US20140142779A1 - Method of controlling a power network - Google Patents
Method of controlling a power network Download PDFInfo
- Publication number
- US20140142779A1 US20140142779A1 US13/678,896 US201213678896A US2014142779A1 US 20140142779 A1 US20140142779 A1 US 20140142779A1 US 201213678896 A US201213678896 A US 201213678896A US 2014142779 A1 US2014142779 A1 US 2014142779A1
- Authority
- US
- United States
- Prior art keywords
- power
- facilities
- storage
- facility
- grid
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B13/00—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
- G05B13/02—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/28—Arrangements for balancing of the load in a network by storage of energy
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/381—Dispersed generators
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/46—Controlling of the sharing of output between the generators, converters, or transformers
- H02J3/48—Controlling the sharing of the in-phase component
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/46—Controlling of the sharing of output between the generators, converters, or transformers
- H02J3/50—Controlling the sharing of the out-of-phase component
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2300/00—Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
- H02J2300/20—The dispersed energy generation being of renewable origin
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2300/00—Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
- H02J2300/20—The dispersed energy generation being of renewable origin
- H02J2300/22—The renewable source being solar energy
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2310/00—The network for supplying or distributing electric power characterised by its spatial reach or by the load
- H02J2310/50—The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads
- H02J2310/56—The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads characterised by the condition upon which the selective controlling is based
- H02J2310/62—The condition being non-electrical, e.g. temperature
- H02J2310/64—The condition being economic, e.g. tariff based load management
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/008—Circuit arrangements for ac mains or ac distribution networks involving trading of energy or energy transmission rights
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
- H02J7/0013—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries acting upon several batteries simultaneously or sequentially
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B70/3225—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E70/00—Other energy conversion or management systems reducing GHG emissions
- Y02E70/30—Systems combining energy storage with energy generation of non-fossil origin
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/50—Energy storage in industry with an added climate change mitigation effect
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/222—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S50/00—Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
- Y04S50/10—Energy trading, including energy flowing from end-user application to grid
Definitions
- the invention describes a method of controlling a power network; a power network controller; and a power network
- Conventional base load power production plants or facilities can deliver power as required to an electricity grid.
- a grid operator may determine the base load at any specific time, i.e. the amount of power required by customers supplied by the grid, and issue appropriate references to any power plant that feeds into the grid.
- Such power plants are generally characterized by a constant power output.
- the amount of power that can be output depends to some extent on the environmental situation, for example the strength of the wind in the case of a wind power plant; or the time of day and extent of cloud cover in the case of a photovoltaic power plant.
- such a conventional “renewable” power plant may have the potential to produce more power than is actually needed, but since the power plant may only generate as much power as is required to fulfil a grid demand, the additional power that it is capable of producing is effectively wasted since it cannot be fed into the grid.
- the amount of power generated by a power production facility is regulated or managed by a plant operator, which ensures that the power fed into the grid fulfils the grid requirements at all times.
- a power plant operator for example a wind power plant “pilot”, is effectively separate and isolated from the grid operator. Therefore, in conventional arrangements, only the grid operator can make use of a power storage facility in which a power “surplus” could be stored for later use.
- the management of power storage facilities in isolation from the power generation plants means that these cannot be operated to optimally utilize their capabilities, and their management is also severely constrained by limitations imposed by grid requirements.
- the method of controlling a power network comprising a number of power generation facilities connected to an electricity grid and a number of power storage facilities connected to the power generation facilities—comprises the steps of monitoring a production capacity of the power generation facilities; monitoring a storage capacity of the power storage facilities; determining an optimal facility control plan on the basis of the storage capacity and the production capacity; and operating the power network, according to the facility control plan, to feed power from the power generation facilities into the electricity grid and/or to transfer power from the power generation facilities to the power storage facilities and/or to consume power from the power storage facilities.
- the power storage facilities are connected to the power generation facilities, which is to be understood to mean that energy output by a power generation facility can be transferred in some manner to one or more of the power storage facilities. Energy transfer can take place over the electricity grid, or a power storage facility may be directly fed by a power generation facility, effectively bypassing the electricity grid.
- An advantage of the method according to the invention is that any number or combination of power generation facilities and power storage facilities can always be operated in a most optimal manner, preferably in a financially most optimal manner.
- the power facilities can be operated under a kind of “mutual dependency”, i.e. a power facility may be controlled under consideration of its own capabilities and also under consideration of the capabilities of the other power facilities.
- an optimal facility control plan may determine that some quantity of power should not be fed into the grid by the power generation facilities, but should instead be stored in one or more power storage facilities, while power from other power storage facilities may be retrieved and fed into the grid instead.
- the decision to generate power, store power or consume a quantity of stored power (e.g. to feed it into the grid) can be influenced by many different factors, as will become clear below.
- the power network can be controlled at any instant in a most optimal manner, from the point of view of energy efficiency as well as economy. Furthermore, any excess power that can be produced by the power generation facilities can be stored for later use in the power storage facilities, while any power deficit of the power generation facilities can be corrected by retrieving power from the power storage facilities.
- excess power is to be understood as any power that is in excess of that required by the electricity grid, while a “power deficit” is to be understood to mean a situation in which the power generation facilities might not be able to meet the grid requirement on their own.
- a power network controller for controlling a power network—comprising a number of power generation facilities connected to an electricity grid and a number of power storage facilities connected to the power generation facilities—comprises an optimizing module for determining an optimal facility control plan on the basis of a storage capacity of the power storage facilities and a generation capacity of the power generation facilities; and a reference computation unit for computing references for the power generation facilities and the power storage facilities on the basis of the facility control plan.
- An advantage of the power network controller according to the invention is that control of the power storage facilities and control of the power generation facilities can be combined in such a way that the facilities are always used to their optimum capacity.
- customized references for example voltage references, power factor references, active power references, etc.—for each of the power generation facilities and the power storage facilities, these can always be operated in the most effective manner to ensure that the power network is optimally run from an energy-efficiency point of view as well as from a financial point of view.
- a power network comprises a number of power generation facilities connected to an electricity grid and a number of power storage facilities connected to the power generation facilities; and also comprises a power network controller according to the invention for controlling the power network.
- An advantage of the power network according to the invention is that it can control any number of power generation facilities and any number of power storage facilities, while the facilities can be of any type or nature.
- the different or varying production capabilities of power generation facilities can be optimally combined with the different or varying storage capabilities of power storage facilities.
- Another advantage of the power network according to the invention is that the power generation facilities and the power storage facilities need not be located geographically close to each other, but can be located essentially anywhere.
- Such an arrangement of distributed power facilities can be referred to collectively as a “virtual” power plant.
- energy transfer between a power generation facility and a power storage facility can take place over the grid, so that the power network according to the invention can be regarded as a combined virtual plant.
- power network used in the context of the invention is to be understood to comprise both power production facilities and power storage facilities.
- a “facility” can comprise a single unit or it may comprise a number of units.
- a power production plant such as a wind power plant can comprise any number of power generating units, in this case wind turbines.
- a single wind turbine can also be regarded as a power production plant. Therefore, in the following, but without restricting the invention in any way, the terms “plant” and “facility” may be used interchangeably.
- a plant or facility is controlled or managed by means of its input references.
- the “reference” is used in the accepted sense and is to be understood as a control input or setpoint, for example a voltage setpoint, a power factor setpoint, etc.
- a control input could also be in the form of an activated pre-programmed function comprising digital commands, for example a pre-programmed function to control an inertial response.
- a controller of a power facility will respond to an input reference by taking appropriate action. For example, a plant controller can send a power reference to a wind turbine controller resulting in a control signal being sent to a pitch drive in order to pitch the rotor blades to obtain a desired increase or decrease in output power.
- an input setpoint to a power storage facility might be linked to the control of a switch, transformer, valve, compressor, etc. in order to convert electricity into a stored energy form.
- a renewable energy source such as wind turbine can provide “ancillary services” in addition to its main service or function, namely to provide active power to the grid.
- An example of an ancillary service of a wind turbine may be its ability to provide spinning reserve.
- some energy storage devices can also provide ancillary services in addition to their storage capabilities. Therefore, in a particularly preferred embodiment of the invention, the method of controlling a power network preferably also comprises the step of monitoring any ancillary service capability of a production facility and any ancillary service capability of a storage facility.
- This information is then also preferably considered in the step of determining the optimal facility control plan with a view to optimising the revenue capability of the power network, considering the value of the actual energy delivered to the grid, the value of the combination of ancillary services delivered to the grid, and the operating cost of delivering each of those services.
- the step of determining the optimal facility plan therefore can involve making decisions about which ancillary service of a production facility and/or a storage facility should be supplied, depending on what is most cost effective. For example, stored energy from a storage facility may be delivered as base load energy to the grid or as an ancillary service, or as a combination of base load and ancillary service, depending on which is most “attractive” from the operational point of view.
- the power network controller according to the invention can directly manage a power production unit by communicating, i.e. exchanging appropriate signals, with a controller of the power production unit.
- a power plant comprising a plurality of power generating units is generally controlled by a central control system, for example a “park pilot” in the case of a wind power plant.
- the power network controller according to the invention preferably communicates with the park pilot or can be realised as an integral part of the park pilot.
- a power storage facility of the power network according to the invention can be “reversible” or “non-reversible”.
- a reversible power storage facility can output energy in the same form as it was input into the storage facility.
- An example of a reversible power storage facility might be a battery, which can be charged using an electrical current, and which outputs an electrical current when discharged.
- a battery storage facility can comprise a rechargeable vehicle battery, and “surplus” electrical energy produced by the power production facilities can be used to charge such batteries.
- a power storage facility preferably comprises batteries of a fleet of electric service vehicles.
- a reversible power storage facility might be a hydro-electric facility, for which electrical energy is used to pump water into a reservoir, and which outputs electricity again when the stored water is used to drive a turbine.
- a non-reversible power storage facility outputs its stored energy in a different form.
- An example of a non-reversible power storage facility might be a synthetic natural gas facility, for which electrical energy is used to synthesize gas and to supply this directly to consumers without any further conversion.
- a synthetic natural gas facility might be operated as a reversible facility by including a gas turbine for converting the stored gas into electric power that can be fed into the electricity grid.
- Other examples of power storage facilities are a thermal storage facility; a flywheel storage facility; a compressed air storage facility; or any other type of power storage facility that is capable of converting electrical energy and storing it in a form from which it can later be retrieved.
- a power generation facility can comprise any of the group of power generation facilities comprising a wind power plant; a tidal power plant; a solar power plant, or any other type of power production facility that is capable of producing energy that can be fed into an electricity grid and/or converted for storage in a power storage plant.
- the method according to the invention preferably comprises a step of determining a grid requirement to be fulfilled by the power network, since the power that is fed into an electrical grid must usually satisfy very strict national or regional grid requirements. Failure to meet such requirements may result in severe penalties.
- the step of operating the power network to transfer power from the power generation facilities to the electricity grid is preferably performed to fulfil any such grid requirement, so that a net power at a grid connection point fulfils the grid requirement.
- a “grid connection point” is a point at which one or more power production facilities feeds into a grid.
- the “net power” is the sum of the individual contributions of the various power production facilities.
- grid compliance is always given priority over any efficiency or monetary optimization of the power network.
- Not all power generation facilities can continually provide power at a constant level.
- “renewable energy” power plants for example wind turbines or wind power plants
- the generated power can exhibit significant variations.
- a wind power plant can deliver its rated power, but it may be unable to provide any power at all during calm or stormy conditions.
- the method according to the invention makes use of the fact that most power generation facilities can generate more power than is required during certain phases, and that the surplus power can be stored in various ways and later retrieved and thus contribute increased competitiveness of the combined production and storage plant by selling the optimal combination of base load power and ancillary services to the grid operator.
- a power storage facility comprises a short-term fast-response power storage facility such as a battery or a fly-wheel, and an operator of the power network will be able to bid on simulated inertial response services.
- the system can provide inertial response by extracting additional short term energy from such a storage device when energy is available, and by operating with spinning reserve when these short-term facilities have no energy in storage.
- one or more such short-term fast-response storage facilities can be “tapped” to correct the deficit, making the plant response more predictable, and minimizing the energy spilled by the plant.
- a combination of fast/slow response can be used to smoothen out the power production of the power network.
- a power storage facility preferably comprises a long-term slow-response power storage facility.
- surplus power can be converted into pumped hydro storage and can be reconverted into electrical energy as required.
- a pumped hydro storage can be used to store surplus energy that can be available for selling in an inter-day or inter-week market, so that excess or surplus energy can be “parked” until it can be sold at an optimum price.
- grid power oscillation damping can be supplied by the virtual plant by oscillating the aggregate power output from the plant as needed for grid stability, but a central power network controller can achieve this oscillating power without curtailing the renewable energy sources. This makes it possible for a power network operator to reduce potential losses and wear, and also makes it possible to sell oscillation damping as a service.
- the grid operator may need a fast ramping of power in order to retain balance on the grid, for example at the start of a working day.
- the accuracy of such ramping events can become more predictable, so that the method according to the invention may be used to quantify and sell this capability as a service to a grid operator or balancing authority.
- the method according to the invention makes it possible to provide under frequency response, i.e. the injection of more active power in proportion to a drop in grid frequency, while at the same time operating any power generation facilities such as wind turbines with a significantly reduced level of spinning reserve.
- the power increase shall again be extracted primarily from the short-term storage, so that the turbines need only be operated with spinning reserve when the energy level of the storage facilities is very low.
- AAC automatic generation control
- the combined power network according to the invention may be operated according to a storage configuration range under consideration of a net import into the plant and an export of available power in addition to whatever power capacity the storage facilities may have.
- the method according to the invention also prioritizes control functions so that factors such as personal safety, equipment safety, grid compliance, efficiency and monetary optimization of the power network are all considered. It is important to ensure that the amount of current drawn from a facility does not exceed its rated limits, for example the power should not ramp faster than a storage facility can safely discharge. Voltages are preferably kept within safe upper and/or lower bounds.
- a key aspect of the method according to the invention is that it allows for an optimization of facility control from a financial aspect—i.e. it allows energy to be produced and stored in a cost-effective manner as well as ancillary services to be provided to the grid, and for this energy or these services to be sold at an optimum price.
- the price of energy i.e. the price that is paid to a power plant operator, can vary in the short-term, so that it is important for a network operator to be able to provide a favourable quantity of power at a favourable point in time.
- the price for ancillary services may similarly vary and new services may become monetized as renewable energy becomes more widespread.
- power production has its price also, and, as mentioned above, power production facilities cannot always deliver the necessary amounts.
- the step of determining an optimal facility control plan comprises performing a revenue projection for a combination of energy services and ancillary services on the basis of a number of forecast variables and/or a number of system variables and/or a number of facility constraints.
- the revenue projection is performed on the basis of one or more of the non-exhaustive set of forecast variables comprising: wind speed forecast; energy production forecast; energy price forecast; spinning reserve price forecast; reactive power price forecast; ramping capability price forecast; inertial response price forecast; frequency response price forecast.
- the forecast variables that are considered will depend on the types of power production and storage facilities being used. For example, a wind forecast will be relevant for a wind turbine or a wind power plant, while a tide forecast will be relevant for a tidal power plant.
- a weather forecast can provide information regarding wind direction, pressure, temperature, etc.
- An energy forecast can be consulted to determine how much energy could be produced during a certain time period in the near future, for example within the next few hours.
- An advanced energy forecast for a wind power plant may be based on numerical weather models, persistency models, neural network models, wake models, large eddy simulations, a service outage schedule, etc.
- a service outage schedule can be used to quantify the down-time of a power production or storage facility, during which time that facility is unavailable to the power network. The power production and/or storage can then be distributed over the remaining facilities.
- An energy price forecast can deliver information about the predicted price of energy in the near future, for example within the next few hours or the next few days, so that a favourable time for selling energy—i.e. feeding energy into the grid—can be determined.
- the energy price forecast can be based on statistical models that take into account the local market structure, and can use information originating from various external sources.
- a spinning reserve price forecast can provide useful information about the price that can be obtained for spinning reserve, since this can be monetized as an ancillary service and therefore can be regarded as a “commodity” that can be traded on the energy market.
- a reactive power price forecast can provide useful information about the price of reactive power, which can be sold as an ancillary service in the event of a grid contingency.
- Other forecasts such as ramping capability price forecast, inertial response price forecast and frequency response price forecast can provide useful information about the potential revenue from such ancillary services.
- Some power markets may only monetize energy (kWh) and other markets may have a combination of fixed prices and fluctuating prices for ancillary services. Therefore, in the method according to the invention, the potential financial contribution from each of the ancillary services is preferably adjusted according to the given market structure.
- the revenue projection is preferably performed on the basis of one or more of the non-exhaustive set of production cost variables comprising: crane cost; service cost; equipment depreciation; reversible storage cycle cost; non-reversible storage cost; conversion loss; internal transmission loss.
- “Crane cost” and “service cost” quantify the necessary maintenance costs for the facilities.
- the “equipment depreciation” system variable quantifies the loss in value of the various elements of the power network.
- the “reversible storage cycle cost” system variable quantifies the loss in capacity, over time, of a reversible power storage facility. For example, a rechargeable battery can charge and discharge for an estimated number of times, while its storage capacity may decrease over its lifetime.
- a “non-reversible storage cost” system variable can model the type of storage. For example, if the non-reversible storage is a bank of charging stations for charging electric service vehicles, these should preferably be charged during a negative pricing time period, and should also preferably be charged while the service vehicles are not required, for example at night. If the non-reversible storage comprises a compressed gas or synthetic natural gas storage system, the model should provide up-to-date information about the price of natural gas and also the cost of conversion, so that a realistic comparison or trade-off can be made between the value of the power generated by a power production plant and the value of sellable gas.
- the “conversion loss” system variable quantifies the conversion losses that will be incurred when converting electrical energy into another form and when converting stored energy back into electrical energy. For example, the conversion cost for a thermal system will be a function of the ambient temperature.
- the “internal transmission loss” system variable quantifies the unavoidable loss of energy when “transferring” power from a power production facility to a power storage facility. Internal transmission losses can be significant for installations comprising very long transmission lines to an interconnection point, for example for large offshore wind power plants.
- the facility control plan is preferably determined to ensure grid compliance at the point of common connection, and at the same time to optimize the potential revenue not just at a given time but over a given period of time.
- the method according to the invention preferably comprises the step of determining quantities of energy originating from different power facilities to be consumed or stored on the basis of corresponding prices for those different energy forms.
- the method according to the invention therefore makes it possible to determine an optimum trade-off between energy production, energy storage, and energy sale so that the power network can be operated to the best of its capabilities, with favourable profitability and energy efficiency.
- the method according to the invention can determine an optimum operation plan scheduling a combination of ancillary services that can be offered, the amount of power to be generated and can determine how much of this generated power should be fed into the grid and how much of it should be converted into another form for immediate consumption or storage for later use during an operation plan scheduling period.
- the method can also determine an optimum amount of stored power that should be retrieved from a reversible storage and fed into the electricity grid, or an optimum amount of stored power that should be retrieved from a non-reversible storage and fed into a consumer grid.
- the optimal combination of charging level for storage batteries, combined with the optimal level of turbine or solar power curtailment should be selected as the operation mode. If spinning reserve is called upon, an appropriate amount shall be made available by retrieving an appropriate amount of energy out of storage and supplementing this by increasing the actual power production of the production facilities. Since the power network controller can optimize the power production as well as the power storage under consideration of many different variables and constraints, the power network may be regarded as a combined control system.
- power fed into an electricity grid is sold at a variable power price.
- the power price is negative, i.e. during a phase of over-production, the power plant operator must pay for the power fed into the grid. This might arise when other “non-renewable” power plants are already saturating the grid so that a power demand is already met.
- a conventional power producing plant may be compelled to terminate production if the accumulated cost of continuing production would otherwise exceed the cost of powering down and powering back up.
- the method according to the invention therefore preferably comprises the step of identifying a period of negative pricing, for example by consulting a power price forecast and analysing the power production capacity of the power generation facilities, and determining, on the basis of the revenue projection, the amount of stored energy to dispose of in anticipation of negative pricing, and a quantity of power to be stored in a power storage facility during such a period of negative pricing. Therefore, instead of having to pay to “dispose of” excess generated power, this can be converted into another form, for example synthesized natural gas, and stored until it can be sold profitably at a later point in time.
- a virtual plant or power network according to the invention can therefore stay connected to the grid during a period of negative pricing, and can continue to produce revenue exclusively from the sale of ancillary services.
- the power network controller can control each type of power generation facility and power storage facility in a custom or tailored manner so that these are optimally driven.
- the active power and reactive power grid requirements can fluctuate according to demand.
- the power network controller comprises a reference distributor unit for distributing active power references and reactive power references between the power generation facilities and power storage facilities according to an active component and a reactive component of a grid requirement. For example, if the grid operator requests a specific amount of active power and reactive power, the net active power shall be controlled to reach this level, and the net reactive power level shall likewise be reached by controlling the reactive contribution from each of the storage and production systems to specified set points by the plant controller.
- a computer program product can comprise software algorithms for carrying out the steps of monitoring a production capacity of the power generation facilities; monitoring a storage capacity of the power storage facilities; performing a revenue projection and for generating references; determining an optimal facility control plan, etc., when the computer program product is loaded into a memory of a programmable device of the power network controller according to the invention.
- FIG. 1 shows a block diagram of a power network according to an embodiment of the invention
- FIG. 2 shows a block diagram of a power network controller according to an embodiment of the invention
- FIG. 3 shows a number of parameters considered by the power network controller of FIG. 2 ;
- FIG. 4 shows further parameters considered by the power network controller of FIG. 2 .
- FIG. 1 shows a block diagram of a power network 1 according to an embodiment of the invention.
- the power network comprises various power generation plants 30 , 31 and various power storage facilities 40 , 41 , 42 .
- Power that is output by the power generation plants 30 , 31 and a reversible power storage facility 40 is collected at a point of common connection PCC for feeding into an electricity grid 5 .
- Surplus power generated by the power generation plants 30 , 31 can be transferred to non-reversible power storage facilities 41 , 42 such as the batteries 41 of a fleet of electric vehicles, or a synthetic natural gas plant 42 , which in this embodiment is realised to supply gas to a consumer gas grid 6 .
- a power network controller 2 receives an input power reference Psched indicating the amount of electrical power required by the grid 5 .
- the power network 1 must fulfil this requirement.
- the power network controller 2 decides how much active power and reactive power should be transferred between the power generation plants 30 , 31 , the power storage facilities 40 , 41 , 42 , and the grid 5 .
- the power network controller 2 establishes an optimal facility control plan on the basis of the production capacity of the power plants 30 , 31 and on the storage capacity of the storage plants 40 , 41 , 42 , and operates the facilities according to the facility control plan to transfer active power and re-active power between the power plants 30 , 31 and the grid 5 and/or between the power plants 30 , 31 and the storage plants 40 , 41 , 42 , and/or from a reversible storage plant 40 to the grid 5 .
- the power network controller 2 determines the optimal facility control plan by considering a number of input parameters M_ 1 , . . . , M_n and data D_ 30 , D_ 31 , D_ 40 , D_ 41 , D_ 42 from the power production and storage plants 30 , 31 , 40 , 41 , 42 .
- data D_ 30 from a wind power plant 30 can supply production data of that wind power plant 30 such as active power, available power, max loss power (used to calculated controller limits), max reference (the max amount of power a sub plant can produce, e.g.
- data D_ 41 from a non-reversible power storage facility 41 may include information about its momentary capacity.
- the input parameters M_, . . . , M_n can provide information about many different aspects of the operation of the power network, for example system variables, forecasts, and constraints.
- the facility control plan can be used to generate references Rref_ 30 , Rref_ 31 , Rref_ 40 , Rref_ 41 , Rref_ 42 for each of the facilities.
- a reference Rref_ 30 for the wind power plant 30 can define active and/or reactive power references for that wind power plant, and a park pilot of the wind power plant 30 can generate appropriate references for each of the wind turbines.
- a reference could also be controlled as a voltage reference or a power factor reference or a combination of voltage, reactive power or power factor references.
- the diagram only shows five facilities 30 , 31 , 40 , 41 , 42 but of course any number of facilities can be combined in a virtual plant. Furthermore, the facilities of such a combined virtual plant do not have to be geographically close together, but can be located at any distance from each other. The facilities of a combined virtual plant do not even need to feed into the same grid, since the power network controller can take more than one electrical grid into consideration.
- FIG. 2 shows a block diagram of a power network controller 2 or “governor” 2 according to an embodiment of the invention.
- a control block 20 receives a grid requirement or reference Pdemand that indicates a required grid power that must be delivered, i.e. the entire power network must operate to satisfy this reference Pdemand.
- the grid reference Pdemand can be the same as the input power reference Psched indicated in FIG. 1 , or can be derived from that by a suitable reference selector unit (not shown).
- the control block 20 compares this with information about the momentary power production given in the data D_x delivered by power generation facilities of the power network, and identifies a difference—surplus or deficit—and provides an appropriate signal to an optimizing module 21 .
- the optimizing module 21 receives various input parameters M_ 1 , . . . , M_n, as well as production data D_x from all power generation and storage facilities. On the basis of this information, the optimizing module 21 can determine the amount of power that should be generated and sold into the grid, the amount of power that should be stored for later use, and the amount of power that should be retrieved from a reversible power storage facility. Many parameters such as power price, weather forecast, power price forecast, service cost etc. as described above, are taken into consideration to determine an optimal plan for this power network from the point of view of short-term and long-term profitability as well as energy efficiency. The optimizing module 21 issues appropriate signals Pstore, Pproduce to a reference distribution unit 22 .
- the optimizing module 21 can generate one collective power storage signal Pstore, or individual power storage signals for each of the storage facilities. Similarly, the optimizing module 21 can generate one collective power production signal Pproduce, or individual power production signals for each of the power production facilities.
- the reference distribution unit 22 uses this information as well as the production data D_x from all power generation and storage facilities to calculate appropriate references Pref_x for each of the facilities.
- FIG. 3 shows various parameters considered by the optimizing module 21 of the power network controller 2 of FIG. 2 .
- the diagram shows exemplary plots of spinning reserve forecast M_ 1 (quantified in $/MWh), reactive power support M_ 2 (quantified in $/MVAr), and energy price M_ 3 (quantified in $/MWh).
- the diagram indicates how such parameters or variables can fluctuate over time (X-axis, hours).
- the point in time at which energy is sold into the electricity grid, or the point in time at which an ancillary service such as spinning reserve or reactive power is sold can significantly influence the profitability of the power network.
- FIG. 4 shows further parameters that might be considered by the optimizing module 21 of the power network controller 2 of FIG. 2 .
- the diagram shows exemplary plots of service schedule M_ 4 (quantified in MWh), service cost M_ 5 and equipment depreciation index M_ 6 (both quantified in $/MWh), which can be of relevance for a facility whose lifetime can be extended by operating it at lower load levels.
- These graphs indicate how such parameters or variables can develop over time t (in the case of service schedule M_ 4 ) or how they are related to production levels p (in the case of service cost M_ 5 and equipment depreciation index M_ 6 ), so that consideration of these factors can be beneficial when working out an optimal facility plan for a power network.
Abstract
Description
- The invention describes a method of controlling a power network; a power network controller; and a power network
- Conventional base load power production plants or facilities—for example nuclear power plants or fossil-fuel power plants—can deliver power as required to an electricity grid. A grid operator may determine the base load at any specific time, i.e. the amount of power required by customers supplied by the grid, and issue appropriate references to any power plant that feeds into the grid. Such power plants are generally characterized by a constant power output. In the case of power production plants that generate electricity using renewable energy sources such as wind energy or solar energy, the amount of power that can be output depends to some extent on the environmental situation, for example the strength of the wind in the case of a wind power plant; or the time of day and extent of cloud cover in the case of a photovoltaic power plant. In certain situations, such a conventional “renewable” power plant may have the potential to produce more power than is actually needed, but since the power plant may only generate as much power as is required to fulfil a grid demand, the additional power that it is capable of producing is effectively wasted since it cannot be fed into the grid. The amount of power generated by a power production facility is regulated or managed by a plant operator, which ensures that the power fed into the grid fulfils the grid requirements at all times. A power plant operator, for example a wind power plant “pilot”, is effectively separate and isolated from the grid operator. Therefore, in conventional arrangements, only the grid operator can make use of a power storage facility in which a power “surplus” could be stored for later use. However, the management of power storage facilities in isolation from the power generation plants means that these cannot be operated to optimally utilize their capabilities, and their management is also severely constrained by limitations imposed by grid requirements.
- It is therefore an object of the invention to provide an improved way of operating a power network that comprises both power production plants and power storage plants.
- This object is achieved by the features of the independent claims.
- According to the invention, the method of controlling a power network—comprising a number of power generation facilities connected to an electricity grid and a number of power storage facilities connected to the power generation facilities—comprises the steps of monitoring a production capacity of the power generation facilities; monitoring a storage capacity of the power storage facilities; determining an optimal facility control plan on the basis of the storage capacity and the production capacity; and operating the power network, according to the facility control plan, to feed power from the power generation facilities into the electricity grid and/or to transfer power from the power generation facilities to the power storage facilities and/or to consume power from the power storage facilities.
- The power storage facilities are connected to the power generation facilities, which is to be understood to mean that energy output by a power generation facility can be transferred in some manner to one or more of the power storage facilities. Energy transfer can take place over the electricity grid, or a power storage facility may be directly fed by a power generation facility, effectively bypassing the electricity grid.
- An advantage of the method according to the invention is that any number or combination of power generation facilities and power storage facilities can always be operated in a most optimal manner, preferably in a financially most optimal manner. The power facilities can be operated under a kind of “mutual dependency”, i.e. a power facility may be controlled under consideration of its own capabilities and also under consideration of the capabilities of the other power facilities. For example, an optimal facility control plan may determine that some quantity of power should not be fed into the grid by the power generation facilities, but should instead be stored in one or more power storage facilities, while power from other power storage facilities may be retrieved and fed into the grid instead. The decision to generate power, store power or consume a quantity of stored power (e.g. to feed it into the grid) can be influenced by many different factors, as will become clear below.
- By determining an optimal facility control plan, the power network can be controlled at any instant in a most optimal manner, from the point of view of energy efficiency as well as economy. Furthermore, any excess power that can be produced by the power generation facilities can be stored for later use in the power storage facilities, while any power deficit of the power generation facilities can be corrected by retrieving power from the power storage facilities. Here, “excess power” is to be understood as any power that is in excess of that required by the electricity grid, while a “power deficit” is to be understood to mean a situation in which the power generation facilities might not be able to meet the grid requirement on their own.
- According to the invention, a power network controller for controlling a power network—comprising a number of power generation facilities connected to an electricity grid and a number of power storage facilities connected to the power generation facilities—comprises an optimizing module for determining an optimal facility control plan on the basis of a storage capacity of the power storage facilities and a generation capacity of the power generation facilities; and a reference computation unit for computing references for the power generation facilities and the power storage facilities on the basis of the facility control plan.
- An advantage of the power network controller according to the invention is that control of the power storage facilities and control of the power generation facilities can be combined in such a way that the facilities are always used to their optimum capacity. By computing “customized” references—for example voltage references, power factor references, active power references, etc.—for each of the power generation facilities and the power storage facilities, these can always be operated in the most effective manner to ensure that the power network is optimally run from an energy-efficiency point of view as well as from a financial point of view.
- According to the invention, a power network comprises a number of power generation facilities connected to an electricity grid and a number of power storage facilities connected to the power generation facilities; and also comprises a power network controller according to the invention for controlling the power network.
- An advantage of the power network according to the invention is that it can control any number of power generation facilities and any number of power storage facilities, while the facilities can be of any type or nature. The different or varying production capabilities of power generation facilities can be optimally combined with the different or varying storage capabilities of power storage facilities. Another advantage of the power network according to the invention is that the power generation facilities and the power storage facilities need not be located geographically close to each other, but can be located essentially anywhere. Such an arrangement of distributed power facilities can be referred to collectively as a “virtual” power plant. As indicated above, energy transfer between a power generation facility and a power storage facility can take place over the grid, so that the power network according to the invention can be regarded as a combined virtual plant.
- Further embodiments and features are given by the dependent claims, as revealed in the following description. Features of different claim categories may be combined as appropriate to give further embodiments not described herein.
- The term “power network” used in the context of the invention is to be understood to comprise both power production facilities and power storage facilities. A “facility” can comprise a single unit or it may comprise a number of units. For example, a power production plant such as a wind power plant can comprise any number of power generating units, in this case wind turbines. Of course, a single wind turbine can also be regarded as a power production plant. Therefore, in the following, but without restricting the invention in any way, the terms “plant” and “facility” may be used interchangeably. A plant or facility is controlled or managed by means of its input references. The “reference” is used in the accepted sense and is to be understood as a control input or setpoint, for example a voltage setpoint, a power factor setpoint, etc. A control input could also be in the form of an activated pre-programmed function comprising digital commands, for example a pre-programmed function to control an inertial response. A controller of a power facility will respond to an input reference by taking appropriate action. For example, a plant controller can send a power reference to a wind turbine controller resulting in a control signal being sent to a pitch drive in order to pitch the rotor blades to obtain a desired increase or decrease in output power. Similarly, an input setpoint to a power storage facility might be linked to the control of a switch, transformer, valve, compressor, etc. in order to convert electricity into a stored energy form.
- A renewable energy source such as wind turbine can provide “ancillary services” in addition to its main service or function, namely to provide active power to the grid. An example of an ancillary service of a wind turbine may be its ability to provide spinning reserve. Similarly, some energy storage devices can also provide ancillary services in addition to their storage capabilities. Therefore, in a particularly preferred embodiment of the invention, the method of controlling a power network preferably also comprises the step of monitoring any ancillary service capability of a production facility and any ancillary service capability of a storage facility. This information is then also preferably considered in the step of determining the optimal facility control plan with a view to optimising the revenue capability of the power network, considering the value of the actual energy delivered to the grid, the value of the combination of ancillary services delivered to the grid, and the operating cost of delivering each of those services. The step of determining the optimal facility plan therefore can involve making decisions about which ancillary service of a production facility and/or a storage facility should be supplied, depending on what is most cost effective. For example, stored energy from a storage facility may be delivered as base load energy to the grid or as an ancillary service, or as a combination of base load and ancillary service, depending on which is most “attractive” from the operational point of view.
- The power network controller according to the invention can directly manage a power production unit by communicating, i.e. exchanging appropriate signals, with a controller of the power production unit. A power plant comprising a plurality of power generating units is generally controlled by a central control system, for example a “park pilot” in the case of a wind power plant. In this case, the power network controller according to the invention preferably communicates with the park pilot or can be realised as an integral part of the park pilot.
- A power storage facility of the power network according to the invention can be “reversible” or “non-reversible”. A reversible power storage facility can output energy in the same form as it was input into the storage facility. An example of a reversible power storage facility might be a battery, which can be charged using an electrical current, and which outputs an electrical current when discharged. For example, a battery storage facility can comprise a rechargeable vehicle battery, and “surplus” electrical energy produced by the power production facilities can be used to charge such batteries. In one embodiment, a power storage facility preferably comprises batteries of a fleet of electric service vehicles. Another example of a reversible power storage facility might be a hydro-electric facility, for which electrical energy is used to pump water into a reservoir, and which outputs electricity again when the stored water is used to drive a turbine. A non-reversible power storage facility outputs its stored energy in a different form. An example of a non-reversible power storage facility might be a synthetic natural gas facility, for which electrical energy is used to synthesize gas and to supply this directly to consumers without any further conversion. Equally, a synthetic natural gas facility might be operated as a reversible facility by including a gas turbine for converting the stored gas into electric power that can be fed into the electricity grid. Other examples of power storage facilities are a thermal storage facility; a flywheel storage facility; a compressed air storage facility; or any other type of power storage facility that is capable of converting electrical energy and storing it in a form from which it can later be retrieved.
- In a power network according to the invention, a power generation facility can comprise any of the group of power generation facilities comprising a wind power plant; a tidal power plant; a solar power plant, or any other type of power production facility that is capable of producing energy that can be fed into an electricity grid and/or converted for storage in a power storage plant.
- The method according to the invention preferably comprises a step of determining a grid requirement to be fulfilled by the power network, since the power that is fed into an electrical grid must usually satisfy very strict national or regional grid requirements. Failure to meet such requirements may result in severe penalties. In the method according to the invention, the step of operating the power network to transfer power from the power generation facilities to the electricity grid is preferably performed to fulfil any such grid requirement, so that a net power at a grid connection point fulfils the grid requirement. Here, a “grid connection point” is a point at which one or more power production facilities feeds into a grid. The “net power” is the sum of the individual contributions of the various power production facilities. Preferably, whenever appropriate, grid compliance is always given priority over any efficiency or monetary optimization of the power network.
- Not all power generation facilities can continually provide power at a constant level. Particularly in the case of “renewable energy” power plants, for example wind turbines or wind power plants, the generated power can exhibit significant variations. During favourable wind conditions, a wind power plant can deliver its rated power, but it may be unable to provide any power at all during calm or stormy conditions. The method according to the invention makes use of the fact that most power generation facilities can generate more power than is required during certain phases, and that the surplus power can be stored in various ways and later retrieved and thus contribute increased competitiveness of the combined production and storage plant by selling the optimal combination of base load power and ancillary services to the grid operator. In a preferred embodiment of the invention, a power storage facility comprises a short-term fast-response power storage facility such as a battery or a fly-wheel, and an operator of the power network will be able to bid on simulated inertial response services. The system can provide inertial response by extracting additional short term energy from such a storage device when energy is available, and by operating with spinning reserve when these short-term facilities have no energy in storage. During a foreseeable brief dip in the grid frequency, one or more such short-term fast-response storage facilities can be “tapped” to correct the deficit, making the plant response more predictable, and minimizing the energy spilled by the plant. A combination of fast/slow response can be used to smoothen out the power production of the power network.
- In other situations, it may be foreseeable that a power generation facility will be unable to feed power into the grid for a prolonged duration. For example, a solar energy plant is unable to provide its rated power output during dim or dark conditions. Therefore, to compensate for such a power deficit, in a power network according to the invention a power storage facility preferably comprises a long-term slow-response power storage facility. For example, surplus power can be converted into pumped hydro storage and can be reconverted into electrical energy as required. Equally, such a pumped hydro storage can be used to store surplus energy that can be available for selling in an inter-day or inter-week market, so that excess or surplus energy can be “parked” until it can be sold at an optimum price.
- In another situation grid power oscillation damping can be supplied by the virtual plant by oscillating the aggregate power output from the plant as needed for grid stability, but a central power network controller can achieve this oscillating power without curtailing the renewable energy sources. This makes it possible for a power network operator to reduce potential losses and wear, and also makes it possible to sell oscillation damping as a service.
- It is also conceivable that the grid operator may need a fast ramping of power in order to retain balance on the grid, for example at the start of a working day. By controlling the production and the storage facilities as a combined power network, the accuracy of such ramping events can become more predictable, so that the method according to the invention may be used to quantify and sell this capability as a service to a grid operator or balancing authority.
- Also, the method according to the invention makes it possible to provide under frequency response, i.e. the injection of more active power in proportion to a drop in grid frequency, while at the same time operating any power generation facilities such as wind turbines with a significantly reduced level of spinning reserve. The power increase shall again be extracted primarily from the short-term storage, so that the turbines need only be operated with spinning reserve when the energy level of the storage facilities is very low.
- In another situation a grid operator could buy automatic generation control (AGC) services from an owner of a power network according to the invention, with a larger regulation range that could be provided by a conventional power plant that only contains production facilities or only contains storage facilities. The combined power network according to the invention may be operated according to a storage configuration range under consideration of a net import into the plant and an export of available power in addition to whatever power capacity the storage facilities may have.
- Preferably, the method according to the invention also prioritizes control functions so that factors such as personal safety, equipment safety, grid compliance, efficiency and monetary optimization of the power network are all considered. It is important to ensure that the amount of current drawn from a facility does not exceed its rated limits, for example the power should not ramp faster than a storage facility can safely discharge. Voltages are preferably kept within safe upper and/or lower bounds.
- A key aspect of the method according to the invention is that it allows for an optimization of facility control from a financial aspect—i.e. it allows energy to be produced and stored in a cost-effective manner as well as ancillary services to be provided to the grid, and for this energy or these services to be sold at an optimum price. The price of energy, i.e. the price that is paid to a power plant operator, can vary in the short-term, so that it is important for a network operator to be able to provide a favourable quantity of power at a favourable point in time. The price for ancillary services may similarly vary and new services may become monetized as renewable energy becomes more widespread. However, power production has its price also, and, as mentioned above, power production facilities cannot always deliver the necessary amounts. Therefore, in a particularly preferred embodiment of the invention, the step of determining an optimal facility control plan comprises performing a revenue projection for a combination of energy services and ancillary services on the basis of a number of forecast variables and/or a number of system variables and/or a number of facility constraints.
- Preferably, the revenue projection is performed on the basis of one or more of the non-exhaustive set of forecast variables comprising: wind speed forecast; energy production forecast; energy price forecast; spinning reserve price forecast; reactive power price forecast; ramping capability price forecast; inertial response price forecast; frequency response price forecast. The forecast variables that are considered will depend on the types of power production and storage facilities being used. For example, a wind forecast will be relevant for a wind turbine or a wind power plant, while a tide forecast will be relevant for a tidal power plant. A weather forecast can provide information regarding wind direction, pressure, temperature, etc. An energy forecast can be consulted to determine how much energy could be produced during a certain time period in the near future, for example within the next few hours. An advanced energy forecast for a wind power plant may be based on numerical weather models, persistency models, neural network models, wake models, large eddy simulations, a service outage schedule, etc. A service outage schedule can be used to quantify the down-time of a power production or storage facility, during which time that facility is unavailable to the power network. The power production and/or storage can then be distributed over the remaining facilities. An energy price forecast can deliver information about the predicted price of energy in the near future, for example within the next few hours or the next few days, so that a favourable time for selling energy—i.e. feeding energy into the grid—can be determined. The energy price forecast can be based on statistical models that take into account the local market structure, and can use information originating from various external sources. A spinning reserve price forecast can provide useful information about the price that can be obtained for spinning reserve, since this can be monetized as an ancillary service and therefore can be regarded as a “commodity” that can be traded on the energy market. Similarly, a reactive power price forecast can provide useful information about the price of reactive power, which can be sold as an ancillary service in the event of a grid contingency. Other forecasts such as ramping capability price forecast, inertial response price forecast and frequency response price forecast can provide useful information about the potential revenue from such ancillary services.
- Some power markets may only monetize energy (kWh) and other markets may have a combination of fixed prices and fluctuating prices for ancillary services. Therefore, in the method according to the invention, the potential financial contribution from each of the ancillary services is preferably adjusted according to the given market structure.
- Also, since power production has associated costs, the revenue projection is preferably performed on the basis of one or more of the non-exhaustive set of production cost variables comprising: crane cost; service cost; equipment depreciation; reversible storage cycle cost; non-reversible storage cost; conversion loss; internal transmission loss. “Crane cost” and “service cost” quantify the necessary maintenance costs for the facilities. The “equipment depreciation” system variable quantifies the loss in value of the various elements of the power network. The “reversible storage cycle cost” system variable quantifies the loss in capacity, over time, of a reversible power storage facility. For example, a rechargeable battery can charge and discharge for an estimated number of times, while its storage capacity may decrease over its lifetime. This variable can be used to minimize the cost and maximize the lifetime of the storage unit. A “non-reversible storage cost” system variable can model the type of storage. For example, if the non-reversible storage is a bank of charging stations for charging electric service vehicles, these should preferably be charged during a negative pricing time period, and should also preferably be charged while the service vehicles are not required, for example at night. If the non-reversible storage comprises a compressed gas or synthetic natural gas storage system, the model should provide up-to-date information about the price of natural gas and also the cost of conversion, so that a realistic comparison or trade-off can be made between the value of the power generated by a power production plant and the value of sellable gas. The “conversion loss” system variable quantifies the conversion losses that will be incurred when converting electrical energy into another form and when converting stored energy back into electrical energy. For example, the conversion cost for a thermal system will be a function of the ambient temperature. The “internal transmission loss” system variable quantifies the unavoidable loss of energy when “transferring” power from a power production facility to a power storage facility. Internal transmission losses can be significant for installations comprising very long transmission lines to an interconnection point, for example for large offshore wind power plants. The facility control plan is preferably determined to ensure grid compliance at the point of common connection, and at the same time to optimize the potential revenue not just at a given time but over a given period of time.
- A situation may arise in which the electricity price is stable, but the price of another form of energy increases. In other words, the profitability of the other energy form is better. Therefore, the method according to the invention preferably comprises the step of determining quantities of energy originating from different power facilities to be consumed or stored on the basis of corresponding prices for those different energy forms. The method according to the invention therefore makes it possible to determine an optimum trade-off between energy production, energy storage, and energy sale so that the power network can be operated to the best of its capabilities, with favourable profitability and energy efficiency.
- With this approach and using the types of variable and constraint mentioned above, the method according to the invention can determine an optimum operation plan scheduling a combination of ancillary services that can be offered, the amount of power to be generated and can determine how much of this generated power should be fed into the grid and how much of it should be converted into another form for immediate consumption or storage for later use during an operation plan scheduling period. The method can also determine an optimum amount of stored power that should be retrieved from a reversible storage and fed into the electricity grid, or an optimum amount of stored power that should be retrieved from a non-reversible storage and fed into a consumer grid. For example, if the price of spinning reserve is predicted to be favourably high within a certain future time window, the optimal combination of charging level for storage batteries, combined with the optimal level of turbine or solar power curtailment should be selected as the operation mode. If spinning reserve is called upon, an appropriate amount shall be made available by retrieving an appropriate amount of energy out of storage and supplementing this by increasing the actual power production of the production facilities. Since the power network controller can optimize the power production as well as the power storage under consideration of many different variables and constraints, the power network may be regarded as a combined control system.
- As indicated above, power fed into an electricity grid is sold at a variable power price. However, a situation may also arise in which the power price is negative, i.e. during a phase of over-production, the power plant operator must pay for the power fed into the grid. This might arise when other “non-renewable” power plants are already saturating the grid so that a power demand is already met. A conventional power producing plant may be compelled to terminate production if the accumulated cost of continuing production would otherwise exceed the cost of powering down and powering back up. The method according to the invention therefore preferably comprises the step of identifying a period of negative pricing, for example by consulting a power price forecast and analysing the power production capacity of the power generation facilities, and determining, on the basis of the revenue projection, the amount of stored energy to dispose of in anticipation of negative pricing, and a quantity of power to be stored in a power storage facility during such a period of negative pricing. Therefore, instead of having to pay to “dispose of” excess generated power, this can be converted into another form, for example synthesized natural gas, and stored until it can be sold profitably at a later point in time. A virtual plant or power network according to the invention can therefore stay connected to the grid during a period of negative pricing, and can continue to produce revenue exclusively from the sale of ancillary services.
- As indicated above, the power network controller can control each type of power generation facility and power storage facility in a custom or tailored manner so that these are optimally driven. The active power and reactive power grid requirements can fluctuate according to demand. Since certain types of power generation facility can provide active power as well as reactive power, in a particularly preferred embodiment of the invention, the power network controller comprises a reference distributor unit for distributing active power references and reactive power references between the power generation facilities and power storage facilities according to an active component and a reactive component of a grid requirement. For example, if the grid operator requests a specific amount of active power and reactive power, the net active power shall be controlled to reach this level, and the net reactive power level shall likewise be reached by controlling the reactive contribution from each of the storage and production systems to specified set points by the plant controller.
- The method according to the invention can be implemented using suitable software algorithms running on appropriate types of computer or server. For example, a computer program product can comprise software algorithms for carrying out the steps of monitoring a production capacity of the power generation facilities; monitoring a storage capacity of the power storage facilities; performing a revenue projection and for generating references; determining an optimal facility control plan, etc., when the computer program product is loaded into a memory of a programmable device of the power network controller according to the invention.
- Other objects and features of the present invention will become apparent from the following detailed descriptions considered in conjunction with the accompanying drawings. It is to be understood, however, that the drawings are designed solely for the purposes of illustration and not as a definition of the limits of the invention.
-
FIG. 1 shows a block diagram of a power network according to an embodiment of the invention; -
FIG. 2 shows a block diagram of a power network controller according to an embodiment of the invention; -
FIG. 3 shows a number of parameters considered by the power network controller ofFIG. 2 ; -
FIG. 4 shows further parameters considered by the power network controller ofFIG. 2 . - In the diagrams, like numbers refer to like objects throughout. Objects in the diagrams are not necessarily drawn to scale.
-
FIG. 1 shows a block diagram of apower network 1 according to an embodiment of the invention. The power network comprises various power generation plants 30, 31 and variouspower storage facilities power storage facility 40 is collected at a point of common connection PCC for feeding into anelectricity grid 5. Surplus power generated by the power generation plants 30, 31 can be transferred to non-reversiblepower storage facilities batteries 41 of a fleet of electric vehicles, or a syntheticnatural gas plant 42, which in this embodiment is realised to supply gas to aconsumer gas grid 6. - A
power network controller 2 receives an input power reference Psched indicating the amount of electrical power required by thegrid 5. Thepower network 1 must fulfil this requirement. - To this end, the
power network controller 2 decides how much active power and reactive power should be transferred between the power generation plants 30, 31, thepower storage facilities grid 5. Thepower network controller 2 establishes an optimal facility control plan on the basis of the production capacity of thepower plants power plants grid 5 and/or between thepower plants reversible storage plant 40 to thegrid 5. Thepower network controller 2 determines the optimal facility control plan by considering a number of input parameters M_1, . . . , M_n and data D_30, D_31, D_40, D_41, D_42 from the power production andstorage plants wind power plant 30 can supply production data of thatwind power plant 30 such as active power, available power, max loss power (used to calculated controller limits), max reference (the max amount of power a sub plant can produce, e.g. its rated power or a value determined by a limitation on a transformer or power line), active power frequency, rated park power, etc; while data D_41 from a non-reversiblepower storage facility 41 may include information about its momentary capacity. The input parameters M_, . . . , M_n can provide information about many different aspects of the operation of the power network, for example system variables, forecasts, and constraints. On the basis of this information, the facility control plan can be used to generate references Rref_30, Rref_31, Rref_40, Rref_41, Rref_42 for each of the facilities. For example, a reference Rref_30 for thewind power plant 30 can define active and/or reactive power references for that wind power plant, and a park pilot of thewind power plant 30 can generate appropriate references for each of the wind turbines. A reference could also be controlled as a voltage reference or a power factor reference or a combination of voltage, reactive power or power factor references. - The diagram only shows five
facilities -
FIG. 2 shows a block diagram of apower network controller 2 or “governor” 2 according to an embodiment of the invention. In this realisation, acontrol block 20 receives a grid requirement or reference Pdemand that indicates a required grid power that must be delivered, i.e. the entire power network must operate to satisfy this reference Pdemand. The grid reference Pdemand can be the same as the input power reference Psched indicated inFIG. 1 , or can be derived from that by a suitable reference selector unit (not shown). Thecontrol block 20 compares this with information about the momentary power production given in the data D_x delivered by power generation facilities of the power network, and identifies a difference—surplus or deficit—and provides an appropriate signal to an optimizingmodule 21. The optimizingmodule 21 receives various input parameters M_1, . . . , M_n, as well as production data D_x from all power generation and storage facilities. On the basis of this information, the optimizingmodule 21 can determine the amount of power that should be generated and sold into the grid, the amount of power that should be stored for later use, and the amount of power that should be retrieved from a reversible power storage facility. Many parameters such as power price, weather forecast, power price forecast, service cost etc. as described above, are taken into consideration to determine an optimal plan for this power network from the point of view of short-term and long-term profitability as well as energy efficiency. The optimizingmodule 21 issues appropriate signals Pstore, Pproduce to areference distribution unit 22. The optimizingmodule 21 can generate one collective power storage signal Pstore, or individual power storage signals for each of the storage facilities. Similarly, the optimizingmodule 21 can generate one collective power production signal Pproduce, or individual power production signals for each of the power production facilities. Thereference distribution unit 22 uses this information as well as the production data D_x from all power generation and storage facilities to calculate appropriate references Pref_x for each of the facilities. -
FIG. 3 shows various parameters considered by the optimizingmodule 21 of thepower network controller 2 ofFIG. 2 . The diagram shows exemplary plots of spinning reserve forecast M_1 (quantified in $/MWh), reactive power support M_2 (quantified in $/MVAr), and energy price M_3 (quantified in $/MWh). The diagram indicates how such parameters or variables can fluctuate over time (X-axis, hours). Clearly, the point in time at which energy is sold into the electricity grid, or the point in time at which an ancillary service such as spinning reserve or reactive power is sold can significantly influence the profitability of the power network. -
FIG. 4 shows further parameters that might be considered by the optimizingmodule 21 of thepower network controller 2 ofFIG. 2 . The diagram shows exemplary plots of service schedule M_4 (quantified in MWh), service cost M_5 and equipment depreciation index M_6 (both quantified in $/MWh), which can be of relevance for a facility whose lifetime can be extended by operating it at lower load levels. These graphs indicate how such parameters or variables can develop over time t (in the case of service schedule M_4) or how they are related to production levels p (in the case of service cost M_5 and equipment depreciation index M_6), so that consideration of these factors can be beneficial when working out an optimal facility plan for a power network. - Although the present invention has been disclosed in the form of preferred embodiments and variations thereon, it will be understood that numerous additional modifications and variations could be made thereto without departing from the scope of the invention.
- For the sake of clarity, it is to be understood that the use of “a” or “an” throughout this application does not exclude a plurality, and “comprising” does not exclude other steps or elements. The mention of a “unit” or a “module” does not preclude the use of more than one unit or module.
Claims (14)
Priority Applications (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US13/678,896 US9778627B2 (en) | 2012-11-16 | 2012-11-16 | Method of controlling a power network |
DK13175133.1T DK2733810T3 (en) | 2012-11-16 | 2013-07-04 | Method of controlling a power grid |
ES13175133.1T ES2669554T3 (en) | 2012-11-16 | 2013-07-04 | Control method of a power network |
EP13175133.1A EP2733810B1 (en) | 2012-11-16 | 2013-07-04 | Method of controlling a power network |
CN201310568851.1A CN103825304B (en) | 2012-11-16 | 2013-11-15 | The method for controlling power network |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US13/678,896 US9778627B2 (en) | 2012-11-16 | 2012-11-16 | Method of controlling a power network |
Publications (2)
Publication Number | Publication Date |
---|---|
US20140142779A1 true US20140142779A1 (en) | 2014-05-22 |
US9778627B2 US9778627B2 (en) | 2017-10-03 |
Family
ID=48703353
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US13/678,896 Active 2034-12-04 US9778627B2 (en) | 2012-11-16 | 2012-11-16 | Method of controlling a power network |
Country Status (5)
Country | Link |
---|---|
US (1) | US9778627B2 (en) |
EP (1) | EP2733810B1 (en) |
CN (1) | CN103825304B (en) |
DK (1) | DK2733810T3 (en) |
ES (1) | ES2669554T3 (en) |
Cited By (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20140244188A1 (en) * | 2013-02-28 | 2014-08-28 | International Business Machines Corporation | Forecasting output power of wind turbine in wind farm |
US20160094035A1 (en) * | 2014-09-26 | 2016-03-31 | Enrichment Technology Company Ltd., Zweigniederlassung Deutschland | Combined electrical power plant |
US20170110995A1 (en) * | 2015-10-16 | 2017-04-20 | Alstom Renewable Technologies | Controller for hydroelectric group |
US9822705B2 (en) | 2015-07-13 | 2017-11-21 | General Elecric Company | Power augmentation system for a gas turbine |
US20170346291A1 (en) * | 2016-05-28 | 2017-11-30 | PXiSE Energy Solutions, LLC | Decoupling Synchrophasor Based Control System for Distributed Energy Resources |
CN108090621A (en) * | 2017-12-28 | 2018-05-29 | 华中科技大学 | A kind of short-term wind speed forecasting method and system based on global optimization stage by stage |
US20180175666A1 (en) * | 2016-12-20 | 2018-06-21 | Ecojiva, LLC | Electrical load management system |
US10267231B2 (en) | 2015-08-06 | 2019-04-23 | General Electric Company | Systems and methods for augmenting gas turbine power output with a pressurized air tank and/or an external compressor |
US10504195B2 (en) * | 2017-11-13 | 2019-12-10 | Mitsubishi Electric Research Laboratories, Inc. | System and method for decentralized energy production |
US10724500B2 (en) * | 2013-08-06 | 2020-07-28 | Wobben Properties Gmbh | Method for controlling wind power plants |
AU2017273433B2 (en) * | 2016-05-28 | 2020-10-08 | PXiSE Energy Solutions, LLC | Decoupling synchrophasor based control system for distributed energy resources |
US11056912B1 (en) | 2021-01-25 | 2021-07-06 | PXiSE Energy Solutions, LLC | Power system optimization using hierarchical clusters |
WO2021228457A1 (en) * | 2020-05-11 | 2021-11-18 | Siemens Aktiengesellschaft | Device and method for controlling energy flows between components of an energy system |
CN113708418A (en) * | 2021-09-24 | 2021-11-26 | 国网湖南省电力有限公司 | Micro-grid optimization scheduling method |
US11336098B2 (en) * | 2016-06-13 | 2022-05-17 | Vestas Wind Systems A/S | Interconnection of multiple renewable energy power plants |
WO2023069316A1 (en) * | 2021-10-21 | 2023-04-27 | 8Me Nova, Llc | Systems and methods for renewable powerplant serving multiple loads |
US20230216339A1 (en) * | 2021-12-31 | 2023-07-06 | Duke Energy Corporation | Systems and methods for differential power generation |
US11734776B2 (en) * | 2017-09-11 | 2023-08-22 | Innogy Se | Open-loop and/or closed-loop control of power generation installations |
WO2023156170A1 (en) * | 2022-02-18 | 2023-08-24 | Siemens Gamesa Renewable Energy Innovation & Technology S.L. | Method of power management of a power plant |
Families Citing this family (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ES2656387T3 (en) | 2014-07-02 | 2018-02-27 | Vestas Wind Systems A/S | A method for the control of a wind turbine including the inversion of an energy flow through a generator |
CN104348189B (en) * | 2014-11-21 | 2016-05-04 | 四川慧盈科技有限责任公司 | A kind of distributed power supply system |
CN104538981B (en) * | 2015-01-09 | 2016-08-24 | 国网山东省电力公司烟台供电公司 | A kind of monitoring method of the battery energy storage system with Reactive-power control function |
SG10201502972VA (en) * | 2015-04-15 | 2016-11-29 | Sun Electric Pte Ltd | Method and system for operating a plurality of photovoltaic (pv) generating facilities connected to an electrical power grid network |
US20160365729A1 (en) * | 2015-06-10 | 2016-12-15 | Tanachat Pochana | Intelligent control system for power generation equipment |
EP3176901A1 (en) * | 2015-12-01 | 2017-06-07 | DET International Holding Limited | Controller for a multiphase inverter |
US10303942B2 (en) * | 2017-02-16 | 2019-05-28 | Siemens Aktiengesellschaft | Short term cloud forecast, improved cloud recognition and prediction and uncertainty index estimation |
JP6987514B2 (en) * | 2017-03-24 | 2022-01-05 | 株式会社日立製作所 | Transaction planning device and transaction planning method |
EP3462560B1 (en) * | 2017-09-27 | 2021-05-12 | Indielux UG (Haftungsbeschränkt) | A method and system for determining and controlling an electricity feed to an electricity grid from a load side of an electric circuit |
CN109617183B (en) * | 2018-12-30 | 2022-05-20 | 深圳市旭联信息技术有限公司 | Intelligent power supply method of multi-battery system |
EP3823125A1 (en) * | 2019-11-15 | 2021-05-19 | Siemens Gamesa Renewable Energy Innovation & Technology, S.L. | Controlling a hybrid power plant |
WO2020234398A1 (en) * | 2019-05-20 | 2020-11-26 | Siemens Gamesa Renewable Energy Innovation & Technology S.L. | Controlling a hybrid power plant |
US20230411966A1 (en) * | 2020-03-26 | 2023-12-21 | Vestas Wind Systems A/S | A method for improved power ramping in a hybrid power plant |
CN112418634B (en) * | 2020-11-17 | 2023-07-14 | 广东电网有限责任公司广州供电局 | Distribution network dispatching power failure planning autonomous cruising system |
CN112886714B (en) * | 2021-01-18 | 2022-07-12 | 国网浙江省电力有限公司电力科学研究院 | Power grid side energy storage power station composite function auxiliary decision-making method |
Citations (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4802100A (en) * | 1986-08-18 | 1989-01-31 | Gas Research Institute | Advanced cogeneration control system |
US20020082747A1 (en) * | 2000-08-11 | 2002-06-27 | Kramer Robert A. | Energy management system and methods for the optimization of distributed generation |
US20020087234A1 (en) * | 2000-12-29 | 2002-07-04 | Abb Ab | System, method and computer program product for enhancing commercial value of electrical power produced from a renewable energy power production facility |
US20020128748A1 (en) * | 2000-12-15 | 2002-09-12 | Alexander Krakovich | Configurable switchgear system |
US6452289B1 (en) * | 2000-07-10 | 2002-09-17 | Satcon Technology Corporation | Grid-linked power supply |
US20020198629A1 (en) * | 2001-04-27 | 2002-12-26 | Enerwise Global Technologies, Inc. | Computerized utility cost estimation method and system |
US6522955B1 (en) * | 2000-07-28 | 2003-02-18 | Metallic Power, Inc. | System and method for power management |
US20070005192A1 (en) * | 2005-06-17 | 2007-01-04 | Optimal Licensing Corporation | Fast acting distributed power system for transmission and distribution system load using energy storage units |
US20080217998A1 (en) * | 2005-02-26 | 2008-09-11 | Parmley Daniel W | Renewable energy power systems |
US20090066287A1 (en) * | 2006-08-10 | 2009-03-12 | V2Green, Inc. | Business Methods in a Power Aggregation System for Distributed Electric Resources |
US20100138066A1 (en) * | 2008-11-14 | 2010-06-03 | Thinkeco Power Inc. | System and method of democratizing power to create a meta-exchange |
US20110082598A1 (en) * | 2009-10-02 | 2011-04-07 | Tod Boretto | Electrical Power Time Shifting |
US20110089693A1 (en) * | 2009-10-19 | 2011-04-21 | Adel Nasiri | Wind energy power conversion system reducing gearbox stress and improving power stability |
US20120061963A1 (en) * | 2009-01-30 | 2012-03-15 | Jan Thisted | Power system frequency inertia for power generation system |
US20120191262A1 (en) * | 2012-01-19 | 2012-07-26 | David Marcus | System and method for conserving energy resources through storage and delivery of renewable energy |
US20120306204A1 (en) * | 2010-02-25 | 2012-12-06 | Vestas Wind Systems A/S | Method and control arrangement for controlling a reactive power source |
US20130024042A1 (en) * | 2011-07-18 | 2013-01-24 | Nec Laboratories America, Inc. | Method for real-time power management of a grid-tied microgrid to extend storage lifetime and reduce cost of energy |
US20130081394A1 (en) * | 2011-09-29 | 2013-04-04 | Michael L. Perry | Solar power system and method therefor |
US20130245847A1 (en) * | 2009-10-23 | 2013-09-19 | Alain P. Steven | Facilitating revenue generation from wholesale electricity markets using an enineering-based energy asset model |
US20140114489A1 (en) * | 2011-06-10 | 2014-04-24 | Enthenergy, Llc. | Sustainable energy efficiency management system |
US8775136B2 (en) * | 2010-12-13 | 2014-07-08 | Siemens Aktiengesellschaft | Primal-dual interior point methods for solving discrete optimal power flow problems implementing a chain rule technique for improved efficiency |
US20140351010A1 (en) * | 2008-11-14 | 2014-11-27 | Thinkeco Power Inc. | System and method of democratizing power to create a meta-exchange |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1256465A (en) | 1999-12-06 | 2000-06-14 | 欧阳永熙 | Control of power output from one generator set to power network and corresponding settlement method in power market |
US20080262857A1 (en) | 2004-12-16 | 2008-10-23 | Perera Anil L M | Reducing the Cost of Distributed Electricity Generation Through Opportunity Generation |
TW201044287A (en) | 2009-06-01 | 2010-12-16 | Open Minder Group Ltd | System and method for evaluating power |
US20110055036A1 (en) | 2009-09-03 | 2011-03-03 | Meishar Immediate Community | Methods and systems for managing electricity delivery and commerce |
US20110276194A1 (en) | 2010-05-10 | 2011-11-10 | Emalfarb Hal A | System and method for energy management |
-
2012
- 2012-11-16 US US13/678,896 patent/US9778627B2/en active Active
-
2013
- 2013-07-04 EP EP13175133.1A patent/EP2733810B1/en active Active
- 2013-07-04 ES ES13175133.1T patent/ES2669554T3/en active Active
- 2013-07-04 DK DK13175133.1T patent/DK2733810T3/en active
- 2013-11-15 CN CN201310568851.1A patent/CN103825304B/en active Active
Patent Citations (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4802100A (en) * | 1986-08-18 | 1989-01-31 | Gas Research Institute | Advanced cogeneration control system |
US6452289B1 (en) * | 2000-07-10 | 2002-09-17 | Satcon Technology Corporation | Grid-linked power supply |
US6522955B1 (en) * | 2000-07-28 | 2003-02-18 | Metallic Power, Inc. | System and method for power management |
US20020082747A1 (en) * | 2000-08-11 | 2002-06-27 | Kramer Robert A. | Energy management system and methods for the optimization of distributed generation |
US20020128748A1 (en) * | 2000-12-15 | 2002-09-12 | Alexander Krakovich | Configurable switchgear system |
US20020087234A1 (en) * | 2000-12-29 | 2002-07-04 | Abb Ab | System, method and computer program product for enhancing commercial value of electrical power produced from a renewable energy power production facility |
US6512966B2 (en) * | 2000-12-29 | 2003-01-28 | Abb Ab | System, method and computer program product for enhancing commercial value of electrical power produced from a renewable energy power production facility |
US20020198629A1 (en) * | 2001-04-27 | 2002-12-26 | Enerwise Global Technologies, Inc. | Computerized utility cost estimation method and system |
US20080217998A1 (en) * | 2005-02-26 | 2008-09-11 | Parmley Daniel W | Renewable energy power systems |
US20070005192A1 (en) * | 2005-06-17 | 2007-01-04 | Optimal Licensing Corporation | Fast acting distributed power system for transmission and distribution system load using energy storage units |
US20090066287A1 (en) * | 2006-08-10 | 2009-03-12 | V2Green, Inc. | Business Methods in a Power Aggregation System for Distributed Electric Resources |
US20100138066A1 (en) * | 2008-11-14 | 2010-06-03 | Thinkeco Power Inc. | System and method of democratizing power to create a meta-exchange |
US20140351010A1 (en) * | 2008-11-14 | 2014-11-27 | Thinkeco Power Inc. | System and method of democratizing power to create a meta-exchange |
US20120061963A1 (en) * | 2009-01-30 | 2012-03-15 | Jan Thisted | Power system frequency inertia for power generation system |
US20110082598A1 (en) * | 2009-10-02 | 2011-04-07 | Tod Boretto | Electrical Power Time Shifting |
US20110089693A1 (en) * | 2009-10-19 | 2011-04-21 | Adel Nasiri | Wind energy power conversion system reducing gearbox stress and improving power stability |
US20130245847A1 (en) * | 2009-10-23 | 2013-09-19 | Alain P. Steven | Facilitating revenue generation from wholesale electricity markets using an enineering-based energy asset model |
US20120306204A1 (en) * | 2010-02-25 | 2012-12-06 | Vestas Wind Systems A/S | Method and control arrangement for controlling a reactive power source |
US8775136B2 (en) * | 2010-12-13 | 2014-07-08 | Siemens Aktiengesellschaft | Primal-dual interior point methods for solving discrete optimal power flow problems implementing a chain rule technique for improved efficiency |
US20140114489A1 (en) * | 2011-06-10 | 2014-04-24 | Enthenergy, Llc. | Sustainable energy efficiency management system |
US20130024042A1 (en) * | 2011-07-18 | 2013-01-24 | Nec Laboratories America, Inc. | Method for real-time power management of a grid-tied microgrid to extend storage lifetime and reduce cost of energy |
US20130081394A1 (en) * | 2011-09-29 | 2013-04-04 | Michael L. Perry | Solar power system and method therefor |
US20120191262A1 (en) * | 2012-01-19 | 2012-07-26 | David Marcus | System and method for conserving energy resources through storage and delivery of renewable energy |
Non-Patent Citations (1)
Title |
---|
Li et al., "Utility-based scheduling for grid computing under constraints of energy budget and deadline", 2009, Elsevier, pgs.,1131-1142. * |
Cited By (26)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10215162B2 (en) * | 2013-02-28 | 2019-02-26 | Utopus Insights, Inc. | Forecasting output power of wind turbine in wind farm |
US11408399B2 (en) | 2013-02-28 | 2022-08-09 | Utopus Insights, Inc. | Forecasting output power of wind turbine in wind farm |
US20140244188A1 (en) * | 2013-02-28 | 2014-08-28 | International Business Machines Corporation | Forecasting output power of wind turbine in wind farm |
US10724500B2 (en) * | 2013-08-06 | 2020-07-28 | Wobben Properties Gmbh | Method for controlling wind power plants |
US20160094035A1 (en) * | 2014-09-26 | 2016-03-31 | Enrichment Technology Company Ltd., Zweigniederlassung Deutschland | Combined electrical power plant |
WO2016046281A1 (en) * | 2014-09-26 | 2016-03-31 | Enrichment Technology Company Ltd. Zweigniederlassung Deutschland | Combined electrical power plant |
US9985437B2 (en) * | 2014-09-26 | 2018-05-29 | Enrichment Technology Company Ltd., Zweigniederlassung Deutschland | Combined electrical power plant |
US9822705B2 (en) | 2015-07-13 | 2017-11-21 | General Elecric Company | Power augmentation system for a gas turbine |
US10267231B2 (en) | 2015-08-06 | 2019-04-23 | General Electric Company | Systems and methods for augmenting gas turbine power output with a pressurized air tank and/or an external compressor |
US10505480B2 (en) * | 2015-10-16 | 2019-12-10 | Alstom Renewable Technologies | Controller for hydroelectric group |
US20170110995A1 (en) * | 2015-10-16 | 2017-04-20 | Alstom Renewable Technologies | Controller for hydroelectric group |
US10615604B2 (en) * | 2016-05-28 | 2020-04-07 | PXiSE Energy Solutions, LLC | Decoupling synchrophasor based control system for distributed energy resources |
US20170346291A1 (en) * | 2016-05-28 | 2017-11-30 | PXiSE Energy Solutions, LLC | Decoupling Synchrophasor Based Control System for Distributed Energy Resources |
AU2017273433B2 (en) * | 2016-05-28 | 2020-10-08 | PXiSE Energy Solutions, LLC | Decoupling synchrophasor based control system for distributed energy resources |
US11336098B2 (en) * | 2016-06-13 | 2022-05-17 | Vestas Wind Systems A/S | Interconnection of multiple renewable energy power plants |
US20180175666A1 (en) * | 2016-12-20 | 2018-06-21 | Ecojiva, LLC | Electrical load management system |
US11734776B2 (en) * | 2017-09-11 | 2023-08-22 | Innogy Se | Open-loop and/or closed-loop control of power generation installations |
US10504195B2 (en) * | 2017-11-13 | 2019-12-10 | Mitsubishi Electric Research Laboratories, Inc. | System and method for decentralized energy production |
JP2020527012A (en) * | 2017-11-13 | 2020-08-31 | 三菱電機株式会社 | Power generation system and energy generation system |
CN108090621A (en) * | 2017-12-28 | 2018-05-29 | 华中科技大学 | A kind of short-term wind speed forecasting method and system based on global optimization stage by stage |
WO2021228457A1 (en) * | 2020-05-11 | 2021-11-18 | Siemens Aktiengesellschaft | Device and method for controlling energy flows between components of an energy system |
US11056912B1 (en) | 2021-01-25 | 2021-07-06 | PXiSE Energy Solutions, LLC | Power system optimization using hierarchical clusters |
CN113708418A (en) * | 2021-09-24 | 2021-11-26 | 国网湖南省电力有限公司 | Micro-grid optimization scheduling method |
WO2023069316A1 (en) * | 2021-10-21 | 2023-04-27 | 8Me Nova, Llc | Systems and methods for renewable powerplant serving multiple loads |
US20230216339A1 (en) * | 2021-12-31 | 2023-07-06 | Duke Energy Corporation | Systems and methods for differential power generation |
WO2023156170A1 (en) * | 2022-02-18 | 2023-08-24 | Siemens Gamesa Renewable Energy Innovation & Technology S.L. | Method of power management of a power plant |
Also Published As
Publication number | Publication date |
---|---|
EP2733810B1 (en) | 2018-04-11 |
ES2669554T3 (en) | 2018-05-28 |
CN103825304A (en) | 2014-05-28 |
US9778627B2 (en) | 2017-10-03 |
EP2733810A2 (en) | 2014-05-21 |
EP2733810A3 (en) | 2014-10-01 |
CN103825304B (en) | 2019-03-12 |
DK2733810T3 (en) | 2018-05-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9778627B2 (en) | Method of controlling a power network | |
CA2844443C (en) | Dispatchable renewable energy generation, control and storage facility | |
Choi et al. | Optimal scheduling and operation of the ESS for prosumer market environment in grid-connected industrial complex | |
Oudalov et al. | Optimizing a battery energy storage system for primary frequency control | |
US9692233B2 (en) | Method for controlling an energy storage system | |
US8457800B2 (en) | System and method for conserving energy resources through storage and delivery of renewable energy | |
CN105684257B (en) | For controlling the microgrid energy management system and method for the operation of micro-capacitance sensor | |
US20140142776A1 (en) | Method of controlling a power plant | |
US9244506B2 (en) | Method of controlling a power plant | |
US20130006431A1 (en) | Procedure for supply control and storage of power provided by a renewable energy generation plant | |
WO2008009986A2 (en) | Aggregated management system | |
AU2019397506A1 (en) | Hybrid power plant | |
Qian et al. | Benefits of energy storage in power systems with high level of intermittent generation | |
Aziz et al. | Issues and mitigations of wind energy penetrated network: Australian network case study | |
EP2541720A1 (en) | Procedure for supply control and storage of power provided by a renewable energy generation plant | |
US20230259086A1 (en) | Adaptive Knowledge-Based Energy Management System and Method | |
Abreu | Wind power generation and dispatch in competitive power markets | |
Zahmoun et al. | Optimal Operation Scheduling of a Combined Wind-Hydro System for Peak Load Shaving | |
Qiu | Planning and Operation of Energy Storage Systems in Power Systems | |
Qi et al. | Coordinated Scheduling of Micro-grid Combined Heat and Power Based on Dynamic Feedback Correction and Virtual Penalty Cost |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: SIEMENS AKTIENGESELLSCHAFT, GERMANY Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:SIEMENS WIND POWER A/S;REEL/FRAME:029558/0729 Effective date: 20121219 Owner name: SIEMENS WIND POWER A/S, DENMARK Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:NIELSEN, KAJ SKOV;STOETTRUP, MICHAEL;SIGNING DATES FROM 20121128 TO 20121211;REEL/FRAME:029558/0717 |
|
STCF | Information on status: patent grant |
Free format text: PATENTED CASE |
|
AS | Assignment |
Owner name: SIEMENS GAMESA RENEWABLE ENERGY A/S, DENMARK Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:SIEMENS AKTIENGESELLSCHAFT;REEL/FRAME:048003/0631 Effective date: 20181025 |
|
MAFP | Maintenance fee payment |
Free format text: PAYMENT OF MAINTENANCE FEE, 4TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1551); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY Year of fee payment: 4 |