US20130153216A1 - Recovery From A Hydrocarbon Reservoir - Google Patents
Recovery From A Hydrocarbon Reservoir Download PDFInfo
- Publication number
- US20130153216A1 US20130153216A1 US13/667,837 US201213667837A US2013153216A1 US 20130153216 A1 US20130153216 A1 US 20130153216A1 US 201213667837 A US201213667837 A US 201213667837A US 2013153216 A1 US2013153216 A1 US 2013153216A1
- Authority
- US
- United States
- Prior art keywords
- reservoir
- pressure
- interval
- production
- quality
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 150000002430 hydrocarbons Chemical class 0.000 title claims abstract description 82
- 229930195733 hydrocarbon Natural products 0.000 title claims abstract description 79
- 238000011084 recovery Methods 0.000 title claims abstract description 54
- 239000004215 Carbon black (E152) Substances 0.000 title claims abstract description 38
- 238000004519 manufacturing process Methods 0.000 claims abstract description 113
- 238000000034 method Methods 0.000 claims abstract description 88
- 230000001483 mobilizing effect Effects 0.000 claims abstract description 15
- 239000003795 chemical substances by application Substances 0.000 claims abstract description 8
- 239000002904 solvent Substances 0.000 claims description 48
- 238000002347 injection Methods 0.000 claims description 45
- 239000007924 injection Substances 0.000 claims description 45
- 239000012530 fluid Substances 0.000 claims description 32
- 230000005484 gravity Effects 0.000 claims description 29
- 230000001351 cycling effect Effects 0.000 claims description 21
- 238000003306 harvesting Methods 0.000 claims description 15
- 238000005553 drilling Methods 0.000 claims description 11
- 230000008859 change Effects 0.000 claims description 8
- 238000010618 wire wrap Methods 0.000 claims description 4
- 239000003921 oil Substances 0.000 description 47
- 239000000295 fuel oil Substances 0.000 description 38
- 230000008569 process Effects 0.000 description 33
- 238000010796 Steam-assisted gravity drainage Methods 0.000 description 29
- VYPSYNLAJGMNEJ-UHFFFAOYSA-N Silicium dioxide Chemical compound O=[Si]=O VYPSYNLAJGMNEJ-UHFFFAOYSA-N 0.000 description 27
- 239000004576 sand Substances 0.000 description 24
- 239000007789 gas Substances 0.000 description 22
- 230000015572 biosynthetic process Effects 0.000 description 19
- 238000005755 formation reaction Methods 0.000 description 19
- 208000035126 Facies Diseases 0.000 description 18
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 17
- 239000000463 material Substances 0.000 description 15
- 239000011435 rock Substances 0.000 description 14
- 239000010426 asphalt Substances 0.000 description 12
- 238000010794 Cyclic Steam Stimulation Methods 0.000 description 11
- 238000011161 development Methods 0.000 description 7
- 230000018109 developmental process Effects 0.000 description 7
- 239000000203 mixture Substances 0.000 description 7
- 239000012071 phase Substances 0.000 description 7
- 238000013459 approach Methods 0.000 description 6
- 238000010793 Steam injection (oil industry) Methods 0.000 description 5
- 238000004891 communication Methods 0.000 description 5
- 230000007423 decrease Effects 0.000 description 5
- 239000007788 liquid Substances 0.000 description 5
- 230000007246 mechanism Effects 0.000 description 5
- 239000000243 solution Substances 0.000 description 5
- 238000010795 Steam Flooding Methods 0.000 description 4
- 238000010438 heat treatment Methods 0.000 description 4
- 238000005065 mining Methods 0.000 description 4
- 230000035515 penetration Effects 0.000 description 4
- 230000035699 permeability Effects 0.000 description 4
- 238000012545 processing Methods 0.000 description 4
- 230000008901 benefit Effects 0.000 description 3
- 125000004122 cyclic group Chemical group 0.000 description 3
- 238000013507 mapping Methods 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- -1 steam Substances 0.000 description 3
- IJGRMHOSHXDMSA-UHFFFAOYSA-N Atomic nitrogen Chemical compound N#N IJGRMHOSHXDMSA-UHFFFAOYSA-N 0.000 description 2
- BVKZGUZCCUSVTD-UHFFFAOYSA-L Carbonate Chemical compound [O-]C([O-])=O BVKZGUZCCUSVTD-UHFFFAOYSA-L 0.000 description 2
- PXHVJJICTQNCMI-UHFFFAOYSA-N Nickel Chemical compound [Ni] PXHVJJICTQNCMI-UHFFFAOYSA-N 0.000 description 2
- NINIDFKCEFEMDL-UHFFFAOYSA-N Sulfur Chemical compound [S] NINIDFKCEFEMDL-UHFFFAOYSA-N 0.000 description 2
- 125000001931 aliphatic group Chemical group 0.000 description 2
- 239000004927 clay Substances 0.000 description 2
- 238000005094 computer simulation Methods 0.000 description 2
- 230000003247 decreasing effect Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 239000010438 granite Substances 0.000 description 2
- 238000005259 measurement Methods 0.000 description 2
- 229910052751 metal Inorganic materials 0.000 description 2
- 239000002184 metal Substances 0.000 description 2
- 150000002739 metals Chemical class 0.000 description 2
- 238000012544 monitoring process Methods 0.000 description 2
- 239000011148 porous material Substances 0.000 description 2
- 229920005989 resin Polymers 0.000 description 2
- 239000011347 resin Substances 0.000 description 2
- 229910052717 sulfur Inorganic materials 0.000 description 2
- 239000011593 sulfur Substances 0.000 description 2
- 239000012808 vapor phase Substances 0.000 description 2
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 description 1
- UFHFLCQGNIYNRP-UHFFFAOYSA-N Hydrogen Chemical compound [H][H] UFHFLCQGNIYNRP-UHFFFAOYSA-N 0.000 description 1
- 235000019738 Limestone Nutrition 0.000 description 1
- 241001214257 Mene Species 0.000 description 1
- XQCFHQBGMWUEMY-ZPUQHVIOSA-N Nitrovin Chemical compound C=1C=C([N+]([O-])=O)OC=1\C=C\C(=NNC(=N)N)\C=C\C1=CC=C([N+]([O-])=O)O1 XQCFHQBGMWUEMY-ZPUQHVIOSA-N 0.000 description 1
- 230000004308 accommodation Effects 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- QVGXLLKOCUKJST-UHFFFAOYSA-N atomic oxygen Chemical compound [O] QVGXLLKOCUKJST-UHFFFAOYSA-N 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 229910052799 carbon Inorganic materials 0.000 description 1
- 239000003575 carbonaceous material Substances 0.000 description 1
- 150000004649 carbonic acid derivatives Chemical class 0.000 description 1
- 239000003245 coal Substances 0.000 description 1
- 238000005056 compaction Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000011109 contamination Methods 0.000 description 1
- 238000010924 continuous production Methods 0.000 description 1
- 230000001276 controlling effect Effects 0.000 description 1
- 239000010779 crude oil Substances 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 230000010339 dilation Effects 0.000 description 1
- 238000007598 dipping method Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000446 fuel Substances 0.000 description 1
- 239000001257 hydrogen Substances 0.000 description 1
- 229910052739 hydrogen Inorganic materials 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 230000008595 infiltration Effects 0.000 description 1
- 238000001764 infiltration Methods 0.000 description 1
- 230000001788 irregular Effects 0.000 description 1
- 239000006028 limestone Substances 0.000 description 1
- 229910052759 nickel Inorganic materials 0.000 description 1
- 229910052757 nitrogen Inorganic materials 0.000 description 1
- 229910017464 nitrogen compound Inorganic materials 0.000 description 1
- 150000002830 nitrogen compounds Chemical class 0.000 description 1
- 239000003027 oil sand Substances 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 150000002894 organic compounds Chemical class 0.000 description 1
- 239000005416 organic matter Substances 0.000 description 1
- 229910052760 oxygen Inorganic materials 0.000 description 1
- 239000001301 oxygen Substances 0.000 description 1
- 239000003208 petroleum Substances 0.000 description 1
- 230000000704 physical effect Effects 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 238000007670 refining Methods 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 239000013049 sediment Substances 0.000 description 1
- 239000012056 semi-solid material Substances 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 239000000377 silicon dioxide Substances 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000011877 solvent mixture Substances 0.000 description 1
- 238000010561 standard procedure Methods 0.000 description 1
- 230000000638 stimulation Effects 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 229910052720 vanadium Inorganic materials 0.000 description 1
- LEONUFNNVUYDNQ-UHFFFAOYSA-N vanadium atom Chemical compound [V] LEONUFNNVUYDNQ-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/24—Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
- E21B43/2406—Steam assisted gravity drainage [SAGD]
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/08—Screens or liners
- E21B43/088—Wire screens
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B2200/00—Special features related to earth drilling for obtaining oil, gas or water
- E21B2200/02—Down-hole chokes or valves for variably regulating fluid flow
Definitions
- the present techniques relate to harvesting resources using gravity drainage processes. Specifically, techniques are disclosed for harvesting resource from poor quality reservoir intervals.
- Hydrocarbons are generally found in subsurface rock formations that can be termed “reservoirs.” Removing hydrocarbons from the reservoirs depends on numerous physical properties of the rock formations, such as the permeability of the rock containing the hydrocarbons, the ability of the hydrocarbons to flow through the rock formations, and the proportion of hydrocarbons present, among others.
- hydrocarbons harvested from these reservoirs may have relatively high viscosities, for example, ranging from 8 API, or lower, up to 20 API, or higher. Accordingly, the hydrocarbons may include heavy oils, bitumen, or other carbonaceous materials, collectively referred to herein as “heavy oil,” which are difficult to recover using standard techniques.
- strip or surface mining may be performed to access the oil sands, which can then be treated with hot water or steam to extract the oil.
- strip or surface mining may be performed to access the oil sands, which can then be treated with hot water or steam to extract the oil.
- deeper formations may not be accessible using a strip mining approach.
- a well can be drilled to the reservoir and steam, hot air, solvents, or combinations thereof, can be injected to release the hydrocarbons. The released hydrocarbons may then be collected by the injection well or by other wells and brought to the surface.
- Thermal recovery operations are used around the world to recover liquid hydrocarbons from both sandstone and carbonate reservoirs. These operations include a suite of steam based in situ thermal recovery techniques, such as cyclic steam stimulation (CSS), steam flooding and steam assisted gravity drainage (SAGD).
- CCS cyclic steam stimulation
- SAGD steam assisted gravity drainage
- CSS techniques includes a number of enhanced recovery methods for harvesting heavy oil from formations that use steam heat to lower the viscosity of the heavy oil.
- These steam assisted hydrocarbon recovery methods are described in U.S. Pat. No. 3,292,702 to Boberg, and U.S. Pat. No. 3,739,852 to Woods, et al., among others.
- CSS and other steam flood techniques have been utilized worldwide, beginning in about 1956 with the utilization of CSS in the Mene Grande field in Venezuela and steam flood in the early 1960s in the Kern River field in California.
- the CSS process may raise the steam injection pressure above the formation fracturing pressure to create fractures within the formation and enhance the surface area access of the steam to the heavy oil, although CSS may also be practiced at pressures that do not fracture the formation.
- the steam raises the temperature of the heavy oil during a heat soak phase, lowering the viscosity of the heavy oil.
- the injection well may then be used to produce heavy oil from the formation.
- the cycle is often repeated until the cost of injecting steam becomes uneconomical, for instance if the cost is higher than the money made from producing the heavy oil.
- successive steam injection cycles reenter earlier created fractures and, thus, the process becomes less efficient over time. CSS is generally practiced in vertical wells, but systems are operational in horizontal wells.
- Solvents may be used in combination with steam in CSS processes, such as in mixtures with the steam or in alternate injections between steam injections. These techniques are described in U.S. Pat. No. 4,280,559 to Best, U.S. Pat. No. 4,519,454 to McMillen, and U.S. Pat. No. 4,697,642 to Vogel, among others.
- SAGD steam assisted gravity drainage
- two horizontal wells are completed into the reservoir.
- the two wells are first drilled vertically to different depths within the reservoir. Thereafter, using directional drilling technology, the two wells are extended in the horizontal direction that result in two horizontal wells, vertically spaced from, but otherwise vertically aligned with the other.
- the production well is located above the base of the reservoir but as close as practical to the bottom of the reservoir, and the injection well is located vertically 10 to 30 feet (3 to 10 meters) above the horizontal well used for production.
- the upper horizontal well is utilized as an injection well and is supplied with steam from the surface.
- the steam rises from the injection well, permeating the reservoir to form a vapor chamber that grows over time towards the top of the reservoir, thereby increasing the temperature within the reservoir.
- the steam, and its condensate raise the temperature of the reservoir and consequently reduce the viscosity of the heavy oil in the reservoir.
- the heavy oil and condensed steam will then drain downward through the reservoir under the action of gravity and may flow into the lower production well, whereby these liquids can be pumped to the surface.
- the condensed steam and heavy oil are separated, and the heavy oil may be diluted with appropriate light hydrocarbons for transport by pipeline.
- Solvents may be used alone or in combination with steam addition to increase the efficiency of the steam in removing the heavy oils. As the solvents blend with the heavy oils and bitumens, they lower the viscosity, allowing the materials to flow towards a production well. The mobility of the heavy oil obtained with the steam and solvent combination is greater than that obtained using steam alone under substantially similar formation conditions.
- An embodiment described herein provides a method for improving recovery from a hydrocarbon reservoir.
- the method includes identifying an interval within the reservoir that comprises a reduced reservoir quality, wherein the interval comprises hydrocarbons.
- a production chamber is formed in a reservoir interval below the interval of reduced reservoir quality, wherein the production chamber is in contact with the interval of reduced reservoir quality.
- Hydrocarbons are mobilized in the interval of reduced reservoir quality by contact with a mobilizing agent.
- a pressure is changed within the interval of reduced reservoir quality to allow hydrocarbon flow from the interval of reduced reservoir quality.
- Another embodiment provides a system for increasing hydrocarbon production from an interval of low quality reservoir.
- the system includes an injection well configured to inject an injectant into a reservoir and a production well configured to produce fluids from the reservoir, wherein the fluids comprise a hydrocarbon.
- a pressure system is configured to change a pressure within a production chamber to increase a flow of hydrocarbon from an interval of low quality reservoir in contact with the production chamber.
- the system includes a gravity drainage system configured to drain a first portion of resources from a high quality interval of a reservoir.
- the system also includes a pressure control system configured to change a pressure on a production chamber to drain a second portion of resources from a low quality interval of a reservoir.
- FIG. 1 is a drawing of a steam assisted gravity drainage (SAGD) process used for harvesting hydrocarbons in a reservoir;
- SAGD steam assisted gravity drainage
- FIG. 2 is a drawing of a steam assisted gravity drainage (SAGD) process, showing a interval of reduced reservoir quality above a interval of high quality reservoir layer;
- SAGD steam assisted gravity drainage
- FIG. 3 is the cross-section of FIG. 2 , showing the interception of the steam chamber with the interval of reduced reservoir quality
- FIG. 4 is the cross-section of FIG. 2 , showing drainage from the interval of reduced quality reservoir as the reservoir pressure is lowered;
- FIG. 5 is the cross-section of FIG. 2 , showing steam infiltration into the interval of reduced quality reservoir as the reservoir pressure is increased;
- FIG. 6 is the cross-section of FIG. 2 , showing a lateral section drilled through the interval of reduced reservoir quality
- FIG. 7 is a schematic of four SAGD well pairs showing pressure patterns to keep total steam injection constant.
- FIG. 8 is a method of harvesting hydrocarbons from an interval of reduced reservoir quality.
- the term “base” indicates a lower boundary of the resources in a reservoir that are practically recoverable, by a gravity-assisted drainage technique, for example, using an injected mobilizing fluid, such as steam, solvents, hot water, gas, and the like.
- the base may be considered a lower boundary of the payzone.
- the lower boundary may be an impermeable rock layer, including, for example, granite, limestone, sandstone, shale, and the like.
- the lower boundary may also include layers that, while not completely impermeable, impede the formation of fluid communication between a well on one side and a well on the other side. Such layers, which may include inclined heterolithic strata (IHS) of broken shale, mud, silt, and the like.
- IHS inclined heterolithic strata
- Bitumen is a naturally occurring heavy oil material. Generally, it is the hydrocarbon component found in oil sands. Bitumen can vary in composition depending upon the degree of loss of more volatile components. It can vary from a very viscous, tar-like, semi-solid material to solid forms. The hydrocarbon types found in bitumen can include aliphatics, aromatics, resins, and asphaltenes. A typical bitumen might be composed of:
- bitumen can contain some water and nitrogen compounds ranging from less than 0.4 wt. % to in excess of 0.7 wt. %.
- the metals content while small, must be removed to avoid contamination of the product synthetic crude oil (SCO).
- Nickel can vary from less than 75 ppm (part per million) to more than 200 ppm.
- Vanadium can range from less than 200 ppm to more than 500 ppm.
- the percentage of the hydrocarbon types found in bitumen can vary.
- the term “heavy oil” includes bitumen, as well as lighter materials that may be found in a sand or carbonate reservoir.
- a pressure “cycle” represents a sequential increase to peak operating pressure in a reservoir, followed by a release of the pressure to a minimum operating pressure. The elapsed time between two periods of peak operating pressure does not have to be the same between cycles, nor do the peak operating pressures and minimum operating pressures.
- a fluid includes a gas or a liquid and may include, for example, a produced hydrocarbon, an injected mobilizing fluid, or water, among other materials.
- a “cyclic recovery process” uses an intermittent injection of injected mobilizing fluid selected to lower the viscosity of heavy oil in a hydrocarbon reservoir.
- the injected mobilizing fluid may include steam, solvents, gas, water, or any combinations thereof. After a soak period, intended to allow the injected material to interact with the heavy oil in the reservoir, the material in the reservoir, including the mobilized heavy oil and some portion of the mobilizing agent may be harvested from the reservoir.
- Cyclic recovery processes use multiple recovery mechanisms, in addition to gravity drainage, early in the life of the process. The significance of these additional recovery mechanisms, for example dilation and compaction, solution gas drive, water flashing, and the like, declines as the recovery process matures.
- gravity drainage is the dominant recovery mechanism in all mature thermal, thermal-solvent and solvent based recovery processes used to develop heavy oil and bitumen deposits, such as steam assisted gravity drainage (SAGD).
- SAGD steam assisted gravity drainage
- “Facility” as used in this description is a tangible piece of physical equipment through which hydrocarbon fluids are either produced from a reservoir or injected into a reservoir, or equipment which can be used to control production or completion operations.
- the term facility is applied to any equipment that may be present along the flow path between a reservoir and its delivery outlets.
- Facilities may comprise production wells, injection wells, well tubulars, wellhead equipment, gathering lines, manifolds, pumps, compressors, separators, surface flow lines, steam generation plants, processing plants, and delivery outlets.
- the term “surface facility” is used to distinguish those facilities other than wells.
- Heavy oil includes oils which are classified by the American Petroleum Institute (API), as heavy oils, extra heavy oils, or bitumens.
- a heavy oil has an API gravity between 22.3° (density of 920 kg/m 3 or 0.920 g/cm 3 ) and 10.0° (density of 1,000 kg/m 3 or 1 g/cm 3 ).
- An extra heavy oil in general, has an API gravity of less than 10.0° (density greater than 1,000 kg/m 3 or greater than 1 g/cm 3 ).
- a source of heavy oil includes oil sand or bituminous sand, which is a combination of clay, sand, water, and bitumen.
- the thermal recovery of heavy oils is based on the viscosity decrease of fluids with increasing temperature or solvent concentration. Once the viscosity is reduced, the mobilization of fluids by steam, hot water flooding, or gravity is possible. The reduced viscosity makes the drainage quicker and therefore directly contributes to the recovery rate.
- hydrocarbon is an organic compound that primarily includes the elements hydrogen and carbon, although nitrogen, sulfur, oxygen, metals, or any number of other elements may be present in small amounts.
- hydrocarbons generally refer to components found in heavy oil or in oil sands. However, the techniques described herein are not limited to heavy oils, but may also be used with any number of other reservoirs to improve gravity drainage of liquids.
- IHS Inclined heterolithic strata
- the layers of rock in IHS are often shale layers formed from clay or other sediments layered over or under sand beds.
- the hydrocarbons may be trapped between the layers of rock.
- IHS layers may be poorly drained, it may be problematic to produce hydrocarbons by gravity drainage from an IHS layer over a sand layer.
- poorer quality facies are intervals in a reservoir that can have poor drainage, often due to a difficulty in establishing a counter-current flow.
- poorer quality facies may include IHS layers above the higher quality sands of a clean pay interval.
- Permeability is the capacity of a rock to transmit fluids through the interconnected pore spaces of the rock.
- the customary unit of measurement for permeability is the millidarcy.
- Pressure is the force exerted per unit area by the gas on the walls of the volume. Pressure can be shown as pounds per square inch (psi). “Atmospheric pressure” refers to the local pressure of the air. “Absolute pressure” (psia) refers to the sum of the atmospheric pressure (14.7 psia at standard conditions) plus the gauge pressure (psig). “Gauge pressure” (psig) refers to the pressure measured by a gauge, which indicates only the pressure exceeding the local atmospheric pressure (i.e., a gauge pressure of 0 psig corresponds to an absolute pressure of 14.7 psia). The term “vapor pressure” has the usual thermodynamic meaning. For a pure component in an enclosed system at a given pressure, the component vapor pressure is essentially equal to the total pressure in the system.
- a “reservoir” is a subsurface rock or sand formation from which a production fluid, or resource, can be harvested.
- the rock formation may include sand, granite, silica, carbonates, clays, and organic matter, such as bitumen, heavy oil, oil, gas, or coal, among others.
- Reservoirs can vary in thickness from less than one foot (0.3048 m) to hundreds of feet (hundreds of m).
- the resource is generally a hydrocarbon, such as a heavy oil impregnated into a sand bed.
- SAGD Steam Assisted Gravity Drainage
- SAGD is a thermal recovery process in which steam, or combinations of steam and solvents, is injected into a first well to lower a viscosity of a heavy oil, and fluids are recovered from a second well. Both wells are generally horizontal in the formation and the first well lies above the second well. Accordingly, the reduced viscosity heavy oil flows down to the second well under the force of gravity, although pressure differential may provide some driving force in various applications.
- SAGD is used as an exemplary process herein, it can be understood that the techniques described can include any gravity driven process, such as those based on steam, solvents, or any combinations thereof.
- thermal recovery processes include any type of hydrocarbon recovery process that uses a heat source to enhance the recovery, for example, by lowering the viscosity of a hydrocarbon. These processes may use injected mobilizing fluids, such as hot water, wet steam, dry steam, or solvents alone, or in any combinations, to lower the viscosity of the hydrocarbon. Such processes may include subsurface processes, such as cyclic steam stimulation (CSS), cyclic solvent stimulation, steam flooding, solvent injection, and SAGD, among others, and processes that use surface processing for the recovery, such as sub-surface mining and surface mining. Any of the processes referred to herein, such as SAGD, may be used in concert with solvents.
- CCS cyclic steam stimulation
- SAGD cyclic solvent stimulation
- a “wellbore” is a hole in the subsurface made by drilling or inserting a conduit into the subsurface.
- a wellbore may have a substantially circular cross section or any other cross-sectional shape, such as an oval, a square, a rectangle, a triangle, or other regular or irregular shapes.
- the term “well,” when referring to an opening in the formation may be used interchangeably with the term “wellbore.”
- multiple pipes may be inserted into a single wellbore, for example, as a liner configured to allow flow from an outer chamber to an inner chamber.
- the injection rate of the injectant can be regulated to maintain an operating pressure determined by an operator.
- the operating pressure will be less than the fracture pressure of the formation, but more than the minimum operation pressure of the installed production lift system.
- the production chamber pressure is kept substantially constant over the duration of the life of the well pattern.
- steam chambers have been operated at higher pressures initially and then allowed to slowly decline over time, for example, as the chambers expand in size. The criteria for when to decrease the steam chamber pressure is typically dictated by when the total steam demand in the field to maintain a constant operating pressure exceeds the installed capacity for supplying the steam to the field.
- the drainage of the mobilized oil is accelerated by varying the pressure in the thin sand lenses present between the shale lamina. This may be performed by cycling the chamber pressures, such as by varying an injection rate or a production rate over time during the gravity drainage process.
- dropping the chamber pressure will also drop the pressure in the partially heated region surrounding the chamber.
- some of the heated water present in a pore space in the thin sand lenses between the shale lamina, as well as within the shale lamina can flash to steam.
- partial pressure changes will cause some of the dissolved gas present in the heated oil to be liberated. These expanding vapors will displace some of the heated oil from the thin sand lenses located between the shale lamina into the chamber.
- the chamber pressures When an injection rate is increased or a production rate is decreased, the chamber pressures will increase.
- the increasing pressure can cause the vapor saturation in the conductively heated region to collapse as gases condense or are reabsorbed, enabling the steam to penetrate faster and deeper into the conductively heated region than would occur without a pressure reduction phase.
- the cycling of the chamber pressure can accelerate the heat penetration and recovery from both good and poor quality facies within the reservoir.
- dropping the chamber pressure will also drop the pressure in the partially mobilized oil region surrounding the chamber.
- some of the dissolved solvent present in the thin sand lenses located between the shale lamina will flash to vapor. Due to partial pressure effects, some of the solution gas present will also be liberated.
- the expanding vapors will displace some of the mobilized oil into the chamber and increase the available surface area between the oil and vapor phases.
- the chamber pressures will increase and the vapor saturation surrounding the chamber will collapse. The collapse will create accommodation space, allowing the injectant to penetrate deeper into the partially mobilized oil region.
- a pressure in the poorer quality facies can be changed by drilling a lateral well through the poorer quality facies, such as in an IHS.
- the lateral well enables steam flow into the lamina of the IHS, relieving the pressure and enabling uni-directional flow, versus counter current flow.
- the lateral well may include a horizontal section that is drilled through the IHS and is aligned with dominant dip direction of an IHS bed.
- This well path can be an initial sidetrack drilled when the gravity drainage well pair is drilled.
- the side track can either be left open or completed with a liner, that includes slotted sections or sections of wire-wrap screen, that is plugged at both ends.
- the well path can also be the result of a separate well that is tied to surface via a cased wellbore. This well path is referred to, herein, as an IHS well.
- a portion of the horizontal section of the IHS well can be placed in a clean interval of the reservoir that is expected to be part of the main steam chamber.
- the oil within the IHS facies that is adjacent to the well path is heated, it may be able to drain along the IHS beds into the underlying steam chamber.
- the drainage results as vapor, such as steam or solvent, cross-flows along the lateral or IHS well and occupies the space being vacated by the draining oil.
- the IHS well's ability to create a sustainable unidirectional flow path allows steam or solvent to replace any bitumen and condensed steam or solvent that drains from the IHS, allowing additional mobilization and drainage to occur. If the IHS well is drilled from the surface, as the chamber matures the IHS well can be used to inject non-condensable gas (NCG) into the IHS facies, further reducing overburden heat loses.
- NCG non-condensable gas
- the shale laminate present in the IHS can stabilize the location and integrity of the gas blanket.
- SAGD is used as the recovery process.
- Those ordinarily skilled in the art will recognize that the approaches disclosed here are equally applicable to all thermal, thermal-solvent and solvent based recovery processes in which gravity drainage is the dominant recovery mechanism.
- FIG. 1 is a drawing of a steam assisted gravity drainage (SAGD) process 100 used for accessing hydrocarbon resources in a reservoir 102 .
- SAGD steam assisted gravity drainage
- steam 104 can be injected through injection wells 106 to the reservoir 102 .
- the injection wells 106 may be horizontally drilled through the reservoir 102 .
- Production wells 108 may be drilled horizontally through the reservoir 102 , with a production well 108 underlying each injection well 106 .
- the injection wells 106 and production wells 108 will be drilled from the same pad 110 at the surface 112 . This may make it easier for the production well 108 to track the injection well 106 .
- the wells 106 and 108 may be drilled from different pads 110 .
- the injection of steam 104 into the injection wells 106 may result in the mobilization of hydrocarbons 114 , which may drain to the production wells 108 and be removed to the surface 112 in a mixed stream 116 that can contain hydrocarbons, condensate and other materials, such as water, gases, and the like.
- Sand filters may be used in the production wells 108 to decrease sand entrainment.
- the mixed stream 116 from a number of production wells 108 may be combined and sent to a processing facility 118 .
- the water and hydrocarbons 120 can be separated, and the hydrocarbons 120 sent on for further refining. Water from the separation may be recycled to a steam generation unit within the facility 118 , with or without further treatment, and used to generate the steam 104 used for the SAGD process 100 .
- the production wells 108 may have a segment that is relatively flat, and in some development, have a slight upward slope from the heel 122 , at which the pipe branches to the surface, to the toe 124 , at which the pipe ends. When present, an upward slope of this horizontal segment may result in the toe 124 being around one to five meters higher than the heel 122 , depending on the length of the horizontal segment. When present, the slight slope assists in draining fluids that enter the horizontal segment to the heel 122 for removal.
- An interval 126 of the reservoir 102 may include poorer quality facies, such as an IHS layer, which drains poorly.
- the poorer quality facies are not limited to intervals 126 at the top of a reservoir 120 , but may be in lenses 128 or other places in the reservoir 102 . As described herein, cycling the pressure of the reservoir 102 may increase the drainage from the interval 126 and lenses 128 , allowing increases in production of hydrocarbons from these locations.
- FIG. 2 is a cross section 200 of a steam assisted gravity drainage (SAGD) process, showing a interval 202 of reduced reservoir quality overlaying an interval 204 of high quality reservoir 204 .
- the interval 202 of reduced reservoir quality may be an IHS facies that contains alternating dipping beds of sand 206 and shale 208 .
- the horizontal sections of an injection wellbore 210 and production wellbore 212 are also shown.
- FIG. 3 is a drawing 300 of the cross-section of FIG. 2 after a production chamber 302 has contacted the base 304 of the interval 202 of reduced reservoir quality.
- the production chamber 302 is a free flowing area of mobilized hydrocarbon that can be formed from steam injection, termed a steam chamber, or through the injection of solvents or both steam and solvents.
- a steam chamber or through the injection of solvents or both steam and solvents.
- the materials in a region 306 of the interval 202 will be affected by the injectant.
- the materials in the affected region 306 can be conductively heated by steam in the production chamber.
- solvent vapor may begin to diffuse into the materials in the affected region 306 .
- FIG. 4 is a drawing 400 of the cross-section of FIG. 2 , showing drainage of oil 402 from the affected region 306 .
- hot water or solvent in the affected region 306 can flash to vapor, helping to displace some of the oil 402 contained in the affected region 306 into the production chamber 302 .
- gases dissolved in the oil can exsolve, further displacing oil 402 from the affected region 306 .
- FIG. 5 is a drawing 500 of the cross-section of FIG. 2 , showing injectant 502 infiltrating into the affected region 306 of the interval 202 of reduced quality reservoir.
- vapor in the affected region 306 can collapse, for example, steam can condense to water and gases can be compressed or redissolved into the oil. This creates voids that allow injectant 502 to penetrate the affected region 306 .
- the affected region 306 can increase in size, increasing the penetration and the amount of oil recovered from the interval 202 of reduced quality reservoir. While the technique described above permit harvesting hydrocarbons from intervals 202 of reduced quality reservoir using standard SAGD equipment arrangements, some techniques for changing the pressure in intervals may permit faster harvesting.
- the well pair trajectories can be aligned with the general direction of the IHS bed dip when using a thermal or a thermal-solvent recovery process.
- the IHS bed dip is the direction along which the lamina are oriented.
- the injection well 210 and production well 212 can be drilled along the direction of the bed dip of the interval 202 of reduced quality reservoir. For a thermal process, this orientation allows the conductively heated oil displaced along the IHS beds to drain down into the chamber at a different point along the same well pair's trajectory.
- interval 202 of poorer quality reservoir is thick
- an environment that enables uni-directional flow, versus counter current, may be created.
- a lateral section can be drilled through the interval 202 at an angle to the bed dip, as discussed with respect to FIG. 6 .
- FIG. 6 is a drawing 600 of the cross-section of FIG. 2 , showing a lateral well 602 located in the interval 202 of reduced reservoir quality.
- the lateral well 602 is drilled through the interval 202 at an obtuse, or shallow, angle 604 to the bed dip angle 606 . This allows the horizontal segment of the lateral well to intercept a large number of individual thin sand lenses present between the shale lamina.
- the lateral is drilled at a shallow angle relative to horizontal. This will help prevent fluids from accumulating in the lateral well, which may reduce its effectiveness.
- the lateral well 602 can be left as an open hole or can be completed, for example, with a slotted liner, wirewrap, or mesh screen.
- the lateral well 602 can be drilled as a side track lateral during the drilling of the well pair 210 and 212 or as a separate well drilled from the surface.
- a portion 610 of the lateral well 602 can be placed in the high quality reservoir 204 , for example, within the production chamber 302 .
- the presence of the lateral well 602 through the interval 202 will act as a very high permeability conduit to allow vapor 608 to enter the IHS. This flow path for the vapor 608 will progressively increase the recovery of the oil from these poorer quality reservoir facies.
- FIG. 7 is a drawing 700 of four representative SAGD well pairs in various phases of the pressure cycling of production chambers.
- the pressure in a first production chamber 702 is declining, allowing water (or solvent) to flash and solution gas to exsolve, displacing oil 402 from the interval 202 of reduced reservoir quality into the first production chamber 702 .
- the second production chamber 704 and fourth production chamber 706 are operating at a constant pressure, enabling the injectant to affect the material in the interval 202 of reduced reservoir quality, for example, allowing conductive heating of the interval 202 from the chambers 704 and 706 .
- the pressure in the third production chamber 708 is increasing, allowing steam, solvent vapor, or exsolved gas to compress, thereby allowing the injectant 502 to invade the interval 202 of reduced reservoir quality.
- the pressure cycling process can be staggered between the well patterns, prior to coalesce of the production chambers 702 , 704 , 706 , and 708 .
- This allows an injectant 502 , such as steam, solvent, or mixtures thereof, to be used in individual production chambers, such as production chamber 708 , during a pressure increase phase.
- the sequential approach can lower, or entirely mitigate, swings in demand for the injectant 502 .
- the coalesced production chambers can be treated as single entities. Accordingly, the pressure cycling practice can be maintained, but with the cycle times progressively becoming longer as the chambers increase in size. The pressure cycling can be continued after all of the production chambers have coalesced, and a decision has been made to allow overall pressures in the production chambers to slowly fall with time. However, in this circumstance, the overall demand for injectant being supplied from the central facility will swing.
- production from the production wells 710 can be controlled to lower production of the injectant 502 in a vapor phase.
- the maximum pressure can be kept below the reservoir fracture pressure to prevent fracturing of the surrounding rock.
- the minimum pressure can be kept at or above the lowest pressure required for the installed production system to efficiently lift the fluids to surface.
- the lowest pressure may be lower than the initial reservoir pressure in order to capture the benefits of the expansion of solution gas exsolving from the oil.
- the pressure differences do not have to be large.
- the minimum pressure may be only 10% less than the maximum pressure.
- the pressure differential may be 50%, 90%, or even greater. A larger pressure differential may be more effective at harvesting the hydrocarbons from the interval 202 of reduced reservoir quality, but may place greater stress on a central facility.
- FIG. 8 is a method 800 of improving the hydrocarbon yield from an interval of reduced reservoir quality.
- the method 800 begins at block 802 with a mapping of the locations of resources in a reservoir and a plan for harvesting those resources.
- the mapping can include locating high quality, such as sand beds, and poorer quality reservoir regions, such as IHS facies.
- the mapping will be performed in the initial planning stages of the recovery scheme.
- a geologic model can be created for the development area. This geologic model is usually constructed using a geologic modeling software program. Available open hole and cased hole log, core, 2D and 3D seismic data, and knowledge of the depositional environment setting can all be used in the construction the geologic model.
- the geologic model and knowledge of surface access constraints can then be used to complete the layout of the recovery process wells, e.g., the injection and production wells and the surface pads.
- a series of performance predictions can be made using a reservoir simulation program, such as Computer Modeling Group's STARs program, in order to identify a useful combination of absolute pressure changes, pressure cycle frequency, or side track lateral trajectories.
- the simulations can also help identify how the combinations should change over time as the recovery process matures.
- the optimization process needs to consider both the needs of individual well pairs and the overall pattern needs. For example, changes in geology and well design may result in different approaches for different wells within the development. It may also be possible to use simple empirical or analog based models for performance prediction. Further, in many developments, one or more follow-up recovery processes, such as the drilling of in-fill wells, can be used to further enhance the recovery of the hydrocarbons. The options to extend recovery can be considered during the pressure cycling planning phase, in addition to any operating pressure and production rate limitations associated with the installed lift system to be used in the production wells.
- the pressure cycling described herein can be included as part of the start-up procedures, such as steam circulation and continuous solvent injection. To achieve a beneficial impact on one or both well pair wells it is necessary for the pressure decline to be sufficient to allow some of the injectant to vaporize and, thus, displace oil from the reservoir into the well and produced. Again, a series of performance predictions can be made using a reservoir simulation program, such as Computer Modeling Group's STARs program in order to identify the optimal combination of absolute pressure change, pressure cycle frequency and how these should evolve over time as the start-up process matures.
- a reservoir simulation program such as Computer Modeling Group's STARs program
- the SAGD well pairs used to harvest the hydrocarbon from the reservoir can be drilled.
- the well pairs may follow the direction of the dip to maximize the yield of hydrocarbons.
- one or more lateral wells may be drilled into the interval of lower quality reservoir to relieve pressure and establish unidirectional flow.
- data collected during their drilling as well as data collected during the operation of the recovery process such as cased hole logs including temperature logs, observation wells, additional time lapse seismic or other remote surveying data, can be used to update the geologic model and to map the evolution of the depletion patterns as the recovery process matures.
- the depletion patterns within the reservoir will be influenced by well placement decisions, geological heterogeneity, well failures, and day to day operating decisions.
- a production chamber can be formed that is in contact with the interval of low quality reservoir, such as an IHS facies above a sand bed.
- the pressure in the production chamber and interval of low quality reservoir can be changed to enhance production of hydrocarbons. In an embodiment, this is performed by cycling the pressure in the production chamber. In another embodiment, the pressure is changed by a lateral well that releases pressure in an interval of low quality reservoir, such an IHS facies. Following the operation of the thermal, thermal-solvent, or solvent based recovery process for a suitable period of time, intervals of high hydrocarbon depletion will create a series of discrete connections between adjacent wells or well pairs, depending on the recovery process. Knowledge of these connections is gained through observances of interwell or interpattern communication of fluids, convergence of operating pressures, as well as via ongoing reservoir depletion monitoring with tools such as time lapse 3D seismic. The connections may be used to determine the cycle time and total pressure range of the cycles used for the recovery during each stage of the development.
- Production rates may be controlled to help minimize the co-production of the injectant used to mobilize the hydrocarbon.
- the injectant is steam, a steam-gas mixture, a steam-solvent mixture, solvent or gas
- such procedures for controlling the amount of injectant co-production can include monitoring the bottom hole temperature or pressure, as well as the production rates of injectant observed at surface.
- the injectant amount and type may also be modified to keep the measurements within control ranges.
- the control measures can be modified to reflect changes in the injectant type and composition that may occur over the life of the project.
- the liner could be completed with inflow control devices to restrict the production of injectant vapour.
- An embodiment provides a method for improving recovery from a hydrocarbon reservoir.
- the method includes identifying an interval within the reservoir that comprises a reduced reservoir quality, wherein the interval comprises hydrocarbons.
- a production chamber is formed in a reservoir interval below the interval of reduced reservoir quality, wherein the production chamber is in contact with the interval of reduced reservoir quality.
- Hydrocarbons are mobilized in the interval of reduced reservoir quality by contact with a mobilizing agent.
- a pressure is changed within the interval of reduced reservoir quality to allow hydrocarbon flow from the interval of reduced reservoir quality.
- the method may include cycling a steam pressure within the production chamber.
- a solvent pressure can be cycled with the production chamber.
- the pressure can be cycled over a period of at least one month.
- Different areas of a reservoir can be cycled using offset pressure phases to keep the total injection rate of the mobilizing fluid substantially constant over time.
- the method includes drilling a lateral segment through the interval of reduced reservoir quality, wherein the lateral segment is configured to allow mobilizing agent flow into the interval of reduced reservoir quality.
- the lateral section can be drilled through the intervals of reduced reservoir quality at an angle to a bed dip.
- the lateral section may be drilled as a side track drilled from one of the gravity drainage wellbores.
- the lateral section may be left open to the production chamber.
- the portion of the lateral segment that is within the interval of reduced reservoir quality can be completed with a slotted liner, a wirewrap screen, or a mesh rite screen.
- the lateral segment can be drilled from the surface.
- Another embodiment provides a system for increasing hydrocarbon production from an interval of low quality reservoir.
- the system includes an injection well configured to inject an injectant into a reservoir and a production well configured to produce fluids from the reservoir, wherein the fluids comprise a hydrocarbon.
- a pressure system is configured to change a pressure within a production chamber to increase a flow of hydrocarbon from an interval of low quality reservoir in contact with the production chamber.
- a maximum operating pressure for the production chamber can be less than a reservoir failure pressure.
- a minimum operating pressure for the production chamber can be at least 10% lower than a maximum operating pressure.
- the pressure system can include an injection system configured to lower the pressure by slowing an injection rate.
- The can include a production system configured to lower the pressure by increasing fluid withdrawal.
- the system can include a number of injection and production well pairs, wherein the pressure of a production chamber associated with a single one of the plurality of injection and production well pairs is cycled.
- the system can be configured to independently cycle the pressure in two or more production chambers, wherein each production chamber is associated with one of the plurality of injection and production well pairs.
- the injection well and production well can be drilled parallel to the direction of a bed dip in the lower quality resource.
- the system includes a gravity drainage system configured to drain a first portion of resources from a high quality interval of a reservoir.
- the system also includes a pressure control system configured to change a pressure on a production chamber to drain a second portion of resources from a low quality interval of a reservoir.
Landscapes
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Chemical & Material Sciences (AREA)
- Dispersion Chemistry (AREA)
- Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)
- Railway Tracks (AREA)
Abstract
A method and systems for improving recovery from a hydrocarbon reservoir are described. A method includes identifying an interval within the reservoir that comprises a reduced reservoir quality, wherein the interval includes hydrocarbons. A production chamber is formed in a reservoir interval below the interval of reduced reservoir quality, wherein the production chamber is in contact with the interval of reduced reservoir quality. Hydrocarbons are mobilized in the interval of reduced reservoir quality by contact with a mobilizing agent and a pressure is changed within the interval of reduced reservoir quality to allow hydrocarbon flow from the interval of reduced reservoir quality.
Description
- This application claims the priority benefit of Canadian Patent Application 2,762,448 filed Dec. 16, 2011 entitled IMPROVING RECOVERY FROM A HYDROCARBON RESERVOIR, the entirety of which is incorporated by reference herein.
- The present techniques relate to harvesting resources using gravity drainage processes. Specifically, techniques are disclosed for harvesting resource from poor quality reservoir intervals.
- This section is intended to introduce various aspects of the art, which may be associated with exemplary embodiments of the present techniques. This discussion is believed to assist in providing a framework to facilitate a better understanding of particular aspects of the present techniques. Accordingly, it should be understood that this section should be read in this light, and not necessarily as admissions of prior art.
- Modern society is greatly dependant on the use of hydrocarbons for fuels and chemical feedstocks. Hydrocarbons are generally found in subsurface rock formations that can be termed “reservoirs.” Removing hydrocarbons from the reservoirs depends on numerous physical properties of the rock formations, such as the permeability of the rock containing the hydrocarbons, the ability of the hydrocarbons to flow through the rock formations, and the proportion of hydrocarbons present, among others.
- Easily harvested sources of hydrocarbon are dwindling, leaving less accessible sources to satisfy future energy needs. However, as the costs of hydrocarbons increase, these less accessible sources become more economically attractive. For example, the harvesting of oil sands to remove hydrocarbons has become more extensive as it has become more economical. The hydrocarbons harvested from these reservoirs may have relatively high viscosities, for example, ranging from 8 API, or lower, up to 20 API, or higher. Accordingly, the hydrocarbons may include heavy oils, bitumen, or other carbonaceous materials, collectively referred to herein as “heavy oil,” which are difficult to recover using standard techniques.
- Several methods have been developed to remove hydrocarbons from oil sands. For example, strip or surface mining may be performed to access the oil sands, which can then be treated with hot water or steam to extract the oil. However, deeper formations may not be accessible using a strip mining approach. For these formations, a well can be drilled to the reservoir and steam, hot air, solvents, or combinations thereof, can be injected to release the hydrocarbons. The released hydrocarbons may then be collected by the injection well or by other wells and brought to the surface.
- A number of techniques have been developed for harvesting heavy oil from subsurface formations using thermal recovery techniques. Thermal recovery operations are used around the world to recover liquid hydrocarbons from both sandstone and carbonate reservoirs. These operations include a suite of steam based in situ thermal recovery techniques, such as cyclic steam stimulation (CSS), steam flooding and steam assisted gravity drainage (SAGD).
- For example, CSS techniques includes a number of enhanced recovery methods for harvesting heavy oil from formations that use steam heat to lower the viscosity of the heavy oil. These steam assisted hydrocarbon recovery methods are described in U.S. Pat. No. 3,292,702 to Boberg, and U.S. Pat. No. 3,739,852 to Woods, et al., among others. CSS and other steam flood techniques have been utilized worldwide, beginning in about 1956 with the utilization of CSS in the Mene Grande field in Venezuela and steam flood in the early 1960s in the Kern River field in California.
- The CSS process may raise the steam injection pressure above the formation fracturing pressure to create fractures within the formation and enhance the surface area access of the steam to the heavy oil, although CSS may also be practiced at pressures that do not fracture the formation. The steam raises the temperature of the heavy oil during a heat soak phase, lowering the viscosity of the heavy oil. The injection well may then be used to produce heavy oil from the formation. The cycle is often repeated until the cost of injecting steam becomes uneconomical, for instance if the cost is higher than the money made from producing the heavy oil. However, successive steam injection cycles reenter earlier created fractures and, thus, the process becomes less efficient over time. CSS is generally practiced in vertical wells, but systems are operational in horizontal wells.
- Solvents may be used in combination with steam in CSS processes, such as in mixtures with the steam or in alternate injections between steam injections. These techniques are described in U.S. Pat. No. 4,280,559 to Best, U.S. Pat. No. 4,519,454 to McMillen, and U.S. Pat. No. 4,697,642 to Vogel, among others.
- Another group of techniques is based on a continuous injection of steam through a first well to lower the viscosity of heavy oils and a continuous production of the heavy oil from a lower-lying second well. Such techniques may be termed “steam assisted gravity drainage” or SAGD. Various embodiments of the SAGD process are described in Canadian Patent No. 1,304,287 to Butler and its corresponding U.S. Pat. No. 4,344,485.
- In SAGD, two horizontal wells are completed into the reservoir. The two wells are first drilled vertically to different depths within the reservoir. Thereafter, using directional drilling technology, the two wells are extended in the horizontal direction that result in two horizontal wells, vertically spaced from, but otherwise vertically aligned with the other. Ideally, the production well is located above the base of the reservoir but as close as practical to the bottom of the reservoir, and the injection well is located vertically 10 to 30 feet (3 to 10 meters) above the horizontal well used for production.
- The upper horizontal well is utilized as an injection well and is supplied with steam from the surface. The steam rises from the injection well, permeating the reservoir to form a vapor chamber that grows over time towards the top of the reservoir, thereby increasing the temperature within the reservoir. The steam, and its condensate, raise the temperature of the reservoir and consequently reduce the viscosity of the heavy oil in the reservoir. The heavy oil and condensed steam will then drain downward through the reservoir under the action of gravity and may flow into the lower production well, whereby these liquids can be pumped to the surface. At the surface of the well, the condensed steam and heavy oil are separated, and the heavy oil may be diluted with appropriate light hydrocarbons for transport by pipeline.
- Solvents may be used alone or in combination with steam addition to increase the efficiency of the steam in removing the heavy oils. As the solvents blend with the heavy oils and bitumens, they lower the viscosity, allowing the materials to flow towards a production well. The mobility of the heavy oil obtained with the steam and solvent combination is greater than that obtained using steam alone under substantially similar formation conditions.
- The techniques discussed above may leave a substantial remainder of hydrocarbons in the reservoir. For example, poor quality reservoir layers may have slow oil drainage under the force of gravity.
- An embodiment described herein provides a method for improving recovery from a hydrocarbon reservoir. The method includes identifying an interval within the reservoir that comprises a reduced reservoir quality, wherein the interval comprises hydrocarbons. A production chamber is formed in a reservoir interval below the interval of reduced reservoir quality, wherein the production chamber is in contact with the interval of reduced reservoir quality. Hydrocarbons are mobilized in the interval of reduced reservoir quality by contact with a mobilizing agent. A pressure is changed within the interval of reduced reservoir quality to allow hydrocarbon flow from the interval of reduced reservoir quality.
- Another embodiment provides a system for increasing hydrocarbon production from an interval of low quality reservoir. The system includes an injection well configured to inject an injectant into a reservoir and a production well configured to produce fluids from the reservoir, wherein the fluids comprise a hydrocarbon. A pressure system is configured to change a pressure within a production chamber to increase a flow of hydrocarbon from an interval of low quality reservoir in contact with the production chamber.
- Another embodiment provides a system for harvesting resources in a low quality interval of a reservoir. The system includes a gravity drainage system configured to drain a first portion of resources from a high quality interval of a reservoir. The system also includes a pressure control system configured to change a pressure on a production chamber to drain a second portion of resources from a low quality interval of a reservoir.
- The advantages of the present techniques are better understood by referring to the following detailed description and the attached drawings, in which:
-
FIG. 1 is a drawing of a steam assisted gravity drainage (SAGD) process used for harvesting hydrocarbons in a reservoir; -
FIG. 2 is a drawing of a steam assisted gravity drainage (SAGD) process, showing a interval of reduced reservoir quality above a interval of high quality reservoir layer; -
FIG. 3 is the cross-section ofFIG. 2 , showing the interception of the steam chamber with the interval of reduced reservoir quality; -
FIG. 4 is the cross-section ofFIG. 2 , showing drainage from the interval of reduced quality reservoir as the reservoir pressure is lowered; -
FIG. 5 is the cross-section ofFIG. 2 , showing steam infiltration into the interval of reduced quality reservoir as the reservoir pressure is increased; -
FIG. 6 is the cross-section ofFIG. 2 , showing a lateral section drilled through the interval of reduced reservoir quality; -
FIG. 7 is a schematic of four SAGD well pairs showing pressure patterns to keep total steam injection constant; and -
FIG. 8 is a method of harvesting hydrocarbons from an interval of reduced reservoir quality. - In the following detailed description section, specific embodiments of the present techniques are described. However, to the extent that the following description is specific to a particular embodiment or a particular use of the present techniques, this is intended to be for exemplary purposes only and simply provides a description of the exemplary embodiments. Accordingly, the techniques are not limited to the specific embodiments described below, but rather, include all alternatives, modifications, and equivalents falling within the true spirit and scope of the appended claims.
- At the outset, for ease of reference, certain terms used in this application and their meanings as used in this context are set forth. To the extent a term used herein is not defined below, it should be given the broadest definition persons in the pertinent art have given that term as reflected in at least one printed publication or issued patent. Further, the present techniques are not limited by the usage of the terms shown below, as all equivalents, synonyms, new developments, and terms or techniques that serve the same or a similar purpose are considered to be within the scope of the present claims.
- As used herein, the term “base” indicates a lower boundary of the resources in a reservoir that are practically recoverable, by a gravity-assisted drainage technique, for example, using an injected mobilizing fluid, such as steam, solvents, hot water, gas, and the like. The base may be considered a lower boundary of the payzone. The lower boundary may be an impermeable rock layer, including, for example, granite, limestone, sandstone, shale, and the like. The lower boundary may also include layers that, while not completely impermeable, impede the formation of fluid communication between a well on one side and a well on the other side. Such layers, which may include inclined heterolithic strata (IHS) of broken shale, mud, silt, and the like. The resources within the reservoir may extend below the base, but the resources below the base may not be recoverable with gravity assisted techniques.
- “Bitumen” is a naturally occurring heavy oil material. Generally, it is the hydrocarbon component found in oil sands. Bitumen can vary in composition depending upon the degree of loss of more volatile components. It can vary from a very viscous, tar-like, semi-solid material to solid forms. The hydrocarbon types found in bitumen can include aliphatics, aromatics, resins, and asphaltenes. A typical bitumen might be composed of:
- 19 wt. % aliphatics (which can range from 5 wt. %-30 wt. %, or higher);
- 19 wt. % asphaltenes (which can range from 5 wt. %-30 wt. %, or higher);
- 30 wt. % aromatics (which can range from 15 wt. %-50 wt. %, or higher);
- 32 wt. % resins (which can range from 15 wt. %-50 wt. %, or higher); and
- some amount of sulfur (which can range in excess of 7 wt. %).
- In addition bitumen can contain some water and nitrogen compounds ranging from less than 0.4 wt. % to in excess of 0.7 wt. %. The metals content, while small, must be removed to avoid contamination of the product synthetic crude oil (SCO). Nickel can vary from less than 75 ppm (part per million) to more than 200 ppm. Vanadium can range from less than 200 ppm to more than 500 ppm. The percentage of the hydrocarbon types found in bitumen can vary. As used herein, the term “heavy oil” includes bitumen, as well as lighter materials that may be found in a sand or carbonate reservoir.
- As used herein, a pressure “cycle” represents a sequential increase to peak operating pressure in a reservoir, followed by a release of the pressure to a minimum operating pressure. The elapsed time between two periods of peak operating pressure does not have to be the same between cycles, nor do the peak operating pressures and minimum operating pressures.
- As used herein, two locations in a reservoir are in “fluid communication” when a path for fluid flow exists between the locations. For example, fluid communication between a production well and an overlying steam chamber can allow mobilized material to flow down to the production well for collection and production. As used herein, a fluid includes a gas or a liquid and may include, for example, a produced hydrocarbon, an injected mobilizing fluid, or water, among other materials.
- As used herein, a “cyclic recovery process” uses an intermittent injection of injected mobilizing fluid selected to lower the viscosity of heavy oil in a hydrocarbon reservoir. The injected mobilizing fluid may include steam, solvents, gas, water, or any combinations thereof. After a soak period, intended to allow the injected material to interact with the heavy oil in the reservoir, the material in the reservoir, including the mobilized heavy oil and some portion of the mobilizing agent may be harvested from the reservoir. Cyclic recovery processes use multiple recovery mechanisms, in addition to gravity drainage, early in the life of the process. The significance of these additional recovery mechanisms, for example dilation and compaction, solution gas drive, water flashing, and the like, declines as the recovery process matures. Practically speaking, gravity drainage is the dominant recovery mechanism in all mature thermal, thermal-solvent and solvent based recovery processes used to develop heavy oil and bitumen deposits, such as steam assisted gravity drainage (SAGD). For this reason the approaches disclosed here are equally applicable to all recovery processes in which at the current stage of depletion gravity drainage is the dominant recovery mechanism.
- “Facility” as used in this description is a tangible piece of physical equipment through which hydrocarbon fluids are either produced from a reservoir or injected into a reservoir, or equipment which can be used to control production or completion operations. In its broadest sense, the term facility is applied to any equipment that may be present along the flow path between a reservoir and its delivery outlets. Facilities may comprise production wells, injection wells, well tubulars, wellhead equipment, gathering lines, manifolds, pumps, compressors, separators, surface flow lines, steam generation plants, processing plants, and delivery outlets. In some instances, the term “surface facility” is used to distinguish those facilities other than wells.
- “Heavy oil” includes oils which are classified by the American Petroleum Institute (API), as heavy oils, extra heavy oils, or bitumens. In general, a heavy oil has an API gravity between 22.3° (density of 920 kg/m3 or 0.920 g/cm3) and 10.0° (density of 1,000 kg/m3 or 1 g/cm3). An extra heavy oil, in general, has an API gravity of less than 10.0° (density greater than 1,000 kg/m3 or greater than 1 g/cm3). For example, a source of heavy oil includes oil sand or bituminous sand, which is a combination of clay, sand, water, and bitumen. The thermal recovery of heavy oils is based on the viscosity decrease of fluids with increasing temperature or solvent concentration. Once the viscosity is reduced, the mobilization of fluids by steam, hot water flooding, or gravity is possible. The reduced viscosity makes the drainage quicker and therefore directly contributes to the recovery rate.
- A “hydrocarbon” is an organic compound that primarily includes the elements hydrogen and carbon, although nitrogen, sulfur, oxygen, metals, or any number of other elements may be present in small amounts. As used herein, hydrocarbons generally refer to components found in heavy oil or in oil sands. However, the techniques described herein are not limited to heavy oils, but may also be used with any number of other reservoirs to improve gravity drainage of liquids.
- “Inclined heterolithic strata” or IHS are layers of rock containing hydrocarbons that can form above or below sand layers in an oil sands reservoir. The layers of rock in IHS are often shale layers formed from clay or other sediments layered over or under sand beds. The hydrocarbons may be trapped between the layers of rock. As IHS layers may be poorly drained, it may be problematic to produce hydrocarbons by gravity drainage from an IHS layer over a sand layer.
- As used herein, “poorer quality facies” are intervals in a reservoir that can have poor drainage, often due to a difficulty in establishing a counter-current flow. In an oil sands reservoir, poorer quality facies may include IHS layers above the higher quality sands of a clean pay interval.
- “Permeability” is the capacity of a rock to transmit fluids through the interconnected pore spaces of the rock. The customary unit of measurement for permeability is the millidarcy.
- “Pressure” is the force exerted per unit area by the gas on the walls of the volume. Pressure can be shown as pounds per square inch (psi). “Atmospheric pressure” refers to the local pressure of the air. “Absolute pressure” (psia) refers to the sum of the atmospheric pressure (14.7 psia at standard conditions) plus the gauge pressure (psig). “Gauge pressure” (psig) refers to the pressure measured by a gauge, which indicates only the pressure exceeding the local atmospheric pressure (i.e., a gauge pressure of 0 psig corresponds to an absolute pressure of 14.7 psia). The term “vapor pressure” has the usual thermodynamic meaning. For a pure component in an enclosed system at a given pressure, the component vapor pressure is essentially equal to the total pressure in the system.
- As used herein, a “reservoir” is a subsurface rock or sand formation from which a production fluid, or resource, can be harvested. The rock formation may include sand, granite, silica, carbonates, clays, and organic matter, such as bitumen, heavy oil, oil, gas, or coal, among others. Reservoirs can vary in thickness from less than one foot (0.3048 m) to hundreds of feet (hundreds of m). The resource is generally a hydrocarbon, such as a heavy oil impregnated into a sand bed.
- As discussed in detail above, “Steam Assisted Gravity Drainage” (SAGD), is a thermal recovery process in which steam, or combinations of steam and solvents, is injected into a first well to lower a viscosity of a heavy oil, and fluids are recovered from a second well. Both wells are generally horizontal in the formation and the first well lies above the second well. Accordingly, the reduced viscosity heavy oil flows down to the second well under the force of gravity, although pressure differential may provide some driving force in various applications. Although SAGD is used as an exemplary process herein, it can be understood that the techniques described can include any gravity driven process, such as those based on steam, solvents, or any combinations thereof.
- “Substantial” when used in reference to a quantity or amount of a material, or a specific characteristic thereof, refers to an amount that is sufficient to provide an effect that the material or characteristic was intended to provide. The exact degree of deviation allowable may in some cases depend on the specific context.
- As used herein, “thermal recovery processes” include any type of hydrocarbon recovery process that uses a heat source to enhance the recovery, for example, by lowering the viscosity of a hydrocarbon. These processes may use injected mobilizing fluids, such as hot water, wet steam, dry steam, or solvents alone, or in any combinations, to lower the viscosity of the hydrocarbon. Such processes may include subsurface processes, such as cyclic steam stimulation (CSS), cyclic solvent stimulation, steam flooding, solvent injection, and SAGD, among others, and processes that use surface processing for the recovery, such as sub-surface mining and surface mining. Any of the processes referred to herein, such as SAGD, may be used in concert with solvents.
- A “wellbore” is a hole in the subsurface made by drilling or inserting a conduit into the subsurface. A wellbore may have a substantially circular cross section or any other cross-sectional shape, such as an oval, a square, a rectangle, a triangle, or other regular or irregular shapes. As used herein, the term “well,” when referring to an opening in the formation, may be used interchangeably with the term “wellbore.” Further, multiple pipes may be inserted into a single wellbore, for example, as a liner configured to allow flow from an outer chamber to an inner chamber.
- For mobilized oil to drain in a gravity drainage process, another material, such as steam or solvent vapor, must occupy the space currently occupied by the oil. In a clean reservoir, such as a sand bed, this readily occurs as counter-current flow can easily be established. However, in an interval of a reservoir containing rock with multiple close spaced layers, such as shale lamina found in inclined heterolithic strata (IHS), counter-current flow slows dramatically. For example, it is possible to heat oil present on one side of a shale lamina, but for the oil to drain, steam needs to find a continuous path around the shale. If the recovery process relies on a cold solvent, the contact area is limited to the sand interface between the individual shale lamina.
- Field data has shown that some oil drainage occurs from an interval of poorer quality reservoir, such as an IHS facies overlying a sand bed, during thermal gravity drainage operations. Conduction heating of the IHS facies causes some of the solution gas dissolved in the oil to exsolve, and the gas displaces a portion of the heated oil into the underlying steam chamber. However, minimal steam chamber development is observed in the IHS facies. This is due to the difficulty to establishing a counter-current flow of draining liquids and rising steam in the thin sand lenses present in the lamina of the IHS. As a result, oil recovery from the IHS is suboptimal.
- Generally, after the establishment of communication between injector wells and producer wells in gravity drainage recovery processes, the injection rate of the injectant, such as steam, hot solvent, cold solvent, or mixtures thereof, can be regulated to maintain an operating pressure determined by an operator. The operating pressure will be less than the fracture pressure of the formation, but more than the minimum operation pressure of the installed production lift system. In gravity drainage processes the production chamber pressure is kept substantially constant over the duration of the life of the well pattern. More recently, steam chambers have been operated at higher pressures initially and then allowed to slowly decline over time, for example, as the chambers expand in size. The criteria for when to decrease the steam chamber pressure is typically dictated by when the total steam demand in the field to maintain a constant operating pressure exceeds the installed capacity for supplying the steam to the field.
- In embodiments described herein, the drainage of the mobilized oil is accelerated by varying the pressure in the thin sand lenses present between the shale lamina. This may be performed by cycling the chamber pressures, such as by varying an injection rate or a production rate over time during the gravity drainage process. For a gravity drainage process that involves heating, dropping the chamber pressure will also drop the pressure in the partially heated region surrounding the chamber. As a result, some of the heated water present in a pore space in the thin sand lenses between the shale lamina, as well as within the shale lamina, can flash to steam. Further, partial pressure changes will cause some of the dissolved gas present in the heated oil to be liberated. These expanding vapors will displace some of the heated oil from the thin sand lenses located between the shale lamina into the chamber.
- When an injection rate is increased or a production rate is decreased, the chamber pressures will increase. The increasing pressure can cause the vapor saturation in the conductively heated region to collapse as gases condense or are reabsorbed, enabling the steam to penetrate faster and deeper into the conductively heated region than would occur without a pressure reduction phase. Thus, the cycling of the chamber pressure can accelerate the heat penetration and recovery from both good and poor quality facies within the reservoir.
- For a gravity drainage process that does not involve heating, such as a solvent driven recovery process, dropping the chamber pressure will also drop the pressure in the partially mobilized oil region surrounding the chamber. As a result, some of the dissolved solvent present in the thin sand lenses located between the shale lamina will flash to vapor. Due to partial pressure effects, some of the solution gas present will also be liberated. The expanding vapors will displace some of the mobilized oil into the chamber and increase the available surface area between the oil and vapor phases. When the injection rate is increased or fluid production decreased, the chamber pressures will increase and the vapor saturation surrounding the chamber will collapse. The collapse will create accommodation space, allowing the injectant to penetrate deeper into the partially mobilized oil region. The increased penetration and the increase in surface area available between the solvent and oil phases accelerates the mixing of the solvent with the oil. As with the cycling of the steam chamber pressure, the pressure cycling process is very effective in accelerating the solvent penetration and recovery from both good and poorer quality facies within the reservoir.
- In another embodiment, a pressure in the poorer quality facies can be changed by drilling a lateral well through the poorer quality facies, such as in an IHS. The lateral well enables steam flow into the lamina of the IHS, relieving the pressure and enabling uni-directional flow, versus counter current flow. The lateral well may include a horizontal section that is drilled through the IHS and is aligned with dominant dip direction of an IHS bed. This well path can be an initial sidetrack drilled when the gravity drainage well pair is drilled. Depending on the integrity of the formation, the side track can either be left open or completed with a liner, that includes slotted sections or sections of wire-wrap screen, that is plugged at both ends. The well path can also be the result of a separate well that is tied to surface via a cased wellbore. This well path is referred to, herein, as an IHS well.
- A portion of the horizontal section of the IHS well can be placed in a clean interval of the reservoir that is expected to be part of the main steam chamber. Once the oil within the IHS facies that is adjacent to the well path is heated, it may be able to drain along the IHS beds into the underlying steam chamber. The drainage results as vapor, such as steam or solvent, cross-flows along the lateral or IHS well and occupies the space being vacated by the draining oil.
- The IHS well's ability to create a sustainable unidirectional flow path allows steam or solvent to replace any bitumen and condensed steam or solvent that drains from the IHS, allowing additional mobilization and drainage to occur. If the IHS well is drilled from the surface, as the chamber matures the IHS well can be used to inject non-condensable gas (NCG) into the IHS facies, further reducing overburden heat loses. The shale laminate present in the IHS can stabilize the location and integrity of the gas blanket.
- For the purposes of this description, SAGD is used as the recovery process. Those ordinarily skilled in the art will recognize that the approaches disclosed here are equally applicable to all thermal, thermal-solvent and solvent based recovery processes in which gravity drainage is the dominant recovery mechanism.
-
FIG. 1 is a drawing of a steam assisted gravity drainage (SAGD)process 100 used for accessing hydrocarbon resources in areservoir 102. In theSAGD process 100,steam 104 can be injected throughinjection wells 106 to thereservoir 102. As previously noted, theinjection wells 106 may be horizontally drilled through thereservoir 102.Production wells 108 may be drilled horizontally through thereservoir 102, with a production well 108 underlying each injection well 106. Generally, theinjection wells 106 andproduction wells 108 will be drilled from thesame pad 110 at thesurface 112. This may make it easier for the production well 108 to track the injection well 106. However, in some embodiments thewells different pads 110. - The injection of
steam 104 into theinjection wells 106 may result in the mobilization ofhydrocarbons 114, which may drain to theproduction wells 108 and be removed to thesurface 112 in amixed stream 116 that can contain hydrocarbons, condensate and other materials, such as water, gases, and the like. Sand filters may be used in theproduction wells 108 to decrease sand entrainment. - The
mixed stream 116 from a number ofproduction wells 108 may be combined and sent to aprocessing facility 118. At theprocessing facility 118, the water andhydrocarbons 120 can be separated, and thehydrocarbons 120 sent on for further refining. Water from the separation may be recycled to a steam generation unit within thefacility 118, with or without further treatment, and used to generate thesteam 104 used for theSAGD process 100. - The
production wells 108 may have a segment that is relatively flat, and in some development, have a slight upward slope from theheel 122, at which the pipe branches to the surface, to thetoe 124, at which the pipe ends. When present, an upward slope of this horizontal segment may result in thetoe 124 being around one to five meters higher than theheel 122, depending on the length of the horizontal segment. When present, the slight slope assists in draining fluids that enter the horizontal segment to theheel 122 for removal. - An
interval 126 of thereservoir 102 may include poorer quality facies, such as an IHS layer, which drains poorly. The poorer quality facies are not limited tointervals 126 at the top of areservoir 120, but may be inlenses 128 or other places in thereservoir 102. As described herein, cycling the pressure of thereservoir 102 may increase the drainage from theinterval 126 andlenses 128, allowing increases in production of hydrocarbons from these locations. -
FIG. 2 is across section 200 of a steam assisted gravity drainage (SAGD) process, showing ainterval 202 of reduced reservoir quality overlaying aninterval 204 ofhigh quality reservoir 204. Theinterval 202 of reduced reservoir quality may be an IHS facies that contains alternating dipping beds ofsand 206 andshale 208. The horizontal sections of aninjection wellbore 210 and production wellbore 212 are also shown. -
FIG. 3 is a drawing 300 of the cross-section ofFIG. 2 after aproduction chamber 302 has contacted thebase 304 of theinterval 202 of reduced reservoir quality. Theproduction chamber 302 is a free flowing area of mobilized hydrocarbon that can be formed from steam injection, termed a steam chamber, or through the injection of solvents or both steam and solvents. As theproduction chamber 302 approachesbase 304 of theinterval 202, the materials in aregion 306 of theinterval 202 will be affected by the injectant. For example, the materials in theaffected region 306 can be conductively heated by steam in the production chamber. Similarly, solvent vapor may begin to diffuse into the materials in theaffected region 306. -
FIG. 4 is a drawing 400 of the cross-section ofFIG. 2 , showing drainage ofoil 402 from the affectedregion 306. As the pressure in thereservoir 204 is lowered, hot water or solvent in theaffected region 306 can flash to vapor, helping to displace some of theoil 402 contained in theaffected region 306 into theproduction chamber 302. Further, gases dissolved in the oil can exsolve, further displacingoil 402 from the affectedregion 306. -
FIG. 5 is a drawing 500 of the cross-section ofFIG. 2 , showinginjectant 502 infiltrating into theaffected region 306 of theinterval 202 of reduced quality reservoir. As the pressure in theproduction chamber 302 is increased, vapor in theaffected region 306 can collapse, for example, steam can condense to water and gases can be compressed or redissolved into the oil. This creates voids that allowinjectant 502 to penetrate theaffected region 306. As each of the pressure cycles is performed, theaffected region 306 can increase in size, increasing the penetration and the amount of oil recovered from theinterval 202 of reduced quality reservoir. While the technique described above permit harvesting hydrocarbons fromintervals 202 of reduced quality reservoir using standard SAGD equipment arrangements, some techniques for changing the pressure in intervals may permit faster harvesting. - To increase the effectiveness of the pressure cycling process in accelerating oil recovery from an
interval 202 with dipped shale lamina, such as an IHS, the well pair trajectories can be aligned with the general direction of the IHS bed dip when using a thermal or a thermal-solvent recovery process. The IHS bed dip is the direction along which the lamina are oriented. In other words, the injection well 210 and production well 212 can be drilled along the direction of the bed dip of theinterval 202 of reduced quality reservoir. For a thermal process, this orientation allows the conductively heated oil displaced along the IHS beds to drain down into the chamber at a different point along the same well pair's trajectory. - However, when pressure cycling is being used in a solvent based process; well orientation relative to the bed dip of the shale lamina is not as significant. This is because the mobilization process relies the solvent migrating up along the sand layers and physically contacting the oil. Further, more frequent pressure cycling may be useful when using a solvent based recovery process than with a steam based recovery process.
- Where the
interval 202 of poorer quality reservoir is thick, an environment that enables uni-directional flow, versus counter current, may be created. To achieve this, a lateral section can be drilled through theinterval 202 at an angle to the bed dip, as discussed with respect toFIG. 6 . -
FIG. 6 is a drawing 600 of the cross-section ofFIG. 2 , showing a lateral well 602 located in theinterval 202 of reduced reservoir quality. Thelateral well 602 is drilled through theinterval 202 at an obtuse, or shallow,angle 604 to thebed dip angle 606. This allows the horizontal segment of the lateral well to intercept a large number of individual thin sand lenses present between the shale lamina. In some embodiments, the lateral is drilled at a shallow angle relative to horizontal. This will help prevent fluids from accumulating in the lateral well, which may reduce its effectiveness. The lateral well 602 can be left as an open hole or can be completed, for example, with a slotted liner, wirewrap, or mesh screen. - The lateral well 602 can be drilled as a side track lateral during the drilling of the
well pair interval 202 of reduced reservoir quality that is adjacent to thelateral well 602 is heated, it will be able to drain along the IHS beds into the underlying steam chamber becausevapor 608, such as steam or gas, will be able to cross-flow along the lateral section and easily access and occupy the space as it is being vacated by the draining oil. Thus, the lateral well 602 can function as a vacuum breaker to relieve pressure behind the oil within theinterval 202 of reduced reservoir quality, allowing the oil to flow out. - A
portion 610 of the lateral well 602 can be placed in thehigh quality reservoir 204, for example, within theproduction chamber 302. As the recovery process matures, and the ability to independently cycle the chamber pressures declines, the presence of the lateral well 602 through theinterval 202 will act as a very high permeability conduit to allowvapor 608 to enter the IHS. This flow path for thevapor 608 will progressively increase the recovery of the oil from these poorer quality reservoir facies. -
FIG. 7 is a drawing 700 of four representative SAGD well pairs in various phases of the pressure cycling of production chambers. In the drawing 700, the pressure in a first production chamber 702 is declining, allowing water (or solvent) to flash and solution gas to exsolve, displacingoil 402 from theinterval 202 of reduced reservoir quality into the first production chamber 702. Thesecond production chamber 704 andfourth production chamber 706 are operating at a constant pressure, enabling the injectant to affect the material in theinterval 202 of reduced reservoir quality, for example, allowing conductive heating of theinterval 202 from thechambers third production chamber 708 is increasing, allowing steam, solvent vapor, or exsolved gas to compress, thereby allowing theinjectant 502 to invade theinterval 202 of reduced reservoir quality. - As shown in the drawing 700, the pressure cycling process can be staggered between the well patterns, prior to coalesce of the
production chambers injectant 502, such as steam, solvent, or mixtures thereof, to be used in individual production chambers, such asproduction chamber 708, during a pressure increase phase. From a facilities perspective, the sequential approach can lower, or entirely mitigate, swings in demand for theinjectant 502. - As adjacent production chambers coalesce, the coalesced production chambers can be treated as single entities. Accordingly, the pressure cycling practice can be maintained, but with the cycle times progressively becoming longer as the chambers increase in size. The pressure cycling can be continued after all of the production chambers have coalesced, and a decision has been made to allow overall pressures in the production chambers to slowly fall with time. However, in this circumstance, the overall demand for injectant being supplied from the central facility will swing.
- During the pressure cycles, production from the
production wells 710 can be controlled to lower production of theinjectant 502 in a vapor phase. The maximum pressure can be kept below the reservoir fracture pressure to prevent fracturing of the surrounding rock. The minimum pressure can be kept at or above the lowest pressure required for the installed production system to efficiently lift the fluids to surface. The lowest pressure may be lower than the initial reservoir pressure in order to capture the benefits of the expansion of solution gas exsolving from the oil. The pressure differences do not have to be large. For example, in an embodiment, the minimum pressure may be only 10% less than the maximum pressure. In other embodiments, the pressure differential may be 50%, 90%, or even greater. A larger pressure differential may be more effective at harvesting the hydrocarbons from theinterval 202 of reduced reservoir quality, but may place greater stress on a central facility. -
FIG. 8 is amethod 800 of improving the hydrocarbon yield from an interval of reduced reservoir quality. Themethod 800 begins atblock 802 with a mapping of the locations of resources in a reservoir and a plan for harvesting those resources. The mapping can include locating high quality, such as sand beds, and poorer quality reservoir regions, such as IHS facies. Generally, the mapping will be performed in the initial planning stages of the recovery scheme. For example, prior to the start of recovery operations, a geologic model can be created for the development area. This geologic model is usually constructed using a geologic modeling software program. Available open hole and cased hole log, core, 2D and 3D seismic data, and knowledge of the depositional environment setting can all be used in the construction the geologic model. The geologic model and knowledge of surface access constraints can then be used to complete the layout of the recovery process wells, e.g., the injection and production wells and the surface pads. - At
block 804, a series of performance predictions can be made using a reservoir simulation program, such as Computer Modeling Group's STARs program, in order to identify a useful combination of absolute pressure changes, pressure cycle frequency, or side track lateral trajectories. The simulations can also help identify how the combinations should change over time as the recovery process matures. - The optimization process needs to consider both the needs of individual well pairs and the overall pattern needs. For example, changes in geology and well design may result in different approaches for different wells within the development. It may also be possible to use simple empirical or analog based models for performance prediction. Further, in many developments, one or more follow-up recovery processes, such as the drilling of in-fill wells, can be used to further enhance the recovery of the hydrocarbons. The options to extend recovery can be considered during the pressure cycling planning phase, in addition to any operating pressure and production rate limitations associated with the installed lift system to be used in the production wells.
- The pressure cycling described herein can be included as part of the start-up procedures, such as steam circulation and continuous solvent injection. To achieve a beneficial impact on one or both well pair wells it is necessary for the pressure decline to be sufficient to allow some of the injectant to vaporize and, thus, displace oil from the reservoir into the well and produced. Again, a series of performance predictions can be made using a reservoir simulation program, such as Computer Modeling Group's STARs program in order to identify the optimal combination of absolute pressure change, pressure cycle frequency and how these should evolve over time as the start-up process matures.
- At
block 806, the SAGD well pairs used to harvest the hydrocarbon from the reservoir can be drilled. As noted above, if a thermal process is used, the well pairs may follow the direction of the dip to maximize the yield of hydrocarbons. At this same time, or at any time during the field operation, one or more lateral wells may be drilled into the interval of lower quality reservoir to relieve pressure and establish unidirectional flow. After the well pairs have been drilled, data collected during their drilling as well as data collected during the operation of the recovery process, such as cased hole logs including temperature logs, observation wells, additional time lapse seismic or other remote surveying data, can be used to update the geologic model and to map the evolution of the depletion patterns as the recovery process matures. The depletion patterns within the reservoir will be influenced by well placement decisions, geological heterogeneity, well failures, and day to day operating decisions. - At
block 808, steam, solvent, or combinations of these agents can be injected into the injection well. Atblock 810, fluids including hydrocarbons, injectants, water, and the like, may be produced from the production well. As the injection and production continues, atblock 812, a production chamber can be formed that is in contact with the interval of low quality reservoir, such as an IHS facies above a sand bed. - At
block 814, the pressure in the production chamber and interval of low quality reservoir can be changed to enhance production of hydrocarbons. In an embodiment, this is performed by cycling the pressure in the production chamber. In another embodiment, the pressure is changed by a lateral well that releases pressure in an interval of low quality reservoir, such an IHS facies. Following the operation of the thermal, thermal-solvent, or solvent based recovery process for a suitable period of time, intervals of high hydrocarbon depletion will create a series of discrete connections between adjacent wells or well pairs, depending on the recovery process. Knowledge of these connections is gained through observances of interwell or interpattern communication of fluids, convergence of operating pressures, as well as via ongoing reservoir depletion monitoring with tools such as time lapse 3D seismic. The connections may be used to determine the cycle time and total pressure range of the cycles used for the recovery during each stage of the development. - Production rates may be controlled to help minimize the co-production of the injectant used to mobilize the hydrocarbon. Depending on whether the injectant is steam, a steam-gas mixture, a steam-solvent mixture, solvent or gas, such procedures for controlling the amount of injectant co-production can include monitoring the bottom hole temperature or pressure, as well as the production rates of injectant observed at surface. In addition, the injectant amount and type may also be modified to keep the measurements within control ranges. The control measures can be modified to reflect changes in the injectant type and composition that may occur over the life of the project. In addition, the liner could be completed with inflow control devices to restrict the production of injectant vapour.
- An embodiment provides a method for improving recovery from a hydrocarbon reservoir. The method includes identifying an interval within the reservoir that comprises a reduced reservoir quality, wherein the interval comprises hydrocarbons. A production chamber is formed in a reservoir interval below the interval of reduced reservoir quality, wherein the production chamber is in contact with the interval of reduced reservoir quality. Hydrocarbons are mobilized in the interval of reduced reservoir quality by contact with a mobilizing agent. A pressure is changed within the interval of reduced reservoir quality to allow hydrocarbon flow from the interval of reduced reservoir quality.
- The method may include cycling a steam pressure within the production chamber. A solvent pressure can be cycled with the production chamber. The pressure can be cycled over a period of at least one month. Different areas of a reservoir can be cycled using offset pressure phases to keep the total injection rate of the mobilizing fluid substantially constant over time.
- In an embodiment, the method includes drilling a lateral segment through the interval of reduced reservoir quality, wherein the lateral segment is configured to allow mobilizing agent flow into the interval of reduced reservoir quality. The lateral section can be drilled through the intervals of reduced reservoir quality at an angle to a bed dip. The lateral section may be drilled as a side track drilled from one of the gravity drainage wellbores. The lateral section may be left open to the production chamber. The portion of the lateral segment that is within the interval of reduced reservoir quality can be completed with a slotted liner, a wirewrap screen, or a mesh rite screen. The lateral segment can be drilled from the surface.
- Another embodiment provides a system for increasing hydrocarbon production from an interval of low quality reservoir. The system includes an injection well configured to inject an injectant into a reservoir and a production well configured to produce fluids from the reservoir, wherein the fluids comprise a hydrocarbon. A pressure system is configured to change a pressure within a production chamber to increase a flow of hydrocarbon from an interval of low quality reservoir in contact with the production chamber.
- In the system, a maximum operating pressure for the production chamber can be less than a reservoir failure pressure. A minimum operating pressure for the production chamber can be at least 10% lower than a maximum operating pressure.
- The pressure system can include an injection system configured to lower the pressure by slowing an injection rate. The can include a production system configured to lower the pressure by increasing fluid withdrawal.
- The system can include a number of injection and production well pairs, wherein the pressure of a production chamber associated with a single one of the plurality of injection and production well pairs is cycled. The system can be configured to independently cycle the pressure in two or more production chambers, wherein each production chamber is associated with one of the plurality of injection and production well pairs. In the system, the injection well and production well can be drilled parallel to the direction of a bed dip in the lower quality resource.
- Another embodiment provides a system for harvesting resources in a low quality interval of a reservoir. The system includes a gravity drainage system configured to drain a first portion of resources from a high quality interval of a reservoir. The system also includes a pressure control system configured to change a pressure on a production chamber to drain a second portion of resources from a low quality interval of a reservoir.
- While the present techniques may be susceptible to various modifications and alternative forms, the embodiments discussed above have been shown only by way of example. However, it should again be understood that the techniques are not intended to be limited to the particular embodiments disclosed herein. Indeed, the present techniques include all alternatives, modifications, and equivalents falling within the true spirit and scope of the appended claims.
Claims (20)
1. A method for improving recovery from a hydrocarbon reservoir, comprising:
identifying an interval within the reservoir that comprises a reduced reservoir quality, wherein the interval comprises hydrocarbons;
forming a production chamber in a reservoir interval below the interval of reduced reservoir quality, wherein the production chamber is in contact with the interval of reduced reservoir quality;
mobilizing hydrocarbons in the interval of reduced reservoir quality by contact with a mobilizing agent; and
changing a pressure within the interval of reduced reservoir quality to allow hydrocarbon flow from the interval of reduced reservoir quality.
2. The method of claim 1 , comprising cycling a steam pressure within the production chamber.
3. The method of claim 1 , comprising cycling a solvent pressure within the production chamber.
4. The method of claim 1 , comprising cycling the pressure over a period of at least one month.
5. The method of claim 1 , comprising cycling different areas of a reservoir using offset pressure phases to keep the total injection rate of the mobilizing fluid substantially constant over time.
6. The method of claim 1 , comprising drilling a lateral segment through the interval of reduced reservoir quality, wherein the lateral segment is configured to allow mobilizing agent flow into the interval of reduced reservoir quality.
7. The method of claim 6 , comprising drilling the lateral section through the intervals of reduced reservoir quality at an angle to a bed dip.
8. The method of claim 6 , comprising drilling the lateral section as a side track drilled from one of the gravity drainage wellbores.
9. The method of claim 6 , comprising leaving the lateral section open to the production chamber.
10. The method of claim 6 , comprising completing the portion of the lateral segment that is within the interval of reduced reservoir quality with a slotted liner, a wirewrap screen, or a mesh rite screen.
11. The method of claim 6 , comprising drilling the lateral segment from the surface.
12. A system for increasing hydrocarbon production from an interval of low quality reservoir, comprising:
an injection well configured to inject an injectant into a reservoir;
a production well configured to produce fluids from the reservoir, wherein the fluids comprise a hydrocarbon; and
a pressure system configured to change a pressure within a production chamber to increase a flow of hydrocarbon from an interval of low quality reservoir in contact with the production chamber.
13. The system of claim 12 , wherein a maximum operating pressure for the production chamber is less than a reservoir failure pressure.
14. The system of claim 12 , wherein a minimum operating pressure for the production chamber is at least 10% lower than a maximum operating pressure.
15. The system of claim 12 , wherein the pressure system comprises an injection system configured to lower the pressure by slowing an injection rate.
16. The system of claim 12 , wherein the pressure system comprises a production system configured to lower the pressure by increasing fluid withdrawal.
17. The system of claim 12 , comprising a plurality of injection and production well pairs, and wherein the pressure of a production chamber associated with a single one of the plurality of injection and production well pairs is cycled.
18. The system of claim 17 , wherein two or more production chambers are independently pressure cycled, wherein each production chamber is associated with one of the plurality of injection and production well pairs.
19. The system of claim 12 , wherein the injection well and production well are drilled parallel to the direction of a bed dip in the lower quality resource.
20. A system for harvesting resources in a low quality interval of a reservoir, comprising:
a gravity drainage system configured to drain a first portion of resources from a high quality interval of a reservoir; and
a pressure control system, wherein the pressure control system is configured to change a pressure on a production chamber to drain a second portion of resources from a low quality interval of a reservoir.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CA2762448A CA2762448C (en) | 2011-12-16 | 2011-12-16 | Improving recovery from a hydrocarbon reservoir |
CA2762448 | 2011-12-16 |
Publications (1)
Publication Number | Publication Date |
---|---|
US20130153216A1 true US20130153216A1 (en) | 2013-06-20 |
Family
ID=48608952
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US13/667,837 Abandoned US20130153216A1 (en) | 2011-12-16 | 2012-11-02 | Recovery From A Hydrocarbon Reservoir |
Country Status (2)
Country | Link |
---|---|
US (1) | US20130153216A1 (en) |
CA (1) | CA2762448C (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20160177691A1 (en) * | 2014-12-18 | 2016-06-23 | Chevron U.S.A. Inc. | Method for upgrading in situ heavy oil |
US9695684B2 (en) | 2014-10-23 | 2017-07-04 | Cgg Services Sas | System and method for predicting the front arrival time in reservoir seismic monitoring |
US10487636B2 (en) | 2017-07-27 | 2019-11-26 | Exxonmobil Upstream Research Company | Enhanced methods for recovering viscous hydrocarbons from a subterranean formation as a follow-up to thermal recovery processes |
US10544664B2 (en) | 2015-09-22 | 2020-01-28 | 9668241 Canada Inc. | Microbially enhanced thermal oil recovery |
US11002123B2 (en) | 2017-08-31 | 2021-05-11 | Exxonmobil Upstream Research Company | Thermal recovery methods for recovering viscous hydrocarbons from a subterranean formation |
US11142681B2 (en) | 2017-06-29 | 2021-10-12 | Exxonmobil Upstream Research Company | Chasing solvent for enhanced recovery processes |
US11261725B2 (en) | 2017-10-24 | 2022-03-01 | Exxonmobil Upstream Research Company | Systems and methods for estimating and controlling liquid level using periodic shut-ins |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9638000B2 (en) | 2014-07-10 | 2017-05-02 | Inflow Systems Inc. | Method and apparatus for controlling the flow of fluids into wellbore tubulars |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5174377A (en) * | 1990-09-21 | 1992-12-29 | Chevron Research And Technology Company | Method for optimizing steamflood performance |
US6257334B1 (en) * | 1999-07-22 | 2001-07-10 | Alberta Oil Sands Technology And Research Authority | Steam-assisted gravity drainage heavy oil recovery process |
US6662872B2 (en) * | 2000-11-10 | 2003-12-16 | Exxonmobil Upstream Research Company | Combined steam and vapor extraction process (SAVEX) for in situ bitumen and heavy oil production |
US6842699B2 (en) * | 1997-12-04 | 2005-01-11 | Baker Hughes Incorporated | Use of MWD assembly for multiple-well drilling |
US20050072567A1 (en) * | 2003-10-06 | 2005-04-07 | Steele David Joe | Loop systems and methods of using the same for conveying and distributing thermal energy into a wellbore |
US20050150657A1 (en) * | 2002-03-13 | 2005-07-14 | Howard William F. | Method and apparatus for injecting steam into a geological formation |
US20090288827A1 (en) * | 2008-05-22 | 2009-11-26 | Husky Oil Operations Limited | In Situ Thermal Process For Recovering Oil From Oil Sands |
US20100012331A1 (en) * | 2006-12-13 | 2010-01-21 | Gushor Inc | Preconditioning An Oilfield Reservoir |
US20100096147A1 (en) * | 2006-07-19 | 2010-04-22 | John Nenniger | Methods and Apparatuses For Enhanced In Situ Hydrocarbon Production |
US20100206555A1 (en) * | 2009-02-19 | 2010-08-19 | Conocophillips Company | Draining a reservoir with an interbedded layer |
US20100218954A1 (en) * | 2007-09-28 | 2010-09-02 | Yale David P | Application of Reservoir Conditioning In Petroleum Reservoirs |
-
2011
- 2011-12-16 CA CA2762448A patent/CA2762448C/en active Active
-
2012
- 2012-11-02 US US13/667,837 patent/US20130153216A1/en not_active Abandoned
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5174377A (en) * | 1990-09-21 | 1992-12-29 | Chevron Research And Technology Company | Method for optimizing steamflood performance |
US6842699B2 (en) * | 1997-12-04 | 2005-01-11 | Baker Hughes Incorporated | Use of MWD assembly for multiple-well drilling |
US6257334B1 (en) * | 1999-07-22 | 2001-07-10 | Alberta Oil Sands Technology And Research Authority | Steam-assisted gravity drainage heavy oil recovery process |
US6662872B2 (en) * | 2000-11-10 | 2003-12-16 | Exxonmobil Upstream Research Company | Combined steam and vapor extraction process (SAVEX) for in situ bitumen and heavy oil production |
US20050150657A1 (en) * | 2002-03-13 | 2005-07-14 | Howard William F. | Method and apparatus for injecting steam into a geological formation |
US20050072567A1 (en) * | 2003-10-06 | 2005-04-07 | Steele David Joe | Loop systems and methods of using the same for conveying and distributing thermal energy into a wellbore |
US20100096147A1 (en) * | 2006-07-19 | 2010-04-22 | John Nenniger | Methods and Apparatuses For Enhanced In Situ Hydrocarbon Production |
US20100012331A1 (en) * | 2006-12-13 | 2010-01-21 | Gushor Inc | Preconditioning An Oilfield Reservoir |
US20100218954A1 (en) * | 2007-09-28 | 2010-09-02 | Yale David P | Application of Reservoir Conditioning In Petroleum Reservoirs |
US20090288827A1 (en) * | 2008-05-22 | 2009-11-26 | Husky Oil Operations Limited | In Situ Thermal Process For Recovering Oil From Oil Sands |
US20100206555A1 (en) * | 2009-02-19 | 2010-08-19 | Conocophillips Company | Draining a reservoir with an interbedded layer |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9695684B2 (en) | 2014-10-23 | 2017-07-04 | Cgg Services Sas | System and method for predicting the front arrival time in reservoir seismic monitoring |
US20160177691A1 (en) * | 2014-12-18 | 2016-06-23 | Chevron U.S.A. Inc. | Method for upgrading in situ heavy oil |
US9739125B2 (en) * | 2014-12-18 | 2017-08-22 | Chevron U.S.A. Inc. | Method for upgrading in situ heavy oil |
US10544664B2 (en) | 2015-09-22 | 2020-01-28 | 9668241 Canada Inc. | Microbially enhanced thermal oil recovery |
US10704372B2 (en) | 2015-09-22 | 2020-07-07 | 9668241 Canada Inc. | Microbially enhanced thermal oil recovery |
US10920550B2 (en) | 2015-09-22 | 2021-02-16 | 9668241 Canada Inc. | Microbially enhanced thermal oil recovery |
US11578575B2 (en) | 2015-09-22 | 2023-02-14 | 9668241 Canada Inc. | Microbially enhanced thermal oil recovery |
US11142681B2 (en) | 2017-06-29 | 2021-10-12 | Exxonmobil Upstream Research Company | Chasing solvent for enhanced recovery processes |
US10487636B2 (en) | 2017-07-27 | 2019-11-26 | Exxonmobil Upstream Research Company | Enhanced methods for recovering viscous hydrocarbons from a subterranean formation as a follow-up to thermal recovery processes |
US11002123B2 (en) | 2017-08-31 | 2021-05-11 | Exxonmobil Upstream Research Company | Thermal recovery methods for recovering viscous hydrocarbons from a subterranean formation |
US11261725B2 (en) | 2017-10-24 | 2022-03-01 | Exxonmobil Upstream Research Company | Systems and methods for estimating and controlling liquid level using periodic shut-ins |
Also Published As
Publication number | Publication date |
---|---|
CA2762448A1 (en) | 2013-06-16 |
CA2762448C (en) | 2019-03-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10927655B2 (en) | Pressure assisted oil recovery | |
CA2762448C (en) | Improving recovery from a hydrocarbon reservoir | |
CA2756389C (en) | Improving recovery from a hydrocarbon reservoir | |
CA2740158C (en) | Harvesting by-passed resource | |
CA2766849C (en) | Recovery from a hydrocarbon reservoir utilizing a mixture of steam and a volatile solvent | |
CA2744749C (en) | Basal planer gravity drainage | |
CA2749437C (en) | Harvesting resource from variable pay intervals | |
CA2744767C (en) | Dual mobilizing agents in basal planar gravity drainage | |
CA2766838C (en) | Enhancing the start-up of resource recovery processes | |
CA2766844C (en) | Heating a hydrocarbon reservoir | |
CA2847759C (en) | A method of enhancing resource recovery from subterranean reservoirs | |
US8770289B2 (en) | Method and system for lifting fluids from a reservoir | |
CA2762439C (en) | Improving recovery from a hydrocarbon reservoir | |
US9359868B2 (en) | Recovery from a subsurface hydrocarbon reservoir | |
CA2826494A1 (en) | Improving recovery from a hydrocarbon reservoir | |
US20130146284A1 (en) | Staggered horizontal well oil recovery process | |
CA2759357C (en) | Staggered horizontal well oil recovery process | |
CA2833068A1 (en) | Bottom-up solvent-aided process and system for hydrocarbon recovery | |
WO2013075207A1 (en) | Staggered horizontal well oil recovery process |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: EXXONMOBIL UPSTREAM RESEARCH COMPANY, TEXAS Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:IMPERIAL OIL RESOURCES LIMITED;REEL/FRAME:030973/0786 Effective date: 20120222 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |