US20090107062A1 - Lifting Equipment For Handling A Wind Turbine Component And A Method For Handling A Wind Turbine Component - Google Patents
Lifting Equipment For Handling A Wind Turbine Component And A Method For Handling A Wind Turbine Component Download PDFInfo
- Publication number
- US20090107062A1 US20090107062A1 US12/346,257 US34625708A US2009107062A1 US 20090107062 A1 US20090107062 A1 US 20090107062A1 US 34625708 A US34625708 A US 34625708A US 2009107062 A1 US2009107062 A1 US 2009107062A1
- Authority
- US
- United States
- Prior art keywords
- sleeve
- lifting equipment
- base frame
- hole
- wind turbine
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
- B66C1/62—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means comprising article-engaging members of a shape complementary to that of the articles to be handled
- B66C1/66—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means comprising article-engaging members of a shape complementary to that of the articles to be handled for engaging holes, recesses, or abutments on articles specially provided for facilitating handling thereof
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
- B66C1/108—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means for lifting parts of wind turbines
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D13/00—Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
- F03D13/10—Assembly of wind motors; Arrangements for erecting wind motors
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- F05B2240/00—Components
- F05B2240/90—Mounting on supporting structures or systems
- F05B2240/91—Mounting on supporting structures or systems on a stationary structure
- F05B2240/912—Mounting on supporting structures or systems on a stationary structure on a tower
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- F05B2260/00—Function
- F05B2260/30—Retaining components in desired mutual position
- F05B2260/301—Retaining bolts or nuts
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/728—Onshore wind turbines
Definitions
- the invention relates to lifting equipment for handling a wind turbine component and a method for handling a wind turbine component.
- EP patent no. EP-B 1 303 447 discloses an example of a known lifting system wherein an outline of a gripping device for a wind turbine tower segment.
- the gripping device can be fastened to the tower segment in a certain position on the flanges, by screw connections through holes adapted to said flanges.
- the holes in the gripping device are arranged according to the holes in the flanges of the tower section.
- An object of the present invention is to describe a lifting device without the mentioned disadvantages and especially does not involve changing operations of lifting equipment during erection of a wind turbine.
- the invention provides lifting equipment for handling wind turbine components in connection with lifting means, said lifting equipment comprising
- attachment points are adjustable mounted in relation to said base frame.
- the lifting equipment can be adapted and used with a plurality of different wind turbine components where the distance and relative angle between attachment points of the components vary.
- said wind turbine component is a wind turbine tower segment.
- one lifting equipment can be used with any of said tower segments including the lower segments with larger diameters and the upper segments with smaller diameters e.g. when erecting a conical wind turbine tower.
- the same lifting equipment can be used when handling the different segments in connection with manufacturing and transportation.
- the preferred attachment points of wind turbine tower segments are the connection holes of any flange of the segments.
- At least one of said attachment points comprises at least one sleeve with a through going hole which centre is dislocated from the centre of said sleeve in order to perform an eccentric movement within the area of a hole in said base frame. It is hereby ensured that the distance and angle between at least two attachment points of the lifting equipment can be adjusted to desired positions i.e. the sleeve hole may be positioned at a desired position within the area of the hole of the base frame.
- the base frame comprises at least one through going hole, the area of said through going hole in the base frame being substantially larger than the area of said hole in at least one sleeve e.g. at least twice in size in relation to a hole in said at least one sleeve.
- the base frame comprises at least one through going hole, the area of said through going hole in the base frame being substantially larger than the area of said hole in at least one sleeve e.g. at least twice in size in relation to a hole in said at least one sleeve.
- the number of sleeves is two, first and second sleeve, which are partly or totally integrated into each other or into the base frame e.g. in depressed areas of the base frame and sleeve, respectively.
- said first sleeve is located in a depressed area of said base frame and a second sleeve is located in a depressed area of said first sleeve opposite to the base frame.
- the eccentric movement between the holes in said two sleeves and the eccentric movement between the hole in the first sleeve and the hole in the base frame allows a double eccentric movement of the hole in the second sleeve in relation to the base frame. It is hereby ensured that it is possible to place the hole in the second sleeve over any desired position within the area of the hole in the base frame which gives the maximum flexibility of the invented lifting equipment.
- said first sleeve comprises a through going hole with a diameter larger than the diameter of the hole in said second sleeve and said base frame comprises a through going hole with a diameter larger than the diameter of the hole in said first sleeve.
- At least a further attachment point comprises a mounted strut in relation to the base frame. It is hereby ensured that shear stress between the wind turbine component and the invented lifting equipment especially during the initial lifting can be handled by a non-movable part of the lifting tool. Furthermore when placing the invented lifting equipment on its location of operation e.g. on the flange of a wind turbine tower section, the steering of the lifting equipment is eased by using the fixed mounted strut as a guard-pin.
- said strut in relation to the base frame is replaceable e.g. to a strut with another diameter and/or length and/or shape such as triangular or circular.
- a strut with another diameter and/or length and/or shape such as triangular or circular.
- the lifting equipment comprises an area for handling, such as when fixing said lifting equipment to a wind tower component.
- a crane or similar lifting means can be used e.g. when placing the invented lifting equipment on its location of operation and thus ensuring that the operating people are not required to lift the equipment to the location manually.
- said base frame comprises an area for connecting said lifting means e.g. a hole for attaching a crane wire and hook.
- said lifting means e.g. a hole for attaching a crane wire and hook.
- the invention also provides a method for handling a wind turbine component, said method comprising steps of
- FIG. 1 illustrates a large modern wind turbine as seen from the front
- FIG. 2 a illustrates a conventional lifting equipment attached to a wind turbine tower segment
- FIG. 2 b illustrates an exploded view of a conventional lifting equipment attached to a wind turbine tower segment
- FIG. 3 illustrates schematically a section of a wind turbine component
- FIG. 4 a illustrates a three-dimensional view of one embodiment of the universal lifting tool according to the invention
- FIG. 4 b illustrates a first side view of one embodiment of the universal lifting tool according to the invention
- FIG. 4 c illustrates a first cross sectional view of the universal lifting tool according to one embodiment of the invention
- FIG. 4 d illustrates a second side view of one embodiment of the universal lifting tool according to one embodiment of the invention
- FIG. 5 illustrates a second cross sectional view of the universal lifting tool according to one embodiment of the invention
- FIG. 6 a illustrates schematically a three-dimensional view of a preferred embodiment of the invented universal lifting tool according to the present invention
- FIG. 6 b illustrates schematically a first side view of a preferred embodiment of the invention
- FIG. 6 c illustrates schematically a second view of a preferred embodiment of the invention
- FIG. 7 a illustrates schematically the invented universal lifting tool when attached to a wind turbine tower segment with a first radius
- FIG. 7 b illustrates schematically the universal lifting tool according to the invention when attached to a wind turbine tower segment with a second radius
- FIG. 8 illustrates schematically an explored view of a preferred embodiment of the present invention attached to a wind turbine segment
- FIG. 9 illustrates schematically a view of a preferred embodiment of the present invention attached to and lifting a wind turbine tower segment.
- FIG. 1 illustrates a modern wind turbine 1 , comprising a tower 2 and a wind turbine nacelle 4 positioned on top of the tower 2 .
- the tower 2 is build up of a plurality of tower segments 3 .
- the wind turbine rotor 5 comprising three wind turbine blades 6 , is connected to the nacelle 4 through the low speed shaft which extends out of the nacelle 4 front.
- FIG. 2 a illustrates schematically one tower segment 3 with flanges 7 .
- Said flanges are constructed with a number of substantially equally spaced holes or connection points 8 around its centreline which is used for attaching the tower segments 3 when the tower 2 is erected.
- connection points 8 are often used as attachment points for lifting tool 9 during manufacturing, transportation and installation.
- lifting tool 9 can be attached to e.g. 2, 4 or 8 locations distributed around the flange 7 .
- said plurality of different tower segments 3 must be placed on top of each other or on top of a foundation and be securely attached at said attachment points.
- the process of erecting a wind turbine tower comprises steps of
- FIG. 2 b illustrates an exploded view of one embodiment of the prior art of a conventional lifting tool 9 connected to said attachment points 8 during e.g. installation.
- the lifting tool comprises a base frame including an eyelet for the purpose of attaching e.g. a shackle 23 connected to lifting means (e.g. a crane) thru a wire 11 .
- FIG. 3 illustrates an origin to a problem with prior art.
- the distance % between the attachment points 8 and the angle ⁇ relative to horizontal may vary.
- a lifting tool with fixed attachment points can only be attached to a component with attachment points distributed in a similar way.
- the ends of wind turbine tower segments may have different radius and may have a variable number of attachment points, said l and ⁇ may vary in relation to the different tower segments.
- a different set of lifting equipment may therefore be required for each tower section.
- FIG. 4 a illustrates a three-dimensional view of a universal lifting tool 12 according to one embodiment of the present invention.
- the universal lifting tool 12 comprises a base plate 13 , a lifting plate 14 and two side plates 15 which in total constitute a base frame for the invented universal lifting tool.
- the lifting plate 14 comprise an eyelet 21 for the attachment of tower lifting means e.g. via a shackle 23 .
- One of the side plates 15 comprise an eyelet 22 for the attachment of tool lifting means to be used when the invented universal lifting tool 12 is to be manoeuvred to its operating position.
- the invented universal lifting tool 12 is to be attached to three attachment points e.g. 8 of a flange 7 of a wind turbine tower section 3 .
- a middle attachment point comprises a strut 19 that penetrates the base plate 13 and is fastened to the base plate such as with two screws 20 .
- the strut can be replaced dependent on the diameter of the connection points 8 and can be e.g. 30 mm, 36 mm, 42 mm or 48 mm in diameter.
- FIG. 4 b illustrates a first side view of the invented universal lifting tool according to one embodiment and illustrates the strut 19 penetrating the base plate 13 .
- One function of the strut 19 is to carry shear forces between the universal lifting tool 12 and the flanges 7 during said first sequence of lifting at said process of erecting a wind turbine tower 2 .
- FIG. 4 a further illustrates that the two distal connection points of this embodiment 12 each comprises sleeves 16 , 17 and a bush 18 located on top of each other.
- a first sleeve 16 is formed with a substantially circular hole 25 dislocated from the centre point of said first sleeve 16 . Said first sleeve 16 can rotate around its centre point as indicated by the dashed arrows.
- a second sleeve 17 is also formed with a circular hole 26 into which the bush 18 fits.
- the centre of said hole 26 is dislocated from the centre point of said second sleeve 17 .
- Said second sleeve can rotate around its centre point as indicated by the dashed arrows.
- the diameter of said hole 25 in said first sleeve 16 exceeds the diameter of said hole 26 in said second sleeve 17 .
- the base plate 13 is formed with a circular hole 24 for each distal attachment point (shown on FIG. 5 ).
- the diameter of said hole 24 exceeds the diameter of said hole 25 of the second sleeve 16 .
- one lifting equipment 12 can be adapted to the connection points 8 of any tower section 3 despite of the angle ⁇ and distance l between the points 8 .
- FIG. 4 c an exploded view of the attachment point 16 b - 18 b , 13 of one embodiment of the lifting tool 12 is shown. It is illustrated that the holes 25 , 26 in said first and second sleeve 16 b , 17 b respectively is dislocated from their centrelines c 1 , c 2 and that dependent on the rotation of the sleeves 16 b , 17 b in relation to the base frame 13 , the hole 26 in the second sleeve 17 can be brought in position within the area of said hole 24 .
- FIG. 4 d illustrates a second side view of one embodiment of the invented lifting equipment. It is illustrated that the angle between the lifting plate 14 and the base plate 13 may be different from 90 degrees.
- FIG. 5 illustrates a cross sectional view of one embodiment of the invented lifting equipment comprising a base plate 13 , a first sleeve 16 , a second sleeve 17 and a bush 18 .
- first sleeve 16 can be countersunk and fitted in the base plate 13 .
- a pointed screw 28 is used for the purpose of keeping said first sleeve 16 positioned during maneuvering of the lifting equipment.
- the second sleeve 17 can be countersunk and fitted in the first sleeve 16 .
- a pointed screw 28 is used for the purpose of keeping said second sleeve 17 positioned during maneuvering of the lifting equipment.
- FIGS. 6 a , 6 b and 6 c illustrates different views of a preferred embodiment of the invented universal lifting tool.
- the universal lifting tool 12 comprises a base plate 13 that constitute a base frame and an eyelet 21 for the attachment of tower lifting means.
- FIG. 6 a further illustrates that two connection points of this preferred embodiment 12 each comprises sleeves 16 , 17 and a bush 18 located on top of each other.
- This example of a preferred embodiment is to be attached to three attachment points e.g. 8 of a flange 7 of a wind turbine tower section 3 .
- a middle attachment point (not illustrated in FIG. 6 a ) comprises a strut 19 fastened to the base plate 13 .
- the strut can be replaced dependent on the diameter of the connection points 8 and can be e.g. 30 mm, 36 mm, 42 mm or 48 mm in diameter.
- first sleeve 16 is formed with a substantially circular hole 25 (not illustrated at FIG. 6 a .) dislocated from the centre point of said first sleeve 16 . Said first sleeve 16 can rotate around its centre point as indicated by the dashed arrows.
- a second sleeve 17 is also formed with a circular hole 26 (not illustrated on FIG. 6 a ) into which the bush 18 fits.
- the centre of said hole 26 is dislocated from the centre point of said second sleeve 17 .
- Said second sleeve can rotate around its centre point as indicated by the dashed arrows.
- the diameter of said hole 25 in said first sleeve 16 exceeds the diameter of said hole 26 in said second sleeve 17 .
- one lifting equipment 12 can be adapted to the connection points 8 of any tower section 3 despite of the angle ⁇ and distance l between the points 8 .
- the eyelet 21 is constructed in such a way that it penetrates the base plate 13 allowing tower lifting means comprising one or more lifting wires to be established through said eyelet 21 . This is further illustrated in FIG. 8 .
- the entrance/exit traces of the eyelet 21 are curved and angled as to minimize stress on the wires and the base plate 13 .
- portions of the entrance/exit traces of the eyelet 21 are rotatable parts 27 and can follow any variation in angulation that occur e.g. when a connected horizontal positioned tower segment is raised to vertical position.
- FIG. 6 b illustrates a first side view of a preferred embodiment of the invention comprising a strut 19 .
- FIG. 6 c illustrates a second view of a preferred embodiment of the invention.
- FIGS. 7 a and 7 b illustrates schematically one embodiment of the invented universal lifting tool 12 attached to flanges 7 of wind turbine tower sections 3 with two different diameters.
- FIG. 7 a illustrates a preferred positioning of the two sleeves 16 and 17 for a flange 7 with a first radius r 1 .
- FIG. 7 b illustrates a preferred positioning of the two sleeves eccentrics 16 and 17 for a flange 7 with a second radius r 2 (i.e. r 1 >r 2 ).
- FIG. 8 illustrates schematically a preferred embodiment of the invented universal lifting tool 12 attached to flanges 7 of a wind turbine tower section 3 and with attached lifting wire 11 .
- FIG. 9 illustrates schematically the invented universal lifting tools 12 attached to a wind turbine tower segment 3 when the segment is lifted to substantially vertical position.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Sustainable Development (AREA)
- Sustainable Energy (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- General Engineering & Computer Science (AREA)
- Wind Motors (AREA)
- Structures Of Non-Positive Displacement Pumps (AREA)
Abstract
The invention relates to a lifting equipment for handling a wind turbine component in connection with lifting means. The equipment comprises a base frame with at least one attachment area, and at least two attachment points for said wind turbine component. The at least one of said attachment points are adjustable mounted in relation to said base frame.
The invention also relates to a method for handling a wind turbine component.
Description
- The present application is a continuation of pending International patent application PCT/DK2007/000313 filed on Jun. 27, 2007 which designates the United States and claims priority from Danish patent application PA 2006 00893 filed on Jun. 30, 2006, the content of which is incorporated herein by reference.
- The invention relates to lifting equipment for handling a wind turbine component and a method for handling a wind turbine component.
- Transportation and lifting of the different sections of a wind turbine is always a challenge and especially wind towers or tower segments are quite unmanageable. The shape and dimensions of the units vary from unit to unit e.g. because of the conical shape of wind towers.
- Usually the tower segments of a wind turbine are mounted with lifting equipment at the tower flanges.
- EP patent no. EP-
B 1 303 447 discloses an example of a known lifting system wherein an outline of a gripping device for a wind turbine tower segment. The gripping device can be fastened to the tower segment in a certain position on the flanges, by screw connections through holes adapted to said flanges. The holes in the gripping device are arranged according to the holes in the flanges of the tower section. - A problem with the solution of the above mentioned EP-patent is that due to the unlike attachment points on the different segments, different unique gripping devices has to be produced and used when erecting a wind turbine. Consequently the erection process will be prolonged and more expensive than necessary.
- An object of the present invention is to describe a lifting device without the mentioned disadvantages and especially does not involve changing operations of lifting equipment during erection of a wind turbine.
- The invention provides lifting equipment for handling wind turbine components in connection with lifting means, said lifting equipment comprising
- a base frame with at least one attachment area, and
- at least two attachment points for said wind turbine component
- where at least one of said attachment points are adjustable mounted in relation to said base frame.
- Hereby it is ensured that the lifting equipment can be adapted and used with a plurality of different wind turbine components where the distance and relative angle between attachment points of the components vary.
- In one aspect of the invention said wind turbine component is a wind turbine tower segment. Hereby it is ensured that one lifting equipment can be used with any of said tower segments including the lower segments with larger diameters and the upper segments with smaller diameters e.g. when erecting a conical wind turbine tower. Furthermore the same lifting equipment can be used when handling the different segments in connection with manufacturing and transportation.
- The preferred attachment points of wind turbine tower segments are the connection holes of any flange of the segments.
- In another aspect of the invention at least one of said attachment points comprises at least one sleeve with a through going hole which centre is dislocated from the centre of said sleeve in order to perform an eccentric movement within the area of a hole in said base frame. It is hereby ensured that the distance and angle between at least two attachment points of the lifting equipment can be adjusted to desired positions i.e. the sleeve hole may be positioned at a desired position within the area of the hole of the base frame.
- In another aspect of the invention the base frame comprises at least one through going hole, the area of said through going hole in the base frame being substantially larger than the area of said hole in at least one sleeve e.g. at least twice in size in relation to a hole in said at least one sleeve. Hereby it is possible to achieve a high degree of freedom to place the hole of the sleeve anywhere within the area of the hole of the base frame.
- In another aspect of the invention the number of sleeves is two, first and second sleeve, which are partly or totally integrated into each other or into the base frame e.g. in depressed areas of the base frame and sleeve, respectively. By integrating the sleeves into each other an enhanced stability can be ensured. Further by entering locking means thru the sleeves and base frame at the integration areas it is possible in an embodiment to lock them to each other e.g. during transportation, positioning etc.
- In a further aspect of the invention said first sleeve is located in a depressed area of said base frame and a second sleeve is located in a depressed area of said first sleeve opposite to the base frame. Hereby it is achieved a higher stability in especially a perpendicular direction in relation to the attachment of the wind turbine component.
- In an even further aspect of the invention the eccentric movement between the holes in said two sleeves and the eccentric movement between the hole in the first sleeve and the hole in the base frame allows a double eccentric movement of the hole in the second sleeve in relation to the base frame. It is hereby ensured that it is possible to place the hole in the second sleeve over any desired position within the area of the hole in the base frame which gives the maximum flexibility of the invented lifting equipment.
- In another aspect of the invention said first sleeve comprises a through going hole with a diameter larger than the diameter of the hole in said second sleeve and said base frame comprises a through going hole with a diameter larger than the diameter of the hole in said first sleeve. Hereby is an advantageous embodiment of the invention achieved.
- In another aspect of the invention at least a further attachment point comprises a mounted strut in relation to the base frame. It is hereby ensured that shear stress between the wind turbine component and the invented lifting equipment especially during the initial lifting can be handled by a non-movable part of the lifting tool. Furthermore when placing the invented lifting equipment on its location of operation e.g. on the flange of a wind turbine tower section, the steering of the lifting equipment is eased by using the fixed mounted strut as a guard-pin.
- In another aspect of the invention said strut in relation to the base frame is replaceable e.g. to a strut with another diameter and/or length and/or shape such as triangular or circular. Hereby it is ensured that an optimal elaborated strut can be used and adapted to the invented lifting equipment dependent of e.g. the elaboration of the attachment point or attachment area.
- In another aspect of the invention the lifting equipment comprises an area for handling, such as when fixing said lifting equipment to a wind tower component. Hereby it is ensured that a crane or similar lifting means can be used e.g. when placing the invented lifting equipment on its location of operation and thus ensuring that the operating people are not required to lift the equipment to the location manually.
- In another aspect of the invention said base frame comprises an area for connecting said lifting means e.g. a hole for attaching a crane wire and hook. Hereby it is ensured that a crane or similar lifting means can advantageously be used after placing the invented lifting equipment on its location of operation.
- The invention also provides a method for handling a wind turbine component, said method comprising steps of
- attaching lifting equipment according to one of the above-described embodiments to said wind turbine component,
- connecting lifting means to said lifting equipment, and
- handling the wind turbine component to a desired position.
- Hereby is an advantageous method to be used with the lifting equipment achieved.
- The invention will be described in the following with reference to the figures in which
-
FIG. 1 illustrates a large modern wind turbine as seen from the front, -
FIG. 2 a illustrates a conventional lifting equipment attached to a wind turbine tower segment, -
FIG. 2 b illustrates an exploded view of a conventional lifting equipment attached to a wind turbine tower segment, -
FIG. 3 illustrates schematically a section of a wind turbine component, -
FIG. 4 a illustrates a three-dimensional view of one embodiment of the universal lifting tool according to the invention, -
FIG. 4 b illustrates a first side view of one embodiment of the universal lifting tool according to the invention, -
FIG. 4 c illustrates a first cross sectional view of the universal lifting tool according to one embodiment of the invention, -
FIG. 4 d illustrates a second side view of one embodiment of the universal lifting tool according to one embodiment of the invention, -
FIG. 5 illustrates a second cross sectional view of the universal lifting tool according to one embodiment of the invention, -
FIG. 6 a illustrates schematically a three-dimensional view of a preferred embodiment of the invented universal lifting tool according to the present invention, -
FIG. 6 b illustrates schematically a first side view of a preferred embodiment of the invention, -
FIG. 6 c illustrates schematically a second view of a preferred embodiment of the invention, -
FIG. 7 a illustrates schematically the invented universal lifting tool when attached to a wind turbine tower segment with a first radius, -
FIG. 7 b illustrates schematically the universal lifting tool according to the invention when attached to a wind turbine tower segment with a second radius, -
FIG. 8 illustrates schematically an explored view of a preferred embodiment of the present invention attached to a wind turbine segment, and -
FIG. 9 illustrates schematically a view of a preferred embodiment of the present invention attached to and lifting a wind turbine tower segment. -
FIG. 1 illustrates amodern wind turbine 1, comprising atower 2 and awind turbine nacelle 4 positioned on top of thetower 2. Thetower 2 is build up of a plurality oftower segments 3. Thewind turbine rotor 5, comprising threewind turbine blades 6, is connected to thenacelle 4 through the low speed shaft which extends out of thenacelle 4 front. -
FIG. 2 a illustrates schematically onetower segment 3 withflanges 7. Said flanges are constructed with a number of substantially equally spaced holes orconnection points 8 around its centreline which is used for attaching thetower segments 3 when thetower 2 is erected. - Besides for used in the purpose of attaching the tower segments to each other, the connection points 8 are often used as attachment points for lifting
tool 9 during manufacturing, transportation and installation. As an example when erecting awind turbine tower 2,lifting tool 9 can be attached to e.g. 2, 4 or 8 locations distributed around theflange 7. - During installation and erection of a
wind turbine tower 2 said plurality ofdifferent tower segments 3 must be placed on top of each other or on top of a foundation and be securely attached at said attachment points. - The process of erecting a wind turbine tower comprises steps of
-
- attaching
lifting tool flange 7, - attaching lifting means to said
lifting tool - a first sequence of lifting the
tower section 3 from the ground. In this sequence the forces acting between thetower section 3 and thelifting tool tower section 3 is in substantially horizontal position) to primarily tension forces (when thetower section 3 is free of the ground and is in substantially vertical position), - a second sequence of positioning the
tower section 3 to its installation position on top of a foundation or another tower section 3, and - a third sequence of attaching and securing the
tower section 3.
- attaching
-
FIG. 2 b illustrates an exploded view of one embodiment of the prior art of aconventional lifting tool 9 connected to said attachment points 8 during e.g. installation. The lifting tool comprises a base frame including an eyelet for the purpose of attaching e.g. ashackle 23 connected to lifting means (e.g. a crane) thru awire 11. - During lifting the clamping
bolts 10 are exposed to the gravitational forces of the tower via sheer and tension and must be dimensioned to comply with this. -
FIG. 3 illustrates an origin to a problem with prior art. Dependent on the construction of e.g. theflanges 7 of a windturbine tower segment 3, the distance % between the attachment points 8 and the angle α relative to horizontal may vary. This means that a lifting tool with fixed attachment points can only be attached to a component with attachment points distributed in a similar way. As e.g. the ends of wind turbine tower segments may have different radius and may have a variable number of attachment points, said l and α may vary in relation to the different tower segments. For the purpose of lifting, a different set of lifting equipment may therefore be required for each tower section. -
FIG. 4 a illustrates a three-dimensional view of auniversal lifting tool 12 according to one embodiment of the present invention. - For this embodiment the
universal lifting tool 12 comprises abase plate 13, a liftingplate 14 and twoside plates 15 which in total constitute a base frame for the invented universal lifting tool. - The lifting
plate 14 comprise aneyelet 21 for the attachment of tower lifting means e.g. via ashackle 23. - One of the
side plates 15 comprise aneyelet 22 for the attachment of tool lifting means to be used when the inventeduniversal lifting tool 12 is to be manoeuvred to its operating position. - In one embodiment the invented
universal lifting tool 12 is to be attached to three attachment points e.g. 8 of aflange 7 of a windturbine tower section 3. - A middle attachment point comprises a
strut 19 that penetrates thebase plate 13 and is fastened to the base plate such as with twoscrews 20. The strut can be replaced dependent on the diameter of the connection points 8 and can be e.g. 30 mm, 36 mm, 42 mm or 48 mm in diameter. -
FIG. 4 b illustrates a first side view of the invented universal lifting tool according to one embodiment and illustrates thestrut 19 penetrating thebase plate 13. - One function of the
strut 19 is to carry shear forces between theuniversal lifting tool 12 and theflanges 7 during said first sequence of lifting at said process of erecting awind turbine tower 2. -
FIG. 4 a further illustrates that the two distal connection points of thisembodiment 12 each comprisessleeves bush 18 located on top of each other. - A
first sleeve 16 is formed with a substantiallycircular hole 25 dislocated from the centre point of saidfirst sleeve 16. Saidfirst sleeve 16 can rotate around its centre point as indicated by the dashed arrows. - A
second sleeve 17 is also formed with acircular hole 26 into which thebush 18 fits. The centre of saidhole 26 is dislocated from the centre point of saidsecond sleeve 17. Said second sleeve can rotate around its centre point as indicated by the dashed arrows. - The diameter of said
hole 25 in saidfirst sleeve 16 exceeds the diameter of saidhole 26 in saidsecond sleeve 17. - For the described embodiment of the invention, the
base plate 13 is formed with acircular hole 24 for each distal attachment point (shown onFIG. 5 ). The diameter of saidhole 24 exceeds the diameter of saidhole 25 of thesecond sleeve 16. - By placing the first 16 and second 17 sleeve on the
base plate 13 as illustrated inFIG. 4 a, and furthermore rotating them in relation to each other, it is possible to bring saidhole 26 in thesecond sleeve 17 in position within the area of saidhole 24 in thebase plate 13 as desired with the positive result, that the distance l and the angle α relative to the fixed attachment point embodied by thestrut 19, can be changed to desired. - It is hereby achieved that one
lifting equipment 12 can be adapted to the connection points 8 of anytower section 3 despite of the angle α and distance l between thepoints 8. - This is further illustrated in
FIG. 4 c where an exploded view of theattachment point 16 b-18 b, 13 of one embodiment of thelifting tool 12 is shown. It is illustrated that theholes second sleeve sleeves base frame 13, thehole 26 in thesecond sleeve 17 can be brought in position within the area of saidhole 24. -
FIG. 4 d illustrates a second side view of one embodiment of the invented lifting equipment. It is illustrated that the angle between the liftingplate 14 and thebase plate 13 may be different from 90 degrees. -
FIG. 5 illustrates a cross sectional view of one embodiment of the invented lifting equipment comprising abase plate 13, afirst sleeve 16, asecond sleeve 17 and abush 18. - In one embodiment the
first sleeve 16 can be countersunk and fitted in thebase plate 13. For said embodiment apointed screw 28 is used for the purpose of keeping saidfirst sleeve 16 positioned during maneuvering of the lifting equipment. - In another embodiment the
second sleeve 17 can be countersunk and fitted in thefirst sleeve 16. For said embodiment apointed screw 28 is used for the purpose of keeping saidsecond sleeve 17 positioned during maneuvering of the lifting equipment. -
FIGS. 6 a, 6 b and 6 c illustrates different views of a preferred embodiment of the invented universal lifting tool. - As illustrated in
FIG. 6 a for this preferred embodiment, theuniversal lifting tool 12 comprises abase plate 13 that constitute a base frame and aneyelet 21 for the attachment of tower lifting means. -
FIG. 6 a further illustrates that two connection points of thispreferred embodiment 12 each comprisessleeves bush 18 located on top of each other. - This example of a preferred embodiment is to be attached to three attachment points e.g. 8 of a
flange 7 of a windturbine tower section 3. - A middle attachment point (not illustrated in
FIG. 6 a) comprises astrut 19 fastened to thebase plate 13. For various embodiments the strut can be replaced dependent on the diameter of the connection points 8 and can be e.g. 30 mm, 36 mm, 42 mm or 48 mm in diameter. - Further a
first sleeve 16 is formed with a substantially circular hole 25 (not illustrated atFIG. 6 a.) dislocated from the centre point of saidfirst sleeve 16. Saidfirst sleeve 16 can rotate around its centre point as indicated by the dashed arrows. - A
second sleeve 17 is also formed with a circular hole 26 (not illustrated onFIG. 6 a) into which thebush 18 fits. The centre of saidhole 26 is dislocated from the centre point of saidsecond sleeve 17. Said second sleeve can rotate around its centre point as indicated by the dashed arrows. - The diameter of said
hole 25 in saidfirst sleeve 16 exceeds the diameter of saidhole 26 in saidsecond sleeve 17. - By placing the first 16 and second 17 sleeve on the
base plate 13 as illustrated inFIG. 6 a, and furthermore rotating them in relation to each other, it is possible to bring saidhole 26 in thesecond sleeve 17 in position within the area of saidhole 24 in thebase plate 13 as desired with the positive result, that the distance l and the angle α relative to the fixed attachment point embodied by thestrut 19, can be changed to desired. - It is hereby achieved that one
lifting equipment 12 can be adapted to the connection points 8 of anytower section 3 despite of the angle α and distance l between thepoints 8. - For one preferred embodiment the
eyelet 21 is constructed in such a way that it penetrates thebase plate 13 allowing tower lifting means comprising one or more lifting wires to be established through saideyelet 21. This is further illustrated inFIG. 8 . - The entrance/exit traces of the
eyelet 21 are curved and angled as to minimize stress on the wires and thebase plate 13. - For various preferred embodiments, portions of the entrance/exit traces of the
eyelet 21 arerotatable parts 27 and can follow any variation in angulation that occur e.g. when a connected horizontal positioned tower segment is raised to vertical position. -
FIG. 6 b illustrates a first side view of a preferred embodiment of the invention comprising astrut 19. -
FIG. 6 c illustrates a second view of a preferred embodiment of the invention. -
FIGS. 7 a and 7 b illustrates schematically one embodiment of the inventeduniversal lifting tool 12 attached toflanges 7 of windturbine tower sections 3 with two different diameters. -
FIG. 7 a illustrates a preferred positioning of the twosleeves flange 7 with a first radius r1. -
FIG. 7 b illustrates a preferred positioning of the twosleeves eccentrics flange 7 with a second radius r2 (i.e. r1>r2). -
FIG. 8 illustrates schematically a preferred embodiment of the inventeduniversal lifting tool 12 attached toflanges 7 of a windturbine tower section 3 and with attached liftingwire 11. -
FIG. 9 illustrates schematically the inventeduniversal lifting tools 12 attached to a windturbine tower segment 3 when the segment is lifted to substantially vertical position.
Claims (17)
1. Lifting equipment for handling a wind turbine component in connection with lifting means
said equipment comprising
a base frame with at least one attachment area, and
at least two attachment points for said wind turbine component
characterized in that
at least one of said attachment points are adjustable mounted in order to perform an eccentric movement in relation to said base frame.
2. Lifting equipment according to claim 1 , wherein said wind turbine component is a wind turbine tower segment.
3. Lifting equipment according to claim 1 , wherein at least one of said attachment points comprises at least one sleeve with a through going hole which centre is dislocated from the centre of said sleeve in order to perform an eccentric movement within the area of a hole in said base frame.
4. Lifting equipment according to any of claims 1 , wherein said base frame comprises at least one through going hole, said through going hole in base frame being substantially larger than said hole in at least one sleeve.
5. Lifting equipment according to claim 3 , wherein the number of sleeves is two, first and second sleeve, which are partly or totally integrated into each other or into the base frame.
6. Lifting equipment according to claim 3 , wherein said first sleeve is located in a depressed area of said base frame and a second sleeve is located in a depressed area of said first sleeve opposite to the base frame.
7. Lifting equipment according to claim 3 , wherein the eccentric movement between the holes in said two sleeves and the eccentric movement between the hole in the first sleeve and the hole in the base frame allows a double eccentric movement of the hole in the second sleeve in relation to the base frame.
8. Lifting equipment according to claim 4 , wherein said first sleeve comprises a through going hole with a diameter larger than the diameter of a hole in a second sleeve and said base frame comprises a through going hole with a diameter larger than the diameter of the hole in said first sleeve.
9. Lifting equipment according to claim 1 , wherein at least a further attachment point comprises a mounted strut in relation to the base frame.
10. Lifting equipment according to claim 9 , wherein said strut in relation to the base frame is replaceable e.g. to a strut with an other diameter and/or length and/or shape such as triangular or circular
11. Lifting equipment according to claim 1 , wherein the lifting equipment comprises an area for handling, such as when fixing said lifting equipment to a wind tower component.
12. Lifting equipment according to claim 1 , wherein said base frame comprises an area for connecting said lifting means.
13. Lifting equipment according to claim 12 , wherein said area for connecting lifting means comprises rotatable parts.
14. A method for handling a wind turbine component, said method comprising steps of
attaching lifting equipment to said wind turbine component by performing an eccentric movement of at least one attachment points included in the equipment,
connecting lifting means to said lifting equipment, and
handling the wind turbine component to a desired position.
15. Lifting equipment according to claim 4 wherein said hole in base frame is at least twice the size of said hole in said sleeve.
16. The lifting equipment according to claim 5 wherein the depressed areas of the base frame and first sleeve are at least partly integrated into each other.
17. Lifting equipment according to claim 12 wherein said lifting means is a hole for attaching a crane wire and hook.
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DKPA200600893 | 2006-06-30 | ||
DKPA200600893 | 2006-06-30 | ||
PCT/DK2007/000313 WO2008000262A1 (en) | 2006-06-30 | 2007-06-27 | Lifting equipment for handling a wind turbine component and a method for handling a wind turbine component |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/DK2007/000313 Continuation WO2008000262A1 (en) | 2006-06-30 | 2007-06-27 | Lifting equipment for handling a wind turbine component and a method for handling a wind turbine component |
Publications (1)
Publication Number | Publication Date |
---|---|
US20090107062A1 true US20090107062A1 (en) | 2009-04-30 |
Family
ID=38515844
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US12/346,257 Abandoned US20090107062A1 (en) | 2006-06-30 | 2008-12-30 | Lifting Equipment For Handling A Wind Turbine Component And A Method For Handling A Wind Turbine Component |
Country Status (11)
Country | Link |
---|---|
US (1) | US20090107062A1 (en) |
EP (1) | EP2035316B1 (en) |
CN (1) | CN101479179B (en) |
AT (1) | ATE491665T1 (en) |
AU (1) | AU2007264206B2 (en) |
BR (1) | BRPI0712840A2 (en) |
CA (1) | CA2654273A1 (en) |
DE (1) | DE602007011264D1 (en) |
ES (1) | ES2357451T3 (en) |
MX (1) | MX2008016378A (en) |
WO (1) | WO2008000262A1 (en) |
Cited By (28)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100078950A1 (en) * | 2008-09-29 | 2010-04-01 | Inda Jeremy P | Lifting Assembly |
US20100139181A1 (en) * | 2008-12-10 | 2010-06-10 | Alejandro Cortina-Cordero | Method for mounting in sections an annular tower for wind power generator, heliostatic power generator or chimney composed from three concrete segments or more |
US20110037279A1 (en) * | 2009-08-14 | 2011-02-17 | Mjt Holdings, Llc | Tower Erection Lift Kit Tools |
US20110109106A1 (en) * | 2009-11-06 | 2011-05-12 | Jeremy Inda | Lifting Assembly |
WO2011086205A1 (en) * | 2010-01-14 | 2011-07-21 | Gamesa Innovation & Technology, S.L. | Blade lifting element and method followed |
CN102275809A (en) * | 2011-07-07 | 2011-12-14 | 中国十七冶集团有限公司 | Special-purposed bidirectional regulation combined lifting appliance for lifting tower drum of wind driven generator |
US20110316297A1 (en) * | 2009-03-17 | 2011-12-29 | Spanset-Secutex Gmbh | Sling Element and Combination Consisting of a Sling Element and a Fastening Means |
ES2371703A1 (en) * | 2010-01-14 | 2012-01-09 | GAMESA INNOVATION & TECHNOLOGY, S.L. | Element for leaf of shovel and method followed. (Machine-translation by Google Translate, not legally binding) |
ES2371709A1 (en) * | 2010-03-12 | 2012-01-09 | GAMESA INNOVATION & TECHNOLOGY S.L. | Element for leaf of shovel. (Machine-translation by Google Translate, not legally binding) |
WO2012101023A3 (en) * | 2011-01-26 | 2012-10-04 | Wobben Properties Gmbh | Method and device for erecting a tower for a wind energy plant |
US20150121987A1 (en) * | 2013-11-01 | 2015-05-07 | Thomas J. Flynn | Lift pin and die |
US9101551B2 (en) | 2013-10-09 | 2015-08-11 | The Procter & Gamble Company | Personal cleansing compositions and methods |
US20170030101A1 (en) * | 2014-04-14 | 2017-02-02 | Vestas Wind Systems A/S | Tower segment handling method and apparatus |
US9655821B2 (en) | 2013-04-05 | 2017-05-23 | The Procter & Gamble Company | Personal care composition comprising a pre-emulsified formulation |
US9657495B2 (en) * | 2015-10-14 | 2017-05-23 | James D. Lockwood | Crane system incorporated into a tower |
EP3214235A1 (en) * | 2016-03-05 | 2017-09-06 | HALFEN GmbH | Connection system for connecting prefabricated concrete parts |
US9993404B2 (en) | 2015-01-15 | 2018-06-12 | The Procter & Gamble Company | Translucent hair conditioning composition |
US10357875B2 (en) * | 2017-10-30 | 2019-07-23 | Jordan T. Mefferd | Tool and rigging holding device |
USD863017S1 (en) | 2018-06-12 | 2019-10-15 | Jordan T. Mefferd | Tool and rigging holder |
US10773375B2 (en) | 2017-10-30 | 2020-09-15 | Jordan T. Mefferd | Tool and rigging holding device |
US10806688B2 (en) | 2014-10-03 | 2020-10-20 | The Procter And Gamble Company | Method of achieving improved volume and combability using an anti-dandruff personal care composition comprising a pre-emulsified formulation |
US10912723B2 (en) | 2016-01-20 | 2021-02-09 | The Procter And Gamble Company | Hair conditioning composition comprising monoalkyl glyceryl ether |
US10966916B2 (en) | 2014-11-10 | 2021-04-06 | The Procter And Gamble Company | Personal care compositions |
US10987290B2 (en) | 2017-10-20 | 2021-04-27 | The Procter And Gamble Company | Aerosol foam skin cleanser |
US11207261B2 (en) | 2014-11-10 | 2021-12-28 | The Procter And Gamble Company | Personal care compositions with two benefit phases |
US11207248B2 (en) | 2014-11-10 | 2021-12-28 | The Procter And Gamble Company | Personal care compositions with two benefit phases |
US11365397B2 (en) | 2018-11-29 | 2022-06-21 | The Procter & Gamble Company | Methods for screening personal care products |
US11419805B2 (en) | 2017-10-20 | 2022-08-23 | The Procter & Gamble Company | Aerosol foam skin cleanser |
Families Citing this family (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
NL1035301C1 (en) * | 2008-04-16 | 2008-06-04 | Dhlc | Lifting and lowering method for e.g. wind turbine blade, comprises modular hoist mounted on rotor casing with aid of support and pulley blocks |
DE102008051015A1 (en) | 2008-10-13 | 2010-04-22 | Spanset-Secutex Gmbh | stop bracket |
DE102009011478A1 (en) * | 2009-03-06 | 2010-09-09 | Repower Systems Ag | Handling device for rotor blade bearings |
DK2456710T3 (en) * | 2009-07-24 | 2013-10-14 | Siemens Ag | Lifting brackets |
WO2011131254A2 (en) * | 2010-04-21 | 2011-10-27 | Siemens Aktiengesellschaft | Fixture and frame which is connectable to an end of a member and method for connecting a fixture to an end of a member |
WO2011137937A2 (en) * | 2010-05-05 | 2011-11-10 | Siemens Aktiengesellschaft | Tagline bracket for hub lift |
ES2396436T3 (en) | 2010-06-29 | 2013-02-21 | Siemens Aktiengesellschaft | Arrangement for raising a tower wall part of a wind turbine and method for raising a tower wall part of a wind turbine |
DK2580468T3 (en) | 2010-07-13 | 2018-01-02 | Siemens Ag | LIFTING AND LEADING DEVICE FOR HANDLING OF WINDOW TOWER SECTIONS |
ES2572738T3 (en) * | 2011-12-16 | 2016-06-02 | Vestas Wind Systems A/S | System and method to manipulate wind turbine tower sections |
CN103434922A (en) * | 2013-09-12 | 2013-12-11 | 中国海洋石油总公司 | Lifting point of all-rotation shell flange |
CN103434920A (en) * | 2013-09-12 | 2013-12-11 | 中国海洋石油总公司 | Lifting point of plate-type traction shell flange |
CN103434923A (en) * | 2013-09-12 | 2013-12-11 | 中国海洋石油总公司 | Lifting point of plate-type shell flange |
EP3356278B2 (en) | 2015-10-01 | 2023-11-08 | Vestas Wind Systems A/S | A lifting arrangement for lifting a wind turbine component |
EP3214234B1 (en) * | 2016-03-05 | 2020-01-29 | HALFEN GmbH | Prefabricated parts connector and connection system for connecting prefabricated concrete parts |
DK3519342T3 (en) | 2016-09-30 | 2020-07-27 | Vestas Wind Sys As | EQUIPMENT FOR HANDLING A WIND TURNING COMPONENT AND METHOD OF ASSEMBLING SUCH EQUIPMENT AND HANDLING OF A WIND TURNING COMPONENT USING SUCH EQUIPMENT |
DK179603B1 (en) * | 2017-06-20 | 2019-02-26 | Envision Energy (Denmark) Aps | Lifting system for a moment bearing, a method of mounting and dismounting a moment bearing and use of such lifting system |
DE102019111104A1 (en) * | 2019-04-30 | 2020-11-05 | Achim Franke | Lifting clamp |
CN111675077A (en) * | 2020-06-17 | 2020-09-18 | 徐州徐工基础工程机械有限公司 | Lifting device of double-wheel mixer |
EP4390117A1 (en) | 2022-12-19 | 2024-06-26 | Wobben Properties GmbH | Lifting means for lifting a component of a wind turbine |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1097185A (en) * | 1913-04-22 | 1914-05-19 | Henry C Oehrle | Coupling-bolt. |
US3006443A (en) * | 1954-12-20 | 1961-10-31 | Joseph T Siler | Method and apparatus for attaching juxtaposed members |
US3686877A (en) * | 1971-02-18 | 1972-08-29 | Albert G Bodin | Sonic method and apparatus for installing off-shore caissons for oil operations and the like |
US3783496A (en) * | 1968-12-19 | 1974-01-08 | J Siler | Method of assembling members having misaligned holes |
US4621962A (en) * | 1984-11-09 | 1986-11-11 | Rozniecki Edward J | Adjustment structure |
US4817417A (en) * | 1987-05-06 | 1989-04-04 | Westinghouse Electric Corp. | Double eccentric mount |
US5141357A (en) * | 1991-01-09 | 1992-08-25 | Sundstrand Corp. | Misalignment compensating fastener insert |
US5207468A (en) * | 1992-05-27 | 1993-05-04 | Georges Saulnier | Self-adjusting transformer sling |
US5653556A (en) * | 1995-10-10 | 1997-08-05 | American Piledriving Equipment, Inc. | Clamping apparatus and methods for driving caissons into the earth |
US6357549B1 (en) * | 1999-06-03 | 2002-03-19 | D. H. Blattner & Sons, Inc. | Guide rail climbing lifting platform and method |
US20050242051A1 (en) * | 1999-01-13 | 2005-11-03 | Porebski James J | Portable lift, support, removal and/or installation system and method |
US20060055188A1 (en) * | 2003-02-26 | 2006-03-16 | Michael Koch | Load-receiving device |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1236995C (en) * | 2000-07-10 | 2006-01-18 | 阿洛伊斯·沃本 | Device for handling unit loads |
WO2003100178A1 (en) * | 2002-05-27 | 2003-12-04 | Vestas Wind Systems A/S | Methode of mounting a wind turbine, a wind turbine foundation anda wind turbine assembly |
-
2007
- 2007-06-27 EP EP07785721A patent/EP2035316B1/en active Active
- 2007-06-27 DE DE602007011264T patent/DE602007011264D1/en active Active
- 2007-06-27 AU AU2007264206A patent/AU2007264206B2/en not_active Ceased
- 2007-06-27 AT AT07785721T patent/ATE491665T1/en not_active IP Right Cessation
- 2007-06-27 CA CA002654273A patent/CA2654273A1/en not_active Abandoned
- 2007-06-27 MX MX2008016378A patent/MX2008016378A/en active IP Right Grant
- 2007-06-27 BR BRPI0712840-1A patent/BRPI0712840A2/en not_active Application Discontinuation
- 2007-06-27 WO PCT/DK2007/000313 patent/WO2008000262A1/en active Application Filing
- 2007-06-27 ES ES07785721T patent/ES2357451T3/en active Active
- 2007-06-27 CN CN2007800244305A patent/CN101479179B/en active Active
-
2008
- 2008-12-30 US US12/346,257 patent/US20090107062A1/en not_active Abandoned
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1097185A (en) * | 1913-04-22 | 1914-05-19 | Henry C Oehrle | Coupling-bolt. |
US3006443A (en) * | 1954-12-20 | 1961-10-31 | Joseph T Siler | Method and apparatus for attaching juxtaposed members |
US3783496A (en) * | 1968-12-19 | 1974-01-08 | J Siler | Method of assembling members having misaligned holes |
US3686877A (en) * | 1971-02-18 | 1972-08-29 | Albert G Bodin | Sonic method and apparatus for installing off-shore caissons for oil operations and the like |
US4621962A (en) * | 1984-11-09 | 1986-11-11 | Rozniecki Edward J | Adjustment structure |
US4817417A (en) * | 1987-05-06 | 1989-04-04 | Westinghouse Electric Corp. | Double eccentric mount |
US5141357A (en) * | 1991-01-09 | 1992-08-25 | Sundstrand Corp. | Misalignment compensating fastener insert |
US5207468A (en) * | 1992-05-27 | 1993-05-04 | Georges Saulnier | Self-adjusting transformer sling |
US5653556A (en) * | 1995-10-10 | 1997-08-05 | American Piledriving Equipment, Inc. | Clamping apparatus and methods for driving caissons into the earth |
US20050242051A1 (en) * | 1999-01-13 | 2005-11-03 | Porebski James J | Portable lift, support, removal and/or installation system and method |
US6357549B1 (en) * | 1999-06-03 | 2002-03-19 | D. H. Blattner & Sons, Inc. | Guide rail climbing lifting platform and method |
US20060055188A1 (en) * | 2003-02-26 | 2006-03-16 | Michael Koch | Load-receiving device |
Cited By (48)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8544923B2 (en) | 2008-09-29 | 2013-10-01 | Engineered Lifting Technologies, Inc. | Lifting assembly |
US20100078950A1 (en) * | 2008-09-29 | 2010-04-01 | Inda Jeremy P | Lifting Assembly |
US20100139181A1 (en) * | 2008-12-10 | 2010-06-10 | Alejandro Cortina-Cordero | Method for mounting in sections an annular tower for wind power generator, heliostatic power generator or chimney composed from three concrete segments or more |
US8555600B2 (en) * | 2008-12-10 | 2013-10-15 | Cortina Innovations, S.A. De C.V. | Method for mounting in sections an annular tower for wind power generator, heliostatic power generator or chimney composed from three concrete segments or more |
US20110316297A1 (en) * | 2009-03-17 | 2011-12-29 | Spanset-Secutex Gmbh | Sling Element and Combination Consisting of a Sling Element and a Fastening Means |
US8544925B2 (en) * | 2009-03-17 | 2013-10-01 | Spanset-Secutex Gmbh | Sling element and combination consisting of a sling element and a fastening means |
US20110037279A1 (en) * | 2009-08-14 | 2011-02-17 | Mjt Holdings, Llc | Tower Erection Lift Kit Tools |
WO2011020086A2 (en) | 2009-08-14 | 2011-02-17 | Mjt Holdings, Llc | Tower erection lift kit tools |
EP2464590A4 (en) * | 2009-08-14 | 2013-12-25 | Mjt Holdings Llc | Tower erection lift kit tools |
US8596700B2 (en) | 2009-08-14 | 2013-12-03 | Mjt Holdings, Llc | Tower erection lift kit tools |
EP2464590A2 (en) * | 2009-08-14 | 2012-06-20 | MJT Holdings, LLC | Tower erection lift kit tools |
US8544924B2 (en) | 2009-11-06 | 2013-10-01 | Engineered Lifting Technologies, Inc. | Lifting assembly |
US20110109106A1 (en) * | 2009-11-06 | 2011-05-12 | Jeremy Inda | Lifting Assembly |
WO2011086205A1 (en) * | 2010-01-14 | 2011-07-21 | Gamesa Innovation & Technology, S.L. | Blade lifting element and method followed |
EP2525092A1 (en) * | 2010-01-14 | 2012-11-21 | Gamesa Innovation & Technology, S.L. | Blade lifting element and method followed |
US9068555B2 (en) * | 2010-01-14 | 2015-06-30 | Gamesa Innovation & Technology, S. L. | Element for lifting the blade and method followed |
US20130025113A1 (en) * | 2010-01-14 | 2013-01-31 | Ion Arocena De La Rua | Element for lifting the blade and method followed |
EP2525092A4 (en) * | 2010-01-14 | 2014-08-20 | Gamesa Innovation & Tech Sl | Blade lifting element and method followed |
ES2371703A1 (en) * | 2010-01-14 | 2012-01-09 | GAMESA INNOVATION & TECHNOLOGY, S.L. | Element for leaf of shovel and method followed. (Machine-translation by Google Translate, not legally binding) |
ES2371709A1 (en) * | 2010-03-12 | 2012-01-09 | GAMESA INNOVATION & TECHNOLOGY S.L. | Element for leaf of shovel. (Machine-translation by Google Translate, not legally binding) |
KR20130135897A (en) * | 2011-01-26 | 2013-12-11 | 보벤 프로퍼티즈 게엠베하 | Method and device for erecting a tower for a wind energy plant |
EP2803616A1 (en) * | 2011-01-26 | 2014-11-19 | Wobben Properties GmbH | Working platform device to work in a varying height und method therefor |
WO2012101023A3 (en) * | 2011-01-26 | 2012-10-04 | Wobben Properties Gmbh | Method and device for erecting a tower for a wind energy plant |
US9534416B2 (en) | 2011-01-26 | 2017-01-03 | Wobben Properties Gmbh | Method and device for erecting a tower for a wind energy plant |
AU2012210698B2 (en) * | 2011-01-26 | 2016-03-17 | Wobben Properties Gmbh | Method and device for erecting a tower for a wind energy plant |
JP2014511448A (en) * | 2011-01-26 | 2014-05-15 | ヴォッベン プロパティーズ ゲーエムベーハー | Method and apparatus for building tower of wind power generator |
KR101665169B1 (en) * | 2011-01-26 | 2016-10-11 | 보벤 프로퍼티즈 게엠베하 | Method and device for erecting a tower for a wind energy plant |
CN102275809A (en) * | 2011-07-07 | 2011-12-14 | 中国十七冶集团有限公司 | Special-purposed bidirectional regulation combined lifting appliance for lifting tower drum of wind driven generator |
US9655821B2 (en) | 2013-04-05 | 2017-05-23 | The Procter & Gamble Company | Personal care composition comprising a pre-emulsified formulation |
US9101551B2 (en) | 2013-10-09 | 2015-08-11 | The Procter & Gamble Company | Personal cleansing compositions and methods |
US20150121987A1 (en) * | 2013-11-01 | 2015-05-07 | Thomas J. Flynn | Lift pin and die |
US10145138B2 (en) * | 2014-04-14 | 2018-12-04 | Vestas Wind Systems A/S | Tower segment handling method and apparatus |
US20170030101A1 (en) * | 2014-04-14 | 2017-02-02 | Vestas Wind Systems A/S | Tower segment handling method and apparatus |
US10806688B2 (en) | 2014-10-03 | 2020-10-20 | The Procter And Gamble Company | Method of achieving improved volume and combability using an anti-dandruff personal care composition comprising a pre-emulsified formulation |
US10966916B2 (en) | 2014-11-10 | 2021-04-06 | The Procter And Gamble Company | Personal care compositions |
US11207248B2 (en) | 2014-11-10 | 2021-12-28 | The Procter And Gamble Company | Personal care compositions with two benefit phases |
US11207261B2 (en) | 2014-11-10 | 2021-12-28 | The Procter And Gamble Company | Personal care compositions with two benefit phases |
US9993404B2 (en) | 2015-01-15 | 2018-06-12 | The Procter & Gamble Company | Translucent hair conditioning composition |
US9657495B2 (en) * | 2015-10-14 | 2017-05-23 | James D. Lockwood | Crane system incorporated into a tower |
US10912723B2 (en) | 2016-01-20 | 2021-02-09 | The Procter And Gamble Company | Hair conditioning composition comprising monoalkyl glyceryl ether |
EP3214235A1 (en) * | 2016-03-05 | 2017-09-06 | HALFEN GmbH | Connection system for connecting prefabricated concrete parts |
CN107152087A (en) * | 2016-03-05 | 2017-09-12 | 哈尔芬有限公司 | Connecting system for connecting concrete prefabricated parts |
US10987290B2 (en) | 2017-10-20 | 2021-04-27 | The Procter And Gamble Company | Aerosol foam skin cleanser |
US11419805B2 (en) | 2017-10-20 | 2022-08-23 | The Procter & Gamble Company | Aerosol foam skin cleanser |
US10773375B2 (en) | 2017-10-30 | 2020-09-15 | Jordan T. Mefferd | Tool and rigging holding device |
US10357875B2 (en) * | 2017-10-30 | 2019-07-23 | Jordan T. Mefferd | Tool and rigging holding device |
USD863017S1 (en) | 2018-06-12 | 2019-10-15 | Jordan T. Mefferd | Tool and rigging holder |
US11365397B2 (en) | 2018-11-29 | 2022-06-21 | The Procter & Gamble Company | Methods for screening personal care products |
Also Published As
Publication number | Publication date |
---|---|
CA2654273A1 (en) | 2008-01-03 |
CN101479179A (en) | 2009-07-08 |
CN101479179B (en) | 2013-01-02 |
AU2007264206B2 (en) | 2011-06-16 |
WO2008000262A1 (en) | 2008-01-03 |
ATE491665T1 (en) | 2011-01-15 |
EP2035316A1 (en) | 2009-03-18 |
BRPI0712840A2 (en) | 2012-12-18 |
DE602007011264D1 (en) | 2011-01-27 |
AU2007264206A1 (en) | 2008-01-03 |
MX2008016378A (en) | 2009-02-16 |
ES2357451T3 (en) | 2011-04-26 |
EP2035316B1 (en) | 2010-12-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20090107062A1 (en) | Lifting Equipment For Handling A Wind Turbine Component And A Method For Handling A Wind Turbine Component | |
US9669497B2 (en) | Method for assembling a blade of a wind turbine | |
EP2456710B1 (en) | Lifting fitting | |
EP1668244B1 (en) | Equipment for mounting on the hub of a wind turbine and method of conducting service on a wind turbine using such equipment | |
EP2937561B1 (en) | Support arrangement of a wind turbine tower | |
US10502189B2 (en) | Methods for erecting or dismantling a multirotor wind turbine | |
EP2770199A2 (en) | Tower assembly system for wind turbines and method thereof | |
EP2998569A1 (en) | Arrangement to align a part of a wind turbine | |
US10081519B2 (en) | Tool for handling a long and heavy object | |
EP3400385B1 (en) | Lifting device for lifting a component of a wind turbine and method for assembling components of a wind turbine | |
CN109952263B (en) | Lifting assembly | |
US11692529B2 (en) | Method for mounting rotor blades of a wind turbine | |
WO2017215718A1 (en) | A wind turbine tower and a method for erecting a wind turbine tower | |
US9862578B2 (en) | Tiltable and rotatable lifting pole assembly | |
AU2008217248B2 (en) | Jib boom rotating tower crane | |
EP2617987A1 (en) | Method and arrangement for installing a rotor blade | |
CN111065815B (en) | Work platform system and method for installing work platform system | |
EP3546413B1 (en) | System and method for lifting and lowering loads on a wind energy turbine | |
EP3356278B1 (en) | A lifting arrangement for lifting a wind turbine component | |
EP3670789A1 (en) | Method of installing tall and super-tall towers | |
CN112673167B (en) | Method for mounting a rotor on a wind turbine, rotor hub and counterweight assembly and lifting device connection member |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: VESTAS WIND SYSTEMS A/S, DENMARK Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:PEDERSEN, GUNNAR KAMP STORGAARD;REEL/FRAME:022558/0824 Effective date: 20081205 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |