US20130037258A1 - Activation-Device Launcher For A Cementing Head - Google Patents
Activation-Device Launcher For A Cementing Head Download PDFInfo
- Publication number
- US20130037258A1 US20130037258A1 US13/596,017 US201213596017A US2013037258A1 US 20130037258 A1 US20130037258 A1 US 20130037258A1 US 201213596017 A US201213596017 A US 201213596017A US 2013037258 A1 US2013037258 A1 US 2013037258A1
- Authority
- US
- United States
- Prior art keywords
- valve
- plug
- activation
- launching
- balls
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
- E21B33/04—Casing heads; Suspending casings or tubings in well heads
- E21B33/05—Cementing-heads, e.g. having provision for introducing cementing plugs
Definitions
- the present invention is related in general to equipment for servicing subterranean wells.
- the invention relates to a cementing head that is intended to drop a combination of darts, balls, bombs and canisters in order to activate downhole equipment, launch cementing plugs, deliver chemical products, or the like.
- Tools currently available on the market for downhole services implement a modular design with darts that are preloaded in baskets within the modules.
- the modules are connected to one another using clamps.
- the darts are held in place mechanically and released by removing the mechanical obstruction and redirecting the flow of the pumped fluid (hereinafter called “process fluid”) through the dart basket.
- the darts are then pumped through the tool by the fluid.
- the first dart to be launched is placed in the lowest module, with subsequent darts passing through the baskets vacated by the earlier darts.
- Darts in prior designs are launched by blocking the bypass flow of the process fluid and forcing the fluid through the dart chamber.
- the dart forms an initial seal when placed into the basket.
- pressure builds and breaks the seal, forcing the dart out of the basket, through the tool and into the main process-fluid stream.
- Some prior art designs consist of modules such as those described in U.S. Pat. Nos. 4,624,312 and 5,890,537.
- the darts are loaded from the topmost module, through the swivel if necessary, and pushed down to their respective baskets with a long rod.
- the modules have valves that are used to select between the dart and the bypass flow.
- the valve itself serves as the mechanical obstruction that prevents the dart from prematurely launching. When the valve is turned, it simultaneously opens a passage for the dart while closing the passage of the bypass flow.
- Another portion of the module is used to launch balls that flow down the well and seat within plugs. Once seated, the balls block the flow of process fluid through the plug, and the resulting pumping-pressure increase causes shear pins to rupture, releasing the plug from its seat.
- the ball launching portion of the module adds significant length to the cement head.
- the present invention allows such improvements.
- the present invention relates to a multiple activation-device launching system for a cementing head having a launcher body comprising a plug valve through which a process fluid and activation devices may pass, and through which balls may be launched when the plug valve is in either the main-flow or bypass-flow position.
- the present invention aims at a plug-valve system for a cementing head that allows the deployment of balls into the process-fluid stream when the valve is in either the main-flow or bypass-flow position.
- balls may pass through the valve in the same manner as other activation devices, including darts, canisters and bombs.
- balls In the bypass-flow position, balls may be inserted through a passage inside the valve axle.
- the valve preferably has a swept cutout through at least 90 degrees of the valve's range of motion.
- the valve may be fabricated as a hollow shell.
- the activation devices may also contain chemical substances that, upon exiting the launching chamber, are released into the well.
- the present invention pertains to a method for deploying one or more activation devices into a process-fluid system, utilizing a multiple-activation device launching system for a cementing head comprising a plug-valve that allows the deployment of balls into the process-fluid stream when the valve is in either the main-flow or bypass-flow position.
- the method comprises pumping a process fluid through the main-flow portion of the launcher body, placing the plug valve in the main-flow position and, if desired, allowing one or more activation devices to pass.
- the plug valve may then be placed in the bypass-flow position, opening a passageway inside the plug-valve axle through which balls may be inserted into the process-fluid stream.
- the plug-valve may be set back to the main-flow position, allowing the passage of additional activation devices. This operating sequence may be repeated until a sufficient number of activation devices have been deployed to complete the treatment.
- the method may further comprise the use of activation devices that contain a chemical substance.
- the chemical substance is here released into the well after exiting the launching chamber.
- the process-fluid stream could comprise other well fluids including, but not limited to, drilling fluids, cement slurries, spacer fluids, chemical washes, acidizing fluids, gravel-packing fluids and scale-removal fluids.
- FIG. 1 is a schematic diagram depicting a conventional prior-art single-stage subsea cementing head system.
- FIG. 2 is a conceptual view of a cementing head plug valve system that allows the release of darts when in the main-flow position, and also allows the release of balls in either the main-flow or bypass-flow position.
- the valve is shown in the bypass-flow position.
- This figure also illustrates how the plug-valve system is installed with respect to the cementing head.
- FIG. 3 depicts the ball launching process, whereby a ball is being injected into the well by passing through the axle of the plug valve system.
- FIG. 4 shows the ball flowing down the wellbore after launching.
- FIG. 5 depicts the dart launching process, whereby the plug valve is rotated into the main-flow position, removing the barrier that previously prevented dart movement. This figure also shows that another ball may be placed into the plug valve axle.
- FIG. 6 shows the dart flowing down toward the wellbore after passing through the valve.
- FIG. 7 shows a subsequent ball launching process, with the valve in the main-flow position.
- FIG. 8 shows the ball flowing down toward the wellbore after launching.
- FIG. 9 shows a ball containing a chemical substance.
- FIG. 10 shows a dart containing a chemical substance.
- FIG. 11 shows the chemical substance escaping from the ball into the process fluid after launching.
- FIG. 12 shows the chemical substance escaping from the dart into the process fluid after launching.
- FIG. 1 depicts a conventional single-stage subsea plug launching system.
- the cementing head 1 located above the rig floor 2 , is made up to the drillpipe 3 , which serves as the casing landing string and controls the cementing plug release.
- the head contains a launching ball 4 and dart 5 .
- the subsea assembly 6 partially inside the casing to be cemented 7 , contains the top cementing plug 8 and the bottom cementing plug 9 . Both plugs are attached to the casing wall by shear pins.
- the casing 7 is initially filled with drilling fluid or spacer fluid.
- the bottom plug launching ball 4 Prior to pumping cement slurry, the bottom plug launching ball 4 is released. The ball travels down the casing, seats inside the bottom plug 9 and blocks fluid flow. The resulting pressure increase causes the shear pins to rupture, releasing the bottom plug. The bottom plug then travels down the casing and stops at the bottom. Extra pump or hydrostatic pressure extrudes the ball through its orifice seat, and cement displacement continues.
- a ball catcher 10 attached to the lower end of the bottom plug retains the ball.
- the top-plug launching dart 5 is released. It seats into the body of the top cementing plug 8 . Increased circulation pressure then causes the shear pins to rupture and release the top plug. The cementing operation continues. At the end of slurry displacement, the top plug stops above the bottom plug 9 .
- the ball-release mechanism 11 and the dart-release mechanism 12 are preferably two separate components of the cementing head.
- the resulting length of the cementing head can lead to ergonomic and logistical problems, particularly in remote locations. Therefore, there is an incentive to employ one release mechanism for both darts and balls, thereby reducing the length of the apparatus.
- the invention involves a plug valve 13 that controls the flow of process fluid through the launcher body 14 .
- the valve rotates around a hollow valve axle 15 , directing process-fluid flow through the bypass-flow path 16 ( FIG. 2 ) or through the main-flow path 17 ( FIG. 5 ).
- Flow is controlled by adjusting the position of the bypass limiter 18 ( FIG. 2 ).
- FIGS. 2-4 depict the valve in the bypass-flow position.
- the bypass-flow position prevents movement of the dart 5 through the valve. Instead, at least one launching ball 4 may pass through the hollow valve axle ( FIG. 2 ), into the fluid flow path ( FIG. 3 ) and travel through the casing toward the wiper plugs ( FIG. 4 ).
- the valve When it is time to release the dart, the valve rotates to the main-flow position, opening a pathway for the dart ( FIG. 5 ) and allowing it to pass through the valve and continue toward the wiper plugs ( FIG. 6 ). During this period it is also possible to insert another ball inside the valve axle for later release ( FIGS. 6-8 ). Thus, balls may be launched when the plug valve is in either position.
- the dual functionality of this design reduces the length of the cement-head assembly.
- the valve has preferably a swept cutout through at least 90 degrees of the valve's range of motion.
- the valve may be fabricated as a hollow shell, allowing a wider berth through which balls may pass, and reducing the probability of their becoming stuck.
- activation devices such as canisters and bombs may be released by this valve apparatus.
- the activation devices may also contain chemical substances that, upon exiting the launching chamber, are released into the well.
- the present invention pertains to a method of operating a plug valve 13 and launching activation devices.
- the method comprises pumping process fluid through the main-flow portion of the launcher body 14 and placing the plug valve in the bypass-flow position.
- At least one ball 4 may be inserted into the hollow valve axle 15 , and then pass through the valve-axle passageway and enter the process-fluid stream.
- the plug valve may then be placed in the main-flow position, allowing at least one activation device to pass and proceed into the wellbore. While the device is in the main-flow position, one or more balls may be inserted into the hollow valve-axle passageway and launched into the process-fluid stream. The plug valve may then be returned to the bypass-flow position.
- one or more balls may be launched while the plug valve is in the bypass-flow position.
- the plug valve may then be reset to the main-flow position, allowing the passage of additional activation devices.
- This operating sequence may be repeated until a sufficient number of activation devices have been deployed to complete the treatment.
- the method of operating the plug valve depicted in FIGS. 2-8 may further comprise activation devices containing a chemical substance that is released after the activation device exits the launching chamber.
- the activation device may begin dispensing the chemical substance immediately upon launching, or at any time thereafter.
- the method of operating the plug valve depicted in FIGS. 2-6 may further comprise activation devices containing a chemical substance that is released after the activation device exits the launching chamber.
- the activation device may begin dispensing the chemical substance immediately upon launching, or at any time thereafter.
- FIG. 9 depicts a ball 4 containing a chemical substance 19 .
- FIG. 10 depicts a dart 5 containing a chemical substance 19 .
- FIG. 11 shows the chemical substance 19 escaping from the ball 4 into the process-fluid stream after launching.
- FIG. 12 shows the chemical substance 19 escaping from the dart 5 into the process-fluid stream.
- multiple-stage plug launching systems are also envisioned in the present invention.
- the invention is not limited to subsea plug launching systems.
Abstract
An activation-device launching system, mounted on a cementing head, allows the deployment of a combination of darts, balls, bombs, canisters in order to activate downhole equipment, launch cementing plugs, deliver chemical products, or the like. A valve controls the flow of process fluid, and holds an activation device in place until it is time for launching. The valve also has a hollow axle through which balls may be launched into the process-fluid stream at any time.
Description
- This application is a divisional application of the U.S. application Ser. No. 12/436,893 incorporated herein by reference in its entirety.
- The statements in this section merely provide background information related to the present disclosure and may not constitute prior art.
- The present invention is related in general to equipment for servicing subterranean wells. Particularly, the invention relates to a cementing head that is intended to drop a combination of darts, balls, bombs and canisters in order to activate downhole equipment, launch cementing plugs, deliver chemical products, or the like.
- Tools currently available on the market for downhole services implement a modular design with darts that are preloaded in baskets within the modules. The modules are connected to one another using clamps. The darts are held in place mechanically and released by removing the mechanical obstruction and redirecting the flow of the pumped fluid (hereinafter called “process fluid”) through the dart basket. The darts are then pumped through the tool by the fluid. The first dart to be launched is placed in the lowest module, with subsequent darts passing through the baskets vacated by the earlier darts.
- Darts in prior designs are launched by blocking the bypass flow of the process fluid and forcing the fluid through the dart chamber. The dart forms an initial seal when placed into the basket. When fluid enters the dart chamber, pressure builds and breaks the seal, forcing the dart out of the basket, through the tool and into the main process-fluid stream.
- Some prior art designs consist of modules such as those described in U.S. Pat. Nos. 4,624,312 and 5,890,537. The darts are loaded from the topmost module, through the swivel if necessary, and pushed down to their respective baskets with a long rod. The modules have valves that are used to select between the dart and the bypass flow. The valve itself serves as the mechanical obstruction that prevents the dart from prematurely launching. When the valve is turned, it simultaneously opens a passage for the dart while closing the passage of the bypass flow.
- Another portion of the module is used to launch balls that flow down the well and seat within plugs. Once seated, the balls block the flow of process fluid through the plug, and the resulting pumping-pressure increase causes shear pins to rupture, releasing the plug from its seat. The ball launching portion of the module adds significant length to the cement head.
- It remains desirable to provide improvements in wellsite surface equipment in efficiency, flexibility, and reliability.
- The present invention allows such improvements.
- In a first aspect, the present invention relates to a multiple activation-device launching system for a cementing head having a launcher body comprising a plug valve through which a process fluid and activation devices may pass, and through which balls may be launched when the plug valve is in either the main-flow or bypass-flow position.
- In another aspect, the present invention aims at a plug-valve system for a cementing head that allows the deployment of balls into the process-fluid stream when the valve is in either the main-flow or bypass-flow position. In the main-flow position, balls may pass through the valve in the same manner as other activation devices, including darts, canisters and bombs. In the bypass-flow position, balls may be inserted through a passage inside the valve axle. An advantage of the dual functionality of this design is the reduction of the length of the cement-head assembly.
- To allow ball deployment in either the main-flow or bypass-flow position, the valve preferably has a swept cutout through at least 90 degrees of the valve's range of motion. In addition, the valve may be fabricated as a hollow shell.
- The activation devices may also contain chemical substances that, upon exiting the launching chamber, are released into the well.
- In yet another aspect, the present invention pertains to a method for deploying one or more activation devices into a process-fluid system, utilizing a multiple-activation device launching system for a cementing head comprising a plug-valve that allows the deployment of balls into the process-fluid stream when the valve is in either the main-flow or bypass-flow position.
- In a preferred embodiment, the method comprises pumping a process fluid through the main-flow portion of the launcher body, placing the plug valve in the main-flow position and, if desired, allowing one or more activation devices to pass. The plug valve may then be placed in the bypass-flow position, opening a passageway inside the plug-valve axle through which balls may be inserted into the process-fluid stream. After launching one or more balls, the plug-valve may be set back to the main-flow position, allowing the passage of additional activation devices. This operating sequence may be repeated until a sufficient number of activation devices have been deployed to complete the treatment.
- The method may further comprise the use of activation devices that contain a chemical substance. The chemical substance is here released into the well after exiting the launching chamber.
- Although the disclosed plug-valve system is mainly being presented in the context of well cementing, it will be appreciated that the process-fluid stream could comprise other well fluids including, but not limited to, drilling fluids, cement slurries, spacer fluids, chemical washes, acidizing fluids, gravel-packing fluids and scale-removal fluids.
-
FIG. 1 is a schematic diagram depicting a conventional prior-art single-stage subsea cementing head system. -
FIG. 2 is a conceptual view of a cementing head plug valve system that allows the release of darts when in the main-flow position, and also allows the release of balls in either the main-flow or bypass-flow position. In this figure the valve is shown in the bypass-flow position. This figure also illustrates how the plug-valve system is installed with respect to the cementing head. -
FIG. 3 depicts the ball launching process, whereby a ball is being injected into the well by passing through the axle of the plug valve system. -
FIG. 4 shows the ball flowing down the wellbore after launching. -
FIG. 5 depicts the dart launching process, whereby the plug valve is rotated into the main-flow position, removing the barrier that previously prevented dart movement. This figure also shows that another ball may be placed into the plug valve axle. -
FIG. 6 shows the dart flowing down toward the wellbore after passing through the valve. -
FIG. 7 shows a subsequent ball launching process, with the valve in the main-flow position. -
FIG. 8 shows the ball flowing down toward the wellbore after launching. -
FIG. 9 shows a ball containing a chemical substance. -
FIG. 10 shows a dart containing a chemical substance. -
FIG. 11 shows the chemical substance escaping from the ball into the process fluid after launching. -
FIG. 12 shows the chemical substance escaping from the dart into the process fluid after launching. - When cementing the annular space between tubulars and the walls of a subterranean wellbore, it is usually necessary to minimize or prevent the commingling of the drilling fluid, spacer fluid and cement slurry. Commingling may result in adverse rheological effects, dilution of the cement slurry and compromised zonal isolation. One way to minimize commingling involves using wiper plugs to separate fluids as they travel down the tubulars. Wiper plugs also clean the inner surface of the tubulars.
-
FIG. 1 depicts a conventional single-stage subsea plug launching system. The cementinghead 1, located above therig floor 2, is made up to thedrillpipe 3, which serves as the casing landing string and controls the cementing plug release. The head contains alaunching ball 4 anddart 5. Thesubsea assembly 6, partially inside the casing to be cemented 7, contains the top cementing plug 8 and thebottom cementing plug 9. Both plugs are attached to the casing wall by shear pins. - Referring to
FIG. 1 , the casing 7 is initially filled with drilling fluid or spacer fluid. Prior to pumping cement slurry, the bottomplug launching ball 4 is released. The ball travels down the casing, seats inside thebottom plug 9 and blocks fluid flow. The resulting pressure increase causes the shear pins to rupture, releasing the bottom plug. The bottom plug then travels down the casing and stops at the bottom. Extra pump or hydrostatic pressure extrudes the ball through its orifice seat, and cement displacement continues. Aball catcher 10 attached to the lower end of the bottom plug retains the ball. - Once the cement slurry has been pumped, the top-
plug launching dart 5 is released. It seats into the body of the top cementing plug 8. Increased circulation pressure then causes the shear pins to rupture and release the top plug. The cementing operation continues. At the end of slurry displacement, the top plug stops above thebottom plug 9. - As depicted in
FIG. 1 , the ball-release mechanism 11 and the dart-release mechanism 12 are preferably two separate components of the cementing head. The resulting length of the cementing head can lead to ergonomic and logistical problems, particularly in remote locations. Therefore, there is an incentive to employ one release mechanism for both darts and balls, thereby reducing the length of the apparatus. - According to a preferred embodiment shown in
FIGS. 2-8 , the invention involves aplug valve 13 that controls the flow of process fluid through thelauncher body 14. The valve rotates around ahollow valve axle 15, directing process-fluid flow through the bypass-flow path 16 (FIG. 2 ) or through the main-flow path 17 (FIG. 5 ). Flow is controlled by adjusting the position of the bypass limiter 18 (FIG. 2 ).FIGS. 2-4 depict the valve in the bypass-flow position. The bypass-flow position prevents movement of thedart 5 through the valve. Instead, at least onelaunching ball 4 may pass through the hollow valve axle (FIG. 2 ), into the fluid flow path (FIG. 3 ) and travel through the casing toward the wiper plugs (FIG. 4 ). - When it is time to release the dart, the valve rotates to the main-flow position, opening a pathway for the dart (
FIG. 5 ) and allowing it to pass through the valve and continue toward the wiper plugs (FIG. 6 ). During this period it is also possible to insert another ball inside the valve axle for later release (FIGS. 6-8 ). Thus, balls may be launched when the plug valve is in either position. The dual functionality of this design reduces the length of the cement-head assembly. - To allow ball deployment in either the main-flow or bypass-flow position, the valve has preferably a swept cutout through at least 90 degrees of the valve's range of motion. In addition, the valve may be fabricated as a hollow shell, allowing a wider berth through which balls may pass, and reducing the probability of their becoming stuck.
- In addition to balls and darts, other activation devices such as canisters and bombs may be released by this valve apparatus. The activation devices may also contain chemical substances that, upon exiting the launching chamber, are released into the well.
- In a preferred embodiment, the present invention pertains to a method of operating a
plug valve 13 and launching activation devices. The method comprises pumping process fluid through the main-flow portion of thelauncher body 14 and placing the plug valve in the bypass-flow position. At least oneball 4 may be inserted into thehollow valve axle 15, and then pass through the valve-axle passageway and enter the process-fluid stream. The plug valve may then be placed in the main-flow position, allowing at least one activation device to pass and proceed into the wellbore. While the device is in the main-flow position, one or more balls may be inserted into the hollow valve-axle passageway and launched into the process-fluid stream. The plug valve may then be returned to the bypass-flow position. As before, one or more balls may be launched while the plug valve is in the bypass-flow position. The plug valve may then be reset to the main-flow position, allowing the passage of additional activation devices. This operating sequence may be repeated until a sufficient number of activation devices have been deployed to complete the treatment. The method of operating the plug valve depicted inFIGS. 2-8 may further comprise activation devices containing a chemical substance that is released after the activation device exits the launching chamber. The activation device may begin dispensing the chemical substance immediately upon launching, or at any time thereafter. - The method of operating the plug valve depicted in
FIGS. 2-6 may further comprise activation devices containing a chemical substance that is released after the activation device exits the launching chamber. The activation device may begin dispensing the chemical substance immediately upon launching, or at any time thereafter.FIG. 9 depicts aball 4 containing achemical substance 19. Similarly,FIG. 10 depicts adart 5 containing achemical substance 19.FIG. 11 shows thechemical substance 19 escaping from theball 4 into the process-fluid stream after launching. Similarly,FIG. 12 shows thechemical substance 19 escaping from thedart 5 into the process-fluid stream. It will be appreciated that multiple-stage plug launching systems are also envisioned in the present invention. In addition, the invention is not limited to subsea plug launching systems. - The preceding description has been presented with reference to presently preferred embodiments of the invention. Persons skilled in the art and technology to which this invention pertains will appreciate that alterations and changes in the described structures and methods of operation can be practiced without meaningfully departing from the principle, and scope of this invention. Accordingly, the foregoing description should not be read as pertaining only to the precise structures described and shown in the accompanying drawings, but rather should be read as consistent with and as support for the following claims, which are to have their fullest and fairest scope.
Claims (8)
1. A multiple activation-device launching system for a cementing head, the launching system comprising a plug-valve through which a process fluid and activation devices may pass, the plug valve having an axle with a hollow passageway through which balls may be independently launched at any time when the plug valve is in either the main-flow or bypass-flow position.
2. The system of claim 1 , wherein the process fluid comprises one or more fluids chosen from the list comprising: drilling fluids, cement slurries, spacer fluids, chemical washes, acidizing fluids, gravel-packing fluids and scale-removal fluids.
3. The system of claim 1 , wherein the activation-devices comprise one or more members of the list comprising: darts, balls, canisters and bombs.
4. The system of claim 1 , wherein the activation-devices contain a chemical substance that may be released after launching of the activation device.
5. The system of claim 4 , wherein at least one ball, or at least one activation device, or both, contains a chemical substance whose release into the process fluid does not commence immediately after deployment into the process-fluid stream.
6. The system of claim 1 , wherein the valve is a hollow shell.
7. The system of claim 1 , wherein one or more balls may be injected and launched through the plug-valve.
8. The system of claim 1 , wherein the plug-valve has a swept cutout through at least 90 degrees of the valve's range of motion.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US13/596,017 US20130037258A1 (en) | 2009-05-07 | 2012-08-27 | Activation-Device Launcher For A Cementing Head |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US12/436,893 US8302698B2 (en) | 2009-05-07 | 2009-05-07 | Activation-device launcher for a cementing head |
US13/596,017 US20130037258A1 (en) | 2009-05-07 | 2012-08-27 | Activation-Device Launcher For A Cementing Head |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US12/436,893 Division US8302698B2 (en) | 2009-05-07 | 2009-05-07 | Activation-device launcher for a cementing head |
Publications (1)
Publication Number | Publication Date |
---|---|
US20130037258A1 true US20130037258A1 (en) | 2013-02-14 |
Family
ID=43050541
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US12/436,893 Expired - Fee Related US8302698B2 (en) | 2009-05-07 | 2009-05-07 | Activation-device launcher for a cementing head |
US13/596,017 Abandoned US20130037258A1 (en) | 2009-05-07 | 2012-08-27 | Activation-Device Launcher For A Cementing Head |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US12/436,893 Expired - Fee Related US8302698B2 (en) | 2009-05-07 | 2009-05-07 | Activation-device launcher for a cementing head |
Country Status (2)
Country | Link |
---|---|
US (2) | US8302698B2 (en) |
WO (1) | WO2010127801A2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
NO347568B1 (en) * | 2014-05-05 | 2024-01-15 | Halliburton Energy Services Inc | Cement head system and method for operating a cement head system |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8910707B2 (en) * | 2011-05-17 | 2014-12-16 | Klimack Holdings Inc. | Cement head |
CN102373898B (en) * | 2011-10-27 | 2014-07-02 | 中国石油集团西部钻探工程有限公司 | Well cementing head |
US9010412B2 (en) | 2011-12-20 | 2015-04-21 | Oil States Energy Services, L.L.C. | Ball drop wellhead control apparatus |
CN107503710B (en) * | 2017-10-11 | 2020-05-19 | 中国海洋石油集团有限公司 | Method for assembling vertical column of well cementation cementing head |
WO2019125412A1 (en) * | 2017-12-19 | 2019-06-27 | Halliburton Energy Services, Inc. | Enhanced design for plug valve |
WO2020257467A1 (en) * | 2019-06-20 | 2020-12-24 | Thru Tubing Solutions, Inc. | Discrete plugging device launcher |
US11719066B1 (en) | 2020-09-23 | 2023-08-08 | Rene Castrillon | Oil well rotating cement head |
US11898409B2 (en) * | 2021-09-30 | 2024-02-13 | Halliburton Energy Services, Inc. | Downhole component deployment method and apparatus |
Family Cites Families (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3076509A (en) * | 1958-05-26 | 1963-02-05 | Burns Erwin | Cementing head |
US3915226A (en) * | 1974-10-11 | 1975-10-28 | Halliburton Co | Double collet release mechanism |
US4681133A (en) * | 1982-11-05 | 1987-07-21 | Hydril Company | Rotatable ball valve apparatus and method |
US4624312A (en) * | 1984-06-05 | 1986-11-25 | Halliburton Company | Remote cementing plug launching system |
US5443122A (en) * | 1994-08-05 | 1995-08-22 | Halliburton Company | Plug container with fluid pressure responsive cleanout |
US5890537A (en) * | 1996-08-13 | 1999-04-06 | Schlumberger Technology Corporation | Wiper plug launching system for cementing casing and liners |
US6182752B1 (en) * | 1998-07-14 | 2001-02-06 | Baker Hughes Incorporated | Multi-port cementing head |
US7055611B2 (en) * | 2002-01-31 | 2006-06-06 | Weatherford / Lamb, Inc. | Plug-dropping container for releasing a plug into a wellbore |
US7353879B2 (en) * | 2004-03-18 | 2008-04-08 | Halliburton Energy Services, Inc. | Biodegradable downhole tools |
US7040401B1 (en) * | 2004-03-31 | 2006-05-09 | Samson Resources Company | Automated plunger catcher and releaser and chemical launcher for a well tubing method and apparatus |
US20080060811A1 (en) * | 2006-09-13 | 2008-03-13 | Halliburton Energy Services, Inc. | Method to control the physical interface between two or more fluids |
-
2009
- 2009-05-07 US US12/436,893 patent/US8302698B2/en not_active Expired - Fee Related
-
2010
- 2010-04-28 WO PCT/EP2010/002623 patent/WO2010127801A2/en active Application Filing
-
2012
- 2012-08-27 US US13/596,017 patent/US20130037258A1/en not_active Abandoned
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
NO347568B1 (en) * | 2014-05-05 | 2024-01-15 | Halliburton Energy Services Inc | Cement head system and method for operating a cement head system |
Also Published As
Publication number | Publication date |
---|---|
US8302698B2 (en) | 2012-11-06 |
WO2010127801A3 (en) | 2011-01-20 |
WO2010127801A2 (en) | 2010-11-11 |
US20100282478A1 (en) | 2010-11-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8302698B2 (en) | Activation-device launcher for a cementing head | |
US8789582B2 (en) | Apparatus and methods for well cementing | |
US7472753B2 (en) | Cementing system for wellbores | |
US9206648B2 (en) | Cementing whipstock apparatus and methods | |
AU2010250060B2 (en) | Subsea Cementing System With Plug Launching Tool | |
CA2403174C (en) | Multi-purpose float equipment and method | |
US20200256152A1 (en) | Top plug with transitionable seal | |
US8327930B2 (en) | Equipment for remote launching of cementing plugs | |
CA3013754A1 (en) | Casing wiper plug system and method for operating the same | |
US20170175498A1 (en) | Pump-Through Perforating Gun Combining Perforation with Other Operation | |
US20150308208A1 (en) | Plug and Gun Apparatus and Method for Cementing and Perforating Casing | |
US8316931B2 (en) | Equipment for remote launching of cementing plugs | |
US8469093B2 (en) | Apparatus and method for autofill equipment activation | |
US9151136B2 (en) | Cementing whipstock apparatus and methods | |
US8770293B2 (en) | Multiple activation-device launcher for a cementing head | |
US20030230405A1 (en) | System for running tubular members | |
US11781386B2 (en) | Tool for remedial of lost circulation while drilling |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |