US20090136337A1 - Method and Apparatus for Improved Reduced Load Operation of Steam Turbines - Google Patents
Method and Apparatus for Improved Reduced Load Operation of Steam Turbines Download PDFInfo
- Publication number
- US20090136337A1 US20090136337A1 US11/944,991 US94499107A US2009136337A1 US 20090136337 A1 US20090136337 A1 US 20090136337A1 US 94499107 A US94499107 A US 94499107A US 2009136337 A1 US2009136337 A1 US 2009136337A1
- Authority
- US
- United States
- Prior art keywords
- flow
- low pressure
- steam
- double
- control system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000000034 method Methods 0.000 title claims abstract description 16
- 238000010438 heat treatment Methods 0.000 claims description 6
- 239000002028 Biomass Substances 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 239000002803 fossil fuel Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01K—STEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
- F01K13/00—General layout or general methods of operation of complete plants
- F01K13/02—Controlling, e.g. stopping or starting
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01K—STEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
- F01K7/00—Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating
- F01K7/16—Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating the engines being only of turbine type
- F01K7/165—Controlling means specially adapted therefor
Definitions
- the present application relates generally to steam turbines and more particularly to the improved performance of steam turbines at reduced-load, part-load, or off-design operating conditions.
- Steam turbines are mechanical devices that convert the thermal energy of pressurized steam into rotational mechanical work.
- large steam turbines generally include several sections, such as a high pressure section, an intermediate pressure section, and a low pressure section. Within each section, multiple stages may be used in the expansion of the steam.
- the sections of large steam turbines possess various design characteristics so as to permit the extraction of the largest possible amount of energy from the expansion of steam through the turbine sections. It is common practice to introduce initially high pressure steam into a high pressure section of the steam turbine. Steam exiting the high pressure section of the turbine is then directed to a reheater before being introduced into a low pressure section of the turbine, where it continues its expansion. In many turbines the steam passes through an intermediate pressure section before being introduced into a low pressure section.
- the annulus area of each stage must increase in order to convert efficiently the thermal energy of the steam to rotational mechanical work. This is accomplished by lengthening the turbine blades or buckets from stage to stage, by increasing the diameter of the rotor upon which the blades are mounted, by adding two or more flow paths in parallel, or combinations thereof.
- the choice of the single-flow or the double-flow low pressure section design may depend on the volume of steam designed to flow though the low pressure section at normal, full-load conditions.
- the best performance of low pressure steam path design may be achieved when steam velocity exiting the last stage buckets of the low pressure section is about 600 feet per second. Lower or higher velocities may degrade the performance of the steam turbine.
- the annulus area of the last stage buckets may be increased or reduced. If steam flow volumes are large enough, however, increasing the length of the turbine blades or the diameter of the rotor upon which the blades are mounted may not be feasible or desirable. Instead, a double-flow section may be used in order to increase the exit annulus area of the low pressure section.
- double-flow low pressure section may be used in parallel.
- approximately equal portions of the steam flow may be introduced to each of the double-flow low pressure sections.
- Steam turbines are designed to operate efficiently under normal, full-load operating conditions. In some circumstances such as a reduced demand for electricity, however, the steam flow to the turbine is reduced for economic reasons. When the flow is reduced below design conditions, the performance of the low pressure section of the steam turbine may drop significantly due to large separation at the hub of the last stage buckets. Exhaust hood performance also may decline. The low steam path efficiency and poor exhaust hood performance may cause poor turbine efficiency at reduced-load, low-load, or off-design operating conditions.
- the present application provides a method of operating a steam turbine at reduced load, including providing a number of low pressure sections, providing a flow control system operable to limit the flow of steam to at least one of the number of low pressure sections, and operating the flow control system to limit the flow of steam to the at least one of the number of low pressure sections when the load is below a predetermined value.
- Another embodiment of the present application provides a method of operating a steam turbine at reduced load, including providing one double-flow low pressure section having two steam flow paths, providing a flow control system operable to limit the flow of steam to at least one of the two flow paths, and operating the flow control system to limit the flow of steam to the at least one of the two flow paths
- a further embodiment of the present application provides a steam turbine.
- the steam turbine may include a number of low pressure sections and a flow control system operable to limit the flow of steam to at least one of the number of low pressure sections.
- FIG. 1 is a schematic view of a steam turbine having two double-flow low pressure sections in accordance with an embodiment of the present application as described herein.
- FIG. 2 is a schematic view of a steam turbine having three double-flow low pressure sections in accordance with an embodiment of the present application as described herein.
- FIG. 3 is a schematic view of a steam turbine having one double-flow low pressure section in accordance with an embodiment of the present application as described herein.
- FIG. 1 shows a schematic view of a steam turbine 10 of an embodiment of the present application.
- Pressurized steam is supplied to the turbine 10 from a steam source 11 , such as, for example, a boiler.
- Energy sources for generating steam may include, but are not limited to, fossil fuel, nuclear, geothermal, solar thermal electric, and biomass energy sources.
- the steam initially is introduced to a high pressure section 12 of the turbine 10 . After the steam flow exits the high pressure section 12 of the turbine 10 , the flow may pass to a reheater 13 where additional thermal energy may be added. In other embodiments the steam may be returned to a boiler where additional superheat may be added.
- the steam may be introduced to a moisture separator to remove any moisture forming in the steam in the high pressure section of the turbine.
- the steam may pass to an intermediate pressure section after the steam flow exists the reheater 13 .
- a crossover pipe 14 may direct the steam flow to a first double-flow low pressure section 15 and a second double-flow low pressure section 16 .
- a flow control system 17 may be provided, which is operable to limit the flow of steam to both of the two low pressure sections.
- the flow control system 17 may include a first valve 18 , located at the inlet of the first double-flow low pressure section 15 , and a second valve 19 , located at the inlet of the second double-flow low pressure section 16 .
- the flow control system 17 may include any device that can regulate, halt, or control the flow of steam to at least one of the number of low pressure sections by closing or partially obstructing the flow path of the steam to at least one of the low pressure sections.
- the flow control system 17 may include a butterfly valve, poppet valve, or a hinged lid or other movable part that closes or modifies the steam flow path.
- the flow control system 17 may include only one valve disposed at the inlet of one of the low pressure sections.
- the flow control system 17 may include a valve disposed between the inlet of the first double-flow low pressure section 15 and the inlet of the second double-flow low pressure section 16 .
- the flow control system 17 is operable to limit the flow of steam to at least one of the number of low pressure sections.
- the flow control system 17 may limit the flow of steam to at least one of the two double-flow low pressure sections.
- the predetermined load at which the flow begins to be limited is a function of the particular design and operating conditions. In general, this load is selected such that the overall output of the low pressure section is maximized.
- the second valve 19 may be closed significantly to limit the flow to the second double-flow low pressure section 16 .
- sufficient steam flow may be allowed to pass through the second valve 19 in order to prevent windage heating in the second double-flow low pressure section 16 .
- Limiting steam flow to the second double-flow low pressure section 16 may cause a corresponding increase in flow to the first double-flow low pressure section 15 , thereby increasing the efficiency of the first double-flow low pressure section 15 .
- the increase in efficiency of the first double-flow low pressure section 15 increases the overall efficiency of the low pressure section of the steam turbine 10 at reduced-load, low-load, or off-design conditions.
- the flow control system 17 may be operated to direct a flow of steam to at least one of the low pressure sections sufficient to produce a steam exit velocity from the low pressure section of between about 500 feet per second and about 700 feet per second.
- the specific flow rate range may vary with the size and configuration of the turbine 10 as a whole.
- the relative flow of steam through the two double-flow low pressure sections may be adjusted using the flow control system 17 in order to maximize overall turbine efficiency.
- each flow end of the first double-flow low pressure section 15 and the second double-flow low pressure section 16 it may discharged to a condenser 20 or otherwise used.
- FIG. 2 shows a schematic view of a steam turbine 27 in accordance with an embodiment of the present application.
- the steam turbine of FIG. 2 may have three double-flow low pressure sections. Pressurized steam is supplied to the turbine 27 from the steam source 11 . The steam initially is introduced to the high pressure section 12 of the turbine 27 . After the steam flow exits the high pressure section 12 of the turbine 27 , it may pass to the reheater 13 where additional thermal energy is added. After the steam flow exits the reheater 13 , the crossover pipe 14 directs the steam flow to the first double-flow low pressure section 15 , the second double-flow low pressure section 16 , and a third double-flow low pressure section 21 .
- the flow control system 17 may be provided to limit the flow of steam to each of the three low pressure sections. In another embodiment, the flow control system 17 may only be operable to limit the flow of steam to one or two of the number of low pressure sections.
- the flow control system 17 may include the first valve 18 , located at the inlet of the first double-flow low pressure section 15 , the second valve 19 , located at the inlet of the second double-flow low pressure section 16 , and a third valve 22 , located at the inlet of the third double-flow low pressure section 21 .
- the flow control system 17 limits the flow of steam to at least one of the three double-flow low pressure sections.
- the third valve 22 may be closed significantly to limit the flow to the third double-flow low pressure section 21 .
- sufficient steam flow may be allowed to pass through the third valve 22 in order to prevent windage heating in the third double-flow low pressure section 21 .
- Limiting steam flow to the third double-flow low pressure section 21 may cause a corresponding increase in flow to the first double-flow low pressure section 15 and the second double-flow low pressure section 16 , thereby increasing the efficiency of the first double-flow low pressure section 15 and the second double-flow low pressure section 16 .
- the increase in efficiency of the first double-flow low pressure section 15 and the second double-flow low pressure section 16 may increase the overall efficiency of the low pressure section of the steam turbine 27 at reduced-load, low-load, or off-design conditions.
- both the second valve 19 and third valve 22 may be closed significantly to limit the flow to the second double-flow low pressure section 16 and third double-flow low pressure section 21 .
- sufficient steam flow may be allowed to pass through the second valve 19 and third valve 22 in order to prevent windage heating in the second double-flow low pressure section 16 and third double-flow low pressure section 21 .
- Limiting steam flow to the second double-flow low pressure section 16 and third double-flow low pressure section 21 may cause a corresponding increase in flow to the first double-flow low pressure section 15 , thereby increasing the efficiency of the first double-flow low pressure section 15 .
- the increase in efficiency of the first double-flow low pressure section 15 may increase the overall efficiency of the low pressure section of the steam turbine 27 at reduced-load, low-load, or off-design conditions.
- the flow control system 17 may be operated to direct a flow of steam to at least one of the low pressure sections sufficient to produce a steam exit velocity from the low pressure section of between about 500 feet per second and about 700 feet per second.
- the specific flow rate range may vary with the size and configuration of the turbine 10 as a whole.
- the relative flow of steam through the three double-flow low pressure sections may be adjusted using the flow control system 17 in order to maximize overall turbine efficiency. After the steam exits each flow end of the first double-flow low pressure section 15 , the second double-flow low pressure section 16 , and the third double-flow low pressure section 21 , it may be discharged to a condenser 20 or otherwise used.
- FIG. 3 shows a schematic view of a steam turbine 28 having one double-flow low pressure section in accordance with an embodiment of the present application.
- Pressurized steam may be supplied to the turbine 28 from the steam source 11 .
- the steam initially is introduced to the high pressure section 12 of the turbine 28 .
- the crossover pipe 14 may direct the steam flow to the first double-flow low pressure section 15 .
- the double-flow low pressure section 15 may have a first steam flow path 23 and a second steam flow path 24 .
- the flow control system 17 may be provided to limit the flow of steam to at least one of the two flow paths.
- the flow control system 17 may include a first valve 25 , located at the inlet of the first flow path 23 , and a second valve 26 , located at the inlet of the second flow path 24 .
- the flow control system 17 limits the flow of steam to at least one of the two flow paths.
- the second valve 26 may be closed significantly to limit the flow to the second flow path 24 .
- sufficient steam flow may be allowed to pass through the second valve 26 in order to prevent windage heating in the second flow path 24 .
- Limiting steam flow to the second flow path 24 may cause a corresponding increase in flow to the first flow path 23 , thereby increasing the overall efficiency of the first double-flow low pressure section 15 at reduced-load, low-load, or off-design conditions.
- the flow control system 17 may be operated to direct a flow of steam to at least one flow path sufficient to produce a steam exit velocity from the flow path of between about 500 feet per second and about 700 feet per second.
- the specific flow rate range may vary with the size and configuration of the turbine 28 as a whole.
- the relative flow of steam through the two flow paths may be adjusted using the flow control system 17 in order to maximize overall turbine efficiency. After the steam exits each flow end of the first double-flow low pressure section 15 , it may be discharged to a condenser 20 or otherwise used.
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Control Of Turbines (AREA)
Abstract
An apparatus and method for improving reduced-load operation of steam turbines. The apparatus may include a number of low pressure sections and a flow control system operable to limit the flow of steam to at least one of the number of low pressure sections. The method may include providing a number of low pressure sections, providing a flow control system operable to limit the flow of steam to at least one of the number of low pressure sections, and operating the flow control system to limit the flow of steam to the at least one of the number of low pressure sections when the load is below a predetermined value.
Description
- The present application relates generally to steam turbines and more particularly to the improved performance of steam turbines at reduced-load, part-load, or off-design operating conditions.
- Steam turbines are mechanical devices that convert the thermal energy of pressurized steam into rotational mechanical work. In order to improve thermal efficiency, large steam turbines generally include several sections, such as a high pressure section, an intermediate pressure section, and a low pressure section. Within each section, multiple stages may be used in the expansion of the steam.
- The sections of large steam turbines possess various design characteristics so as to permit the extraction of the largest possible amount of energy from the expansion of steam through the turbine sections. It is common practice to introduce initially high pressure steam into a high pressure section of the steam turbine. Steam exiting the high pressure section of the turbine is then directed to a reheater before being introduced into a low pressure section of the turbine, where it continues its expansion. In many turbines the steam passes through an intermediate pressure section before being introduced into a low pressure section.
- Because of the increase in volume as the steam expands through the stages of each section, the annulus area of each stage must increase in order to convert efficiently the thermal energy of the steam to rotational mechanical work. This is accomplished by lengthening the turbine blades or buckets from stage to stage, by increasing the diameter of the rotor upon which the blades are mounted, by adding two or more flow paths in parallel, or combinations thereof.
- When two flow paths of a section of a turbine are in parallel, this is known as a double-flow section. It is a common practice to have one or more of the sections configured in a double flow arrangement in which steam entering a middle portion of the section encounters a diverging flow path. Following entry into this middle portion of one of the turbine sections, the steam exits in opposite directions with both flows directed to rotate the turbine shaft in the same direction. Thus, for example, steam entering from the top or bottom exits toward the left and right.
- The choice of the single-flow or the double-flow low pressure section design may depend on the volume of steam designed to flow though the low pressure section at normal, full-load conditions. The best performance of low pressure steam path design may be achieved when steam velocity exiting the last stage buckets of the low pressure section is about 600 feet per second. Lower or higher velocities may degrade the performance of the steam turbine. In order to adjust the exit velocity of the low pressure section, the annulus area of the last stage buckets may be increased or reduced. If steam flow volumes are large enough, however, increasing the length of the turbine blades or the diameter of the rotor upon which the blades are mounted may not be feasible or desirable. Instead, a double-flow section may be used in order to increase the exit annulus area of the low pressure section. Similarly, if a single double-flow low pressure section does not provide sufficient annulus area to achieve adequate steam exit velocities, two or more double-flow low pressure sections may be used in parallel. In turbines having a number of double-flow low pressure sections, approximately equal portions of the steam flow may be introduced to each of the double-flow low pressure sections.
- Steam turbines are designed to operate efficiently under normal, full-load operating conditions. In some circumstances such as a reduced demand for electricity, however, the steam flow to the turbine is reduced for economic reasons. When the flow is reduced below design conditions, the performance of the low pressure section of the steam turbine may drop significantly due to large separation at the hub of the last stage buckets. Exhaust hood performance also may decline. The low steam path efficiency and poor exhaust hood performance may cause poor turbine efficiency at reduced-load, low-load, or off-design operating conditions.
- There is a desire, therefore, to provide a method and apparatus for improving the operation of steam turbines at reduced-load. Such a method and apparatus may improve the efficiency of steam turbines at such operating conditions.
- In one embodiment, the present application provides a method of operating a steam turbine at reduced load, including providing a number of low pressure sections, providing a flow control system operable to limit the flow of steam to at least one of the number of low pressure sections, and operating the flow control system to limit the flow of steam to the at least one of the number of low pressure sections when the load is below a predetermined value.
- Another embodiment of the present application provides a method of operating a steam turbine at reduced load, including providing one double-flow low pressure section having two steam flow paths, providing a flow control system operable to limit the flow of steam to at least one of the two flow paths, and operating the flow control system to limit the flow of steam to the at least one of the two flow paths
- A further embodiment of the present application provides a steam turbine. The steam turbine may include a number of low pressure sections and a flow control system operable to limit the flow of steam to at least one of the number of low pressure sections.
- These and other features of the present application will become apparent to one of ordinary skill in the art upon review of the following detailed description when taken in conjunction with the several drawings and the appended claims.
-
FIG. 1 is a schematic view of a steam turbine having two double-flow low pressure sections in accordance with an embodiment of the present application as described herein. -
FIG. 2 is a schematic view of a steam turbine having three double-flow low pressure sections in accordance with an embodiment of the present application as described herein. -
FIG. 3 is a schematic view of a steam turbine having one double-flow low pressure section in accordance with an embodiment of the present application as described herein. - Referring now to the drawings, in which like numerals indicate like elements throughout the separate views,
FIG. 1 shows a schematic view of asteam turbine 10 of an embodiment of the present application. Pressurized steam is supplied to theturbine 10 from asteam source 11, such as, for example, a boiler. Energy sources for generating steam may include, but are not limited to, fossil fuel, nuclear, geothermal, solar thermal electric, and biomass energy sources. The steam initially is introduced to ahigh pressure section 12 of theturbine 10. After the steam flow exits thehigh pressure section 12 of theturbine 10, the flow may pass to areheater 13 where additional thermal energy may be added. In other embodiments the steam may be returned to a boiler where additional superheat may be added. In a further embodiment the steam may be introduced to a moisture separator to remove any moisture forming in the steam in the high pressure section of the turbine. In a still further embodiment, the steam may pass to an intermediate pressure section after the steam flow exists thereheater 13. - After the steam flow exits the
reheater 13, acrossover pipe 14 may direct the steam flow to a first double-flowlow pressure section 15 and a second double-flowlow pressure section 16. Aflow control system 17 may be provided, which is operable to limit the flow of steam to both of the two low pressure sections. - The
flow control system 17 may include afirst valve 18, located at the inlet of the first double-flowlow pressure section 15, and asecond valve 19, located at the inlet of the second double-flowlow pressure section 16. In particular embodiments, theflow control system 17 may include any device that can regulate, halt, or control the flow of steam to at least one of the number of low pressure sections by closing or partially obstructing the flow path of the steam to at least one of the low pressure sections. For example, theflow control system 17 may include a butterfly valve, poppet valve, or a hinged lid or other movable part that closes or modifies the steam flow path. In another embodiment, theflow control system 17 may include only one valve disposed at the inlet of one of the low pressure sections. In a further embodiment, theflow control system 17 may include a valve disposed between the inlet of the first double-flowlow pressure section 15 and the inlet of the second double-flowlow pressure section 16. - In operation at reduced-load, low-load, or off-design conditions, the performance of the low pressure section of the
steam turbine 10 may drop significantly. In order to improve turbine efficiency at such conditions, theflow control system 17 is operable to limit the flow of steam to at least one of the number of low pressure sections. When the steam flow is reduced below design conditions or below a predetermined value, theflow control system 17 may limit the flow of steam to at least one of the two double-flow low pressure sections. The predetermined load at which the flow begins to be limited is a function of the particular design and operating conditions. In general, this load is selected such that the overall output of the low pressure section is maximized. - For example, the
second valve 19 may be closed significantly to limit the flow to the second double-flowlow pressure section 16. In particular embodiments, sufficient steam flow may be allowed to pass through thesecond valve 19 in order to prevent windage heating in the second double-flowlow pressure section 16. Limiting steam flow to the second double-flowlow pressure section 16 may cause a corresponding increase in flow to the first double-flowlow pressure section 15, thereby increasing the efficiency of the first double-flowlow pressure section 15. The increase in efficiency of the first double-flowlow pressure section 15 increases the overall efficiency of the low pressure section of thesteam turbine 10 at reduced-load, low-load, or off-design conditions. - In a particular embodiment, the
flow control system 17 may be operated to direct a flow of steam to at least one of the low pressure sections sufficient to produce a steam exit velocity from the low pressure section of between about 500 feet per second and about 700 feet per second. The specific flow rate range may vary with the size and configuration of theturbine 10 as a whole. The relative flow of steam through the two double-flow low pressure sections may be adjusted using theflow control system 17 in order to maximize overall turbine efficiency. - After the steam exits each flow end of the first double-flow
low pressure section 15 and the second double-flowlow pressure section 16, it may discharged to acondenser 20 or otherwise used. -
FIG. 2 shows a schematic view of asteam turbine 27 in accordance with an embodiment of the present application. Instead of the two double-flow low pressure sections ofFIG. 1 , the steam turbine ofFIG. 2 may have three double-flow low pressure sections. Pressurized steam is supplied to theturbine 27 from thesteam source 11. The steam initially is introduced to thehigh pressure section 12 of theturbine 27. After the steam flow exits thehigh pressure section 12 of theturbine 27, it may pass to thereheater 13 where additional thermal energy is added. After the steam flow exits thereheater 13, thecrossover pipe 14 directs the steam flow to the first double-flowlow pressure section 15, the second double-flowlow pressure section 16, and a third double-flowlow pressure section 21. Theflow control system 17 may be provided to limit the flow of steam to each of the three low pressure sections. In another embodiment, theflow control system 17 may only be operable to limit the flow of steam to one or two of the number of low pressure sections. Theflow control system 17 may include thefirst valve 18, located at the inlet of the first double-flowlow pressure section 15, thesecond valve 19, located at the inlet of the second double-flowlow pressure section 16, and athird valve 22, located at the inlet of the third double-flowlow pressure section 21. - In operation at reduced-load, low-load, or off-design conditions, the
flow control system 17 limits the flow of steam to at least one of the three double-flow low pressure sections. For example, thethird valve 22 may be closed significantly to limit the flow to the third double-flowlow pressure section 21. In particular embodiments, sufficient steam flow may be allowed to pass through thethird valve 22 in order to prevent windage heating in the third double-flowlow pressure section 21. Limiting steam flow to the third double-flowlow pressure section 21 may cause a corresponding increase in flow to the first double-flowlow pressure section 15 and the second double-flowlow pressure section 16, thereby increasing the efficiency of the first double-flowlow pressure section 15 and the second double-flowlow pressure section 16. The increase in efficiency of the first double-flowlow pressure section 15 and the second double-flowlow pressure section 16 may increase the overall efficiency of the low pressure section of thesteam turbine 27 at reduced-load, low-load, or off-design conditions. - In another embodiment, both the
second valve 19 andthird valve 22 may be closed significantly to limit the flow to the second double-flowlow pressure section 16 and third double-flowlow pressure section 21. In particular embodiments, sufficient steam flow may be allowed to pass through thesecond valve 19 andthird valve 22 in order to prevent windage heating in the second double-flowlow pressure section 16 and third double-flowlow pressure section 21. Limiting steam flow to the second double-flowlow pressure section 16 and third double-flowlow pressure section 21 may cause a corresponding increase in flow to the first double-flowlow pressure section 15, thereby increasing the efficiency of the first double-flowlow pressure section 15. The increase in efficiency of the first double-flowlow pressure section 15 may increase the overall efficiency of the low pressure section of thesteam turbine 27 at reduced-load, low-load, or off-design conditions. - In a particular embodiment, the
flow control system 17 may be operated to direct a flow of steam to at least one of the low pressure sections sufficient to produce a steam exit velocity from the low pressure section of between about 500 feet per second and about 700 feet per second. The specific flow rate range may vary with the size and configuration of theturbine 10 as a whole. The relative flow of steam through the three double-flow low pressure sections may be adjusted using theflow control system 17 in order to maximize overall turbine efficiency. After the steam exits each flow end of the first double-flowlow pressure section 15, the second double-flowlow pressure section 16, and the third double-flowlow pressure section 21, it may be discharged to acondenser 20 or otherwise used. -
FIG. 3 shows a schematic view of asteam turbine 28 having one double-flow low pressure section in accordance with an embodiment of the present application. Pressurized steam may be supplied to theturbine 28 from thesteam source 11. The steam initially is introduced to thehigh pressure section 12 of theturbine 28. After the steam flow exits thehigh pressure section 12 of theturbine 28, it may pass to thereheater 13 where additional thermal energy is added. After the steam flow exits thereheater 13, thecrossover pipe 14 may direct the steam flow to the first double-flowlow pressure section 15. The double-flowlow pressure section 15 may have a firststeam flow path 23 and a secondsteam flow path 24. Theflow control system 17 may be provided to limit the flow of steam to at least one of the two flow paths. Theflow control system 17 may include afirst valve 25, located at the inlet of thefirst flow path 23, and asecond valve 26, located at the inlet of thesecond flow path 24. - In operation at reduced-load, low-load, or off-design conditions, the
flow control system 17 limits the flow of steam to at least one of the two flow paths. For example, thesecond valve 26 may be closed significantly to limit the flow to thesecond flow path 24. In particular embodiments, sufficient steam flow may be allowed to pass through thesecond valve 26 in order to prevent windage heating in thesecond flow path 24. Limiting steam flow to thesecond flow path 24 may cause a corresponding increase in flow to thefirst flow path 23, thereby increasing the overall efficiency of the first double-flowlow pressure section 15 at reduced-load, low-load, or off-design conditions. - In a particular embodiment, the
flow control system 17 may be operated to direct a flow of steam to at least one flow path sufficient to produce a steam exit velocity from the flow path of between about 500 feet per second and about 700 feet per second. The specific flow rate range may vary with the size and configuration of theturbine 28 as a whole. The relative flow of steam through the two flow paths may be adjusted using theflow control system 17 in order to maximize overall turbine efficiency. After the steam exits each flow end of the first double-flowlow pressure section 15, it may be discharged to acondenser 20 or otherwise used. - It should be understood that the foregoing relates only to the preferred embodiments of the present application and that numerous changes and modifications may be made herein without departing from the general spirit and scope of the invention as defined by the following claims and the equivalents thereof.
Claims (19)
1. A method of operating a steam turbine at reduced load, comprising:
providing a plurality of low pressure sections;
providing a flow control system operable to limit the flow of steam to at least one of the plurality of low pressure sections; and
operating the flow control system to limit the flow of steam to the at least one of the plurality of low pressure sections when the load is below a predetermined value.
2. The method of claim 1 , wherein the step of providing a plurality of low pressure sections comprises providing two double-flow low pressure sections.
3. The method of claim 1 , wherein the step of providing a plurality of low pressure sections comprises providing three double-flow low pressure sections.
4. The method of claim 1 , wherein the step of providing a flow control system operable to limit the flow of steam to at least one of the plurality of low pressure sections comprises providing at least one valve disposed at the inlet of the at least one of the plurality of low pressure sections.
5. The method of claim 2 , wherein the step of providing a flow control system operable to limit the flow of steam to at least one of the plurality of low pressure sections comprises providing a valve disposed between the inlet of a first double-flow low pressure section and the inlet of a second double-flow low pressure section.
6. The method of claim 3 , wherein the step of providing a flow control system operable to limit the flow of steam to at least one of the plurality of low pressure sections comprises providing a first valve disposed at the inlet of a first double-flow low pressure section and a second valve disposed at the inlet of a second double-flow low pressure section.
7. The method of claim 1 , wherein the flow control system provides a flow of steam to each of the plurality of low pressure sections to prevent windage heating.
8. The method of claim 1 , further comprising operating the flow control system to direct a flow of steam to at least one of the plurality of low pressure sections sufficient to produce a steam exit velocity of between about 500 feet per second and about 700 feet per second from the at least one of the plurality of low pressure sections.
9. A method of operating a steam turbine at reduced load, comprising:
providing one double-flow low pressure section having two steam flow paths;
providing a flow control system operable to limit the flow of steam to at least one of the two flow paths; and
operating the flow control system to limit the flow of steam to the at least one of the two flow paths.
10. A steam turbine, comprising:
a plurality of low pressure sections; and
a flow control system operable to limit the flow of steam to at least one of the plurality of low pressure sections.
11. The steam turbine of claim 10 , wherein the plurality of low pressure sections comprises two double-flow low pressure sections.
12. The steam turbine of claim 10 , wherein the plurality of low pressure sections comprises three double-flow low pressure sections.
13. The steam turbine of claim 10 , wherein the flow control system comprises at least one valve disposed at the inlet of the at least one of the plurality of low pressure sections.
14. The steam turbine of claim 11 , wherein the flow control system comprises a valve disposed between the inlet of a first double-flow low pressure section and the inlet of a second double-flow low pressure section.
15. The steam turbine of claim 12 , wherein the flow control system comprises a first valve disposed at the inlet of a first double-flow low pressure section and a second valve disposed at the inlet of a second double-flow low pressure section.
16. The steam turbine of claim 10 , wherein the flow control system is operable to provide sufficient flow of steam to each of the plurality of low pressure sections to prevent windage heating.
17. The steam turbine of claim 10 , wherein the flow control system is operable to direct a flow of steam to at least one of the plurality of low pressure sections sufficient to produce a steam exit velocity of between about 500 feet per second and about 700 feet per second from the at least one of the plurality of low pressure sections.
18. The steam turbine of claim 10 , further comprising a moisture separator, wherein the moisture separator provides the flow of steam to the plurality of low pressure sections.
19. The steam turbine of claim 10 , further comprising a crossover pipe, wherein the crossover pipe provides the flow of steam to the plurality of low pressure sections.
Priority Applications (5)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US11/944,991 US20090136337A1 (en) | 2007-11-26 | 2007-11-26 | Method and Apparatus for Improved Reduced Load Operation of Steam Turbines |
| JP2008297624A JP2009127627A (en) | 2007-11-26 | 2008-11-21 | Method and device for improving reduced load operation of steam turbine |
| DE102008037579A DE102008037579A1 (en) | 2007-11-26 | 2008-11-24 | Method and apparatus for improved operation of steam turbines at reduced load |
| FR0858007A FR2924157A1 (en) | 2007-11-26 | 2008-11-25 | METHOD AND DEVICE FOR IMPROVED OPERATION WITH REDUCED LOAD OF STEAM TURBINES |
| RU2008146607/06A RU2008146607A (en) | 2007-11-26 | 2008-11-25 | METHOD AND DEVICE FOR IMPROVED OPERATION OF STEAM TURBINES UNDER LOWER LOAD |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US11/944,991 US20090136337A1 (en) | 2007-11-26 | 2007-11-26 | Method and Apparatus for Improved Reduced Load Operation of Steam Turbines |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US20090136337A1 true US20090136337A1 (en) | 2009-05-28 |
Family
ID=40577231
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US11/944,991 Abandoned US20090136337A1 (en) | 2007-11-26 | 2007-11-26 | Method and Apparatus for Improved Reduced Load Operation of Steam Turbines |
Country Status (5)
| Country | Link |
|---|---|
| US (1) | US20090136337A1 (en) |
| JP (1) | JP2009127627A (en) |
| DE (1) | DE102008037579A1 (en) |
| FR (1) | FR2924157A1 (en) |
| RU (1) | RU2008146607A (en) |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20100146970A1 (en) * | 2008-03-07 | 2010-06-17 | Clean Energy Systems, Inc. | Method and system for enhancing power output of renewable thermal cycle power plants |
| US20100326084A1 (en) * | 2009-03-04 | 2010-12-30 | Anderson Roger E | Methods of oxy-combustion power generation using low heating value fuel |
| US20110247333A1 (en) * | 2010-04-13 | 2011-10-13 | General Electric Company | Double flow low-pressure steam turbine |
| US20140216035A1 (en) * | 2013-02-05 | 2014-08-07 | Alstom Technology Ltd | Steam power plant with a second low-pressure turbine and an additional condensing system |
| US20140283518A1 (en) * | 2011-04-15 | 2014-09-25 | Doosan Babcock Limited | Turbine system |
| CN104204425A (en) * | 2012-04-04 | 2014-12-10 | 西门子公司 | Power plant and method for operating a power plant facility |
| CN104471199A (en) * | 2012-07-12 | 2015-03-25 | 西门子公司 | Methods used to support grid frequency |
Families Citing this family (14)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101968041B (en) * | 2010-09-29 | 2012-05-30 | 武汉凯迪工程技术研究总院有限公司 | Solar power generation method and system taking biomass boiler as auxiliary heat source |
| JP5792663B2 (en) * | 2012-03-07 | 2015-10-14 | ヤンマー株式会社 | Ship waste heat recovery system |
| JP6778475B2 (en) * | 2015-07-01 | 2020-11-04 | アネスト岩田株式会社 | Power generation system and power generation method |
| US11592009B2 (en) | 2021-04-02 | 2023-02-28 | Ice Thermal Harvesting, Llc | Systems and methods for generation of electrical power at a drilling rig |
| US11644015B2 (en) | 2021-04-02 | 2023-05-09 | Ice Thermal Harvesting, Llc | Systems and methods for generation of electrical power at a drilling rig |
| US11326550B1 (en) | 2021-04-02 | 2022-05-10 | Ice Thermal Harvesting, Llc | Systems and methods utilizing gas temperature as a power source |
| US11480074B1 (en) | 2021-04-02 | 2022-10-25 | Ice Thermal Harvesting, Llc | Systems and methods utilizing gas temperature as a power source |
| US11293414B1 (en) | 2021-04-02 | 2022-04-05 | Ice Thermal Harvesting, Llc | Systems and methods for generation of electrical power in an organic rankine cycle operation |
| US11421663B1 (en) | 2021-04-02 | 2022-08-23 | Ice Thermal Harvesting, Llc | Systems and methods for generation of electrical power in an organic Rankine cycle operation |
| US11493029B2 (en) | 2021-04-02 | 2022-11-08 | Ice Thermal Harvesting, Llc | Systems and methods for generation of electrical power at a drilling rig |
| US11486370B2 (en) | 2021-04-02 | 2022-11-01 | Ice Thermal Harvesting, Llc | Modular mobile heat generation unit for generation of geothermal power in organic Rankine cycle operations |
| US11236735B1 (en) | 2021-04-02 | 2022-02-01 | Ice Thermal Harvesting, Llc | Methods for generating geothermal power in an organic Rankine cycle operation during hydrocarbon production based on wellhead fluid temperature |
| US12312981B2 (en) | 2021-04-02 | 2025-05-27 | Ice Thermal Harvesting, Llc | Systems and methods utilizing gas temperature as a power source |
| US12180861B1 (en) | 2022-12-30 | 2024-12-31 | Ice Thermal Harvesting, Llc | Systems and methods to utilize heat carriers in conversion of thermal energy |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0941906A (en) * | 1995-07-31 | 1997-02-10 | Mitsubishi Heavy Ind Ltd | Steam turbine generating plant |
| US20080010968A1 (en) * | 2006-07-17 | 2008-01-17 | Dirk Hartmann | Steam Turbine With Heating Steam Extraction and Power Plant With Steam Turbine |
Family Cites Families (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CH350306A (en) * | 1956-08-02 | 1960-11-30 | Licentia Gmbh | Steam turbine with regulated extraction |
| JPS59150909A (en) * | 1983-02-17 | 1984-08-29 | Toshiba Corp | steam turbine plant |
| FR2560636B1 (en) * | 1984-03-01 | 1988-07-08 | Alsthom Atlantique | TURBINE BODY FOR URBAN HEATING |
| ITTO20040758A1 (en) * | 2004-10-29 | 2005-01-29 | Ansaldo Energia Spa | METHOD AND PLANT FOR THE OPERATIONAL RECONVERSION IN COMBINED CYCLE OF PAIRS OF EXISTING STEAM TURBOGRUPPES |
-
2007
- 2007-11-26 US US11/944,991 patent/US20090136337A1/en not_active Abandoned
-
2008
- 2008-11-21 JP JP2008297624A patent/JP2009127627A/en not_active Withdrawn
- 2008-11-24 DE DE102008037579A patent/DE102008037579A1/en not_active Withdrawn
- 2008-11-25 FR FR0858007A patent/FR2924157A1/en not_active Withdrawn
- 2008-11-25 RU RU2008146607/06A patent/RU2008146607A/en not_active Application Discontinuation
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0941906A (en) * | 1995-07-31 | 1997-02-10 | Mitsubishi Heavy Ind Ltd | Steam turbine generating plant |
| US20080010968A1 (en) * | 2006-07-17 | 2008-01-17 | Dirk Hartmann | Steam Turbine With Heating Steam Extraction and Power Plant With Steam Turbine |
Non-Patent Citations (2)
| Title |
|---|
| JP 59-113216 A English Abstract. Accessed JPO website January 2, 2012. 2 pages. * |
| JP 59-150909 A English Abstract. Accessed JPO website January 2, 2012. 2 pages. * |
Cited By (14)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20100146970A1 (en) * | 2008-03-07 | 2010-06-17 | Clean Energy Systems, Inc. | Method and system for enhancing power output of renewable thermal cycle power plants |
| US8631658B2 (en) * | 2008-03-07 | 2014-01-21 | Clean Energy Systems, Inc. | Method and system for enhancing power output of renewable thermal cycle power plants |
| US20100326084A1 (en) * | 2009-03-04 | 2010-12-30 | Anderson Roger E | Methods of oxy-combustion power generation using low heating value fuel |
| US20110247333A1 (en) * | 2010-04-13 | 2011-10-13 | General Electric Company | Double flow low-pressure steam turbine |
| US9631520B2 (en) * | 2011-04-15 | 2017-04-25 | Doosan Babcock Limited | Turbine system |
| US20140283518A1 (en) * | 2011-04-15 | 2014-09-25 | Doosan Babcock Limited | Turbine system |
| CN104204425A (en) * | 2012-04-04 | 2014-12-10 | 西门子公司 | Power plant and method for operating a power plant facility |
| JP2015515573A (en) * | 2012-04-04 | 2015-05-28 | シーメンス アクティエンゲゼルシャフト | Method for operating a power plant and power plant equipment |
| US9574462B2 (en) | 2012-04-04 | 2017-02-21 | Siemens Aktiengesellschaft | Method for operating a power plant installation |
| CN104471199A (en) * | 2012-07-12 | 2015-03-25 | 西门子公司 | Methods used to support grid frequency |
| US20150135721A1 (en) * | 2012-07-12 | 2015-05-21 | Siemens Aktiengesellschaft | Method for supporting a mains frequency |
| AU2014200595B2 (en) * | 2013-02-05 | 2015-10-29 | General Electric Technology Gmbh | Steam power plant with a second low-pressure turbine and an additional condensing system |
| US20140216035A1 (en) * | 2013-02-05 | 2014-08-07 | Alstom Technology Ltd | Steam power plant with a second low-pressure turbine and an additional condensing system |
| US9752461B2 (en) * | 2013-02-05 | 2017-09-05 | General Electric Technology Gmbh | Steam power plant with a second low-pressure turbine and an additional condensing system |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2009127627A (en) | 2009-06-11 |
| RU2008146607A (en) | 2010-05-27 |
| FR2924157A1 (en) | 2009-05-29 |
| DE102008037579A1 (en) | 2009-05-28 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US20090136337A1 (en) | Method and Apparatus for Improved Reduced Load Operation of Steam Turbines | |
| RU2719413C2 (en) | Systems with closed regenerative thermodynamic cycle of electric power generation and methods of their operation | |
| JP5400539B2 (en) | Integration of gas turbine exhaust diffuser and exhaust heat recovery boiler system | |
| US20080245071A1 (en) | Thermal power plant | |
| KR101594323B1 (en) | Power plant with integrated fuel gas preheating | |
| JPH1162515A5 (en) | ||
| US9732635B2 (en) | Method for enhanced cold steam turbine start in a supplementary fired multi gas turbine combined cycle plant | |
| JP2009092372A (en) | Supercritical steam combined cycle and its method | |
| US8505299B2 (en) | Steam turbine flow adjustment system | |
| US9856754B1 (en) | Cascaded recompression closed brayton cycle system | |
| US20130097993A1 (en) | Heat recovery steam generator and methods of coupling same to a combined cycle power plant | |
| US20140096535A1 (en) | Gas turbine system with reheat spray control | |
| JP2011220165A (en) | Steam turbine plant | |
| JP2015161304A (en) | Exhaust plenum for radial diffuser | |
| US9752461B2 (en) | Steam power plant with a second low-pressure turbine and an additional condensing system | |
| EP3244030A1 (en) | A steam power plant with power boost through the use of top heater drain reheating | |
| US10287922B2 (en) | Steam turbine plant, combined cycle plant provided with same, and method of operating steam turbine plant | |
| US9404395B2 (en) | Selective pressure kettle boiler for rotor air cooling applications | |
| US20140069078A1 (en) | Combined Cycle System with a Water Turbine | |
| CN102007274A (en) | Steam turbine system for a power plant | |
| Thern et al. | Temporary CO2 capture shut down: Implications on low pressure steam turbine design and efficiency | |
| US4862692A (en) | Supercritical pressure once-through boiler | |
| JP5977504B2 (en) | Steam-driven power plant | |
| Radin et al. | Specific features relating to development and operation of steam turbines for combined-cycle plants | |
| EP1666699B1 (en) | Combined cycle power plant with gas and steam turbo groups |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AS | Assignment |
Owner name: GENERAL ELECTRIC COMPANY, NEW YORK Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:BOSS, MICHAEL J.;HOFER, DOUGLAS;MUNDRA, KAMLESH;AND OTHERS;REEL/FRAME:020153/0612;SIGNING DATES FROM 20071102 TO 20071119 |
|
| STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |