US20130181147A1 - Blowout preventer with port for entry between casing and tubing string and/or port for entry into tubing string - Google Patents

Blowout preventer with port for entry between casing and tubing string and/or port for entry into tubing string Download PDF

Info

Publication number
US20130181147A1
US20130181147A1 US13/824,091 US201113824091A US2013181147A1 US 20130181147 A1 US20130181147 A1 US 20130181147A1 US 201113824091 A US201113824091 A US 201113824091A US 2013181147 A1 US2013181147 A1 US 2013181147A1
Authority
US
United States
Prior art keywords
tubing string
blowout preventer
casing
elongate member
tubing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US13/824,091
Inventor
Andrew J. Wright
James Bentley
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Millennium Oilflow Systems and Technology Inc
Original Assignee
Millennium Oilflow Systems and Technology Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Millennium Oilflow Systems and Technology Inc filed Critical Millennium Oilflow Systems and Technology Inc
Priority to US13/824,091 priority Critical patent/US20130181147A1/en
Assigned to GADU INC. reassignment GADU INC. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: BENTLEY, JAMES, WRIGHT, ANDREW J.
Assigned to MILLENNIUM OILFLOW SYSTEMS & TECHNOLOGY INC. reassignment MILLENNIUM OILFLOW SYSTEMS & TECHNOLOGY INC. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: GADU INC.
Publication of US20130181147A1 publication Critical patent/US20130181147A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/02Surface sealing or packing
    • E21B33/03Well heads; Setting-up thereof
    • E21B33/06Blow-out preventers, i.e. apparatus closing around a drill pipe, e.g. annular blow-out preventers
    • E21B33/061Ram-type blow-out preventers, e.g. with pivoting rams
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/02Surface sealing or packing
    • E21B33/03Well heads; Setting-up thereof
    • E21B33/068Well heads; Setting-up thereof having provision for introducing objects or fluids into, or removing objects from, wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/02Valve arrangements for boreholes or wells in well heads

Definitions

  • This invention relates generally to oil well production equipment, and more particularly to a new and useful blowout preventer for use on an oil or other well driven into an underground formation.
  • a blowout preventer is a device typically used to seal off or close off an oil pumping well. It acts somewhat similar to a valve and generally has apposing rams that move together to seal off well pressure from within the well to atmosphere.
  • the majority of all BOP's on production wells will have a polish rod extending through their center during use.
  • the polish rod may have a reciprocation motion when used in a pump jack application or a rotating motion when used in a PCP (progressing cavity pump) application.
  • the ram body is typically made of steel and contains an elastomer seal that squeezes against the polish rod and also squeezes against the inside of the BOP to seal pressure in the well. With the rams in their open position oil is allowed to flow up through the BOP and exit through a flow line. With the rams closed the well is shut off and flow is contained.
  • a typical oil well is made up of casing which runs the length of the well and has a casing bowl attached to it above the ground.
  • the exterior of the casing is cemented to the drilled oil well hole to provide a tight seal preventing any well pressure from leaking to the surface.
  • Inside the casing is tubing that runs the length of the oil well down to the pump or motor at the bottom of the well.
  • the top of the tubing is attached to a tubing hanger which seals the tubing from well pressure and is usually found in the tubing head just below the BOP.
  • a common problem with the production of oil is sand.
  • Sand released out of the oil settles and often causes pumps and motors to become plugged, or surrounds the outside of pumps and motors causing a reduction in oil production and/or resulting in the pump becoming locked in place.
  • a procedure called a “flush-by” is performed where a hose or coiled tubing is run down through the tubing, or between the tubing and the casing, to allow high pressure liquids (such as water) to flush the sand out.
  • the BOP must then typically be removed to gain access to the tubing hanger located in the casing bowl.
  • the hanger must be lifted out of the casing bowl and high enough to allow the coil tubing to be inserted into the annulus between the tubing and the casing.
  • the coil tubing can then be inserted the length of the tubing string down to the pump or motor.
  • Some wells also collect high amounts of sand beyond the pump and motor so coiled tubing may have to be inserted further down the well.
  • the hanger and tubing is much heavier than the polish rod, sucker rod and rotor, accordingly larger lifting equipment is often needed at the well site when it is necessary to lift the tubing.
  • Flush by's are a very important procedure for maximizing oil production, but in many cases they can be time consuming, resulting in increased costs from the perspective of labour, necessary equipment to perform the procedure and down time for the well.
  • the improved BOP of the present invention is designed to save time, and as a result costs, when performing a flush by, and also helps to keep the well head manageable in terms of size, and the number of well head components.
  • the invention therefore, in one of its aspects, provides an improved blowout preventer that addresses some of the deficiencies of current blowout preventers and that enhances the ability to insert fluid or an elongate member into a well.
  • the invention concerns an improved blowout preventer for a well having a casing extending into an underground formation, said improved blowout preventer comprising a main housing having a generally longitudinally oriented bore therethrough for releasably receiving a pump rod therein; a pair of opposed ram members received within a pair of generally transverse bores within said main housing, said ram members moveable between an engaged position wherein they sealingly engage the pump rod and each other when a pump rod is received through said longitudinal bore, and a disengaged position wherein they are retracted from engaging either the pump rod or each other; and, one or more side entry ports within said main housing, said side entry ports permitting a fluid or elongate member to be inserted into the casing.
  • FIG. 1 is a vertical cross-sectional view through a typical oil well that employs a progressing cavity pump and having attached to the well head an improved blowout preventer generally constructed in accordance with one of the preferred embodiments of the present invention
  • FIG. 2 is a side elevational view of the improved blowout preventer shown in FIG. 1 , together with some of the related well head components;
  • FIG. 3 is a cross-sectional view taken along the line 3 - 3 of FIG. 2 ;
  • FIG. 4 is a side elevational view of an alternate embodiment of the improved blowout preventer shown in FIG. 1 , together with some of the related well head components;
  • FIG. 5 is a cross-sectional view taken along the line 5 - 5 of FIG. 4 ;
  • FIG. 6 is a side elevational view of an alternate embodiment of the improved blowout preventer shown in FIG. 1 , together with some of the related well head components;
  • FIG. 7 is a cross-sectional view taken along the line 7 - 7 of FIG. 6 ;
  • FIG. 8 is side elevational view of one of the preferred embodiments of the improved blowout preventer constructed in accordance with the present invention.
  • FIG. 9 is a cross-sectional view taken along the line 9 - 9 of FIG. 8 ;
  • FIG. 10 is a cross-sectional view taken along the line 10 - 10 of FIG. 8 .
  • the new improved BOP design combines several wellhead servicing procedures that are done on various wellhead components to be completed in the BOP.
  • stuffing boxes, polish rod clamps and BOP's had to be unbolted and removed to gain access to the tubing string and sucker rods, rotors, stators, pumps, etc.
  • Such items are typically the main components that have to be replaced over time or that get sanded in and need to be flushed out by a flush-by unit.
  • the improved BOP of the present invention will allow for the servicing and the operation of the wellhead to be contained in one unit.
  • the BOP has a removable stuffing box built into a rod hanger.
  • the rod hanger is preferably situated internally in the top of the BOP with the entrance to the tubing string being through the rod hanger. With the use of seals and lock down screws the rod hanger is sealed and secured to the BOP.
  • the top of the rod hanger receives the shaft of a PCP drive head or some form of rotating input shaft that transmits rotating torque through the rod hanger to an end of the rod hanger shaft which is connected to the sucker rods for driving a PCP rotor.
  • the BOP rams are able to clamp on the hanger shaft and seal off all well pressure. If desired, a second set of blind rams could be positioned above the sealing rams that could also seal off the well pressure if there were no rods in the center of the BOP.
  • the BOP could also have more than two sets of rams.
  • the rod input shaft may be connected to a secondary shaft below it, the secondary shaft having a area for the rams to clamp the shaft securely with teeth, spline etc. This shaft would be useful when lifting the rod hanger out of the BOP where the rams would clamp on the secondary rod and secure it to disconnect the rod, hanger shaft.
  • the rod hanger shaft could also be extended and be supported by the rams and sealed and clamped from preventing rotation.
  • drive heads typically have had a rotating polish rod through the center and extending out of the top where a clamp would transmit the rotational torque from the motor to the rotor.
  • This structure can present a hazard to workers.
  • the drive motor only needs to have a shaft engagement in the rod hanger, leaving no rotating members sticking out of the top of the drive motor.
  • the hanger may be hollow and may include a plug for closing off its hollow interior.
  • the plug may be a valve or other mechanism for closing the hollow bore of the rod hanger. Alternately, there could be more than one plug, or a combination of plugs and valves.
  • the new BOP also receives the tubing hanger below the rams.
  • the tubing hanger is sealed and held in place with lock down screws.
  • the tubing hanger would typically be placed in a casing bowl or tubing head. Having the hanger placed in the BOP saves time, since in prior wells the BOP would have to be removed to gain access to the tubing hanger.
  • the BOP of the present invention has an entry port that allows fluid, coiled tubing, a cable, probe or other elongate member to enter the BOP on the side or face with an angle of entry angle that in most cases would typically be no greater than 30 degrees. In some cases (for example where the entry port is used for inserting probes or sensors) the angle of entry could be greater.
  • the coil tubing fluid or other elongate member
  • the BOP can be constructed with one or more entry ports.
  • Those entry ports may also be at different locations about the main body of the BOP, may have different angles of inclination and may terminate at either the bottom surface of the BOP or within the longitudinal bore through the BOP main housing.
  • the entry ports may allow direct access to the interior of the tubing string (for example, see FIG. 5 ), may allow direct access to the annulus between the casing and the tubing string (for example, see FIG. 3 ) or may allow direct access to both the interior of the tubing string and the annulus between the casing and the tubing string (for example, see FIG. 7 ).
  • the entry port would commonly be positioned above the rams, it could also be located below the rams and/or below the rams and tubing hanger.
  • the entry port saves time as the hanger does not have to be removed or lifted from the BOP to perform a flush by operation.
  • This improved BOP also permits for a reduction in operator error at a well site by reducing the need for undoing and redoing connections. Undoing and redoing connections also often requires the replacement of gaskets and can be time consuming.
  • the improved BOP also helps to reduce wellhead height which has advantages in terms of strain on wellhead equipment in non-vertical wells.

Abstract

An improved blowout preventer for a well having a casing extending into an underground formation. The blowout preventer has a pair of opposed ram members received within a pair transverse bores within the main housing. The ram members move between an engaged position wherein they engage the pump rod and each other when a pump rod is received through the longitudinal bore in the housing, and a disengaged position where they are retracted from engaging either the pump rod or each other. There are one or more side entry ports within the main housing which permit a fluid or elongate member to be inserted into the casing.

Description

    FIELD OF THE INVENTION
  • This invention relates generally to oil well production equipment, and more particularly to a new and useful blowout preventer for use on an oil or other well driven into an underground formation.
  • BACKGROUND OF THE INVENTION
  • A blowout preventer (BOP) is a device typically used to seal off or close off an oil pumping well. It acts somewhat similar to a valve and generally has apposing rams that move together to seal off well pressure from within the well to atmosphere. The majority of all BOP's on production wells will have a polish rod extending through their center during use. The polish rod may have a reciprocation motion when used in a pump jack application or a rotating motion when used in a PCP (progressing cavity pump) application. The ram body is typically made of steel and contains an elastomer seal that squeezes against the polish rod and also squeezes against the inside of the BOP to seal pressure in the well. With the rams in their open position oil is allowed to flow up through the BOP and exit through a flow line. With the rams closed the well is shut off and flow is contained.
  • A typical oil well is made up of casing which runs the length of the well and has a casing bowl attached to it above the ground. The exterior of the casing is cemented to the drilled oil well hole to provide a tight seal preventing any well pressure from leaking to the surface. Inside the casing is tubing that runs the length of the oil well down to the pump or motor at the bottom of the well. The top of the tubing is attached to a tubing hanger which seals the tubing from well pressure and is usually found in the tubing head just below the BOP. When the well is pumping either by a pump jack or a PCP the oil flows up through the tubing and in to the BOP, where it continues its way through flow lines to a tank, reservoir or pipeline.
  • A common problem with the production of oil is sand. Sand released out of the oil settles and often causes pumps and motors to become plugged, or surrounds the outside of pumps and motors causing a reduction in oil production and/or resulting in the pump becoming locked in place. To release the sand from the well a procedure called a “flush-by” is performed where a hose or coiled tubing is run down through the tubing, or between the tubing and the casing, to allow high pressure liquids (such as water) to flush the sand out. In the case of well having a PCP drive, for the hose or coil tubing to gain access to the inside of the tubing string the drive head must first be removed and the polish rod and connected sucker rods lifted to remove the rotor from the stator to allow the coiled tubing to pass through the stator and permit access to the well at a point below the pump. This is time consuming as the drive head, stuffing box and clamps must be removed, requiring in most the use of cases cranes, boom trucks or other lifting devices. To flush the sand from between the tubing and the casing, or from inside the tubing string, the drive head, clamps, stuffing boxes etc (i.e. the top of the wellhead) must be removed. The BOP must then typically be removed to gain access to the tubing hanger located in the casing bowl. The hanger must be lifted out of the casing bowl and high enough to allow the coil tubing to be inserted into the annulus between the tubing and the casing. The coil tubing can then be inserted the length of the tubing string down to the pump or motor. Some wells also collect high amounts of sand beyond the pump and motor so coiled tubing may have to be inserted further down the well. The hanger and tubing is much heavier than the polish rod, sucker rod and rotor, accordingly larger lifting equipment is often needed at the well site when it is necessary to lift the tubing.
  • Flush by's are a very important procedure for maximizing oil production, but in many cases they can be time consuming, resulting in increased costs from the perspective of labour, necessary equipment to perform the procedure and down time for the well. The improved BOP of the present invention is designed to save time, and as a result costs, when performing a flush by, and also helps to keep the well head manageable in terms of size, and the number of well head components.
  • SUMMARY OF THE INVENTION
  • The invention therefore, in one of its aspects, provides an improved blowout preventer that addresses some of the deficiencies of current blowout preventers and that enhances the ability to insert fluid or an elongate member into a well.
  • In one aspect the invention concerns an improved blowout preventer for a well having a casing extending into an underground formation, said improved blowout preventer comprising a main housing having a generally longitudinally oriented bore therethrough for releasably receiving a pump rod therein; a pair of opposed ram members received within a pair of generally transverse bores within said main housing, said ram members moveable between an engaged position wherein they sealingly engage the pump rod and each other when a pump rod is received through said longitudinal bore, and a disengaged position wherein they are retracted from engaging either the pump rod or each other; and, one or more side entry ports within said main housing, said side entry ports permitting a fluid or elongate member to be inserted into the casing.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • For a better understanding of the present invention, and to show more clearly how it may be carried into effect, reference will now be made, by way of example, to the accompanying drawings which show the preferred embodiments of the present invention in which:
  • FIG. 1 is a vertical cross-sectional view through a typical oil well that employs a progressing cavity pump and having attached to the well head an improved blowout preventer generally constructed in accordance with one of the preferred embodiments of the present invention;
  • FIG. 2 is a side elevational view of the improved blowout preventer shown in FIG. 1, together with some of the related well head components;
  • FIG. 3 is a cross-sectional view taken along the line 3-3 of FIG. 2;
  • FIG. 4 is a side elevational view of an alternate embodiment of the improved blowout preventer shown in FIG. 1, together with some of the related well head components;
  • FIG. 5 is a cross-sectional view taken along the line 5-5 of FIG. 4;
  • FIG. 6 is a side elevational view of an alternate embodiment of the improved blowout preventer shown in FIG. 1, together with some of the related well head components;
  • FIG. 7 is a cross-sectional view taken along the line 7-7 of FIG. 6;
  • FIG. 8 is side elevational view of one of the preferred embodiments of the improved blowout preventer constructed in accordance with the present invention;
  • FIG. 9 is a cross-sectional view taken along the line 9-9 of FIG. 8; and,
  • FIG. 10 is a cross-sectional view taken along the line 10-10 of FIG. 8.
  • DESCRIPTION OF THE PREFERRED EMBODIMENT
  • The present invention may be embodied in a number of different forms. However, the specification and drawings describe and disclose only some of the specific forms of the invention and are not intended to limit the scope of the invention as defined in the claims that follow herein.
  • The new improved BOP design combines several wellhead servicing procedures that are done on various wellhead components to be completed in the BOP. In the past drive heads, stuffing boxes, polish rod clamps and BOP's had to be unbolted and removed to gain access to the tubing string and sucker rods, rotors, stators, pumps, etc. Such items are typically the main components that have to be replaced over time or that get sanded in and need to be flushed out by a flush-by unit. The improved BOP of the present invention will allow for the servicing and the operation of the wellhead to be contained in one unit. The BOP has a removable stuffing box built into a rod hanger. The rod hanger is preferably situated internally in the top of the BOP with the entrance to the tubing string being through the rod hanger. With the use of seals and lock down screws the rod hanger is sealed and secured to the BOP. The top of the rod hanger receives the shaft of a PCP drive head or some form of rotating input shaft that transmits rotating torque through the rod hanger to an end of the rod hanger shaft which is connected to the sucker rods for driving a PCP rotor. The BOP rams are able to clamp on the hanger shaft and seal off all well pressure. If desired, a second set of blind rams could be positioned above the sealing rams that could also seal off the well pressure if there were no rods in the center of the BOP. The BOP could also have more than two sets of rams. In addition, the rod input shaft may be connected to a secondary shaft below it, the secondary shaft having a area for the rams to clamp the shaft securely with teeth, spline etc. This shaft would be useful when lifting the rod hanger out of the BOP where the rams would clamp on the secondary rod and secure it to disconnect the rod, hanger shaft. The rod hanger shaft could also be extended and be supported by the rams and sealed and clamped from preventing rotation.
  • In prior PCP wellheads, drive heads typically have had a rotating polish rod through the center and extending out of the top where a clamp would transmit the rotational torque from the motor to the rotor. This structure can present a hazard to workers. With the improved BOP of the present invention the drive motor only needs to have a shaft engagement in the rod hanger, leaving no rotating members sticking out of the top of the drive motor.
  • In certain applications the hanger may be hollow and may include a plug for closing off its hollow interior. The plug may be a valve or other mechanism for closing the hollow bore of the rod hanger. Alternately, there could be more than one plug, or a combination of plugs and valves.
  • The new BOP also receives the tubing hanger below the rams. The tubing hanger is sealed and held in place with lock down screws. In prior wells the tubing hanger would typically be placed in a casing bowl or tubing head. Having the hanger placed in the BOP saves time, since in prior wells the BOP would have to be removed to gain access to the tubing hanger.
  • The BOP of the present invention has an entry port that allows fluid, coiled tubing, a cable, probe or other elongate member to enter the BOP on the side or face with an angle of entry angle that in most cases would typically be no greater than 30 degrees. In some cases (for example where the entry port is used for inserting probes or sensors) the angle of entry could be greater. When inserted through the entry port the coil tubing (fluid or other elongate member) will be allowed to travel down the well between the casing and the tubing string, and/or down the tubing. It will be appreciated from a thorough understanding of the invention, and from a review of the attached drawings, that depending on the particular needs and depending on the nature of a particular well, the BOP can be constructed with one or more entry ports. Those entry ports may also be at different locations about the main body of the BOP, may have different angles of inclination and may terminate at either the bottom surface of the BOP or within the longitudinal bore through the BOP main housing. Hence, depending upon the relative positioning of the BOP and the tubing string hanger, and depending on the nature and point of termination of the entry ports, the entry ports may allow direct access to the interior of the tubing string (for example, see FIG. 5), may allow direct access to the annulus between the casing and the tubing string (for example, see FIG. 3) or may allow direct access to both the interior of the tubing string and the annulus between the casing and the tubing string (for example, see FIG. 7).
  • While the entry port would commonly be positioned above the rams, it could also be located below the rams and/or below the rams and tubing hanger. The entry port saves time as the hanger does not have to be removed or lifted from the BOP to perform a flush by operation. This improved BOP also permits for a reduction in operator error at a well site by reducing the need for undoing and redoing connections. Undoing and redoing connections also often requires the replacement of gaskets and can be time consuming. The improved BOP also helps to reduce wellhead height which has advantages in terms of strain on wellhead equipment in non-vertical wells.
  • It is to be understood that what has been described are the preferred embodiments of the invention and that it may be possible to make variations to these embodiments while staying within the broad scope of the invention. Some of these variations have been discussed while others will be readily apparent to those skilled in the art. For example, while the attached Figures show the insertion of coiled tubing through the entry ports in the BOP, it will be appreciated that those ports could be used for direct fluid injection or to receive hoses, tubing, cables, wires, probes, sensors or a wide variety of other elongate or other members with which there may be a desire to access the interior of the tubing string and/or the annulus between the tubing string and the casing.

Claims (13)

1. An improved blowout preventer for a well having a casing extending into an underground formation, the improved blowout preventer comprising:
a main housing having a generally longitudinally oriented bore therethrough for releasably receiving a pump rod therein;
a pair of opposed ram members received within a pair of generally transverse bores within the main housing, the ram members moveable between an engaged position wherein they sealingly engage the pump rod and each other when a pump rod is received through the longitudinal bore, and a disengaged position wherein they are retracted from engaging either the pump rod or each other;
one or more side entry ports within the main housing, the side entry ports permitting a fluid or elongate member to be inserted into the casing; and
an attachment for a tubing string within the main housing.
2. The improved blowout preventer as claimed in claim 1, wherein the attachment for a tubing string is a tubing hanger
3. The improved blowout preventer as claimed in claim 1 wherein the casing includes a tubing string supported by the attachment for the tubing string, the fluid or elongate member being inserted into the annulus between the casing and the tubing string.
4. The improved blowout preventer as claimed in claim 1 wherein the casing includes a tubing string supported by the attachment for the tubing string, the fluid or elongate member being inserted into the hollow interior of the tubing string.
5. The improved blowout preventer as claimed in claim 1, wherein the casing includes a tubing string extending at least partially therethrough, the blowout preventer including two or more side entry ports within the main housing, the side entry ports permitting fluid or an elongate member to be inserted into the annulus between the casing and the tubing string, and fluid or an elongate member to be inserted into the tubing string.
6. The improved blowout preventer as claimed in claim 1 wherein the elongate member is a hose, cable, tube or coiled tubing.
7. An improved blowout preventer for a well having a casing extending into an underground formation, the improved blowout preventer comprising:
a main housing having a generally longitudinally oriented bore therethrough for releasably receiving a pump rod therein;
a pair of opposed ram members received within a pair of generally transverse bores within the main housing, the ram members moveable between an engaged position wherein they sealingly engage the pump rod and each other when a pump rod is received through the longitudinal bore, and a disengaged position wherein they are retracted from engaging either the pump rod or each other; and
an attachment for a tubing hanger within the main housing.
8. The improved blowout preventer as claimed in claim 7, further comprising one or more side entry ports within the main housing, the side entry ports permitting a fluid or elongate member to be inserted into the casing.
9. The improved blowout preventer as claimed in claim 7, wherein the attachment for a tubing string is a tubing hanger.
10. The improved blowout preventer as claimed in claim 8, wherein the casing includes a tubing string supported by the attachment for the tubing string, the fluid or elongate member being inserted into the annulus between the casing and the tubing string
11. The improved blowout preventer as claimed in claim 7, wherein the casing includes a tubing string supported by the attachment for the tubing string, the fluid or elongate member being inserted into the hollow interior of the tubing string.
12. The improved blowout preventer as claimed in claim 8, wherein the casing includes a tubing string extending at least partially therethrough, the blowout preventer including two or more side entry ports within the main housing, the side entry ports permitting fluid or an elongate member to be inserted into the annulus between the casing and the tubing string, and fluid or an elongate member to be inserted into the tubing string.
13. The improved blowout preventer as claimed in claim 8 wherein the elongate member is a hose, cable, tube or coiled tubing.
US13/824,091 2010-09-16 2011-09-16 Blowout preventer with port for entry between casing and tubing string and/or port for entry into tubing string Abandoned US20130181147A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US13/824,091 US20130181147A1 (en) 2010-09-16 2011-09-16 Blowout preventer with port for entry between casing and tubing string and/or port for entry into tubing string

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US38361310P 2010-09-16 2010-09-16
PCT/CA2011/001048 WO2012034227A1 (en) 2010-09-16 2011-09-16 Improved blowout preventer with port for entry between casing and tubing string and/or port for entry into tubing string
US13/824,091 US20130181147A1 (en) 2010-09-16 2011-09-16 Blowout preventer with port for entry between casing and tubing string and/or port for entry into tubing string

Publications (1)

Publication Number Publication Date
US20130181147A1 true US20130181147A1 (en) 2013-07-18

Family

ID=45830900

Family Applications (1)

Application Number Title Priority Date Filing Date
US13/824,091 Abandoned US20130181147A1 (en) 2010-09-16 2011-09-16 Blowout preventer with port for entry between casing and tubing string and/or port for entry into tubing string

Country Status (4)

Country Link
US (1) US20130181147A1 (en)
AU (1) AU2011301740A1 (en)
CA (1) CA2812692C (en)
WO (1) WO2012034227A1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140060855A1 (en) * 2008-02-11 2014-03-06 Cameron International Corporation Angled-penetrator device and system
WO2015153331A1 (en) * 2014-04-01 2015-10-08 Cameron International Corporation Rod hang-off system
RU2745949C1 (en) * 2020-09-25 2021-04-05 Публичное акционерное общество «Татнефть» имени В.Д. Шашина Preventer for a well with a double-row pipe string
US20210238944A1 (en) * 2018-05-25 2021-08-05 2170775 Alberta Ltd. Modular head for well tubulars
US20220251917A1 (en) * 2021-02-05 2022-08-11 Nexus Energy Technologies Inc. Annular fracturing cleanout apparatus and method

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102767345A (en) * 2012-07-25 2012-11-07 胜利油田东胜精攻石油开发集团股份有限公司 Multifunctional sucker rod hanging blowout preventer

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3151680A (en) * 1961-11-15 1964-10-06 Warren E Parkhurst Well pressure control apparatus
US4090395A (en) * 1977-03-28 1978-05-23 Exxon Production Research Company Casing seal and blowout preventer tester and test method
US4503879A (en) * 1983-11-04 1985-03-12 Joy Manufacturing Company Plug mechanism for wellhead tool
US5372202A (en) * 1992-08-28 1994-12-13 Dallas; Murray Wellhead isolation tool and method of use
US5743332A (en) * 1996-02-16 1998-04-28 Stream-Flo Industries Ltd. Integral wellhead assembly for pumping wells
US20020134548A1 (en) * 2001-03-23 2002-09-26 Lam Tony M. Wellhead production pumping tree
US20030000693A1 (en) * 2001-06-22 2003-01-02 Cooper Cameron Corporation Blow out preventer testing apparatus
US20080202770A1 (en) * 2005-06-08 2008-08-28 Bj Services Company , U.S.A. Wellbore Bypass Method and Apparatus
US20100294492A1 (en) * 2007-12-12 2010-11-25 Cameron International Corporation Function Spool

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3664415A (en) * 1970-09-14 1972-05-23 Halliburton Co Method and apparatus for testing wells
EP2149670A1 (en) * 2008-07-31 2010-02-03 Services Pétroliers Schlumberger Method and apparatus for installing a wireline for logging or other operations in an under-balanced well

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3151680A (en) * 1961-11-15 1964-10-06 Warren E Parkhurst Well pressure control apparatus
US4090395A (en) * 1977-03-28 1978-05-23 Exxon Production Research Company Casing seal and blowout preventer tester and test method
US4503879A (en) * 1983-11-04 1985-03-12 Joy Manufacturing Company Plug mechanism for wellhead tool
US5372202A (en) * 1992-08-28 1994-12-13 Dallas; Murray Wellhead isolation tool and method of use
US5743332A (en) * 1996-02-16 1998-04-28 Stream-Flo Industries Ltd. Integral wellhead assembly for pumping wells
US20020134548A1 (en) * 2001-03-23 2002-09-26 Lam Tony M. Wellhead production pumping tree
US20030000693A1 (en) * 2001-06-22 2003-01-02 Cooper Cameron Corporation Blow out preventer testing apparatus
US20080202770A1 (en) * 2005-06-08 2008-08-28 Bj Services Company , U.S.A. Wellbore Bypass Method and Apparatus
US20100294492A1 (en) * 2007-12-12 2010-11-25 Cameron International Corporation Function Spool

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140060855A1 (en) * 2008-02-11 2014-03-06 Cameron International Corporation Angled-penetrator device and system
US9273530B2 (en) * 2008-02-11 2016-03-01 Cameron International Corporation Angled-penetrator device and system
WO2015153331A1 (en) * 2014-04-01 2015-10-08 Cameron International Corporation Rod hang-off system
GB2538912A (en) * 2014-04-01 2016-11-30 Cameron Int Corp Rod hang-off system
US9828823B2 (en) 2014-04-01 2017-11-28 Cameron International Corporation Rod hang-off system
GB2538912B (en) * 2014-04-01 2018-11-21 Cameron Tech Ltd Rod hang-off system
US20210238944A1 (en) * 2018-05-25 2021-08-05 2170775 Alberta Ltd. Modular head for well tubulars
US11585181B2 (en) * 2018-05-25 2023-02-21 2170775 Alberta Ltd. Modular head for well tubulars
RU2745949C1 (en) * 2020-09-25 2021-04-05 Публичное акционерное общество «Татнефть» имени В.Д. Шашина Preventer for a well with a double-row pipe string
US20220251917A1 (en) * 2021-02-05 2022-08-11 Nexus Energy Technologies Inc. Annular fracturing cleanout apparatus and method

Also Published As

Publication number Publication date
AU2011301740A1 (en) 2013-04-04
CA2812692A1 (en) 2012-03-22
CA2812692C (en) 2018-03-13
WO2012034227A1 (en) 2012-03-22

Similar Documents

Publication Publication Date Title
CA2812692C (en) Improved blowout preventer with port for entry between casing and tubing string and/or port for entry into tubing string
US6827147B2 (en) Reciprocating lubricator
US6817423B2 (en) Wall stimulation tool and method of using same
US8794351B2 (en) Device and method for drilling with continuous tool rotation and continuous drilling fluid supply
US7740073B2 (en) Wellhead seal unit
CA2967933C (en) Subsea slanted wellhead system and bop system with dual injector head units
US20050109514A1 (en) Tree mounted well flow interface device
US20070144743A1 (en) Tree mounted well flow interface device
GB2437286A (en) Retrievable tubing hanger installed below spool tree
US11624358B2 (en) Measuring backlash of a pump gear train
US10287830B2 (en) Combined casing and drill-pipe fill-up, flow-back and circulation tool
EP4303398A2 (en) Modular head for well tubulars
US20190277281A1 (en) Progressing cavity pump in which rotor depth can be determined without disassembly of above ground equipment, and methods, systems and tools relating to same
EP3807494B1 (en) Method for replacing a chemical injection valve connected to a well head via an injection line housing and injection line plugging tool
US20220268110A1 (en) Systems and Methods For Rotating a Casing String In a Wellbore
RU2143052C1 (en) Sealing fittings (versions)
OA21231A (en) A Continuous Rod Pump Drive System.

Legal Events

Date Code Title Description
AS Assignment

Owner name: GADU INC., BARBADOS

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:WRIGHT, ANDREW J.;BENTLEY, JAMES;REEL/FRAME:030040/0344

Effective date: 20100924

AS Assignment

Owner name: MILLENNIUM OILFLOW SYSTEMS & TECHNOLOGY INC., CANA

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:GADU INC.;REEL/FRAME:030076/0513

Effective date: 20111006

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION