US20120048539A1 - Reservoir Pressure Monitoring - Google Patents
Reservoir Pressure Monitoring Download PDFInfo
- Publication number
- US20120048539A1 US20120048539A1 US13/215,379 US201113215379A US2012048539A1 US 20120048539 A1 US20120048539 A1 US 20120048539A1 US 201113215379 A US201113215379 A US 201113215379A US 2012048539 A1 US2012048539 A1 US 2012048539A1
- Authority
- US
- United States
- Prior art keywords
- pressure
- formation
- pressure gauge
- perforator
- housing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000012544 monitoring process Methods 0.000 title claims description 7
- 230000015572 biosynthetic process Effects 0.000 claims abstract description 76
- 238000004891 communication Methods 0.000 claims abstract description 25
- 238000000034 method Methods 0.000 claims abstract description 23
- 239000004568 cement Substances 0.000 claims abstract description 16
- 230000008878 coupling Effects 0.000 claims description 7
- 238000010168 coupling process Methods 0.000 claims description 7
- 238000005859 coupling reaction Methods 0.000 claims description 7
- 239000012530 fluid Substances 0.000 claims description 6
- 230000004888 barrier function Effects 0.000 claims description 5
- 230000000977 initiatory effect Effects 0.000 description 12
- 238000009530 blood pressure measurement Methods 0.000 description 6
- 229930195733 hydrocarbon Natural products 0.000 description 6
- 150000002430 hydrocarbons Chemical class 0.000 description 6
- 239000004215 Carbon black (E152) Substances 0.000 description 4
- 230000008901 benefit Effects 0.000 description 4
- 238000005474 detonation Methods 0.000 description 4
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 239000000523 sample Substances 0.000 description 2
- 230000004913 activation Effects 0.000 description 1
- 238000004873 anchoring Methods 0.000 description 1
- 230000003466 anti-cipated effect Effects 0.000 description 1
- 238000012512 characterization method Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 239000013078 crystal Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000010304 firing Methods 0.000 description 1
- 230000009969 flowable effect Effects 0.000 description 1
- 230000002706 hydrostatic effect Effects 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000003534 oscillatory effect Effects 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 239000010453 quartz Substances 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- VYPSYNLAJGMNEJ-UHFFFAOYSA-N silicon dioxide Inorganic materials O=[Si]=O VYPSYNLAJGMNEJ-UHFFFAOYSA-N 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 230000001052 transient effect Effects 0.000 description 1
- 239000011800 void material Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/06—Measuring temperature or pressure
Definitions
- the invention relates generally to the field of downhole pressure measurement. More specifically, the present invention relates to measuring formation pressure with permanent pressure gauges mounted outside of wellbore casing and using shaped charges mounted outside the casing to communicate pressure from the formation to the gauges.
- Formation pressure adjacent to a hydrocarbon producing wellbore can be monitored to assess reservoir characteristics and forecast future hydrocarbon production. Formation pressures are also sometimes monitored for evaluating safety and environmental concerns. Over time, more complex wells have been developed that are deeper and include more elaborate lateral branches. As the deeper and branched wells generally extend through more than one formation, additional locations for pressure monitoring are identified. As well production technology advances to allow deeper and more complex well systems, similar advancements in pressure monitoring have been made.
- a method of completing a wellbore that includes providing wellbore casing having shaped charges and permanent pressure gauges on an outer surface of the casing.
- the casing is inserted into the wellbore and cement is injected into an annulus formed between the casing and wellbore.
- the shaped charges are strategically deployed on the casing so they aim towards a wall of the wellbore and are spaced apart along the casing.
- detonating the shaped charges creates perforations into a formation around the wellbore and places the pressure gauges into pressure communication with the formation. Pressure readings are delivered to the surface from the pressure gauges in the form of signals.
- the method of characterizing includes providing a perforator in an annulus that is between a downhole tubular and a borehole wall.
- the perforator is used to form a perforation through the wall and into the subterranean formation; thus the perforation allows communication of pressure in the subterranean formation to the annulus.
- Pressure in the subterranean formation is then estimated by measuring pressure in the annulus. In one example embodiment, pressure measurements are taken over a period of time so that changes of pressure in the subterranean formation over the period of time can be monitored.
- the perforator can be a shaped charge, a perforating bullet, or a fluid jet.
- measuring pressure in the annulus involves providing a pressure gauge in the annulus and monitoring an output from the pressure gauge.
- the perforator includes a housing and the perforation extends into the housing so that an inside of the housing is in pressure communication with the subterranean formation, and wherein an input to the pressure gauge is ported to the inside of the housing.
- the perforator is made up of a housing and the perforation extends into the housing so that an inside of the housing is in pressure communication with the subterranean formation, and wherein the pressure gauge is disposed inside the housing.
- the subterranean formation includes multiple zones, in this example the method involves repeating the steps of providing, perforating, and measuring in at least two of the zones.
- cement is provided in the annulus after the perforator is included but before the formation is perforated.
- the system is made up of a perforator selectively disposed in an annulus formed between a downhole tubular and a wall of a wellbore and a pressure gauge in pressure communication with the perforator. Further included is a coupling mounted on the pressure gauge attached to a signal line, so that when the perforator is initiated to create a perforation through the wall of the wellbore, the pressure gauge is brought into pressure communication with the formation and the pressure in the formation can be measured through the signal line.
- the perforator is a perforating gun with a shaped charge, and cement is provided in the annulus; as such, the perforation extends through a portion of the cement.
- Tubing may optionally be provided that is connected between the pressure gauge and the perforator for providing pressure communication between the pressure gauge and the perforator.
- a controller in communication with the pressure gauge through the signal line and in communication with the perforator through a signal line.
- the downhole tubular is casing that lines the wellbore and the perforator and the pressure gauge are each clamped to an outer surface of the casing.
- Also described herein is a method of measuring pressure in a formation adjacent to a wellbore lined with casing.
- the method involves providing a shaped charge in an annulus between the casing and a wall of the wellbore, providing a pressure gauge in the annulus and in pressure communication with the shaped charge, forming a perforation in the formation by projecting a jet from the shaped charge into the formation from the annulus, sensing pressure of the formation with the pressure gauge, and directing a signal from the pressure gauge through a signal line that represents pressure sensed in the formation.
- the shaped charge is included within a perforating gun having a housing, and the pressure gauge is in fluid communication with the shaped charge by a length of tubing connecting the housing and the pressure gauge.
- the shaped charge is included within a perforating gun having a housing, and the pressure gauge is disposed in the housing.
- the method can optionally be repeated, and the perforation can occur in a portion of the formation that is isolated from the first portion of the formation perforated by a formation barrier.
- FIG. 1 is a side sectional view of a system in a wellbore for estimating pressure in a subterranean formation.
- FIG. 2 is a side sectional view of the system of FIG. 1 with cement added into the wellbore.
- FIG. 3 is a side sectional view of the system of FIG. 2 forming perforations in the formation.
- FIG. 4 is a side view of a sample embodiment of a pressure gauge and perforator.
- FIG. 5 is a side sectional view of a portion of a pressure gauge of FIG. 4 .
- FIG. 6 is a side view of a perforator and pressure gauge on an outer surface of a casing.
- FIG. 7 is a side view of a perforator and pressure gauge on an outer surface of a well bore casing.
- FIG. 8 is a side sectional view of an alternate embodiment of the system for measuring pressure in a subterranean formation.
- each perforating gun 14 includes a perforator 18 oriented so that it is aimed away from the casing string 12 and into a formation 20 surrounding the well bore 10 .
- perforators 18 include shaped charges, perforating bullets, and fluid jets.
- the perforating gun 14 as shown contains a single shaped charge, a perforating gun used for this application may contain many shaped charges.
- the perforating guns 14 may be arranged so that the perforators 18 associated with each perforating gun 14 are spaced apart axially within the well bore 10 .
- the spacing of the perforators 18 can vary depending on the particular formation 20 in which the well bore 10 is formed. It is believed it is well within the capabilities of those skilled in the art to determine a designated spacing of the perforators 18 .
- Pressure gauges 22 are further illustrated that are coupled on the outer circumference of the casing string 12 .
- a pressure gauge 22 is provided for each perforating gun 14 .
- the pressure gauges 22 may be in communication with the surface and optionally coupled with other pressure gauges within the well bore 10 .
- FIG. 2 depicts cement 24 having been injected into the annulus 16 of FIG. 1 for anchoring the casing string 12 within the well bore 10 .
- the cement 24 covers the outer surfaces of the perforating guns 14 and pressure gauges 22 .
- the cement 24 is any substance flowable into the annulus 16 and/or used for securing the casing string 12 .
- the cement 24 may also be used to provide a barrier preventing flow along the length of the annulus 16 .
- perforators 18 have been detonated to form perforations 26 that extend through a portion of the cement 24 and into the formation 20 in a direction away from the casing string 12 .
- the perforating guns 14 include a single perforator 18 with an associated detonator (not shown) for initiating detonation of the perforator 18 .
- the perforator 18 is a shaped charge and has formed and directed a jet 19 into the formation 20 to create the perforations 26 .
- a digital switch (not shown) may be included with the perforating guns 14 so each individual perforating gun 14 may be independently fired.
- the perforations 26 provide pressure communication from the formation 20 to the annulus 16 .
- the pressure gauges 22 communicates with the pressure gauges 22 .
- pressure in the formation 20 may be monitored by the pressure gauges 22 via the perforations 26 .
- the pressure gauges 22 are mounted onto the casing string 12 adjacent to the portion of the perforating guns 14 having the perforator 18 to maximize accuracy of pressure measurements in the formation 20 .
- the permanent placement of the gauges 22 in the annulus 16 allows for pressure monitoring of the formation 20 over time, where the time frame can be as discrete as minutes, up to multiples of years, and all time frames in between. The ability to monitor formation pressure over a time frame not only can help identify transient issues downhole, but also be useful in estimating production capacity of the formation and anticipated production duration.
- FIG. 3 Further illustrated in the example of FIG. 3 are multiple zones Z 1 -Z n , included within the formation. Barriers B 1 -B n separate the zones Z 1 -Z n , from one another, wherein the barriers B 1 -B n may block fluid flow between adjacent zones Z 1 -Z n , and allow a pressure gradient to form that is in excess of hydrostatic pressure.
- the example embodiment of FIG. 3 depicts the perforating guns 14 and pressure gauges 22 strategically located so that perforations 26 created by the perforators 18 are in separate zones Z 1 -Z n thereby enabling discrete pressure measurements from more than one, or each of, the zones Z 1 -Z n .
- dimensions of a hydrocarbon producing reservoir in the formation 20 can affect how the pressure gauges 22 are strategically located. It is appreciated that it is within the capabilities of those skilled in the art to identify locations in a subterranean reservoir of hydrocarbons where pressure measurements would provide information useful for characterizing the reservoir.
- An advantage of strategically located pressure measurements is the ability to measure pressure depletion along a path where the borehole 10 intersects the formation 20 ; which can be used for estimating reserves in the formation 20 and also useful for maximizing recovery of hydrocarbons from the formation 20 .
- example tandems 27 each made up of a perforating gun 14 and a pressure gauge 22 are illustrated in a side view.
- the tandems 27 of FIG. 4 represent a portion of the perforating guns 14 and pressure gauges 22 included with the casing string 12 disclosed herein.
- tandems 27 are formed by coupling a perforating gun 14 and pressure gauge with clamps 28 .
- Initiation lines 30 are shown connected to upper and lower ends of each perforating gun 14 .
- the initiation lines 30 may be cables that transmit a signal instructing the firing head (not shown) within the perforating gun 14 to detonate the shape charge therein.
- the initiation lines 30 may be detonation cord that once ignited at one end transmits a detonation shock wave along the length of the initiation line 30 for detonating shape charges within each perforating gun 14 .
- Signal lines 32 communicate pressure between the pressure gauges 22 in the tandems 27 depicted in FIG. 4 and also to the other tandems 27 with the casing string 12 thereby forming a pressure gauge circuit.
- a coupling 33 is shown provided with one of the pressure gauges 22 for attachment to the signal line 32 . Couplings 33 can be provided at each point where signal lines 32 attach to the pressure gauges 22 .
- a coupling 33 can be any form of attaching the signal line 32 with the pressure gauge 22 , such as a male/female socket arrangement or simple contact of conducting elements (not shown) in the signal line 32 with contacts (not shown) in the pressure gauge 22 .
- tubing 34 coupled on one end to each pressure gauge 22 and on its other end to the body of an associated perforating gun 14 . As such, pressure within the formation 20 communicates through the perforation 26 , into the body or bodies of the perforating guns 14 , and through the tubing 34 to each pressure gauge 22 .
- a controller 36 is further schematically illustrated in FIG. 4 shown disposed above the surface 37 and connected to ends of the initiation and signal lines 30 , 32 .
- the controller 36 of FIG. 4 is in communication with the perforators 14 via the initiation lines 30 and pressure gauges 22 via the signal lines 32 . Selective activation of the perforators 14 can be done using the controller 36 as well as monitoring signals from the pressure gauges 22 for collecting pressure data.
- the controller 36 can be an information handling system that is stand alone or incorporated within a surface truck (not shown).
- FIG. 5 Provided in a side view in FIG. 5 and taken along line 5 - 5 from FIG. 4 , is an example embodiment of the pressure gauge 22 having a signal line 32 depending downward from a lower end of the pressure gauge 22 .
- the signal line 32 of FIG. 5 connects to another pressure gauge (not shown) at a different elevation on the casing string.
- a pressure port 38 formed through the outer body of the pressure gauge 22 that may optionally be threaded and adapted to receive the tubing 34 of FIG. 4 .
- FIG. 6 An alternative example embodiment of the well bore assembly is shown in a side view in FIG. 6 .
- a perforating gun 14 is anchored onto the outer surface of the casing 12 and initiation lines 30 attach to respective upper and lower ends of the perforating gun 14 .
- the pressure gauge 22 shown adjacent the perforating gun 14 is anchored on the outer surface of the casing string 12 thereby out of the path of a perforating jet that forms upon detonation of the perforator 18 .
- Tubing 34 connects the pressure gauge 22 with the inside of the body of the perforating gun 14 .
- the pressure gauge is made of a device having oscillatory quartz crystal that responds to pressure variations so that pressure is experienced by pressure gauge 22 can be converted into signals that are then transmitted to surface via the signal line 32 , or other communications means.
- a line generally coaxial with the perforation 26 extends substantially towards an axis A X of the casing 12 rather than at an angle with the axis A X .
- clamps 40 are shown coupling the perforating gun 14 with the outer surface of the casing 12 . Additional clamps 28 are shown attaching the pressure gauge 22 to the perforating gun 14 to define a tandem arrangement mounted on the casing string 12 . Placement of the clamps 28 , 40 is variable depending on position of the tubing 34 and perforator 18 .
- a casing string 12 is provided with the perforating guns 14 and pressure gauges 22 on its outer surface and then deployed into the well bore 10 .
- the pressure gauges 22 may be housed inside the perforating guns 14 and protected therein while inserting the casing string 12 into the wellbore 10 .
- the perforating gun 14 can also shield the pressure gauges 22 during cement 24 injection, as shown in FIG. 2 .
- the perforators 18 are detonated to produce perforations 26 in the formation 20 .
- a sequence of perforator 18 initiation may begin by first initiating the lower most perforator 18 , and then sequentially initiating each successive perforator 18 towards the surface.
- pressure from the formation 20 is communicated directly to each pressure gauge 22 .
- pressure monitored with the pressure gauges 22 may be analyzed to assess characteristics within the formation 20 , such as a prediction of future or expected hydrocarbon production from within the well bore 10 .
- FIG. 8 illustrates in a side sectional view an alternate embodiment of a system for measuring pressure in a subterranean formation.
- the casing 12 A includes collars 42 where adjacent sections of casing 12 A are joined, such as by a threaded fitting (not shown).
- a perforator 18 A and pressure gauge 22 A are set within the body of the collar 42 .
- at least a portion of the initiation lines 30 A and signal lines 32 A are routed through the collar 42 .
Landscapes
- Physics & Mathematics (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Geophysics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Measuring Fluid Pressure (AREA)
Abstract
A method of completing a wellbore that includes providing wellbore casing having shaped charges and permanent pressure gauges on an outer surface of the casing. In an example of use, the casing is inserted into the wellbore and cement is injected into an annulus formed between the casing and wellbore. The shaped charges are strategically deployed on the casing so they aim towards a wall of the wellbore and are spaced apart along the casing. Thus detonating the shaped charges creates perforations into a formation around the wellbore and places the pressure gauges into pressure communication with the formation. Pressure readings are delivered to the surface from the pressure gauges in the form of signals.
Description
- This application claims priority to and the benefit of U.S. Provisional Application Ser. No. 61/376,327, filed Aug. 24, 2010, the full disclosure of which is hereby incorporated by reference herein.
- 1. Field of Invention
- The invention relates generally to the field of downhole pressure measurement. More specifically, the present invention relates to measuring formation pressure with permanent pressure gauges mounted outside of wellbore casing and using shaped charges mounted outside the casing to communicate pressure from the formation to the gauges.
- 2. Description of Prior Art
- Formation pressure adjacent to a hydrocarbon producing wellbore can be monitored to assess reservoir characteristics and forecast future hydrocarbon production. Formation pressures are also sometimes monitored for evaluating safety and environmental concerns. Over time, more complex wells have been developed that are deeper and include more elaborate lateral branches. As the deeper and branched wells generally extend through more than one formation, additional locations for pressure monitoring are identified. As well production technology advances to allow deeper and more complex well systems, similar advancements in pressure monitoring have been made.
- For open hole wellbores that have not yet been lined, tools are sometimes inserted into the wellbore and a probe from the tool penetrates into the adjacent formation to directly measure pressure in the formation. Such characterization tools are impractical once the wellbore has been lined. Thus after completion of the wellbore, permanent pressure gauges are typically deployed inside the wellbore casing for measuring the internal wellbore pressure.
- Disclosed herein is a method of completing a wellbore that includes providing wellbore casing having shaped charges and permanent pressure gauges on an outer surface of the casing. In an example of use, the casing is inserted into the wellbore and cement is injected into an annulus formed between the casing and wellbore. The shaped charges are strategically deployed on the casing so they aim towards a wall of the wellbore and are spaced apart along the casing. Thus detonating the shaped charges creates perforations into a formation around the wellbore and places the pressure gauges into pressure communication with the formation. Pressure readings are delivered to the surface from the pressure gauges in the form of signals.
- Also disclosed herein is a method of characterizing a subterranean formation. In one example the method of characterizing includes providing a perforator in an annulus that is between a downhole tubular and a borehole wall. The perforator is used to form a perforation through the wall and into the subterranean formation; thus the perforation allows communication of pressure in the subterranean formation to the annulus. Pressure in the subterranean formation is then estimated by measuring pressure in the annulus. In one example embodiment, pressure measurements are taken over a period of time so that changes of pressure in the subterranean formation over the period of time can be monitored. The perforator can be a shaped charge, a perforating bullet, or a fluid jet. In one example embodiment, measuring pressure in the annulus involves providing a pressure gauge in the annulus and monitoring an output from the pressure gauge. In an example, the perforator includes a housing and the perforation extends into the housing so that an inside of the housing is in pressure communication with the subterranean formation, and wherein an input to the pressure gauge is ported to the inside of the housing. In an optional embodiment, the perforator is made up of a housing and the perforation extends into the housing so that an inside of the housing is in pressure communication with the subterranean formation, and wherein the pressure gauge is disposed inside the housing. Optionally, the subterranean formation includes multiple zones, in this example the method involves repeating the steps of providing, perforating, and measuring in at least two of the zones. Alternatively, cement is provided in the annulus after the perforator is included but before the formation is perforated.
- Further described herein is a system for measuring pressure in a subterranean formation. In one example embodiment the system is made up of a perforator selectively disposed in an annulus formed between a downhole tubular and a wall of a wellbore and a pressure gauge in pressure communication with the perforator. Further included is a coupling mounted on the pressure gauge attached to a signal line, so that when the perforator is initiated to create a perforation through the wall of the wellbore, the pressure gauge is brought into pressure communication with the formation and the pressure in the formation can be measured through the signal line. In an example embodiment, the perforator is a perforating gun with a shaped charge, and cement is provided in the annulus; as such, the perforation extends through a portion of the cement. Tubing may optionally be provided that is connected between the pressure gauge and the perforator for providing pressure communication between the pressure gauge and the perforator. Yet further optionally included is a controller in communication with the pressure gauge through the signal line and in communication with the perforator through a signal line. In another alternative embodiment, the downhole tubular is casing that lines the wellbore and the perforator and the pressure gauge are each clamped to an outer surface of the casing.
- Also described herein is a method of measuring pressure in a formation adjacent to a wellbore lined with casing. In one example the method involves providing a shaped charge in an annulus between the casing and a wall of the wellbore, providing a pressure gauge in the annulus and in pressure communication with the shaped charge, forming a perforation in the formation by projecting a jet from the shaped charge into the formation from the annulus, sensing pressure of the formation with the pressure gauge, and directing a signal from the pressure gauge through a signal line that represents pressure sensed in the formation. In an alternate embodiment, the shaped charge is included within a perforating gun having a housing, and the pressure gauge is in fluid communication with the shaped charge by a length of tubing connecting the housing and the pressure gauge. Optionally, the shaped charge is included within a perforating gun having a housing, and the pressure gauge is disposed in the housing. The method can optionally be repeated, and the perforation can occur in a portion of the formation that is isolated from the first portion of the formation perforated by a formation barrier.
- Some of the features and benefits of the present invention having been stated, others will become apparent as the description proceeds when taken in conjunction with the accompanying drawings, in which:
-
FIG. 1 is a side sectional view of a system in a wellbore for estimating pressure in a subterranean formation. -
FIG. 2 is a side sectional view of the system ofFIG. 1 with cement added into the wellbore. -
FIG. 3 is a side sectional view of the system ofFIG. 2 forming perforations in the formation. -
FIG. 4 is a side view of a sample embodiment of a pressure gauge and perforator. -
FIG. 5 is a side sectional view of a portion of a pressure gauge ofFIG. 4 . -
FIG. 6 is a side view of a perforator and pressure gauge on an outer surface of a casing. -
FIG. 7 is a side view of a perforator and pressure gauge on an outer surface of a well bore casing. -
FIG. 8 is a side sectional view of an alternate embodiment of the system for measuring pressure in a subterranean formation. - While the invention will be described in connection with the preferred embodiments, it will be understood that it is not intended to limit the invention to that embodiment. On the contrary, it is intended to cover all alternatives, modifications, and equivalents, as may be included within the spirit and scope of the invention as defined by the appended claims.
- The present invention will now be described more fully hereinafter with reference to the accompanying drawings in which embodiments of the invention are shown. This invention may, however, be embodied in many different forms and should not be construed as limited to the illustrated embodiments set forth herein; rather, these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the scope of the invention to those skilled in the art. Like numbers refer to like elements throughout.
- It is to be understood that the invention is not limited to the exact details of construction, operation, exact materials, or embodiments shown and described, as modifications and equivalents will be apparent to one skilled in the art. In the drawings and specification, there have been disclosed illustrative embodiments of the invention and, although specific terms are employed, they are used in a generic and descriptive sense only and not for the purpose of limitation. Accordingly, the invention is therefore to be limited only by the scope of the appended claims.
- Referring now to
FIG. 1 , an example well bore 10 is shown in a side sectional view having acasing string 12 inserted into the well bore 10. Thecasing string 12 ofFIG. 1 has perforatingguns 14 attached on the outer surface of thecasing string 12 that are disposed in anannulus 16 formed in between thecasing 12 and inner wall of the well bore 10. In the embodiment ofFIG. 1 , each perforatinggun 14 includes a perforator 18 oriented so that it is aimed away from thecasing string 12 and into aformation 20 surrounding the well bore 10. Examples ofperforators 18 include shaped charges, perforating bullets, and fluid jets. It should be noted that while the perforatinggun 14 as shown contains a single shaped charge, a perforating gun used for this application may contain many shaped charges. In the example ofFIG. 1 , the perforatingguns 14 may be arranged so that theperforators 18 associated with each perforatinggun 14 are spaced apart axially within the well bore 10. The spacing of theperforators 18 can vary depending on theparticular formation 20 in which the well bore 10 is formed. It is believed it is well within the capabilities of those skilled in the art to determine a designated spacing of theperforators 18. - Pressure gauges 22 are further illustrated that are coupled on the outer circumference of the
casing string 12. In the example embodiment ofFIG. 1 , apressure gauge 22 is provided for each perforatinggun 14. However, other embodiments exist of the well bore assembly ofFIG. 1 wherein any number ofpressure gauges 22 can vary from the number of perforatingguns 14. As described in more detail below, the pressure gauges 22 may be in communication with the surface and optionally coupled with other pressure gauges within the well bore 10. -
FIG. 2 depictscement 24 having been injected into theannulus 16 ofFIG. 1 for anchoring thecasing string 12 within the well bore 10. In theannulus 16, thecement 24 covers the outer surfaces of the perforatingguns 14 and pressure gauges 22. Embodiments exist where thecement 24 is any substance flowable into theannulus 16 and/or used for securing thecasing string 12. Moreover, thecement 24 may also be used to provide a barrier preventing flow along the length of theannulus 16. - Referring now to
FIG. 3 , perforators 18 have been detonated to formperforations 26 that extend through a portion of thecement 24 and into theformation 20 in a direction away from thecasing string 12. In one example, the perforatingguns 14 include asingle perforator 18 with an associated detonator (not shown) for initiating detonation of theperforator 18. In the example ofFIG. 3 , theperforator 18 is a shaped charge and has formed and directed ajet 19 into theformation 20 to create theperforations 26. Optionally, a digital switch (not shown) may be included with the perforatingguns 14 so each individual perforatinggun 14 may be independently fired. Theperforations 26 provide pressure communication from theformation 20 to theannulus 16. Communicating pressure from theformation 20 into theannulus 16 in turn communicates with the pressure gauges 22. Thus pressure in theformation 20 may be monitored by the pressure gauges 22 via theperforations 26. Accordingly, in one example embodiment the pressure gauges 22 are mounted onto thecasing string 12 adjacent to the portion of the perforatingguns 14 having theperforator 18 to maximize accuracy of pressure measurements in theformation 20. Moreover, the permanent placement of thegauges 22 in theannulus 16 allows for pressure monitoring of theformation 20 over time, where the time frame can be as discrete as minutes, up to multiples of years, and all time frames in between. The ability to monitor formation pressure over a time frame not only can help identify transient issues downhole, but also be useful in estimating production capacity of the formation and anticipated production duration. - Further illustrated in the example of
FIG. 3 are multiple zones Z1-Zn, included within the formation. Barriers B1-Bn separate the zones Z1-Zn, from one another, wherein the barriers B1-Bn may block fluid flow between adjacent zones Z1-Zn, and allow a pressure gradient to form that is in excess of hydrostatic pressure. The example embodiment ofFIG. 3 depicts the perforatingguns 14 andpressure gauges 22 strategically located so thatperforations 26 created by theperforators 18 are in separate zones Z1-Zn thereby enabling discrete pressure measurements from more than one, or each of, the zones Z1-Zn. Also, dimensions of a hydrocarbon producing reservoir in theformation 20 can affect how the pressure gauges 22 are strategically located. It is appreciated that it is within the capabilities of those skilled in the art to identify locations in a subterranean reservoir of hydrocarbons where pressure measurements would provide information useful for characterizing the reservoir. An advantage of strategically located pressure measurements is the ability to measure pressure depletion along a path where theborehole 10 intersects theformation 20; which can be used for estimating reserves in theformation 20 and also useful for maximizing recovery of hydrocarbons from theformation 20. - In
FIG. 4 ,example tandems 27 each made up of a perforatinggun 14 and apressure gauge 22 are illustrated in a side view. Thetandems 27 ofFIG. 4 represent a portion of the perforatingguns 14 andpressure gauges 22 included with thecasing string 12 disclosed herein. As shown,tandems 27 are formed by coupling a perforatinggun 14 and pressure gauge withclamps 28.Initiation lines 30 are shown connected to upper and lower ends of each perforatinggun 14. The initiation lines 30 may be cables that transmit a signal instructing the firing head (not shown) within the perforatinggun 14 to detonate the shape charge therein. Alternatively, the initiation lines 30 may be detonation cord that once ignited at one end transmits a detonation shock wave along the length of theinitiation line 30 for detonating shape charges within each perforatinggun 14.Signal lines 32 communicate pressure between the pressure gauges 22 in thetandems 27 depicted inFIG. 4 and also to theother tandems 27 with thecasing string 12 thereby forming a pressure gauge circuit. Acoupling 33 is shown provided with one of the pressure gauges 22 for attachment to thesignal line 32.Couplings 33 can be provided at each point where signal lines 32 attach to the pressure gauges 22. Acoupling 33 can be any form of attaching thesignal line 32 with thepressure gauge 22, such as a male/female socket arrangement or simple contact of conducting elements (not shown) in thesignal line 32 with contacts (not shown) in thepressure gauge 22. Further illustrated inFIG. 4 istubing 34 coupled on one end to eachpressure gauge 22 and on its other end to the body of an associated perforatinggun 14. As such, pressure within theformation 20 communicates through theperforation 26, into the body or bodies of the perforatingguns 14, and through thetubing 34 to eachpressure gauge 22. - A
controller 36 is further schematically illustrated inFIG. 4 shown disposed above thesurface 37 and connected to ends of the initiation andsignal lines controller 36 ofFIG. 4 is in communication with theperforators 14 via the initiation lines 30 andpressure gauges 22 via the signal lines 32. Selective activation of theperforators 14 can be done using thecontroller 36 as well as monitoring signals from the pressure gauges 22 for collecting pressure data. Thecontroller 36 can be an information handling system that is stand alone or incorporated within a surface truck (not shown). - Provided in a side view in
FIG. 5 and taken along line 5-5 fromFIG. 4 , is an example embodiment of thepressure gauge 22 having asignal line 32 depending downward from a lower end of thepressure gauge 22. Thesignal line 32 ofFIG. 5 connects to another pressure gauge (not shown) at a different elevation on the casing string. Further illustrated inFIG. 5 is apressure port 38 formed through the outer body of thepressure gauge 22 that may optionally be threaded and adapted to receive thetubing 34 ofFIG. 4 . - An alternative example embodiment of the well bore assembly is shown in a side view in
FIG. 6 . In this example, a perforatinggun 14 is anchored onto the outer surface of thecasing 12 andinitiation lines 30 attach to respective upper and lower ends of the perforatinggun 14. Thepressure gauge 22 shown adjacent the perforatinggun 14 is anchored on the outer surface of thecasing string 12 thereby out of the path of a perforating jet that forms upon detonation of theperforator 18.Tubing 34 connects thepressure gauge 22 with the inside of the body of the perforatinggun 14. In one example, the pressure gauge is made of a device having oscillatory quartz crystal that responds to pressure variations so that pressure is experienced bypressure gauge 22 can be converted into signals that are then transmitted to surface via thesignal line 32, or other communications means. Additionally, to maximize penetration of theformation 20 with theperforation 26 at 0° phase can be designated for creating the perforation 26 (FIG. 3 ). That is, a line generally coaxial with theperforation 26 extends substantially towards an axis AX of thecasing 12 rather than at an angle with the axis AX. - In another embodiment provided in a side view in
FIG. 7 , clamps 40 are shown coupling the perforatinggun 14 with the outer surface of thecasing 12.Additional clamps 28 are shown attaching thepressure gauge 22 to the perforatinggun 14 to define a tandem arrangement mounted on thecasing string 12. Placement of theclamps tubing 34 andperforator 18. - In one example of use, as illustrated in
FIG. 1 , acasing string 12 is provided with the perforatingguns 14 andpressure gauges 22 on its outer surface and then deployed into the well bore 10. Alternatively, the pressure gauges 22 may be housed inside the perforatingguns 14 and protected therein while inserting thecasing string 12 into thewellbore 10. The perforatinggun 14 can also shield the pressure gauges 22 duringcement 24 injection, as shown inFIG. 2 . Further illustrating the example, after thecement 24 is set, theperforators 18 are detonated to produceperforations 26 in theformation 20. A sequence ofperforator 18 initiation may begin by first initiating the lowermost perforator 18, and then sequentially initiating eachsuccessive perforator 18 towards the surface. By porting the pressure gauge to a void within the perforatinggun 14, pressure from theformation 20 is communicated directly to eachpressure gauge 22. Thus over time, pressure monitored with the pressure gauges 22 may be analyzed to assess characteristics within theformation 20, such as a prediction of future or expected hydrocarbon production from within the well bore 10. -
FIG. 8 illustrates in a side sectional view an alternate embodiment of a system for measuring pressure in a subterranean formation. In this example thecasing 12A includescollars 42 where adjacent sections of casing 12A are joined, such as by a threaded fitting (not shown). In the example ofFIG. 8 aperforator 18A andpressure gauge 22A are set within the body of thecollar 42. In the embodiment ofFIG. 8 , at least a portion of theinitiation lines 30A andsignal lines 32A are routed through thecollar 42. - The present invention described herein, therefore, is well adapted to carry out the objects and attain the ends and advantages mentioned, as well as others inherent therein. While a presently preferred embodiment of the invention has been given for purposes of disclosure, numerous changes exist in the details of procedures for accomplishing the desired results. For example, components of the perforating gun and pressure gauge could be integrated into a single modular unit within a single housing. In this embodiment the perforating gun components could be miniaturized to fit within a housing that would normally only accommodate the pressure gauge. These and other similar modifications will readily suggest themselves to those skilled in the art, and are intended to be encompassed within the spirit of the present invention disclosed herein and the scope of the appended claims.
Claims (17)
1. A method of characterizing a subterranean formation comprising:
a. providing a perforator in an annulus formed between a downhole tubular and a wall of a borehole that intersects the subterranean formation;
b. using the perforator to form a perforation through the wall and into the subterranean formation thereby communicating pressure in the subterranean formation to the annulus; and
c. estimating pressure in the subterranean formation by measuring pressure in the annulus.
2. The method of claim 1 , wherein step (c) is performed over a period of time and changes of pressure in the subterranean formation over the period of time are monitored.
3. The method of claim 1 , wherein the perforator comprises a device selected from the group consisting of a shaped charge, a perforating bullet, and a fluid jet.
4. The method of claim 1 , wherein the step of measuring pressure in the annulus comprises providing a pressure gauge in the annulus and monitoring an output from the pressure gauge.
5. The method of claim 3 , wherein the perforator comprises a housing and the perforation extends into the housing so that an inside of the housing is in pressure communication with the subterranean formation, and wherein an input to the pressure gauge is ported to the inside of the housing.
6. The method of claim 3 , wherein the perforator comprises a housing and the perforation extends into the housing so that an inside of the housing is in pressure communication with the subterranean formation, and wherein the pressure gauge is disposed inside the housing.
7. The method of claim 1 , wherein the subterranean formation includes multiple zones, the method further comprising performing steps (a)-(c) in at least two of the zones.
8. The method of claim 1 , further comprising providing cement in the annulus after step (a) and before step (b).
9. A system for measuring pressure in a subterranean formation comprising:
a perforator selectively disposed in an annulus formed between a downhole tubular and a wall of a wellbore;
a pressure gauge in pressure communication with the perforator; and
a coupling mounted on the pressure gauge attached to a signal line, so that when the perforator is initiated to create a perforation through the wall of the wellbore, the pressure gauge is brought into pressure communication with the formation and the pressure in the formation can be measured through the signal line.
10. The system of claim 9 , wherein the perforator comprises a perforating gun with a shaped charge and wherein cement is provided in the annulus and the perforation extends through a portion of the cement.
11. The system of claim 9 , further comprising tubing connected between the pressure gauge and the perforator for providing pressure communication between the pressure gauge and the perforator.
12. The system of claim 9 , further comprising a controller in communication with the pressure gauge through the signal line and in communication with the perforator through a signal line.
13. The system of claim 9 , wherein the downhole tubular comprises casing lining the wellbore and the perforator and the pressure gauge are each clamped to an outer surface of the casing.
14. A method of measuring pressure in a formation adjacent a wellbore lined with casing, the method comprising:
a. providing a shaped charge in an annulus between the casing and a wall of the wellbore;
b. providing a pressure gauge in the annulus and in pressure communication with the shaped charge;
c. forming a perforation in the formation by projecting a jet from the shaped charge into the formation from the annulus;
d. sensing pressure of the formation with the pressure gauge; and
e. directing a signal from the pressure gauge through a signal line that represents pressure sensed in the formation.
15. The method of claim 14 , wherein the shaped charge is included within a perforating gun having a housing, and the pressure gauge is in fluid communication with the shaped charge by a length of tubing connecting the housing and the pressure gauge.
16. The method of claim 14 , wherein the shaped charge is included within a perforating gun having a housing, and the pressure gauge is disposed in the housing.
17. The method of claim 14 , further comprising repeating steps (a)-(e), and wherein the perforation of step (c) is in a portion of the formation that is isolated from the portion of the formation of claim 14 by a formation barrier.
Priority Applications (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US13/215,379 US20120048539A1 (en) | 2010-08-24 | 2011-08-23 | Reservoir Pressure Monitoring |
GB1222718.7A GB2497207A (en) | 2010-08-24 | 2011-08-24 | Reservoir pressure monitoring |
PCT/US2011/048994 WO2012027492A2 (en) | 2010-08-24 | 2011-08-24 | Reservoir pressure monitoring |
NO20121467A NO20121467A1 (en) | 2010-08-24 | 2012-12-06 | Reservoir pressure monitoring |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US37632710P | 2010-08-24 | 2010-08-24 | |
US13/215,379 US20120048539A1 (en) | 2010-08-24 | 2011-08-23 | Reservoir Pressure Monitoring |
Publications (1)
Publication Number | Publication Date |
---|---|
US20120048539A1 true US20120048539A1 (en) | 2012-03-01 |
Family
ID=45695592
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US13/215,379 Abandoned US20120048539A1 (en) | 2010-08-24 | 2011-08-23 | Reservoir Pressure Monitoring |
Country Status (4)
Country | Link |
---|---|
US (1) | US20120048539A1 (en) |
GB (1) | GB2497207A (en) |
NO (1) | NO20121467A1 (en) |
WO (1) | WO2012027492A2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2020006187A1 (en) * | 2018-06-29 | 2020-01-02 | Halliburton Energy Services, Inc. | Casing conveyed, externally mounted perforation concept |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9476289B2 (en) | 2013-09-12 | 2016-10-25 | G&H Diversified Manufacturing Lp | In-line adapter for a perforating gun |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5467823A (en) * | 1993-11-17 | 1995-11-21 | Schlumberger Technology Corporation | Methods and apparatus for long term monitoring of reservoirs |
US6386288B1 (en) * | 1999-04-27 | 2002-05-14 | Marathon Oil Company | Casing conveyed perforating process and apparatus |
US6994167B2 (en) * | 2000-09-09 | 2006-02-07 | Schlumberger Technology Corporation | Method and system for cement lining a wellbore |
US8540027B2 (en) * | 2006-08-31 | 2013-09-24 | Geodynamics, Inc. | Method and apparatus for selective down hole fluid communication |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2373498C (en) * | 2002-02-27 | 2009-05-19 | Terrence G. Moffatt | Pressure sensor assembly for wellbore |
GB0502395D0 (en) * | 2005-02-05 | 2005-03-16 | Expro North Sea Ltd | Reservoir monitoring system |
EP1945905B1 (en) * | 2005-11-04 | 2010-11-24 | Shell Oil Company | Monitoring formation properties |
-
2011
- 2011-08-23 US US13/215,379 patent/US20120048539A1/en not_active Abandoned
- 2011-08-24 WO PCT/US2011/048994 patent/WO2012027492A2/en active Application Filing
- 2011-08-24 GB GB1222718.7A patent/GB2497207A/en not_active Withdrawn
-
2012
- 2012-12-06 NO NO20121467A patent/NO20121467A1/en not_active Application Discontinuation
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5467823A (en) * | 1993-11-17 | 1995-11-21 | Schlumberger Technology Corporation | Methods and apparatus for long term monitoring of reservoirs |
US6386288B1 (en) * | 1999-04-27 | 2002-05-14 | Marathon Oil Company | Casing conveyed perforating process and apparatus |
US6994167B2 (en) * | 2000-09-09 | 2006-02-07 | Schlumberger Technology Corporation | Method and system for cement lining a wellbore |
US8540027B2 (en) * | 2006-08-31 | 2013-09-24 | Geodynamics, Inc. | Method and apparatus for selective down hole fluid communication |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2020006187A1 (en) * | 2018-06-29 | 2020-01-02 | Halliburton Energy Services, Inc. | Casing conveyed, externally mounted perforation concept |
US11268356B2 (en) | 2018-06-29 | 2022-03-08 | Halliburton Energy Services, Inc. | Casing conveyed, externally mounted perforation concept |
Also Published As
Publication number | Publication date |
---|---|
GB2497207A (en) | 2013-06-05 |
NO20121467A1 (en) | 2012-12-17 |
WO2012027492A3 (en) | 2012-04-26 |
WO2012027492A2 (en) | 2012-03-01 |
GB201222718D0 (en) | 2013-01-30 |
WO2012027492A4 (en) | 2012-06-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11680454B2 (en) | Method of plugging and pressure testing a well | |
US11668188B2 (en) | Differential velocity sensor | |
EP1853792B1 (en) | Device and method for firing perforating guns | |
EP3102782B1 (en) | Frac sleeve system and method for non-sequential downhole operations | |
US6837310B2 (en) | Intelligent perforating well system and method | |
US8365814B2 (en) | Pre-verification of perforation alignment | |
MX2013009009A (en) | Device for verifying detonator connection. | |
US11402190B2 (en) | Detonation system having sealed explosive initiation assembly | |
US20150252669A1 (en) | Method and apparatus for reservoir testing and monitoring | |
GB2406870A (en) | Intelligent well perforation system | |
EP1731709A2 (en) | Method and system for performing operations and for improving production in wells | |
CA3090586C (en) | Detonation system having sealed explosive initiation assembly | |
US20120048539A1 (en) | Reservoir Pressure Monitoring | |
US20230115055A1 (en) | Tandem seal adapter with integrated tracer material | |
CA3151264A1 (en) | Detonation system having sealed explosive initiation assembly |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: BAKER HUGHES INCORPORATED, TEXAS Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:CLARK, JOHN H.;COOPER, PHILIP G.;EVANS, RANDY L.;AND OTHERS;SIGNING DATES FROM 20110822 TO 20110823;REEL/FRAME:026790/0223 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |