US20120080194A1 - Method and apparatus for capturing oil leaking from an underwater well - Google Patents
Method and apparatus for capturing oil leaking from an underwater well Download PDFInfo
- Publication number
- US20120080194A1 US20120080194A1 US12/894,319 US89431910A US2012080194A1 US 20120080194 A1 US20120080194 A1 US 20120080194A1 US 89431910 A US89431910 A US 89431910A US 2012080194 A1 US2012080194 A1 US 2012080194A1
- Authority
- US
- United States
- Prior art keywords
- tube
- water
- segments
- another
- well
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000000034 method Methods 0.000 title claims abstract description 18
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 35
- 238000004873 anchoring Methods 0.000 claims abstract description 11
- 239000003129 oil well Substances 0.000 claims abstract description 6
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 claims description 8
- 239000000463 material Substances 0.000 claims description 6
- 239000007787 solid Substances 0.000 claims description 6
- 239000003345 natural gas Substances 0.000 claims description 4
- 239000004744 fabric Substances 0.000 claims description 3
- 239000002184 metal Substances 0.000 claims description 3
- 238000004904 shortening Methods 0.000 claims 1
- 230000001360 synchronised effect Effects 0.000 claims 1
- 238000005188 flotation Methods 0.000 description 7
- 230000007935 neutral effect Effects 0.000 description 3
- 238000007667 floating Methods 0.000 description 2
- 230000014509 gene expression Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/01—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
- E21B43/0122—Collecting oil or the like from a submerged leakage
Definitions
- a system for capturing oil leaking from an underwater well includes an elongate hollow tube which is deployed vertically in the water above the well.
- An anchoring system which anchors the tube to the floor beneath the body of water includes an adjustment system which allows moving the tube transversely to a location where it captures the maximum amount of oil.
- a method is provided for constructing the tube from a plurality of tube segments, and erecting it above a leaking oil well.
- FIG. 1 is a side elevation view of a system for capturing oil from a leaking well embodying the subject invention.
- FIG. 2 is a perspective view, looking from above, of the system of FIG. 1 .
- FIG. 3 is a side elevation view similar to FIG. 1 , showing how the tube that is used to capture the oil can be moved transversely.
- FIG. 4 is a partial perspective view showing a first embodiment of a tube segment, which is an element of the subject invention.
- FIG. 5 is a partial perspective view showing another embodiment of a tube segment.
- FIG. 6 is a perspective view of the tube segment shown in FIG. 5 in a collapsed position.
- FIG. 7 is a side elevation view illustrating one method of constructing the system.
- FIGS. 8 and 9 are perspective views, similar to FIG. 2 , showing methods for constructing the system.
- an elongate hollow tube 10 is deployed in a vertical orientation over a leaking underwater oil well.
- the tube 10 has an upper end 12 , FIG. 8 , which is located proximate the surface of the water, and a lower end 14 , which is located substantially below the surface of the water, but above the floor 16 of the body of water. How far the lower end is above the floor depends upon the diameter of the tube, the velocity which the leaking oil exits the floor 16 , and the extent of water currents between the floor and the lower end 14 .
- the tube is open at both ends, but a domed shape collection chamber 20 covers its upper end 12 .
- a plurality of flotation devices 22 are attached to the tube around its outer surface to support the tube vertically at the appropriate depth. Providing this neutral buoyancy could be achieved by other means.
- the collection chamber 20 and upper end 12 of the tube project through an opening 23 in a flotation platform 24 which is shown schematically. Flotation platforms of this type are well known in the offshore oil well technology.
- floats 26 Attached to the platform 24 at generally equally spaced locations around the tube are a plurality of floats 26 .
- the floats 26 are attached to the platform 24 to form an integral floating unit.
- Each float is anchored to the floor 16 by means of a cable 28 which extends between the float and a platform anchor 30 located on the floor 16 .
- the platform anchors 30 are located around a circle circumscribed on the floor 16 having a diameter which is much larger than the diameter of the tube 10 , in order to maintain the tube in generally the same location.
- An anchoring system anchors the lower end of the tube 10 to the floor 16 .
- the platform 24 and the anchoring system work together to maintain the tube 10 in its vertical orientation.
- the anchoring system includes an adjustment system 32 which permits the tube to be moved laterally in order to initially locate it above the escaping oil 18 and to keep it in the optimal location to capture the maximum amount of the oil.
- Located on each float 26 is a take-up device 34 having a cable 36 attached to it. In the embodiment shown in the drawings, the take-up device is a winch, but it could be another type of device.
- the cables 36 are directed downwardly along the length of the tube by passing them through guides 38 located on the outer surface of the tube.
- the guides could be rollers such as shown, or any other device which will allow a cable to movably extend along the longitudinal length of the tube.
- the bottoms of the cables 36 are attached to tube anchors 40 located on the floor 16 .
- the tube anchors 40 are located on a circle circumscribed on the floor 16 having a diameter which is greater than the diameter of the tube 16 and less than the diameter of the circle the float anchors are located around. Referring now also to FIG. 4 , by using the take-up devices 34 to shorten a cable 38 a onto its associated take-up device 34 and lengthening the cable 28 b on the opposite take-up device 34 .
- the tube 10 , platform 24 , and floats 26 will be moved laterally.
- the tube 10 In order to facilitate erection of the tube 10 , it is constructed from a plurality of tube segments 42 which are joined end-to-end, FIGS. 4 and 5 .
- the tube segments 42 a In the embodiment shown in FIG. 4 , the tube segments 42 a have a solid wall 44 with flanges 46 at each end.
- the wall 44 could be constructed from metal or another rigid material.
- the tube segments 42 b are collapsible.
- the collapsible tube segments 42 b have a plurality of annular rings 48 which support a flexible wall 50 .
- the wall 50 could be a fabric material, such as rubberized canvas, or any other flexible material which can function in this environment.
- the rings 48 are made from metal or other suitable rigid material.
- the rings at each end of each tube segment 42 b serve as the flanges which are used to attach adjacent tube segments to one another.
- the flexible tube segments 42 b collapse by their own weight when placed on a solid surface, FIG.
- longitudinal straps 54 may be attached to the rings 48 at selected intervals around the periphery of the tube segment.
- the tube segments 42 can be attached to one another by bolting, riveting, installing collars, or by other known means. Holes 56 are shown in the flanges to facilitate this.
- the tube 10 can either be assembled remote from the leaking well and towed to the site of the well, FIG. 7 , or erected at the site of the well, FIGS. 8 and 9 .
- One way of accomplishing the former is to assemble the tube segments 42 onshore and pull them into the water as additional tube segments are attached, FIG. 7 .
- Covers 58 cover both ends of the tube so that air trapped in the tube causes it to float.
- the cables 36 from the take-up devices 34 are fed through the guides 38 and attached to the tube anchors 40 .
- Appropriate flotation devices 22 are attached to the tube to provide neutral buoyancy and the cover 58 is removed from what will be the lower end of the tube. This will allow water to flow into the tube and the tube will sink lower end first. The filling of the tube with water and the flotation devices cause the tube to become vertical with its upper end adjacent to the surface of the water.
- the crane 62 is used to lift collapsible tube segments off of a barge or similar floating storage structure (not shown). The crane then lowers the tube segment through the opening 23 in the platform 24 into the water, and the tube segment is allowed to expand. Flotation devices 22 are attached to this tube segment so that it floats with its upper end 12 near the surface of the water. The crane 62 is then disconnected from this tube segment and is attached to another collapsed tube segment 42 b. The new tube segment is then placed over and lowered against the previous tube segment.
- the tube 10 can be erected either before the well is drilled or after it is drilled, including after a leak has occurred.
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Chemical & Material Sciences (AREA)
- Oil, Petroleum & Natural Gas (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Earth Drilling (AREA)
Abstract
A system for capturing oil leaking from an underground well includes an elongate hollow tube which is deployed vertically in the water with its open lower end located above the oil well. A system for securing the tube in the desired location where it captures the maximum amount of leaking oil includes an adjustment system which allows the tube to be moved transversely once it is in place. A method is provided for erecting the tube and anchoring it at the desired location above the leaking well.
Description
- When oil wells are located under water, it can be difficult and time consuming to cap them if an accident occurs and there is uncontrolled leakage of oil from the well. While there are procedures for capping or otherwise plugging underwater wells, a considerable amount of oil can flow out of the well before it can be capped. This leakage can cause extensive environmental damage and there can be considerable costs involved in attempting to capture the oil that is discharged from the well before the well is capped.
- A system for capturing oil leaking from an underwater well includes an elongate hollow tube which is deployed vertically in the water above the well. An anchoring system which anchors the tube to the floor beneath the body of water includes an adjustment system which allows moving the tube transversely to a location where it captures the maximum amount of oil. A method is provided for constructing the tube from a plurality of tube segments, and erecting it above a leaking oil well.
- The foregoing and other objectives, features, and advantages of the invention will be more readily understood upon consideration of the following detailed description of the invention, taken in conjunction with the accompanying drawings.
-
FIG. 1 is a side elevation view of a system for capturing oil from a leaking well embodying the subject invention. -
FIG. 2 is a perspective view, looking from above, of the system ofFIG. 1 . -
FIG. 3 is a side elevation view similar toFIG. 1 , showing how the tube that is used to capture the oil can be moved transversely. -
FIG. 4 is a partial perspective view showing a first embodiment of a tube segment, which is an element of the subject invention. -
FIG. 5 is a partial perspective view showing another embodiment of a tube segment. -
FIG. 6 is a perspective view of the tube segment shown inFIG. 5 in a collapsed position. -
FIG. 7 is a side elevation view illustrating one method of constructing the system. -
FIGS. 8 and 9 are perspective views, similar toFIG. 2 , showing methods for constructing the system. - Referring now to
FIG. 1 of the drawings, an elongatehollow tube 10 is deployed in a vertical orientation over a leaking underwater oil well. Thetube 10 has anupper end 12,FIG. 8 , which is located proximate the surface of the water, and alower end 14, which is located substantially below the surface of the water, but above thefloor 16 of the body of water. How far the lower end is above the floor depends upon the diameter of the tube, the velocity which the leaking oil exits thefloor 16, and the extent of water currents between the floor and thelower end 14. However, it preferably is located close enough to the floor so that a large portion of theoil 18 escaping from the well is still traveling substantially vertically upwardly and has not dispersed substantially to where a significant portion of it flows into the lower end of the tube. The tube is open at both ends, but a domedshape collection chamber 20 covers itsupper end 12. A plurality offlotation devices 22 are attached to the tube around its outer surface to support the tube vertically at the appropriate depth. Providing this neutral buoyancy could be achieved by other means. Referring now also toFIG. 2 , thecollection chamber 20 andupper end 12 of the tube project through an opening 23 in aflotation platform 24 which is shown schematically. Flotation platforms of this type are well known in the offshore oil well technology. Attached to theplatform 24 at generally equally spaced locations around the tube are a plurality offloats 26. In the embodiment illustrated, there are four floats, but there could be any number of floats. Thefloats 26 are attached to theplatform 24 to form an integral floating unit. Each float is anchored to thefloor 16 by means of acable 28 which extends between the float and aplatform anchor 30 located on thefloor 16. Theplatform anchors 30 are located around a circle circumscribed on thefloor 16 having a diameter which is much larger than the diameter of thetube 10, in order to maintain the tube in generally the same location. - An anchoring system anchors the lower end of the
tube 10 to thefloor 16. Theplatform 24 and the anchoring system work together to maintain thetube 10 in its vertical orientation. The anchoring system includes anadjustment system 32 which permits the tube to be moved laterally in order to initially locate it above the escapingoil 18 and to keep it in the optimal location to capture the maximum amount of the oil. Located on eachfloat 26 is a take-updevice 34 having acable 36 attached to it. In the embodiment shown in the drawings, the take-up device is a winch, but it could be another type of device. Thecables 36 are directed downwardly along the length of the tube by passing them throughguides 38 located on the outer surface of the tube. The guides could be rollers such as shown, or any other device which will allow a cable to movably extend along the longitudinal length of the tube. The bottoms of thecables 36 are attached totube anchors 40 located on thefloor 16. In the embodiment, thetube anchors 40 are located on a circle circumscribed on thefloor 16 having a diameter which is greater than the diameter of thetube 16 and less than the diameter of the circle the float anchors are located around. Referring now also toFIG. 4 , by using the take-up devices 34 to shorten a cable 38 a onto its associated take-updevice 34 and lengthening thecable 28 b on the opposite take-updevice 34. Thetube 10,platform 24, andfloats 26 will be moved laterally. - In order to facilitate erection of the
tube 10, it is constructed from a plurality oftube segments 42 which are joined end-to-end,FIGS. 4 and 5 . In the embodiment shown inFIG. 4 , thetube segments 42 a have asolid wall 44 withflanges 46 at each end. Thewall 44 could be constructed from metal or another rigid material. - The
tube segments 42 b, shown inFIGS. 5 and 6 , are collapsible. Thecollapsible tube segments 42 b have a plurality ofannular rings 48 which support aflexible wall 50. Thewall 50 could be a fabric material, such as rubberized canvas, or any other flexible material which can function in this environment. Therings 48 are made from metal or other suitable rigid material. The rings at each end of eachtube segment 42 b serve as the flanges which are used to attach adjacent tube segments to one another. Theflexible tube segments 42 b collapse by their own weight when placed on a solid surface,FIG. 6 , but by covering the ends of the tube segment and drawing a vacuum through aline 52, thewall 50 will be pulled inwardly when the tube segment is collapsed so that it is out of the way. In order to strengthen the collapsible tube segments and facilitate hanging them vertically,longitudinal straps 54 may be attached to therings 48 at selected intervals around the periphery of the tube segment. Thetube segments 42 can be attached to one another by bolting, riveting, installing collars, or by other known means.Holes 56 are shown in the flanges to facilitate this. Thetube 10 can either be assembled remote from the leaking well and towed to the site of the well,FIG. 7 , or erected at the site of the well,FIGS. 8 and 9 . One way of accomplishing the former is to assemble thetube segments 42 onshore and pull them into the water as additional tube segments are attached,FIG. 7 .Covers 58 cover both ends of the tube so that air trapped in the tube causes it to float. When the tube has been towed to the site, thecables 36 from the take-up devices 34 are fed through theguides 38 and attached to thetube anchors 40.Appropriate flotation devices 22 are attached to the tube to provide neutral buoyancy and thecover 58 is removed from what will be the lower end of the tube. This will allow water to flow into the tube and the tube will sink lower end first. The filling of the tube with water and the flotation devices cause the tube to become vertical with its upper end adjacent to the surface of the water. Thecover 58 at the upper end of the tube is removed and acrane 16 located on one of thefloats 26 then places thecollection chamber 20 on top of the tube and the collection chamber and tube are joined,FIG. 2 . While this erection method could be used with eithersolid tube segments 42 a orcollapsible tube segments 42 b, it is shown in the drawings withsolid tube segments 42 a because this method would more commonly be used for erecting thetube 10 fromsolid tube segments 42 a. - Erecting the
tube 10 on the site would most commonly be used for erecting the tube fromcollapsible tube segments 42 b. Referring now toFIG. 9 , the crane 62 is used to lift collapsible tube segments off of a barge or similar floating storage structure (not shown). The crane then lowers the tube segment through theopening 23 in theplatform 24 into the water, and the tube segment is allowed to expand.Flotation devices 22 are attached to this tube segment so that it floats with itsupper end 12 near the surface of the water. The crane 62 is then disconnected from this tube segment and is attached to anothercollapsed tube segment 42 b. The new tube segment is then placed over and lowered against the previous tube segment. The two tube segments are then attached and additional flotation devices are attached so that the combined tube segments have neutral buoyancy. The process is then repeated until the tube has reached the desired length.Cables 36 are then fed throughguides 38 and attached to the tube anchors 40. Finally, the crane is used to place thecollection chamber 20 on top of the tube. Regardless of which erection method is used, after the tube is erected,oil 18 from the leaking well rises through the water in the tube, due to its lower density, until it reaches thecollection chamber 20. Any natural gas contained in the oil raises to the top of the collection chamber where it is removed through anatural gas line 64. The natural gas is collected for use or is burned. Oil is removed from thecollection chamber 20 by means ofoil lines 64 and its pumped to a tanker or barge for transportation. - The
tube 10 can be erected either before the well is drilled or after it is drilled, including after a leak has occurred. - The terms and expressions which have been employed in the foregoing specification are used therein as terms of description and not of limitation, and there is no intention, in the use of such terms and expressions, of excluding equivalents of the features shown and described or portions thereof, it being recognized that the scope of the invention is defined and limited only by the claims which follow.
Claims (30)
1. A system for capturing oil leaking from an underwater well comprising:
(a) an elongate hollow tube deployed in a vertical orientation above a leaking well, said tube having an upper end which is proximate the surface of the water and a lower end which is substantially below the surface of the water; and
(b) an anchoring system for anchoring the lower end of said tube to the floor below the water.
2. The system of claim 1 including an adjustment system associated with said anchoring system which allows said tube to be moved to an optimum location where it captures the maximum amount of oil leaking from said well.
3. The system of claim 1 including buoyancy devices attached to said tube in order to support said tube with its upper end proximate the surface of the water.
4. The system of claim 1 wherein said tube comprises a series of tube segments joined to one another end-to-end.
5. The system of claim 4 wherein said tube segments have a solid metal wall.
6. The system of claim 4 wherein said tube segments are collapsible.
7. The system of claim 6 wherein said tube segments comprise two or more rigid rings and a flexible wall made from a fabric material, which is supported by said rings.
8. The system of claim 7 wherein said fabric material is rubberized canvas.
9. The system of claim 7 including straps which are attached to and extend between adjacent rings at spaced apart locations around the periphery of said rings.
10. The system of claim 4 wherein said tube segments have outwardly projecting flanges at each end thereof and said tube segments are joined to one another by attaching flanges from adjacent tube segments to one another.
11. The system of claim 10 wherein said adjacent tube segments are welded to one another.
12. The system of claim 10 wherein said adjacent tube segments are bolted to one another.
13. The system of claim 10 including a clamp ring which clamps flanges of adjacent tube sections to one another.
14. The system of claim 1 including a collection chamber which is connected to the upper end of said tube.
15. The system of claim 14 including one or more conduits for removing oil from said collection chamber.
16. The system of claim 14 including one or more conduits for removing natural gas from said collection chamber.
17. The system of claim 1 wherein the lower end of said tube has a sufficiently large diameter and is located sufficiently close to the floor of the body of water that a large portion of the oil leaking from the well flows into said tube as it rises to the surface.
18. The system of claim 2 wherein said anchoring system includes at least three cables having lower ends which are attached to the floor below the water at generally evenly spaced intervals around a circle circumcised on said floor, said circle having a diameter which is greater than the diameter of said tube.
19. The system of claim 17 wherein said adjustment system comprises:
(a) guides located on said tube which allow said cables to extend moveably along the linear extent of said tube;
(b) a take-up device associated with each of said cables located at the surface of said body of water; and
(c) said take-up devices being capable of lengthening or shortening the amount of the associated cable which is located in the water.
20. The system of claim 19 where said take-up devices are winches.
21. The system of claim 18 wherein said cables are located in pairs which are diametrically opposed from one another around the periphery of said tube.
22. The system of claim 21 wherein said take-up devices are synchronized so that when one of said cables is shortened, the opposed cable is lengthened like a mount.
23. A method of constructing the system of claim 4 comprising:
(a) placing a first one of said tube segments on its side adjacent to the water with the end facing the water covered with a first removable cap;
(b) attaching the end of said first tube segment to a towing vessel located in the water;
(c) attaching another tube segment to the existing tube segment;
(d) using said vessel to pull said first tube segment into the water;
(e) repeating steps (c) and (d) until the resulting tube has the desired length;
(f) covering the unattached end of the resulting tube with a second removable cap; and
(g) using said vessel to tow said tube to an underwater well.
24. The method of claim 23 including the following additional steps:
(a) attaching an anchoring system to said tube to anchor said tube to the floor below the water; and
(b) removing the second removable cap from said tube allowing said tube to submerge.
25. The method of claim 24 including attaching buoyancy devices to said tube such that when submerged it is oriented vertically with an upper end located proximate the surface of the water and a lower end which is substantially below the surface of the water.
26. The method of claim 25 including providing an adjustment system to said tube which allows said tube to be moved transversely in the water.
27. A method of constructing the system of claim 6 , comprising:
(a) providing a plurality of collapsed tube segments at a location above said oil well;
(b) expanding one of said collapsed tube segments and suspending it above the water;
(c) expanding another collapsed tube segment and attaching it to the top of said one of said tube segments; and
(d) repeating steps (b) and (c) until the resulting tube has the desired length.
28. The method of claim 27 including attaching buoyancy devices to said tube such that when submerged said tube is oriented substantially vertically with an upper end located proximate the surface of the water.
29. The method of claim 28 including attaching an anchoring system to said tube to anchor said tube to the floor below the water.
30. The method of claim 29 including providing an adjustment system which allows said tube to be moved transversely in the water.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US12/894,319 US20120080194A1 (en) | 2010-09-30 | 2010-09-30 | Method and apparatus for capturing oil leaking from an underwater well |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US12/894,319 US20120080194A1 (en) | 2010-09-30 | 2010-09-30 | Method and apparatus for capturing oil leaking from an underwater well |
Publications (1)
Publication Number | Publication Date |
---|---|
US20120080194A1 true US20120080194A1 (en) | 2012-04-05 |
Family
ID=45888798
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US12/894,319 Abandoned US20120080194A1 (en) | 2010-09-30 | 2010-09-30 | Method and apparatus for capturing oil leaking from an underwater well |
Country Status (1)
Country | Link |
---|---|
US (1) | US20120080194A1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10385642B2 (en) * | 2014-11-26 | 2019-08-20 | Statoil Petroleum As | Method of lowering an apparatus |
US10400410B2 (en) * | 2011-02-03 | 2019-09-03 | Marquix, Inc. | Containment unit and method of using same |
US10696363B2 (en) * | 2018-02-16 | 2020-06-30 | Ut-Battelle, Llc | Floating membrane reservoir system |
-
2010
- 2010-09-30 US US12/894,319 patent/US20120080194A1/en not_active Abandoned
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10400410B2 (en) * | 2011-02-03 | 2019-09-03 | Marquix, Inc. | Containment unit and method of using same |
US10753058B2 (en) * | 2011-02-03 | 2020-08-25 | Marquix, Inc. | Containment unit and method of using same |
US10385642B2 (en) * | 2014-11-26 | 2019-08-20 | Statoil Petroleum As | Method of lowering an apparatus |
US10696363B2 (en) * | 2018-02-16 | 2020-06-30 | Ut-Battelle, Llc | Floating membrane reservoir system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3548605A (en) | Submergible vehicle for emergency offshore gas leakage | |
US20110274496A1 (en) | Undersea leak remediation device and method | |
US3653215A (en) | Method and apparatus for confining and collecting oil leakage | |
US20110318106A1 (en) | Apparatus for collecting and transporting fluids in a body of water | |
DK2288789T3 (en) | DEVICE FOR THE EXTRACTION OF A MATERIAL FROM THE BOTTOM OF A WATER MASS, PLACES FOR EXTRACTION AND RELATED PROCEDURE | |
US9051704B2 (en) | Cold water piping system including an articulating interface, modular elements, and strainer assembly | |
JPS5925713B2 (en) | Installation method and device for tension break platform | |
US8523482B1 (en) | On demand non-rigid underwater oil and gas containment and retrieval system and method | |
NO151866B (en) | SUBSEA | |
US3736756A (en) | Method and apparatus for assembling an offshore structure | |
US8784011B2 (en) | Marine-equipment installation method and apparatus | |
GB2063776A (en) | Apparatus and method for collecting subsea oil leakage and the like | |
KR20160021753A (en) | Deployment system | |
CN102562009B (en) | Efficient open water riser deployment | |
BR112018070882B1 (en) | METHOD AND SYSTEM FOR INSTALLING A SUBSEA PIPELINE IN A SUBSEA STRUCTURE | |
KR20120120217A (en) | Measurement platform to be installed in water | |
US20120080194A1 (en) | Method and apparatus for capturing oil leaking from an underwater well | |
US20120121335A1 (en) | Deepwater containment system with surface separator and method of using same | |
BR112021002657A2 (en) | maneuvering loads in subsea operations | |
US20130263426A1 (en) | Method for installing a device for recovering hydrocarbons | |
US20120070231A1 (en) | Oil collection system and method for deepwater spills | |
JPS6024279B2 (en) | Method and apparatus for extracting oil or gas from the seabed in deep water | |
JP2017075469A (en) | Collection device for water bottom flowing methane gas and collection method for the same | |
WO2014202948A1 (en) | Gravity base for a marine structure | |
US20120213587A1 (en) | Deepwater containment systems with flexible riser and methods of using same |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |