US20100252249A1 US12/670,898 US67089808A US2010252249A1 US 20100252249 A1 US20100252249 A1 US 20100252249A1 US 67089808 A US67089808 A US 67089808A US 2010252249 A1 US2010252249 A1 US 2010252249A1
Authority
US
United States
Prior art keywords
storage site
electrodes
electric heater
pipeline
injection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US12/670,898
Inventor
Dirk Diehl
Bernd Wacker
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Siemens AG
Original Assignee
Siemens AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens AG filed Critical Siemens AG
Assigned to SIEMENS AKTIENGESELLSCHAFT reassignment SIEMENS AKTIENGESELLSCHAFT ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: WACKER, BERND, DIEHL, DIRK
Publication of US20100252249A1 publication Critical patent/US20100252249A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/24Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
    • E21B43/2401Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection by means of electricity
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/24Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
    • E21B43/2406Steam assisted gravity drainage [SAGD]
    • E21B43/2408SAGD in combination with other methods
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/30Specific pattern of wells, e.g. optimising the spacing of wells
    • E21B43/305Specific pattern of wells, e.g. optimising the spacing of wells comprising at least one inclined or horizontal well

Definitions

  • the two electrodes of the electric heater can be formed by essentially perpendicularly oriented electric conductors running at least in part in the storage site.
  • a perpendicular borehole does not require a great deal of drilling.
  • electric conductors which work inductively and resistively relative to at least parts of the storage site can be introduced into the storage site simply and effectively.
  • This device is especially advantageous if it has to be assumed that the permeability diminishes at increasing depth, or the permeability is non-homogeneous in a horizontal direction, in other words that a non-homogeneous and if appropriate anisotropic storage site is present in respect of permeability and/or porosity.
  • the electrodes can run coaxially in a guide pipe, said guide pipe being permeable to liquid for the selective deposition of a liquid in parts of the storage site at the corresponding subareas running in the storage site. Thanks to the guide pipe the storage site can be supplied with liquid in selective areas, as a result of which the electrical conductivity of the storage site can be affected. In this way the conductivity of the storage site can be ensured, so that the electric heater will operate fault-free.
  • the device can have an injection pipeline projecting into the storage site.
  • the storage site can be heated on the one hand by means of the electric heater and on the other hand by for example a steam-assisted heating procedure. Both procedures can interwork in synergy.
  • Hot steam can be applied to the injection pipeline and the production pipeline. If an underground storage site is exploited in accordance with an SAGD procedure or a similar or related procedure, hot steam is applied to pipelines typically present in the storage site.
  • the combination of such a hot-steam-based procedure with an electric heating procedure is especially advantageous, since as a result of the hot steam additional water is introduced into the storage site, which increases the electrical conductivity of the storage site.
  • a particular electrical conductivity is necessary in order to implement an inductive and resistive electric heating procedure. Thanks to the synergetic combination of a hot steam procedure and an electric heating procedure the efficiency of the combined procedure can be increased over and above that of both individual procedures.
  • liquid preferably a liquid which is enriched with an electrolyte to improve the conductivity
  • the electrical conductivity of the storage site 100 can be selectively adjusted. In this way the functional capability of the electric heater can be ensured.
  • the ends of the electrodes 301 , 301 ′ which face away from the power source 302 can be short-circuited using an electrical bridge 502 .
  • the distance between the boreholes can in this case be controlled using generally known measures; for example a transmitter can be operated in the first borehole, with the drill head of the second borehole being able to determine the distance from the first borehole on the basis of this transmitted signal.

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)
  • Extraction Or Liquid Replacement (AREA)

Abstract

A device for in situ extraction of a substance including hydrocarbons while reducing the viscosity thereof from an underground storage site is provided. The device includes at least one production pipeline leading out of the storage site, and at least two electrodes which are inductively and resistively effective relative to at least parts of the storage site.

Description

    CROSS REFERENCE TO RELATED APPLICATIONS
  • This application is the US National Stage of International Application No. PCT/EP2008/060074 filed Jul. 31, 2008, and claims the benefit thereof. The International Application claims the benefits of German Application No. 10 2007 036 832.3 DE filed Aug. 3, 2007. All of the applications are incorporated by reference herein in their entirety.
  • FIELD OF INVENTION
  • The invention relates to a device for in situ extraction of a substance comprising hydrocarbons. The substance comprising hydrocarbons is conveyed from an underground storage site while reducing the viscosity thereof. The device comprises at least one production pipeline leading out of the storage site. Such devices for conveying substances comprising hydrocarbons are for example known from “Steam-Injection Strategy and Energetics of Steam-Assisted Gravity Drainage” by I. D. Gates, 2005, SPE International Thermal Operations and Heavy Oil Symposium, Calgary, Canada, Nov. 1-3, 2005.
  • BACKGROUND OF INVENTION
  • Large parts of the world's oil reserves are in the form of oil sands. Oil sand is a mixture of rock, clay, sand, water and bitumen or other heavy oils. In the following, references to bitumen, which occurs with a typical viscosity of API 5° to 15° depending on the storage site, also include heavy and very heavy oils or long-chain hydrocarbons generally. The bitumen can be converted into synthetic crude oil by means of further process steps. Oil sands in some cases are found in geological strata at low depth, which are accessible to open-cast mining. However, large deposits of oil sands also exist which cannot be accessed by open-cast mining. Typically in situ extraction takes place at depths of 60 m or more, since in this situation it no longer seems profitable to remove the overburden.
  • A method typically used to extract such deposits is “Steam Assisted Gravity Drainage” (SAGD), in which the bitumen occurring in a storage site is heated by hot steam and the storage site is rendered more permeable by the steam pressure. In this way the viscosity of the bitumen is reduced, so that it can be conveyed in liquid form, as well as more quickly, from the storage site. The change in the viscosity of the bitumen is caused by an increase in temperature. For this purpose hot steam is compressed through pipelines into the underground storage site, so that the storage site is heated, and at the same time an overpressure builds up in the storage site. Liquid bitumen is conveyed through a further pipe to the surface by the overpressure prevailing in the storage site (cf. also undergraduate seminar on topics relating to “Unconventional hydrocarbons” on the subject of “Heavy oils and ultra-heavy oils” by J. Seim, Freiberg, Germany, January 2001).
  • To improve the fluidity of the bitumen the hot steam can be mixed with a solvent. The pipelines for the injection of the hot steam, or of the mixture of hot steam and solvent, are essentially laid in parallel to one another, running horizontally within the storage site. The injection pipeline and production pipeline are typically about 5 m to 10 m apart from one another in the vertical direction. However, the distance between the injection and the production pipeline depends on the thickness of the storage site. In the horizontal direction the pipes extend for a length of between several hundred meters and a few kilometers within the storage site.
  • Before bitumen actually starts being conveyed out of the storage site, it first has to be heated, in order to reduce the viscosity of the bitumen present in the sand or rock. During the heating phase, to ensure rapid heating of the storage site, hot steam is applied to both the injection pipeline and the production pipeline for a period of approximately 3 months. At the end of the heating phase, the viscosity of the bitumen in the storage site is such that when further hot steam is applied to the injection pipeline, resulting in overpressure in the storage site, liquid bitumen can be conveyed out of the production pipeline to the surface. When sufficient pressure builds up the installation of jacking oil pumps to bring the bitumen/water emulsion up can be dispensed with.
  • SUMMARY OF INVENTION
  • The SAGD procedure currently practiced, as has been roughly outlined, exhibits various technical problems. Firstly, hot steam can escape from the storage site via channels or porous rock strata present in the storage site, thereby reducing the thermal energy introduced into the storage site. Excessive pressures in the storage site can result in soil distortions on the surface (blow-out), especially if the overburden is not very thick. A further problem is “fingering” within the reservoir, whereby steam breakout (steam short-circuit) occurs generally at the start or end of the horizontal part of the parallel steam injection or production pipeline, when the steam seeks out a preferred communicating path between both pipelines and undesired pressure is dissipated, with the injected steam condensing and being conveyed through the production pipeline as water, so that less steam and thus thermal energy is supplied to the storage site and the effectiveness of the process is dramatically reduced. Pressure and temperature within the storage site, for the rapid heating thereof, cannot therefore be increased arbitrarily, depending on the storage site conditions. Large quantities of fresh water are required for the SAGD procedure. The quantity of water required is measured on the basis of the “steam to oil ratio” (SOR). Strict environmental regulations in the production areas call for a reduction in the “steam to oil ratio”, in order to protect the above-ground and underground stores of water.
  • An object of the present invention is to specify a device for in situ extraction of a substance comprising hydrocarbons, in particular a device for conveying heavy oils or bitumen out of an oil sand storage site, which is an improvement over the prior art at least in that a reduced heating phase prior to the start of the production phase can be achieved.
  • The object is achieved with a device as claimed in the independent claim. Developments are specified in the dependent claims.
  • The invention is based on the consideration of using an electric heater, which works both inductively and resistively relative to at least parts of the storage site, for the rapid heating thereof. The storage site itself works as a resistive (non-inductive) resistor relative to the heater's at least two electrodes. At the same time the storage site is also heated inductively by the electric heater.
  • According to the invention a device is specified for in situ extraction of a substance comprising hydrocarbons while reducing the viscosity thereof from an underground storage site, said device containing at least one production pipeline leading out of the storage site. The device further has at least two electrodes, which work inductively and resistively relative to at least parts of the storage site as an electric heater. Advantageously the heating time for the reservoir containing the substance comprising hydrocarbons can be reduced with the inventive device. Compared to devices as known from the prior art, the “steam to oil ratio” can be reduced.
  • Advantageous embodiments of the inventive device for in situ extraction of a substance comprising hydrocarbons emerge from the claims dependent on the independent claim, it being possible to combine the embodiment as claimed in the independent claim with the features of one dependent claim, and preferably with those of several dependent claims. Accordingly the inventive device for extraction of a substance comprising hydrocarbons can additionally have the following features:
  • The two electrodes of the electric heater can be formed by essentially perpendicularly oriented electric conductors running at least in part in the storage site. A perpendicular borehole does not require a great deal of drilling. Thus electric conductors which work inductively and resistively relative to at least parts of the storage site can be introduced into the storage site simply and effectively. This device is especially advantageous if it has to be assumed that the permeability diminishes at increasing depth, or the permeability is non-homogeneous in a horizontal direction, in other words that a non-homogeneous and if appropriate anisotropic storage site is present in respect of permeability and/or porosity.
  • The at least two electrodes of the electric heater can be formed by essentially horizontally oriented electric conductors running at least in part within the storage site. With electric conductors which run horizontally within the storage site, a large part of the storage site can be heated both resistively and inductively by electricity.
  • The electrodes can be rod-shaped metal conductors. Rod-shaped metal conductors are especially simple and cheap.
  • The space between at least segments of the electrodes can decrease as the length of the electrodes increases, from the perspective of a power source. The reduction in distance can in particular be stepless. In particular the distance between the segments of the electrodes can decrease linearly. By changing the distance between the electrodes it is possible to keep the voltage drop constant over the length of the electrodes. This voltage drop is determined by the electrical resistance of the electrodes themselves, plus the electrical resistance of the soil correspondingly present between the electrodes. In this way it is advantageously possible to prevent the entire heat output of the electrodes dropping away at an area in the soil close to the power source.
  • The electrodes can run coaxially in a guide pipe, said guide pipe being permeable to liquid for the selective deposition of a liquid in parts of the storage site at the corresponding subareas running in the storage site. Thanks to the guide pipe the storage site can be supplied with liquid in selective areas, as a result of which the electrical conductivity of the storage site can be affected. In this way the conductivity of the storage site can be ensured, so that the electric heater will operate fault-free.
  • The device can have an injection pipeline projecting into the storage site. In that the device has both an injection pipeline and a production pipeline, the storage site can be heated on the one hand by means of the electric heater and on the other hand by for example a steam-assisted heating procedure. Both procedures can interwork in synergy.
  • The electrodes can be connected to one another electrically at their end regions remote from the power source by a connecting post. Thanks to such an electrical connection the operational reliability of the electric heater can be improved.
  • The injection pipeline and the production pipeline can have pipe sections running in the storage site essentially parallel to one another, oriented essentially horizontally. Seen in cross-section perpendicular to the injection and production pipeline, the electrodes of the electric heater are disposed on both sides of the injection and production pipeline. Thanks to an arrangement of the electrodes of the electric heater on both sides of the injection and production pipeline, the volume of the storage site, which extends in a horizontal direction between the injection and production pipelines, can in particular be heated by the electric heater. Particularly advantageously, a larger volume of the storage site can be extracted in this way. SAGD procedures known from the prior art achieve an extraction of between 40 and 60% of the bitumen present in the storage site. According to the embodiment described above, extraction levels of over 70% appear possible.
  • At least two of the electrodes of the electric heater can be formed by at least parts of the injection pipeline or the production pipeline. In that the electric heater is formed by at least parts of the injection or production pipeline, it is possible to cut down on additional material for the electric heater; another borehole is thus likewise dispensed with. Such a design of the electric heater is hence especially advantageous.
  • Hot steam can be applied to the injection pipeline and the production pipeline. If an underground storage site is exploited in accordance with an SAGD procedure or a similar or related procedure, hot steam is applied to pipelines typically present in the storage site. The combination of such a hot-steam-based procedure with an electric heating procedure is especially advantageous, since as a result of the hot steam additional water is introduced into the storage site, which increases the electrical conductivity of the storage site. A particular electrical conductivity is necessary in order to implement an inductive and resistive electric heating procedure. Thanks to the synergetic combination of a hot steam procedure and an electric heating procedure the efficiency of the combined procedure can be increased over and above that of both individual procedures.
  • The hot steam can be enriched with an electrolyte, preferably with salt. The electrical conductivity of the steam is increased in this way. The effectiveness of an inductive and resistive electric heater relative to at least parts of a storage site essentially depends on the electrical conductivity of the storage site. In that the hot steam introduced into the storage site by the injection and/or production pipeline is additionally provided with minerals, preferably with salt, the electrical conductivity of the storage site can be selectively adjusted and if appropriate increased.
  • The electric heater can be an alternating current heater. An alternating current heater prevents ions from migrating within the storage site. Advantageously carbonization or salt encrustation of the injection and/or production pipeline can be prevented in this way.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • Further advantageous embodiments of the inventive device emerge from the claims not addressed above and in particular from the drawing explained below. The drawing shows preferred embodiments of the inventive device in a highly diagrammatic illustration. It shows:
  • FIG. 1 an outline sketch of a device for in situ extraction of a substance comprising hydrocarbons from an underground storage site,
  • FIG. 2 a cross-section through the extraction area of such a storage site,
  • FIGS. 3 and 4 a device for in situ extraction of a substance comprising hydrocarbons with an electric heater
  • and
  • FIG. 5 a further possible embodiment of such a device.
  • Corresponding parts in the figures are in each case provided with the same reference characters. Parts not explained in greater detail are generally known prior art.
  • DETAILED DESCRIPTION OF INVENTION
  • FIG. 1 shows a diagrammatic illustration of a device for in situ extraction of a substance comprising hydrocarbons from an underground storage site 100 while reducing the viscosity thereof. Such a device can for example be a device for extraction of bitumen from an oil sand deposit. An injection pipeline 101 runs from the earth's surface into the storage site 100. A production pipeline 102 leads out of the storage site 100 to the earth's surface. Devices are conceivable in which a plurality of injection pipelines 101 and a plurality of production pipelines 102 are used to convey the substance comprising hydrocarbons from the underground storage site 100. The storage site 100 can in particular be an oil sand deposit or an oil shale deposit, from which bitumen or other heavy oils can be extracted.
  • To be able to extract the substance comprising hydrocarbons from the storage site 100, the viscosity of the substance comprising hydrocarbons present in the storage site 100 must be reduced. For this purpose at least parts of the storage site 100 must be heated. To heat the storage site 100 hot steam is applied to the injection pipeline and the production pipeline 102. After being heated for a period of typically 3 months the viscosity of the substance comprising hydrocarbons present in the storage site 100 has decreased so much as a result of the increased temperature that the substance has become free-flowing. If water steam is now further applied to the injection pipeline 101, then as a result of the overpressure present in the storage site or at least parts of the storage site 100 a substance comprising hydrocarbons can be conveyed through the production pipeline 102 to the surface. To maintain the temperature needed for the substance comprising hydrocarbons to flow freely, hot steam is again applied to the injection pipeline 101. Once the extracted substance comprising hydrocarbons arrives at the surface it can be subjected to further processing steps, so that synthetic crude oil can be obtained.
  • FIG. 2 shows a cross-section through the storage site 100, in which two injection pipelines 101, 101′ and two production pipelines 102, 102′ run. The hot steam exiting from the injection pipelines 101, 101′ is shown diagrammatically by arrows. The hot steam foams steam chambers 201, 201′ within the storage site 100, from which the substance comprising hydrocarbons which has become free-flowing can be conveyed. A dead volume 202, in which the viscosity of the substance comprising hydrocarbons present in the storage site 100 is too high to enable it to be conveyed, extends in a horizontal direction between the steam chambers 201, 201′. The dead volume 202 of the storage site 100 cannot be extracted.
  • FIG. 3 shows a device for in situ extraction of a substance comprising hydrocarbons from a storage site 100, which in addition to two injection pipelines 101, 101′, which have pipeline sections running horizontally in the storage site 100, has two production pipelines 102, 102′. The device for in situ extraction of a substance comprising hydrocarbons furthermore has two electrodes 301, 301′, which run in perpendicular boreholes within the storage site 100. The electrodes 301, 301′ work as an inductive and resistive electric heater relative to at least parts of the storage site 100. Determined by the conductivity of at least parts of the storage site 100, especially of the dead volume 202, this can be heated resistively by current flowing between the two electrodes 301, 301′. The resistive heating effect is indicated by arrows and/or lines within the storage site 100. At the same time the electrodes 301, 301′ work in the volumes 303, 303′ as inductive heaters. The electrodes 301, 301′ can be insulated in respect of the soil by means of electrical insulators 304, 304′ in areas in which these run outside the actual storage site 100. In this way the resistive heat output can be introduced in defined areas of the storage site 100. The electrodes 301, 301′ can in particular be rod-shaped metal conductors made of an especially highly conductive metal.
  • The device shown in FIG. 3 for in situ extraction of a substance comprising hydrocarbons can in particular be operated such that the storage site 100 is heated both by means of hot steam and also by means of the electric heater. In the heating phase of the storage site 100 hot steam can thus be applied both to the injection pipelines 101, 101′ and to the production pipelines 102, 102′, and in addition the volume to be conveyed out of the substance comprising hydrocarbons, especially the dead volume 202, can be heated by means of the electric heater via the electrodes 301, 301′. In this way a shorter heating time can be achieved than if the storage site 100 is merely heated by means of the electric heater or by means of steam being applied. The electric heater can in particular be an alternating current heater, as a result of which no migration of ions occurs within the storage site 100.
  • By heating the storage site 100 or at least parts of the storage site 100 it is possible to reduce the liquid content of the storage site 100 and thus to reduce the electrical conductivity of the storage site 100. A decreasing conductivity of the storage site 100 means that the electric heater, in particular the resistive method of operation, becomes less efficient. To counter this loss of conductivity, hot steam forced into the storage site 100 can be enriched with minerals, in particular with salts. Furthermore, by controlling the enrichment of the hot steam with minerals, in particular with salts, the conductivity of the storage site 100 can be selectively adjusted. The minerals or salts are thereby added to the hot steam after it exits from the steam generator. On the other hand, when the bitumen is extracted at a location, no conductivity is required at this location either. In particular the inductive mode of working means that losses only occur where conductivity exists, in other words the depth of penetration expands accordingly and the bitumen present in the case of natural conductivity is heated and flows down by force of gravity with the naturally occurring reservoir electrolyte. Naturally initially the loss mechanism at the electrode will be at its most effective as a result of resistive as well as inductive working; in other words at the start of extraction the bitumen is made more free-flowing there. If the conductivity at the electrode is low, there is no contact between electrode and reservoir; the inductive mechanism now comes into its own, as it does not rely on the electrical contact between electrode and reservoir.
  • FIG. 4 shows a device for in situ extraction of a substance comprising hydrocarbons from a storage site 100. According to the exemplary embodiment illustrated in FIG. 4 at least parts of the injection pipelines 100, 101′ are used as electrodes of the electric heater. In particular those parts of the injection pipelines 100, 101′ can be used as electrodes 301, 301′ of the electric heater which run essentially horizontally within the storage site 100. The parts of the injection pipelines 100, 101′ acting as electrodes 301, 301′ heat at least parts of the storage site 100 both resistively and inductively. In particular the electrodes 301, 301 heat areas 303, 303′ which extend in cylindrical fashion around the injection pipelines 101, 101′. In addition to these inductively heated areas 303, 303′ the dead volume 202 is in particular heated in resistive fashion. For the purpose of the electric heater the injection pipelines 101, 101′ are connected to an alternating current source 302.
  • FIG. 5 shows a device for in situ extraction of a substance comprising hydrocarbons from a storage site 100. The exemplary embodiment shown in FIG. 5 comprises two production pipelines 102, 102′ which lead out of the storage site 100. Two electrodes 301, 301′, each of which is disposed in a guide pipe 501, 501′, project into the storage site 100. The guide pipes 501, 501′ can be accessed from the surface and the parts running outside the storage site or the areas of the storage site 100 to be heated are additionally electrically insulated against the soil by electrical insulations 304, 304′. The guide pipes 501, 501′ can be accessed from the earth's surface for a liquid and have areas permeable to liquid in certain areas within the storage site 100. This can for example entail porous designs of the pipe walls or openings or holes.
  • In that liquid, preferably a liquid which is enriched with an electrolyte to improve the conductivity, is selectively introduced into the storage site 100 or parts of the storage site 100, the electrical conductivity of the storage site 100 can be selectively adjusted. In this way the functional capability of the electric heater can be ensured. As a further measure to ensure the functional capability of the electric heater the ends of the electrodes 301, 301′ which face away from the power source 302 can be short-circuited using an electrical bridge 502.
  • With the exemplary embodiment illustrated in FIG. 5 it is possible to exploit a bitumen storage site without using hot steam. The storage site can be heated merely by means of the electric heater in inductive and resistive fashion, and the liquid bitumen present in the production pipeline 102, 102′ can be recovered by means of a lifting pump or is conveyed to the surface by natural geological overpressure. As an option, hot steam can be applied to the storage site 100 at intervals over the production pipelines 102, 102′, so that the pressure within the storage site 100 rises. The overpressure created in this way can likewise be used to convey bitumen from the storage site 100.
  • The electrodes 301, 301′ can continue to run within the storage site 100 such that the distance between them decreases with the increasing length of the electrodes 301, from the perspective of the power source 302. In particular the distance between the electrodes 301, 301′ can decrease linearly. In this way it is possible to prevent the electric heat output, in particular the resistive electric heat output from the perspective of the power source 302, from being introduced into the storage site 100 at the start of the electrodes 301, 301′ or dropping away into this area. The distance between the electrodes 301, 301′ can in particular be selected such that a continuous heat output over the length of the electrodes 301, 301′, in particular over the length of the subareas of the electrodes 301, 301′ which run within the storage site 100, can be achieved by taking account of the electrical conductivity of the storage site 100.
  • The distance between the boreholes can in this case be controlled using generally known measures; for example a transmitter can be operated in the first borehole, with the drill head of the second borehole being able to determine the distance from the first borehole on the basis of this transmitted signal.

Claims (21)

1.-15. (canceled)
16. A device for in situ extraction of a substance including hydrocarbons from an underground storage site by reducing the viscosity of the substance, comprising:
a production pipeline leading out of the storage site; and
two electrodes of an electric heater, the electric heater working inductively and resistively relative to parts of the storage site.
17. The device as claimed in claim 16, wherein the two electrodes of the electric heater are formed by essentially perpendicularly oriented electrodes running at least partially in the storage site.
18. The device as claimed in claim 16, wherein the two electrodes of the electric heater are formed by essentially horizontally oriented electrodes running at least partially in the storage site.
19. The device as claimed in claim 16, further comprising:
a power source, wherein segments of the electrodes are spaced at a distance from one another, the distance decreasing steplessly with an increasing length of the electrodes from the perspective of the power source.
20. The device as claimed in claim 19, wherein the distance between the segments of the electrodes decreases linearly.
21. The device as claimed in claim 16, wherein the electrodes are rod-shaped metal electrical conductors.
22. The device as claimed in claim 16, further comprising:
a guide pipe, the electrodes running coaxially in the guide pipe, wherein the guide pipe is permeable to liquid for a deposition of a liquid in parts of the storage site at corresponding subareas running in the storage site.
23. The device as claimed in claim 19, further comprising:
a guide pipe, the electrodes running coaxially in the guide pipe, wherein the guide pipe is permeable to liquid for a deposition of a liquid in parts of the storage site at corresponding subareas running in the storage sige.
24. The device as claimed in claim 16, wherein the electrodes are electrically connected to one another by a connecting post at their end areas remote from the power source.
25. The device as claimed in claim 16, further comprising:
an injection pipeline projecting into the storage site.
26. The device as claimed in claim 23, further comprising:
an injection pipeline projecting into the storage site.
27. The device as claimed in claim 25, wherein the injection pipeline and the production pipeline have horizontally oriented pipe sections running essentially parallel to one another in the storage site, and, when viewed in a cross-section perpendicular to the injection and production pipeline, the electrodes are disposed on both sides of the injection and production pipeline.
28. The device as claimed in claim 25, wherein one of the two electrodes of the electric heater is formed by at least parts of the injection pipeline and the other electrode is formed by the at least parts of the production pipeline.
29. The device as claimed in claim 26, wherein one of the two electrodes of the electric heater is formed by at least parts of the injection pipeline and the other electrode is formed by the at least parts of the production pipeline.
30. The device as claimed in claim 25, wherein hot steam is applied to the injection pipeline and the production pipeline.
31. The device as claimed in claim 26, wherein hot steam is applied to the injection pipeline and the production pipeline.
32. The device as claimed in claim 30, wherein the hot steam is provided with an electrolyte to increase its electrical conductivity.
33. The device as claimed in claim 31, wherein the hot steam is provided with a salt to increase its electrical conductivity.
34. The device as claimed in claim 16, wherein the electric heater is an alternating current heater.
35. The device as claimed in claim 16, wherein a frequency in the range of 1 Hz and 200 kHz and a voltage in the range from 100 V to 10 kV is provided for the electric heater.
US12/670,898 2007-08-03 2008-07-31 Device for in situ extraction of a substance comprising hydrocarbons Abandoned US20100252249A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
DE102007036832.3 2007-08-03
DE102007036832A DE102007036832B4 (en) 2007-08-03 2007-08-03 Apparatus for the in situ recovery of a hydrocarbonaceous substance
PCT/EP2008/060074 WO2009019197A2 (en) 2007-08-03 2008-07-31 Device for in situ extraction of a substance comprising hydrocarbons

Publications (1)

Publication Number Publication Date
US20100252249A1 true US20100252249A1 (en) 2010-10-07

Family

ID=40175964

Family Applications (1)

Application Number Title Priority Date Filing Date
US12/670,898 Abandoned US20100252249A1 (en) 2007-08-03 2008-07-31 Device for in situ extraction of a substance comprising hydrocarbons

Country Status (5)

Country Link
US (1) US20100252249A1 (en)
CA (1) CA2695246C (en)
DE (1) DE102007036832B4 (en)
RU (1) RU2426868C1 (en)
WO (1) WO2009019197A2 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110277992A1 (en) * 2010-05-14 2011-11-17 Paul Grimes Systems and methods for enhanced recovery of hydrocarbonaceous fluids
US20140020891A1 (en) * 2012-07-20 2014-01-23 Sunrise Oil Sands Partnership Water injection method for assisting in recovery of heavy oil
WO2015069406A3 (en) * 2013-11-07 2015-09-11 Exxonmobil Upstream Research Company Systems and methods of controlling in situ resistive heating elements
US9322255B2 (en) 2010-02-22 2016-04-26 Siemens Aktiengesellschaft Device and method for the recovery, in particular in-situ recovery, of a carbonaceous substance from subterranean formations
US20170328175A1 (en) * 2014-11-19 2017-11-16 Siemens Aktiengesellschaft Deposit Heater
US10087715B2 (en) 2012-12-06 2018-10-02 Siemens Aktiengesellschaft Arrangement and method for introducing heat into a geological formation by means of electromagnetic induction
US10221666B2 (en) * 2013-12-18 2019-03-05 Siemens Aktiengesellschaft Method for introducing an inductor loop into a rock formation
CN111537434A (en) * 2020-05-11 2020-08-14 西南石油大学 Stride earthquake fault buried pipeline test device

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102008022176A1 (en) 2007-08-27 2009-11-12 Siemens Aktiengesellschaft Device for "in situ" production of bitumen or heavy oil
DE102008062326A1 (en) 2008-03-06 2009-09-17 Siemens Aktiengesellschaft Arrangement for inductive heating of oil sands and heavy oil deposits by means of live conductors
WO2009135806A1 (en) 2008-05-05 2009-11-12 Siemens Aktiengesellschaft Method and device for “in-situ” conveying of bitumen or very heavy oil
DE102008044955A1 (en) 2008-08-29 2010-03-04 Siemens Aktiengesellschaft Method and apparatus for "in situ" production of bitumen or heavy oil
DE102008044953A1 (en) 2008-08-29 2010-03-04 Siemens Aktiengesellschaft Plant for the in situ recovery of a carbonaceous substance
DE102008047219A1 (en) 2008-09-15 2010-03-25 Siemens Aktiengesellschaft Process for the extraction of bitumen and / or heavy oil from an underground deposit, associated plant and operating procedures of this plant
DE102009010289A1 (en) 2009-02-24 2010-09-02 Siemens Aktiengesellschaft Device for measuring temperature in electromagnetic fields, use of this device and associated measuring arrangement
DE102010023542B4 (en) 2010-02-22 2012-05-24 Siemens Aktiengesellschaft Apparatus and method for recovering, in particular recovering, a carbonaceous substance from a subterranean deposit
DE102010008776A1 (en) 2010-02-22 2011-08-25 Siemens Aktiengesellschaft, 80333 Apparatus and method for recovering, in particular recovering, a carbonaceous substance from a subterranean deposit
DE102010020154B4 (en) 2010-03-03 2014-08-21 Siemens Aktiengesellschaft Method and apparatus for "in situ" production of bitumen or heavy oil
DE102010041329A1 (en) 2010-09-24 2012-03-29 Siemens Aktiengesellschaft Device for heating soil
RU2518581C2 (en) * 2012-07-17 2014-06-10 Александр Петрович Линецкий Oil and gas, shale and coal deposit development method
EP2734009A1 (en) * 2012-11-15 2014-05-21 Siemens Aktiengesellschaft Induction device for the heating of an oil reservoir, in particular a heavy oil reservoir
EP2886792A1 (en) * 2013-12-18 2015-06-24 Siemens Aktiengesellschaft Method for introducing an inductor loop into a rock formation
RU2710057C1 (en) * 2018-09-05 2019-12-24 Артём Сергеевич Голубов Oil well viscous production method

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2748868A (en) * 1954-07-19 1956-06-05 Union Oil Co Well heater
US3133591A (en) * 1954-05-20 1964-05-19 Orpha B Brandon Method and apparatus for forming and/or augmenting an energy wave
US4084638A (en) * 1975-10-16 1978-04-18 Probe, Incorporated Method of production stimulation and enhanced recovery of oil
US4199025A (en) * 1974-04-19 1980-04-22 Electroflood Company Method and apparatus for tertiary recovery of oil
USRE30738E (en) * 1980-02-06 1981-09-08 Iit Research Institute Apparatus and method for in situ heat processing of hydrocarbonaceous formations
US4303128A (en) * 1979-12-04 1981-12-01 Marr Jr Andrew W Injection well with high-pressure, high-temperature in situ down-hole steam formation
US4545435A (en) * 1983-04-29 1985-10-08 Iit Research Institute Conduction heating of hydrocarbonaceous formations
US4821798A (en) * 1987-06-09 1989-04-18 Ors Development Corporation Heating system for rathole oil well
US5167280A (en) * 1990-06-24 1992-12-01 Mobil Oil Corporation Single horizontal well process for solvent/solute stimulation
US5449251A (en) * 1993-05-04 1995-09-12 The Regents Of The University Of California Dynamic underground stripping: steam and electric heating for in situ decontamination of soils and groundwater
US5586213A (en) * 1992-02-05 1996-12-17 Iit Research Institute Ionic contact media for electrodes and soil in conduction heating
US20030132224A1 (en) * 2000-03-30 2003-07-17 Canitron Systems, Inc. Oil and gas well alloy squeezing method and apparatus
US20030141053A1 (en) * 2001-12-10 2003-07-31 Jian-Yang Yuan Wet electric heating process
US7128153B2 (en) * 2001-10-24 2006-10-31 Shell Oil Company Treatment of a hydrocarbon containing formation after heating
US8485254B2 (en) * 2007-08-27 2013-07-16 Siemens Aktiengesellschaft Method and apparatus for in situ extraction of bitumen or very heavy oil

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2634137A1 (en) * 1976-07-29 1978-02-02 Fisher Hydrocarbon deposit electric induction heating - in situ by induction coil enclosing selected deposit section
US4957646A (en) * 1987-08-26 1990-09-18 Shell Oil Company Steam foam surfactants enriched in alpha olefin disulfonates for enhanced oil recovery
US7398823B2 (en) * 2005-01-10 2008-07-15 Conocophillips Company Selective electromagnetic production tool
DE102007008292B4 (en) * 2007-02-16 2009-08-13 Siemens Ag Apparatus and method for recovering a hydrocarbonaceous substance while reducing its viscosity from an underground deposit

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3133591A (en) * 1954-05-20 1964-05-19 Orpha B Brandon Method and apparatus for forming and/or augmenting an energy wave
US2748868A (en) * 1954-07-19 1956-06-05 Union Oil Co Well heater
US4199025A (en) * 1974-04-19 1980-04-22 Electroflood Company Method and apparatus for tertiary recovery of oil
US4084638A (en) * 1975-10-16 1978-04-18 Probe, Incorporated Method of production stimulation and enhanced recovery of oil
US4303128A (en) * 1979-12-04 1981-12-01 Marr Jr Andrew W Injection well with high-pressure, high-temperature in situ down-hole steam formation
USRE30738E (en) * 1980-02-06 1981-09-08 Iit Research Institute Apparatus and method for in situ heat processing of hydrocarbonaceous formations
US4545435A (en) * 1983-04-29 1985-10-08 Iit Research Institute Conduction heating of hydrocarbonaceous formations
US4821798A (en) * 1987-06-09 1989-04-18 Ors Development Corporation Heating system for rathole oil well
US5167280A (en) * 1990-06-24 1992-12-01 Mobil Oil Corporation Single horizontal well process for solvent/solute stimulation
US5586213A (en) * 1992-02-05 1996-12-17 Iit Research Institute Ionic contact media for electrodes and soil in conduction heating
US5449251A (en) * 1993-05-04 1995-09-12 The Regents Of The University Of California Dynamic underground stripping: steam and electric heating for in situ decontamination of soils and groundwater
US20030132224A1 (en) * 2000-03-30 2003-07-17 Canitron Systems, Inc. Oil and gas well alloy squeezing method and apparatus
US7128153B2 (en) * 2001-10-24 2006-10-31 Shell Oil Company Treatment of a hydrocarbon containing formation after heating
US20030141053A1 (en) * 2001-12-10 2003-07-31 Jian-Yang Yuan Wet electric heating process
US8485254B2 (en) * 2007-08-27 2013-07-16 Siemens Aktiengesellschaft Method and apparatus for in situ extraction of bitumen or very heavy oil

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9322255B2 (en) 2010-02-22 2016-04-26 Siemens Aktiengesellschaft Device and method for the recovery, in particular in-situ recovery, of a carbonaceous substance from subterranean formations
US20110277992A1 (en) * 2010-05-14 2011-11-17 Paul Grimes Systems and methods for enhanced recovery of hydrocarbonaceous fluids
US20140020891A1 (en) * 2012-07-20 2014-01-23 Sunrise Oil Sands Partnership Water injection method for assisting in recovery of heavy oil
US9291042B2 (en) * 2012-07-20 2016-03-22 Sunrise Oil Sands Partnership Water injection method for assisting in recovery of heavy oil
US10087715B2 (en) 2012-12-06 2018-10-02 Siemens Aktiengesellschaft Arrangement and method for introducing heat into a geological formation by means of electromagnetic induction
WO2015069406A3 (en) * 2013-11-07 2015-09-11 Exxonmobil Upstream Research Company Systems and methods of controlling in situ resistive heating elements
AU2014347209B2 (en) * 2013-11-07 2017-02-02 Exxonmobil Upstream Research Company Systems and methods of controlling in situ resistive heating elements
AU2014347209A8 (en) * 2013-11-07 2017-02-16 Exxonmobil Upstream Research Company Systems and methods of controlling in situ resistive heating elements
US10221666B2 (en) * 2013-12-18 2019-03-05 Siemens Aktiengesellschaft Method for introducing an inductor loop into a rock formation
US20170328175A1 (en) * 2014-11-19 2017-11-16 Siemens Aktiengesellschaft Deposit Heater
CN111537434A (en) * 2020-05-11 2020-08-14 西南石油大学 Stride earthquake fault buried pipeline test device

Also Published As

Publication number Publication date
DE102007036832B4 (en) 2009-08-20
WO2009019197A2 (en) 2009-02-12
DE102007036832A1 (en) 2009-02-05
WO2009019197A3 (en) 2010-10-21
CA2695246A1 (en) 2009-02-12
CA2695246C (en) 2013-02-12
RU2426868C1 (en) 2011-08-20

Similar Documents

Publication Publication Date Title
CA2695246C (en) Device for in situ extraction of a substance comprising hydrocarbons
US9399905B2 (en) Leak detection in circulated fluid systems for heating subsurface formations
RU2524584C2 (en) Systems and methods for underground seam processing with help of electric conductors
US9080441B2 (en) Multiple electrical connections to optimize heating for in situ pyrolysis
CA2729430C (en) Recovery of hydrocarbons using artificial topseals
CA2692988C (en) Draining a reservoir with an interbedded layer
US9127523B2 (en) Barrier methods for use in subsurface hydrocarbon formations
US20130175029A1 (en) Method of forming subterranean barriers with molten wax
US20070102152A1 (en) Recovery of hydrocarbons using electrical stimulation
CA2815737C (en) Steam assisted gravity drainage with added oxygen geometry for impaired bitumen reservoirs
CN104895541B (en) The method of oil reservoir interval interlayer is broken through in dual horizontal well SAGD exploitations
RU2582251C1 (en) Development method of layer-by-zonal heterogeneous superviscous oil or bitumen
US10087715B2 (en) Arrangement and method for introducing heat into a geological formation by means of electromagnetic induction
CA3046523C (en) System and method for sagd inter-well management and pseudo infill optimization scheme
CA2851782C (en) Method for hydrocarbon recovery using heated liquid water injection with rf heating
AU2011237624B2 (en) Leak detection in circulated fluid systems for heating subsurface formations
WO2011127267A1 (en) Barrier methods for use in subsurface hydrocarbon formations
RU2693055C1 (en) Method for development of high-viscosity oil deposit with water-saturated zones
WO2021005383A1 (en) Method for enhancing oil recovery
CA1248442A (en) In-situ steam drive oil recovery process
RU2669968C1 (en) Method for mining deposits of bituminous oil from horizontal well
CN104373099A (en) Target orientation fracture layout using two adjacent wells in underground porous rock layer
RU2522112C1 (en) Thermal shaft method of high-viscosity oil pool development
RU2354816C1 (en) Well
Tremblay Cold Flow: A Multi-Well Cold Flow (Production) Model

Legal Events

Date Code Title Description
AS Assignment

Owner name: SIEMENS AKTIENGESELLSCHAFT, GERMANY

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:DIEHL, DIRK;WACKER, BERND;SIGNING DATES FROM 20100111 TO 20100118;REEL/FRAME:023856/0898

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION