US20130118188A1 - Method of defrosting an energy recovery ventilator unit - Google Patents
Method of defrosting an energy recovery ventilator unit Download PDFInfo
- Publication number
- US20130118188A1 US20130118188A1 US13/293,454 US201113293454A US2013118188A1 US 20130118188 A1 US20130118188 A1 US 20130118188A1 US 201113293454 A US201113293454 A US 201113293454A US 2013118188 A1 US2013118188 A1 US 2013118188A1
- Authority
- US
- United States
- Prior art keywords
- air
- defrost
- zone
- energy recovery
- unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/30—Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/30—Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
- F24F11/41—Defrosting; Preventing freezing
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F12/00—Use of energy recovery systems in air conditioning, ventilation or screening
- F24F12/001—Use of energy recovery systems in air conditioning, ventilation or screening with heat-exchange between supplied and exhausted air
- F24F12/006—Use of energy recovery systems in air conditioning, ventilation or screening with heat-exchange between supplied and exhausted air using an air-to-air heat exchanger
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F2140/00—Control inputs relating to system states
- F24F2140/30—Condensation of water from cooled air
Definitions
- This application is directed, in general, to space conditioning systems and methods for conditioning the temperature and humidity of an enclosed space using an energy recovery ventilator unit, and in particular, to methods and devices for defrosting energy recovery ventilator units.
- Energy recovery ventilator units are often used in space conditioning systems to maintain air quality while minimizing energy losses. Sometimes the energy recovery ventilator unit can become frosted, thereby reducing the functionality of the unit.
- One embodiment of the disclosure is a method defrosting an energy recovery ventilator unit.
- the method comprises activating a defrost process of an enthalpy-exchange zone of the energy recovery ventilator unit when an air-flow blockage in the enthalpy-exchange zone coincides with a frost threshold in the ambient environment surrounding the energy recovery ventilator unit.
- the method also comprises terminating the defrost process, including terminating the defrost process when an operating condition in the vicinity of the enthalpy-exchange zone substantially returns to a pre-frosting operating condition.
- the energy recovery ventilator unit comprises a defrost control module configured to activate the defrost process and to terminate the defrost process, as described above.
- FIG. 1 presents a flow diagram showing selected steps in an example method of defrosting an energy recovery ventilator unit according to the principles of the disclosure
- FIG. 2 presents an cross-sectional view of an example energy recovery ventilator unit of the present disclosure
- FIG. 3 presents a flow diagram of an example implementation of the method of the disclosure in the case where the energy recovery ventilator unit does not include a powered heat source or a secondary air-intake opening;
- FIG. 4 presents a flow diagram of another example implementation of the method of the disclosure in the case where the energy recovery ventilator unit does include a powered heat source but does not include a secondary air intake opening;
- FIG. 5 presents a flow diagram of another example implementation of the method of the disclosure in the case where the energy recovery ventilator unit does include a powered heat source 250 but not a secondary air-intake opening;
- FIG. 6 presents a flow diagram of another example implementation of the method of the disclosure in the case where the energy recovery ventilator unit does include a powered heat source and a secondary air-intake opening.
- FIG. 1 presents a flow diagram showing selected steps in an example method of defrosting an energy recovery ventilator unit according to the principles of the disclosure.
- FIG. 2 presents a perspective view of an example energy recovery ventilator unit 200 of the disclosure, which can include but is not limited to, any of the design layouts and any of the components parts described in Appl-1.
- the unit 200 can be part of a space conditioning system 202 .
- the unit 200 can comprise a cabinet 205 housing an intake air zone 210 (e.g., sometimes a primary intake air zone), a supply air zone 212 , a return air zone 214 , an exhaust air zone 216 and an enthalpy-exchange zone 218 .
- the intake zone 210 and the exhaust zone 216 are both on one side 220 of the enthalpy exchange zone 218
- the supply zone 212 and the return zone 214 are both on an opposite side 225 of the enthalpy exchange zone 218 .
- the energy recovery ventilator unit 100 also comprises a first blower 230 and a second blower 235 .
- the first blower 230 is located in the intake zone 210 and is configured to push, or alternatively pull, outside air into the intake zone 210 and straight through the enthalpy exchange zone 218 into the supply zone 212 .
- the second blower 235 is located in the return zone 214 and is configured to push, or alternatively pull, return air into the return zone 214 and straight through the enthalpy exchange zone 218 into the exhaust zone 216 .
- the enthalpy exchange zone 218 can include one or more enthalpy-exchanger devices 240 configured as one or more enthalpy wheels or other enthalpy-exchange devices such as plated heat exchangers or heat pipes or other devices familiar to those skilled in the art.
- the unit can further include a defrost control module 245 which as illustrated, can be located on the outside surface of the cabinet 205 although other located are within the scope of the disclosed unit 200 .
- the method 100 of defrosting the energy recovery ventilator unit 200 comprises a step 105 of activating a defrost process of an enthalpy-exchange zone 218 of the energy recovery ventilator unit 200 when an air-flow blockage in the enthalpy-exchange zone 218 coincides with a frost threshold in the ambient environment surrounding the energy recovery ventilator unit 200 .
- some embodiments of the method 100 can include a step 107 of determining if an air-flow blockage exists in the enthalpy-exchange zone 218 .
- Step 107 can include any of the processes described in Appl-2 for determining the presence of an air-flow blockage through an enthalpy-exchange zone 218 .
- step 107 can include determining a pressure difference across the enthalpy-exchange zone 218 while the energy recovery ventilator unit 200 is operating.
- step 107 can include determining a heat transfer efficiency across the enthalpy-exchange zone 218 while the energy recovery ventilator unit 200 is operating.
- the pressure or heat transfer efficiency can be compared to the analogous operational characteristic of pressure or heat transfer when the unit 200 determined during step 108 when the unit 200 was in a known normal operating condition.
- the pressure difference increases or heat transfer decreases beyond a pre-defined limit the presence of an air-flow blockage is signaled, such as disclosed in Appl-2.
- some embodiments of the method 100 can include a step 109 of determining if the air-flow blockage in the enthalpy-exchange zone coincides with a frost threshold existing in the ambient environment surrounding the unit 200 .
- frost threshold refers to a pre-selected temperature value corresponding to the measured ambient air-temperature surrounding the energy recovery ventilator unit at which frost formation will occur.
- the frost threshold can correspond to a pre-selected temperature value in a range of 20 to 32° F.
- the frost threshold can be pre-selected temperature value that is adjusted depending on the relative humidity within energy recovery ventilator unit 200 .
- the frost threshold may be a temperature value of 20° F. when the relative humidity is low (e.g., 30 percent or lower) but linearly adjusted to 32° F. as the relative humidity reaches 100 percent.
- the defrost process (step 105 ) can be activated.
- a non-frost failure mode step 110 can be activated. This can advantageously prevent the unit 200 from going into a defrost mode when it is determined a frosting condition unlikely to have occurred.
- the procedures followed when the non-frost failure mode (step 110 ) is activated can include any of the processes described in Appl-2.
- the method 100 also comprises a step 115 of terminating the defrost process, including a step 116 of terminating the defrost process when an operating condition in the vicinity of the enthalpy-exchange zone 218 substantially returns to a pre-frosting operating condition.
- operating condition refers to an environmental conditions or properties at one or more locations in the unit 200 that is measurable while the unit 200 is operating either before or during the defrost process (step 110 ).
- pre-frosting operating condition refers to the environmental condition when the unit 200 was in a normal operating state step 108 (e.g., prior to detecting a air-flow blockage in step 107 )
- defrosting can reduce the energy and heat transfer efficiency of the unit 200 , and in some cases damage components (e.g., the enthalpy-exchanger devices 240 ) of the unit 200 .
- damage components e.g., the enthalpy-exchanger devices 240
- terminating the defrost process can include monitoring one or more different operating conditions of the unit 200 .
- terminating the defrost process can further include a step 117 of determining the operating condition (as part of step 116 ), which includes measuring an air-pressure difference across the enthalpy-exchange zone 218 while the unit 200 is operating.
- step 116 the operating condition
- pressure transducers 242 situated on either side of the enthalpy zone 218 , can monitor the pressure during defrost process (step 110 ) as well as during pre-defrost conditions, such as determined, e.g., during a normal operating state (step 109 ).
- terminating the defrost process includes terminating after the operating condition, corresponding to the measured air-pressure difference across the enthalpy-exchange zone 218 , has decreased to substantially equal to (e.g., within ⁇ 10% in some cases) the pre-frosting operating condition, corresponding to an air-pressure difference across the enthalpy-exchange zone 218 measured prior to activating the defrost process (e.g., measured during step 109 ).
- terminating the defrost process (step 115 ) further includes a step 119 of determining the operating condition (as part of step 116 ), which includes measuring a heat transfer efficiency across the enthalpy-exchange zone 218 while the unit 200 is operating.
- temperature sensor 244 situated on either side of the enthalpy zone 218 , can monitor the temperature during defrost process (step 110 ) as well as during pre-defrost conditions, such as determined, e.g., during a normal operating state (step 109 ).
- the heat transfer efficiency is proportional to the ratio of: the temperature difference between the intake air zone 210 and the supply air zone 212 divided by the temperature difference between the return air zone 214 and the intake air zone 210 .
- the temperature difference between the difference between return air zone 214 and intake air zone 210 is considered to represent the overall heat transfer occurring in the unit 200 , e.g., that drives energy transfer, while the temperature difference between the intake air zone 210 and the supply air zone is considered to represent the actual heat transfer occurring.
- terminating the defrost process includes terminating after the operating condition, corresponding to the measured heat transfer efficiency across the enthalpy-exchange zone 218 , has decreased to be substantially equal to (e.g., within ⁇ 10% in some cases) the pre-frosting operating condition, corresponding to a heat transfer efficiency across the enthalpy-exchange zone 218 measured prior to activating the defrost process (e.g., measured during step 109 ).
- the non-defrost failure mode (step 110 ) is entered.
- step 115 it is also desirable to terminate the defrost process (step 115 ) after a measured pre-selected time limit is reached (step 120 ). This can advantageously prevent excessive energy and time being expended on defrosting when the enthalpy exchange zone 218 is blocked for reason other than frosting.
- the time limit measured in step 120 has reached the pre-selected time limit (e.g., a defrosting time limit has expired)
- the non-defrost failure mode is entered.
- some embodiments of the method 100 provide multiple defrosting strategies that can be implemented, either alone or in combination, as part of the defrosting process 105 , and implements in a fashion that depends on the ambient environmental conditions surrounding the unit 200 or on the components that are included in the unit 200 .
- the activated defrost process (step 105 ) further includes a step 130 of activating a powered heat source 250 configured to warm air in the intake air zone 210 or the exhaust air zone 216 located inside of the unit 200 .
- the powered heat source 250 can pre-heat the ambient cold air outside of the unit to thereby facilitate rapid defrosting.
- the powered heat source 250 can be an electric heater.
- a gas-fired heat exchanger could be used.
- the powered heat source 250 is, or includes, a modular electric heater coupled to the outside of the unit 200 and located upstream of an air intake opening 252 of the intake air zone 210 .
- modular electric heater refers to a self-contained heater that includes one or more of temperature sensors, electrical power connections, device control connections, as integral parts of the heater 250 , thereby facilitating field-installation of the heater 250 , e.g., to a previously installed unit 200 .
- activating the powered heat source 250 in step 130 further including a step 132 of adjusting the powered heat source 250 to one of a plurality of different levels of heat generation as a function of an ambient air temperature surrounding the unit 200 . For instance, if the ambient air temperature is at or below a pre-selected set-point (e.g., 20° F. in some cases) then the heater 250 can be adjusted to a high level of heating. If the ambient air temperature is above the set-point then the heater 250 can be adjusted to a low level of heating.
- a pre-selected set-point e.g. 20° F. in some cases
- Having the ability to adjust to plurality of different levels facilitates using the full heating the potential of the heater at certain times, but, avoiding excessive heating at other times, that could damage, e.g., due to melting or softening of plastic parts in the enthalpy exchange device 240 , or other components of the unit 200 .
- the activated defrost process (step 105 ) further includes a step 135 of reducing airflow from an air intake zone 210 located inside of the unit 200 to the enthalpy exchange-zone 218 .
- the speed of the air blower 230 located in the intake air zone 210 can be reduced.
- the speed of the air blower 230 is reduced by about 20 to 30 percent as compared to the speed of the air blower when the unit 200 is in its normal operating state (e.g., step 108 ). Reducing the airflow can facilitate defrosting because the amount of cold air drawn into the unit 200 from the ambient outside air is reduced.
- reducing the airflow from the air-intake zone 210 (step 135 ) at or during the same time as activating the heat source 250 (step 130 ) can speed defrosting because the temperature of the air reaching the enthalpy zone 218 is increased.
- the activated defrost process (step 105 ) further includes a step 140 of activating an air controller assembly 260 so as to allow air-flow through a secondary air-intake opening 262 connected to the supply zone 212 located inside of the unit 200 .
- the air controller assembly 260 can include baffles or dampers 264 which are configured to be continuously adjustable to allow substantially no air, to large volumes of air, to pass through the secondary intake opening 260 .
- FIG. 2 only a partial cut-away view of the example air controller assembly 260 is depicted so that the supply air zone 212 and secondary input opening 262 can be more clearly depicted.
- the air controller assembly 260 is activated in step 140 when the air flow through the primary air intake zone 210 is reduced in step 135 .
- allowing air through the secondary air-intake opening 262 is important to meeting certain fresh air requirements that must be met, even when performing the defrost process (step 105 ).
- the reduction in the air flow from the air intake zone 210 and an increase in the air-flow through the secondary air-intake opening 262 are coordinated such that the air-pressure inside of the unit 200 substantially equals an ambient air pressure surrounding unit 200 .
- the air controller assembly 260 is activated such that there is a slightly negative pressure compared to the global demand pressure (e.g., within about 0.1 to ⁇ 0.2 inches, water column) to help prevent any ensure that any air conditioned by the enthalpy exchange zone 218 does not get blown out of the unit 200 (e.g., through the secondary air-intake opening 262 ) before being transferred into a air-handler unit 510 , (e.g., heating ventilation and cooling system, such as a roof top unit), coupled to the unit 200 .
- a slightly negative pressure compared to the global demand pressure (e.g., within about 0.1 to ⁇ 0.2 inches, water column) to help prevent any ensure that any air conditioned by the enthalpy exchange zone 218 does not get blown out of the unit 200 (e.g., through the secondary air-intake opening 262 ) before being transferred into a air-handler unit 510 , (e.g., heating ventilation and cooling system, such as a roof top unit), coupled to
- the defrost process (activated in step 105 ) further includes a step 145 of activating a heat source 270 of an air-handling unit 272 that is coupled to the unit 200 , such that the air exiting the air-handling unit 272 is heated to a substantially same temperature than before the defrosting process was activated (step 105 ).
- the heater 270 of the air-handling unit 272 can be a gas-fired heater, electric heater or other heater familiar to those skilled in the art.
- the air-handling unit is located down-stream, and configured to receive air, from the unit 200 .
- the air-handling unit can be part of the space conditioning system 202 .
- Activating the heat source 270 of an air-handling unit 272 in step 145 can advantageously heat cold outside air through the secondary air-intake opening 262 and thereby make the conditioned space more comfortable during the defrosting process 115 .
- the heat source 270 in the air-handling unit 272 is activated in step 145 at the same time, or before, the air controller assembly is activated in step 140 .
- the air controller assembly in step 140 cases dampers 264 covering the secondary air-intake opening 262 can take one to two minutes to fully open.
- activating the heater 270 can pre-heat the air such that when the secondary air-intake opening 262 is fully opened, the air reaching the conditioned space is preheated to substantially same temperature as before the defrosting process started.
- the energy recovery ventilator unit 200 can comprise any of embodiments of the unit 200 discussed in the context of FIG. 1 and presented in FIG. 2 .
- the unit 200 comprises a defrost control module 245 is configured to activate the defrost process (step 105 ) and terminate the defrost process (step 115 ), such as disclosed in the context of FIG. 1 .
- Embodiments of the unit 200 can include the components such as the intake air zone, 210 , supply air zone 212 , return air zone 214 , exhaust air zone 216 , enthalpy exchange zone 218 , as disclosed above and as further disclosed in Appl-1, Appl-2 and Appl-3.
- the unit 200 can include pressure transducers 242 configured to measuring an air-pressure difference across the enthalpy-exchange zone 218 while the unit 200 is operating.
- the pressure transducers 242 can be configured to transmit the measured air pressure difference to the defrost control module 245 , and the defrost control module 245 can be configured to determine the operating condition as including the air-pressure difference in accordance with step 117 .
- the unit 200 can include temperature sensors configured to measuring air temperatures 244 of the intake zone 210 , a supply air zone 212 , and a return air zone 214 located inside of the unit 200 .
- the temperature sensors 244 can be configured to transmit the measured air temperatures to the defrost control module 245 .
- the defrost control module 245 can be configured to determine the operating condition as including a heat transfer efficiency determined from the measured air temperatures, in accordance with step 119 .
- the defrost module 245 can be configured to terminate the defrost process (step 115 ) after a preselected time limit is reached.
- the defrost module 245 includes an electronic timing circuit that monitors the time when the defrost process was activated in step 105 , and compare the accumulated defrosting time to the preselected time limit, e.g., as set by factory or installation personnel.
- the unit 200 can further include a powered heat source 250 configured to warm air in the intake air zone 210 or the exhaust air zone 216 located inside of the unit 200 , and the defrost control module can be configured to activate or deactivate the heat source 250 .
- the powered heat source 250 includes, or is, a modular electric heater configured to be coupled to the outside of the unit 200 and located upstream of the air intake opening 252 of the intake air zone 210 .
- the defrost module 245 can be configured to control the airflow from the air intake zone 210 located inside unit 200 to the enthalpy exchange-zone 218 .
- the defrost module 245 includes an electronic circuit configured to control the speed of the air intake blower 250 located in the intake air zone 210 , in accordance with step 135 .
- the unit 200 can further include an air controller assembly 260 configured to adjust an amount of air-flow through a secondary air-intake opening 262 connected to a supply zone 212 located inside of the unit 200 , and the defrost control module 245 can be configured to control the air controller assembly 260 to increase or decrease the amount of air allowed through the secondary air-intake opening 262 .
- an air controller assembly 260 configured to adjust an amount of air-flow through a secondary air-intake opening 262 connected to a supply zone 212 located inside of the unit 200
- the defrost control module 245 can be configured to control the air controller assembly 260 to increase or decrease the amount of air allowed through the secondary air-intake opening 262 .
- the defrost control module 245 can be configured the control a heat source 270 of an air-handling unit 272 that is coupled to the unit 200 .
- the defrost module 245 includes an electronic circuit that is configured to activate the heat source 272 , e.g., when there is air flowing through the secondary intake air opening 262 , such that the air exiting the space conditioning system is heated to a substantially same temperature than before the defrosting process was activated.
- the electronic circuit can be configured to deactivate the heat source 272 , when the defrosting process in terminated in step 115 , or when there is not longer air flowing through the secondary intake air opening 262 .
- FIGS. 3-6 present of example implementations of the method 100 and the unit 200 .
- FIG. 3 presents a flow diagram of an example implementation of the method 100 in the case where the unit 200 does not include a powered heat source 250 or a secondary air-intake opening 262 .
- the method 100 can include a starting a defrost check mode (step 301 ) which can include: step 303 of turning on the enthalpy exchange device 240 (e.g., make sure an enthalpy wheel device 240 is rotating), step 305 of verifying that the blower 250 is at the proper set point for heat transfer to occur, and step 307 (an example of step 109 ) of deciding whether to enter defrost mode including, e.g. measuring the outside air temperature and determining if the temperature is above the frost threshold.
- step 301 can include: step 303 of turning on the enthalpy exchange device 240 (e.g., make sure an enthalpy wheel device 240 is rotating), step 305 of verifying that the blower 250 is at the proper set point for heat transfer to occur, and step 30
- the defrost check can include entering a non-frost failure mode step 310 (an example of step 110 ), if it is decided, in step 307 , that the blockage is not due to frost formation.
- the defrost check can include a step 313 of deciding if there is a heater 250 installed. If there is a heater 250 installed, then other procedures such as set forth in FIGS. 4-8 may be followed. If there is not a heater 250 installed, then a blower defrost mode (step 315 ) is entered (an example of step 105 ).
- the blower defrost mode can include a step 317 of reducing the air flow to the enthalpy exchange zone 218 e.g., by increasing the speed of the blower 230 (an example of step 135 ), a step 319 of commencing a timer, a step 321 of monitoring the accumulated time and determining in step 323 if a time-limit is reached (examples of step 120 ).
- step 325 of further increasing the air flow is activated and in step 327 the operating condition (e.g., pressure difference and/or heat transfer efficiency) is measured (an example of steps 116 , 117 , 119 ).
- step 329 it is decided if the operating condition (e.g., pressure or heat transfer efficiency) is not different than the pre-frosting operating condition. If there is no difference, then the blower defrost mode (step 315 ) is terminated (an example of step 115 ) and the unit 200 returns to a normal operating state in step 331 (an example of step 108 ). If there is still a difference in the operating condition compared to the pre-frosting condition, then a second blower defrost mode (step 333 ) is entered (an example continuation of step 105 ).
- the operating condition e.g., pressure difference and/or heat transfer efficiency
- the second blower defrost mode includes steps 335 , 337 , 339 , 341 , 343 , 345 , and 347 which are analogous to steps 317 , 319 , 321 , 323 , 325 , 327 , and 329 , respectively, with the exception that the air flow reduction in step 335 is greater than the air flow reduction in step 317 (e.g., blower 230 speed is further lowered).
- a third blower defrost mode (step 353 ) is entered (an example of continuing step 105 ).
- the third blower defrost mode includes steps 355 , 357 , 359 , 361 , 363 , 365 , and 367 which are analogous to steps 317 , 319 , 321 , 323 , 325 , 327 , and 329 , respectively, with the exception that the air flow reduction in step 355 is more (e.g., blower 230 speed is lower) than the air flow reduction in step 317 or step 335 .
- the air flow is reduced to zero in step 355 (e.g., the blower 230 is turned off), while in other cases there is still air flow to enthalpy exchange zone 218 .
- the time-limit set in step 339 can be different than the time-limit set in step 319 .
- blower defrost modes could be increased or decreased compared to that depicted in FIG. before after a final decision step (e.g., step 367 ) that the is still a difference in the pressure difference or heat transfer efficiency compared to a pre-frosting operating condition and the a non-frost failure mode step 310 is activated.
- FIG. 4 presents a flow diagram of another example implementation of the method 100 in the case where the unit 200 does include a powered heat source 250 but does not include the secondary air intake opening 262 .
- the same numbers indicate steps that are analogous to the steps described in FIG. 3 , with the exception that instead of a blower defrost mode step 315 , there is a combined blower and heating defrost mode step 415 , which can include activating the powered heat source 250 (an example of step 130 , as part of step 105 ) and reducing the air flow such as described in the context of the defrost mode 315 disclosed in FIG. 3 .
- an electric heater 250 can be staged to different heating levels based on an outside air temperature measured in the air-intake zone 210 the control module 245 can lower the intake air blower 230 speed, and electric heater 250 heater operated at a low heating level, until the pressure difference across the enthalpy zone 218 (e.g., an enthalpy wheel intake pressure minus a the wheel exhaust pressure) are at pre-frost conditions. If frosting not addressed the speed of the blower 230 can be reduced to an allowable minimum and electric heater will operate at a higher heating level.
- FIG. 5 presents a flow diagram of another example implementation of the method 100 in the case where the unit 200 does include a powered heat source 250 but not the secondary air-intake opening 262 .
- the same numbers indicate steps that are analogous to the steps described in FIG. 3 .
- a blower defrost mode step 315 or combined blower defrost mode and heating mode step 415 ( FIG. 4 )
- there is a staged heating defrost mode step 515 (an example of step 130 as part of step 105 ).
- step 517 it determined if there outside air temperature is below a pre-selected temperature.
- a low level of heating is selected (an example of step 132 ). If the outside air temperature is below the pre-selected temperature, then at step 521 , a high level of heating is selected (again an example of step 132 ). Alternatively, if after the time-limit set in step 319 has expired and there is still a difference in the pressure difference or heat transfer efficiency compared to a pre-frosting operating condition, the heating can transition at step 323 from the low level (step 519 ) to the high level (step 521 ).
- the staged heating mode step 515 can transition at step 523 to the combined blower defrost mode and heating mode step 415 as described in FIG. 4 .
- an electric heater 250 is staged in as quickly as possible to facilitate continued delivery the correct amount of fresh air.
- the pressure across the enthalpy zone 218 can be monitoring to determine if defrost has been completed by observing that the pressure difference has reverted back to pre-frosted level.
- FIG. 6 presents a flow diagram of another example implementation of the method 100 in the case where the unit 200 does include a powered heat source 250 and the secondary air-intake opening 262 .
- the same numbers indicate steps that are analogous to the steps described in FIGS. 3 and 5 .
- a blower defrost mode step 315 there is a combined blower and staged heating defrost mode step 615 which can include activating an air controller assembly 260 and a heat source 270 of an air-handler unit 272 (examples of steps 140 and 145 , respectively as part of step 105 ).
- a heat source 270 of an air-handler unit 272 can be activated in step 617 , e.g., as a preheating step.
- step 617 e.g., as a preheating step.
- step 619 of reducing the air flow to the enthalpy exchange zone 218 (e.g., similar to step 317 ) plus activating an air controller assembly 260 (e.g., to open dampers covering the secondary air-intake opening 262 ).
- step 621 it is determined if the secondary air-intake opening 262 is fully open and pressure in the unit 200 is at or slightly below a global pressure value (e.g., such as further described in Appl-3).
- Step 623 If the pressure in the unit 200 is too low, then the intake air flow is increases (e.g., by increasing the blower 230 speed) in step 623 . Steps 619 , 621 and 623 are followed by either of steps 519 or 521 depending on the decision made in step 517 . Subsequent steps are similar to the steps presented in FIG. 3 or 5 .
- control module 245 will slow down intake blower 230 to a minimum accepted air-flow and open up dampers 264 of the air controller assembly 260 until pressure at the air-handler 272 is the same as the ambient pressure.
- An electric heater 250 will energize at maximum heating capacity until the pressure difference across the enthalpy exchange zone 218 is at a pre-frost condition. Then the damper will slowly close as the intake blower 230 speed increases back to it normal set point.
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Defrosting Systems (AREA)
Abstract
A method of defrosting an energy recovery ventilator unit. The method comprises activating a defrost process of an enthalpy-exchange zone of the energy recovery ventilator unit when an air-flow blockage in the enthalpy-exchange zone coincides with a frost threshold in the ambient environment surrounding the energy recovery ventilator unit. The method also comprises terminating the defrost process, including terminating the defrost process when an operating condition in the vicinity of the enthalpy-exchange zone substantially returns to a pre-frosting operating condition.
Description
- This application is related to U.S. patent application Ser. No. ______ (docket no. P100090), by McKie et al., entitled, “DESIGN LAYOUT FOR AN ENERGY RECOVERY VENTILATOR SYSTEM” (“Appl-1”), filed on Oct. ______, 2011, U.S. patent application Ser. No. 13/267,542 (Docket No. P100094), by McKie et al., entitled, “DETECTING AND CORRECTING ENTHALPY WHEEL FAILURE MODES” (“Appl-2”), filed on Oct. 6, 2011, and U.S. patent application Ser. No. 13/267,492 (Docket No. P100076), by McKie et al., entitled, “ERV GLOBAL PRESSURE DEMAND CONTROL VENTILATION MODE (ERV CASE)” (“Appl-3”), filed on Oct. 6, 2011, all of which are incorporated herein by reference in their entirety. One or more of the above applications may describe embodiments of Energy Recovery Ventilator Units components and processes thereof that may be suitable for making and/or use in some of the embodiments described herein.
- This application is directed, in general, to space conditioning systems and methods for conditioning the temperature and humidity of an enclosed space using an energy recovery ventilator unit, and in particular, to methods and devices for defrosting energy recovery ventilator units.
- Energy recovery ventilator units are often used in space conditioning systems to maintain air quality while minimizing energy losses. Sometimes the energy recovery ventilator unit can become frosted, thereby reducing the functionality of the unit.
- One embodiment of the disclosure is a method defrosting an energy recovery ventilator unit. The method comprises activating a defrost process of an enthalpy-exchange zone of the energy recovery ventilator unit when an air-flow blockage in the enthalpy-exchange zone coincides with a frost threshold in the ambient environment surrounding the energy recovery ventilator unit. The method also comprises terminating the defrost process, including terminating the defrost process when an operating condition in the vicinity of the enthalpy-exchange zone substantially returns to a pre-frosting operating condition.
- Another embodiment is an energy recovery ventilator unit. The energy recovery ventilator unit comprises a defrost control module configured to activate the defrost process and to terminate the defrost process, as described above.
- Reference is now made to the following descriptions taken in conjunction with the accompanying drawings, in which:
-
FIG. 1 presents a flow diagram showing selected steps in an example method of defrosting an energy recovery ventilator unit according to the principles of the disclosure; -
FIG. 2 presents an cross-sectional view of an example energy recovery ventilator unit of the present disclosure; -
FIG. 3 presents a flow diagram of an example implementation of the method of the disclosure in the case where the energy recovery ventilator unit does not include a powered heat source or a secondary air-intake opening; -
FIG. 4 presents a flow diagram of another example implementation of the method of the disclosure in the case where the energy recovery ventilator unit does include a powered heat source but does not include a secondary air intake opening; -
FIG. 5 presents a flow diagram of another example implementation of the method of the disclosure in the case where the energy recovery ventilator unit does include a poweredheat source 250 but not a secondary air-intake opening; and -
FIG. 6 presents a flow diagram of another example implementation of the method of the disclosure in the case where the energy recovery ventilator unit does include a powered heat source and a secondary air-intake opening. - The term, “or,” as used herein, refers to a non-exclusive or, unless otherwise indicated. Also, the various embodiments described herein are not necessarily mutually exclusive, as some embodiments can be combined with one or more other embodiments to form new embodiments.
- It is desirable to have an efficient and flexible method for defrosting an energy recovery ventilator unit that both minimizes the energy expended for defrosting and minimizes the time spent when the energy recovery ventilator unit is not in its normal operating mode.
-
FIG. 1 presents a flow diagram showing selected steps in an example method of defrosting an energy recovery ventilator unit according to the principles of the disclosure. To facilitate understanding of the flow diagram presented inFIG. 1 ,FIG. 2 presents a perspective view of an example energyrecovery ventilator unit 200 of the disclosure, which can include but is not limited to, any of the design layouts and any of the components parts described in Appl-1. Theunit 200 can be part of aspace conditioning system 202. - For instance, the
unit 200 can comprise acabinet 205 housing an intake air zone 210 (e.g., sometimes a primary intake air zone), asupply air zone 212, areturn air zone 214, anexhaust air zone 216 and an enthalpy-exchange zone 218. Theintake zone 210 and theexhaust zone 216 are both on oneside 220 of theenthalpy exchange zone 218, and, thesupply zone 212 and thereturn zone 214 are both on anopposite side 225 of theenthalpy exchange zone 218. The energyrecovery ventilator unit 100 also comprises afirst blower 230 and asecond blower 235. Thefirst blower 230 is located in theintake zone 210 and is configured to push, or alternatively pull, outside air into theintake zone 210 and straight through theenthalpy exchange zone 218 into thesupply zone 212. Thesecond blower 235 is located in thereturn zone 214 and is configured to push, or alternatively pull, return air into thereturn zone 214 and straight through theenthalpy exchange zone 218 into theexhaust zone 216. Theenthalpy exchange zone 218 can include one or more enthalpy-exchanger devices 240 configured as one or more enthalpy wheels or other enthalpy-exchange devices such as plated heat exchangers or heat pipes or other devices familiar to those skilled in the art. As further illustrates the unit can further include adefrost control module 245 which as illustrated, can be located on the outside surface of thecabinet 205 although other located are within the scope of the disclosedunit 200. - Returning to
FIG. 1 , themethod 100 of defrosting the energyrecovery ventilator unit 200 comprises astep 105 of activating a defrost process of an enthalpy-exchange zone 218 of the energyrecovery ventilator unit 200 when an air-flow blockage in the enthalpy-exchange zone 218 coincides with a frost threshold in the ambient environment surrounding the energyrecovery ventilator unit 200. - As further illustrated in
FIG. 1 some embodiments of themethod 100 can include astep 107 of determining if an air-flow blockage exists in the enthalpy-exchange zone 218.Step 107 can include any of the processes described in Appl-2 for determining the presence of an air-flow blockage through an enthalpy-exchange zone 218. In somecases step 107 can include determining a pressure difference across the enthalpy-exchange zone 218 while the energyrecovery ventilator unit 200 is operating. In other cases,step 107 can include determining a heat transfer efficiency across the enthalpy-exchange zone 218 while the energyrecovery ventilator unit 200 is operating. The pressure or heat transfer efficiency can be compared to the analogous operational characteristic of pressure or heat transfer when theunit 200 determined duringstep 108 when theunit 200 was in a known normal operating condition. When the pressure difference increases or heat transfer decreases beyond a pre-defined limit the presence of an air-flow blockage is signaled, such as disclosed in Appl-2. - As also in
FIG. 1 , some embodiments of themethod 100 can include astep 109 of determining if the air-flow blockage in the enthalpy-exchange zone coincides with a frost threshold existing in the ambient environment surrounding theunit 200. - The term, frost threshold, as used herein, refers to a pre-selected temperature value corresponding to the measured ambient air-temperature surrounding the energy recovery ventilator unit at which frost formation will occur. In some cases, for example, the frost threshold can correspond to a pre-selected temperature value in a range of 20 to 32° F. In some cases, the frost threshold can be pre-selected temperature value that is adjusted depending on the relative humidity within energy
recovery ventilator unit 200. For example, in some cases, the frost threshold may be a temperature value of 20° F. when the relative humidity is low (e.g., 30 percent or lower) but linearly adjusted to 32° F. as the relative humidity reaches 100 percent. - As illustrated for the
example method 100 shown inFIG. 1 , when there is both an air-flow blockage (e.g., yes, in step 107) in the enthalpy-exchange zone 218 and there is a frost threshold (e.g., yes, in step 109) the defrost process (step 105) can be activated. Alternatively, when there is an air-flow blockage (yes, in step 107) in the enthalpy-exchange zone 218 but there is a frost threshold (no in step 109) then a non-frostfailure mode step 110 can be activated. This can advantageously prevent theunit 200 from going into a defrost mode when it is determined a frosting condition unlikely to have occurred. The procedures followed when the non-frost failure mode (step 110) is activated can include any of the processes described in Appl-2. - As shown in
FIG. 1 , themethod 100 also comprises astep 115 of terminating the defrost process, including astep 116 of terminating the defrost process when an operating condition in the vicinity of the enthalpy-exchange zone 218 substantially returns to a pre-frosting operating condition. The term operating condition, as used herein, refers to an environmental conditions or properties at one or more locations in theunit 200 that is measurable while theunit 200 is operating either before or during the defrost process (step 110). The term pre-frosting operating condition refers to the environmental condition when theunit 200 was in a normal operating state step 108 (e.g., prior to detecting a air-flow blockage in step 107) - It is often desirable for the defrost process to continue for as short a period as possible, because defrosting can reduce the energy and heat transfer efficiency of the
unit 200, and in some cases damage components (e.g., the enthalpy-exchanger devices 240) of theunit 200. In some cases, minimizing the defrosting time can be facilitated by providing multiple different criteria for terminating the defrost process. Consequently, terminating the defrost process can include monitoring one or more different operating conditions of theunit 200. - For instance, in some cases, terminating the defrost process (step 115) can further include a
step 117 of determining the operating condition (as part of step 116), which includes measuring an air-pressure difference across the enthalpy-exchange zone 218 while theunit 200 is operating. For example,pressure transducers 242, situated on either side of theenthalpy zone 218, can monitor the pressure during defrost process (step 110) as well as during pre-defrost conditions, such as determined, e.g., during a normal operating state (step 109). In such cases, terminating the defrost process (step 115) includes terminating after the operating condition, corresponding to the measured air-pressure difference across the enthalpy-exchange zone 218, has decreased to substantially equal to (e.g., within ±10% in some cases) the pre-frosting operating condition, corresponding to an air-pressure difference across the enthalpy-exchange zone 218 measured prior to activating the defrost process (e.g., measured during step 109). - For instance, in some cases, terminating the defrost process (step 115) further includes a
step 119 of determining the operating condition (as part of step 116), which includes measuring a heat transfer efficiency across the enthalpy-exchange zone 218 while theunit 200 is operating. - For example,
temperature sensor 244, situated on either side of theenthalpy zone 218, can monitor the temperature during defrost process (step 110) as well as during pre-defrost conditions, such as determined, e.g., during a normal operating state (step 109). The heat transfer efficiency is proportional to the ratio of: the temperature difference between theintake air zone 210 and thesupply air zone 212 divided by the temperature difference between thereturn air zone 214 and theintake air zone 210. The temperature difference between the difference betweenreturn air zone 214 andintake air zone 210 is considered to represent the overall heat transfer occurring in theunit 200, e.g., that drives energy transfer, while the temperature difference between theintake air zone 210 and the supply air zone is considered to represent the actual heat transfer occurring. - In such cases, terminating the defrost process (step 115) includes terminating after the operating condition, corresponding to the measured heat transfer efficiency across the enthalpy-
exchange zone 218, has decreased to be substantially equal to (e.g., within ±10% in some cases) the pre-frosting operating condition, corresponding to a heat transfer efficiency across the enthalpy-exchange zone 218 measured prior to activating the defrost process (e.g., measured during step 109). - In some embodiments, however, if the operating condition has not substantially returned to a pre-frosting operating condition, then the non-defrost failure mode (step 110) is entered.
- In some cases, it is also desirable to terminate the defrost process (step 115) after a measured pre-selected time limit is reached (step 120). This can advantageously prevent excessive energy and time being expended on defrosting when the
enthalpy exchange zone 218 is blocked for reason other than frosting. In some cases, if the time limit measured instep 120 has reached the pre-selected time limit (e.g., a defrosting time limit has expired), the non-defrost failure mode (step 110) is entered. - To facilitate minimizing the defrosting time and minimizing the energy expended on defrosting, some embodiments of the
method 100 provide multiple defrosting strategies that can be implemented, either alone or in combination, as part of thedefrosting process 105, and implements in a fashion that depends on the ambient environmental conditions surrounding theunit 200 or on the components that are included in theunit 200. - For instance, in some embodiments, the activated defrost process (step 105) further includes a
step 130 of activating apowered heat source 250 configured to warm air in theintake air zone 210 or theexhaust air zone 216 located inside of theunit 200. Thepowered heat source 250 can pre-heat the ambient cold air outside of the unit to thereby facilitate rapid defrosting. In some cases, thepowered heat source 250 can be an electric heater. However, in other cases, a gas-fired heat exchanger could be used. In some cases, thepowered heat source 250 is, or includes, a modular electric heater coupled to the outside of theunit 200 and located upstream of anair intake opening 252 of theintake air zone 210. The term modular electric heater, as used herein, refers to a self-contained heater that includes one or more of temperature sensors, electrical power connections, device control connections, as integral parts of theheater 250, thereby facilitating field-installation of theheater 250, e.g., to a previously installedunit 200. - In some embodiments, activating the
powered heat source 250 instep 130 further including astep 132 of adjusting thepowered heat source 250 to one of a plurality of different levels of heat generation as a function of an ambient air temperature surrounding theunit 200. For instance, if the ambient air temperature is at or below a pre-selected set-point (e.g., 20° F. in some cases) then theheater 250 can be adjusted to a high level of heating. If the ambient air temperature is above the set-point then theheater 250 can be adjusted to a low level of heating. Having the ability to adjust to plurality of different levels facilitates using the full heating the potential of the heater at certain times, but, avoiding excessive heating at other times, that could damage, e.g., due to melting or softening of plastic parts in theenthalpy exchange device 240, or other components of theunit 200. - For instance, in some embodiments, the activated defrost process (step 105) further includes a
step 135 of reducing airflow from anair intake zone 210 located inside of theunit 200 to the enthalpy exchange-zone 218. For instance, the speed of theair blower 230 located in theintake air zone 210 can be reduced. For instance, in some cases the speed of theair blower 230 is reduced by about 20 to 30 percent as compared to the speed of the air blower when theunit 200 is in its normal operating state (e.g., step 108). Reducing the airflow can facilitate defrosting because the amount of cold air drawn into theunit 200 from the ambient outside air is reduced. In some cases, when theunit 200 includes the poweredheat source 250, reducing the airflow from the air-intake zone 210 (step 135) at or during the same time as activating the heat source 250 (step 130) can speed defrosting because the temperature of the air reaching theenthalpy zone 218 is increased. - In some embodiments, the activated defrost process (step 105) further includes a
step 140 of activating anair controller assembly 260 so as to allow air-flow through a secondary air-intake opening 262 connected to thesupply zone 212 located inside of theunit 200. As further disclosed in Appl-1, theair controller assembly 260 can include baffles ordampers 264 which are configured to be continuously adjustable to allow substantially no air, to large volumes of air, to pass through thesecondary intake opening 260. InFIG. 2 , only a partial cut-away view of the exampleair controller assembly 260 is depicted so that thesupply air zone 212 and secondary input opening 262 can be more clearly depicted. - As illustrated in
FIG. 1 in some cases, theair controller assembly 260 is activated instep 140 when the air flow through the primaryair intake zone 210 is reduced instep 135. In some applications (e.g., schools, hospitals), allowing air through the secondary air-intake opening 262 is important to meeting certain fresh air requirements that must be met, even when performing the defrost process (step 105). In some cases, to facilitate meeting the fresh air requirements, the reduction in the air flow from theair intake zone 210 and an increase in the air-flow through the secondary air-intake opening 262 are coordinated such that the air-pressure inside of theunit 200 substantially equals an ambient airpressure surrounding unit 200. Examples of some such embodiments are further described in Appl-3 in the context of using measurements from a global demand pressure sensor of theunit 200 as part of controlling theair controller assembly 260 and thereby achieving the desired amount of air-flow through a secondary air-intake opening 262 to meet the fresh air requirements. In some cases, theair controller assembly 260 is activated such that there is a slightly negative pressure compared to the global demand pressure (e.g., within about 0.1 to −0.2 inches, water column) to help prevent any ensure that any air conditioned by theenthalpy exchange zone 218 does not get blown out of the unit 200 (e.g., through the secondary air-intake opening 262) before being transferred into a air-handler unit 510, (e.g., heating ventilation and cooling system, such as a roof top unit), coupled to theunit 200. - In some embodiments, the defrost process (activated in step 105) further includes a
step 145 of activating aheat source 270 of an air-handling unit 272 that is coupled to theunit 200, such that the air exiting the air-handling unit 272 is heated to a substantially same temperature than before the defrosting process was activated (step 105). Theheater 270 of the air-handling unit 272 can be a gas-fired heater, electric heater or other heater familiar to those skilled in the art. As illustrated inFIG. 2 the air-handling unit is located down-stream, and configured to receive air, from theunit 200. The air-handling unit can be part of thespace conditioning system 202. - Activating the
heat source 270 of an air-handling unit 272 instep 145 can advantageously heat cold outside air through the secondary air-intake opening 262 and thereby make the conditioned space more comfortable during thedefrosting process 115. In some cases, theheat source 270 in the air-handling unit 272 is activated instep 145 at the same time, or before, the air controller assembly is activated instep 140. For instance, in some cases, activating the air controller assembly instep 140cases dampers 264 covering the secondary air-intake opening 262 can take one to two minutes to fully open. During this time, activating theheater 270 can pre-heat the air such that when the secondary air-intake opening 262 is fully opened, the air reaching the conditioned space is preheated to substantially same temperature as before the defrosting process started. - Another embodiment of the disclosure is the energy
recovery ventilator unit 200, which can comprise any of embodiments of theunit 200 discussed in the context ofFIG. 1 and presented inFIG. 2 . For instance, theunit 200 comprises adefrost control module 245 is configured to activate the defrost process (step 105) and terminate the defrost process (step 115), such as disclosed in the context ofFIG. 1 . Embodiments of theunit 200 can include the components such as the intake air zone, 210,supply air zone 212, returnair zone 214,exhaust air zone 216,enthalpy exchange zone 218, as disclosed above and as further disclosed in Appl-1, Appl-2 and Appl-3. - For instance, the
unit 200 can includepressure transducers 242 configured to measuring an air-pressure difference across the enthalpy-exchange zone 218 while theunit 200 is operating. Thepressure transducers 242 can be configured to transmit the measured air pressure difference to thedefrost control module 245, and thedefrost control module 245 can be configured to determine the operating condition as including the air-pressure difference in accordance withstep 117. - For instance, the
unit 200 can include temperature sensors configured to measuringair temperatures 244 of theintake zone 210, asupply air zone 212, and areturn air zone 214 located inside of theunit 200. Thetemperature sensors 244 can be configured to transmit the measured air temperatures to thedefrost control module 245. Thedefrost control module 245 can be configured to determine the operating condition as including a heat transfer efficiency determined from the measured air temperatures, in accordance withstep 119. - For instance, the
defrost module 245 can be configured to terminate the defrost process (step 115) after a preselected time limit is reached. In some embodiments, e.g., thedefrost module 245 includes an electronic timing circuit that monitors the time when the defrost process was activated instep 105, and compare the accumulated defrosting time to the preselected time limit, e.g., as set by factory or installation personnel. - For instance, the
unit 200 can further include apowered heat source 250 configured to warm air in theintake air zone 210 or theexhaust air zone 216 located inside of theunit 200, and the defrost control module can be configured to activate or deactivate theheat source 250. In some embodiments thepowered heat source 250 includes, or is, a modular electric heater configured to be coupled to the outside of theunit 200 and located upstream of theair intake opening 252 of theintake air zone 210. - For instance, the
defrost module 245 can be configured to control the airflow from theair intake zone 210 located insideunit 200 to the enthalpy exchange-zone 218. In some embodiments, e.g., thedefrost module 245 includes an electronic circuit configured to control the speed of theair intake blower 250 located in theintake air zone 210, in accordance withstep 135. - For instance, the
unit 200 can further include anair controller assembly 260 configured to adjust an amount of air-flow through a secondary air-intake opening 262 connected to asupply zone 212 located inside of theunit 200, and thedefrost control module 245 can be configured to control theair controller assembly 260 to increase or decrease the amount of air allowed through the secondary air-intake opening 262. - For instance, the
defrost control module 245 can be configured the control aheat source 270 of an air-handling unit 272 that is coupled to theunit 200. In some embodiments, e.g., thedefrost module 245 includes an electronic circuit that is configured to activate theheat source 272, e.g., when there is air flowing through the secondaryintake air opening 262, such that the air exiting the space conditioning system is heated to a substantially same temperature than before the defrosting process was activated. The electronic circuit can be configured to deactivate theheat source 272, when the defrosting process in terminated instep 115, or when there is not longer air flowing through the secondaryintake air opening 262. - Aspects of the disclosed method of defrosting are further illustrated in
FIGS. 3-6 , which present of example implementations of themethod 100 and theunit 200. -
FIG. 3 presents a flow diagram of an example implementation of themethod 100 in the case where theunit 200 does not include apowered heat source 250 or a secondary air-intake opening 262. Themethod 100 can include a starting a defrost check mode (step 301) which can include: step 303 of turning on the enthalpy exchange device 240 (e.g., make sure anenthalpy wheel device 240 is rotating),step 305 of verifying that theblower 250 is at the proper set point for heat transfer to occur, and step 307 (an example of step 109) of deciding whether to enter defrost mode including, e.g. measuring the outside air temperature and determining if the temperature is above the frost threshold. The defrost check (step 301) can include entering a non-frost failure mode step 310 (an example of step 110), if it is decided, instep 307, that the blockage is not due to frost formation. The defrost check (step 301) can include astep 313 of deciding if there is aheater 250 installed. If there is aheater 250 installed, then other procedures such as set forth inFIGS. 4-8 may be followed. If there is not aheater 250 installed, then a blower defrost mode (step 315) is entered (an example of step 105). - The blower defrost mode (step 315) can include a
step 317 of reducing the air flow to theenthalpy exchange zone 218 e.g., by increasing the speed of the blower 230 (an example of step 135), astep 319 of commencing a timer, astep 321 of monitoring the accumulated time and determining instep 323 if a time-limit is reached (examples of step 120). If the time-limit is reached, astep 325 of further increasing the air flow (e.g., such as the air flow prior to step 317) is activated and instep 327 the operating condition (e.g., pressure difference and/or heat transfer efficiency) is measured (an example ofsteps step 329, it is decided if the operating condition (e.g., pressure or heat transfer efficiency) is not different than the pre-frosting operating condition. If there is no difference, then the blower defrost mode (step 315) is terminated (an example of step 115) and theunit 200 returns to a normal operating state in step 331 (an example of step 108). If there is still a difference in the operating condition compared to the pre-frosting condition, then a second blower defrost mode (step 333) is entered (an example continuation of step 105). - The second blower defrost mode (step 333) includes
steps steps step 335 is greater than the air flow reduction in step 317 (e.g.,blower 230 speed is further lowered). - If there is still a difference in the operating condition (e.g., pressure difference or heat transfer efficiency) compared to a pre-frosting operating condition, then a third blower defrost mode (step 353) is entered (an example of continuing step 105). Again the third blower defrost mode (step 353) includes
steps steps step 355 is more (e.g.,blower 230 speed is lower) than the air flow reduction instep 317 orstep 335. In some cases, the air flow is reduced to zero in step 355 (e.g., theblower 230 is turned off), while in other cases there is still air flow toenthalpy exchange zone 218. In some cases the time-limit set instep 339 can be different than the time-limit set instep 319. - Based on the present disclosure, one of ordinary skill would appreciate that the number of blower defrost modes could be increased or decreased compared to that depicted in FIG. before after a final decision step (e.g., step 367) that the is still a difference in the pressure difference or heat transfer efficiency compared to a pre-frosting operating condition and the a non-frost
failure mode step 310 is activated. -
FIG. 4 presents a flow diagram of another example implementation of themethod 100 in the case where theunit 200 does include apowered heat source 250 but does not include the secondaryair intake opening 262. The same numbers indicate steps that are analogous to the steps described inFIG. 3 , with the exception that instead of a blowerdefrost mode step 315, there is a combined blower and heatingdefrost mode step 415, which can include activating the powered heat source 250 (an example ofstep 130, as part of step 105) and reducing the air flow such as described in the context of thedefrost mode 315 disclosed inFIG. 3 . - In some cases, e.g., an
electric heater 250 can be staged to different heating levels based on an outside air temperature measured in the air-intake zone 210 thecontrol module 245 can lower theintake air blower 230 speed, andelectric heater 250 heater operated at a low heating level, until the pressure difference across the enthalpy zone 218 (e.g., an enthalpy wheel intake pressure minus a the wheel exhaust pressure) are at pre-frost conditions. If frosting not addressed the speed of theblower 230 can be reduced to an allowable minimum and electric heater will operate at a higher heating level. - Aspects of a another embodiment staged heating are further illustrated in
FIG. 5 which presents a flow diagram of another example implementation of themethod 100 in the case where theunit 200 does include apowered heat source 250 but not the secondary air-intake opening 262. Again, the same numbers indicate steps that are analogous to the steps described inFIG. 3 . Instead of a blowerdefrost mode step 315, or combined blower defrost mode and heating mode step 415 (FIG. 4 ), there is a staged heating defrost mode step 515 (an example ofstep 130 as part of step 105). Instep 517, it determined if there outside air temperature is below a pre-selected temperature. If the outside air temperature is above the pre-selected temperature then atstep 519, a low level of heating is selected (an example of step 132). If the outside air temperature is below the pre-selected temperature, then atstep 521, a high level of heating is selected (again an example of step 132). Alternatively, if after the time-limit set instep 319 has expired and there is still a difference in the pressure difference or heat transfer efficiency compared to a pre-frosting operating condition, the heating can transition atstep 323 from the low level (step 519) to the high level (step 521). If after the time-limit set instep 337 has expired and there is still a difference in the pressure difference or heat transfer efficiency compared to a pre-frosting operating condition, the stagedheating mode step 515 can transition atstep 523 to the combined blower defrost mode andheating mode step 415 as described inFIG. 4 . - In some cases, e.g., an
electric heater 250 is staged in as quickly as possible to facilitate continued delivery the correct amount of fresh air. The pressure across theenthalpy zone 218 can be monitoring to determine if defrost has been completed by observing that the pressure difference has reverted back to pre-frosted level. -
FIG. 6 presents a flow diagram of another example implementation of themethod 100 in the case where theunit 200 does include apowered heat source 250 and the secondary air-intake opening 262. Again, the same numbers indicate steps that are analogous to the steps described inFIGS. 3 and 5 . Instead of a blowerdefrost mode step 315, there is a combined blower and staged heatingdefrost mode step 615 which can include activating anair controller assembly 260 and aheat source 270 of an air-handler unit 272 (examples ofsteps - After starting the defrost mode, a
heat source 270 of an air-handler unit 272 can be activated instep 617, e.g., as a preheating step. Afterstep 517, but before either ofsteps step 619 of reducing the air flow to the enthalpy exchange zone 218 (e.g., similar to step 317) plus activating an air controller assembly 260 (e.g., to open dampers covering the secondary air-intake opening 262). Instep 621 it is determined if the secondary air-intake opening 262 is fully open and pressure in theunit 200 is at or slightly below a global pressure value (e.g., such as further described in Appl-3). If the pressure in theunit 200 is too low, then the intake air flow is increases (e.g., by increasing theblower 230 speed) instep 623.Steps steps step 517. Subsequent steps are similar to the steps presented inFIG. 3 or 5. - In some cases, e.g., the
control module 245 will slow downintake blower 230 to a minimum accepted air-flow and open updampers 264 of theair controller assembly 260 until pressure at the air-handler 272 is the same as the ambient pressure. Anelectric heater 250 will energize at maximum heating capacity until the pressure difference across theenthalpy exchange zone 218 is at a pre-frost condition. Then the damper will slowly close as theintake blower 230 speed increases back to it normal set point. - Those skilled in the art to which this application relates will appreciate that other and further additions, deletions, substitutions and modifications may be made to the described embodiments.
Claims (20)
1. A method of defrosting an energy recovery ventilator unit, comprising:
activating a defrost process of an enthalpy-exchange zone of the energy recovery ventilator unit when an air-flow blockage in the enthalpy-exchange zone coincides with a frost threshold in the ambient environment surrounding the energy recovery ventilator unit; and
terminating the defrost process, including terminating the defrost process when an operating condition in the vicinity of the enthalpy-exchange zone substantially returns to a pre-frosting operating condition.
2. The method of claim 1 , wherein terminating the process to defrost further includes determining the operating condition, including measuring an air-pressure difference across the enthalpy-exchange zone while the energy recovery ventilator unit is operating.
3. The method of claim 2 , wherein terminating the defrost process includes terminating after the operating condition, corresponding to the measured air-pressure difference across the enthalpy-exchange zone, has decreased to substantially equal the pre-frosting operating condition, corresponding to an air-pressure difference across the enthalpy-exchange zone measured prior to activating the defrost process.
4. The method of claim 1 , wherein terminating the process to defrost further includes determining the operating condition, including measuring a heat transfer efficiency across the enthalpy-exchange zone while the energy recovery ventilator unit is operating.
5. The method of claim 4 , wherein terminating the process to defrost includes terminating after the operating condition, corresponding to the measured heat transfer efficiency, has decreased to be substantially equal to the pre-frosting operating condition, corresponding to an heat transfer efficiency across the enthalpy-exchange zone prior to activating the defrost process.
6. The method of claim 1 , wherein terminating the process to defrost includes terminating after a preselected time limit is reached.
7. The method of claim 1 , wherein the defrost process further includes activating a powered heat source configured to warm air in an intake air zone or an exhaust air zone located inside of the energy recovery ventilator unit.
8. The method of claim 7 , wherein the powered heat source includes a modular electric heater coupled to the outside of the energy recovery ventilator unit and located upstream of an air intake opening of the intake air zone.
9. The method of claim 7 , wherein activating the powered heat source further including adjusting the powered heat source to one of a plurality of different levels of heat generation as a function of an ambient air temperature surrounding the energy recovery ventilator unit.
10. The method of claim 1 , wherein the defrost process further includes reducing airflow from an air intake zone located inside of the energy recovery ventilator unit to the enthalpy exchange-zone.
11. The method of claim 10 , wherein the defrost process further includes activating an air controller assembly so as to allow air-flow through a secondary air-intake opening connected to a supply zone located inside of the energy recovery ventilator unit.
12. The method of claim 11 , wherein the reduction in the air flow from the air intake zone and an increase in the air-flow through the secondary air-intake opening are coordinated such that the air-pressure inside of the energy recovery ventilator unit substantially equals an ambient air pressure surrounding the energy recovery ventilator unit.
13. The method of claim 11 , wherein the defrost process further includes activating a heat source of an air-handling unit coupled to the energy recovery ventilator unit, such that the air exiting the air-handling unit is heated to a substantially same temperature than before the defrosting process was activated.
14. The method of claim 13 , wherein the heat source in the air-handling unit is activated at the same time, or before, the air controller assembly is activated.
15. An energy recovery ventilator unit, comprising:
a defrost control module configured to:
activate a defrost process of an enthalpy-exchange zone of the energy recovery ventilator unit when an air-flow blockage in the enthalpy-exchange zone coincides with a frost threshold in the ambient environment surrounding the energy recovery ventilator unit; and
terminate the defrost process, including terminating the defrost process when an operating condition in the vicinity of the enthalpy-exchange zone substantially returns to a pre-frosting operating condition.
16. The unit of claim 15 , further including pressure transducers configured to measuring an air-pressure difference across the enthalpy-exchange zone while the energy recovery ventilator unit is operating and configured to transmit the measured air pressure difference to the defrost control module, and wherein the defrost control module is configured to determine the operating condition as including the air-pressure difference.
17. The unit of claim 15 , further including temperature sensors configured to measuring air temperatures of an intake air zone, a supply air zone, and a return air zone located inside of the energy recovery ventilator unit and configured to transmit the measured air temperatures to the defrost control module, and wherein the defrost control module is configured to determine the operating condition as including a heat transfer efficiency determined from the measured air temperatures.
18. The unit of claim 15 , wherein the defrost control module is further configured to terminate the defrost process after a preselected time limit is reached.
19. The unit of claim 15 , further including a powered heat source configured to warm air in an intake air zone or an exhaust air zone located inside of the energy recovery ventilator unit, wherein the defrost control module is configured to activate or deactivate the heat source.
20. The unit of claim 19 , wherein the powered heat source includes a modular electric heater configured to be coupled to the outside of the energy recovery ventilator unit and located upstream of an air intake opening of the intake air zone.
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US13/293,454 US20130118188A1 (en) | 2011-11-10 | 2011-11-10 | Method of defrosting an energy recovery ventilator unit |
US14/641,090 US9791163B2 (en) | 2011-11-10 | 2015-03-06 | Method of defrosting an energy recovery ventilator unit |
US15/708,530 US10386087B2 (en) | 2011-11-10 | 2017-09-19 | Method of defrosting an energy recovery ventilator unit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US13/293,454 US20130118188A1 (en) | 2011-11-10 | 2011-11-10 | Method of defrosting an energy recovery ventilator unit |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US14/641,090 Division US9791163B2 (en) | 2011-11-10 | 2015-03-06 | Method of defrosting an energy recovery ventilator unit |
Publications (1)
Publication Number | Publication Date |
---|---|
US20130118188A1 true US20130118188A1 (en) | 2013-05-16 |
Family
ID=48279332
Family Applications (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US13/293,454 Abandoned US20130118188A1 (en) | 2011-11-10 | 2011-11-10 | Method of defrosting an energy recovery ventilator unit |
US14/641,090 Active 2032-07-29 US9791163B2 (en) | 2011-11-10 | 2015-03-06 | Method of defrosting an energy recovery ventilator unit |
US15/708,530 Active US10386087B2 (en) | 2011-11-10 | 2017-09-19 | Method of defrosting an energy recovery ventilator unit |
Family Applications After (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US14/641,090 Active 2032-07-29 US9791163B2 (en) | 2011-11-10 | 2015-03-06 | Method of defrosting an energy recovery ventilator unit |
US15/708,530 Active US10386087B2 (en) | 2011-11-10 | 2017-09-19 | Method of defrosting an energy recovery ventilator unit |
Country Status (1)
Country | Link |
---|---|
US (3) | US20130118188A1 (en) |
Cited By (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104819543A (en) * | 2014-01-30 | 2015-08-05 | 特灵国际有限公司 | System and Method of Protecting an HVAC System |
US20150253049A1 (en) * | 2014-03-04 | 2015-09-10 | General Electric Company | Water heater appliance and a method for operating the same |
US9175872B2 (en) | 2011-10-06 | 2015-11-03 | Lennox Industries Inc. | ERV global pressure demand control ventilation mode |
CN105042786A (en) * | 2015-07-30 | 2015-11-11 | 广东美的制冷设备有限公司 | Dehumidifier and method and device for controlling dehumidifier |
US9395097B2 (en) | 2011-10-17 | 2016-07-19 | Lennox Industries Inc. | Layout for an energy recovery ventilator system |
US9404668B2 (en) | 2011-10-06 | 2016-08-02 | Lennox Industries Inc. | Detecting and correcting enthalpy wheel failure modes |
US9441843B2 (en) | 2011-10-17 | 2016-09-13 | Lennox Industries Inc. | Transition module for an energy recovery ventilator unit |
CN106765917A (en) * | 2016-12-07 | 2017-05-31 | 珠海格力电器股份有限公司 | Air conditioner control method and device |
US9671122B2 (en) | 2011-12-14 | 2017-06-06 | Lennox Industries Inc. | Controller employing feedback data for a multi-strike method of operating an HVAC system and monitoring components thereof and an HVAC system employing the controller |
US20170219237A1 (en) * | 2014-10-10 | 2017-08-03 | Mitsubishi Electric Corporation | Heat-exchange ventilation device |
US9791163B2 (en) | 2011-11-10 | 2017-10-17 | Lennox Industries Inc. | Method of defrosting an energy recovery ventilator unit |
US9835353B2 (en) | 2011-10-17 | 2017-12-05 | Lennox Industries Inc. | Energy recovery ventilator unit with offset and overlapping enthalpy wheels |
CN107842970A (en) * | 2017-10-18 | 2018-03-27 | 广东美的暖通设备有限公司 | Air-conditioning system and its defrosting control method and device |
CN108286775A (en) * | 2017-12-29 | 2018-07-17 | 广东高而美制冷设备有限公司 | It is a kind of that there is waste heat recovery and anti-freeze defrosting control method |
EP3207315A4 (en) * | 2014-10-16 | 2018-10-24 | Swegon Operations AB | Adaptive defrosting of an air treatment system |
CN108895609A (en) * | 2018-07-30 | 2018-11-27 | 珠海格力电器股份有限公司 | Defrosting control method for air conditioning system and air conditioning system |
US20190056134A1 (en) * | 2016-01-08 | 2019-02-21 | Mitsubishi Electric Corporation | Ventilator, and defrosting method |
EP2876378B1 (en) * | 2013-11-12 | 2019-10-30 | FläktGroup Deutschland GmbH | System for the recovery of heat |
CN111079302A (en) * | 2019-12-25 | 2020-04-28 | 中国大唐集团科学技术研究院有限公司火力发电技术研究院 | Low-pressure cylinder efficiency measuring and calculating system and method |
US11371761B2 (en) * | 2020-04-13 | 2022-06-28 | Haier Us Appliance Solutions, Inc. | Method of operating an air conditioner unit based on airflow |
US20220390138A1 (en) * | 2021-05-30 | 2022-12-08 | Trane International Inc. | Capacity control for hvac system |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN206191809U (en) * | 2016-09-22 | 2017-05-24 | 广东松下环境系统有限公司 | Ventilation device |
CN106801976A (en) * | 2017-01-06 | 2017-06-06 | 海信(广东)空调有限公司 | Air conditioner defrosting method |
CN107166664A (en) * | 2017-06-09 | 2017-09-15 | 青岛海尔空调器有限总公司 | A kind of air conditioner and control method |
US11187429B2 (en) * | 2017-08-31 | 2021-11-30 | Steven Winter Associates, Inc. | Integrated heat and energy recovery ventilator system |
CN109373505A (en) * | 2018-10-26 | 2019-02-22 | 奥克斯空调股份有限公司 | A kind of air-conditioning cleaning prompting control method and air conditioner |
CN109633780B (en) * | 2018-12-19 | 2020-06-26 | 国家电投集团河南电力有限公司 | Method, system and equipment for detecting blockage of stator bar of internal water cooling generator |
Citations (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4281522A (en) * | 1979-10-30 | 1981-08-04 | Carrier Corporation | Makeup air preconditioner for use with an air conditioning unit |
US4843838A (en) * | 1987-12-23 | 1989-07-04 | Allen Trask | Air-to-air heat pump |
US5497823A (en) * | 1993-12-30 | 1996-03-12 | Honeywell Inc. | Energy recovery ventilator: means for defrosting heat exchanger medium and damper motor actuation means |
US6209622B1 (en) * | 1994-10-24 | 2001-04-03 | Venmar Ventilation Inc. | Ventilation system |
US6289974B1 (en) * | 1997-07-11 | 2001-09-18 | Elastek, Inc. | Integrated heat recovery ventilator HEPA filter using a HEPA filter material regenerative heat exchanger |
US6328095B1 (en) * | 2000-03-06 | 2001-12-11 | Honeywell International Inc. | Heat recovery ventilator with make-up air capability |
US6415616B1 (en) * | 1999-09-03 | 2002-07-09 | Lg Electronics, Inc. | Method for controlling defrost heater of refrigerator |
US20020153133A1 (en) * | 1998-11-09 | 2002-10-24 | Building Performance Equipment Inc. | Ventilator system and method |
US6575228B1 (en) * | 2000-03-06 | 2003-06-10 | Mississippi State Research And Technology Corporation | Ventilating dehumidifying system |
US20030140638A1 (en) * | 2001-08-22 | 2003-07-31 | Delaware Capital Formation, Inc. | Refrigeration system |
US6925999B2 (en) * | 2003-11-03 | 2005-08-09 | American Standard International Inc. | Multistage warm air furnace with single stage thermostat and return air sensor and method of operating same |
US20050236150A1 (en) * | 2004-04-22 | 2005-10-27 | Chagnot Catherine J | Heat and energy recovery ventilators and methods of use |
US7090000B2 (en) * | 2003-10-30 | 2006-08-15 | Trent Metals Limited | Heat recovery ventilator |
US7231967B2 (en) * | 1994-01-31 | 2007-06-19 | Building Performance Equipment, Inc. | Ventilator system and method |
US20070144187A1 (en) * | 2005-12-22 | 2007-06-28 | Ki Seok Lee | Defrosting method of air conditioner |
US20070234748A1 (en) * | 2006-04-06 | 2007-10-11 | Robertshaw Controls Company | System and method for determining defrost power delivered by a defrost heater |
US20080076346A1 (en) * | 2006-09-26 | 2008-03-27 | Osman Ahmed | Ventilation Control Based on Occupancy |
US7716936B2 (en) * | 2006-06-26 | 2010-05-18 | Heatcraft Refrigeration Products, L.L.C. | Method and apparatus for affecting defrost operations for a refrigeration system |
US8123518B2 (en) * | 2008-07-10 | 2012-02-28 | Honeywell International Inc. | Burner firing rate determination for modulating furnace |
Family Cites Families (38)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3252508A (en) | 1962-02-12 | 1966-05-24 | William H Goettl | Combination air conditioner |
US3889742A (en) | 1973-11-13 | 1975-06-17 | Gas Dev Corp | Air conditioning apparatus and method |
US4018266A (en) | 1975-04-30 | 1977-04-19 | Command-Aire Corporation | Building fresh air ventilator system |
US4060913A (en) | 1976-08-02 | 1977-12-06 | Takasago Thermal Engineering Co., Ltd | Assembly for dehydrating air to be supplied to blast furnace |
JPS6118445U (en) | 1984-07-10 | 1986-02-03 | ワイケイケイ株式会社 | ventilation system |
US4754651A (en) | 1986-04-18 | 1988-07-05 | Shortridge Instruments, Inc. | Differential pressure apparatus for measuring flow and velocity |
US4854726A (en) | 1986-05-29 | 1989-08-08 | Hughes Aircraft Company | Thermal stress screening system |
US5183098A (en) | 1989-08-17 | 1993-02-02 | Stirling Technology, Inc. | Air to air heat recovery ventilator |
JP2602589Y2 (en) | 1990-10-29 | 2000-01-17 | カルソニック株式会社 | Housing for mounting temperature sensor |
US5761908A (en) | 1994-06-10 | 1998-06-09 | Air Quality Engineering | Apparatus suited for ventilating rooms contaminated with infectious disease organisms |
US5826641A (en) | 1994-10-27 | 1998-10-27 | Aaon, Inc. | Air conditioner with heat wheel |
US5726424A (en) | 1996-05-13 | 1998-03-10 | Technology Licensing Corporation | Modular control enclosure for a cooking appliance |
US5728289A (en) | 1996-10-11 | 1998-03-17 | Kirchnavy; Steve | Sensor cell holder for gas analyzer |
US6039109A (en) | 1996-11-05 | 2000-03-21 | Stirling Technology, Inc. | Air to air heat and moisture recovery ventilator |
US6407469B1 (en) | 1999-11-30 | 2002-06-18 | Balboa Instruments, Inc. | Controller system for pool and/or spa |
DE10113627B4 (en) | 2001-03-20 | 2005-12-29 | Rittal Gmbh & Co. Kg | Cabinet monitoring device |
US6629422B2 (en) | 2001-06-07 | 2003-10-07 | Keith E. Wellman | Sequential defrosting of refrigerated display cases |
US20030178411A1 (en) | 2002-03-25 | 2003-09-25 | Mark Manganiello | Food steamer with automatic electric steam trap, power modulation and automatic connected water supply |
US7316261B2 (en) | 2002-12-06 | 2008-01-08 | Lg Electronics Inc. | Heat exchanging system of ventilating device |
US7053497B2 (en) | 2003-02-10 | 2006-05-30 | Briggs & Stratton Power Products Group, Llc | Monitoring system for a generator |
KR100497783B1 (en) | 2003-05-01 | 2005-06-29 | 이준한 | Winch for Underwater Fish-Gathering Light and Control Method Therefor |
US7286907B2 (en) | 2004-02-12 | 2007-10-23 | Usa Technologies, Inc. | Method and apparatus for conserving power consumed by a refrigerated appliance utilizing audio signal detection |
US7258280B2 (en) | 2004-04-13 | 2007-08-21 | Tuckernuck Technologies Llc | Damper control in space heating and cooling |
US7922149B2 (en) | 2004-07-29 | 2011-04-12 | Siemens Industry Inc. | Damper actuator assembly |
US7383691B2 (en) | 2005-01-26 | 2008-06-10 | Hewlett-Packard Development Company, L.P. | Modular networked sensor assembly |
EP2270619B1 (en) | 2005-12-02 | 2013-05-08 | iRobot Corporation | Modular robot |
US20070171647A1 (en) | 2006-01-25 | 2007-07-26 | Anthony, Inc. | Control system for illuminated display case |
US7891573B2 (en) | 2006-03-03 | 2011-02-22 | Micro Metl Corporation | Methods and apparatuses for controlling air to a building |
US20090095096A1 (en) | 2007-10-10 | 2009-04-16 | Charles Edwin Dean | Hazardous materials sensing robot |
EP2209554B1 (en) | 2007-11-13 | 2017-10-11 | F. Hoffmann-La Roche AG | Modular sensor cassette |
US8600559B2 (en) * | 2008-10-27 | 2013-12-03 | Lennox Industries Inc. | Method of controlling equipment in a heating, ventilation and air conditioning network |
KR20110044014A (en) * | 2009-10-22 | 2011-04-28 | 엘지이노텍 주식회사 | Defrosting system and method of refrigerator |
US8943848B2 (en) * | 2010-06-16 | 2015-02-03 | Reznor Llc | Integrated ventilation unit |
US9404668B2 (en) | 2011-10-06 | 2016-08-02 | Lennox Industries Inc. | Detecting and correcting enthalpy wheel failure modes |
US9175872B2 (en) | 2011-10-06 | 2015-11-03 | Lennox Industries Inc. | ERV global pressure demand control ventilation mode |
US9395097B2 (en) | 2011-10-17 | 2016-07-19 | Lennox Industries Inc. | Layout for an energy recovery ventilator system |
US20130118188A1 (en) | 2011-11-10 | 2013-05-16 | Justin McKie | Method of defrosting an energy recovery ventilator unit |
US20150204578A1 (en) * | 2013-01-30 | 2015-07-23 | Ecoleap, Llc | Heat and energy recovery and regeneration assembly, system and method |
-
2011
- 2011-11-10 US US13/293,454 patent/US20130118188A1/en not_active Abandoned
-
2015
- 2015-03-06 US US14/641,090 patent/US9791163B2/en active Active
-
2017
- 2017-09-19 US US15/708,530 patent/US10386087B2/en active Active
Patent Citations (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4281522A (en) * | 1979-10-30 | 1981-08-04 | Carrier Corporation | Makeup air preconditioner for use with an air conditioning unit |
US4843838A (en) * | 1987-12-23 | 1989-07-04 | Allen Trask | Air-to-air heat pump |
US5497823A (en) * | 1993-12-30 | 1996-03-12 | Honeywell Inc. | Energy recovery ventilator: means for defrosting heat exchanger medium and damper motor actuation means |
US7231967B2 (en) * | 1994-01-31 | 2007-06-19 | Building Performance Equipment, Inc. | Ventilator system and method |
US6209622B1 (en) * | 1994-10-24 | 2001-04-03 | Venmar Ventilation Inc. | Ventilation system |
US20060219381A1 (en) * | 1994-10-24 | 2006-10-05 | Frederic Lagace | Ventilation system |
US6289974B1 (en) * | 1997-07-11 | 2001-09-18 | Elastek, Inc. | Integrated heat recovery ventilator HEPA filter using a HEPA filter material regenerative heat exchanger |
US20020153133A1 (en) * | 1998-11-09 | 2002-10-24 | Building Performance Equipment Inc. | Ventilator system and method |
US6415616B1 (en) * | 1999-09-03 | 2002-07-09 | Lg Electronics, Inc. | Method for controlling defrost heater of refrigerator |
US6575228B1 (en) * | 2000-03-06 | 2003-06-10 | Mississippi State Research And Technology Corporation | Ventilating dehumidifying system |
US6328095B1 (en) * | 2000-03-06 | 2001-12-11 | Honeywell International Inc. | Heat recovery ventilator with make-up air capability |
US20030140638A1 (en) * | 2001-08-22 | 2003-07-31 | Delaware Capital Formation, Inc. | Refrigeration system |
US7090000B2 (en) * | 2003-10-30 | 2006-08-15 | Trent Metals Limited | Heat recovery ventilator |
US6925999B2 (en) * | 2003-11-03 | 2005-08-09 | American Standard International Inc. | Multistage warm air furnace with single stage thermostat and return air sensor and method of operating same |
US20050236150A1 (en) * | 2004-04-22 | 2005-10-27 | Chagnot Catherine J | Heat and energy recovery ventilators and methods of use |
US20070144187A1 (en) * | 2005-12-22 | 2007-06-28 | Ki Seok Lee | Defrosting method of air conditioner |
US20070234748A1 (en) * | 2006-04-06 | 2007-10-11 | Robertshaw Controls Company | System and method for determining defrost power delivered by a defrost heater |
US7716936B2 (en) * | 2006-06-26 | 2010-05-18 | Heatcraft Refrigeration Products, L.L.C. | Method and apparatus for affecting defrost operations for a refrigeration system |
US20080076346A1 (en) * | 2006-09-26 | 2008-03-27 | Osman Ahmed | Ventilation Control Based on Occupancy |
US8123518B2 (en) * | 2008-07-10 | 2012-02-28 | Honeywell International Inc. | Burner firing rate determination for modulating furnace |
Non-Patent Citations (1)
Title |
---|
Ian Shaprio, Water & Energy Use in Steam-Heated Buildings, May 2010, ASHRAE * |
Cited By (31)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10823447B2 (en) | 2011-10-06 | 2020-11-03 | Lennox Industries Inc. | System and method for controlling a blower of an energy recovery ventilator in response to internal air pressure |
US9175872B2 (en) | 2011-10-06 | 2015-11-03 | Lennox Industries Inc. | ERV global pressure demand control ventilation mode |
US9404668B2 (en) | 2011-10-06 | 2016-08-02 | Lennox Industries Inc. | Detecting and correcting enthalpy wheel failure modes |
US10197344B2 (en) | 2011-10-06 | 2019-02-05 | Lennox Industries Inc. | Detecting and correcting enthalpy wheel failure modes |
US10337759B2 (en) | 2011-10-17 | 2019-07-02 | Lennox Industries, Inc. | Transition module for an energy recovery ventilator unit |
US9835353B2 (en) | 2011-10-17 | 2017-12-05 | Lennox Industries Inc. | Energy recovery ventilator unit with offset and overlapping enthalpy wheels |
US9395097B2 (en) | 2011-10-17 | 2016-07-19 | Lennox Industries Inc. | Layout for an energy recovery ventilator system |
US9441843B2 (en) | 2011-10-17 | 2016-09-13 | Lennox Industries Inc. | Transition module for an energy recovery ventilator unit |
US9791163B2 (en) | 2011-11-10 | 2017-10-17 | Lennox Industries Inc. | Method of defrosting an energy recovery ventilator unit |
US10386087B2 (en) | 2011-11-10 | 2019-08-20 | Lennox Industries Inc. | Method of defrosting an energy recovery ventilator unit |
US9671122B2 (en) | 2011-12-14 | 2017-06-06 | Lennox Industries Inc. | Controller employing feedback data for a multi-strike method of operating an HVAC system and monitoring components thereof and an HVAC system employing the controller |
EP2876378B1 (en) * | 2013-11-12 | 2019-10-30 | FläktGroup Deutschland GmbH | System for the recovery of heat |
CN104819543A (en) * | 2014-01-30 | 2015-08-05 | 特灵国际有限公司 | System and Method of Protecting an HVAC System |
US9664425B2 (en) * | 2014-03-04 | 2017-05-30 | Haier Us Appliance Solutions, Inc. | Heat pump water heater appliance and a method for operating the same |
US20150253049A1 (en) * | 2014-03-04 | 2015-09-10 | General Electric Company | Water heater appliance and a method for operating the same |
US20170219237A1 (en) * | 2014-10-10 | 2017-08-03 | Mitsubishi Electric Corporation | Heat-exchange ventilation device |
US10094587B2 (en) * | 2014-10-10 | 2018-10-09 | Mitsubishi Electric Corporation | Heat-exchange ventilation device |
EP3207315A4 (en) * | 2014-10-16 | 2018-10-24 | Swegon Operations AB | Adaptive defrosting of an air treatment system |
CN105042786A (en) * | 2015-07-30 | 2015-11-11 | 广东美的制冷设备有限公司 | Dehumidifier and method and device for controlling dehumidifier |
US10935269B2 (en) * | 2016-01-08 | 2021-03-02 | Mitsubishi Electric Corporation | Ventilator, and defrosting method |
US20190056134A1 (en) * | 2016-01-08 | 2019-02-21 | Mitsubishi Electric Corporation | Ventilator, and defrosting method |
GB2559692B (en) * | 2016-01-08 | 2021-02-10 | Mitsubishi Electric Corp | Ventilator, and defrosting method |
CN106765917A (en) * | 2016-12-07 | 2017-05-31 | 珠海格力电器股份有限公司 | Air conditioner control method and device |
CN107842970A (en) * | 2017-10-18 | 2018-03-27 | 广东美的暖通设备有限公司 | Air-conditioning system and its defrosting control method and device |
US11561020B2 (en) | 2017-10-18 | 2023-01-24 | Gd Midea Heating & Ventilating Equipment Co., Ltd. | Air conditioning system, and defrosting control method and device thereof |
CN108286775A (en) * | 2017-12-29 | 2018-07-17 | 广东高而美制冷设备有限公司 | It is a kind of that there is waste heat recovery and anti-freeze defrosting control method |
CN108895609A (en) * | 2018-07-30 | 2018-11-27 | 珠海格力电器股份有限公司 | Defrosting control method for air conditioning system and air conditioning system |
CN111079302A (en) * | 2019-12-25 | 2020-04-28 | 中国大唐集团科学技术研究院有限公司火力发电技术研究院 | Low-pressure cylinder efficiency measuring and calculating system and method |
US11371761B2 (en) * | 2020-04-13 | 2022-06-28 | Haier Us Appliance Solutions, Inc. | Method of operating an air conditioner unit based on airflow |
US20220390138A1 (en) * | 2021-05-30 | 2022-12-08 | Trane International Inc. | Capacity control for hvac system |
US11892188B2 (en) * | 2021-05-30 | 2024-02-06 | Trane International Inc. | Capacity control for HVAC system |
Also Published As
Publication number | Publication date |
---|---|
US9791163B2 (en) | 2017-10-17 |
US10386087B2 (en) | 2019-08-20 |
US20150241081A1 (en) | 2015-08-27 |
US20180003404A1 (en) | 2018-01-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10386087B2 (en) | Method of defrosting an energy recovery ventilator unit | |
AU2008218073B2 (en) | Air-conditioning ventilator | |
US8944897B2 (en) | Ventilation system and controlling method of the same | |
CN205536138U (en) | New trend humidification system | |
KR102047754B1 (en) | Multi-function smart air conditioning system | |
CN104896647A (en) | Cold air prevention control method and system of indoor unit of air conditioner | |
EP3698088B1 (en) | An air handling unit for a ventilation system in a building and a method for performing a defrosting operation of an air handling unit | |
CN207907434U (en) | A kind of double low-temperature receiver depth dehumidifying fresh air treatment systems | |
US20180372361A1 (en) | Heat exchange type ventilation device | |
KR101024699B1 (en) | An air conditioning system | |
CN110006108A (en) | Air conditioner | |
KR101520236B1 (en) | air conditioner with freeze protection system and freeze protection method for the air conditioner | |
JP2010145012A (en) | Heat exchange type ventilation device | |
CN111023414B (en) | Air conditioning system and dehumidification control method | |
CN204787419U (en) | Air conditioner | |
CN213020401U (en) | Heating defrosting air source hot water pump | |
CN209801659U (en) | Air conditioner | |
CN112797540A (en) | Heat exchange fresh air system and control method | |
CN111219858A (en) | Multistage electric auxiliary heating water multi-connected air conditioner cold air prevention control method and system and air conditioner | |
JPH11248232A (en) | Floor-heating air-conditioning system | |
JP2007240028A (en) | Air supply and exhaust control method of boiler equipment for power generation | |
CN110081509A (en) | A kind of antifreeze regulation unit of hot water heating air conditioner double temp and its control method | |
CN108592185B (en) | Operation method of building cooling and heating system | |
CN216814447U (en) | Constant temperature, humidity and oxygen installation system | |
CN116045468B (en) | Control method and device of fresh air system, fresh air system and storage medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: LENNOX INDUSTRIES INC., TEXAS Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:MCKIE, JUSTIN;PEREZ, ERIC;THOMAS, HERMAN MARCUS;AND OTHERS;REEL/FRAME:027207/0588 Effective date: 20111101 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |