US20080308453A1 - Catalyst withdrawal method for regulating catalyst inventory in a fluid catalyst cracking unit - Google Patents

Catalyst withdrawal method for regulating catalyst inventory in a fluid catalyst cracking unit Download PDF

Info

Publication number
US20080308453A1
US20080308453A1 US12/201,146 US20114608A US2008308453A1 US 20080308453 A1 US20080308453 A1 US 20080308453A1 US 20114608 A US20114608 A US 20114608A US 2008308453 A1 US2008308453 A1 US 2008308453A1
Authority
US
United States
Prior art keywords
catalyst
fcc unit
storage vessel
withdrawal
regenerator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US12/201,146
Inventor
Martin Evans
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Johnson Matthey Process Technologies Inc
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US12/201,146 priority Critical patent/US20080308453A1/en
Assigned to INTERCAT, INC. reassignment INTERCAT, INC. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: EVANS, MARTIN
Publication of US20080308453A1 publication Critical patent/US20080308453A1/en
Assigned to INTERCAT-SAVANNAH, INC. reassignment INTERCAT-SAVANNAH, INC. MERGER (SEE DOCUMENT FOR DETAILS). Assignors: INTERCAT EQUIPMENT, INC.
Assigned to INTERCAT TRANSPORTATION, INC. reassignment INTERCAT TRANSPORTATION, INC. MERGER (SEE DOCUMENT FOR DETAILS). Assignors: INTERCAT-SAVANNAH, INC.
Assigned to INTERCAT, INC. reassignment INTERCAT, INC. MERGER (SEE DOCUMENT FOR DETAILS). Assignors: INTERCAT TRANSPORTATION, INC.
Assigned to JOHNSON MATTHEY PROCESS TECHNOLOGIES, INC. reassignment JOHNSON MATTHEY PROCESS TECHNOLOGIES, INC. CHANGE OF NAME (SEE DOCUMENT FOR DETAILS). Assignors: INTERCAT, INC.
Abandoned legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01JCHEMICAL OR PHYSICAL PROCESSES, e.g. CATALYSIS OR COLLOID CHEMISTRY; THEIR RELEVANT APPARATUS
    • B01J8/00Chemical or physical processes in general, conducted in the presence of fluids and solid particles; Apparatus for such processes
    • B01J8/0015Feeding of the particles in the reactor; Evacuation of the particles out of the reactor
    • B01J8/003Feeding of the particles in the reactor; Evacuation of the particles out of the reactor in a downward flow
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01JCHEMICAL OR PHYSICAL PROCESSES, e.g. CATALYSIS OR COLLOID CHEMISTRY; THEIR RELEVANT APPARATUS
    • B01J8/00Chemical or physical processes in general, conducted in the presence of fluids and solid particles; Apparatus for such processes
    • B01J8/0015Feeding of the particles in the reactor; Evacuation of the particles out of the reactor
    • B01J8/0035Periodical feeding or evacuation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01JCHEMICAL OR PHYSICAL PROCESSES, e.g. CATALYSIS OR COLLOID CHEMISTRY; THEIR RELEVANT APPARATUS
    • B01J8/00Chemical or physical processes in general, conducted in the presence of fluids and solid particles; Apparatus for such processes
    • B01J8/005Separating solid material from the gas/liquid stream
    • B01J8/0055Separating solid material from the gas/liquid stream using cyclones
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01JCHEMICAL OR PHYSICAL PROCESSES, e.g. CATALYSIS OR COLLOID CHEMISTRY; THEIR RELEVANT APPARATUS
    • B01J8/00Chemical or physical processes in general, conducted in the presence of fluids and solid particles; Apparatus for such processes
    • B01J8/18Chemical or physical processes in general, conducted in the presence of fluids and solid particles; Apparatus for such processes with fluidised particles
    • B01J8/20Chemical or physical processes in general, conducted in the presence of fluids and solid particles; Apparatus for such processes with fluidised particles with liquid as a fluidising medium
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10GCRACKING HYDROCARBON OILS; PRODUCTION OF LIQUID HYDROCARBON MIXTURES, e.g. BY DESTRUCTIVE HYDROGENATION, OLIGOMERISATION, POLYMERISATION; RECOVERY OF HYDROCARBON OILS FROM OIL-SHALE, OIL-SAND, OR GASES; REFINING MIXTURES MAINLY CONSISTING OF HYDROCARBONS; REFORMING OF NAPHTHA; MINERAL WAXES
    • C10G11/00Catalytic cracking, in the absence of hydrogen, of hydrocarbon oils
    • C10G11/14Catalytic cracking, in the absence of hydrogen, of hydrocarbon oils with preheated moving solid catalysts
    • C10G11/18Catalytic cracking, in the absence of hydrogen, of hydrocarbon oils with preheated moving solid catalysts according to the "fluidised-bed" technique
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10GCRACKING HYDROCARBON OILS; PRODUCTION OF LIQUID HYDROCARBON MIXTURES, e.g. BY DESTRUCTIVE HYDROGENATION, OLIGOMERISATION, POLYMERISATION; RECOVERY OF HYDROCARBON OILS FROM OIL-SHALE, OIL-SAND, OR GASES; REFINING MIXTURES MAINLY CONSISTING OF HYDROCARBONS; REFORMING OF NAPHTHA; MINERAL WAXES
    • C10G11/00Catalytic cracking, in the absence of hydrogen, of hydrocarbon oils
    • C10G11/14Catalytic cracking, in the absence of hydrogen, of hydrocarbon oils with preheated moving solid catalysts
    • C10G11/18Catalytic cracking, in the absence of hydrogen, of hydrocarbon oils with preheated moving solid catalysts according to the "fluidised-bed" technique
    • C10G11/187Controlling or regulating
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01JCHEMICAL OR PHYSICAL PROCESSES, e.g. CATALYSIS OR COLLOID CHEMISTRY; THEIR RELEVANT APPARATUS
    • B01J2208/00Processes carried out in the presence of solid particles; Reactors therefor
    • B01J2208/00008Controlling the process
    • B01J2208/00017Controlling the temperature
    • B01J2208/00106Controlling the temperature by indirect heat exchange
    • B01J2208/00168Controlling the temperature by indirect heat exchange with heat exchange elements outside the bed of solid particles
    • B01J2208/00176Controlling the temperature by indirect heat exchange with heat exchange elements outside the bed of solid particles outside the reactor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01JCHEMICAL OR PHYSICAL PROCESSES, e.g. CATALYSIS OR COLLOID CHEMISTRY; THEIR RELEVANT APPARATUS
    • B01J2208/00Processes carried out in the presence of solid particles; Reactors therefor
    • B01J2208/00008Controlling the process
    • B01J2208/00017Controlling the temperature
    • B01J2208/00106Controlling the temperature by indirect heat exchange
    • B01J2208/00168Controlling the temperature by indirect heat exchange with heat exchange elements outside the bed of solid particles
    • B01J2208/00185Fingers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01JCHEMICAL OR PHYSICAL PROCESSES, e.g. CATALYSIS OR COLLOID CHEMISTRY; THEIR RELEVANT APPARATUS
    • B01J2208/00Processes carried out in the presence of solid particles; Reactors therefor
    • B01J2208/00008Controlling the process
    • B01J2208/00017Controlling the temperature
    • B01J2208/00106Controlling the temperature by indirect heat exchange
    • B01J2208/00168Controlling the temperature by indirect heat exchange with heat exchange elements outside the bed of solid particles
    • B01J2208/00203Coils
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01JCHEMICAL OR PHYSICAL PROCESSES, e.g. CATALYSIS OR COLLOID CHEMISTRY; THEIR RELEVANT APPARATUS
    • B01J2208/00Processes carried out in the presence of solid particles; Reactors therefor
    • B01J2208/00008Controlling the process
    • B01J2208/00017Controlling the temperature
    • B01J2208/00106Controlling the temperature by indirect heat exchange
    • B01J2208/00168Controlling the temperature by indirect heat exchange with heat exchange elements outside the bed of solid particles
    • B01J2208/00212Plates; Jackets; Cylinders
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01JCHEMICAL OR PHYSICAL PROCESSES, e.g. CATALYSIS OR COLLOID CHEMISTRY; THEIR RELEVANT APPARATUS
    • B01J2208/00Processes carried out in the presence of solid particles; Reactors therefor
    • B01J2208/00008Controlling the process
    • B01J2208/00017Controlling the temperature
    • B01J2208/00327Controlling the temperature by direct heat exchange
    • B01J2208/00336Controlling the temperature by direct heat exchange adding a temperature modifying medium to the reactants
    • B01J2208/00353Non-cryogenic fluids
    • B01J2208/00371Non-cryogenic fluids gaseous
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01JCHEMICAL OR PHYSICAL PROCESSES, e.g. CATALYSIS OR COLLOID CHEMISTRY; THEIR RELEVANT APPARATUS
    • B01J2208/00Processes carried out in the presence of solid particles; Reactors therefor
    • B01J2208/00008Controlling the process
    • B01J2208/00539Pressure
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01JCHEMICAL OR PHYSICAL PROCESSES, e.g. CATALYSIS OR COLLOID CHEMISTRY; THEIR RELEVANT APPARATUS
    • B01J2208/00Processes carried out in the presence of solid particles; Reactors therefor
    • B01J2208/00008Controlling the process
    • B01J2208/00548Flow
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01JCHEMICAL OR PHYSICAL PROCESSES, e.g. CATALYSIS OR COLLOID CHEMISTRY; THEIR RELEVANT APPARATUS
    • B01J2208/00Processes carried out in the presence of solid particles; Reactors therefor
    • B01J2208/00008Controlling the process
    • B01J2208/0061Controlling the level
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01JCHEMICAL OR PHYSICAL PROCESSES, e.g. CATALYSIS OR COLLOID CHEMISTRY; THEIR RELEVANT APPARATUS
    • B01J2208/00Processes carried out in the presence of solid particles; Reactors therefor
    • B01J2208/00008Controlling the process
    • B01J2208/00619Controlling the weight
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01JCHEMICAL OR PHYSICAL PROCESSES, e.g. CATALYSIS OR COLLOID CHEMISTRY; THEIR RELEVANT APPARATUS
    • B01J2208/00Processes carried out in the presence of solid particles; Reactors therefor
    • B01J2208/00008Controlling the process
    • B01J2208/00734Controlling static charge
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01JCHEMICAL OR PHYSICAL PROCESSES, e.g. CATALYSIS OR COLLOID CHEMISTRY; THEIR RELEVANT APPARATUS
    • B01J2208/00Processes carried out in the presence of solid particles; Reactors therefor
    • B01J2208/00743Feeding or discharging of solids
    • B01J2208/00761Discharging
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01JCHEMICAL OR PHYSICAL PROCESSES, e.g. CATALYSIS OR COLLOID CHEMISTRY; THEIR RELEVANT APPARATUS
    • B01J2208/00Processes carried out in the presence of solid particles; Reactors therefor
    • B01J2208/00743Feeding or discharging of solids
    • B01J2208/00769Details of feeding or discharging
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01JCHEMICAL OR PHYSICAL PROCESSES, e.g. CATALYSIS OR COLLOID CHEMISTRY; THEIR RELEVANT APPARATUS
    • B01J2219/00Chemical, physical or physico-chemical processes in general; Their relevant apparatus
    • B01J2219/00049Controlling or regulating processes
    • B01J2219/00191Control algorithm
    • B01J2219/00193Sensing a parameter
    • B01J2219/00207Sensing a parameter other than of the reactor heat exchange system
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01JCHEMICAL OR PHYSICAL PROCESSES, e.g. CATALYSIS OR COLLOID CHEMISTRY; THEIR RELEVANT APPARATUS
    • B01J2219/00Chemical, physical or physico-chemical processes in general; Their relevant apparatus
    • B01J2219/00049Controlling or regulating processes
    • B01J2219/00191Control algorithm
    • B01J2219/00211Control algorithm comparing a sensed parameter with a pre-set value
    • B01J2219/0022Control algorithm comparing a sensed parameter with a pre-set value calculating difference
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01JCHEMICAL OR PHYSICAL PROCESSES, e.g. CATALYSIS OR COLLOID CHEMISTRY; THEIR RELEVANT APPARATUS
    • B01J2219/00Chemical, physical or physico-chemical processes in general; Their relevant apparatus
    • B01J2219/00049Controlling or regulating processes
    • B01J2219/00191Control algorithm
    • B01J2219/00222Control algorithm taking actions
    • B01J2219/00227Control algorithm taking actions modifying the operating conditions
    • B01J2219/00229Control algorithm taking actions modifying the operating conditions of the reaction system
    • B01J2219/00236Control algorithm taking actions modifying the operating conditions of the reaction system at the reactor outlet
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10GCRACKING HYDROCARBON OILS; PRODUCTION OF LIQUID HYDROCARBON MIXTURES, e.g. BY DESTRUCTIVE HYDROGENATION, OLIGOMERISATION, POLYMERISATION; RECOVERY OF HYDROCARBON OILS FROM OIL-SHALE, OIL-SAND, OR GASES; REFINING MIXTURES MAINLY CONSISTING OF HYDROCARBONS; REFORMING OF NAPHTHA; MINERAL WAXES
    • C10G2300/00Aspects relating to hydrocarbon processing covered by groups C10G1/00 - C10G99/00
    • C10G2300/70Catalyst aspects

Definitions

  • Embodiments of the invention generally relate to a catalyst withdrawal apparatus and method for regulating catalyst inventory in a fluid catalytic cracking catalyst unit.
  • FIG. 1 is a simplified schematic of a conventional fluid catalytic cracking system 130 .
  • the fluid catalytic cracking system 130 generally includes a fluid catalytic cracking (FCC) unit 110 coupled to a catalyst injection system 100 , a petroleum feed stock source 104 , an exhaust system 114 and a distillation system 116 .
  • FCC fluid catalytic cracking
  • One or more catalysts from the catalyst injection system 100 and petroleum from the petroleum feed stock source 104 are delivered to the FCC unit 110 .
  • the petroleum and catalysts are reacted in the FCC unit 110 to produce a vapor that is collected and separated into various petrochemical products in the distillation system 116 .
  • the exhaust system 114 is coupled to the FCC unit 110 and is adapted to control and/or monitor the exhausted byproducts of the fluid cracking process.
  • the FCC unit 110 includes a regenerator 150 and a reactor 152 .
  • the reactor 152 primarily houses the catalytic cracking reaction of the petroleum feed stock and delivers the cracked product in vapor form to the distillation system 116 .
  • Spend catalyst from the cracking reaction is transfer from the reactor 152 to the regenerator 150 where the catalyst is rejuvenated by removing coke and other materials.
  • the rejuvenated catalyst is reintroduced into the reactor 152 to continue the petroleum cracking process.
  • By-products from the catalyst rejuvenation are exhausted from the regenerator 150 through an effluent stack of the exhaust system 114 .
  • the FCC unit 110 includes a catalyst injection system 100 that maintains a continuous or semi continuous addition of fresh catalyst to the inventory circulating between the regenerator 150 and the reactor 152 .
  • the catalyst injection system 100 includes a main catalyst source 102 and one or more additive sources 106 .
  • the main catalyst source 102 and the additive source 106 are coupled to the FCC unit 110 by a process line 122 .
  • a fluid source such as a blower or air compressor 108 , is coupled to the process line 122 and provides pressurized fluid, such as air, that is utilized to carry the various powdered catalysts from the sources 102 , 106 through the process line 122 and into the FCC unit 110 .
  • One or more controllers 120 is/are utilized to control the amounts of catalysts and additives utilized in the FCC unit 110 .
  • different additives are provided to the FCC unit 110 to control the ratio of product types recovered in the distillation system 116 (i.e., for example, more LPG than gasoline) and to control the composition of emissions passing through the exhaust system 114 , among other process control attributes.
  • the controller 120 is generally positioned proximate the catalyst sources 106 , 102 and the FCC unit 110 , the controller 120 is typically housed in an explosion-proof enclosure to prevent spark ignition of gases which may potentially exist on the exterior of the enclosure in a petroleum processing environment.
  • catalyst is periodically added utilizing a catalyst injection system.
  • some catalyst is lost through the distillation system 116 , while some catalyst is lost through the effluent exiting the regenerator 150 .
  • the addition rate required to maintain a desired level of catalytic activity sometimes matches the loss rate through attrition, and in this case, there is no need for corrective measures.
  • Catalyst withdrawal systems are normally sized for the most demanding operating case, which is when the entire catalyst inventory is removed during a short period of time when the FCC unit is shut down.
  • the periodic operational-type catalyst withdrawals for level control addressed by this invention can take place once a day, once a week, or once a month, depending on how quickly the catalyst inventory level is building. Because these sudden changes in regenerator bed level cause changes in the pressure balance of the FCC unit, they may result in changes in catalyst circulation rate, reactor temperature and/or regenerator temperature, and these upset the stability of the FCC unit operation. As these changes in the dynamic equilibrium force the FCC unit away from its operating limits, the desired product mix and/or effluent composition may not be obtained.
  • a catalyst withdrawal apparatus and method for regulating catalyst inventory in a fluid catalytic cracking catalyst (FCC) unit includes a pressure vessel having a metering device coupled to a fill port.
  • a heat dissipater is located adjacent the metering device and is adapted to cool catalyst entering the pressure vessel.
  • a sensor is coupled to the pressure vessel arranged to provide a metric indicative of catalyst entering the pressure vessel through the metering device.
  • a fluid catalyst cracking system in another embodiment, includes a FCC unit having a catalyst withdrawal apparatus coupled thereto and configured to meter catalyst removed from the FCCU.
  • a method for regulating catalyst inventory in a FCC unit includes the steps of determining a change of catalyst present in a FCC unit, withdrawing catalyst from the FCC unit into an isolatable storage vessel coupled to the FCC unit, measuring the amount of catalyst disposed in the storage vessel, and removing the measured catalyst from the storage vessel.
  • FIG. 1 is a simplified schematic view of a conventional fluid catalytic cracking system
  • FIG. 2 is a simplified schematic diagram of a fluid catalytic cracking system having a catalyst withdrawal system in accordance with one embodiment of the present invention
  • FIG. 3 is a sectional view of on embodiment of the catalyst withdrawal system of FIG. 2 ;
  • FIG. 4 is a flow diagram of one embodiment of a method of regulating catalyst in a fluid catalytic cracking system.
  • the invention generally provides catalyst withdrawal apparatus suitable for use on a fluid catalyst cracking (FCC) unit and a method for regulating catalyst inventory in a FCC unit.
  • FCC fluid catalyst cracking
  • the invention facilitates the removal of excess catalysts from the FCC unit with minimal process disruption.
  • FIG. 2 is a simplified schematic of a fluid catalytic cracking system 230 having a metered catalyst withdrawal system 240 .
  • the fluid catalytic cracking system 230 generally includes a fluid catalytic cracking (FCC) unit 210 coupled to a catalyst injection system 200 and the metered catalyst withdrawal system 240 , a controller 220 , a petroleum feed stock source 204 , an exhaust system 214 and a distillation system 216 .
  • FCC fluid catalytic cracking
  • One or more catalysts from the catalyst injection system 200 and petroleum from the petroleum feed stock source 204 are delivered to the FCC unit 210 .
  • the petroleum and catalysts are reacted in the FCC unit 210 to produce a vapor that is collected and separated into various petrochemical products in the distillation system 216 .
  • the heaviest products recovered in the distillation system 216 are generally tested to determine the amount of entrained catalyst.
  • the testing may be carried out daily or once a shift in a refinery laboratory 218 . It is contemplated the amount of entrained catalyst may be determined by other methods, such as, but not limited to some form of online analysis.
  • the metric of entrained catalyst is provided from the laboratory 218 to the controller 220 for using in regulating the catalyst within the FCC unit as further described below.
  • the exhaust system 214 is interface with an exhaust 212 of the regenerator 250 and is adapted to monitor the composition of materials exhausted from the regenerator 250 .
  • the exhaust system 214 is configured to detect a metric of catalyst exiting the regenerator 250 through the exhaust. This metric may be obtained by determining the amount of catalyst particles and/or catalyst fines entrained in the regenerator exhaust.
  • the exhaust system 214 may include a third or fourth stage separator, for example, a cyclone separator 232 and a scrubber 234 .
  • the metric of catalyst exiting the regenerator 250 can be provided to the controller 220 and utilized to balance the amount of catalyst within the FCC unit 210 as further described below.
  • the FCC unit 210 includes a regenerator 250 and a reactor 252 as known in the art.
  • the reactor 252 primarily houses the catalytic cracking reaction of the petroleum feed stock and delivers the cracked product in vapor form to the distillation system 216 .
  • Spend catalyst from the cracking reaction is transferred from the reactor 252 to the regenerator 250 , where the catalyst is rejuvenated by removing coke and other materials.
  • the rejuvenated catalyst is reintroduced into the reactor 252 to continue the petroleum cracking process.
  • By-products from the catalyst rejuvenation process are exhausted from the regenerator 250 through an effluent stack.
  • the FCC unit 210 includes a catalyst injection system 200 that maintains a semi continuous addition of fresh catalyst to the catalyst inventory circulating between the regenerator 250 and the reactor 252 .
  • the catalyst injection system 200 includes a main catalyst source 202 and one or more additive sources 206 .
  • the main catalyst source 202 and the additive source 206 are coupled to the FCC unit 210 by a process line 222 .
  • a fluid source such as a blower or air compressor 208 , is coupled to the process line 222 and provides pressurized fluid, such as air, that is utilized to carry the various powdered catalysts from the sources 202 , 206 through the process line 222 and into the FCC unit 210 .
  • the main catalyst source 202 generally delivers a Y-zeolite containing catalyst, which drives the main cracking process. Examples of catalyst injection systems that may be adapted to benefit the invention are described in U.S. Pat. No. 5,389,236, issued Feb. 14, 1995; U.S. Pat. No. 6,358,401, issued Mar. 19, 2002; U.S. patent application Ser. No. 10/304,670 filed Nov. 2, 2002; U.S. Pat. No.
  • the controller 220 is utilized to regulate the addition of catalysts and/or additives made by the injection system 200 and withdrawals made by the metered catalyst withdrawal system 240 so that the dynamic equilibrium of catalyst within the FCC unit 210 may be maintained.
  • the controller 220 is generally positioned proximate the catalyst sources 206 , 202 and the FCC unit 210 , the controller 220 is typically housed in an explosion-proof enclosure to prevent spark ignition of gases which may potentially exist on the exterior of the enclosure in a petroleum processing environment.
  • the controller 220 may be equipped with remote access capability so that activity may be monitored from other locations, such as operations center or by catalyst suppliers.
  • a controller having such capability is described in U.S. Pat. No. 6,859,759, issued Feb. 22, 2005 and U.S. patent application Ser. No. 10/304,670, filed Nov. 26, 2002, both of which are hereby incorporated by reference in their entireties.
  • the regenerator 250 may be equipped with one or more sensors that provide a metric indicative of a catalyst level within the regenerator 250 .
  • the regenerator 250 includes a first sensor 242 and a second sensor 244 configured to detect when the level of catalyst within the regenerator 250 exceeds an upper or lower threshold.
  • the sensor 242 , 244 may be an differential pressure measurement device, optical transducer, a capacitance device, a sonic transducer or other device suitable for providing information from which the level or volume of catalyst disposed in the regenerator 250 may be resolved.
  • the first sensor 242 provides an indication to the controller 220 that the catalyst level is low
  • the controller 220 may initiate a catalyst injection by the catalyst injection system 200 .
  • the controller 220 may initiate a catalyst withdrawal from the FCC unit by the catalyst withdrawal system 240 , or speed up these otherwise semi-continuous withdrawal processes.
  • the metered catalyst withdrawal system 240 is coupled to the regenerator 250 by a conduit 254 .
  • a metering device 256 is disposed in the conduit 254 to control the flow of catalyst between the regenerator 250 and the metered withdrawal system 240 .
  • An outlet valve 260 is coupled to the catalyst withdrawal system 240 and is configured to control the flow of catalyst between the withdrawal system 240 and the spent catalyst storage/disposal 262 .
  • the metering device 256 and outlet valve 260 may be similarly constructed.
  • FIG. 3 depicts a larger view of one embodiment of the metered withdrawal system 240 of FIG. 2 .
  • the withdrawal system 240 includes a storage vessel 310 having the metering device 256 and the outlet valve 260 coupled thereto.
  • the storage vessel 310 is typically a metal container suitable for use at high temperatures having a fill port 314 and a discharge port 316 .
  • the discharge port 316 is positioned at or near a bottom of the storage vessel 310 .
  • the storage vessel 310 is coupled to a pressure control apparatus 318 that controls the pressure within the storage vessel 310 .
  • the pressure control apparatus 318 generally pressurizes the storage vessel 310 to about 5 to about 60 pounds per square inch (about 0.35 to about 4.2 kg/cm 2 ) during withdrawal operations.
  • the apparatus 318 may intermittently vent the storage vessel 310 to about atmospheric pressure to accommodate filling the vessel 310 with catalyst from the regenerator 250 .
  • the storage vessel 310 is vented through a vent port 312 that is coupled to the regenerator's exhaust 212 or other suitable effluent stack.
  • a control valve 308 is provided to regulate (or prevent) flow through the vent port 314 from the storage vessel 310 .
  • a cyclone 380 or similar device may also be inserted in the vent line to minimize catalyst carryover from the storage vessel 310 . Recovered fines from the cyclone 380 may be transferred through a return conduit 382 to the storage vessel 310 .
  • the pressure control apparatus 318 is configured to provide air or other gas into the vessel 310 .
  • the air or other gas may be utilized to fluidize, aerate and/or otherwise cool the withdrawn catalyst disposed in the vessel 310 .
  • the pressure control apparatus 318 may additionally be configured to control the flow of the air or other gas provided to the vessel 310 , thereby providing the ability to optimize cooling of the withdrawn catalyst and control environmental conditions within the storage vessel 310 .
  • the metering device 256 is coupled to the fill port 314 to monitor to control the amount of catalyst received from the regenerator 250 .
  • the outlet valve 260 is coupled to the discharged port 316 to control the amount of withdrawn catalyst removed from the storage vessel 310 to the spent catalyst storage/disposal 262 through an outlet line 304 .
  • the metering device 256 may be an on/off valve such as an everlasting valve, a rotary valve or other device suitable for removing and/or regulating the amount of catalyst withdrawn from the FCC unit 210 into the storage vessel 310 .
  • the metering device 256 may determine the amount of catalyst by weight, volume, timed dispense or by other manners.
  • the metering device 256 is typically configured to remove about 0.1 to about 30 tons per day of catalyst from the regenerator 250 without interruption of processing in the FCC unit 210 .
  • the metering device 256 typically removes catalysts from the FCC unit 210 periodically over the course of a planned production cycle, typically 24 hours, in multiple shots of predetermined amounts spaced over the production cycle.
  • catalysts may also be removed from the FCC unit 210 in an “as needed” basis as discussed above.
  • the metering device 256 is a control valve 332 that regulates the amount of catalyst delivered from the regenerator 250 into the storage vessel 310 by timed actuation.
  • the control valve 332 may include shear disk (not shown) for opening and closing a valve orifice.
  • the shear disk rotates eccentricity while additionally rotating clear of the orifice to provide a self-lapping, seat cleaning action that prevents the withdrawn catalyst from grooving the sealing surfaces of the shear disk and valve seat that could cause the valve leakage.
  • One valve that may be adapted to benefit from the invention is available from the Everlasting Valve Company, located in South Plainfield, N.J. Other control valves may alternatively be utilized.
  • control valve 332 and the outlet valve 260 are interlocked to prevent simultaneous opening. This allows data to be obtained between valve 332 , 260 openings such that the amount of catalyst entering and leaving the storage vessel 310 may be accurately resolved.
  • the outlet valve 260 is opened while the pressure regulating system 240 provides air at about 60 psi (about 4.2 kg/cm 2 ) into the interior of the storage vessel 310 to cause catalyst to flow from the storage vessel 310 through the valve 260 and into the spent catalyst storage/disposal 262 via the outlet line 304 .
  • the metered withdrawal system 240 includes one or more sensors 264 for providing a metric suitable for resolving the amount of catalyst passing through the metering device 256 during each withdrawal of catalyst from the regenerator 250 .
  • the sensors 264 may be configured to detect the level (i.e., volume) of catalyst in the storage vessel 310 , the weight of catalyst in the storage vessel 310 and/or the rate of catalyst movement through at least one of the storage vessel 310 , the fill port 314 , the discharge port 316 , the metering device 256 , the outlet valve 260 , the conduit 254 or outlet line 304 .
  • the sensor 264 is a plurality of load cells 306 adapted to provide a metric indicative of the weight of catalyst in the storage vessel 310 .
  • the load cells 306 are respectively coupled to a plurality of legs 336 that supports the storage vessel 310 above a surface 320 , such as a concrete pad. Each of the legs 336 has one load cell 320 coupled thereto.
  • the controller 220 receives the outputs of the load cells 320 and utilizes sequential data samples obtained therefrom to resolve the net amount of withdrawn catalyst after each actuation of the metering device 256 . Data samples are also taken after actuation of the outlet valve 260 such that the true amount of catalyst withdrawn from the FCC unit 210 through the system 240 may be accurately determined.
  • the net amount of catalyst withdrawn over the course of the production cycle may be monitored so that variations in the amount of catalyst dispensed in each individual shot may be compensated for by adjusting the delivery attributes of the metering device 256 , for example, changing the open time of the control valve 332 to allow more (or less) catalyst to pass therethrough and be removed from the FCC unit 210 .
  • the sensor 264 may be a level sensor 328 coupled to the storage vessel 310 and adapted to detect a metric indicative of the level of catalyst within the storage vessel 310 .
  • the level sensor 328 may be a differential pressure measuring device, an optical transducer, a capacitance device, a sonic transducer or other device suitable for providing information from which the level or volume of catalyst disposed in the storage vessel 310 may be resolved.
  • the sensor 264 may be a flow sensor 330 adapted to detect the flow of catalyst through one of the components of the catalyst withdrawal system 240 .
  • the flow sensor 330 maybe a contact or non-contact device and may be mounted to the storage vessel 310 , the metering device 256 or the conduit 254 coupling the storage vessel 310 to the waste container.
  • the flow sensor 330 may be a sonic flow meter or capacitance device adapted to detect the rate of entrained particles (i.e., catalyst) moving through the delivery line 308 .
  • a heat dissipater 258 is coupled to or positioned approximate to the conduit 254 .
  • the heat dissipater 258 is configured to extract heat from the catalyst within conduit 254 , thereby reducing the temperature of the catalyst flowing from the regenerator 250 to the metered withdrawal system 240 .
  • the heat dissipater 258 may be positioned proximate the conduit 254 between the regenerator 250 and the metering device 256 , or positioned proximate the conduit 254 between the metering device 256 and the storage vessel 310 .
  • the conduit 254 may be coiled or define a torturous path such that the heat dissipater 258 may be interfaced with a greater length of conduit than if the conduit was routed in a straight line path as shown in FIG. 2 , thereby improving the amount of heat transferred therebetween.
  • the heat dissipater 258 may include at least one or more temperature regulating features.
  • the heat dissipater 258 may include heat transfer fins 342 .
  • the heat dissipater 258 may include one or more conduits 344 coupled to a fluid source 346 through which a heat transfer fluid is flowed.
  • the storage vessel 310 may also be equipped with a thermal regulating device 358 to reduce the temperature of the storage vessel 310 .
  • the thermal regulating device 358 may be configured similar to the heat dissipater 258 described above.
  • the thermal regulating device 358 may include heat transfer fins 360 .
  • the thermal regulating device 358 may include one or more conduits 362 coupled to a fluid source 364 through which a heat transfer fluid is flowed.
  • the storage vessel 310 may alternatively and/or additionally be cooled as described above by providing fluid from the pressure control apparatus 318 into the vessel 310 .
  • the control valve 308 may also be periodically opened to allow heated gases disposed on the interior volume of the vessel 310 to be removed and replace by cooler gas provided from the pressure control apparatus 318 .
  • the temperature of the gas and/or catalyst entering vessel 310 may be monitored using a sensor 384 . If the controller 220 determines, in response to a metric of temperature provided by the sensor 384 , that the temperature of the gas and/or catalyst entering the vessel exceed a predefined limit, then a remedial action may be initiated.
  • remedial actions may include at least one of shutting off the flow through into the vessel 310 to allow the system to cool before restarting, reducing the flow rate of catalyst into vessel 310 using the regulating device 256 , increasing the heat extraction rate of the heat dissipater 258 or adding an extra flow of cold air to the catalyst leaving the regenerator to cool it down through jets 386 formed in the conduit 254 .
  • the controller 220 is provided to control the function of at least the withdrawal system 240 .
  • the controller 220 may be any suitable logic device for controlling the operation of the catalyst withdrawal system 240 .
  • the controller 220 is a programmable logic controller (PLC), such as those available from GE Fanuc.
  • PLC programmable logic controller
  • other controllers such as microcontrollers, microprocessors, programmable gate arrays, and application specific integrated circuits (ASICs) may be used to perform the controlling functions of the controller 220 .
  • ASICs application specific integrated circuits
  • the injection system 200 and the withdrawal system 240 may have separate controllers, which may, or may not, be linked.
  • the controller 220 is coupled to various support circuits that provide various signals to the controller 220 .
  • These support circuits include, power supplies, clocks, input and output interface circuits and the like.
  • Other support circuits couple to the temperature sensor 384 , the sensors 264 , the metering device 256 , the outlet valve 260 , the pressure control apparatus 318 and the like, to the controller 220 .
  • FIG. 4 is flow diagram of one embodiment of a method 400 for regulating catalyst within a FCC unit.
  • the method 400 begins at step 402 by obtaining a metric of catalyst lost and/or removed from the FCC unit.
  • the metric of catalyst lost may be a predefined value. For example, based on empirical data, or calculated data, or maybe a provided real time and/or as an updated metric. Examples of updated and/or provided metrics include a metric of catalyst entrained in the product stream at the distiller, catalyst exiting the regenerator through the exhaust system, catalyst removed from the metered withdrawal system, among others.
  • a metric of catalyst additions are obtained.
  • the metric of catalyst addition are typically attained from the catalyst addition system, in the form of catalyst and/or additives added to the FCC unit.
  • an amount of catalyst within the FCC unit is determined.
  • the amount of catalyst is determined by summing the catalyst additions obtained at step 404 minus the catalyst removed from the system obtained at step 402 .
  • the determination of catalyst within the FCC unit may be made from data obtained over a predetermined period of time.
  • the predetermined period of time may be in fractions of an hour, hourly, daily or over other time periods.
  • the determination of catalyst within the FCC unit may be made from data obtained real time, for example, by monitoring a data stream such as regenerator bed level.
  • the total catalyst determined may, alternatively, be calculated by subtracting the catalyst removed over the period from the last determination and adding the catalyst added over the same period.
  • the catalyst amount is compared against a threshold value or process window. If the determined catalyst is outside of a predefined process window (or exceeds the threshold), appropriate catalyst additions or withdrawals are made at step 410 .
  • This cycle of monitoring the amount of catalyst is repeated in order to maintain the dynamic catalyst equilibrium in the FCC unit.
  • this allows the FCC unit to continue operating at or near processing limits with minimal fluctuation, thereby providing the desired product mix and emissions composition with minimal dis-optimisation, thereby maximizing the profitability of the FCC system refiner.
  • the withdrawal system 240 may be set to remove a predefined amount of catalyst over a predefined period of time.
  • the withdrawal system 240 may be set to remove a target withdrawal of about 4 tons of catalyst per day.
  • the withdrawal may be made in predetermined increments, such that a total withdrawal amount will be made over the predefined period.
  • the operator may manually initiate withdrawals from the regenerator 250 using the system 240 .
  • the operator may initiate a withdrawal in response to the catalyst bed level within the regenerator 250 , such as provided by information obtained by the sensor 244 ,
  • the manual withdrawal may be made in addition to the target withdrawal, or count against the target withdrawal for that time period.

Abstract

A catalyst withdrawal method for regulating catalyst inventory in a fluid catalytic cracking catalyst (FCC) unit is provided. In one embodiment, a catalyst withdrawal apparatus for removing catalyst from a FCC unit includes a pressure vessel having a metering device coupled to a fill port. A heat dissipater is located adjacent the metering device and is adapted to cool catalyst entering the pressure vessel. A sensor is coupled to the pressure vessel arranged to provide a metric indicative of catalyst entering the pressure vessel through the metering device. In another embodiment, a method for regulating catalyst inventory in a FCC unit includes the steps of determining a change of catalyst present in a FCC unit, withdrawing catalyst from the FCC unit into an isolatable storage vessel coupled to the FCC unit, measuring the amount of catalyst disposed in the storage vessel, and removing the measured catalyst from the storage vessel.

Description

    CROSS REFERENCE TO RELATED APPLICATIONS
  • This application is a divisional of U.S. patent application Ser. No. 11/184,125, filed Jul. 19, 2005, which is herein incorporated by reference in its entirety.
  • BACKGROUND OF THE INVENTION
  • 1. Field of the Invention
  • Embodiments of the invention generally relate to a catalyst withdrawal apparatus and method for regulating catalyst inventory in a fluid catalytic cracking catalyst unit.
  • 2. Description of the Related Art
  • FIG. 1 is a simplified schematic of a conventional fluid catalytic cracking system 130. The fluid catalytic cracking system 130 generally includes a fluid catalytic cracking (FCC) unit 110 coupled to a catalyst injection system 100, a petroleum feed stock source 104, an exhaust system 114 and a distillation system 116. One or more catalysts from the catalyst injection system 100 and petroleum from the petroleum feed stock source 104 are delivered to the FCC unit 110. The petroleum and catalysts are reacted in the FCC unit 110 to produce a vapor that is collected and separated into various petrochemical products in the distillation system 116. The exhaust system 114 is coupled to the FCC unit 110 and is adapted to control and/or monitor the exhausted byproducts of the fluid cracking process.
  • The FCC unit 110 includes a regenerator 150 and a reactor 152. The reactor 152 primarily houses the catalytic cracking reaction of the petroleum feed stock and delivers the cracked product in vapor form to the distillation system 116. Spend catalyst from the cracking reaction is transfer from the reactor 152 to the regenerator 150 where the catalyst is rejuvenated by removing coke and other materials. The rejuvenated catalyst is reintroduced into the reactor 152 to continue the petroleum cracking process. By-products from the catalyst rejuvenation are exhausted from the regenerator 150 through an effluent stack of the exhaust system 114.
  • The FCC unit 110 includes a catalyst injection system 100 that maintains a continuous or semi continuous addition of fresh catalyst to the inventory circulating between the regenerator 150 and the reactor 152. The catalyst injection system 100 includes a main catalyst source 102 and one or more additive sources 106. The main catalyst source 102 and the additive source 106 are coupled to the FCC unit 110 by a process line 122. A fluid source, such as a blower or air compressor 108, is coupled to the process line 122 and provides pressurized fluid, such as air, that is utilized to carry the various powdered catalysts from the sources 102, 106 through the process line 122 and into the FCC unit 110.
  • One or more controllers 120 is/are utilized to control the amounts of catalysts and additives utilized in the FCC unit 110. Typically, different additives are provided to the FCC unit 110 to control the ratio of product types recovered in the distillation system 116 (i.e., for example, more LPG than gasoline) and to control the composition of emissions passing through the exhaust system 114, among other process control attributes. As the controller 120 is generally positioned proximate the catalyst sources 106, 102 and the FCC unit 110, the controller 120 is typically housed in an explosion-proof enclosure to prevent spark ignition of gases which may potentially exist on the exterior of the enclosure in a petroleum processing environment.
  • During processing, there is a dynamic balance of the total catalyst within the FCC unit. As discussed above, catalyst is periodically added utilizing a catalyst injection system. During the cracking process, some catalyst is lost through the distillation system 116, while some catalyst is lost through the effluent exiting the regenerator 150. The addition rate required to maintain a desired level of catalytic activity sometimes matches the loss rate through attrition, and in this case, there is no need for corrective measures.
  • If the amount of catalyst within the FCC unit diminishes over time, the performance and desired output of the FCC unit will diminish, and the FCC unit will become inoperable. Conversely, if the catalyst inventory in the FCC unit increases over time, the catalyst bed level within the regenerator reaches an upper operating limit, necessitating a small catalyst withdrawal to prevent unacceptably high catalyst emissions into the flue gas stream, or other process upsets.
  • Catalyst withdrawal systems are normally sized for the most demanding operating case, which is when the entire catalyst inventory is removed during a short period of time when the FCC unit is shut down. The periodic operational-type catalyst withdrawals for level control addressed by this invention can take place once a day, once a week, or once a month, depending on how quickly the catalyst inventory level is building. Because these sudden changes in regenerator bed level cause changes in the pressure balance of the FCC unit, they may result in changes in catalyst circulation rate, reactor temperature and/or regenerator temperature, and these upset the stability of the FCC unit operation. As these changes in the dynamic equilibrium force the FCC unit away from its operating limits, the desired product mix and/or effluent composition may not be obtained. As the FCC unit is a major profit center in most refineries, a great deal of time and investment made by refineries to ensure the FCC unit is always operating against its operating limits, thereby maximizing profitability. Anything that forces the operation of the FCC unit away from these limits reduces profitability and is a major detriment to the refiner. Thus, it would be highly desirable to stabilize the FCC operation by eliminating sudden catalyst withdrawals, thus maintaining the dynamic balance of catalyst in a FCC unit.
  • Therefore, there is a need for a catalyst withdrawal apparatus suitable for use with a fluid catalytic cracking catalyst unit.
  • SUMMARY OF THE INVENTION
  • A catalyst withdrawal apparatus and method for regulating catalyst inventory in a fluid catalytic cracking catalyst (FCC) unit is provided. In one embodiment, a catalyst withdrawal apparatus for removing catalyst from a FCC unit includes a pressure vessel having a metering device coupled to a fill port. A heat dissipater is located adjacent the metering device and is adapted to cool catalyst entering the pressure vessel. A sensor is coupled to the pressure vessel arranged to provide a metric indicative of catalyst entering the pressure vessel through the metering device.
  • In another embodiment, a fluid catalyst cracking system is provided that includes a FCC unit having a catalyst withdrawal apparatus coupled thereto and configured to meter catalyst removed from the FCCU.
  • In yet another embodiment, a method for regulating catalyst inventory in a FCC unit includes the steps of determining a change of catalyst present in a FCC unit, withdrawing catalyst from the FCC unit into an isolatable storage vessel coupled to the FCC unit, measuring the amount of catalyst disposed in the storage vessel, and removing the measured catalyst from the storage vessel.
  • DESCRIPTION OF THE DRAWINGS
  • So that the manner in which the above recited features of the present invention are attained and can be understood in detail, a more particular description of the invention, briefly summarized above, may be had by reference to the embodiments thereof which are illustrated in the appended drawings. It is to be noted, however, that the appended drawings illustrate only typical embodiments of this invention and are therefore not to be considered limiting of its scope, for the invention may admit to other equally effective embodiments.
  • FIG. 1 is a simplified schematic view of a conventional fluid catalytic cracking system;
  • FIG. 2 is a simplified schematic diagram of a fluid catalytic cracking system having a catalyst withdrawal system in accordance with one embodiment of the present invention;
  • FIG. 3 is a sectional view of on embodiment of the catalyst withdrawal system of FIG. 2; and
  • FIG. 4 is a flow diagram of one embodiment of a method of regulating catalyst in a fluid catalytic cracking system.
  • To facilitate understanding, identical reference numerals have been used, wherever possible, to designate identical elements that are common to the figures. It is contemplated that features from any one embodiment may be beneficially incorporated in other embodiments without additional recitation.
  • DETAILED DESCRIPTION
  • The invention generally provides catalyst withdrawal apparatus suitable for use on a fluid catalyst cracking (FCC) unit and a method for regulating catalyst inventory in a FCC unit. Advantageously, the invention facilitates the removal of excess catalysts from the FCC unit with minimal process disruption.
  • FIG. 2 is a simplified schematic of a fluid catalytic cracking system 230 having a metered catalyst withdrawal system 240. The fluid catalytic cracking system 230 generally includes a fluid catalytic cracking (FCC) unit 210 coupled to a catalyst injection system 200 and the metered catalyst withdrawal system 240, a controller 220, a petroleum feed stock source 204, an exhaust system 214 and a distillation system 216. One or more catalysts from the catalyst injection system 200 and petroleum from the petroleum feed stock source 204 are delivered to the FCC unit 210. The petroleum and catalysts are reacted in the FCC unit 210 to produce a vapor that is collected and separated into various petrochemical products in the distillation system 216.
  • The heaviest products recovered in the distillation system 216 are generally tested to determine the amount of entrained catalyst. In one embodiment, the testing may be carried out daily or once a shift in a refinery laboratory 218. It is contemplated the amount of entrained catalyst may be determined by other methods, such as, but not limited to some form of online analysis. The metric of entrained catalyst is provided from the laboratory 218 to the controller 220 for using in regulating the catalyst within the FCC unit as further described below.
  • The exhaust system 214 is interface with an exhaust 212 of the regenerator 250 and is adapted to monitor the composition of materials exhausted from the regenerator 250. In one embodiment, the exhaust system 214 is configured to detect a metric of catalyst exiting the regenerator 250 through the exhaust. This metric may be obtained by determining the amount of catalyst particles and/or catalyst fines entrained in the regenerator exhaust. As such, the exhaust system 214 may include a third or fourth stage separator, for example, a cyclone separator 232 and a scrubber 234. The metric of catalyst exiting the regenerator 250 can be provided to the controller 220 and utilized to balance the amount of catalyst within the FCC unit 210 as further described below.
  • The FCC unit 210 includes a regenerator 250 and a reactor 252 as known in the art. The reactor 252 primarily houses the catalytic cracking reaction of the petroleum feed stock and delivers the cracked product in vapor form to the distillation system 216. Spend catalyst from the cracking reaction is transferred from the reactor 252 to the regenerator 250, where the catalyst is rejuvenated by removing coke and other materials. The rejuvenated catalyst is reintroduced into the reactor 252 to continue the petroleum cracking process. By-products from the catalyst rejuvenation process are exhausted from the regenerator 250 through an effluent stack.
  • The FCC unit 210 includes a catalyst injection system 200 that maintains a semi continuous addition of fresh catalyst to the catalyst inventory circulating between the regenerator 250 and the reactor 252. The catalyst injection system 200 includes a main catalyst source 202 and one or more additive sources 206. The main catalyst source 202 and the additive source 206 are coupled to the FCC unit 210 by a process line 222. A fluid source, such as a blower or air compressor 208, is coupled to the process line 222 and provides pressurized fluid, such as air, that is utilized to carry the various powdered catalysts from the sources 202, 206 through the process line 222 and into the FCC unit 210.
  • Typically, different additives are provided from the addition source 206 to the FCC unit 210 to control the ratio of product types recovered in the distillation system 216 (i.e., for example, more LPG than gasoline) and to control the composition of emissions passing through the exhaust system 214, among other process control attributes. The main catalyst source 202 generally delivers a Y-zeolite containing catalyst, which drives the main cracking process. Examples of catalyst injection systems that may be adapted to benefit the invention are described in U.S. Pat. No. 5,389,236, issued Feb. 14, 1995; U.S. Pat. No. 6,358,401, issued Mar. 19, 2002; U.S. patent application Ser. No. 10/304,670 filed Nov. 2, 2002; U.S. Pat. No. 6,859,759 issued Feb. 22, 2005; U.S. patent application Ser. No. 10/445,543, filed May 27, 2003; and U.S. patent application Ser. No. 10/717,250, filed Nov. 19, 2003, all of which are hereby incorporated by reference in their entireties. Other suitable catalyst injection systems that may be adapted to benefit the invention are available from Intercat Equipment Corporation, located in Sea Girt, N.J.
  • The controller 220 is utilized to regulate the addition of catalysts and/or additives made by the injection system 200 and withdrawals made by the metered catalyst withdrawal system 240 so that the dynamic equilibrium of catalyst within the FCC unit 210 may be maintained. As the controller 220 is generally positioned proximate the catalyst sources 206, 202 and the FCC unit 210, the controller 220 is typically housed in an explosion-proof enclosure to prevent spark ignition of gases which may potentially exist on the exterior of the enclosure in a petroleum processing environment. The controller 220 may be equipped with remote access capability so that activity may be monitored from other locations, such as operations center or by catalyst suppliers. A controller having such capability is described in U.S. Pat. No. 6,859,759, issued Feb. 22, 2005 and U.S. patent application Ser. No. 10/304,670, filed Nov. 26, 2002, both of which are hereby incorporated by reference in their entireties.
  • The regenerator 250 may be equipped with one or more sensors that provide a metric indicative of a catalyst level within the regenerator 250. In the embodiment depicted in FIG. 2, the regenerator 250 includes a first sensor 242 and a second sensor 244 configured to detect when the level of catalyst within the regenerator 250 exceeds an upper or lower threshold. The sensor 242, 244 may be an differential pressure measurement device, optical transducer, a capacitance device, a sonic transducer or other device suitable for providing information from which the level or volume of catalyst disposed in the regenerator 250 may be resolved. For example, if the first sensor 242 provides an indication to the controller 220 that the catalyst level is low, the controller 220 may initiate a catalyst injection by the catalyst injection system 200. If the second sensor 244 provides an indication to the controller 220 that the catalyst level is high, the controller 220 may initiate a catalyst withdrawal from the FCC unit by the catalyst withdrawal system 240, or speed up these otherwise semi-continuous withdrawal processes.
  • The metered catalyst withdrawal system 240 is coupled to the regenerator 250 by a conduit 254. A metering device 256 is disposed in the conduit 254 to control the flow of catalyst between the regenerator 250 and the metered withdrawal system 240. An outlet valve 260 is coupled to the catalyst withdrawal system 240 and is configured to control the flow of catalyst between the withdrawal system 240 and the spent catalyst storage/disposal 262. The metering device 256 and outlet valve 260 may be similarly constructed.
  • FIG. 3 depicts a larger view of one embodiment of the metered withdrawal system 240 of FIG. 2. The withdrawal system 240 includes a storage vessel 310 having the metering device 256 and the outlet valve 260 coupled thereto. The storage vessel 310 is typically a metal container suitable for use at high temperatures having a fill port 314 and a discharge port 316. Typically, the discharge port 316 is positioned at or near a bottom of the storage vessel 310. The storage vessel 310 is coupled to a pressure control apparatus 318 that controls the pressure within the storage vessel 310. The pressure control apparatus 318 generally pressurizes the storage vessel 310 to about 5 to about 60 pounds per square inch (about 0.35 to about 4.2 kg/cm2) during withdrawal operations. The apparatus 318 may intermittently vent the storage vessel 310 to about atmospheric pressure to accommodate filling the vessel 310 with catalyst from the regenerator 250.
  • The storage vessel 310 is vented through a vent port 312 that is coupled to the regenerator's exhaust 212 or other suitable effluent stack. A control valve 308 is provided to regulate (or prevent) flow through the vent port 314 from the storage vessel 310. A cyclone 380 or similar device may also be inserted in the vent line to minimize catalyst carryover from the storage vessel 310. Recovered fines from the cyclone 380 may be transferred through a return conduit 382 to the storage vessel 310.
  • In one embodiment, the pressure control apparatus 318 is configured to provide air or other gas into the vessel 310. The air or other gas may be utilized to fluidize, aerate and/or otherwise cool the withdrawn catalyst disposed in the vessel 310. The pressure control apparatus 318 may additionally be configured to control the flow of the air or other gas provided to the vessel 310, thereby providing the ability to optimize cooling of the withdrawn catalyst and control environmental conditions within the storage vessel 310.
  • The metering device 256 is coupled to the fill port 314 to monitor to control the amount of catalyst received from the regenerator 250. The outlet valve 260 is coupled to the discharged port 316 to control the amount of withdrawn catalyst removed from the storage vessel 310 to the spent catalyst storage/disposal 262 through an outlet line 304. The metering device 256 may be an on/off valve such as an everlasting valve, a rotary valve or other device suitable for removing and/or regulating the amount of catalyst withdrawn from the FCC unit 210 into the storage vessel 310. The metering device 256 may determine the amount of catalyst by weight, volume, timed dispense or by other manners. Depending on the catalyst requirements of the system 230, the metering device 256 is typically configured to remove about 0.1 to about 30 tons per day of catalyst from the regenerator 250 without interruption of processing in the FCC unit 210. The metering device 256 typically removes catalysts from the FCC unit 210 periodically over the course of a planned production cycle, typically 24 hours, in multiple shots of predetermined amounts spaced over the production cycle. However, catalysts may also be removed from the FCC unit 210 in an “as needed” basis as discussed above.
  • In the embodiment depicted in FIG. 3, the metering device 256 is a control valve 332 that regulates the amount of catalyst delivered from the regenerator 250 into the storage vessel 310 by timed actuation. The control valve 332 may include shear disk (not shown) for opening and closing a valve orifice. In one embodiment, the shear disk rotates eccentricity while additionally rotating clear of the orifice to provide a self-lapping, seat cleaning action that prevents the withdrawn catalyst from grooving the sealing surfaces of the shear disk and valve seat that could cause the valve leakage. One valve that may be adapted to benefit from the invention is available from the Everlasting Valve Company, located in South Plainfield, N.J. Other control valves may alternatively be utilized.
  • Generally, the control valve 332 and the outlet valve 260 are interlocked to prevent simultaneous opening. This allows data to be obtained between valve 332, 260 openings such that the amount of catalyst entering and leaving the storage vessel 310 may be accurately resolved. In one embodiment, the outlet valve 260 is opened while the pressure regulating system 240 provides air at about 60 psi (about 4.2 kg/cm2) into the interior of the storage vessel 310 to cause catalyst to flow from the storage vessel 310 through the valve 260 and into the spent catalyst storage/disposal 262 via the outlet line 304.
  • Referring back to FIG. 2, the metered withdrawal system 240 includes one or more sensors 264 for providing a metric suitable for resolving the amount of catalyst passing through the metering device 256 during each withdrawal of catalyst from the regenerator 250. The sensors 264 may be configured to detect the level (i.e., volume) of catalyst in the storage vessel 310, the weight of catalyst in the storage vessel 310 and/or the rate of catalyst movement through at least one of the storage vessel 310, the fill port 314, the discharge port 316, the metering device 256, the outlet valve 260, the conduit 254 or outlet line 304.
  • In the embodiment depicted in FIG. 3, the sensor 264 is a plurality of load cells 306 adapted to provide a metric indicative of the weight of catalyst in the storage vessel 310. The load cells 306 are respectively coupled to a plurality of legs 336 that supports the storage vessel 310 above a surface 320, such as a concrete pad. Each of the legs 336 has one load cell 320 coupled thereto. The controller 220 receives the outputs of the load cells 320 and utilizes sequential data samples obtained therefrom to resolve the net amount of withdrawn catalyst after each actuation of the metering device 256. Data samples are also taken after actuation of the outlet valve 260 such that the true amount of catalyst withdrawn from the FCC unit 210 through the system 240 may be accurately determined. Additionally, the net amount of catalyst withdrawn over the course of the production cycle may be monitored so that variations in the amount of catalyst dispensed in each individual shot may be compensated for by adjusting the delivery attributes of the metering device 256, for example, changing the open time of the control valve 332 to allow more (or less) catalyst to pass therethrough and be removed from the FCC unit 210.
  • Alternatively, the sensor 264 may be a level sensor 328 coupled to the storage vessel 310 and adapted to detect a metric indicative of the level of catalyst within the storage vessel 310. The level sensor 328 may be a differential pressure measuring device, an optical transducer, a capacitance device, a sonic transducer or other device suitable for providing information from which the level or volume of catalyst disposed in the storage vessel 310 may be resolved. By utilizing the sensed difference in the level of catalyst disposed in the storage vessel 310 after dispenses, the amount of catalyst removed from the regenerator 250 may be resolved for a known storage vessel geometry.
  • Alternatively, the sensor 264 may be a flow sensor 330 adapted to detect the flow of catalyst through one of the components of the catalyst withdrawal system 240. The flow sensor 330 maybe a contact or non-contact device and may be mounted to the storage vessel 310, the metering device 256 or the conduit 254 coupling the storage vessel 310 to the waste container. In the embodiment depicted in FIG. 3, the flow sensor 330 may be a sonic flow meter or capacitance device adapted to detect the rate of entrained particles (i.e., catalyst) moving through the delivery line 308.
  • Returning to FIG. 2, a heat dissipater 258 is coupled to or positioned approximate to the conduit 254. The heat dissipater 258 is configured to extract heat from the catalyst within conduit 254, thereby reducing the temperature of the catalyst flowing from the regenerator 250 to the metered withdrawal system 240.
  • Referring additionally to FIG. 3, the heat dissipater 258 may be positioned proximate the conduit 254 between the regenerator 250 and the metering device 256, or positioned proximate the conduit 254 between the metering device 256 and the storage vessel 310. In another embodiment, the conduit 254 may be coiled or define a torturous path such that the heat dissipater 258 may be interfaced with a greater length of conduit than if the conduit was routed in a straight line path as shown in FIG. 2, thereby improving the amount of heat transferred therebetween.
  • The heat dissipater 258 may include at least one or more temperature regulating features. For example, the heat dissipater 258 may include heat transfer fins 342. In another embodiment, the heat dissipater 258 may include one or more conduits 344 coupled to a fluid source 346 through which a heat transfer fluid is flowed. By reducing the temperature of catalyst being withdrawn from the regenerator 250, the design constraint of the withdrawal system 240 may be relaxed accordingly with the reduction in catalyst temperature entering the vessel 310.
  • Similarly, the storage vessel 310 may also be equipped with a thermal regulating device 358 to reduce the temperature of the storage vessel 310. The thermal regulating device 358 may be configured similar to the heat dissipater 258 described above. For example, the thermal regulating device 358 may include heat transfer fins 360. In another embodiment, the thermal regulating device 358 may include one or more conduits 362 coupled to a fluid source 364 through which a heat transfer fluid is flowed.
  • The storage vessel 310 may alternatively and/or additionally be cooled as described above by providing fluid from the pressure control apparatus 318 into the vessel 310. The control valve 308 may also be periodically opened to allow heated gases disposed on the interior volume of the vessel 310 to be removed and replace by cooler gas provided from the pressure control apparatus 318.
  • The temperature of the gas and/or catalyst entering vessel 310 may be monitored using a sensor 384. If the controller 220 determines, in response to a metric of temperature provided by the sensor 384, that the temperature of the gas and/or catalyst entering the vessel exceed a predefined limit, then a remedial action may be initiated. For example, remedial actions may include at least one of shutting off the flow through into the vessel 310 to allow the system to cool before restarting, reducing the flow rate of catalyst into vessel 310 using the regulating device 256, increasing the heat extraction rate of the heat dissipater 258 or adding an extra flow of cold air to the catalyst leaving the regenerator to cool it down through jets 386 formed in the conduit 254.
  • Returning to FIG. 2, the controller 220 is provided to control the function of at least the withdrawal system 240. The controller 220 may be any suitable logic device for controlling the operation of the catalyst withdrawal system 240. In one embodiment, the controller 220 is a programmable logic controller (PLC), such as those available from GE Fanuc. However, from the disclosure herein, those skilled in the art will realize that other controllers such as microcontrollers, microprocessors, programmable gate arrays, and application specific integrated circuits (ASICs) may be used to perform the controlling functions of the controller 220. It is contemplated that the injection system 200 and the withdrawal system 240 may have separate controllers, which may, or may not, be linked.
  • The controller 220 is coupled to various support circuits that provide various signals to the controller 220. These support circuits include, power supplies, clocks, input and output interface circuits and the like. Other support circuits couple to the temperature sensor 384, the sensors 264, the metering device 256, the outlet valve 260, the pressure control apparatus 318 and the like, to the controller 220.
  • FIG. 4 is flow diagram of one embodiment of a method 400 for regulating catalyst within a FCC unit. The method 400 begins at step 402 by obtaining a metric of catalyst lost and/or removed from the FCC unit. The metric of catalyst lost may be a predefined value. For example, based on empirical data, or calculated data, or maybe a provided real time and/or as an updated metric. Examples of updated and/or provided metrics include a metric of catalyst entrained in the product stream at the distiller, catalyst exiting the regenerator through the exhaust system, catalyst removed from the metered withdrawal system, among others.
  • At step 404, a metric of catalyst additions are obtained. The metric of catalyst addition are typically attained from the catalyst addition system, in the form of catalyst and/or additives added to the FCC unit.
  • At step 406, an amount of catalyst within the FCC unit is determined. In one embodiment, the amount of catalyst is determined by summing the catalyst additions obtained at step 404 minus the catalyst removed from the system obtained at step 402. The determination of catalyst within the FCC unit may be made from data obtained over a predetermined period of time. The predetermined period of time may be in fractions of an hour, hourly, daily or over other time periods. The determination of catalyst within the FCC unit may be made from data obtained real time, for example, by monitoring a data stream such as regenerator bed level. As the process described above is iterative, the total catalyst determined may, alternatively, be calculated by subtracting the catalyst removed over the period from the last determination and adding the catalyst added over the same period.
  • At step 408, the catalyst amount is compared against a threshold value or process window. If the determined catalyst is outside of a predefined process window (or exceeds the threshold), appropriate catalyst additions or withdrawals are made at step 410. This cycle of monitoring the amount of catalyst is repeated in order to maintain the dynamic catalyst equilibrium in the FCC unit. Advantageously, this allows the FCC unit to continue operating at or near processing limits with minimal fluctuation, thereby providing the desired product mix and emissions composition with minimal dis-optimisation, thereby maximizing the profitability of the FCC system refiner.
  • In another embodiment of a method for regulating catalyst within a FCC unit, the withdrawal system 240 may be set to remove a predefined amount of catalyst over a predefined period of time. For example, the withdrawal system 240 may be set to remove a target withdrawal of about 4 tons of catalyst per day. The withdrawal may be made in predetermined increments, such that a total withdrawal amount will be made over the predefined period. In one embodiment the operator may manually initiate withdrawals from the regenerator 250 using the system 240. For example, the operator may initiate a withdrawal in response to the catalyst bed level within the regenerator 250, such as provided by information obtained by the sensor 244, The manual withdrawal may be made in addition to the target withdrawal, or count against the target withdrawal for that time period.
  • Although the teachings of the present invention have been shown and described in detail herein, those skilled in the art can readily devise other varied embodiments that still incorporate the teachings and do not depart from the scope and spirit of the invention.

Claims (4)

1. A method for controlling an amount of catalyst in a fluid catalytic cracking unit, comprising:
determining a change of catalyst present in a catalytic cracking unit (FCCU);
withdrawing catalyst from the FCCU into an isolatable storage vessel coupled to the FCCU;
measuring the amount of catalyst disposed in the storage vessel; and
removing the measured catalyst from the storage vessel.
2. The method of claim 1, wherein the step of measuring further comprises:
sensing a metric of catalyst disposed in the storage vessel.
3. The method of claim 2, wherein the step of sensing further comprises:
determining a change in weight of the storage vessel.
4. The method of claim 2, wherein the step of withdrawing further comprises:
venting the storage vessel.
US12/201,146 2005-07-19 2008-08-29 Catalyst withdrawal method for regulating catalyst inventory in a fluid catalyst cracking unit Abandoned US20080308453A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US12/201,146 US20080308453A1 (en) 2005-07-19 2008-08-29 Catalyst withdrawal method for regulating catalyst inventory in a fluid catalyst cracking unit

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US11/184,125 US7431894B2 (en) 2005-07-19 2005-07-19 Catalyst withdrawal apparatus for regulating catalyst inventory in a fluid catalyst cracking unit
US12/201,146 US20080308453A1 (en) 2005-07-19 2008-08-29 Catalyst withdrawal method for regulating catalyst inventory in a fluid catalyst cracking unit

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
US11/184,125 Division US7431894B2 (en) 2005-07-19 2005-07-19 Catalyst withdrawal apparatus for regulating catalyst inventory in a fluid catalyst cracking unit

Publications (1)

Publication Number Publication Date
US20080308453A1 true US20080308453A1 (en) 2008-12-18

Family

ID=37669434

Family Applications (2)

Application Number Title Priority Date Filing Date
US11/184,125 Active 2027-01-16 US7431894B2 (en) 2005-07-19 2005-07-19 Catalyst withdrawal apparatus for regulating catalyst inventory in a fluid catalyst cracking unit
US12/201,146 Abandoned US20080308453A1 (en) 2005-07-19 2008-08-29 Catalyst withdrawal method for regulating catalyst inventory in a fluid catalyst cracking unit

Family Applications Before (1)

Application Number Title Priority Date Filing Date
US11/184,125 Active 2027-01-16 US7431894B2 (en) 2005-07-19 2005-07-19 Catalyst withdrawal apparatus for regulating catalyst inventory in a fluid catalyst cracking unit

Country Status (8)

Country Link
US (2) US7431894B2 (en)
EP (1) EP1904294B1 (en)
CN (1) CN101223027B (en)
AU (2) AU2006270144B2 (en)
CA (1) CA2615893C (en)
MX (1) MX2008000873A (en)
WO (1) WO2007011808A2 (en)
ZA (1) ZA200800544B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108714402A (en) * 2018-05-31 2018-10-30 中石化(洛阳)科技有限公司 It is a kind of for fluidized bed plant catalyst it is online determine carbon system, its determine carbon evaluation method and fluidized bed plant online

Families Citing this family (44)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7597797B2 (en) * 2006-01-09 2009-10-06 Alliance Process Partners, Llc System and method for on-line spalling of a coker
WO2008021774A1 (en) * 2006-08-07 2008-02-21 Intercat Equipment, Inc. Vacuum powered addition system
US8092756B2 (en) * 2008-02-05 2012-01-10 Intercat Equipment, Inc. Catalyst withdrawal apparatus and method for regulating catalyst inventory in a unit
US20090277514A1 (en) * 2008-05-09 2009-11-12 D-Cok, Llc System and method to control catalyst migration
CA2731074C (en) * 2008-07-17 2017-01-03 Intercat Equipment, Inc. Material delivery system to one or more units and methods of such delivery
EP2321383B1 (en) * 2008-09-05 2013-07-03 Intercat Equipment, Inc. Material withdrawal apparatus and methods of regulating material inventory in one or more units
CN102264870B (en) * 2008-12-23 2014-01-08 英特卡设备有限公司 Material withdrawal apparatus and methods of regulating material inventory in one or more units
US9284495B2 (en) * 2009-03-20 2016-03-15 Uop Llc Maintaining catalyst activity for converting a hydrocarbon feed
US10016737B2 (en) 2015-03-03 2018-07-10 Johnson Matthey Public Limited Company Withdrawal system
CN107407524A (en) 2015-03-03 2017-11-28 庄信万丰处理技术股份有限公司 Heat exchanger
US9864823B2 (en) 2015-03-30 2018-01-09 Uop Llc Cleansing system for a feed composition based on environmental factors
US10222787B2 (en) 2016-09-16 2019-03-05 Uop Llc Interactive petrochemical plant diagnostic system and method for chemical process model analysis
US10684631B2 (en) * 2017-03-27 2020-06-16 Uop Llc Measuring and determining hot spots in slide valves for petrochemical plants or refineries
US10678272B2 (en) * 2017-03-27 2020-06-09 Uop Llc Early prediction and detection of slide valve sticking in petrochemical plants or refineries
US10754359B2 (en) * 2017-03-27 2020-08-25 Uop Llc Operating slide valves in petrochemical plants or refineries
US11396002B2 (en) 2017-03-28 2022-07-26 Uop Llc Detecting and correcting problems in liquid lifting in heat exchangers
US10794401B2 (en) 2017-03-28 2020-10-06 Uop Llc Reactor loop fouling monitor for rotating equipment in a petrochemical plant or refinery
US10670027B2 (en) 2017-03-28 2020-06-02 Uop Llc Determining quality of gas for rotating equipment in a petrochemical plant or refinery
US11037376B2 (en) 2017-03-28 2021-06-15 Uop Llc Sensor location for rotating equipment in a petrochemical plant or refinery
US10663238B2 (en) 2017-03-28 2020-05-26 Uop Llc Detecting and correcting maldistribution in heat exchangers in a petrochemical plant or refinery
US11130111B2 (en) 2017-03-28 2021-09-28 Uop Llc Air-cooled heat exchangers
US10962302B2 (en) 2017-03-28 2021-03-30 Uop Llc Heat exchangers in a petrochemical plant or refinery
US10816947B2 (en) 2017-03-28 2020-10-27 Uop Llc Early surge detection of rotating equipment in a petrochemical plant or refinery
US10794644B2 (en) 2017-03-28 2020-10-06 Uop Llc Detecting and correcting thermal stresses in heat exchangers in a petrochemical plant or refinery
US10752844B2 (en) 2017-03-28 2020-08-25 Uop Llc Rotating equipment in a petrochemical plant or refinery
US10844290B2 (en) 2017-03-28 2020-11-24 Uop Llc Rotating equipment in a petrochemical plant or refinery
US10670353B2 (en) 2017-03-28 2020-06-02 Uop Llc Detecting and correcting cross-leakage in heat exchangers in a petrochemical plant or refinery
US10752845B2 (en) 2017-03-28 2020-08-25 Uop Llc Using molecular weight and invariant mapping to determine performance of rotating equipment in a petrochemical plant or refinery
US10695711B2 (en) 2017-04-28 2020-06-30 Uop Llc Remote monitoring of adsorber process units
AR111737A1 (en) * 2017-05-05 2019-08-14 Dow Global Technologies Llc EXTRACTION SYSTEM OF BULK CATALYST AND METHODS FOR THE USE OF THE SAME
US10913905B2 (en) 2017-06-19 2021-02-09 Uop Llc Catalyst cycle length prediction using eigen analysis
US11365886B2 (en) 2017-06-19 2022-06-21 Uop Llc Remote monitoring of fired heaters
US10739798B2 (en) 2017-06-20 2020-08-11 Uop Llc Incipient temperature excursion mitigation and control
US11130692B2 (en) 2017-06-28 2021-09-28 Uop Llc Process and apparatus for dosing nutrients to a bioreactor
CN110869115B (en) 2017-07-07 2023-04-18 庄信万丰处理技术股份有限公司 Extraction system
WO2019020655A1 (en) * 2017-07-28 2019-01-31 Hte Gmbh The High Throughput Experimentation Company Device and method for catalytically converting chemical substances at dwell times in the range of 0.1-10 seconds
US10994240B2 (en) 2017-09-18 2021-05-04 Uop Llc Remote monitoring of pressure swing adsorption units
US11194317B2 (en) 2017-10-02 2021-12-07 Uop Llc Remote monitoring of chloride treaters using a process simulator based chloride distribution estimate
US11676061B2 (en) 2017-10-05 2023-06-13 Honeywell International Inc. Harnessing machine learning and data analytics for a real time predictive model for a FCC pre-treatment unit
US11105787B2 (en) 2017-10-20 2021-08-31 Honeywell International Inc. System and method to optimize crude oil distillation or other processing by inline analysis of crude oil properties
JP2021505375A (en) 2017-12-11 2021-02-18 ビーエーエスエフ コーポレーション Reactive silica-alumina matrix component composition for residual oil decomposition catalyst
US10901403B2 (en) 2018-02-20 2021-01-26 Uop Llc Developing linear process models using reactor kinetic equations
US10734098B2 (en) 2018-03-30 2020-08-04 Uop Llc Catalytic dehydrogenation catalyst health index
US10953377B2 (en) 2018-12-10 2021-03-23 Uop Llc Delta temperature control of catalytic dehydrogenation process reactors

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4211636A (en) * 1975-08-27 1980-07-08 Mobil Oil Corporation FCC Catalyst section control
US5464591A (en) * 1994-02-08 1995-11-07 Bartholic; David B. Process and apparatus for controlling and metering the pneumatic transfer of solid particulates

Family Cites Families (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3009588A (en) * 1959-06-30 1961-11-21 Socony Mobil Oil Co Inc Pressure control in solids transfer systems
US4018671A (en) * 1975-01-14 1977-04-19 Marathon Oil Company Intermittent catalyst addition system
US4327055A (en) * 1979-12-31 1982-04-27 Exxon Research & Engineering Co. Continuous catalyst unloading device
US4769127A (en) * 1985-09-30 1988-09-06 Amoco Corporation Computerized monorail catalyst handling process and system for resid hydrotreating units
US4840726A (en) * 1986-11-20 1989-06-20 Atlantic Richfield Company Method for determining and controlling the amount of finely divided particulate solids added to a stream of fluid
JPS63294934A (en) * 1987-12-21 1988-12-01 Koa Sekiyu Kk Method for measuring and supplying fcc catalyst
US4888156A (en) * 1988-04-29 1989-12-19 Houdry Process Corporation Fluid catalytic cracking unit regeneration having internal cooling means
US5389236A (en) * 1993-04-21 1995-02-14 Bartholic; David B. Method and apparatus for controlling introduction of catalysts into FCC units
US5464691A (en) * 1994-07-22 1995-11-07 Arizona Chemical Company Laminated barrier film
DE19605435A1 (en) * 1996-02-14 1997-08-21 Basf Ag Process for the preparation of aldehydes by hydroformylation with a rhodium catalyst and recovery of the rhodium catalyst by extraction
US5810045A (en) * 1996-12-16 1998-09-22 Bulldog Technologies U.S.A., Inc. Valve device for introducing particulate materials into a high pressure air stream
US6358401B1 (en) * 1999-07-14 2002-03-19 Intercat Equipment, Inc. Apparatus and procedures for replenishing particulate materials used in industrial processes
US6878656B2 (en) * 2002-10-07 2005-04-12 David B. Bartholic Method for preparing a substitute for fresh fluid catalytic cracking catalyst
US6859759B2 (en) * 2002-12-16 2005-02-22 Intercat Equipment, Inc. Method and apparatus for monitoring catalyst requirements of a fluid catalytic cracking catalyst injection system
US6974559B2 (en) * 2003-02-26 2005-12-13 Intercat Equipment, Inc. Apparatus for metering catalyst in a fluid catalytic cracking catalyst injection system
US20040099572A1 (en) * 2002-11-26 2004-05-27 Martin Evans FCC catalyst injection system having closed loop control
US7050944B2 (en) * 2002-11-26 2006-05-23 Intercat Equipment, Inc. FCC catalyst injection system having local data access

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4211636A (en) * 1975-08-27 1980-07-08 Mobil Oil Corporation FCC Catalyst section control
US5464591A (en) * 1994-02-08 1995-11-07 Bartholic; David B. Process and apparatus for controlling and metering the pneumatic transfer of solid particulates

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108714402A (en) * 2018-05-31 2018-10-30 中石化(洛阳)科技有限公司 It is a kind of for fluidized bed plant catalyst it is online determine carbon system, its determine carbon evaluation method and fluidized bed plant online

Also Published As

Publication number Publication date
CN101223027B (en) 2014-04-02
ZA200800544B (en) 2009-04-29
US7431894B2 (en) 2008-10-07
WO2007011808A2 (en) 2007-01-25
CN101223027A (en) 2008-07-16
EP1904294A4 (en) 2009-12-02
WO2007011808A3 (en) 2007-11-01
AU2006270144B2 (en) 2009-12-10
US20070020154A1 (en) 2007-01-25
CA2615893A1 (en) 2007-01-25
AU2010200915B2 (en) 2012-05-10
EP1904294B1 (en) 2013-03-13
AU2010200915A1 (en) 2010-04-01
MX2008000873A (en) 2008-03-26
EP1904294A2 (en) 2008-04-02
CA2615893C (en) 2010-10-12
AU2006270144A1 (en) 2007-01-25

Similar Documents

Publication Publication Date Title
US7431894B2 (en) Catalyst withdrawal apparatus for regulating catalyst inventory in a fluid catalyst cracking unit
US7572364B2 (en) Fluid catalytic cracking system with fines addition system
Blanding Reaction rates in catalytic cracking of petroleum
JP6082175B2 (en) Advanced control of severe fluid catalytic cracking process to maximize propylene production from petroleum feedstock
US7390396B2 (en) Catalyst injection system with pressure control
Han et al. Modeling and optimization of a fluidized catalytic cracking process under full and partial combustion modes
US11473020B2 (en) Fluid catalytic cracking of petroleum oil with reduced emissions
EP2376602B1 (en) Method of withdrawing material from an fcc unit
RU2764214C1 (en) Evaluation of the service life of the cyclone based on the remaining thickness of the abrasion-resistant lining
Radu et al. Modelling and simulation of an industrial fluid catalytic cracking unit
Gauthier et al. Industrial development and operation of an efficient riser separation system for FCC units
Jarullah et al. Optimal design and
Thomas et al. Steady State Analysis of a UOP SBS Fluid Catalytic Cracking Unit in Aspen HYSYS
Jack et al. MODELLING FLUID CATALYTIC CRACKING REACTOR FOR CRACKING OF GAS OIL
Hongdul A Study of Ni/V contamination and interaction in cracking catalyst

Legal Events

Date Code Title Description
AS Assignment

Owner name: INTERCAT, INC., NEW JERSEY

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:EVANS, MARTIN;REEL/FRAME:021461/0814

Effective date: 20050718

AS Assignment

Owner name: INTERCAT-SAVANNAH, INC., GEORGIA

Free format text: MERGER;ASSIGNOR:INTERCAT EQUIPMENT, INC.;REEL/FRAME:037674/0320

Effective date: 20140331

AS Assignment

Owner name: INTERCAT TRANSPORTATION, INC., GEORGIA

Free format text: MERGER;ASSIGNOR:INTERCAT-SAVANNAH, INC.;REEL/FRAME:037735/0978

Effective date: 20140331

AS Assignment

Owner name: INTERCAT, INC., GEORGIA

Free format text: MERGER;ASSIGNOR:INTERCAT TRANSPORTATION, INC.;REEL/FRAME:037762/0845

Effective date: 20140331

AS Assignment

Owner name: JOHNSON MATTHEY PROCESS TECHNOLOGIES, INC., GEORGI

Free format text: CHANGE OF NAME;ASSIGNOR:INTERCAT, INC.;REEL/FRAME:037866/0993

Effective date: 20140331

STCB Information on status: application discontinuation

Free format text: ABANDONED -- AFTER EXAMINER'S ANSWER OR BOARD OF APPEALS DECISION