateral wellbores and the one or more substantially vertical wellbores; introducing a tubing string having a downhole debris removal tool disposed substantially near the lower end of the tubing string into the downhole wellbore; positioning the downhole debris removal tool substantially proximal to a blockage of fines and debris; circulating fluid through the downhole debris removal tool for disintegrating the blockage of fines and debris; and collecting the fines and debris in the downhole debris removal tool for removal out of the downhole wellbore.
- the method may further include removing the downhole debris removal tool from the downhole wellbore. Also, the method may further include resuming the extraction of the hydrocarbon gas from the downhole wellbore through one or more of the one or more substantially lateral wellbores and the one or more substantially vertical wellbores. In another aspect, the disintegrating the blockage may include flowing a fluid under pressure through one or more outlets disposed through the end of the downhole debris removal tool.
- the collecting the fines and debris may include filtering the fines and debris from the fluid through screens disposed about the downhole debris removal tool. Further, the positioning the downhole debris removal tool may include reversing direction of travel of the tubing string to create a larger distance between the downhole debris removal tool and the fines and debris. Additionally, the collecting the fines and debris in the downhole debris removal tool may include slidably closing the downhole debris removal tool to contain the fines and debris within the downhole debris removal tool.
- the present invention may be directed to a a method for recovering hydrocarbon gas from a coal seam gas well, including providing one or more substantially lateral wellbores and one or more substantially vertical wellbores in fluid communication with one another in a coal seam; introducing a submersible pump into one or more of the one or more vertical wellbores; extracting water from the downhole wellbore through one or more of the substantially vertical wellbores; running a tubing string having a downhole debris removal tool disposed substantially near the lower end of the tubing string into one or more of the one or more substantially lateral wellbores; circulating fluid through the downhole debris removal tool for disintegrating a mass of coal fines; collecting the coal fines in the downhole debris removal tool for removal out of the coal seam gas well; removing the downhole debris removal tool from the coal seam gas well; and extracting the hydrocarbon gas from the coal seam gas well through one or more of the one or more substantially lateral wellbores and the one or more substantially vertical wellbores.
- the running a tubing string may further include running a second tubing string having a downhole debris removal tool disposed substantially near the lower end of the second tubing string into one or more of the one or more substantially vertical wellbores.
- the method may further include moving distally the downhole debris removal tool further into the coal seam gas well.
- the disintegrating a mass of coal fines may include flowing a fluid under pressure through one or more outlets disposed through the end of the downhole debris removal tool.
- the collecting the fines and debris may include filtering the fines and debris from the fluid through screens disposed about the downhole debris removal tool.
- the positioning the downhole debris removal tool may further include reversing direction of travel of the tubing string to create a larger distance between the downhole debris removal tool and the fines and debris.
- the collecting the fines and debris in the downhole debris removal tool may further include slidably closing the downhole debris removal tool to contain the fines and debris within the downhole debris removal tool.
- FIG. 1 is a schematic illustration of a downhole debris removal system according to an embodiment
- FIG. 2 is a schematic illustration of a downhole debris removal system according to another embodiment
- FIG. 3A is a cross-section view of a downhole debris removal tool in a first operating position of the downhole debris removal system according to an embodiment
- FIG. 3B is a cross-section view of a downhole debris removal tool in a second operating position of the downhole debris removal system according to an embodiment
- FIG. 3C is a side view of a downhole debris removal tool of the downhole debris removal system according to an embodiment
- FIG. 4 is a flowchart of a process for removing fines and debris from a downhole wellbore of the downhole debris removal system according to an embodiment
- FIG. 5 is a flowchart of a process for removing fines and debris from a downhole wellbore of the downhole debris removal system according to another embodiment.
- FIG. 6 is a flowchart of a process for removing coal fines from a downhole wellbore in a coal seam of the downhole debris removal system according to another embodiment.
- proximal refers to a linear, non-linear, or curvilinear distance or point nearer to a point of reference or direction that is closer to a relative term or object
- distal refers to a linear, non-linear, or curvilinear distance or point farther to a point of reference or direction that is farther to a relative term or object.
- a downhole debris removal system in use with an oil and gas production unit is schematically illustrated and generally designated 50 .
- One or more water onshore extraction control units 52 a - 52 n are located over an oil and gas formation 54 .
- downhole debris removal system 50 is discussed herein with reference to onshore production, downhole debris removal system 50 may be used with any type of onshore or offshore oil and/or gas rig and/or operation as are commonly known to those skilled in the art.
- a wellhead installation 56 may include a blowout preventer 58 , which may be located on ground 60 for providing fluid communication and control between formation 54 and oil and gas operations, such as a coiled tubing unit (not shown), for example.
- wellhead installation 56 and blowout preventer 58 are part of many different configurations of oil and gas rigs, platforms, operations, and the like, and that other components that may be commonly associated with processing and recovering hydrocarbon gases and fluids for consumer use are not shown or described herein. Further, downhole debris removal system 50 may be used with other types of hydrocarbon recovery operations that are commonly known to those skilled in the art.
- a wellbore 62 extends through the various earth strata including formation 54 .
- a casing 64 may be cemented within a vertical and/or horizontal section of wellbore 62 by cement 66 .
- FIG. 1 depicts one lateral wellbore 62 , it should be understood by those skilled in the art that downhole debris removal system 50 may be used in conjunction with any number of vertical and/or lateral wellbores.
- wellbore 62 may be a cased or open hole wellbore in fluid communication with one or more vertical wellbores, as described further below.
- Downhole debris removal system 50 may include a conduit 68 , such as coiled tubing or tubular members, which provide fluid communication to the downhole end of wellbore 62 .
- conduit 68 may include casing, liners, and the like.
- downhole debris removal system 50 may include one or more vertical wellbores 70 a - 70 n (collectively vertical wellbores 70 ) that are in fluid communication with wellbore 62 .
- FIG. 1 shows a substantially cased wellbore 62 where conduit 68 extends substantially towards the end of wellbore 62 .
- conduit 68 may include perforations, screens, and the like for allowing gas and liquids to pass from formation 54 into conduit 68 .
- wellbore 62 may be partially or fully cemented. As shown in FIG. 1 , cement 66 is not in place throughout the entire length of wellbore 62 .
- wellbore 62 may be an open hole wellbore 62 where conduit 68 is not in place the entire length of wellbore 62 .
- conduit 68 may extend a partial length through wellbore 62 , but may end prior to vertical wellbores 70 .
- conduit 68 may extend any length through wellbore 62 .
- FIG. 1 depicts downhole debris removal system 50 in a substantially horizontal wellbore
- downhole debris removal system 50 is equally well suited for use in wells having other directional configurations including horizontal wells, vertical wells, deviated wellbores, slanted wells, multilateral wells, and the like.
- any number of vertical wellbores 70 may be included with the present downhole debris removal system.
- Vertical wellbores 70 and wellbore 62 may all be in fluid communication with each other and may constitute a well system, in one embodiment.
- Downhole debris removal system 50 may further include one or more conduits 72 a - 72 n (collectively conduits 72 ) in fluid communication with one or more pumps 74 a - 74 n (collectively pumps 74 ) for extracting water and other fluids from any portions, including vertical, horizontal, lateral, and the like, of wellbore 62 as described further below.
- conduit 72 a is located in vertical wellbore 70 a
- conduit 72 b is located in vertical wellbore 70 b
- conduit 72 c is located in vertical wellbore 70 c .
- any number of vertical wellbores 70 may be used with downhole debris removal system 50 .
- downhole debris removal system 50 may be used in a wellbore system that includes wellbore 62 but does not include vertical wellbores 70 .
- downhole debris removal system 50 may be used in a wellbore system that includes vertical wellbores 70 but does not include wellbore 62 .
- Conduits 72 may be any type of tubular members, pipes, etc. that provide a pathway/flowpath between pumps 74 and water extraction control units 52 for gases, liquids, and fluids as are commonly known to those skilled in the art.
- downhole debris removal system 50 may include a downhole debris removal tool 76 for removing fines and debris from any portions of wellbore 62 , in one embodiment.
- downhole debris removal tool 76 is located substantially between vertical wellbore 70 b and vertical wellbore 70 n for clearing fines and debris in this section of wellbore 62 , in one example.
- downhole debris removal tool 76 may be moved along and through any section of wellbore 62 , such as from any vertical wellbores 70 to any other vertical wellbores 70 as desired for selectively removing fines and debris disposed or accumulated in any portions of wellbore 62 , in one embodiment.
- downhole debris removal system 50 may include one or more wellbores 62 for extracting hydrocarbon gas, water, and other gases and fluids.
- this wellbore may be used to extract or remove fines and debris with downhole debris removal tool 76 when parts of the well system become blocked or restricted by accumulated fines and debris in the well system.
- wellbores 70 a - 70 n may be used for extracting or removing water for de-watering the well system and they may also be used for recovering hydrocarbon gas from formation 54 once a desirable amount of water has been removed from the well system.
- other components may be used in vertical wellbores 70 for de-watering the well system and recovering/controlling the recovery of hydrocarbons, such as hydrocarbon liquid and/or gas, that are commonly known to those skilled in the art.
- downhole debris removal system 100 in use with two oil and gas production units are schematically illustrated and generally designated 100 .
- downhole debris removal system 100 many of the corresponding numerals shown refer to corresponding elements, parts, and the like described relative to downhole debris removal system 50 , thus they may not be repeated in detail below.
- downhole debris removal system 100 further includes another oil and gas production unit including blowout preventer 102 and wellhead installation 104 for recovering oil and gas from a substantially vertical wellbore, such as vertical wellbore 70 a.
- Wellhead installation 56 including blowout preventer 58 , are located on ground 60 for providing fluid communication and control between formation 54 and oil and gas operations, such as a coiled tubing unit (not shown), for example.
- oil and gas operations such as a coiled tubing unit (not shown), for example.
- wellhead installation 56 and blowout preventer 58 may be part of many different configurations of oil and gas rigs, platforms, operations, and the like, and that other components that may be commonly associated with processing hydrocarbon gases and fluids are not shown or described herein.
- Wellbore 70 a extends through the various earth strata including formation 54 . Even though FIG. 2 depicts one substantially lateral wellbore 62 and one substantially vertical wellbore 70 a for recovering hydrocarbon gases and fluids it should be understood by those skilled in the art that downhole debris removal system 100 may be used in conjunction with any number of wellbores, such as lateral wellbore 62 . Further, downhole debris removal system 100 may be used with any number of substantially horizontal wellbores and vertical wellbores of a wellbore system. Additionally, wellbores 62 and 70 a may be cased or open hole wellbores in fluid communication with one or more vertical wellbores, as described further herein.
- FIG. 2 depicts downhole debris removal system 100 with a substantially vertical wellbore it should be understood by those skilled in the art that the downhole debris removal system is equally well suited for use in wells or well systems having other directional configurations including horizontal wells, vertical wells, deviated wellbores, slanted wells, multilateral wells and the like.
- Downhole debris removal system 100 may include a conduit 106 , such as coiled tubing, tubular members, pipe, and the like which provide fluid communication to the downhole end of wellbore 70 a . Additionally, downhole debris removal system 100 may include one or more vertical wellbores 70 b - 70 n (collectively vertical wellbores 70 ) that are in fluid communication with wellbores 62 and 70 a . Although three vertical wellbores 70 a - 70 n are shown in FIG. 2 , any number of vertical wellbores 70 may be included with the present downhole debris removal system. Vertical wellbores 70 and wellbore 62 may all be in fluid communication with each other and may constitute a well system, in one embodiment.
- a conduit 106 such as coiled tubing, tubular members, pipe, and the like which provide fluid communication to the downhole end of wellbore 70 a .
- downhole debris removal system 100 may include one or more vertical wellbores 70 b - 70 n (collectively vertical wellbores 70 ) that
- Conduit 106 is in fluid communication with formation 54 for extracting hydrocarbon gas and other fluids from any portions, including vertical, horizontal, lateral, and the like, of formation 54 as described further below.
- downhole debris removal system 100 may include a downhole debris removal tool 76 located within vertical wellbore 70 a for removing fines and debris from any portions of wellbore 70 a , in one embodiment. As can be seen in FIG. 2 , downhole debris removal tool 76 is also located with wellbore 62 .
- downhole debris removal system 100 may include one or more wellbores 62 and 70 a for extracting hydrocarbon gas, water, and other gases and fluids.
- these wellbores may be used to extract or remove fines and debris with downhole debris removal tool 76 when parts of the well system become blocked or restricted by accumulated fines and debris in the well system.
- wellbores 70 b - 70 n may be used for extracting or removing water for de-watering the well system and they may also be used for recovering hydrocarbon gas from formation 54 once a desirable amount of water has been removed from the well system.
- Downhole debris removal systems 50 , 100 may include any number of downhole debris removal tools 76 for removing accumulated fines and debris within any of the wellbores of the well or well system.
- several downhole debris removal tool 76 may be used in series or in a stacked configuration in each of one or more wellbore 62 and vertical wellbores 70 .
- a series of downhole debris removal tool 76 may be located one above another along a work string and the like for utilizing in a downhole well environment.
- Downhole debris removal tool 76 includes a substantially tubular upper end 302 and upper sub 304 having a substantially tubular axially threaded end or connector 306 for coupling to a lower end of a tubular member or conduits 68 and 106 located above upper sub 304 .
- Downhole debris removal tool further includes a lower end 308 .
- Lower end 308 preferably is adapted to engage a collection of sand or other mass of fines and debris within formation 54 and/or the well system.
- lower end 308 may be beveled or conical in shape for improved removal or engagement with fines and debris in formation 54 and/or well system.
- Lower end 308 also should be adapted or configured to provide a stream of fluid therethrough and thus, like upper end 302 , may also be substantially tubular.
- lower end 308 forms a nose cone or member 310 with one or more fluid nozzles, outlets, or jets sized and positioned to provide multiple jets of fluid at the leading end of nose member 310 .
- nose member 310 may have a first outlet 312 along the longitudinal axis (LA) of downhole debris removal tool 76 .
- nose member 310 also may have one or more angled nozzles, outlets, or jets 314 that are angled relative to LA, for example.
- Extending between upper end 302 and the lower end 308 of downhole debris removal tool 76 is a substantially tubular member, such as mandrel 316 .
- the upper end of nose member 310 may be threadedly connected to the lower end of mandrel 316 via threaded ends or connectors 317
- the lower end of upper sub 304 may be threadedly connected to the upper end of mandrel 316 via threaded ends or connectors 305 .
- These threaded connections may be provided with or include seals, such as O-rings (not shown).
- mandrel 316 may be integrally formed with the upper sub 304 , nose member 310 , or both.
- mandrel 316 may consists of one member or may be one or more members that provide a flow path between upper sub 304 and nose member 310 .
- the lumens, passageways, or flowpaths of the upper sub 304 , mandrel 316 , and nose member 310 are continuous and form a flow passageway 318 extending end-to-end through the downhole debris removal tool 76 .
- a strainer or screen basket 320 is slidably supported on mandrel 316 substantially between upper sub 304 and nose member 310 .
- an annular flowpath or space 325 is provided between the inner surface of screen basket 320 and the outer surface of mandrel 316 for providing a flowpath for the recovered fluids and fines from wellbore 62 and vertical wellbores 70 .
- screen basket 320 includes a tubular body 322 having multiple screen openings 324 , which are disposed through and about tubular body 322 .
- screen basket 320 may be made from screen type materials that provide fluid flow therethrough while retaining fines and debris.
- the diameter or size of screen openings 324 may be determined based on the size of fines and debris that are to be recovered from wellbore 62 and vertical wellbores 70 .
- the size of screen openings 324 should be such that the fines and debris recovered by downhole debris removal tool 76 in wellbore 62 and vertical wellbores 70 are trapped in space 325 of downhole debris removal tool 76 while providing for the flow of fluid through screen openings 324 of downhole debris removal tool 76 as discussed further below.
- the upper end of tubular body 322 may include an upper end member 326 that is slidably disposed about mandrel 316 .
- Upper end member 326 preferably may have a sloped exterior wall 328 on its upper or uphole end.
- the lower or downhole end of tubular body 322 is open for providing an opening or entrance to space 325 for enabling the flow of fines, debris, and fluid to flow into space 325 as discussed further below.
- the lower or downhole end of tubular body 322 may include a gage ring 330 with a flared inlet 332 .
- Gage ring 330 may be connected to the end of tubular body 322 by a threaded coupler 334 .
- a belled or flared end may be formed to the lower end of tubular body 322 .
- the upper end of nose member 310 preferably has an angled annular shoulder 336 to facilitate a sealing engagement with inlet 332 of gage ring 330 of screen basket 320 when downhole debris removal tool 76 is in a substantially closed position as best shown in FIG. 3B .
- screen basket 320 will be urged upwardly on mandrel 316 allowing fines and debris carried in the well fluids to enter inlet 332 as shown by flowpath 327 .
- Screen openings 324 of screen basket 320 trap the fines and debris substantially within space 325 while allowing well fluid to flow through screen openings 324 by flowpath 329 .
- screen basket 320 When the tubing string is withdrawn from the well system, screen basket 320 will be urged downwardly on the mandrel 316 until the flared inlet 332 abuts shoulder 336 and closes screen basket 320 thus trapping the fines and debris within space 325 of downhole debris removal tool 76 . This allows the collected fines and debris to be removed from the well system and pulled up to the surface.
- Downhole debris removal system 50 and downhole debris removal system 100 may also include methods of extracting fines and debris from one or more well systems in formation 54 , for example.
- an embodiment of a method for removing fines and debris from a well and/or well system in formation 54 is schematically and generally designated 400 .
- downhole debris removal tool 76 may be attached to the end of one or more conduits and/or tubing strings, such as conduit 68 and conduits 72 , to be run into formation 54 .
- the conduit and/or tubing string including downhole debris removal tool 76 may then be introduced into formation 54 and advanced in a conventional manner.
- step 406 while the tubing string is advanced into one or more of wellbore 62 and/or vertical wellbores 70 , fluid may be circulated down through the tubing string through passageway 318 in downhole debris removal tool 76 and out the end of one or more outlets outlet 312 , 314 .
- This flow will agitate the well fluids and assist in the flow of fluid, fines, and debris into inlet 332 of gage ring 330 . This is shown via flowpath 327 entering inlet 332 , where fines, debris, and fluid enter space 325 . Fines and debris are then screened or trapped within space 325 while fluid is allowed to pass through screen openings 324 shown via flowpath 329 .
- Fluid flow through downhole debris removal tool 76 may be continuous or intermittent.
- step 408 if a mass of fines, coal fines, sand, or other debris restricts or blocks the downhole wellbore, advancement of the tubing string may be halted while the fluid flow through downhole debris removal tool 76 is continued. Additionally, the tubing string may even be withdrawn slightly during this step to further facilitate the breaking up and removal of such a blockage. This step will allow one or more of outlet 312 and outlets 314 to force jet streams of fluid on the obstruction until it is broken and dislodged. This step may also include allowing fluid flow to be increased to facilitate the disintegration of the plug or obstruction, if necessary. In step 410 , advancement of the tool string may be resumed until the operation is completed.
- Downhole debris removal tool 76 enables continuous fluid flow while the drill string is advanced to agitate well fluids and debris, enhancing the operation of the tool and reducing the likelihood that operation will be interrupted by blockages of sand and debris in the well.
- FIG. 5 another embodiment of a method for removing fines and debris from a well and/or well system in formation 54 is schematically and generally designated 500 .
- one or more substantially lateral wellbores, such as wellbore 62 may be intersected with one or more substantially vertical wellbores 70 .
- wellbore 62 and vertical wellbores 70 may be cased or open hole wellbores as commonly known to those skilled in the art.
- step 502 water may be first extracted from vertical wellbores 70 via conduits 72 , pumps 74 , and water extraction control units 52 .
- This dewatering step may occur through any or all of vertical wellbores 70 , for example.
- This step may include operating one or more water extraction control units 52 for controlling the flow of water through pumps 74 and conduits 72 to dewater the downhole wellbore or well system formed by the intersection of the substantially lateral section of wellbore 62 and vertical wellbores 70 .
- step 504 hydrocarbon gas may be recovered or extracted from one or more of wellbore 62 and vertical wellbores 70 . This step may include additional processing of the hydrocarbon gas subsequent to recovering it above ground 60 , for example.
- downhole debris removal tool 76 may be run into the downhole well or well system and positioned substantially adjacent or proximal to the restriction or blockage.
- fluid may be circulated down through the tubing string through passageway 318 in downhole debris removal tool 76 and out the end of outlets 312 and 314 . This flow will agitate the well fluids and assist in the flow of fines, debris, and fluid through into inlet 332 as shown in flowpath 327 and into space 325 . Fines and debris will be screened or trapped within space 325 while fluid flow will occur through screen openings 324 as shown in flowpath 329 . Fluid flow through downhole debris removal tool 76 may be continuous or intermittent.
- step 510 if a mass of fines, coal fines, sand, or other debris restricts or blocks the downhole wellbore, advancement of the tubing string may be halted while the fluid flow through downhole debris removal tool 76 is continued. Additionally, the tubing string may even be withdrawn slightly during this step to further facilitate the breaking up and removal of such a blockage. This step will allow one or more of outlet 312 and outlets 314 to force jet streams of fluid on the obstruction until it is broken and dislodged. This step may also include allowing fluid flow to be increased to facilitate the disintegration of the plug or obstruction, if necessary. In step 512 , advancement of the tool string may be resumed until the operation is completed.
- step 514 downhole debris removal tool 76 may be removed from the downhole wellbore or well system.
- step 516 recovery or extraction of the hydrocarbon gas may be resumed through one or more of wellbore 62 and vertical wellbores 70 as described herein. This step may include recovering and further processing the hydrocarbon gas above ground 60 via one or more of wellbore 62 and vertical wellbores 70 , in one example.
- Downhole debris removal tool 76 enables continuous fluid flow while the drill string is advanced to agitate well fluids and debris, enhancing the operation of the tool and reducing the likelihood that operation will be interrupted by blockages of fines, sand, and debris in the well.
- an embodiment of a method for removing coal fines from a well and/or well system in formation 54 is schematically and generally designated 600 .
- This particular embodiment may be applicable for coal seam gas wells, in one example.
- one or more substantially lateral wellbores, such as wellbore 62 is intersected with one or more substantially vertical wellbores 70 .
- wellbore 62 and vertical wellbores 70 may be cased or open hole wellbores as commonly known to those skilled in the art.
- formation 54 may be a coal seam as is commonly known to those skilled in the art.
- step 602 submersible pumps 74 are run into or positioned in one or more vertical wellbores 70 and operated to extract water from the downhole wellbore or well system via conduits 72 and water extraction control units 52 , for example.
- coal fines begin to accumulate and restrict one or more of wellbore 62 and vertical wellbores 70 . Due to the low bottom hole pressure, the coal fines are difficult to circulate out of the substantially lateral section of wellbore 62 and/or lower sections of vertical wellbores 70 and they accumulate creating blockages within one or more of wellbore 62 and vertical wellbores 70 , for example.
- downhole debris removal tool 76 may be run into the downhole well or well system and positioned substantially adjacent or proximal to the restriction or blockage caused by the accumulation of the coal fines.
- fluid may be circulated down through the tubing string to passageway 318 in downhole debris removal tool 76 and out the end of one or more outlets outlet 312 , 314 . This flow will agitate the well fluids and assist in the flow of fluid, fines, and debris into inlet 332 of gage ring 330 . This is shown via flowpath 327 entering inlet 332 , where fines, debris, and fluid enter space 325 . Fines and debris are then screened or trapped within space 325 while fluid is allowed to pass through screen openings 324 shown via flowpath 329 . Fluid flow through downhole debris removal tool 76 may be continuous or intermittent.
- step 608 if a mass of coal fines restricts or blocks the downhole wellbore, advancement of the tubing string may be halted in any of the wellbores while the fluid flow is continued, and the tubing string may even be withdrawn slightly.
- This step provides for a forceful stream of fluid to exit one or more outlet 312 and outlets 314 to work on the obstruction of coal fines until it is broken and dislodged.
- This step may also include allowing fluid flow to be increased to facilitate the disintegration of the plug or obstruction, if necessary.
- This step may further include capturing the coal fines in one or more downhole debris removal tool 76 .
- This step further includes having a pore size or screen mesh size of screen basket 320 to retain or collect the coal fines while simultaneously allowing fluid to pass through screen openings 324 of screen basket 320 .
- advancement of the tool string may be resumed until the operation is completed.
- step 612 downhole debris removal tool 76 may be removed from the downhole wellbore or well system.
- step 614 recovery or extraction of the hydrocarbon gas may begin through one or more of wellbore 62 and vertical wellbores 70 as described herein. This step may include recovering and further processing the hydrocarbon gas above ground 60 via one or more of wellbore 62 and vertical wellbores 70 , in one example.
- Downhole debris removal tool 76 enables continuous fluid flow while the drill string is advanced to agitate well fluids and debris, enhancing the operation of the tool and reducing the likelihood that operation will be interrupted by blockages of fines, sand, and debris in the well.
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Chemical & Material Sciences (AREA)
- Dispersion Chemistry (AREA)
- Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)
Abstract
A method for removing fines and debris from a downhole wellbore in a formation, including introducing a tubing string having a downhole debris removal tool disposed substantially near the lower end of the tubing string into the downhole wellbore; positioning the downhole debris removal tool substantially proximal to the fines and debris; circulating fluid through the downhole debris removal tool for disintegrating the fines and debris; and collecting the fines and debris in the downhole debris removal tool for removal out of the downhole wellbore.
Description
- This application claims the benefit of U.S. Provisional Application No. 60/804,789, filed 25 Mar. 2013. The entirety of this aforementioned application is incorporated herein by reference.
- This invention relates, in general, to a system and method for removing debris from a downhole wellbore.
- Without limiting the scope of the present invention, its background will be described in relation to a system and method for removing debris from a downhole wellbore, as an example.
- Recovering hydrocarbon gas from downhole environments can be problematic. For example, in coal seam gas recovery operations, water in the wellbores oftentimes impedes the gas recovery process in a particular hydrocarbon bearing formation. In some gas recovery or production processes, one or more horizontally drilled wellbores are intersected or connected with one or more vertical wellbores that contain pumps for removing the water that collects in the wellbore system. After the water is removed through the vertical wellbores, then hydrocarbon gas can be recovered through the same vertical wellbores, for example.
- One problem associated with the de-watering process is that it creates a low bottom hole pressure in the downhole wellbore that causes fines and debris, drawn with the hydrocarbon gas, to accumulate in the horizontal wellbore. Eventually, the horizontal wellbore accumulate enough fines or debris to severally restrict or block the flow of the hydrocarbon gas into the vertical wellbores causing a reduction in gas production. At this point, the fines or debris must be removed from the wellbore to restore the flow of hydrocarbon gas. Similarly, fines and/or debris may restrict or block the flow of hydrocarbon gas through the vertical wellbores, which then may also need to be removed to restore production gas flows.
- The present invention disclosed herein is directed to a system and method for removing debris from a downhole wellbore (“downhole debris removal system”). In one embodiment, the present invention is directed to a downhole debris removal tool, including a mandrel having an upper end and a lower end and a central passageway extending therebetween; a screen basket having an upper end and a lower end, the screen basket slidably disposed about the mandrel and operatable between an open position and a closed position; and a nose member having an upper end and a lower end and located substantially proximal to and in fluid communication with the lower end of the mandrel, the lower end of the nose member having one or more outlets for providing a stream of fluid therethrough.
- In one aspect, the lower end of the screen basket may include a flared end for sealing with the upper end of the nose member when in the closed position. Additionally, the upper end of the screen basket may be in a sealed arrangement with the mandrel for creating an annular space between the inner surface of the screen basket and the outer surface of the mandrel for retaining fines and debris. Further, the upper end of the nose member may terminate in an angular shoulder for sealing with the flared end of the lower end of the screen basket.
- In another aspect, the screen basket may include a plurality of screen openings sized to allow fluid to pass through while retaining fines and debris. Also, the flared end may be a gage ring. The downhole debris removal tool may also include an upper sub connected to the upper end of the mandrel, the upper sub having a larger diameter than the mandrel for engaging with the upper end of the screen basket when in the open position.
- In another embodiment, the present invention may be directed to a method for removing fines and debris from a downhole wellbore in a formation, including introducing a tubing string having a downhole debris removal tool disposed substantially near the lower end of the tubing string into the downhole wellbore; positioning the downhole debris removal tool substantially proximal to the fines and debris; circulating fluid through the downhole debris removal tool for disintegrating the fines and debris; and collecting the fines and debris in the downhole debris removal tool for removal out of the downhole wellbore.
- In one aspect, the disintegrating the fines and debris may include flowing a fluid under pressure through one or more outlets disposed through the end of the downhole debris removal tool. Also, the collecting the fines and debris may include filtering the fines and debris from the fluid through screens disposed about the downhole debris removal tool. Further, the method may include advancing distally the tubing string into the downhole wellbore.
- In another aspect, the introducing a tubing string having a downhole debris removal tool may further include flowing a fluid under pressure through one or more outlets disposed through the end of the downhole debris removal tool. Additionally, the positioning the downhole debris removal tool may include reversing direction of travel of the tubing string to create a larger distance between the downhole debris removal tool and the fines and debris. In yet another aspect, the collecting the fines and debris in the downhole debris removal tool may further include slidably closing the downhole debris removal tool to contain the fines and debris within the downhole debris removal tool.
- In yet another embodiment, the present invention may be directed to a method for recovering hydrocarbon gas from a downhole wellbore in a formation, including providing one or more substantially lateral wellbores and one or more substantially vertical wellbores in fluid communication with one another in the formation; introducing a submersible pump into one or more of the one or more vertical wellbores; extracting water from the downhole wellbore through one or more of the substantially vertical wellbores; extracting the hydrocarbon gas from the downhole wellbore through one or more of the one or more substantially lateral wellbores and the one or more substantially vertical wellbores; introducing a tubing string having a downhole debris removal tool disposed substantially near the lower end of the tubing string into the downhole wellbore; positioning the downhole debris removal tool substantially proximal to a blockage of fines and debris; circulating fluid through the downhole debris removal tool for disintegrating the blockage of fines and debris; and collecting the fines and debris in the downhole debris removal tool for removal out of the downhole wellbore.
- In one aspect, the method may further include removing the downhole debris removal tool from the downhole wellbore. Also, the method may further include resuming the extraction of the hydrocarbon gas from the downhole wellbore through one or more of the one or more substantially lateral wellbores and the one or more substantially vertical wellbores. In another aspect, the disintegrating the blockage may include flowing a fluid under pressure through one or more outlets disposed through the end of the downhole debris removal tool.
- In yet another aspect, the collecting the fines and debris may include filtering the fines and debris from the fluid through screens disposed about the downhole debris removal tool. Further, the positioning the downhole debris removal tool may include reversing direction of travel of the tubing string to create a larger distance between the downhole debris removal tool and the fines and debris. Additionally, the collecting the fines and debris in the downhole debris removal tool may include slidably closing the downhole debris removal tool to contain the fines and debris within the downhole debris removal tool.
- In still yet another embodiment, the present invention may be directed to a a method for recovering hydrocarbon gas from a coal seam gas well, including providing one or more substantially lateral wellbores and one or more substantially vertical wellbores in fluid communication with one another in a coal seam; introducing a submersible pump into one or more of the one or more vertical wellbores; extracting water from the downhole wellbore through one or more of the substantially vertical wellbores; running a tubing string having a downhole debris removal tool disposed substantially near the lower end of the tubing string into one or more of the one or more substantially lateral wellbores; circulating fluid through the downhole debris removal tool for disintegrating a mass of coal fines; collecting the coal fines in the downhole debris removal tool for removal out of the coal seam gas well; removing the downhole debris removal tool from the coal seam gas well; and extracting the hydrocarbon gas from the coal seam gas well through one or more of the one or more substantially lateral wellbores and the one or more substantially vertical wellbores.
- In one aspect, the running a tubing string may further include running a second tubing string having a downhole debris removal tool disposed substantially near the lower end of the second tubing string into one or more of the one or more substantially vertical wellbores. Also, the method may further include moving distally the downhole debris removal tool further into the coal seam gas well. In another aspect, the disintegrating a mass of coal fines may include flowing a fluid under pressure through one or more outlets disposed through the end of the downhole debris removal tool. Additionally, the collecting the fines and debris may include filtering the fines and debris from the fluid through screens disposed about the downhole debris removal tool.
- In yet another aspect, the positioning the downhole debris removal tool may further include reversing direction of travel of the tubing string to create a larger distance between the downhole debris removal tool and the fines and debris. Further, the collecting the fines and debris in the downhole debris removal tool may further include slidably closing the downhole debris removal tool to contain the fines and debris within the downhole debris removal tool.
- For a more complete understanding of the features and advantages of the present invention, reference is now made to the detailed description of the invention along with the accompanying figures in which corresponding numerals in the different figures refer to corresponding parts and in which:
-
FIG. 1 is a schematic illustration of a downhole debris removal system according to an embodiment; -
FIG. 2 is a schematic illustration of a downhole debris removal system according to another embodiment; -
FIG. 3A is a cross-section view of a downhole debris removal tool in a first operating position of the downhole debris removal system according to an embodiment; -
FIG. 3B is a cross-section view of a downhole debris removal tool in a second operating position of the downhole debris removal system according to an embodiment; -
FIG. 3C is a side view of a downhole debris removal tool of the downhole debris removal system according to an embodiment; -
FIG. 4 is a flowchart of a process for removing fines and debris from a downhole wellbore of the downhole debris removal system according to an embodiment; -
FIG. 5 is a flowchart of a process for removing fines and debris from a downhole wellbore of the downhole debris removal system according to another embodiment; and -
FIG. 6 is a flowchart of a process for removing coal fines from a downhole wellbore in a coal seam of the downhole debris removal system according to another embodiment. - While the making and using of various embodiments of the present invention are discussed in detail below, it should be appreciated that the present invention provides many applicable inventive concepts which can be embodied in a wide variety of specific contexts. The specific embodiments discussed herein are merely illustrative of specific ways to make and use the invention, and do not limit the scope of the present invention.
- In the following description of the representative embodiments of the invention, directional terms, such as “above,” “below,” “upper,” “lower,” etc., are used for convenience in referring to the accompanying drawings. In general, “above,” “upper,” “upward,” and similar terms refer to a direction toward the earth's surface along a wellbore, and “below,” “lower,” “downward,” and similar terms refer to a direction away from the earth's surface along the wellbore. Additionally, the term “proximal” refers to a linear, non-linear, or curvilinear distance or point nearer to a point of reference or direction that is closer to a relative term or object, and the term “distal” refers to a linear, non-linear, or curvilinear distance or point farther to a point of reference or direction that is farther to a relative term or object.
- Referring to
FIG. 1 , a downhole debris removal system in use with an oil and gas production unit is schematically illustrated and generally designated 50. One or more water onshore extraction control units 52 a-52 n (collectively water extraction control units 52) are located over an oil andgas formation 54. Although downholedebris removal system 50 is discussed herein with reference to onshore production, downholedebris removal system 50 may be used with any type of onshore or offshore oil and/or gas rig and/or operation as are commonly known to those skilled in the art. Awellhead installation 56 may include ablowout preventer 58, which may be located onground 60 for providing fluid communication and control betweenformation 54 and oil and gas operations, such as a coiled tubing unit (not shown), for example. As is known to those skilled in the art,wellhead installation 56 andblowout preventer 58 are part of many different configurations of oil and gas rigs, platforms, operations, and the like, and that other components that may be commonly associated with processing and recovering hydrocarbon gases and fluids for consumer use are not shown or described herein. Further, downholedebris removal system 50 may be used with other types of hydrocarbon recovery operations that are commonly known to those skilled in the art. - In another embodiment, other types of surface control units other than
wellhead installation 56 andblowout preventers 58 may be used with downholedebris removal system 50. For example, a coiled tubing unit may be in place ofwellhead installation 56 andblowout preventers 58. - A
wellbore 62 extends through the various earthstrata including formation 54. Acasing 64 may be cemented within a vertical and/or horizontal section ofwellbore 62 bycement 66. Even thoughFIG. 1 depicts onelateral wellbore 62, it should be understood by those skilled in the art that downholedebris removal system 50 may be used in conjunction with any number of vertical and/or lateral wellbores. Additionally, wellbore 62 may be a cased or open hole wellbore in fluid communication with one or more vertical wellbores, as described further below. - Downhole
debris removal system 50 may include aconduit 68, such as coiled tubing or tubular members, which provide fluid communication to the downhole end ofwellbore 62. Some examples ofconduit 68 may include casing, liners, and the like. Additionally, downholedebris removal system 50 may include one or more vertical wellbores 70 a-70 n (collectively vertical wellbores 70) that are in fluid communication withwellbore 62. -
FIG. 1 shows a substantially casedwellbore 62 whereconduit 68 extends substantially towards the end ofwellbore 62. In this embodiment,conduit 68 may include perforations, screens, and the like for allowing gas and liquids to pass fromformation 54 intoconduit 68. Additionally in this embodiment, wellbore 62 may be partially or fully cemented. As shown inFIG. 1 ,cement 66 is not in place throughout the entire length ofwellbore 62. - In another embodiment, wellbore 62 may be an open hole wellbore 62 where
conduit 68 is not in place the entire length ofwellbore 62. In this embodiment,conduit 68 may extend a partial length throughwellbore 62, but may end prior to vertical wellbores 70. In yet another embodiment,conduit 68 may extend any length throughwellbore 62. - In addition, even though
FIG. 1 depicts downholedebris removal system 50 in a substantially horizontal wellbore, it should be understood by those skilled in the art that downholedebris removal system 50 is equally well suited for use in wells having other directional configurations including horizontal wells, vertical wells, deviated wellbores, slanted wells, multilateral wells, and the like. - Although three substantially vertical wellbores 70 are shown in
FIG. 1 , any number of vertical wellbores 70 may be included with the present downhole debris removal system. Vertical wellbores 70 and wellbore 62 may all be in fluid communication with each other and may constitute a well system, in one embodiment. - Downhole
debris removal system 50 may further include one or more conduits 72 a-72 n (collectively conduits 72) in fluid communication with one or more pumps 74 a-74 n (collectively pumps 74) for extracting water and other fluids from any portions, including vertical, horizontal, lateral, and the like, ofwellbore 62 as described further below. As shown inFIG. 1 ,conduit 72 a is located invertical wellbore 70 a,conduit 72 b is located invertical wellbore 70 b, and conduit 72 c is located in vertical wellbore 70 c. As discussed above, any number of vertical wellbores 70 may be used with downholedebris removal system 50. Additionally, in some instances, downholedebris removal system 50 may be used in a wellbore system that includeswellbore 62 but does not include vertical wellbores 70. In yet another embodiment, downholedebris removal system 50 may be used in a wellbore system that includes vertical wellbores 70 but does not includewellbore 62. Conduits 72 may be any type of tubular members, pipes, etc. that provide a pathway/flowpath between pumps 74 and water extraction control units 52 for gases, liquids, and fluids as are commonly known to those skilled in the art. - Further, downhole
debris removal system 50 may include a downholedebris removal tool 76 for removing fines and debris from any portions ofwellbore 62, in one embodiment. As shown inFIG. 1 , downholedebris removal tool 76 is located substantially betweenvertical wellbore 70 b andvertical wellbore 70 n for clearing fines and debris in this section ofwellbore 62, in one example. Further, downholedebris removal tool 76 may be moved along and through any section ofwellbore 62, such as from any vertical wellbores 70 to any other vertical wellbores 70 as desired for selectively removing fines and debris disposed or accumulated in any portions ofwellbore 62, in one embodiment. - As shown in
FIG. 1 , downholedebris removal system 50 may include one ormore wellbores 62 for extracting hydrocarbon gas, water, and other gases and fluids. In addition, this wellbore may be used to extract or remove fines and debris with downholedebris removal tool 76 when parts of the well system become blocked or restricted by accumulated fines and debris in the well system. Additionally, wellbores 70 a-70 n may be used for extracting or removing water for de-watering the well system and they may also be used for recovering hydrocarbon gas fromformation 54 once a desirable amount of water has been removed from the well system. In another embodiment, other components may be used in vertical wellbores 70 for de-watering the well system and recovering/controlling the recovery of hydrocarbons, such as hydrocarbon liquid and/or gas, that are commonly known to those skilled in the art. - Turning now to
FIG. 2 , a downhole debris removal system in use with two oil and gas production units are schematically illustrated and generally designated 100. In describing downholedebris removal system 100 many of the corresponding numerals shown refer to corresponding elements, parts, and the like described relative to downholedebris removal system 50, thus they may not be repeated in detail below. As shown inFIG. 2 , downholedebris removal system 100 further includes another oil and gas production unit includingblowout preventer 102 andwellhead installation 104 for recovering oil and gas from a substantially vertical wellbore, such asvertical wellbore 70 a. -
Wellhead installation 56, includingblowout preventer 58, are located onground 60 for providing fluid communication and control betweenformation 54 and oil and gas operations, such as a coiled tubing unit (not shown), for example. As is known to those skilled in the art,wellhead installation 56 andblowout preventer 58 may be part of many different configurations of oil and gas rigs, platforms, operations, and the like, and that other components that may be commonly associated with processing hydrocarbon gases and fluids are not shown or described herein. -
Wellbore 70 a extends through the various earthstrata including formation 54. Even thoughFIG. 2 depicts one substantiallylateral wellbore 62 and one substantiallyvertical wellbore 70 a for recovering hydrocarbon gases and fluids it should be understood by those skilled in the art that downholedebris removal system 100 may be used in conjunction with any number of wellbores, such aslateral wellbore 62. Further, downholedebris removal system 100 may be used with any number of substantially horizontal wellbores and vertical wellbores of a wellbore system. Additionally, wellbores 62 and 70 a may be cased or open hole wellbores in fluid communication with one or more vertical wellbores, as described further herein. - In addition, even though
FIG. 2 depicts downholedebris removal system 100 with a substantially vertical wellbore it should be understood by those skilled in the art that the downhole debris removal system is equally well suited for use in wells or well systems having other directional configurations including horizontal wells, vertical wells, deviated wellbores, slanted wells, multilateral wells and the like. - Downhole
debris removal system 100 may include aconduit 106, such as coiled tubing, tubular members, pipe, and the like which provide fluid communication to the downhole end ofwellbore 70 a. Additionally, downholedebris removal system 100 may include one or morevertical wellbores 70 b-70 n (collectively vertical wellbores 70) that are in fluid communication withwellbores FIG. 2 , any number of vertical wellbores 70 may be included with the present downhole debris removal system. Vertical wellbores 70 and wellbore 62 may all be in fluid communication with each other and may constitute a well system, in one embodiment. -
Conduit 106 is in fluid communication withformation 54 for extracting hydrocarbon gas and other fluids from any portions, including vertical, horizontal, lateral, and the like, offormation 54 as described further below. Further, downholedebris removal system 100 may include a downholedebris removal tool 76 located withinvertical wellbore 70 a for removing fines and debris from any portions ofwellbore 70 a, in one embodiment. As can be seen inFIG. 2 , downholedebris removal tool 76 is also located withwellbore 62. - As shown in
FIG. 2 , downholedebris removal system 100 may include one ormore wellbores debris removal tool 76 when parts of the well system become blocked or restricted by accumulated fines and debris in the well system. Additionally, wellbores 70 b-70 n may be used for extracting or removing water for de-watering the well system and they may also be used for recovering hydrocarbon gas fromformation 54 once a desirable amount of water has been removed from the well system. - Downhole
debris removal systems debris removal tools 76 for removing accumulated fines and debris within any of the wellbores of the well or well system. In addition, several downholedebris removal tool 76 may be used in series or in a stacked configuration in each of one ormore wellbore 62 and vertical wellbores 70. For example, a series of downholedebris removal tool 76 may be located one above another along a work string and the like for utilizing in a downhole well environment. - Referring now to
FIGS. 3A-3C , one embodiment of downholedebris removal tool 76 is shown. Downholedebris removal tool 76 includes a substantially tubularupper end 302 andupper sub 304 having a substantially tubular axially threaded end orconnector 306 for coupling to a lower end of a tubular member orconduits upper sub 304. Downhole debris removal tool further includes alower end 308.Lower end 308 preferably is adapted to engage a collection of sand or other mass of fines and debris withinformation 54 and/or the well system. In one embodiment,lower end 308 may be beveled or conical in shape for improved removal or engagement with fines and debris information 54 and/or well system.Lower end 308 also should be adapted or configured to provide a stream of fluid therethrough and thus, likeupper end 302, may also be substantially tubular. - Most preferably,
lower end 308 forms a nose cone ormember 310 with one or more fluid nozzles, outlets, or jets sized and positioned to provide multiple jets of fluid at the leading end ofnose member 310. For example,nose member 310 may have afirst outlet 312 along the longitudinal axis (LA) of downholedebris removal tool 76. Additionally,nose member 310 also may have one or more angled nozzles, outlets, orjets 314 that are angled relative to LA, for example. - Extending between
upper end 302 and thelower end 308 of downholedebris removal tool 76 is a substantially tubular member, such asmandrel 316. In one embodiment, the upper end ofnose member 310 may be threadedly connected to the lower end ofmandrel 316 via threaded ends orconnectors 317, while the lower end ofupper sub 304 may be threadedly connected to the upper end ofmandrel 316 via threaded ends orconnectors 305. These threaded connections may be provided with or include seals, such as O-rings (not shown). Still further,mandrel 316 may be integrally formed with theupper sub 304,nose member 310, or both. Additionally,mandrel 316 may consists of one member or may be one or more members that provide a flow path betweenupper sub 304 andnose member 310. Thus, the lumens, passageways, or flowpaths of theupper sub 304,mandrel 316, andnose member 310 are continuous and form aflow passageway 318 extending end-to-end through the downholedebris removal tool 76. - A strainer or
screen basket 320 is slidably supported onmandrel 316 substantially betweenupper sub 304 andnose member 310. In one embodiment, an annular flowpath orspace 325 is provided between the inner surface ofscreen basket 320 and the outer surface ofmandrel 316 for providing a flowpath for the recovered fluids and fines fromwellbore 62 and vertical wellbores 70. While the structure and shape ofscreen basket 320 may vary, in a preferred form,screen basket 320 includes atubular body 322 havingmultiple screen openings 324, which are disposed through and abouttubular body 322. In one embodiment,screen basket 320 may be made from screen type materials that provide fluid flow therethrough while retaining fines and debris. - Additionally, the diameter or size of
screen openings 324 may be determined based on the size of fines and debris that are to be recovered fromwellbore 62 and vertical wellbores 70. The size ofscreen openings 324 should be such that the fines and debris recovered by downholedebris removal tool 76 inwellbore 62 and vertical wellbores 70 are trapped inspace 325 of downholedebris removal tool 76 while providing for the flow of fluid throughscreen openings 324 of downholedebris removal tool 76 as discussed further below. - The upper end of
tubular body 322 may include anupper end member 326 that is slidably disposed aboutmandrel 316.Upper end member 326 preferably may have a slopedexterior wall 328 on its upper or uphole end. The lower or downhole end oftubular body 322 is open for providing an opening or entrance tospace 325 for enabling the flow of fines, debris, and fluid to flow intospace 325 as discussed further below. In this particular embodiment, the lower or downhole end oftubular body 322 may include agage ring 330 with a flaredinlet 332.Gage ring 330 may be connected to the end oftubular body 322 by a threadedcoupler 334. - In another embodiment, in place of
gage ring 330, a belled or flared end may be formed to the lower end oftubular body 322. The upper end ofnose member 310 preferably has an angledannular shoulder 336 to facilitate a sealing engagement withinlet 332 ofgage ring 330 ofscreen basket 320 when downholedebris removal tool 76 is in a substantially closed position as best shown inFIG. 3B . - Now it will be understood that as the tubing string, such as
conduit 68, is advanced into any ofwellbores 62 and 70,screen basket 320 will be urged upwardly onmandrel 316 allowing fines and debris carried in the well fluids to enterinlet 332 as shown byflowpath 327.Screen openings 324 ofscreen basket 320 trap the fines and debris substantially withinspace 325 while allowing well fluid to flow throughscreen openings 324 byflowpath 329. When the tubing string is withdrawn from the well system,screen basket 320 will be urged downwardly on themandrel 316 until the flaredinlet 332 abutsshoulder 336 and closesscreen basket 320 thus trapping the fines and debris withinspace 325 of downholedebris removal tool 76. This allows the collected fines and debris to be removed from the well system and pulled up to the surface. - Downhole
debris removal system 50 and downholedebris removal system 100 may also include methods of extracting fines and debris from one or more well systems information 54, for example. With reference toFIG. 4 , an embodiment of a method for removing fines and debris from a well and/or well system information 54 is schematically and generally designated 400. Instep 402, downholedebris removal tool 76 may be attached to the end of one or more conduits and/or tubing strings, such asconduit 68 and conduits 72, to be run intoformation 54. Instep 404, the conduit and/or tubing string including downholedebris removal tool 76 may then be introduced intoformation 54 and advanced in a conventional manner. - In
step 406, while the tubing string is advanced into one or more ofwellbore 62 and/or vertical wellbores 70, fluid may be circulated down through the tubing string throughpassageway 318 in downholedebris removal tool 76 and out the end of one ormore outlets outlet inlet 332 ofgage ring 330. This is shown viaflowpath 327 enteringinlet 332, where fines, debris, andfluid enter space 325. Fines and debris are then screened or trapped withinspace 325 while fluid is allowed to pass throughscreen openings 324 shown viaflowpath 329. Fluid flow through downholedebris removal tool 76 may be continuous or intermittent. - In
step 408, if a mass of fines, coal fines, sand, or other debris restricts or blocks the downhole wellbore, advancement of the tubing string may be halted while the fluid flow through downholedebris removal tool 76 is continued. Additionally, the tubing string may even be withdrawn slightly during this step to further facilitate the breaking up and removal of such a blockage. This step will allow one or more ofoutlet 312 andoutlets 314 to force jet streams of fluid on the obstruction until it is broken and dislodged. This step may also include allowing fluid flow to be increased to facilitate the disintegration of the plug or obstruction, if necessary. Instep 410, advancement of the tool string may be resumed until the operation is completed. - Now it will be appreciated that this method provides removal of fines and debris from a downhole wellbore in a formation, such as
formation 54. Downholedebris removal tool 76 enables continuous fluid flow while the drill string is advanced to agitate well fluids and debris, enhancing the operation of the tool and reducing the likelihood that operation will be interrupted by blockages of sand and debris in the well. - With reference now to
FIG. 5 , another embodiment of a method for removing fines and debris from a well and/or well system information 54 is schematically and generally designated 500. In this embodiment, one or more substantially lateral wellbores, such aswellbore 62 may be intersected with one or more substantially vertical wellbores 70. In this embodiment, wellbore 62 and vertical wellbores 70 may be cased or open hole wellbores as commonly known to those skilled in the art. - In
step 502, water may be first extracted from vertical wellbores 70 via conduits 72, pumps 74, and water extraction control units 52. This dewatering step may occur through any or all of vertical wellbores 70, for example. This step may include operating one or more water extraction control units 52 for controlling the flow of water through pumps 74 and conduits 72 to dewater the downhole wellbore or well system formed by the intersection of the substantially lateral section ofwellbore 62 and vertical wellbores 70. Instep 504, hydrocarbon gas may be recovered or extracted from one or more ofwellbore 62 and vertical wellbores 70. This step may include additional processing of the hydrocarbon gas subsequent to recovering it aboveground 60, for example. - Once fines and debris begin to accumulate in the downhole wellbore in
formation 54, the flow of hydrocarbon gas may become restricted or blocked fully thereby reducing or stopping production of the hydrocarbon gas aboveground 60. Instep 506, downholedebris removal tool 76 may be run into the downhole well or well system and positioned substantially adjacent or proximal to the restriction or blockage. Instep 508, fluid may be circulated down through the tubing string throughpassageway 318 in downholedebris removal tool 76 and out the end ofoutlets inlet 332 as shown inflowpath 327 and intospace 325. Fines and debris will be screened or trapped withinspace 325 while fluid flow will occur throughscreen openings 324 as shown inflowpath 329. Fluid flow through downholedebris removal tool 76 may be continuous or intermittent. - In
step 510, if a mass of fines, coal fines, sand, or other debris restricts or blocks the downhole wellbore, advancement of the tubing string may be halted while the fluid flow through downholedebris removal tool 76 is continued. Additionally, the tubing string may even be withdrawn slightly during this step to further facilitate the breaking up and removal of such a blockage. This step will allow one or more ofoutlet 312 andoutlets 314 to force jet streams of fluid on the obstruction until it is broken and dislodged. This step may also include allowing fluid flow to be increased to facilitate the disintegration of the plug or obstruction, if necessary. Instep 512, advancement of the tool string may be resumed until the operation is completed. - In
step 514, downholedebris removal tool 76 may be removed from the downhole wellbore or well system. Instep 516, recovery or extraction of the hydrocarbon gas may be resumed through one or more ofwellbore 62 and vertical wellbores 70 as described herein. This step may include recovering and further processing the hydrocarbon gas aboveground 60 via one or more ofwellbore 62 and vertical wellbores 70, in one example. - Now it will be appreciated that that this method provides removal of fines and debris from a downhole wellbore in a formation, such as
formation 54. Downholedebris removal tool 76 enables continuous fluid flow while the drill string is advanced to agitate well fluids and debris, enhancing the operation of the tool and reducing the likelihood that operation will be interrupted by blockages of fines, sand, and debris in the well. - With reference now to
FIG. 6 , an embodiment of a method for removing coal fines from a well and/or well system information 54 is schematically and generally designated 600. This particular embodiment may be applicable for coal seam gas wells, in one example. In this embodiment, one or more substantially lateral wellbores, such aswellbore 62 is intersected with one or more substantially vertical wellbores 70. In this embodiment, wellbore 62 and vertical wellbores 70 may be cased or open hole wellbores as commonly known to those skilled in the art. In this embodiment,formation 54 may be a coal seam as is commonly known to those skilled in the art. - In
step 602, submersible pumps 74 are run into or positioned in one or more vertical wellbores 70 and operated to extract water from the downhole wellbore or well system via conduits 72 and water extraction control units 52, for example. As the water is pulled into the substantially lateral section ofwellbore 62, coal fines begin to accumulate and restrict one or more ofwellbore 62 and vertical wellbores 70. Due to the low bottom hole pressure, the coal fines are difficult to circulate out of the substantially lateral section ofwellbore 62 and/or lower sections of vertical wellbores 70 and they accumulate creating blockages within one or more ofwellbore 62 and vertical wellbores 70, for example. - In
step 604, downholedebris removal tool 76 may be run into the downhole well or well system and positioned substantially adjacent or proximal to the restriction or blockage caused by the accumulation of the coal fines. Insteps passageway 318 in downholedebris removal tool 76 and out the end of one ormore outlets outlet inlet 332 ofgage ring 330. This is shown viaflowpath 327 enteringinlet 332, where fines, debris, andfluid enter space 325. Fines and debris are then screened or trapped withinspace 325 while fluid is allowed to pass throughscreen openings 324 shown viaflowpath 329. Fluid flow through downholedebris removal tool 76 may be continuous or intermittent. - Additionally regarding
step 608, if a mass of coal fines restricts or blocks the downhole wellbore, advancement of the tubing string may be halted in any of the wellbores while the fluid flow is continued, and the tubing string may even be withdrawn slightly. This step provides for a forceful stream of fluid to exit one ormore outlet 312 andoutlets 314 to work on the obstruction of coal fines until it is broken and dislodged. This step may also include allowing fluid flow to be increased to facilitate the disintegration of the plug or obstruction, if necessary. This step may further include capturing the coal fines in one or more downholedebris removal tool 76. This step further includes having a pore size or screen mesh size ofscreen basket 320 to retain or collect the coal fines while simultaneously allowing fluid to pass throughscreen openings 324 ofscreen basket 320. Instep 610, advancement of the tool string may be resumed until the operation is completed. - In
step 612, downholedebris removal tool 76 may be removed from the downhole wellbore or well system. Instep 614, recovery or extraction of the hydrocarbon gas may begin through one or more ofwellbore 62 and vertical wellbores 70 as described herein. This step may include recovering and further processing the hydrocarbon gas aboveground 60 via one or more ofwellbore 62 and vertical wellbores 70, in one example. - Now it will be appreciated that that this method provides removal of fines and debris from a downhole wellbore in a formation, such as
formation 54. Downholedebris removal tool 76 enables continuous fluid flow while the drill string is advanced to agitate well fluids and debris, enhancing the operation of the tool and reducing the likelihood that operation will be interrupted by blockages of fines, sand, and debris in the well. - While this invention has been described with reference to illustrative embodiments, this description is not intended to be construed in a limiting sense. Various modifications and combinations of the illustrative embodiments as well as other embodiments of the invention will be apparent to persons skilled in the art upon reference to the description. It is, therefore, intended that the appended claims encompass any such modifications or embodiments.
Claims (28)
1. A downhole debris removal tool, comprising:
a mandrel having an upper end and a lower end and a central passageway extending therebetween;
a screen basket having an upper end and a lower end, the screen basket slidably disposed about the mandrel and operatable between an open position and a closed position; and
a nose member having an upper end and a lower end and located substantially proximal to and in fluid communication with the lower end of the mandrel, the lower end of the nose member having one or more outlets for providing a stream of fluid therethrough.
2. The downhole debris removal tool as recited in claim 1 , wherein the lower end of the screen basket includes a flared end for sealing with the upper end of the nose member when in the closed position.
3. The downhole debris removal tool as recited in claim 1 , wherein upper end of the screen basket is in a sealed arrangement with the mandrel for creating an annular space between the inner surface of the screen basket and the outer surface of the mandrel for retaining fines and debris.
4. The downhole debris removal tool as recited in claim 2 , wherein the upper end of the nose member terminates in an angular shoulder for sealing with the flared end of the lower end of the screen basket.
5. The downhole debris removal tool as recited in claim 1 , wherein the screen basket includes a plurality of screen openings sized to allow fluid to pass through while retaining fines and debris.
6. The downhole debris removal tool as recited in claim 2 , wherein the flared end is a gage ring.
7. The downhole debris removal tool as recited in claim 1 , further comprising:
an upper sub connected to the upper end of the mandrel, the upper sub having a larger diameter than the mandrel for engaging with the upper end of the screen basket when in the open position.
8. A method for removing fines and debris from a downhole wellbore in a formation, comprising:
introducing a tubing string having a downhole debris removal tool disposed substantially near the lower end of the tubing string into the downhole wellbore;
positioning the downhole debris removal tool substantially proximal to the fines and debris;
circulating fluid through the downhole debris removal tool for disintegrating the fines and debris; and
collecting the fines and debris in the downhole debris removal tool for removal out of the downhole wellbore.
9. The method as recited in claim 8 , wherein the disintegrating the fines and debris comprises:
flowing a fluid under pressure through one or more outlets disposed through the end of the downhole debris removal tool.
10. The method as recited in claim 8 , wherein the collecting the fines and debris comprises:
filtering the fines and debris from the fluid through screens disposed about the downhole debris removal tool.
11. The method as recited in claim 8 , further comprising:
advancing distally the tubing string into the downhole wellbore.
12. The method as recited in claim 8 , wherein the introducing a tubing string having a downhole debris removal tool further comprises:
flowing a fluid under pressure through one or more outlets disposed through the end of the downhole debris removal tool.
13. The method as recited in claim 8 , wherein the positioning the downhole debris removal tool further comprises:
reversing direction of travel of the tubing string to create a larger distance between the downhole debris removal tool and the fines and debris.
14. The method as recited in claim 8 , wherein the collecting the fines and debris in the downhole debris removal tool further comprises:
slidably closing the downhole debris removal tool to contain the fines and debris within the downhole debris removal tool.
15. A method for recovering hydrocarbon gas from a downhole wellbore in a formation, comprising:
providing one or more substantially lateral wellbores and one or more substantially vertical wellbores in fluid communication with one another in the formation;
introducing a submersible pump into one or more of the one or more vertical wellbores;
extracting water from the downhole wellbore through one or more of the substantially vertical wellbores;
extracting the hydrocarbon gas from the downhole wellbore through one or more of the one or more substantially lateral wellbores and the one or more substantially vertical wellbores;
introducing a tubing string having a downhole debris removal tool disposed substantially near the lower end of the tubing string into the downhole wellbore;
positioning the downhole debris removal tool substantially proximal to a blockage of fines and debris;
circulating fluid through the downhole debris removal tool for disintegrating the blockage of fines and debris; and
collecting the fines and debris in the downhole debris removal tool for removal out of the downhole wellbore.
16. The method as recited in claim 15 , further comprising:
removing the downhole debris removal tool from the downhole wellbore.
17. The method as recited in claim 15 , further comprising:
resuming the extraction of the hydrocarbon gas from the downhole wellbore through one or more of the one or more substantially lateral wellbores and the one or more substantially vertical wellbores.
18. The method as recited in claim 15 , wherein the disintegrating the blockage comprises:
flowing a fluid under pressure through one or more outlets disposed through the end of the downhole debris removal tool.
19. The method as recited in claim 15 , wherein the collecting the fines and debris comprises:
filtering the fines and debris from the fluid through screens disposed about the downhole debris removal tool.
20. The method as recited in claim 15 , wherein the positioning the downhole debris removal tool further comprises:
reversing direction of travel of the tubing string to create a larger distance between the downhole debris removal tool and the fines and debris.
21. The method as recited in claim 15 , wherein the collecting the fines and debris in the downhole debris removal tool further comprises:
slidably closing the downhole debris removal tool to contain the fines and debris within the downhole debris removal tool.
22. A method for recovering hydrocarbon gas from a coal seam gas well, comprising:
providing one or more substantially lateral wellbores and one or more substantially vertical wellbores in fluid communication with one another in a coal seam;
introducing a submersible pump into one or more of the one or more vertical wellbores;
extracting water from the downhole wellbore through one or more of the substantially vertical wellbores;
running a tubing string having a downhole debris removal tool disposed substantially near the lower end of the tubing string into one or more of the one or more substantially lateral wellbores;
circulating fluid through the downhole debris removal tool for disintegrating a mass of coal fines;
collecting the coal fines in the downhole debris removal tool for removal out of the coal seam gas well;
removing the downhole debris removal tool from the coal seam gas well; and
extracting the hydrocarbon gas from the coal seam gas well through one or more of the one or more substantially lateral wellbores and the one or more substantially vertical wellbores.
23. The method as recited in claim 22 , wherein the running a tubing string may further comprise:
running a second tubing string having a downhole debris removal tool disposed substantially near the lower end of the second tubing string into one or more of the one or more substantially vertical wellbores.
24. The method as recited in claim 22 , further comprising:
moving distally the downhole debris removal tool further into the coal seam gas well.
25. The method as recited in claim 22 , wherein the disintegrating a mass of coal fines comprises:
flowing a fluid under pressure through one or more outlets disposed through the end of the downhole debris removal tool.
26. The method as recited in claim 22 , wherein the collecting the fines and debris comprises:
filtering the fines and debris from the fluid through screens disposed about the downhole debris removal tool.
27. The method as recited in claim 22 , wherein the positioning the downhole debris removal tool further comprises:
reversing direction of travel of the tubing string to create a larger distance between the downhole debris removal tool and the fines and debris.
28. The method as recited in claim 22 , wherein the collecting the fines and debris in the downhole debris removal tool further comprises:
slidably closing the downhole debris removal tool to contain the fines and debris within the downhole debris removal tool.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US14/224,346 US20140202699A1 (en) | 2006-06-14 | 2014-03-25 | System and Method for Removing Debris from a Downhole Wellbore |
PCT/US2014/031739 WO2014160716A2 (en) | 2013-03-25 | 2014-03-25 | System and method for removing debris from a downhole wellbore |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US80478906P | 2006-06-14 | 2006-06-14 | |
US14/224,346 US20140202699A1 (en) | 2006-06-14 | 2014-03-25 | System and Method for Removing Debris from a Downhole Wellbore |
Publications (1)
Publication Number | Publication Date |
---|---|
US20140202699A1 true US20140202699A1 (en) | 2014-07-24 |
Family
ID=51206825
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US14/224,346 Abandoned US20140202699A1 (en) | 2006-06-14 | 2014-03-25 | System and Method for Removing Debris from a Downhole Wellbore |
Country Status (1)
Country | Link |
---|---|
US (1) | US20140202699A1 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018106121A1 (en) * | 2016-12-06 | 2018-06-14 | Bri Well Services As | Apparatus and method for collecting debris from a wellbore |
US10301883B2 (en) | 2017-05-03 | 2019-05-28 | Coil Solutions, Inc. | Bit jet enhancement tool |
US10502014B2 (en) | 2017-05-03 | 2019-12-10 | Coil Solutions, Inc. | Extended reach tool |
CN115045640A (en) * | 2022-06-27 | 2022-09-13 | 中煤科工集团西安研究院有限公司 | Device and method for pulling screen pipe in opposite directions through penetrating drilled holes |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3572431A (en) * | 1969-09-08 | 1971-03-23 | Donald P Hammon | Fluid circulating and retrieving apparatus for oil wells |
US4190113A (en) * | 1978-07-27 | 1980-02-26 | Harrison Wayne O | Well cleanout tool |
US5251701A (en) * | 1992-03-12 | 1993-10-12 | Wada Ventures | Methods and apparatus for removing debris from a well bore |
US5553669A (en) * | 1995-02-14 | 1996-09-10 | Trainer; C. W. | Particulate separator for fluid production wells |
US6719050B2 (en) * | 2002-02-06 | 2004-04-13 | Kenneth E. Longacre | Method and apparatus for removing solid material from a well using a rotary pump |
US6951251B2 (en) * | 2003-10-06 | 2005-10-04 | Bilco Tools, Inc. | Junk basket and method |
US7493951B1 (en) * | 2005-11-14 | 2009-02-24 | Target Drilling, Inc. | Under-balanced directional drilling system |
US8800660B2 (en) * | 2009-03-26 | 2014-08-12 | Smith International, Inc. | Debris catcher for collecting well debris |
-
2014
- 2014-03-25 US US14/224,346 patent/US20140202699A1/en not_active Abandoned
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3572431A (en) * | 1969-09-08 | 1971-03-23 | Donald P Hammon | Fluid circulating and retrieving apparatus for oil wells |
US4190113A (en) * | 1978-07-27 | 1980-02-26 | Harrison Wayne O | Well cleanout tool |
US5251701A (en) * | 1992-03-12 | 1993-10-12 | Wada Ventures | Methods and apparatus for removing debris from a well bore |
US5553669A (en) * | 1995-02-14 | 1996-09-10 | Trainer; C. W. | Particulate separator for fluid production wells |
US6719050B2 (en) * | 2002-02-06 | 2004-04-13 | Kenneth E. Longacre | Method and apparatus for removing solid material from a well using a rotary pump |
US6951251B2 (en) * | 2003-10-06 | 2005-10-04 | Bilco Tools, Inc. | Junk basket and method |
US7493951B1 (en) * | 2005-11-14 | 2009-02-24 | Target Drilling, Inc. | Under-balanced directional drilling system |
US8800660B2 (en) * | 2009-03-26 | 2014-08-12 | Smith International, Inc. | Debris catcher for collecting well debris |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018106121A1 (en) * | 2016-12-06 | 2018-06-14 | Bri Well Services As | Apparatus and method for collecting debris from a wellbore |
US10301883B2 (en) | 2017-05-03 | 2019-05-28 | Coil Solutions, Inc. | Bit jet enhancement tool |
US10502014B2 (en) | 2017-05-03 | 2019-12-10 | Coil Solutions, Inc. | Extended reach tool |
CN115045640A (en) * | 2022-06-27 | 2022-09-13 | 中煤科工集团西安研究院有限公司 | Device and method for pulling screen pipe in opposite directions through penetrating drilled holes |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2856689C (en) | Apparatus and method for removing debris from a well | |
US10689949B2 (en) | Systems and apparatuses for separating wellbore fluids and solids during production | |
RU2644172C2 (en) | Tool for cleaning the main wellbore of well | |
US20200123888A1 (en) | Apparatuses, systems, and methods for improving downhole separation of gases from liquids while producing reservoir fluid | |
US20140202699A1 (en) | System and Method for Removing Debris from a Downhole Wellbore | |
CN111886398B (en) | Separating gas and liquid in a wellbore | |
WO2014160716A2 (en) | System and method for removing debris from a downhole wellbore | |
US12006795B2 (en) | Debris removal apparatus with self cleaning filter assembly, well system, and method of use | |
US20220145728A1 (en) | Debris removal apparatus with self cleaning filter assembly | |
US11168531B1 (en) | Window mill including a hydraulic line connector | |
US10982511B2 (en) | Downhole system for gravel packing without a washpipe | |
CA2932521C (en) | Optimized liquid or condensate well production | |
AU2005225147B2 (en) | Downhole Surge Pressure Reduction and Filtering Apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: THRU TUBING SOLUTIONS, INC, OKLAHOMA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:LOVING, STANLEY W.;REEL/FRAME:032517/0626 Effective date: 20140324 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |