US20130248192A1 - Multizone and zone-by-zone abrasive jetting tools and methods for fracturing subterranean formations - Google Patents
Multizone and zone-by-zone abrasive jetting tools and methods for fracturing subterranean formations Download PDFInfo
- Publication number
- US20130248192A1 US20130248192A1 US13/848,640 US201313848640A US2013248192A1 US 20130248192 A1 US20130248192 A1 US 20130248192A1 US 201313848640 A US201313848640 A US 201313848640A US 2013248192 A1 US2013248192 A1 US 2013248192A1
- Authority
- US
- United States
- Prior art keywords
- fluid
- packer element
- jet
- bore
- packer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 230000015572 biosynthetic process Effects 0.000 title claims description 44
- 238000000034 method Methods 0.000 title claims description 14
- 238000005755 formation reaction Methods 0.000 title 1
- 239000012530 fluid Substances 0.000 claims abstract description 126
- 238000007789 sealing Methods 0.000 claims abstract description 11
- 230000000903 blocking effect Effects 0.000 claims description 9
- 230000002441 reversible effect Effects 0.000 description 15
- 230000000977 initiatory effect Effects 0.000 description 5
- 238000004519 manufacturing process Methods 0.000 description 5
- 238000004891 communication Methods 0.000 description 3
- 238000004140 cleaning Methods 0.000 description 2
- 229930195733 hydrocarbon Natural products 0.000 description 2
- 150000002430 hydrocarbons Chemical class 0.000 description 2
- 238000010348 incorporation Methods 0.000 description 2
- 238000005086 pumping Methods 0.000 description 2
- 238000011084 recovery Methods 0.000 description 2
- 239000004576 sand Substances 0.000 description 2
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 230000003628 erosive effect Effects 0.000 description 1
- 230000002028 premature Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/12—Packers; Plugs
- E21B33/127—Packers; Plugs with inflatable sleeve
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/11—Perforators; Permeators
- E21B43/114—Perforators using direct fluid action on the wall to be perforated, e.g. abrasive jets
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B2200/00—Special features related to earth drilling for obtaining oil, gas or water
- E21B2200/06—Sleeve valves
Definitions
- Embodiments disclosed herein relate to systems, tools and methods for jet perforating a tubular extending into a subterranean formation, the tool releasably sealing an annulus about the tubular for controllably directing fluid for forming the perforations and for fracturing the formation therethrough.
- Horizontal wellbores in a formation are often lined with a primary casing along the vertical portion and heel, the primary casing being cemented therein.
- An open wellbore portion extends horizontally from the heel along the formation through one or more zones of interest. Completion tools can be run into the openhole portion of the wellbore for fracturing the wellbore to enhance production therefrom.
- the liner or secondary casing can be left uncemented or can be cemented in the wellbore.
- the liner is thereafter perforated at a plurality of locations spaced therealong and corresponding to the zones of interest to create flowpaths therethrough to permit fluids, such as fracturing fluids, to reach the formation therebeyond.
- One method is to fit a completion string with a plurality of conventional tools, such as shown in FIG. 1A , one tool per zone of interest, and run the completion string into the liner, aligning the tools with the zones.
- a treatment annulus is formed between the completion string and liner.
- Each conventional tool comprises a sub having a jet housing with a bore contiguous with the completion string.
- the jet housing is fit with a plurality of jet ports oriented towards the wall of the liner.
- the jet ports are alternately blocked or opened to the bore by a sliding sleeve fit to the housing bore.
- the uphole end of the sleeve of each tool is sized to receive a corresponding drop ball, each successive uphole tool in the completion string having a ball seat with a successively larger diameter.
- the completion string with jet tools is run into the liner.
- a first ball is dropped, shifting the sleeve of the distal, downhole-most tool open and blocking the bore of the tool below the jet ports.
- Abrasive fluids are pumped down the completion string to direct abrasive fluid through the opened jet ports against the liner, perforating the liner and eroding the formation therebehind.
- fracturing fluid is directed downhole which also flows through the jet ports and into the formation, fracturing the formation and directing sand or other proppent into the formation.
- Some circulation of clean fluid continues to remove excess fracturing sand up the annulus.
- the process is repeated with a next larger ball corresponding with the diameter of the ball seat on the next uphole tool.
- Embodiments disclosed herein enable setting and maintaining a packer element, incorporated into a fluid-jetting sub, in a set position using a fluid pressure in the completion tubing on which the sub is conveyed. Pressure in the completion tubing is maintained at a higher pressure than in an annulus surrounding the sub for maintaining the packer element in the set position.
- the packer element is an inflatable element and in other embodiments the packer element is a compressible packer element.
- a fluid-jetting sub is deployable into a wellbore on a completion string and forming an annulus therebetween, for use in perforating and fracturing a subterranean formation.
- the sub comprises: a tubular housing adapted for connection to the completion string and having a tool bore formed therethrough being contiguous with a bore of the completion string.
- a plurality of jet ports extend substantially radially through the tubular housing.
- a packer element is formed circumferentially about the housing downhole of the plurality of jet ports and is adapted to seal the annulus when actuated to a set position.
- a fluid block is formed in the bore of the housing downhole of at least the plurality of jet ports for at least temporarily blocking a flow of fluid through the tool bore therebelow.
- the fluid in the tool bore is caused to exit the plurality of jet ports for delivering fluid therethrough for perforating and fracturing the formation; and operatively engages the packer element for actuating the packer element to the set position.
- a completion tool is deployable into a wellbore on a completion string and forms an annulus therebetween for use in perforating and fracturing a subterranean formation.
- the tool comprises: one or more fluid-jet subs incorporated in the completion string.
- Each of the one or more fluid-jet subs has a tubular housing connectable within the completion string and having a tool bore formed therethrough being contiguous with a bore of the completion string.
- a plurality of jet ports extend substantially radially through the tubular housing.
- a packer element is formed circumferentially about the housing downhole of the plurality of jet ports for sealing the annulus when actuated to a set position.
- a fluid block is formed in the bore of the housing downhole of at least the plurality of jet ports for at least temporarily blocking a flow of fluid through the tool bore therebelow.
- the fluid flowing through the bores of the tubing string and the fluid-jet sub is caused to exit the plurality of jet ports for delivering fluid therethrough for perforating and fracturing the formation; and to operatively engage the packer element for actuating the packer element to the set position.
- the completion string is a jointed tubular string and the one or more fluid-jetting subs is two or more fluid-jet subs, the two or more fluid-jet subs being spaced along the jointed tubular string for positioning at zones of interest in the formation.
- the completion string is coiled tubing and the one or more fluid-jetting subs is one fluid-jetting sub, the fluid-jetting sub being positioned adjacent a distal end of the coiled tubing for positioning at zones of interest in the formation.
- a method for completion of a wellbore comprises: incorporating one or more fluid jetting subs into a completion tubing string deployed into a wellbore and forming an annulus therebetween.
- Each of the one or more fluid jetting subs has a housing having a bore formed therethrough contiguous with a bore of the completion string.
- One or more jet ports extending radially through the housing and a packer element is formed about the housing therebelow. The flow of fluid through the tool bore is at least temporarily blocked below at least the jet ports. Fluid is flowed through the contiguous bore for increasing pressure within the tool bore to greater than outside the housing.
- the pressure acts to actuate the packer element to a set position and to jet fluid through the one or more jet ports for jetting perforations in at least the wellbore.
- the pressure is maintained in the tool bore greater than outside the housing to maintain the packer element in the set position while providing treatment fluid through the completion string or through the annulus for treating the formation through the perforations.
- FIG. 1 is a sectional side view of a prior art jet sub, a plurality of which are spaced along the wellbore;
- FIG. 2A is a sectional side view of an embodiment of a fluid jetting sub having an one or more jet ports, an inflatable packer element therebelow and one or more packer ports for inflation of the packer element prior to actuation of the packer, the one or more jet ports and the one or more packer ports being covered by a sleeve in a closed position;
- FIG. 2B is a sectional side view of the inflatable fluid jetting sub of FIG. 2A following shifting of the sleeve to open the one or more jet ports for perforation and the one or more packer ports for actuation of the packer element;
- FIGS. 3 to 8 are schematic illustrations of an embodiment having a plurality of fluid jetting subs according to FIG. 2A incorporated into and spaced apart along a completion string, 31 ⁇ 2 inch tubing string the completion string being jointed tubing such as a 31 ⁇ 2 inch tubing string, more particularly,
- FIG. 3 illustrates initial steps in completing access to a subterranean formation, commencing with running in a first casing string along the vertical and heel portion of the wellbore, typically cementing the first casing therealong, with open hole along the zones of interest and running in a secondary casing string, such as 51 ⁇ 2 inch casing, into the open hole portion for accessing the formation;
- FIG. 4 illustrates a next step of running in the completion string for locating and spacing a plurality of the fluid-jetting subs having the inflatable packer elements along the second casing string and forming a circulation annulus therebetween;
- FIG. 5 illustrates commencement of jet perforation and treatment at a first interval initiated by a ball drop for the downhole zone for shifting the sleeve of the first, downhole-most fluid-jetting sub to the open position for enabling abrasive jetting and setting of the inflatable packer;
- FIG. 6A illustrates the next step of providing a fluid flow through the tubing string to the open packer ports for inflating the packer and applying abrasive fluid to the open jet ports for jet perforating the second casing string at the downhole zone of interest, enabling fracturing of the zone through the jet ports as desired;
- FIG. 6B illustrates an optional intermediate step of reverse circulating down the circulation annulus to recover the previous dropped ball, circulating the ball up the completion string to surface and unsetting the packer element;
- FIG. 7A illustrates initiating completion of the next successive uphole interval initiated by dropping a successive, next larger size ball, for shifting the sleeve in the successive uphole fluid-jetting sub;
- FIG. 7B illustrates the optional step of reverse circulating down the annulus to recover the successive next larger size ball up the completion string to surface before repeating for each successive uphole zone and unsetting the packer;
- FIG. 7C illustrates the case where only some or no balls had been previously recovered, illustrating the step of reverse circulating down the annulus to recover all remaining balls in the completion string to surface;
- FIG. 8 illustrates a final the step of having pulled the completion string out of hole for production from the formation through the jet perforated, second casing
- FIGS. 9 to 15 are schematic illustrations of an embodiment having a plurality of fluid-jetting subs incorporated in a completion string and spaced apart therealong, each sub incorporating one or more jet ports, a compressible packer element therebelow and an axially moveable sleeve for opening the jet ports and compressing the packer element in an open position, the completion string being jointed tubing, more particularly,
- FIG. 9 illustrates the initial steps according to FIG. 3 ;
- FIG. 10 illustrates a next step of running in the completion string, for locating and spacing a plurality of the fluid-jetting subs having the compressible packer elements along the second casing string and forming a circulation annulus therebetween;
- FIG. 11 illustrates commencement of jet perforation and treatment at a first interval initiated by a ball drop for the downhole zone for shifting the sleeve of the first, downhole-most fluid-jetting sub to the open position for enabling abrasive jetting and setting of the compressible packer
- FIG. 12A illustrates the next step of providing a fluid flow through the tubing string for maintaining a pressure on the sleeve for compressing the packer element and for applying abrasive fluid to the open jet ports for jet perforating the second casing string at the downhole zone of interest, enabling fracturing of the zone through the jet ports as desired;
- FIG. 12B illustrates an optional intermediate step of reverse circulating down the circulation annulus to recover the previous dropped ball, circulating the ball up the completion string to surface and unsetting the packer element;
- FIG. 13A illustrates initiating completion of the next successive uphole interval initiated by dropping a successive, next larger size ball, for shifting the sleeve in the successive uphole fluid-jetting sub;
- FIG. 13B illustrates the optional step of reverse circulating down the annulus to recover the successive next larger size ball up the completion string to surface before repeating for each successive uphole zone and unsetting the packer;
- FIG. 14 illustrates the case where only some or no balls had been previously recovered, illustrating the step of reverse circulating down the annulus to recover all remaining balls in the completion string to surface and unsetting all of the remaining packer elements;
- FIG. 15 illustrates having pulled the completion string from the wellbore according to FIG. 8 ;
- FIGS. 16 to 21 are schematic illustrations of an embodiment having a single fluid-jetting sub having one or more open jet ports, an inflatable packer element therebelow and one or more open packer ports fluidly connected to the packer element, the jet packer sub being run-in to the wellbore using coiled tubing having a blocked distal end; more particularly,
- FIG. 16 illustrates the initial steps of completion of the wellbore according to FIGS. 3 and 9 ;
- FIG. 17 illustrates running in the coiled tubing having the single fluid-jetting sub positioned adjacent the blocked distal end and positioning the fluid-jetting sub adjacent a downhole-most zone of interest;
- FIG. 18 illustrates flowing fluid through the coiled tubing for enabling fluid jetting from the open jet ports and inflation of the inflatable packer element through the open packer ports;
- FIG. 19 illustrates stopping the flow of fluid through the coiled tubing for deflating the packer element and enabling re-positioning of the fluid-jetting sub at an uphole zone of interest
- FIG. 20 illustrates flowing fluid through the coiled tubing for enabling fluid jetting from the open jet ports and inflation of the inflatable packer element through the open packer ports at the uphole zone of interest;
- FIG. 21 illustrates pulling the coiled tubing and fluid-jetting sub from the wellbore
- FIGS. 22 to 27 are schematic illustrations of an embodiment having a single fluid-jetting sub having one or more open jet ports, a compressible packer element therebelow and a sleeve positioned below the jet ports and being axially moveable within the sub, the sleeve being operatively connected to the compressible packer element for compressing the packer element when actuated to move axially therein, the jet packer sub being run-in to the wellbore using coiled tubing having a flow port at a distal end; more particularly
- FIG. 22 illustrates the initial steps of completion of the wellbore according to FIGS. 3 , 9 and 16 ;
- FIG. 23 illustrates running in the coiled tubing having the single fluid-jetting sub positioned adjacent the distal end and positioning the fluid-jetting sub adjacent a downhole-most zone of interest;
- FIG. 24 illustrates a ball drop engaging a ball seat on the sleeve, fluid pressure in the coiled tubing acting to axially compress the packer element and set the packer, fluid flowing through the coiled tubing enabling fluid jetting from the open jet ports;
- FIG. 25 illustrates stopping the flow of fluid through the coiled tubing for unsetting the packer element and enabling re-positioning of the fluid-jetting sub at a next successive uphole zone of interest
- FIG. 26 illustrates initiating completion of the next successive uphole interval by seating a ball on the ball seat for axially compressing the packer element and setting the packer, fluid flowing through the coiled tubing enabling fluid jetting from the open jet ports;
- FIG. 27 illustrates pulling the coiled tubing and fluid-jetting sub from the wellbore
- a prior art jet sub 10 of a plurality of such subs, is spaced along a wellbore.
- a jet sub housing 12 has a tool bore 14 fit with a sliding sleeve 16 .
- a plurality of jets 18 are fit to a wall 20 of the housing 12 and have jet ports 22 communicating between the tool bore 14 and an exterior of the housing 12 .
- the jet ports 22 are releaseably blocked by the sliding sleeve 16 when the sliding sleeve 16 is in a closed position.
- the sleeve 16 is temporarily secured axially within the housing 12 by shear pins 24 for blocking the jet ports 22 .
- the sleeve 16 has a ball seat 26 at an uphole end 28 for stopping a dropped ball 30 and sealing the tool bore 14 .
- Sufficient fluid pressure uphole of the ball 30 creates a shifting force to shear the shear pins 24 and shift the sleeve 16 downhole to an open position for opening the jet ports 22 .
- fluid-jetting subs 40 which further incorporate a packer element 42 formed about the housing 12 , downhole of one or more jet ports 18 in the housing wall 20 .
- One or more of the fluid jetting subs 40 is incorporated into a completion string 44 , either at or near a distal end 46 thereof when a single sub 40 is used or spaced therealong when two or more of the subs 40 are used.
- the tool bore 14 is contiguous with a bore 45 of the completion string 44 .
- the packer element 42 is actuated to a set position to seal an annulus 48 between the sub 40 and a wellbore 50 by pressure which results from a flow of a fluid through the bore 45 of the completion string 44 and the tool bore 14 . Maintaining sufficient pressure in the completion string 44 , such as about 1000 psi greater than that in the annulus 48 , maintains the packer element 42 in the set position. Release of pressure within the completion string 44 releases the packer element 42 and permits movement of the completion string 44 within the wellbore 50 or removal of the completion string 44 therefrom. Further, the flow of fluid, such as an abrasive fluid, in the completion string 44 is directed through the jet ports 22 when the jet ports 22 are open.
- fluid such as an abrasive fluid
- Embodiments, disclosed herein are shown in the context of a horizontal wellbore which has been cased and cemented vertically using a primary casing and cased along the horizontal portion of the wellbore using a secondary uncemented casing. As one of skill in the art will appreciate however, embodiments can be used for completions wherein at least the horizontal portion of the wellbore is cased and uncemented, cased and cemented or is an uncased openhole.
- a fluid-jetting sub 40 having an inflatable packer element 42 is shown, prior to actuation.
- one or more of such inflatable fluid-jetting subs 40 can be used.
- the subs 40 are spaced and located along the completion string 44 , such as a 5 % inch jointed tubular completion string 44 .
- 12 or more fluid-jetting subs 40 can be spaced along a portion of the completion string 44 extending 600 meters or more into a formation 56 .
- each fluid-jetting sub 40 has the housing 12 and the tool bore 14 formed therethrough.
- the tool bore 14 is fit with the sliding sleeve 16 .
- One or more jets 18 are fit to the housing wall 20 and have the jet ports 22 communicating between the tool bore 14 and outside of the housing 2 .
- the jet ports 22 are releaseably blocked by the sliding sleeve 16 .
- the sleeve 16 is temporarily secured axially within the housing 12 by the shear pins 24 for blocking the jet ports 22 , when the sleeve 16 is in the closed position.
- a packer element 42 which is inflatable and suitable for sealing to the wellbore 48 or to a casing 52 which is cemented or uncemented in the wellbore 50 , is formed about the housing 12 downhole of the jet ports 22 .
- One or more packer ports 54 are formed in the housing 12 between the tool bore 14 and the packer element 42 for providing fluid communication therebetween when the packer ports 54 are open.
- the sliding sleeve 16 in a closed position, further releaseably blocks the packer ports 54 , such as to prevent premature actuation of the packer element 42 .
- the sleeve 16 has the ball seat 26 at the uphole end 28 for stopping the dropped ball 30 and sealing the tool bore 14 .
- Fluid flowing through the completion string 44 causes sufficient fluid pressure uphole of the ball 30 to create the shifting force to shear the shear pins 24 and shift the sleeve 16 downhole to the open position for opening both the jet ports 22 and the packer ports 54 .
- Each sleeve 16 of each of the plurality of fluid-jetting subs 40 has a ball seat 26 sized for a different diameter drop ball 30 , the downhole-most fluid-jetting sub 40 having the smallest ball seat 26 .
- Each successive uphole fluid-jetting sub's sleeve 16 has an incrementally larger ball seat 26 and corresponding ball 30 .
- the downhole-most fluid-jetting sub 40 is absent a sleeve 16 , the jet ports 22 and packer ports 54 always being open.
- the inflatable fluid-jetting sub 40 when deployed, is located within the wellbore 50 or casing string 52 , forming the annulus 48 therebetween.
- the ball 30 When the ball 30 is dropped, the ball 30 seats at the uphole end 28 of the sleeve 16 .
- pressure increases causing the shear pin or pins 24 to be sheared and the sleeve 16 is shifted axially downhole to the open position to open the jet ports 24 and the packer ports 54 . Fluid flows from the tool bore 14 through the packer ports 54 into the packer element 42 to inflate and set the packer element 42 , sealing the annulus 48 about the fluid-jetting sub 40 .
- fluids F such as abrasive fluids for jet perforating, flow from the jet ports 22 toward the casing 52 and cannot escape downhole past the set packer element 42 . Perforations are formed through the surrounding wellbore 50 or casing 52 and into the formation beyond.
- a subterranean formation 56 is accessed, commencing with running in a first casing string 52 p along a vertical portion 58 and heel 60 portion of the wellbore 50 .
- the first casing 52 p is typically cemented therealong.
- An openhole, substantially horizontal portion 62 extends along zones of interest in the formation 56 .
- a second casing string 52 s is run downhole into the openhole portion 62 for accessing the formation 56 therefrom in a cased operation or is left uncased in an openhole operation.
- the completion string 44 is run into the second casing 52 s, the completion string 44 having a plurality of the fluid-jetting subs 40 adapted for incorporation therein, such as by threading, spaced apart and located therealong.
- Two fluid-jetting subs 40 are shown for illustrative purposes.
- jet perforation and treatment is commenced at a first dowhole-most interval by dropping the ball 30 which corresponds in size to the ball seat 26 of the sleeve 16 in the fluid-jetting sub 40 at the zone of interest.
- pressure increases within the completion tubing 44 and tool bore 14 and the sleeve 16 is caused to shift to the open position, opening fluid communication of the tool bore 14 with the jet ports 22 and the packer ports 54 for inflating the packer element 42 .
- the fluid F inflates the packer element 42 .
- Fluid typically an abrasive fluid
- Treatment fluid such as a fracturing fluid can be directed through the perforations in the secondary casing 52 s through either the completion string 44 or the annulus 48 . If treatment fluid is provided through the annulus 48 , sufficient fluid must also be provided through the completion string 44 to maintain the pressure within the completion string above the annulus pressure, such as by about 1000 psi, so as to maintain the packer element 42 in the set position.
- a treatment fluid through the completion string 44 can be stopped or reduced and a clean-up fluid can be circulated either down the annulus 48 or through the completion string 44 for cleaning debris.
- a higher pressure in the annulus 48 than in the completion string 44 causes the inflatable packer element 42 to deflate, permitting fluid flow downhole past the fluid-jetting sub 40 .
- FIG. 7A illustrates initiating completion of a next, successive, uphole interval.
- Jet perforation is initiated by dropping a successive, next larger size ball 30 , corresponding to the size of the ball seat 26 in the successive fluid-jetting sub 40 at the interval of interest.
- the ball drop shifts the sleeve 16 of the successive uphole sub 40 , enabling the jet ports 22 and inflatable packer element 42 as previously described.
- the packer element 42 inflates and abrasive fluid is applied to the jet ports 22 for jet perforating the second casing string 52 s at the next uphole successive zone of interest.
- the successive ball 30 can be reverse circulated to surface as described for FIG. 6B before repeating the process as described for each successive uphole zone.
- FIG. 7C illustrates the case where only some or no balls 30 had been previously recovered, illustrating the step of reverse circulating down the annulus 48 to recover all remaining balls 30 up the completion string 44 to surface.
- FIG. 8 illustrates a final step of having pulled the completion string 44 out of hole (POOH) for production of hydrocarbons from the formation 56 through the perforations in the second casing 52 s.
- POOH completion string 44 out of hole
- a fluid-jetting sub 40 comprises a compressible packer element 70 instead of an inflatable packer element 42 having packer ports 54 as discussed above.
- a distal end 72 of the sleeve 16 is operatively connected to the compressible packer element 70 , such as at a collar, such that when the ball 30 seats in the ball seat 26 at the uphole end 28 of the sleeve 16 , pressure applied to the ball 30 causes the sleeve 16 to shift to the open position for opening the jet ports 22 , the distal end 72 applying sufficient force at the compressible packer element 70 for compressing or squeezing the packer element 70 into engagement with the casing 52 s or wellbore 50 .
- the compressible packer element 70 is set for sealing the annulus 48 therebelow.
- a subterranean formation 56 is accessed, commencing with running in a first casing string 52 p along a vertical portion 58 and heel 60 portion of the wellbore 50 .
- the first casing 52 p is typically cemented therealong.
- An openhole, substantially horizontal portion 62 extends along zones of interest in the formation 56 .
- a second casing string 52 s is run downhole into the openhole portion 62 for accessing the formation 56 therefrom in a cased operation or is left uncased in an openhole operation.
- the completion string 44 is run into the second casing 52 s, the completion string 44 having a plurality of the compressible packer fluid-jetting subs 40 adapted for incorporation therein, such as by threading, spaced apart and located therealong.
- Two fluid-jetting subs 40 are shown for illustrative purposes.
- jet perforation and treatment is commenced at a first dowhole-most interval by dropping the ball 30 which corresponds in size to the ball seat 26 of the sleeve 16 in the fluid-jetting sub 40 at the zone of interest.
- pressure increases within the completion tubing 44 and tool bore 14 and the sleeve 16 is caused to shift to the open position, opening fluid communication of the tool bore 14 with the jet ports 22 , the distal end 72 of the sleeve 16 acting at the compressible packer element 70 for setting the packer element 70 as described above.
- the fluid pressure acting at the ball 30 acts to compress the packer element 70 for extruding the packer element 70 outwardly into contact with the casing 52 s.
- Fluid F typically an abrasive fluid
- Treatment fluid such as a fracturing fluid can be directed through the perforations in the secondary casing 52 s through either the completion string 44 or the annulus 48 . If treatment fluid is provided through the annulus 48 , sufficient fluid must also be provided through the completion string 44 to maintain the pressure within the completion string 44 above the annulus pressure, such as by about 1000 psi, so as to maintain the packer element 70 in the set position.
- a treatment fluid through the completion string 44 can be stopped or reduced and a clean-up fluid can be circulated either down the annulus 48 or through the completion string 44 for cleaning debris.
- a higher pressure in the annulus 48 than in the bore 45 of the completion string 44 causes the compressible packer element 70 to relax, permitting fluid flow downhole past the fluid-jetting sub 40 .
- FIG. 13A illustrates initiating completion of a next, successive, uphole interval.
- Jet perforation is initiated by dropping a successive, next larger size ball 30 , corresponding to the size of the ball seat 26 in the successive fluid-jetting sub 40 at the interval of interest.
- the ball drop shifts the sleeve 16 of the successive uphole sub 40 , enabling the jet ports 22 and the compressible packer element 70 as previously described.
- the packer element 70 extrudes outwardly to seal against the casing 52 s and abrasive fluid is applied to the jet ports 22 for jet perforating the second casing string 52 s at the next uphole successive zone of interest.
- the successive ball 30 can be reverse circulated to surface as described for FIG. 12B before repeating the process as described for each successive uphole zone.
- FIG. 14 illustrates the case where only some or no balls 30 had been previously recovered, illustrating the step of reverse circulating down the annulus 48 to recover all remaining balls 30 up the bore 45 of the completion string 44 to surface.
- FIG. 15 illustrates a final step of having pulled the completion string 44 out of hole (POOH) for production of hydrocarbons from the formation 56 through the perforations in the second casing 52 s.
- POOH completion string 44 out of hole
- Applicant believes that it is also possible to incorporate a plurality of spaced apart inflatable or compressible packer fluid-jetting subs 40 into a casing string 52 which is uncemented in the openhole portion 62 of the wellbore.
- a completion string 44 is not required.
- the casing string 52 is used as the completion string 44 , fluid being pumped through the casing string 52 to actuate the inflatable or compressible packer elements 42 , 70 as described above and to deliver jets of fluid from the jet ports 22 for perforating the formation 56 thereabout.
- a completion string 44 such as coiled tubing 80
- a single fluid-jetting sub 40 having an inflatable packer element 42 .
- the coiled tubing 80 is run in to the wellbore 50 for perforation and fracturing operations and is moved zone-by-zone therein. No sliding sleeve 16 or ball seat 26 is required to inflate the packer element 42 . Jet ports 22 and packer ports 54 remain open at all times. A distal end 82 of the coiled tubing 80 is blocked downhole from the single fluid-jetting sub 40 .
- Fluid pumped through the coiled tubing 80 actuates the inflatable packer element 42 through the open packer ports 54 and exits the open jet ports 22 for perforating the casing 52 or the wellbore 50 in an openhole operation.
- Fluid pressure is maintained in the coiled tubing 80 at a pressure greater than in the annulus 48 so as to maintain the packer element 42 in the inflated or set position during operation.
- the subterranean formation 56 is accessed, commencing with running in a first casing string 52 p along a vertical portion 58 and heel 60 portion of the wellbore 50 .
- the first casing 52 p is typically cemented therealong.
- the openhole, substantially horizontal portion 62 extends along zones of interest in the formation 56 .
- the second casing string 52 s is run downhole into the openhole portion 62 for accessing the formation 56 therefrom in a cased operation or is left uncased for an openhole operation.
- the coiled tubing deployed fluid-jetting sub 40 is run in the wellbore 50 , the fluid-jetting sub 40 being positioned at a first downhole-most zone of interest.
- fluid is pumped through the coiled tubing 80 to the tool bore 14 . Fluid is blocked at the distal end 82 of the coiled tubing 80 and is caused to enter the jet ports 22 and the packer ports 54 for inflating the inflatable packer element 42 and perforating and treating as previously described.
- the inflatable packer element 42 is deflated, such as by reducing or stopping the flow of fluid through the coiled tubing 80 or by pumping fluid through the annulus 48 at a pressure greater than in the coiled tubing 80 .
- the packer element 42 is deflated, the coiled tubing string can be lifted for positioning the fluid-jetting sub adjacent a next, successive uphole zone of interest.
- the CT-conveyed fluid-jetting sub 40 is pulled out of the wellbore 50 .
- a completion string 44 such as coiled tubing 80
- a completion string 44 is fit with a single fluid-jetting sub 40 having the compressible packer element 70 .
- the coiled tubing 80 is run in to the wellbore 50 for perforation and fracturing operations and is moved zone-by-zone therein.
- the sliding sleeve 16 and ball seat 26 are operatively connected to the compressible packer element 42 for compression of the packer element 70 to the set position. Jet ports 22 remain open at all times.
- a distal end 82 of the coiled tubing 80 is open downhole from the single fluid-jetting sub 40 .
- Fluid pumped through the coiled tubing 80 acts on a ball 30 dropped therein to engage the ball seat 26 for temporarily blocking the tool bore 14 and compressing the sleeve 16 , such as against a collar, for compressing the packer element 70 as described above. Fluid exits the open jet ports 22 for perforating the casing 52 or the wellbore 50 in an openhole operation. Fluid pressure is maintained in the coiled tubing 80 at a pressure greater than in the annulus 48 so as to maintain the packer element 70 in the compressed or set position during operation.
- the subterranean formation 56 is accessed, commencing with running in a first casing string 52 p along a vertical portion 58 and heel 60 portion of the wellbore 50 .
- the first casing 52 p is typically cemented therealong.
- the openhole, substantially horizontal portion 62 extends along zones of interest in the formation 56 .
- the second casing string 52 s is run downhole into the openhole portion 62 for accessing the formation 56 therefrom in a cased operation or is left uncased for an openhole operation.
- the coiled tubing deployed fluid-jetting sub 40 is run in the wellbore 50 , the fluid-jetting sub 40 being positioned at a first downhole-most zone of interest.
- fluid is pumped through the coiled tubing 80 to the tool bore 14 . Fluid is blocked at the ball 30 engaging the ball seat 26 and is caused to shift the sleeve 16 for compressing the compressible packer element 70 and to enter the jet ports 22 for perforating and treating as previously described and.
- the compressible packer element 70 is relaxed, such as by reducing or stopping the flow of fluid through the coiled tubing 80 or by pumping fluid through the annulus 48 at a pressure greater than in the coiled tubing 80 .
- the coiled tubing 80 can be lifted for positioning the fluid-jetting sub adjacent a next, successive uphole zone of interest.
- the CT-conveyed fluid-jetting sub 40 is pulled out of the wellbore 50 .
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
One or more fluid-jetting subs having jet ports and a packer element are incorporated into a completion string for deployment into a wellbore for perforation and treatment operations. The packer element, being either an inflatable packer element or a compressible packer element, is downhole of the jet ports and is fluid pressure actuated. Pressure in the completion string is maintained at a pressure higher than in the annulus thereabout to keep the packer set for sealing the annulus therebelow while fluid is delivered through the jet ports for perforating or treatment such as fracturing.
Description
- This application claims the benefit of U.S. Provisional Patent application Ser. No. 61/614,076, filed Mar. 22, 2012, the entirety of which is incorporated herein by reference.
- Embodiments disclosed herein relate to systems, tools and methods for jet perforating a tubular extending into a subterranean formation, the tool releasably sealing an annulus about the tubular for controllably directing fluid for forming the perforations and for fracturing the formation therethrough.
- Horizontal wellbores in a formation are often lined with a primary casing along the vertical portion and heel, the primary casing being cemented therein. An open wellbore portion extends horizontally from the heel along the formation through one or more zones of interest. Completion tools can be run into the openhole portion of the wellbore for fracturing the wellbore to enhance production therefrom.
- It is also known to run in a production liner or secondary casing through the primary casing and along the open wellbore portion. The liner or secondary casing can be left uncemented or can be cemented in the wellbore. The liner is thereafter perforated at a plurality of locations spaced therealong and corresponding to the zones of interest to create flowpaths therethrough to permit fluids, such as fracturing fluids, to reach the formation therebeyond.
- One method is to fit a completion string with a plurality of conventional tools, such as shown in
FIG. 1A , one tool per zone of interest, and run the completion string into the liner, aligning the tools with the zones. A treatment annulus is formed between the completion string and liner. Each conventional tool comprises a sub having a jet housing with a bore contiguous with the completion string. The jet housing is fit with a plurality of jet ports oriented towards the wall of the liner. The jet ports are alternately blocked or opened to the bore by a sliding sleeve fit to the housing bore. The uphole end of the sleeve of each tool is sized to receive a corresponding drop ball, each successive uphole tool in the completion string having a ball seat with a successively larger diameter. - In operation, the completion string with jet tools is run into the liner. A first ball is dropped, shifting the sleeve of the distal, downhole-most tool open and blocking the bore of the tool below the jet ports. Abrasive fluids are pumped down the completion string to direct abrasive fluid through the opened jet ports against the liner, perforating the liner and eroding the formation therebehind. Once the perforating is complete, fracturing fluid is directed downhole which also flows through the jet ports and into the formation, fracturing the formation and directing sand or other proppent into the formation. Some circulation of clean fluid continues to remove excess fracturing sand up the annulus. Optionally, one can reverse circulate, down the annulus and up the bore to circulate the dropped ball to surface.
- The process is repeated with a next larger ball corresponding with the diameter of the ball seat on the next uphole tool.
- It is known that each successive fracturing process is at risk of lower efficiency as a partial flow path can develop or exist along the annulus towards a downhole previous zone. Clearly there is interest in developing tools and processes which enable more efficient and effective fracturing.
- Embodiments disclosed herein enable setting and maintaining a packer element, incorporated into a fluid-jetting sub, in a set position using a fluid pressure in the completion tubing on which the sub is conveyed. Pressure in the completion tubing is maintained at a higher pressure than in an annulus surrounding the sub for maintaining the packer element in the set position. In embodiments the packer element is an inflatable element and in other embodiments the packer element is a compressible packer element.
- In one broad aspect, a fluid-jetting sub is deployable into a wellbore on a completion string and forming an annulus therebetween, for use in perforating and fracturing a subterranean formation. The sub comprises: a tubular housing adapted for connection to the completion string and having a tool bore formed therethrough being contiguous with a bore of the completion string. A plurality of jet ports extend substantially radially through the tubular housing. A packer element is formed circumferentially about the housing downhole of the plurality of jet ports and is adapted to seal the annulus when actuated to a set position. A fluid block is formed in the bore of the housing downhole of at least the plurality of jet ports for at least temporarily blocking a flow of fluid through the tool bore therebelow. When the fluid is at least temporarily blocked, the fluid in the tool bore is caused to exit the plurality of jet ports for delivering fluid therethrough for perforating and fracturing the formation; and operatively engages the packer element for actuating the packer element to the set position.
- In another broad aspect, a completion tool is deployable into a wellbore on a completion string and forms an annulus therebetween for use in perforating and fracturing a subterranean formation. The tool comprises: one or more fluid-jet subs incorporated in the completion string. Each of the one or more fluid-jet subs has a tubular housing connectable within the completion string and having a tool bore formed therethrough being contiguous with a bore of the completion string. A plurality of jet ports extend substantially radially through the tubular housing. A packer element is formed circumferentially about the housing downhole of the plurality of jet ports for sealing the annulus when actuated to a set position. A fluid block is formed in the bore of the housing downhole of at least the plurality of jet ports for at least temporarily blocking a flow of fluid through the tool bore therebelow. When the fluid is at least temporarily blocked, the fluid flowing through the bores of the tubing string and the fluid-jet sub is caused to exit the plurality of jet ports for delivering fluid therethrough for perforating and fracturing the formation; and to operatively engage the packer element for actuating the packer element to the set position.
- In an embodiment, the completion string is a jointed tubular string and the one or more fluid-jetting subs is two or more fluid-jet subs, the two or more fluid-jet subs being spaced along the jointed tubular string for positioning at zones of interest in the formation.
- In another embodiment, the completion string is coiled tubing and the one or more fluid-jetting subs is one fluid-jetting sub, the fluid-jetting sub being positioned adjacent a distal end of the coiled tubing for positioning at zones of interest in the formation.
- In yet another broad aspect, a method for completion of a wellbore comprises: incorporating one or more fluid jetting subs into a completion tubing string deployed into a wellbore and forming an annulus therebetween. Each of the one or more fluid jetting subs has a housing having a bore formed therethrough contiguous with a bore of the completion string. One or more jet ports extending radially through the housing and a packer element is formed about the housing therebelow. The flow of fluid through the tool bore is at least temporarily blocked below at least the jet ports. Fluid is flowed through the contiguous bore for increasing pressure within the tool bore to greater than outside the housing. The pressure acts to actuate the packer element to a set position and to jet fluid through the one or more jet ports for jetting perforations in at least the wellbore. The pressure is maintained in the tool bore greater than outside the housing to maintain the packer element in the set position while providing treatment fluid through the completion string or through the annulus for treating the formation through the perforations.
-
FIG. 1 is a sectional side view of a prior art jet sub, a plurality of which are spaced along the wellbore; -
FIG. 2A is a sectional side view of an embodiment of a fluid jetting sub having an one or more jet ports, an inflatable packer element therebelow and one or more packer ports for inflation of the packer element prior to actuation of the packer, the one or more jet ports and the one or more packer ports being covered by a sleeve in a closed position; -
FIG. 2B is a sectional side view of the inflatable fluid jetting sub ofFIG. 2A following shifting of the sleeve to open the one or more jet ports for perforation and the one or more packer ports for actuation of the packer element; -
FIGS. 3 to 8 are schematic illustrations of an embodiment having a plurality of fluid jetting subs according toFIG. 2A incorporated into and spaced apart along a completion string, 3½ inch tubing string the completion string being jointed tubing such as a 3½ inch tubing string, more particularly, -
FIG. 3 illustrates initial steps in completing access to a subterranean formation, commencing with running in a first casing string along the vertical and heel portion of the wellbore, typically cementing the first casing therealong, with open hole along the zones of interest and running in a secondary casing string, such as 5½ inch casing, into the open hole portion for accessing the formation; -
FIG. 4 illustrates a next step of running in the completion string for locating and spacing a plurality of the fluid-jetting subs having the inflatable packer elements along the second casing string and forming a circulation annulus therebetween; -
FIG. 5 illustrates commencement of jet perforation and treatment at a first interval initiated by a ball drop for the downhole zone for shifting the sleeve of the first, downhole-most fluid-jetting sub to the open position for enabling abrasive jetting and setting of the inflatable packer; -
FIG. 6A illustrates the next step of providing a fluid flow through the tubing string to the open packer ports for inflating the packer and applying abrasive fluid to the open jet ports for jet perforating the second casing string at the downhole zone of interest, enabling fracturing of the zone through the jet ports as desired; -
FIG. 6B illustrates an optional intermediate step of reverse circulating down the circulation annulus to recover the previous dropped ball, circulating the ball up the completion string to surface and unsetting the packer element; -
FIG. 7A illustrates initiating completion of the next successive uphole interval initiated by dropping a successive, next larger size ball, for shifting the sleeve in the successive uphole fluid-jetting sub; -
FIG. 7B illustrates the optional step of reverse circulating down the annulus to recover the successive next larger size ball up the completion string to surface before repeating for each successive uphole zone and unsetting the packer; -
FIG. 7C illustrates the case where only some or no balls had been previously recovered, illustrating the step of reverse circulating down the annulus to recover all remaining balls in the completion string to surface; -
FIG. 8 illustrates a final the step of having pulled the completion string out of hole for production from the formation through the jet perforated, second casing; -
FIGS. 9 to 15 are schematic illustrations of an embodiment having a plurality of fluid-jetting subs incorporated in a completion string and spaced apart therealong, each sub incorporating one or more jet ports, a compressible packer element therebelow and an axially moveable sleeve for opening the jet ports and compressing the packer element in an open position, the completion string being jointed tubing, more particularly, -
FIG. 9 illustrates the initial steps according toFIG. 3 ; -
FIG. 10 illustrates a next step of running in the completion string, for locating and spacing a plurality of the fluid-jetting subs having the compressible packer elements along the second casing string and forming a circulation annulus therebetween; -
FIG. 11 illustrates commencement of jet perforation and treatment at a first interval initiated by a ball drop for the downhole zone for shifting the sleeve of the first, downhole-most fluid-jetting sub to the open position for enabling abrasive jetting and setting of the compressible packer -
FIG. 12A illustrates the next step of providing a fluid flow through the tubing string for maintaining a pressure on the sleeve for compressing the packer element and for applying abrasive fluid to the open jet ports for jet perforating the second casing string at the downhole zone of interest, enabling fracturing of the zone through the jet ports as desired; -
FIG. 12B illustrates an optional intermediate step of reverse circulating down the circulation annulus to recover the previous dropped ball, circulating the ball up the completion string to surface and unsetting the packer element; -
FIG. 13A illustrates initiating completion of the next successive uphole interval initiated by dropping a successive, next larger size ball, for shifting the sleeve in the successive uphole fluid-jetting sub; -
FIG. 13B illustrates the optional step of reverse circulating down the annulus to recover the successive next larger size ball up the completion string to surface before repeating for each successive uphole zone and unsetting the packer; -
FIG. 14 illustrates the case where only some or no balls had been previously recovered, illustrating the step of reverse circulating down the annulus to recover all remaining balls in the completion string to surface and unsetting all of the remaining packer elements; -
FIG. 15 illustrates having pulled the completion string from the wellbore according toFIG. 8 ; -
FIGS. 16 to 21 are schematic illustrations of an embodiment having a single fluid-jetting sub having one or more open jet ports, an inflatable packer element therebelow and one or more open packer ports fluidly connected to the packer element, the jet packer sub being run-in to the wellbore using coiled tubing having a blocked distal end; more particularly, -
FIG. 16 illustrates the initial steps of completion of the wellbore according toFIGS. 3 and 9 ; -
FIG. 17 illustrates running in the coiled tubing having the single fluid-jetting sub positioned adjacent the blocked distal end and positioning the fluid-jetting sub adjacent a downhole-most zone of interest; -
FIG. 18 illustrates flowing fluid through the coiled tubing for enabling fluid jetting from the open jet ports and inflation of the inflatable packer element through the open packer ports; -
FIG. 19 illustrates stopping the flow of fluid through the coiled tubing for deflating the packer element and enabling re-positioning of the fluid-jetting sub at an uphole zone of interest; -
FIG. 20 illustrates flowing fluid through the coiled tubing for enabling fluid jetting from the open jet ports and inflation of the inflatable packer element through the open packer ports at the uphole zone of interest; -
FIG. 21 illustrates pulling the coiled tubing and fluid-jetting sub from the wellbore -
FIGS. 22 to 27 are schematic illustrations of an embodiment having a single fluid-jetting sub having one or more open jet ports, a compressible packer element therebelow and a sleeve positioned below the jet ports and being axially moveable within the sub, the sleeve being operatively connected to the compressible packer element for compressing the packer element when actuated to move axially therein, the jet packer sub being run-in to the wellbore using coiled tubing having a flow port at a distal end; more particularly -
FIG. 22 illustrates the initial steps of completion of the wellbore according toFIGS. 3 , 9 and 16; -
FIG. 23 illustrates running in the coiled tubing having the single fluid-jetting sub positioned adjacent the distal end and positioning the fluid-jetting sub adjacent a downhole-most zone of interest; -
FIG. 24 illustrates a ball drop engaging a ball seat on the sleeve, fluid pressure in the coiled tubing acting to axially compress the packer element and set the packer, fluid flowing through the coiled tubing enabling fluid jetting from the open jet ports; -
FIG. 25 illustrates stopping the flow of fluid through the coiled tubing for unsetting the packer element and enabling re-positioning of the fluid-jetting sub at a next successive uphole zone of interest; -
FIG. 26 illustrates initiating completion of the next successive uphole interval by seating a ball on the ball seat for axially compressing the packer element and setting the packer, fluid flowing through the coiled tubing enabling fluid jetting from the open jet ports; -
FIG. 27 illustrates pulling the coiled tubing and fluid-jetting sub from the wellbore; - Having reference to
FIG. 1 , a priorart jet sub 10, of a plurality of such subs, is spaced along a wellbore. Ajet sub housing 12 has a tool bore 14 fit with a slidingsleeve 16. A plurality ofjets 18 are fit to awall 20 of thehousing 12 and havejet ports 22 communicating between the tool bore 14 and an exterior of thehousing 12. Thejet ports 22 are releaseably blocked by the slidingsleeve 16 when the slidingsleeve 16 is in a closed position. Thesleeve 16 is temporarily secured axially within thehousing 12 byshear pins 24 for blocking thejet ports 22. Thesleeve 16 has aball seat 26 at anuphole end 28 for stopping adropped ball 30 and sealing the tool bore 14. Sufficient fluid pressure uphole of theball 30 creates a shifting force to shear the shear pins 24 and shift thesleeve 16 downhole to an open position for opening thejet ports 22. - Having reference to
FIGS. 3-27 , embodiments, disclosed herein, are fluid-jettingsubs 40 which further incorporate apacker element 42 formed about thehousing 12, downhole of one ormore jet ports 18 in thehousing wall 20. One or more of thefluid jetting subs 40 is incorporated into acompletion string 44, either at or near a distal end 46 thereof when asingle sub 40 is used or spaced therealong when two or more of thesubs 40 are used. The tool bore 14 is contiguous with abore 45 of thecompletion string 44. Thepacker element 42 is actuated to a set position to seal anannulus 48 between thesub 40 and awellbore 50 by pressure which results from a flow of a fluid through thebore 45 of thecompletion string 44 and the tool bore 14. Maintaining sufficient pressure in thecompletion string 44, such as about 1000 psi greater than that in theannulus 48, maintains thepacker element 42 in the set position. Release of pressure within thecompletion string 44 releases thepacker element 42 and permits movement of thecompletion string 44 within thewellbore 50 or removal of thecompletion string 44 therefrom. Further, the flow of fluid, such as an abrasive fluid, in thecompletion string 44 is directed through thejet ports 22 when thejet ports 22 are open. - Embodiments, disclosed herein are shown in the context of a horizontal wellbore which has been cased and cemented vertically using a primary casing and cased along the horizontal portion of the wellbore using a secondary uncemented casing. As one of skill in the art will appreciate however, embodiments can be used for completions wherein at least the horizontal portion of the wellbore is cased and uncemented, cased and cemented or is an uncased openhole.
- In one embodiment, as shown in
FIG. 2A , a fluid-jettingsub 40 having aninflatable packer element 42 is shown, prior to actuation. As stated above, one or more of such inflatable fluid-jettingsubs 40 can be used. Where a plurality ofpacker jet subs 40 are used, thesubs 40 are spaced and located along thecompletion string 44, such as a 5% inch jointedtubular completion string 44. For example, 12 or more fluid-jettingsubs 40 can be spaced along a portion of thecompletion string 44 extending 600 meters or more into aformation 56. - As in the
prior art sub 10, each fluid-jettingsub 40 has thehousing 12 and the tool bore 14 formed therethrough. The tool bore 14 is fit with the slidingsleeve 16. One ormore jets 18 are fit to thehousing wall 20 and have thejet ports 22 communicating between the tool bore 14 and outside of the housing 2. Thejet ports 22 are releaseably blocked by the slidingsleeve 16. Thesleeve 16 is temporarily secured axially within thehousing 12 by the shear pins 24 for blocking thejet ports 22, when thesleeve 16 is in the closed position. Apacker element 42, which is inflatable and suitable for sealing to thewellbore 48 or to a casing 52 which is cemented or uncemented in thewellbore 50, is formed about thehousing 12 downhole of thejet ports 22. One ormore packer ports 54 are formed in thehousing 12 between the tool bore 14 and thepacker element 42 for providing fluid communication therebetween when thepacker ports 54 are open. The slidingsleeve 16, in a closed position, further releaseably blocks thepacker ports 54, such as to prevent premature actuation of thepacker element 42. - The
sleeve 16 has theball seat 26 at theuphole end 28 for stopping thedropped ball 30 and sealing the tool bore 14. Fluid flowing through thecompletion string 44 causes sufficient fluid pressure uphole of theball 30 to create the shifting force to shear the shear pins 24 and shift thesleeve 16 downhole to the open position for opening both thejet ports 22 and thepacker ports 54. - Each
sleeve 16 of each of the plurality of fluid-jettingsubs 40 has aball seat 26 sized for a differentdiameter drop ball 30, the downhole-most fluid-jettingsub 40 having thesmallest ball seat 26. Each successive uphole fluid-jetting sub'ssleeve 16 has an incrementallylarger ball seat 26 and correspondingball 30. Optionally, the downhole-most fluid-jettingsub 40 is absent asleeve 16, thejet ports 22 andpacker ports 54 always being open. - As shown in greater detail in
FIG. 2B , the inflatable fluid-jettingsub 40, when deployed, is located within thewellbore 50 or casing string 52, forming theannulus 48 therebetween. When theball 30 is dropped, theball 30 seats at theuphole end 28 of thesleeve 16. As fluid flows in thecompletion string 44 and the tool bore 14, pressure increases causing the shear pin or pins 24 to be sheared and thesleeve 16 is shifted axially downhole to the open position to open thejet ports 24 and thepacker ports 54. Fluid flows from the tool bore 14 through thepacker ports 54 into thepacker element 42 to inflate and set thepacker element 42, sealing theannulus 48 about the fluid-jettingsub 40. As theannulus 48 is sealed below thejet ports 22, fluids F, such as abrasive fluids for jet perforating, flow from thejet ports 22 toward the casing 52 and cannot escape downhole past theset packer element 42. Perforations are formed through the surroundingwellbore 50 or casing 52 and into the formation beyond. - Inflatable Fluid Jetting Sub—In use with a Jointed Tubular Completion String
- In operation, and having reference to
FIG. 3 , asubterranean formation 56 is accessed, commencing with running in afirst casing string 52 p along avertical portion 58 andheel 60 portion of thewellbore 50. Thefirst casing 52 p is typically cemented therealong. An openhole, substantiallyhorizontal portion 62 extends along zones of interest in theformation 56. Asecond casing string 52 s is run downhole into theopenhole portion 62 for accessing theformation 56 therefrom in a cased operation or is left uncased in an openhole operation. - As shown in
FIG. 4 , thecompletion string 44, typically a jointed tubular string, is run into thesecond casing 52 s, thecompletion string 44 having a plurality of the fluid-jettingsubs 40 adapted for incorporation therein, such as by threading, spaced apart and located therealong. Two fluid-jettingsubs 40 are shown for illustrative purposes. - As shown in
FIG. 5 , jet perforation and treatment is commenced at a first dowhole-most interval by dropping theball 30 which corresponds in size to theball seat 26 of thesleeve 16 in the fluid-jettingsub 40 at the zone of interest. As shown, pressure increases within thecompletion tubing 44 and tool bore 14 and thesleeve 16 is caused to shift to the open position, opening fluid communication of the tool bore 14 with thejet ports 22 and thepacker ports 54 for inflating thepacker element 42. - As shown in
FIG. 6A , the fluid F inflates thepacker element 42. Fluid, typically an abrasive fluid, is directed through thejet ports 22 for jet perforating thesecond casing string 52 s at the downhole zone of interest. Treatment fluid, such as a fracturing fluid can be directed through the perforations in thesecondary casing 52 s through either thecompletion string 44 or theannulus 48. If treatment fluid is provided through theannulus 48, sufficient fluid must also be provided through thecompletion string 44 to maintain the pressure within the completion string above the annulus pressure, such as by about 1000 psi, so as to maintain thepacker element 42 in the set position. After perforating and treating, delivery of a treatment fluid through thecompletion string 44 can be stopped or reduced and a clean-up fluid can be circulated either down theannulus 48 or through thecompletion string 44 for cleaning debris. A higher pressure in theannulus 48 than in thecompletion string 44 causes theinflatable packer element 42 to deflate, permitting fluid flow downhole past the fluid-jettingsub 40. - One can then proceed to jet perforate at the next zone of interest, leaving the
ball 30 within the tool bore 14 orcompletion string 44. - Optionally, as shown in
FIG. 6B one can perform an intermediate step of reverse circulating a fluid down theannulus 48 which enters theopen jet ports 22 for circulating theball 30 up thebore 45 of thecompletion string 44 to surface for recovery of the previously droppedball 30. -
FIG. 7A illustrates initiating completion of a next, successive, uphole interval. Jet perforation is initiated by dropping a successive, nextlarger size ball 30, corresponding to the size of theball seat 26 in the successive fluid-jettingsub 40 at the interval of interest. The ball drop shifts thesleeve 16 of the successiveuphole sub 40, enabling thejet ports 22 andinflatable packer element 42 as previously described. Thepacker element 42 inflates and abrasive fluid is applied to thejet ports 22 for jet perforating thesecond casing string 52 s at the next uphole successive zone of interest. - Optionally once again, as shown in
FIG. 7B thesuccessive ball 30 can be reverse circulated to surface as described forFIG. 6B before repeating the process as described for each successive uphole zone. - Once all of the zones have been completed, if not already recovered individually, all of the
balls 30 used in the completion can be recovered by reverse circulating down theannulus 48 to convey theballs 30 up thecompletion string 44 to surface.FIG. 7C , illustrates the case where only some or noballs 30 had been previously recovered, illustrating the step of reverse circulating down theannulus 48 to recover all remainingballs 30 up thecompletion string 44 to surface. -
FIG. 8 illustrates a final step of having pulled thecompletion string 44 out of hole (POOH) for production of hydrocarbons from theformation 56 through the perforations in thesecond casing 52 s. - Having reference to
FIGS. 9 to 15 , in an embodiment, a fluid-jettingsub 40 comprises acompressible packer element 70 instead of aninflatable packer element 42 havingpacker ports 54 as discussed above. Adistal end 72 of thesleeve 16 is operatively connected to thecompressible packer element 70, such as at a collar, such that when theball 30 seats in theball seat 26 at theuphole end 28 of thesleeve 16, pressure applied to theball 30 causes thesleeve 16 to shift to the open position for opening thejet ports 22, thedistal end 72 applying sufficient force at thecompressible packer element 70 for compressing or squeezing thepacker element 70 into engagement with thecasing 52 s orwellbore 50. Thus, thecompressible packer element 70 is set for sealing theannulus 48 therebelow. - Compressible Fluid Jetting Sub—In use with a Jointed Tubular Completion String
- In operation, and having reference to
FIG. 9 , asubterranean formation 56 is accessed, commencing with running in afirst casing string 52 p along avertical portion 58 andheel 60 portion of thewellbore 50. Thefirst casing 52 p is typically cemented therealong. An openhole, substantiallyhorizontal portion 62 extends along zones of interest in theformation 56. Asecond casing string 52 s is run downhole into theopenhole portion 62 for accessing theformation 56 therefrom in a cased operation or is left uncased in an openhole operation. - As shown in
FIG. 10 , thecompletion string 44, typically a jointed tubular string, is run into thesecond casing 52 s, thecompletion string 44 having a plurality of the compressible packer fluid-jettingsubs 40 adapted for incorporation therein, such as by threading, spaced apart and located therealong. Two fluid-jettingsubs 40 are shown for illustrative purposes. - As shown in
FIG. 11 , jet perforation and treatment is commenced at a first dowhole-most interval by dropping theball 30 which corresponds in size to theball seat 26 of thesleeve 16 in the fluid-jettingsub 40 at the zone of interest. As shown, pressure increases within thecompletion tubing 44 and tool bore 14 and thesleeve 16 is caused to shift to the open position, opening fluid communication of the tool bore 14 with thejet ports 22, thedistal end 72 of thesleeve 16 acting at thecompressible packer element 70 for setting thepacker element 70 as described above. - As shown in
FIG. 12A , the fluid pressure acting at theball 30 acts to compress thepacker element 70 for extruding thepacker element 70 outwardly into contact with thecasing 52 s. Fluid F, typically an abrasive fluid, is directed through thejet ports 22 for jet perforating thesecond casing string 52 s at the downhole zone of interest. Treatment fluid, such as a fracturing fluid can be directed through the perforations in thesecondary casing 52 s through either thecompletion string 44 or theannulus 48. If treatment fluid is provided through theannulus 48, sufficient fluid must also be provided through thecompletion string 44 to maintain the pressure within thecompletion string 44 above the annulus pressure, such as by about 1000 psi, so as to maintain thepacker element 70 in the set position. After perforating and treating, delivery of a treatment fluid through thecompletion string 44 can be stopped or reduced and a clean-up fluid can be circulated either down theannulus 48 or through thecompletion string 44 for cleaning debris. A higher pressure in theannulus 48 than in thebore 45 of thecompletion string 44 causes thecompressible packer element 70 to relax, permitting fluid flow downhole past the fluid-jettingsub 40. - One can then proceed to jet perforate at the next zone of interest, leaving the
ball 30 within the tool bore 14 orcompletion string 44. - Optionally, as shown in
FIG. 12B one can perform an intermediate step of reverse circulating a fluid down theannulus 48 to circulate theball 30 up thebore 45 of thecompletion string 44 to surface for recovery of the previously droppedball 30. -
FIG. 13A illustrates initiating completion of a next, successive, uphole interval. Jet perforation is initiated by dropping a successive, nextlarger size ball 30, corresponding to the size of theball seat 26 in the successive fluid-jettingsub 40 at the interval of interest. The ball drop shifts thesleeve 16 of the successiveuphole sub 40, enabling thejet ports 22 and thecompressible packer element 70 as previously described. Thepacker element 70 extrudes outwardly to seal against thecasing 52 s and abrasive fluid is applied to thejet ports 22 for jet perforating thesecond casing string 52 s at the next uphole successive zone of interest. - Optionally once again, as shown in
FIG. 13B thesuccessive ball 30 can be reverse circulated to surface as described forFIG. 12B before repeating the process as described for each successive uphole zone. - Once all of the zones have been completed, if not already recovered individually, all of the
balls 30 used in the completion can be recovered by reverse circulating down theannulus 48 to convey theballs 30 up thebore 45 of thecompletion string 44 to surface.FIG. 14 , illustrates the case where only some or noballs 30 had been previously recovered, illustrating the step of reverse circulating down theannulus 48 to recover all remainingballs 30 up thebore 45 of thecompletion string 44 to surface. -
FIG. 15 illustrates a final step of having pulled thecompletion string 44 out of hole (POOH) for production of hydrocarbons from theformation 56 through the perforations in thesecond casing 52 s. - Applicant believes that it is also possible to incorporate a plurality of spaced apart inflatable or compressible packer fluid-jetting
subs 40 into a casing string 52 which is uncemented in theopenhole portion 62 of the wellbore. Acompletion string 44 is not required. The casing string 52 is used as thecompletion string 44, fluid being pumped through the casing string 52 to actuate the inflatable orcompressible packer elements jet ports 22 for perforating theformation 56 thereabout. - Inflatable Fluid Jetting Sub—In use with a Coiled Tubing Completion String
- In another embodiment, as illustrated in
FIGS. 16 through 21 , acompletion string 44, such as coiledtubing 80, is fit with a single fluid-jettingsub 40 having aninflatable packer element 42. The coiledtubing 80 is run in to thewellbore 50 for perforation and fracturing operations and is moved zone-by-zone therein. No slidingsleeve 16 orball seat 26 is required to inflate thepacker element 42.Jet ports 22 andpacker ports 54 remain open at all times. Adistal end 82 of the coiledtubing 80 is blocked downhole from the single fluid-jettingsub 40. Fluid pumped through the coiledtubing 80 actuates theinflatable packer element 42 through theopen packer ports 54 and exits theopen jet ports 22 for perforating the casing 52 or thewellbore 50 in an openhole operation. Fluid pressure is maintained in the coiledtubing 80 at a pressure greater than in theannulus 48 so as to maintain thepacker element 42 in the inflated or set position during operation. - In operation, and having reference to
FIG. 16 , thesubterranean formation 56 is accessed, commencing with running in afirst casing string 52 p along avertical portion 58 andheel 60 portion of thewellbore 50. Thefirst casing 52 p is typically cemented therealong. The openhole, substantiallyhorizontal portion 62 extends along zones of interest in theformation 56. Thesecond casing string 52 s is run downhole into theopenhole portion 62 for accessing theformation 56 therefrom in a cased operation or is left uncased for an openhole operation. - As shown in
FIG. 17 , the coiled tubing deployed fluid-jettingsub 40 is run in thewellbore 50, the fluid-jettingsub 40 being positioned at a first downhole-most zone of interest. - Having reference to
FIG. 18 fluid is pumped through the coiledtubing 80 to the tool bore 14. Fluid is blocked at thedistal end 82 of the coiledtubing 80 and is caused to enter thejet ports 22 and thepacker ports 54 for inflating theinflatable packer element 42 and perforating and treating as previously described. - As shown in
FIG. 19 , once a zone is perforated and treated, such as by a fracturing operation, theinflatable packer element 42 is deflated, such as by reducing or stopping the flow of fluid through the coiledtubing 80 or by pumping fluid through theannulus 48 at a pressure greater than in the coiledtubing 80. Once thepacker element 42 is deflated, the coiled tubing string can be lifted for positioning the fluid-jetting sub adjacent a next, successive uphole zone of interest. - Once repositioned, as shown in
FIG. 20 , the process of setting theinflatable packer element 42 is repeated for sealing theannulus 48 therebelow and for jet perforation and treatment is repeated at the successive uphole zone. - As shown in
FIG. 21 , upon completion of the perforation and treatment processes in the wellbore the CT-conveyed fluid-jettingsub 40 is pulled out of thewellbore 50. - Compressible Fluid Jetting Sub—In use with a Coiled Tubing Completion String
- In yet another embodiment, as illustrated in
FIGS. 22 through 27 , acompletion string 44, such as coiledtubing 80, is fit with a single fluid-jettingsub 40 having thecompressible packer element 70. The coiledtubing 80 is run in to thewellbore 50 for perforation and fracturing operations and is moved zone-by-zone therein. The slidingsleeve 16 andball seat 26 are operatively connected to thecompressible packer element 42 for compression of thepacker element 70 to the set position.Jet ports 22 remain open at all times. Adistal end 82 of the coiledtubing 80 is open downhole from the single fluid-jettingsub 40. Fluid pumped through the coiledtubing 80 acts on aball 30 dropped therein to engage theball seat 26 for temporarily blocking the tool bore 14 and compressing thesleeve 16, such as against a collar, for compressing thepacker element 70 as described above. Fluid exits theopen jet ports 22 for perforating the casing 52 or thewellbore 50 in an openhole operation. Fluid pressure is maintained in the coiledtubing 80 at a pressure greater than in theannulus 48 so as to maintain thepacker element 70 in the compressed or set position during operation. - In operation, and having reference to
FIG. 22 , thesubterranean formation 56 is accessed, commencing with running in afirst casing string 52 p along avertical portion 58 andheel 60 portion of thewellbore 50. Thefirst casing 52 p is typically cemented therealong. The openhole, substantiallyhorizontal portion 62 extends along zones of interest in theformation 56. Thesecond casing string 52 s is run downhole into theopenhole portion 62 for accessing theformation 56 therefrom in a cased operation or is left uncased for an openhole operation. - As shown in
FIG. 23 , the coiled tubing deployed fluid-jettingsub 40 is run in thewellbore 50, the fluid-jettingsub 40 being positioned at a first downhole-most zone of interest. - Having reference to
FIG. 24 fluid is pumped through the coiledtubing 80 to the tool bore 14. Fluid is blocked at theball 30 engaging theball seat 26 and is caused to shift thesleeve 16 for compressing thecompressible packer element 70 and to enter thejet ports 22 for perforating and treating as previously described and. - As shown in
FIG. 25 , once a zone is perforated and treated, such as by a fracturing operation, thecompressible packer element 70 is relaxed, such as by reducing or stopping the flow of fluid through the coiledtubing 80 or by pumping fluid through theannulus 48 at a pressure greater than in the coiledtubing 80. Once thepacker element 42 is relaxed, the coiledtubing 80 can be lifted for positioning the fluid-jetting sub adjacent a next, successive uphole zone of interest. - Once repositioned, as shown in
FIG. 26 , the process of setting theinflatable packer element 42 is repeated for sealing theannulus 48 therebelow and for jet perforation and treatment is repeated at the successive uphole zone. - As shown in
FIG. 27 , upon completion of the perforation and treatment processes in the wellbore the CT-conveyed fluid-jettingsub 40 is pulled out of thewellbore 50.
Claims (10)
1. A fluid-jetting sub, deployable into a wellbore on a completion string and forming an annulus therebetween, for use in perforating and fracturing a subterranean formation comprising:
a tubular housing adapted for connection to the completion string and having a tool bore formed therethrough being contiguous with a bore of the completion string;
a plurality of jet ports extending substantially radially through the tubular housing;
a packer element formed circumferentially about the housing downhole of the plurality of jet ports and adapted to seal the annulus when actuated to a set position; and
a fluid block formed in the bore of the housing downhole of at least the plurality of jet ports for at least temporarily blocking a flow of fluid through the tool bore therebelow,
wherein when the fluid is at least temporarily blocked, the fluid in the tool bore
is caused to exit the plurality of jet ports for delivering fluid therethrough for perforating and fracturing the formation; and
to operatively engage the packer element for actuating the packer element to the set position.
2. The fluid-jetting sub of claim 1 wherein the packer element is an inflatable element, the sub further comprising:
one or more packer ports extending radially through the housing for fluidly connecting between the tool bore and the packer element uphole of the fluid block, the fluid entering the one or more packer ports for operatively engaging the packer element for inflating the packer element to the set position.
3. The fluid-jetting sub of claim 2 further comprising a sliding sleeve positioned within the tool bore and axially moveable therein to cover the plurality of jet ports and the one or more packer ports in a closed position and to open the plurality of jet ports and the one or more packer ports in an open position.
4. The fluid-jetting sub of claim 3 further comprising:
a ball seat operatively connected to the sleeve and adapted to receive a ball dropped into the bore of the housing for forming the fluid block, fluid pressure acting at the fluid block for axially moving the sleeve from the closed position to the open position for delivering fluid through the plurality of jet ports and through the one or more packer ports.
5. The fluid-jetting sub of claim 1 wherein the packer element is a compressible element, the sub further comprising:
a ball seat operatively engaging the packer element and adapted to receive a ball dropped into the bore of the housing for forming the fluid block, fluid pressure acting at the ball sealed in the ball seat for compressing the packer element to the set position.
6. The fluid-jetting sub of claim 5 further comprising:
a sliding sleeve positioned within the tool bore and axially moveable therein to cover the plurality of jet ports in a closed position, the sliding sleeve being operatively connected to the packer element, the ball seat being formed on the sliding sleeve, wherein
fluid pressure acting at the ball sealed in the ball seat moves the sliding sleeve axially from the closed position to an open position for opening the plurality of jet ports and for acting to compress the packer element to the set position.
7. A completion tool deployable into a wellbore on a completion string and forming an annulus therebetween for use in perforating and fracturing a subterranean formation comprising:
one or more fluid-jet subs incorporated in the completion string, each of the one or more fluid-jet subs having
a tubular housing connectable within the completion string and having a tool bore formed therethrough being contiguous with a bore of the completion string;
a plurality of jet ports extending substantially radially through the tubular housing;
a packer element formed circumferentially about the housing downhole of the plurality of jet ports for sealing the annulus when actuated to a set position; and
a fluid block formed in the bore of the housing downhole of at least the plurality of jet ports for at least temporarily blocking a flow of fluid through the tool bore therebelow,
wherein when the fluid is at least temporarily blocked, the fluid flowing through the bores of the tubing string and the fluid-jet sub
is caused to exit the plurality of jet ports for delivering fluid therethrough for perforating and fracturing the formation; and
to operatively engage the packer element for actuating the packer element to the set position.
8. The completion tool of claim 7 wherein the completion string is a jointed tubular string and the one or more fluid-jetting subs is two or more fluid-jet subs, the two or more fluid-jet subs are spaced along the jointed tubular string for positioning at zones of interest in the formation.
9. The completion tool of claim 7 wherein the completion string as coiled tubing and the one or more fluid-jetting subs is one fluid-jetting sub, the fluid-jetting sub being positioned adjacent a distal end of the coiled tubing for positioning at zones of interest in the formation.
10. A method for completion of a wellbore comprising:
incorporating one or more fluid jetting subs into a completion tubing string deployed into a wellbore and forming an annulus therebetween, each of the one or more fluid jetting subs having
a housing having a bore formed therethrough contiguous with a bore of the completion string;
one or more jet ports extending radially through the housing and;
a packer element formed about the housing therebelow;
at least temporarily blocking the flow of fluid through the tool bore below at least the jet ports;
flowing fluid through the contiguous bore for increasing pressure within the tool bore to greater than outside the housing, the pressure acting to actuate the packer element to a set position and to jet fluid through the one or more jet ports for jetting perforations in at least the wellbore; and
maintaining the pressure in the tool bore greater than outside the housing to maintain the packer element in the set position while providing treatment fluid through the completion string or through the annulus for treating the formation through the perforations.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US13/848,640 US20130248192A1 (en) | 2012-03-22 | 2013-03-21 | Multizone and zone-by-zone abrasive jetting tools and methods for fracturing subterranean formations |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201261614076P | 2012-03-22 | 2012-03-22 | |
US13/848,640 US20130248192A1 (en) | 2012-03-22 | 2013-03-21 | Multizone and zone-by-zone abrasive jetting tools and methods for fracturing subterranean formations |
Publications (1)
Publication Number | Publication Date |
---|---|
US20130248192A1 true US20130248192A1 (en) | 2013-09-26 |
Family
ID=49210710
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US13/848,640 Abandoned US20130248192A1 (en) | 2012-03-22 | 2013-03-21 | Multizone and zone-by-zone abrasive jetting tools and methods for fracturing subterranean formations |
Country Status (2)
Country | Link |
---|---|
US (1) | US20130248192A1 (en) |
CA (1) | CA2810139A1 (en) |
Cited By (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103498656A (en) * | 2013-10-22 | 2014-01-08 | 中国石油天然气股份有限公司 | Tongue-and-groove type multi-layer fracturing pipe column with equal drift diameters |
US20150053397A1 (en) * | 2013-08-26 | 2015-02-26 | Baker Hughes Incorporated | Re-fracturing Bottom Hole Assembly and Method |
WO2015085169A3 (en) * | 2013-12-05 | 2015-09-17 | Weatherford/Lamb, Inc. | Toe sleeve isolation system for cemented casing in borehole |
US20160258258A1 (en) * | 2015-03-03 | 2016-09-08 | William Jani | Method and tool for perforating a wellbore casing in a formation using a sand jet, and using such tool to further frac the formation |
US9447663B1 (en) * | 2010-08-03 | 2016-09-20 | Thru Tubing Solutions, Inc. | Abrasive perforator with fluid bypass |
CN106285576A (en) * | 2016-09-29 | 2017-01-04 | 西南石油大学 | A kind of long-life Contiuum type sand jet perforator and manufacturing process thereof |
CN106481324A (en) * | 2015-08-25 | 2017-03-08 | 中国石油化工股份有限公司 | Hydraulic control self-unsealing formula fracturing strings |
WO2017124980A1 (en) * | 2016-01-20 | 2017-07-27 | 中国石油化工股份有限公司 | Tool for jet packing and fracturing and tubular column comprising same |
US9777558B1 (en) | 2005-03-12 | 2017-10-03 | Thru Tubing Solutions, Inc. | Methods and devices for one trip plugging and perforating of oil and gas wells |
CN109469470A (en) * | 2018-12-20 | 2019-03-15 | 中国海洋石油集团有限公司 | A kind of horizontal well naked eye staged fracturing equipment |
CN109577925A (en) * | 2017-09-28 | 2019-04-05 | 中国石油天然气股份有限公司 | The more cluster fracturing strings of more cluster spray guns, hydraulic jet perforation and technique |
US10294754B2 (en) | 2017-03-16 | 2019-05-21 | Baker Hughes, A Ge Company, Llc | Re-closable coil activated frack sleeve |
US10329889B2 (en) | 2015-03-03 | 2019-06-25 | Pinnacle Oil Tools Inc. | Fracking tool further having a dump port for sand flushing, and method of fracking a formation using such tool |
US20190292880A1 (en) * | 2018-03-26 | 2019-09-26 | Comitt Well Solutions Us Holding Inc. | Methods and systems for a seal to maintain constant pressure within a tool with a sliding internal seal |
US10677024B2 (en) | 2017-03-01 | 2020-06-09 | Thru Tubing Solutions, Inc. | Abrasive perforator with fluid bypass |
CN112267866A (en) * | 2020-11-05 | 2021-01-26 | 中国石油天然气股份有限公司 | Small-diameter pipe staged fracturing production pipe column and method for side drilling well and small-hole well |
CN112483059A (en) * | 2019-09-12 | 2021-03-12 | 中国石油化工股份有限公司 | Sand blasting sliding sleeve device and well completion pipe string comprising same |
US11236590B2 (en) * | 2016-01-20 | 2022-02-01 | China Petroleum & Chemical Corporation | Device for jet packing and fracturing and tubular column comprising same |
CN114607278A (en) * | 2022-03-29 | 2022-06-10 | 中国石油大学(北京) | Cave making method and cave making spray gun for coal-bed gas well |
US11542815B2 (en) | 2020-11-30 | 2023-01-03 | Saudi Arabian Oil Company | Determining effect of oxidative hydraulic fracturing |
US11619127B1 (en) | 2021-12-06 | 2023-04-04 | Saudi Arabian Oil Company | Wellhead acoustic insulation to monitor hydraulic fracturing |
US11649702B2 (en) | 2020-12-03 | 2023-05-16 | Saudi Arabian Oil Company | Wellbore shaped perforation assembly |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050217869A1 (en) * | 2002-04-05 | 2005-10-06 | Baker Hughes Incorporated | High pressure expandable packer |
US7343975B2 (en) * | 2005-09-06 | 2008-03-18 | Halliburton Energy Services, Inc. | Method for stimulating a well |
CN101539007A (en) * | 2009-04-15 | 2009-09-23 | 中国石油大学(北京) | Abrasive jetting device and method for abrasive jetting flow and jetting perforation and multiple fracturing |
US20110198082A1 (en) * | 2010-02-18 | 2011-08-18 | Ncs Oilfield Services Canada Inc. | Downhole tool assembly with debris relief, and method for using same |
US20120160524A1 (en) * | 2009-06-22 | 2012-06-28 | Peter Lumbye | Completion assembly and a method for stimulating, segmenting and controlling erd wells |
-
2013
- 2013-03-21 CA CA2810139A patent/CA2810139A1/en not_active Abandoned
- 2013-03-21 US US13/848,640 patent/US20130248192A1/en not_active Abandoned
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050217869A1 (en) * | 2002-04-05 | 2005-10-06 | Baker Hughes Incorporated | High pressure expandable packer |
US7343975B2 (en) * | 2005-09-06 | 2008-03-18 | Halliburton Energy Services, Inc. | Method for stimulating a well |
CN101539007A (en) * | 2009-04-15 | 2009-09-23 | 中国石油大学(北京) | Abrasive jetting device and method for abrasive jetting flow and jetting perforation and multiple fracturing |
US20120160524A1 (en) * | 2009-06-22 | 2012-06-28 | Peter Lumbye | Completion assembly and a method for stimulating, segmenting and controlling erd wells |
US20110198082A1 (en) * | 2010-02-18 | 2011-08-18 | Ncs Oilfield Services Canada Inc. | Downhole tool assembly with debris relief, and method for using same |
Non-Patent Citations (1)
Title |
---|
Machine Translation of CN 101539007B * |
Cited By (30)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9777558B1 (en) | 2005-03-12 | 2017-10-03 | Thru Tubing Solutions, Inc. | Methods and devices for one trip plugging and perforating of oil and gas wells |
US9447663B1 (en) * | 2010-08-03 | 2016-09-20 | Thru Tubing Solutions, Inc. | Abrasive perforator with fluid bypass |
US20150053397A1 (en) * | 2013-08-26 | 2015-02-26 | Baker Hughes Incorporated | Re-fracturing Bottom Hole Assembly and Method |
US9810047B2 (en) * | 2013-08-26 | 2017-11-07 | Baker Hughes | Re-fracturing bottom hole assembly and method |
CN103498656A (en) * | 2013-10-22 | 2014-01-08 | 中国石油天然气股份有限公司 | Tongue-and-groove type multi-layer fracturing pipe column with equal drift diameters |
WO2015085169A3 (en) * | 2013-12-05 | 2015-09-17 | Weatherford/Lamb, Inc. | Toe sleeve isolation system for cemented casing in borehole |
US9976384B2 (en) | 2013-12-05 | 2018-05-22 | Weatherford Technology Holdings, Llc | Toe sleeve isolation system for cemented casing in borehole |
US10287861B2 (en) | 2015-03-03 | 2019-05-14 | Pinnacle Oil Tools Inc. | Method and tool for perforating a wellbore casing in a formation using a sand jet, and using such tool to further frac the formation |
US20160258258A1 (en) * | 2015-03-03 | 2016-09-08 | William Jani | Method and tool for perforating a wellbore casing in a formation using a sand jet, and using such tool to further frac the formation |
US10329889B2 (en) | 2015-03-03 | 2019-06-25 | Pinnacle Oil Tools Inc. | Fracking tool further having a dump port for sand flushing, and method of fracking a formation using such tool |
US9719334B2 (en) * | 2015-03-03 | 2017-08-01 | William Jani | Method and tool for perforating a wellbore casing in a formation using a sand jet, and using such tool to further frac the formation |
CN106481324A (en) * | 2015-08-25 | 2017-03-08 | 中国石油化工股份有限公司 | Hydraulic control self-unsealing formula fracturing strings |
WO2017124980A1 (en) * | 2016-01-20 | 2017-07-27 | 中国石油化工股份有限公司 | Tool for jet packing and fracturing and tubular column comprising same |
AU2017209220B2 (en) * | 2016-01-20 | 2022-03-17 | China Petroleum & Chemical Corporation | Device for jet packing and fracturing and tubular column comprising same |
US11236590B2 (en) * | 2016-01-20 | 2022-02-01 | China Petroleum & Chemical Corporation | Device for jet packing and fracturing and tubular column comprising same |
US11142989B2 (en) | 2016-01-20 | 2021-10-12 | China Petroleum & Chemical Corporation | Tool for jet packing and fracturing and tubular column comprising same |
CN106285576A (en) * | 2016-09-29 | 2017-01-04 | 西南石油大学 | A kind of long-life Contiuum type sand jet perforator and manufacturing process thereof |
US10677024B2 (en) | 2017-03-01 | 2020-06-09 | Thru Tubing Solutions, Inc. | Abrasive perforator with fluid bypass |
US10294754B2 (en) | 2017-03-16 | 2019-05-21 | Baker Hughes, A Ge Company, Llc | Re-closable coil activated frack sleeve |
CN109577925A (en) * | 2017-09-28 | 2019-04-05 | 中国石油天然气股份有限公司 | The more cluster fracturing strings of more cluster spray guns, hydraulic jet perforation and technique |
US20190292880A1 (en) * | 2018-03-26 | 2019-09-26 | Comitt Well Solutions Us Holding Inc. | Methods and systems for a seal to maintain constant pressure within a tool with a sliding internal seal |
US10648284B2 (en) * | 2018-03-26 | 2020-05-12 | Comitt Well Solutions LLC | Methods and systems for a seal to maintain constant pressure within a tool with a sliding internal seal |
WO2019190720A1 (en) * | 2018-03-26 | 2019-10-03 | Comitt Well Solutions Us Holding Inc. | Methods and systems for a seal to maintain constant pressure within a tool with a sliding internal seal |
CN109469470A (en) * | 2018-12-20 | 2019-03-15 | 中国海洋石油集团有限公司 | A kind of horizontal well naked eye staged fracturing equipment |
CN112483059A (en) * | 2019-09-12 | 2021-03-12 | 中国石油化工股份有限公司 | Sand blasting sliding sleeve device and well completion pipe string comprising same |
CN112267866A (en) * | 2020-11-05 | 2021-01-26 | 中国石油天然气股份有限公司 | Small-diameter pipe staged fracturing production pipe column and method for side drilling well and small-hole well |
US11542815B2 (en) | 2020-11-30 | 2023-01-03 | Saudi Arabian Oil Company | Determining effect of oxidative hydraulic fracturing |
US11649702B2 (en) | 2020-12-03 | 2023-05-16 | Saudi Arabian Oil Company | Wellbore shaped perforation assembly |
US11619127B1 (en) | 2021-12-06 | 2023-04-04 | Saudi Arabian Oil Company | Wellhead acoustic insulation to monitor hydraulic fracturing |
CN114607278A (en) * | 2022-03-29 | 2022-06-10 | 中国石油大学(北京) | Cave making method and cave making spray gun for coal-bed gas well |
Also Published As
Publication number | Publication date |
---|---|
CA2810139A1 (en) | 2013-09-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20130248192A1 (en) | Multizone and zone-by-zone abrasive jetting tools and methods for fracturing subterranean formations | |
US7066265B2 (en) | System and method of production enhancement and completion of a well | |
CA2621572C (en) | Bottomhole assembly and method for stimulating a well | |
US10487626B2 (en) | Fracturing valve and fracturing tool string | |
US7337844B2 (en) | Perforating and fracturing | |
CA2843619C (en) | Downhole tool assembly with debris relief, and method for using same | |
US7748460B2 (en) | Method and apparatus for wellbore fluid treatment | |
US7278486B2 (en) | Fracturing method providing simultaneous flow back | |
US20130213646A1 (en) | Apparatus and methods for wellbore completion | |
US9957777B2 (en) | Frac plug and methods of use | |
US20230127815A1 (en) | Multi-zone perforate and treat system and method | |
US10006278B2 (en) | Method of treating a downhole formation using a downhole packer | |
US7703525B2 (en) | Well perforating and fracturing | |
US20180320478A1 (en) | Method and apparatus for wellbore fluid treatment | |
CA2901074A1 (en) | Sleeve system for use in wellbore completion operations | |
EP3551840B1 (en) | Methods and apparatus for creating wellbores | |
WO2016069863A1 (en) | Flow-activated flow control device and method of using same in wellbore completion assemblies | |
WO2015054077A1 (en) | Downhole packer and method of treating a downhole formation using the downhole packer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |