US20120301344A1 - Method of using powder metallurgy fabrication for manufacturing integral header and tube replacement sections - Google Patents

Method of using powder metallurgy fabrication for manufacturing integral header and tube replacement sections Download PDF

Info

Publication number
US20120301344A1
US20120301344A1 US13/463,467 US201213463467A US2012301344A1 US 20120301344 A1 US20120301344 A1 US 20120301344A1 US 201213463467 A US201213463467 A US 201213463467A US 2012301344 A1 US2012301344 A1 US 2012301344A1
Authority
US
United States
Prior art keywords
head
tube replacement
mold
further including
replacement section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US13/463,467
Inventor
David W. Gandy
Kent K. Coleman
John Shingledecker
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute Inc
Original Assignee
Electric Power Research Institute Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute Inc filed Critical Electric Power Research Institute Inc
Priority to US13/463,467 priority Critical patent/US20120301344A1/en
Assigned to ELECTRIC POWER RESEARCH INSTITUTE, INC. reassignment ELECTRIC POWER RESEARCH INSTITUTE, INC. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: COLEMAN, KENT K., GANDY, DAVID W., Shingledecker, John
Priority to JP2012113310A priority patent/JP2012255208A/en
Priority to CN201210163440.XA priority patent/CN103143713A/en
Publication of US20120301344A1 publication Critical patent/US20120301344A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22FWORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER; APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
    • B22F3/00Manufacture of workpieces or articles from metallic powder characterised by the manner of compacting or sintering; Apparatus specially adapted therefor ; Presses and furnaces
    • B22F3/12Both compacting and sintering
    • B22F3/14Both compacting and sintering simultaneously
    • B22F3/15Hot isostatic pressing
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22FWORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER; APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
    • B22F3/00Manufacture of workpieces or articles from metallic powder characterised by the manner of compacting or sintering; Apparatus specially adapted therefor ; Presses and furnaces
    • B22F3/24After-treatment of workpieces or articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22FWORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER; APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
    • B22F5/00Manufacture of workpieces or articles from metallic powder characterised by the special shape of the product
    • B22F5/10Manufacture of workpieces or articles from metallic powder characterised by the special shape of the product of articles with cavities or holes, not otherwise provided for in the preceding subgroups
    • B22F5/106Tube or ring forms

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Mechanical Engineering (AREA)
  • Powder Metallurgy (AREA)

Abstract

A method of manufacturing integral head and tube replacement sections includes the steps of providing a reverse mold of a head and tube replacement section, providing an atomized steel powder, and filling the reverse mold with the atomized steel powder. The method further includes the step of inserting the mold into a hot isostatic processing (HIP) furnace to consolidate and sinter the powder into the shape of the head and tube replacement section.

Description

    BACKGROUND OF THE INVENTION
  • This application claims the benefit of Provisional Application No. 61/489,505 filed on May 24, 2011.
  • This application relates to a method of manufacturing integral header and tube replacement sections.
  • Many fossil power plants were built for continuous base-load operation and are now beginning to see meaningful cyclic operation. Significant strains on components such as headers and high temperature piping are commonly associated with the cyclic practices often resulting in component degradation, cracking, and eventual failure of the component. Additionally, cyclic operation can result in thermal gradients at various locations along the length of headers which can lead to overheating and damage at these locations. When damage is encountered, utilities are often faced with the dilemma of replacing the entire header or removal of a short section (usually on the order of 3-8 feet in length) of the header.
  • Carbon or low alloy steel and stainless steel headers are commonly fabricated using either rolled & welded (R&W) plate sections or extruded pipe sections. Penetrations (or holes) are machined into the header at specified orientations around the header diameter and along specific lengths wherein stub tubes are then joined to the component. The stub tubes are joined to the header via various welding methods and processes, depending on the manufacturer. Due to the geometry of the stub to header weld, the welding is often performed manually and inspection is very difficult. Thus, failures in the weld or ligament cracking between penetrations are common failure mechanisms.
  • Acquisitions of replacement sections often require long lead-times, as much as 12 months or more, with the manufacturer resulting in de-rating of the plant and lost revenues until the replacement section or a new header can be obtained.
  • BRIEF SUMMARY OF THE INVENTION
  • These and other shortcomings of the prior art are addressed by the present invention, which provides a method of manufacturing integral header and tube replacement sections that provides a cost-effective alternative to the conventional manufacturing processes used for producing a header replacement, that provides for shorter lead-times, and that improves the overall quality of the header replacement section as a number of attachment welds (tubes to header) can be eliminated.
  • According to one aspect of the present invention, a method of manufacturing integral head and tube replacement sections includes the steps of providing a reverse mold of a head and tube replacement section, providing an atomized steel powder, filling the reverse mold with the atomized steel powder, and inserting the mold into a hot isostatic processing (HIP) furnace to consolidate and sinter the powder into the shape of the head and tube replacement section.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • The subject matter that is regarded as the invention may be best understood by reference to the following description taken in conjunction with the accompanying drawing figures in which:
  • FIG. 1 shows an integral header to tube attachment according to an embodiment of the invention; and
  • FIG. 2 is a flow diagram of the method for manufacturing an integral header to tube attachment.
  • DETAILED DESCRIPTION OF THE INVENTION
  • Referring to the drawings, an integral header to tube attachment section formed in accordance with an embodiment of the invention is illustrated in FIG. 1 and shown generally at reference numeral 10.
  • The present invention provides an alternative to the conventional manufacturing process which results in shorter lead-times and improved overall quality of a replacement section. It uses a combination of powder metallurgy (PM) and hot isostatic processing (HIP) to generate the replacement section that is near-net shaped with stub tubes produced as part of the overall PM/HIP effort. No welds are required to join the stub tubes to the header. With this process, the problematic weld joints are eliminated entirely and result in a much longer overall life of the integral header assembly. The technology is applicable to headers used in fossil plants, HRSG plants, and any other applications (chemical, petro-chem, pulp & paper) involving headers and header replacement.
  • The HIP/PM technology eliminates the rolled & welded or extrusion manufacturing steps as a header section can be produced as one completed system. More importantly, it eliminates the joining of the stub tube to the header as the stub tube and header are integrally manufactured in one continuous PM/HIP process. Referring to FIG. 2, the process involves the design of an exact duplicate, Block 11, of the damaged header section including the short tube sections, FIG. 1, which can be obtained from drawings of the header. Next, a reverse mold (container) of the header section is generated, Block 12, in two halves (or more) from a carbon steel material that establishes the final shape of the header section. The mold is assembled together and then filled with an atomized low alloy steel powder to fill the mold, Block 13. Next, the mold is evacuated using a vacuum to eliminate any potential air pockets and then sealed via welding, Block 14.
  • The entire assembly is then inserted into an HIP furnace and brought to a high temperature and pressure (usually under an inert argon atmosphere) to consolidate and sinter the powder into the final shape of the header, Block 16. The assembly is maintained at the sintering temperature for a given period of time and then allowed to cool to room temperature, Blocks 17 and 18. Additional heat treatment will likely be required to bring the header to a normalized and tempered condition for service, Block 19. This final heat treatment can be performed in or out of the mold. Removal of the mold is required once the header has been allowed to return to room temperature, Block 20.
  • At this point, the header should be in a near-net shape (near final shape) condition. Some clean-up and grinding may be required to assure that the can, mold and any residuals are removed to obtain a final surface, Block 21. A couple of additional steps are also required at this point: 1) boring of the stub tubes to produce an inner penetration, Block 22, and 2) chamfering of the inside diameter of the bore regions, Block 23. Both of these operations are easily accomplished using CNC milling/boring operations.
  • It should be pointed out once again that the stub tubes are now an integral part of the header that requires no weld transition between the header and stub tube, a region of considerable problems in the past. Elimination of the weldment, removes thermal expansion concerns, potential fatigue and creep damage issues, and wedging that is often associated with the weld attachment of a stub tube. As an integral stub tube, only welds to attach the stub tube to the existing boiler tubes are required, significantly reducing future damage. Because the shape can be carefully controlled, repeatable smooth transitions between the stub and header are achieved reducing the potential for stress risers.
  • The foregoing has described a method for manufacturing integral header and tube replacement sections. While specific embodiments of the present invention have been described, it will be apparent to those skilled in the art that various modifications thereto can be made without departing from the spirit and scope of the invention. Accordingly, the foregoing description of the preferred embodiment of the invention and the best mode for practicing the invention are provided for the purpose of illustration only and not for the purpose of limitation.

Claims (12)

1. A method of manufacturing integral head and tube replacement sections, comprising the steps of:
(a) providing a reverse mold of a head and tube replacement section;
(b) providing an atomized steel powder;
(c) filling the reverse mold with the atomized steel powder; and
(d) inserting the mold into a hot isostatic processing (HIP) furnace to consolidate and sinter the powder into the shape of the head and tube replacement section.
2. The method according to claim 1, further including the step of subjecting the mold to a vacuum to eliminate air pockets.
3. The method according to claim 2, further including the step of sealing the mold to maintain vacuum.
4. The method according to claim 1, further including the step of bringing the HIP furnace up to a high pressure and a high temperature to consolidate and sinter the powder.
5. The method according to claim 4, wherein the HIP furnace is brought up to a high temperature and high pressure in an inert gas atmosphere.
6. The method according to claim 4, further including the step of maintaining the HIP furnace at a high temperature and high pressure for a pre-determined amount of time.
7. The method according to claim 1, further including the step of cooling the mold and sintered powder to room temperature.
8. The method according to claim 1, further including the step of heat treating the head and tube replacement section.
9. The method according to claim 1, further including the step of finishing the head and tube replacement section into final form.
10. The method according to claim 9, wherein the step of finishing includes the step of grinding the outer surface of the head and tube replacement section to remove any residuals and obtain a final surface.
11. The method according to claim 9, wherein the step of finishing includes the step of boring a stub tube of the head and tube replacement section to produce an inner penetration.
12. The method according to claim 9, wherein the step of finishing includes the step of chamfering an inside of bore regions of the head and tube replacement section.
US13/463,467 2011-05-24 2012-05-03 Method of using powder metallurgy fabrication for manufacturing integral header and tube replacement sections Abandoned US20120301344A1 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
US13/463,467 US20120301344A1 (en) 2011-05-24 2012-05-03 Method of using powder metallurgy fabrication for manufacturing integral header and tube replacement sections
JP2012113310A JP2012255208A (en) 2011-05-24 2012-05-17 Method of using powder metallurgy fabrication for manufacturing integral header and tube replacement section
CN201210163440.XA CN103143713A (en) 2011-05-24 2012-05-24 Method of using powder metallurgy fabrication for manufacturing integral header and tube replacement sections

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US201161489505P 2011-05-24 2011-05-24
US13/463,467 US20120301344A1 (en) 2011-05-24 2012-05-03 Method of using powder metallurgy fabrication for manufacturing integral header and tube replacement sections

Publications (1)

Publication Number Publication Date
US20120301344A1 true US20120301344A1 (en) 2012-11-29

Family

ID=47219351

Family Applications (1)

Application Number Title Priority Date Filing Date
US13/463,467 Abandoned US20120301344A1 (en) 2011-05-24 2012-05-03 Method of using powder metallurgy fabrication for manufacturing integral header and tube replacement sections

Country Status (3)

Country Link
US (1) US20120301344A1 (en)
JP (1) JP2012255208A (en)
CN (1) CN103143713A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3656492A1 (en) * 2018-11-23 2020-05-27 Commissariat à l'Energie Atomique et aux Energies Alternatives Method for producing a manifold for heat exchanger with hot isostatic pressing (hip), application to the production of an absorber for concentrating thermal solar power plant
CN111720622A (en) * 2020-06-29 2020-09-29 中国化学工程第十一建设有限公司 Construction method of long-distance heat distribution pipeline
CN112226598A (en) * 2020-10-21 2021-01-15 浙江工业职业技术学院 Hot isostatic pressing process for aviation special-shaped pipe casting

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5284530A (en) * 1991-09-30 1994-02-08 Sumitomo Metal Industries, Ltd. Duplex stainless steel having improved corrosion resistance
US6042780A (en) * 1998-12-15 2000-03-28 Huang; Xiaodi Method for manufacturing high performance components
US20020136917A1 (en) * 2001-03-26 2002-09-26 Damadoran Raghu Metallic tubular components for industrial flowstreams

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5284530A (en) * 1991-09-30 1994-02-08 Sumitomo Metal Industries, Ltd. Duplex stainless steel having improved corrosion resistance
US6042780A (en) * 1998-12-15 2000-03-28 Huang; Xiaodi Method for manufacturing high performance components
US20020136917A1 (en) * 2001-03-26 2002-09-26 Damadoran Raghu Metallic tubular components for industrial flowstreams

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
ASM Handbook, Volume 7, "Powder Metal TEchnologies and Applications", 1998, pgs. 1424-1461 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3656492A1 (en) * 2018-11-23 2020-05-27 Commissariat à l'Energie Atomique et aux Energies Alternatives Method for producing a manifold for heat exchanger with hot isostatic pressing (hip), application to the production of an absorber for concentrating thermal solar power plant
FR3089001A1 (en) * 2018-11-23 2020-05-29 Commissariat A L' Energie Atomique Et Aux Energies Alternatives Method for producing a heat exchanger collector with hot isostatic compression (CIC), application to the production of an absorber for a concentrated solar thermal power plant
CN111720622A (en) * 2020-06-29 2020-09-29 中国化学工程第十一建设有限公司 Construction method of long-distance heat distribution pipeline
CN112226598A (en) * 2020-10-21 2021-01-15 浙江工业职业技术学院 Hot isostatic pressing process for aviation special-shaped pipe casting

Also Published As

Publication number Publication date
CN103143713A (en) 2013-06-12
JP2012255208A (en) 2012-12-27

Similar Documents

Publication Publication Date Title
CN111093864B (en) Capsule for hot isostatic pressing
EP3470721B1 (en) Flexible, thermal-isolating, dual-walled tube with bellows and method for manufacture thereof
RU2468890C2 (en) Composite billet with porosity fraction controlled in, at least, one layer, methods of its production and use
TW201341700A (en) Steam generator heating tube repair means and repair method
US20130121868A1 (en) Method of manufacturing a weld-free apparatus for connection of dissimilar metals using functionally graded compositionally control powder metallurgy and hot isostatic processing methods
US20120301344A1 (en) Method of using powder metallurgy fabrication for manufacturing integral header and tube replacement sections
JP2011518952A5 (en)
CN101021164A (en) Methods and apparatus for turbine engine rotors
EP3085472B1 (en) Method of manufacturing a turbine blisk through hot isostatic pressing using a metal core
US11738404B2 (en) Method to eliminate dissimilar metal welds
CN105290554B (en) A kind of vacuum brazing technique of niobium tungsten alloy and stainless steel ring-shaped work pieces
CN100395068C (en) High pressure vacuum electronic beam welding method for stator ring of air compressor of gas steam turine
EP2527063B1 (en) Functionally graded compositional control methods to eliminate dissimilar metal welds (DMWs) during manufacture of integral headers
JP2014505213A (en) Reduction of residual stress in welding
US11278961B2 (en) Containment for hot isostatic pressing and vacuum degassing apparatus
KR20120131123A (en) Method of using powder metallurgy fabrication for manufacturing integral header and tube replacement sections
KR100810436B1 (en) Manufacturing method of material for fuel injection nozzle using HIP processing
CN104353921A (en) Brazing method of hermetically sealed seat component
CN104197062A (en) Structure of sealing surface of valve body of small-diameter high-pressure forged steel stop valve
CN104128686B (en) Four aerofoil profile radio frequency four polar field accelerator cavity π tringle hydrogen slice soldering methods
CN204083414U (en) The structure of the valve body sealing surface of small-bore high-pressure forged steel stop valve
KR20120131124A (en) FUNCTIONALLY GRADED COMPOSITIONAL CONTROL METHODS TO ELIMINATE DISSIMILAR METAL WELDS DMWs DURING MANUFACTURE OF INTEGRAL HEADERS
US20150190891A1 (en) Repair of Casting Defects
US20130248585A1 (en) Brazing method
KR100899780B1 (en) Manufacturing method of material for fuel injection nozzle using hip processing

Legal Events

Date Code Title Description
AS Assignment

Owner name: ELECTRIC POWER RESEARCH INSTITUTE, INC., NORTH CAR

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:GANDY, DAVID W.;COLEMAN, KENT K.;SHINGLEDECKER, JOHN;REEL/FRAME:028152/0011

Effective date: 20120427

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION