US20120027525A1 - Jack-up offshore platform and its use for assembling and servicing a structure at sea - Google Patents
Jack-up offshore platform and its use for assembling and servicing a structure at sea Download PDFInfo
- Publication number
- US20120027525A1 US20120027525A1 US12/845,904 US84590410A US2012027525A1 US 20120027525 A1 US20120027525 A1 US 20120027525A1 US 84590410 A US84590410 A US 84590410A US 2012027525 A1 US2012027525 A1 US 2012027525A1
- Authority
- US
- United States
- Prior art keywords
- jack
- lifting device
- platform
- offshore platform
- work deck
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B17/02—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
- E02B17/021—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto with relative movement between supporting construction and platform
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B2017/0039—Methods for placing the offshore structure
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B2017/0056—Platforms with supporting legs
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B2017/0056—Platforms with supporting legs
- E02B2017/0065—Monopile structures
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B2017/0091—Offshore structures for wind turbines
Definitions
- the invention relates to a jack-up offshore platform, on which is provided a lifting device for manipulating a load.
- the invention also relates to the use of the jack-up offshore platform for assembling and servicing structures at sea, in particular a wind turbine.
- a typical example is an offshore wind turbine, which comprises a nacelle supported by a tower of more than 100 meters high above sea level.
- a hub is connected to the nacelle for holding rotor blades, which can have a length of 70 meters and more.
- the nacelle alone typically accounts for 350 tons in weight.
- lifting cranes and counterweights become increasingly heavy, which consequentially also requires sturdier platforms.
- the lifting cranes, including their counterweights moreover tend to take up more and more workspace from the jack-up offshore platform. Transporting large cranes and counterweights is also increasingly demanding and costly.
- a jack-up offshore platform comprising a work deck and a lifting device for lifting a load from the work deck, the lifting device comprising a main boom for manipulating the load, which main boom is pivotally connected to support means at a pivot, the support means being provided to support the pivot in an elevated position with respect to the work deck.
- a further advantage of the platform according to the invention is that its lifting device has a reduced working radius for a given reachable height compared to the known lifting crane, which is supported by the work deck of the jack-up platform directly.
- An additional advantage of the jack-up offshore platform according to the invention is that its lifting device takes up less space of the jack-up offshore platform, in rest and in operation, and makes assembling or servicing structures at sea less expensive and easier to perform.
- the jack-up offshore platform is characterized in that the elevated position is at least 10 m above the platform, even more preferred at least 20 m above the platform, and most preferred at least 30 m above the work deck of the platform. It has turned out that the support means in such preferred embodiments in particular provide additional stability to the lifting device.
- a jack-up offshore platform wherein the support means comprise a pre-defined fixed-height support means.
- the pre-defined height is selected according to the particular needs of the project.
- the height of the elevated position above the work deck of the platform ranges from 20 to 80% of the total height of the lifting device in its highest position.
- This embodiment provides an optimum between the possibility to reach high altitudes and the strength of the lifting device.
- a jack-up platform for which the height of the elevated position above the work deck of the platform ranges from 30 to 70% of the total height of the lifting device in its highest position.
- a jack-up platform for which the height of the elevated position above the work deck of the platform ranges from 40 to 60% of the total height of the lifting device in its highest position.
- the support means of the invention may be movable or static.
- the support means comprise a static support structure, that is, more preferably, positioned on the work deck of the platform.
- Such an embodiment of the lifting device is stable, strong and cost effective.
- a very suitable jack-up offshore platform according to the invention is characterized in that the support structure comprises a truss framework. Truss frameworks are light, and can be designed and assembled easily in accordance with the requirements.
- the jack-up offshore platform is characterized in that the lifting device comprises counterbalancing means that are connectable to the platform and/or the support means.
- the counterbalancing means When manipulating a load, the counterbalancing means are connected to the jack-up platform and/or the support means.
- the counterbalancing means When manipulating a load, the counterbalancing means are connected to the jack-up platform and/or the support means.
- the counterbalancing means As a result, at least a part of the force carried by the counterbalancing means is transferred to the jack-up offshore platform, eventually through the support means, and the counterweight needed to counterbalance the load can be reduced compared to the state of the art, or even deleted altogether.
- a larger load can be lifted relative to the state of the art platform and crane.
- a preferred counterbalancing means comprise at least one counterbalancing cable attached to the lifting device, and preferably to the main boom (or booms) thereof, and connectable to the platform and/or support structure.
- the counterbalancing means are connectable to the jack-up offshore platform and/or the support structure at least two spaced apart connection positions. This allows to use the lifting device in at least two different positions. For example, with the main boom of the lifting device in a first position, a load can be lifted from a cargo ship onto a particular location of the platform, and, with the main boom of the lifting device in a second position, the load can be repositioned to the structure at sea.
- the counterbalancing means are connectable to the platform and/or the support structure at two spaced apart connection positions.
- the lifting device When servicing or assembling a structure at sea, such as a wind turbine, the lifting device usually lifts parts from a first location, for example from a cargo ship or from the jack-up offshore platform, and positions the load at the preferred location of the structure. When these locations are at a substantial distance from each other, two spaced apart connection positions allow for effective use of the counterbalancing cables, whereas even more limited workspace of the jack-up offshore platform is used.
- the counterbalancing means are connectable to the platform nearby edges of the jack-up offshore platform. This saves even more workspace, as edges are usually not part of the workspace, or at least not used extensively.
- the counterbalancing means are movably connectable to the jack-up offshore platform.
- the jack-up offshore platform may for instance comprise a guide, such as a cable-guide or a bar-guide, fixed to the platform.
- the first connection means may for instance be provided in the form of a hook that is connected to the cable-guide or bar-guide and will slide along the cable-guide or bar-guide when moving the lifting crane.
- a person skilled in the art may envisage other solutions to such a movable connection.
- the present embodiment does not demand or demands less connecting and disconnecting of the counterbalancing means during the use of the lifting crane.
- the connection between the counterbalancing means and the jack-up offshore platform can move relative to the platform, whereby the counterbalancing means can be used over a wider range of positions of the lifting crane.
- a preferred embodiment of the lifting device comprises, in addition to the counterbalancing means, a counterweight, supported by the lifting device.
- a lifting device is able to move and rotate its main boom in its unconnected state (when it is not connected to the platform) in a number of stable configurations, eventually carrying a relatively small load.
- the counterweight of the present embodiment will typically be smaller than the counterweight of the known lifting crane, and therefore still saves weight and workspace.
- the distance between the counterweight and the lifted load is adjustable.
- the lifting device of the jack-up platform preferably comprises at least one sensor for detecting forces, and control means for counterbalancing the load such that the lifting device remains in equilibrium on the basis of the outcome of the detected forces.
- the detected forces for a certain load can be influenced by changing the position of the lifting device and/or by tightening or loosening the counteracting cable, and/or eventually also by tightening or loosening other cables provided between different parts of the lifting device.
- the sensors and control means may also be used to find an equilibrium position of the device in which the force in the counterbalancing means is about zero. If the detected force in the counterbalancing cable for instance is below a predetermined low value, the counterbalancing cable may be disconnected from the platform without the lifting device loosing its equilibrium.
- the sensors and control means may also be used to limit the stress in the counteracting cable to below a certain yield stress, in order to prevent fracture of the cable.
- the control means may also provide a signal, for example a sound or a light signal, to inform the user when a certain predetermined stress level is exceeded.
- the lifting device of the jack-up platform according to the invention is able to lift loads higher than the known platform lifting crane.
- the lifting device of the jack-up platform is particularly useful for lifting loads to a height between 50 and 150 meter, preferably between 60 and 130 meter and most preferably between 70 and 110 meter above the work deck of the jack-up offshore platform.
- the jack-up offshore platform according to the invention allows for supporting a lifting device without a counterweight, and thus can be designed smaller or may provide an increased workspace of the jack-up offshore platform.
- the invention finally relates to the use of a jack-up offshore platform according to the invention for assembling and servicing structures at sea. Especially when transport of a lifting device is needed, the invention is advantageous, as no or at least a smaller counterweight is needed. In particular assembling high structures, such as wind turbines, and/or heavy structures can be performed more easily with the jack-up offshore platform according to the invention.
- FIG. 1 schematically shows an embodiment of the jack-up offshore platform according to the invention in side view
- FIG. 2 schematically shows the jack-up offshore platform of FIG. 2 during transport.
- a jack-up offshore platform 1 is shown in an anchored position at a servicing site.
- the platform 1 comprises a work deck 2 for carrying a substantial load (typically 1000 tons and more), and is provided with legs 3 that support the work deck 2 .
- Each of the legs 3 stand substantially upright and is movable in that direction from an upper position during transport (shown in FIG. 2 ) to a lower position when in anchored position (shown in FIG. 1 ), where it takes support onto the sea bottom 200 .
- the height position of the work deck 2 relative to the water level 100 can be changed by fixating it relative to the legs 3 by pushing pistons 4 .
- platform 1 is anchored at sea close to a structure to be assembled, i.e.
- Wind turbine 50 comprises foundation 51 , two tower sections ( 52 , 53 ) and a nacelle 54 .
- tower sections ( 52 , 53 ) and nacelle 54 have already been lifted and placed into position by a lifting device 10 , provided on the platform 1 .
- Platform 1 comprises a lifting device 10 , built up of basically two parts. The first part comprises a structure that is pivotal around pivot point 13 a and at least comprises a main boom 14 for manipulating the load, which in FIG. 1 is the rotor 55 of wind turbine 50 .
- a turntable 11 is provided for at least main boom 14 , allowing for rotation of the main lifting boom 14 relative to the jack-up offshore platform 1 about a vertical axis 12 .
- the lifting device 10 further comprises a frame 13 , that pivotally supports the main boom 14 , and a second boom 15 , around pivot 13 a .
- additional booms 16 are pivotally supported at the top section 14 a of main boom 14 . All booms are interconnected by cables ( 24 , 29 ).
- the rotor 55 is connected to holding means 17 of lifting device 10 .
- the first part of the lifting device that at least includes main boom 14 is pivotally connected through frame 13 to a second part of the lifting device 10 , being support means in the form of a static truss framework 20 .
- Framework 20 not only supports the first part—booms ( 14 , 15 )—of the lifting device 10 but is also provided to support the pivot 13 a in an elevated position with respect to platform 1 , and in particular work deck 2 thereof.
- the elevated position of the pivot 13 a above work deck 2 is defined by the height 21 of the truss framework 20 , which is around 40 m in the example shown. In principle any height 21 above work deck 2 can be contemplated.
- the height 21 of the support means 20 ranges between 20 and 80% of the total height of lifting device 10 in its highest position, more preferably between 30 and 70% and most preferably between 40 and 60%. For a typical wind turbine of more than 100 meters high above sea level, and rotor blades of 70 m in diameter, this would represent a maximum height to be lifted of about 135 m, and therefore a preferred height range 21 of between 27 and 108 m, and most preferred between 54 and 81 m.
- Truss members 22 and cross members 23 of truss network 20 should have a sufficient cross-section to accommodate the design forces in operation, which for the embodiment shown are of the order of 450 tons per truss or more.
- Truss network 20 may be static, i.e. substantially permanently connected to platform 1 , or may be made dynamic, i.e. by providing its lower members 22 with wheels for instance.
- the cross-section of the truss network may be adapted to the particular requirements
- the sides of truss network 20 measure around 12 m, with main boom 14 having a length of about 56 m.
- the lifting device 10 of the invention saves considerable space on the work deck 2 , since it does not comprise many moving members on work deck level.
- the truss structure moreover is spacious in itself.
- the lifting angle is actually reduced with respect to the typical lifting angle of the lifting crane of the state of the art, which leads to an increased working radius.
- the lifting angle is defined as the angle between the longitudinal axis of main boom 14 and the horizontal direction.
- lifting device 10 comprises counterbalancing means in the form of counterbalancing cable 24 that are connectable to the platform. It is also possible to provide counterbalancing means that are connectable to support means 20 .
- Counterbalancing cable 24 is at its first end 24 a connected to jack-up offshore platform 1 , nearby an edge thereof. Cable 24 is guided over a pulley 26 , fixed to the top 15 a of the second boom 15 and connected to frame 13 of lifting device 10 at a second end 24 b of cable 24 . At this end, a force sensor (not shown) is provided. Control cables 29 and 30 are provided to manipulate the relative positions of booms ( 14 , 15 , 16 ).
- lifting device 10 comprises a counterweight 32 , which is movably connected to frame 13 , so as to allow a substantially horizontal displacement of counterweight 32 to and fro from pivot 13 a of main boom 14 .
- counterbalancing cable 24 and/or control cables ( 29 , 30 ) are provided with force sensors (not shown), connected to a control system, which controls winches (not shown) for altering the length of cables ( 24 , 29 , 30 ) as a result of the level of the detected forces.
- the first part of lifting device 10 may be rotated about the axis 12 to another desired position, e.g. by 180°.
- booms 16 and/or 14 may be lowered to position rotor 55 on the semi-finished wind turbine 100 .
- the counterbalancing forces in counterbalancing cable 24 and control cable 29 will of course increase again. This increase will be less however than when using the known lifting device.
- FIG. 2 Another substantial advantage of the platform according to the invention is that it can be provided with lifting device 10 at shore, and then easily transported to the site at sea for servicing or building.
- the lifting device is provided in a configuration, as shown in FIG. 2 .
- the offshore platform 1 according to the invention is sailed to its destination with the legs 3 in a position other than the lower position thereof. In FIG. 2 , legs 3 are in their upper position, in which legs 3 extend far above the water level 100 and above the work deck 2 , which is preferred for speed.
- the support structure 20 and the first pivotable part of the lifting device, which comprises booms ( 14 , 15 , 16 ), are firmly fixated to the platform 1 by counteracting cable 24 and transport cable 25 , provided for this purpose.
- Counteracting cable is attached to platform 1 at its end 24 a , for instance with a hook-eye connection, and to frame 13 at its other end 24 b .
- Transport cable 25 is at one end 25 a connected to the holding means 17 for a load, and with its other end 25 b to platform 1 , for instance also by a hook-eye connection.
- cables 24 and 25 are stressed under control of the control system to firmly hold the lifting device 10 onto platform 1 .
- platform 1 is preferably sailed to its destination, for instance using a pusher.
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Jib Cranes (AREA)
Abstract
A jack-up offshore platform includes a work deck and a lifting device for manipulating a load from the work deck. The lifting device includes a main boom for manipulating the load, which main boom is pivotally connected to a support structure at a pivot. The support structure is provided to support the pivot in an elevated position with respect to the work deck, which allows manipulation of heavier loads and moreover saves space on the work deck. In a preferred embodiment, the platform further includes a counterbalancing structure that is connectable to the platform and/or the support structure. Also included is the use of the platform for assembling and servicing a structure at sea.
Description
- This application is based on European Patent Application No. 08169403.6, filed Nov. 19, 2008. Priority is not claimed.
- The invention relates to a jack-up offshore platform, on which is provided a lifting device for manipulating a load. The invention also relates to the use of the jack-up offshore platform for assembling and servicing structures at sea, in particular a wind turbine.
- There is an increasing amount of large structures at sea that have to be serviced and repaired. A typical example is an offshore wind turbine, which comprises a nacelle supported by a tower of more than 100 meters high above sea level. A hub is connected to the nacelle for holding rotor blades, which can have a length of 70 meters and more. The nacelle alone typically accounts for 350 tons in weight. When assembling, servicing or repairing such large structures at sea, parts of the structure are generally transported to a jack-up offshore platform close to the structure, on which platform is provided a lifting crane for lifting the parts. Lifting cranes tend to become larger and larger to accommodate the ever increasing dimensions of the large structures. As structures become higher and larger, the required lifting cranes and counterweights become increasingly heavy, which consequentially also requires sturdier platforms. The lifting cranes, including their counterweights moreover tend to take up more and more workspace from the jack-up offshore platform. Transporting large cranes and counterweights is also increasingly demanding and costly.
- It is an object of the present invention to provide an improved jack-up offshore platform for assembling or servicing large and high structures at sea.
- According to the invention, this object is achieved by a jack-up offshore platform, comprising a work deck and a lifting device for lifting a load from the work deck, the lifting device comprising a main boom for manipulating the load, which main boom is pivotally connected to support means at a pivot, the support means being provided to support the pivot in an elevated position with respect to the work deck. By providing support means that support the pivot in an elevated position with respect to the platform, the lifting device cannot only reach increased heights but is also able to support more load. Indeed, its booms can be designed smaller for a given height, which makes these booms stronger.
- A further advantage of the platform according to the invention is that its lifting device has a reduced working radius for a given reachable height compared to the known lifting crane, which is supported by the work deck of the jack-up platform directly. An additional advantage of the jack-up offshore platform according to the invention is that its lifting device takes up less space of the jack-up offshore platform, in rest and in operation, and makes assembling or servicing structures at sea less expensive and easier to perform.
- By providing support means for supporting the pivot of the main boom in an elevated position with respect to the work deck of the platform, any serviceable height as required by the circumstances can in principle be reached. In a preferred embodiment, the jack-up offshore platform is characterized in that the elevated position is at least 10 m above the platform, even more preferred at least 20 m above the platform, and most preferred at least 30 m above the work deck of the platform. It has turned out that the support means in such preferred embodiments in particular provide additional stability to the lifting device.
- In a preferred embodiment of the invention, a jack-up offshore platform is provided wherein the support means comprise a pre-defined fixed-height support means. The pre-defined height is selected according to the particular needs of the project.
- In another preferred embodiment of the jack-up offshore platform according to the invention, the height of the elevated position above the work deck of the platform ranges from 20 to 80% of the total height of the lifting device in its highest position. This embodiment provides an optimum between the possibility to reach high altitudes and the strength of the lifting device. Even more preferred is a jack-up platform for which the height of the elevated position above the work deck of the platform ranges from 30 to 70% of the total height of the lifting device in its highest position. Most preferred is a jack-up platform for which the height of the elevated position above the work deck of the platform ranges from 40 to 60% of the total height of the lifting device in its highest position.
- The support means of the invention may be movable or static. In a preferred embodiment of the jack-up platform according to the invention, the support means comprise a static support structure, that is, more preferably, positioned on the work deck of the platform. Such an embodiment of the lifting device is stable, strong and cost effective.
- A very suitable jack-up offshore platform according to the invention is characterized in that the support structure comprises a truss framework. Truss frameworks are light, and can be designed and assembled easily in accordance with the requirements.
- In another preferred embodiment, the jack-up offshore platform according to the invention is characterized in that the lifting device comprises counterbalancing means that are connectable to the platform and/or the support means. When manipulating a load, the counterbalancing means are connected to the jack-up platform and/or the support means. As a result, at least a part of the force carried by the counterbalancing means is transferred to the jack-up offshore platform, eventually through the support means, and the counterweight needed to counterbalance the load can be reduced compared to the state of the art, or even deleted altogether. Alternatively, a larger load can be lifted relative to the state of the art platform and crane. A preferred counterbalancing means comprise at least one counterbalancing cable attached to the lifting device, and preferably to the main boom (or booms) thereof, and connectable to the platform and/or support structure.
- In yet another preferred embodiment, the counterbalancing means are connectable to the jack-up offshore platform and/or the support structure at least two spaced apart connection positions. This allows to use the lifting device in at least two different positions. For example, with the main boom of the lifting device in a first position, a load can be lifted from a cargo ship onto a particular location of the platform, and, with the main boom of the lifting device in a second position, the load can be repositioned to the structure at sea. In a simple, yet adequate embodiment, the counterbalancing means are connectable to the platform and/or the support structure at two spaced apart connection positions. When servicing or assembling a structure at sea, such as a wind turbine, the lifting device usually lifts parts from a first location, for example from a cargo ship or from the jack-up offshore platform, and positions the load at the preferred location of the structure. When these locations are at a substantial distance from each other, two spaced apart connection positions allow for effective use of the counterbalancing cables, whereas even more limited workspace of the jack-up offshore platform is used. Preferably, the counterbalancing means are connectable to the platform nearby edges of the jack-up offshore platform. This saves even more workspace, as edges are usually not part of the workspace, or at least not used extensively.
- In still another preferred embodiment, the counterbalancing means are movably connectable to the jack-up offshore platform. To establish such a movable connection between the counterbalancing means and the platform, the jack-up offshore platform may for instance comprise a guide, such as a cable-guide or a bar-guide, fixed to the platform. The first connection means may for instance be provided in the form of a hook that is connected to the cable-guide or bar-guide and will slide along the cable-guide or bar-guide when moving the lifting crane. A person skilled in the art may envisage other solutions to such a movable connection. The present embodiment does not demand or demands less connecting and disconnecting of the counterbalancing means during the use of the lifting crane. When moving the lifting crane, the connection between the counterbalancing means and the jack-up offshore platform can move relative to the platform, whereby the counterbalancing means can be used over a wider range of positions of the lifting crane.
- Although the off-shore jack-up platform, and in particular the lifting device according to the invention does not need a counterweight, a preferred embodiment of the lifting device comprises, in addition to the counterbalancing means, a counterweight, supported by the lifting device. Such a lifting device is able to move and rotate its main boom in its unconnected state (when it is not connected to the platform) in a number of stable configurations, eventually carrying a relatively small load. The counterweight of the present embodiment will typically be smaller than the counterweight of the known lifting crane, and therefore still saves weight and workspace. Preferably, the distance between the counterweight and the lifted load is adjustable. This results in a more flexible lifting device, as the counterbalancing couple exerted by the counterweight about lifted load can be adjusted, resulting in easy repositioning of loads. It is particularly preferred to minimize the distance between the lifted load and the counterweight before disconnecting the counterbalancing means from the platform, since this provides stability to the lifting device.
- The lifting device of the jack-up platform according to the invention preferably comprises at least one sensor for detecting forces, and control means for counterbalancing the load such that the lifting device remains in equilibrium on the basis of the outcome of the detected forces. The detected forces for a certain load can be influenced by changing the position of the lifting device and/or by tightening or loosening the counteracting cable, and/or eventually also by tightening or loosening other cables provided between different parts of the lifting device. The sensors and control means may also be used to find an equilibrium position of the device in which the force in the counterbalancing means is about zero. If the detected force in the counterbalancing cable for instance is below a predetermined low value, the counterbalancing cable may be disconnected from the platform without the lifting device loosing its equilibrium. This allows to safely reposition the lifting device to another position. On the other hand, the sensors and control means may also be used to limit the stress in the counteracting cable to below a certain yield stress, in order to prevent fracture of the cable. The control means may also provide a signal, for example a sound or a light signal, to inform the user when a certain predetermined stress level is exceeded.
- The lifting device of the jack-up platform according to the invention is able to lift loads higher than the known platform lifting crane. The lifting device of the jack-up platform is particularly useful for lifting loads to a height between 50 and 150 meter, preferably between 60 and 130 meter and most preferably between 70 and 110 meter above the work deck of the jack-up offshore platform.
- The jack-up offshore platform according to the invention allows for supporting a lifting device without a counterweight, and thus can be designed smaller or may provide an increased workspace of the jack-up offshore platform.
- The invention finally relates to the use of a jack-up offshore platform according to the invention for assembling and servicing structures at sea. Especially when transport of a lifting device is needed, the invention is advantageous, as no or at least a smaller counterweight is needed. In particular assembling high structures, such as wind turbines, and/or heavy structures can be performed more easily with the jack-up offshore platform according to the invention.
- These and other aspects of the invention will be apparent from and elucidated with reference to the embodiment(s) described hereinafter.
- The invention will now be explained in more detail with reference to the drawings, without however being limited thereto and wherein:
-
FIG. 1 schematically shows an embodiment of the jack-up offshore platform according to the invention in side view; and -
FIG. 2 schematically shows the jack-up offshore platform ofFIG. 2 during transport. - Referring to
FIG. 1 , a jack-up offshore platform 1 according to the invention is shown in an anchored position at a servicing site. The platform 1 comprises awork deck 2 for carrying a substantial load (typically 1000 tons and more), and is provided withlegs 3 that support thework deck 2. Each of thelegs 3 stand substantially upright and is movable in that direction from an upper position during transport (shown inFIG. 2 ) to a lower position when in anchored position (shown inFIG. 1 ), where it takes support onto thesea bottom 200. The height position of thework deck 2 relative to thewater level 100 can be changed by fixating it relative to thelegs 3 by pushingpistons 4. InFIG. 1 , platform 1 is anchored at sea close to a structure to be assembled, i.e. asemi-finished wind turbine 50, which is anchored in thesea bottom 200 byfoundation 51.Wind turbine 50 comprisesfoundation 51, two tower sections (52, 53) and anacelle 54. InFIG. 1 , tower sections (52, 53) andnacelle 54 have already been lifted and placed into position by alifting device 10, provided on the platform 1. Platform 1 comprises alifting device 10, built up of basically two parts. The first part comprises a structure that is pivotal aroundpivot point 13 a and at least comprises amain boom 14 for manipulating the load, which inFIG. 1 is therotor 55 ofwind turbine 50. A turntable 11 is provided for at leastmain boom 14, allowing for rotation of themain lifting boom 14 relative to the jack-up offshore platform 1 about avertical axis 12. The liftingdevice 10 further comprises aframe 13, that pivotally supports themain boom 14, and asecond boom 15, aroundpivot 13 a. In the embodiment shown,additional booms 16 are pivotally supported at thetop section 14 a ofmain boom 14. All booms are interconnected by cables (24, 29). Therotor 55 is connected to holding means 17 of liftingdevice 10. - According to the invention, the first part of the lifting device that at least includes
main boom 14 is pivotally connected throughframe 13 to a second part of thelifting device 10, being support means in the form of astatic truss framework 20.Framework 20 not only supports the first part—booms (14, 15)—of thelifting device 10 but is also provided to support thepivot 13 a in an elevated position with respect to platform 1, and inparticular work deck 2 thereof. In the embodiment shown inFIG. 1 , the elevated position of thepivot 13 aabove work deck 2 is defined by theheight 21 of thetruss framework 20, which is around 40 m in the example shown. In principle anyheight 21 abovework deck 2 can be contemplated. It has advantages when theheight 21 of the support means 20 ranges between 20 and 80% of the total height of liftingdevice 10 in its highest position, more preferably between 30 and 70% and most preferably between 40 and 60%. For a typical wind turbine of more than 100 meters high above sea level, and rotor blades of 70 m in diameter, this would represent a maximum height to be lifted of about 135 m, and therefore apreferred height range 21 of between 27 and 108 m, and most preferred between 54 and 81 m. - The
truss members 22 andcross members 23 oftruss network 20 should have a sufficient cross-section to accommodate the design forces in operation, which for the embodiment shown are of the order of 450 tons per truss or more.Truss network 20 may be static, i.e. substantially permanently connected to platform 1, or may be made dynamic, i.e. by providing itslower members 22 with wheels for instance. The cross-section of the truss network may be adapted to the particular requirements The sides oftruss network 20 measure around 12 m, withmain boom 14 having a length of about 56 m. The liftingdevice 10 of the invention saves considerable space on thework deck 2, since it does not comprise many moving members on work deck level. The truss structure moreover is spacious in itself. By providing thepivot 13 a well above work deck level, the lifting angle is actually reduced with respect to the typical lifting angle of the lifting crane of the state of the art, which leads to an increased working radius. The lifting angle is defined as the angle between the longitudinal axis ofmain boom 14 and the horizontal direction. - In the embodiment shown, lifting
device 10 comprises counterbalancing means in the form of counterbalancingcable 24 that are connectable to the platform. It is also possible to provide counterbalancing means that are connectable to support means 20. Counterbalancingcable 24 is at itsfirst end 24 a connected to jack-up offshore platform 1, nearby an edge thereof.Cable 24 is guided over apulley 26, fixed to the top 15 a of thesecond boom 15 and connected to frame 13 of liftingdevice 10 at asecond end 24 b ofcable 24. At this end, a force sensor (not shown) is provided.Control cables device 10 comprises acounterweight 32, which is movably connected to frame 13, so as to allow a substantially horizontal displacement ofcounterweight 32 to and fro frompivot 13 a ofmain boom 14. Preferably, counterbalancingcable 24 and/or control cables (29, 30) are provided with force sensors (not shown), connected to a control system, which controls winches (not shown) for altering the length of cables (24, 29, 30) as a result of the level of the detected forces. - When manipulating a load, such as
rotor 55, the load will exert a moment about thepivot 13 a ofmain boom 14. This moment is counteracted by the action of counterbalancingcable 24 in cooperation with thefirst control cable 29, as well as thecounterweight 32, thereby providing moment equilibrium tomain boom 14. It is clear that by providing support means 20, the typical moments will be much lower than in the state of the art lifting device which has its pivot typically at deck level. Whenmain boom 14 and alsoadditional boom 16 are brought in a more inclined position, the moment aboutpivot 13 a will decrease. As a result the counterbalancing forces in counterbalancingcable 24 andcontrol cable 29 will also decrease, and eventually become about zero. In this position, counterbalancingcable 24 may be disconnected from platform 1. Withmain boom 14 andboom 16 in the maximally inclined orientation, the first part of liftingdevice 10 may be rotated about theaxis 12 to another desired position, e.g. by 180°. After reconnectingcounterbalancing cable 24 in the new position to platform 1,booms 16 and/or 14 may be lowered to positionrotor 55 on thesemi-finished wind turbine 100. During lowering of the booms, the counterbalancing forces in counterbalancingcable 24 andcontrol cable 29 will of course increase again. This increase will be less however than when using the known lifting device. - Another substantial advantage of the platform according to the invention is that it can be provided with lifting
device 10 at shore, and then easily transported to the site at sea for servicing or building. For transport, the lifting device is provided in a configuration, as shown inFIG. 2 . The offshore platform 1 according to the invention is sailed to its destination with thelegs 3 in a position other than the lower position thereof. InFIG. 2 ,legs 3 are in their upper position, in whichlegs 3 extend far above thewater level 100 and above thework deck 2, which is preferred for speed. Thesupport structure 20 and the first pivotable part of the lifting device, which comprises booms (14, 15, 16), are firmly fixated to the platform 1 by counteractingcable 24 andtransport cable 25, provided for this purpose. Counteracting cable is attached to platform 1 at itsend 24 a, for instance with a hook-eye connection, and to frame 13 at itsother end 24 b.Transport cable 25 is at oneend 25 a connected to the holding means 17 for a load, and with itsother end 25 b to platform 1, for instance also by a hook-eye connection. For transport,cables lifting device 10 onto platform 1. In this configuration, platform 1 is preferably sailed to its destination, for instance using a pusher. - While the invention has been illustrated and described in detail in the drawings and foregoing description, such illustration and description are to be considered illustrative or exemplary and not restrictive; the invention is not limited to the disclosed embodiments and those skilled in the art will be able to design many alternative embodiments without departing from the scope of the appended claims. In the claims, any reference signs placed between parentheses shall not be construed as limiting the claim. Use of the verb “to comprise” and its conjugations does not exclude the presence of elements or steps other than those stated in a claim. The article “a” or “an” preceding an element does not exclude the presence of a plurality of such elements. The invention may be implemented by means of hardware comprising several distinct elements, and by means of a suitably programmed computer. In the device claim enumerating several means, several of these means may be embodied by one and the same item of hardware. The mere fact that certain measures are recited in mutually different dependent claims does not indicate that a combination of these measures cannot be used to advantage.
Claims (13)
1. A jack-up offshore platform, comprising a work deck and a lifting device for lifting a load from the work deck, the lifting device comprising a main boom for manipulating the load, which main boom is pivotally connected to support means at a pivot, the support means being provided to support the pivot in an elevated position with respect to the work deck.
2. A jack-up offshore platform according to claim 1 , wherein the elevated position is at least 10 m above the work deck of the platform.
3. A jack-up offshore platform according to claim 2 , wherein the elevated position is at least 40 m above the work deck of the platform.
4. A jack-up offshore platform according to claim 1 , wherein the support means comprise a pre-defined fixed-height support means.
5. A jack-up offshore platform according to claim 1 , wherein the height of the elevated position above the work deck of the platform ranges from 20 to 80% of the total height of the lifting device in its highest position.
6. A jack-up offshore platform according to claim 1 , wherein the height of the elevated position above the work deck of the platform ranges from 40 to 60% of the total height of the lifting device in its highest position.
7. A jack-up offshore platform according to claim 1 , wherein the support means comprise a static support structure, preferably provided on the work deck of the platform.
8. A jack-up offshore platform according to claim 7 , wherein the support structure comprises a truss framework.
9. A jack-up offshore platform according to claim 1 , wherein the lifting device comprises counterbalancing means that are connectable to the platform and/or the support means.
10. A jack-up offshore platform according to claim 9 , wherein the counterbalancing means are connectable to the platform nearby edges of the jack-up offshore platform.
11. A jack-up offshore platform according to claim 1 , wherein the lifting device comprises at least one sensor for detecting forces and control means for counterbalancing the load such that the lifting device remains in equilibrium, on the basis of the outcome of the detected forces.
13. A jack-up offshore platform according to claim 1 , wherein the lifting device is adapted for lifting loads to a height between 50 and 150 meters, preferably between 60 and 130 meters and most preferably between 70 and 110 meters above the work deck of the jack-up offshore platform.
14. Use of a jack-up offshore platform according to claim 1 for assembling and servicing a structure at sea.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US12/845,904 US20120027525A1 (en) | 2010-07-29 | 2010-07-29 | Jack-up offshore platform and its use for assembling and servicing a structure at sea |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US12/845,904 US20120027525A1 (en) | 2010-07-29 | 2010-07-29 | Jack-up offshore platform and its use for assembling and servicing a structure at sea |
Publications (1)
Publication Number | Publication Date |
---|---|
US20120027525A1 true US20120027525A1 (en) | 2012-02-02 |
Family
ID=45526900
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US12/845,904 Abandoned US20120027525A1 (en) | 2010-07-29 | 2010-07-29 | Jack-up offshore platform and its use for assembling and servicing a structure at sea |
Country Status (1)
Country | Link |
---|---|
US (1) | US20120027525A1 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20110219614A1 (en) * | 2010-02-08 | 2011-09-15 | GeoSea N.V. | Method and device for assembling a wind turbine at sea |
CN105058052A (en) * | 2015-08-28 | 2015-11-18 | 中国能源建设集团湖南火电建设有限公司 | Method for installation of 3 MW wind generating set |
US20170352402A1 (en) * | 2015-09-16 | 2017-12-07 | Micron Technology, Inc. | Timing control circuit shared by a plurality of banks |
US10875748B2 (en) * | 2016-11-11 | 2020-12-29 | Itrec B.V. | Marine crane vessel and method of operation |
-
2010
- 2010-07-29 US US12/845,904 patent/US20120027525A1/en not_active Abandoned
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20110219614A1 (en) * | 2010-02-08 | 2011-09-15 | GeoSea N.V. | Method and device for assembling a wind turbine at sea |
US8661668B2 (en) * | 2010-02-08 | 2014-03-04 | GeoSea N.V. | Method and device for assembling a wind turbine at sea |
CN105058052A (en) * | 2015-08-28 | 2015-11-18 | 中国能源建设集团湖南火电建设有限公司 | Method for installation of 3 MW wind generating set |
US20170352402A1 (en) * | 2015-09-16 | 2017-12-07 | Micron Technology, Inc. | Timing control circuit shared by a plurality of banks |
US10875748B2 (en) * | 2016-11-11 | 2020-12-29 | Itrec B.V. | Marine crane vessel and method of operation |
EP3538472B1 (en) * | 2016-11-11 | 2022-10-19 | Itrec B.V. | Marine crane vessel and method of operation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2189575B1 (en) | Jack-up offshore platform and a method thereof | |
EP2189574A1 (en) | Jack-up offshore platform and its use for assembling and servicing a structure at sea | |
US10487802B2 (en) | Lifting device for connecting two rotor blade segments of a wind turbine | |
JP7038704B2 (en) | How to make a monopile upright as the basis of a wind turbine | |
US8251004B2 (en) | Device for transporting structures on water | |
EP2364949A1 (en) | Methods and apparatus for handling a tower section of a wind turbine with a crane | |
US20120027523A1 (en) | Device and method for assembling a structure at sea | |
US9802795B2 (en) | Crane for handling of wind turbine generator components and method of hoisting of such a crane | |
BE1018581A4 (en) | DEVICE AND METHOD FOR ASSEMBLING A SEA CONSTRUCTION WORK. | |
US20120027525A1 (en) | Jack-up offshore platform and its use for assembling and servicing a structure at sea | |
US9085444B2 (en) | Flexible articulated jib arm | |
EP3263891B1 (en) | Method for mounting a wind turbine on a tower | |
EP2472008A1 (en) | Jack-up offshore platform and its use for lifting large and heavy loads | |
EP3980363B1 (en) | Hoisting crane for use on an offshore vessel and method of operation | |
WO2022069455A1 (en) | Hoist arrangement for a wind turbine blade access platform | |
KR200431439Y1 (en) | Apparatus for enforcing vessel crane | |
WO2014082684A1 (en) | Lifting frame | |
BE1020451A4 (en) | DEVICE AND METHOD FOR ASSEMBLING A SEA CONSTRUCTION WORK. | |
CN112912333B (en) | Crane vessel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: GEOSEA N.V., BELGIUM Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:VANDENBULCKE, LUC;VANDERBEKE, KOEN;REEL/FRAME:025124/0164 Effective date: 20100819 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |