US20080281540A1 - Apparatus and method for estimating synchronized phasors at predetermined times referenced to a common time standard in an electrical system - Google Patents
Apparatus and method for estimating synchronized phasors at predetermined times referenced to a common time standard in an electrical system Download PDFInfo
- Publication number
- US20080281540A1 US20080281540A1 US12/114,898 US11489808A US2008281540A1 US 20080281540 A1 US20080281540 A1 US 20080281540A1 US 11489808 A US11489808 A US 11489808A US 2008281540 A1 US2008281540 A1 US 2008281540A1
- Authority
- US
- United States
- Prior art keywords
- phasor
- referenced
- signal
- power system
- acquisition time
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R19/00—Arrangements for measuring currents or voltages or for indicating presence or sign thereof
- G01R19/25—Arrangements for measuring currents or voltages or for indicating presence or sign thereof using digital measurement techniques
- G01R19/2513—Arrangements for monitoring electric power systems, e.g. power lines or loads; Logging
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/70—Smart grids as climate change mitigation technology in the energy generation sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/22—Flexible AC transmission systems [FACTS] or power factor or reactive power compensating or correcting units
Definitions
- the present invention generally relates to monitoring, metering, protection and control of electrical systems, and more specifically, to an apparatus and method for estimating synchronized phasors at predetermined times referenced to an absolute time standard in an electrical system.
- Electrical power systems include a variety of power system elements such as electrical generators, electrical motors, power transformers, power transmission lines, buses and capacitors, to name a few.
- the electric power systems also include various monitoring devices, control devices, metering devices, and protective devices (e.g. protective relays).
- these devices are microprocessor-based or “intelligent” electronic devices (IEDs), that utilize phasors (i.e., a constant complex number representing a sinusoidal function of time) to perform their respective function(s).
- IEDs microprocessor-based or “intelligent” electronic devices
- phasors i.e., a constant complex number representing a sinusoidal function of time
- the phasors are derived from local or shared remote measurements sampled from currents and/or voltages of the electric power system.
- the accuracy of such measurements is of paramount importance when achieving a desired level of electrical power system performance. Such accuracy is predicated on both the accuracy of the measurement itself and the accuracy of the knowledge of the acquisition time of the measurement.
- the absolute time standard typically includes one of the coordinated universal time (UTC) or international atomic time (TAI), distributed by the Global Positioning System (GPS) and then with a time protocol such as the Inter Range Instrumentation Group time code standard (IRIG) or over Ethernet.
- UTC coordinated universal time
- TAI international atomic time
- GPS Global Positioning System
- IRIG Inter Range Instrumentation Group time code standard
- Systems employing absolute time reference schemes utilize voltage and/or current measurements that are sampled from analog voltage and/or current signal(s) with respect to the absolute time. As a result, both the measurement value and the time at which the measurement value is acquired can be obtained, processed, stored, and/or transported with high accuracy.
- synchronized phasors In applications such as power system state determination, it is desirable to sample voltage and/or current signals at many points across the electric power system at the same moment. In that case, using an absolute time standard, the voltages and/or current signals are sampled at a coordinated time instant to allow synchronization of the acquisition across the network. The resulting voltage and/or current measurements are processed to form “synchronized phasors” which are then utilized to enable new applications for the monitoring, metering, protection, and control of the electric power generation, transmission, and distribution network of the electric power system. The synchronized phasors may also be stored for subsequent use in analyzing a fault or other anomalous electrical power system condition.
- Real-time monitoring of the present state of the electrical power system is often accomplished using a state-estimation algorithm.
- the state-estimation algorithm utilizes measured voltage and power measurements that are collected from monitored points or nodes in the electric power system. The measured quantities are then used to estimate the state of the electric power system.
- One inherent limitation of state-estimation algorithms however is the time delay introduced as a result of the estimation of the power system state. It is therefore desirable to minimize the delay due to determination of the estimated state values, as well as any delay between the determination of the estimated state values and any subsequent control action (i.e. a control latency).
- An electric power system utilizing the synchronized phasors can aid in reducing the control latency inherent in state-estimation algorithms. Because each synchronized phasor represents a present state value of the power system, derivation of estimated state values is not required, and the mechanisms which determine the control action are able to act more quickly.
- a further application for the use of synchronized phasors includes the dynamic or continuous recording of the variable electric power system magnitude and phase angle. Utilizing such a dynamic recording enables subsequent analysis of changes in the electric power system due to, for example, opening or closing a line, equilibrium differences between generation and load, or unstable power swings. A number of types of protection functions such as those found in protective relays may also benefit from the use of synchronized phasors.
- synchronized phasors may be used to improve detection of the loss of electric power system synchronization when generators begin operation at different speeds.
- a remedial action scheme can be quickly employed to “island” a portion(s) of the electric power system or shed a load.
- phasors are calculated from stepped-down analog voltage and current signals of the electric power system.
- the analog voltage and/or current signals are filtered, sampled with respect to the local power system frequency (e.g., 60 Hz) and processed to form phasors suitable for use by a microprocessor or other intelligent device.
- Synchronous phasors are similarly calculated except that they are sampled with respect to an absolute time standard and derived with respect to a coordinated time instant.
- the absolute time reference is generated via GPS, transmitting time and location information that is used by local receivers of the intelligent electronic devices.
- the acquisition may be based on deriving each sample instant from the absolute time reference, and recording the time at which the sample is taken.
- a synchronized phasor or phasor quantity must be referenced to a standard to allow correlation to other synchronized phasors even when the synchronized phasors are acquired from multiple electric power system locations with varying states and frequencies.
- One method known in the art that may be used to reference a synchronized phasor includes correlating an associated sampled voltage or current signal to a phasor with a frequency equal to the nominal power system frequency and with a predetermined phase that has been set in all of the IEDs or measuring devices.
- a single analog quantity can be chosen as the reference for all IEDs communicating and sharing the synchronized phasors.
- the frequency at one point in the distribution scheme is sometimes chosen as a reference for all devices computing synchronized phasors.
- a feature of a reference signal such as a zero crossing, can provide the reference for the phase value.
- an apparatus estimates a plurality of synchronized phasors at predetermined times referenced to an absolute time standard in an electrical power system.
- the apparatus includes a sample controller configured to determine a frequency of a power system signal acquired at each location of the electrical power system where the synchronized phasors are calculated, a sampling means configured to sample the power system signal at a sampling interval rate based on a frequency of the power system signal to form a plurality of signal samples, a time controller configured to generate a plurality of acquisition time values based on an occurrence of each of the plurality signal samples at a corresponding plurality of different times referenced to the absolute time standard.
- Each of the plurality of acquisition time values is associated with a phasor magnitude and a phasor phase angle derived from each of the plurality of signal samples.
- the apparatus also includes a phasor estimator configured to adjust the phasor magnitude and the phasor phase angle for each of the plurality of signal samples based on a time difference between a corresponding selected acquisition time value of the plurality of acquisition time values and a predetermined time of the predetermined times referenced to the absolute time standard to form the plurality of synchronized phasors.
- a method estimates a plurality of synchronized phasors at predetermined times referenced to an absolute time standard in an electrical power system.
- the method includes acquiring a power system signal at a location of the electrical power system, determining a frequency of the power system signal, sampling the power system signal at a sampling interval rate based on a frequency of the power system signal to form a plurality of signal samples, and generating a plurality of acquisition time values based on an occurrence of each of the plurality signal samples at a corresponding plurality of different times referenced to the absolute time standard.
- Each of the plurality of acquisition time values is associated with a phasor magnitude and a phasor phase angle derived from each of the plurality of signal samples.
- the method further includes adjusting the phasor magnitude and the phasor phase angle based on a time difference between a corresponding selected acquisition time value of the plurality of acquisition time values and a predetermined time of the predetermined times referenced to the absolute time standard to form the plurality of synchronized phasors.
- the location of the power system is local and the power system signal is a local analog input signal.
- the location of the power system is remote and the power system signal is a digitized remote analog input signal.
- a method estimates a plurality of synchronized phasors at predetermined times referenced to an absolute time standard in an electrical power system.
- the method includes acquiring a power system signal at a location of the electrical power system, determining a frequency of the power system signal, sampling the power system signal at a sampling interval rate based on a frequency of the power system signal to form a plurality of signal samples, and generating a plurality of acquisition time values based on an occurrence of each of the plurality signal samples at a corresponding plurality of different times referenced to the absolute time standard, each of the plurality of acquisition time values associated with a phasor magnitude and a phasor phase angle derived from each of the plurality of signal samples.
- the method further includes interpolating the phasor magnitude and rotating phasor phase angle to form a corresponding plurality of referenced phasor magnitudes and referenced phasor phase angles of the plurality of synchronized phasors based on a time difference between a corresponding selected acquisition time value of the plurality of acquisition time values and a predetermined time of the predetermined times referenced to the absolute time standard.
- FIG. 1 is a single line schematic of a power system that may be utilized in a typical wide area network.
- FIG. 2 is a block diagram of the power system and the IED of FIG. 1 in conjunction with a time source configured to deliver an absolute time, according to an embodiment of the invention.
- FIG. 3 is a functional block diagram of the IED of FIG. 1 , according to an embodiment of the invention.
- FIG. 4 is a functional block diagram of the phasor estimation of FIG. 3 , according to an embodiment of the invention.
- FIG. 5 is an exemplary timeline illustrating the relationship between the selected acquisition time values T a , T b , T c . . . , the acquisition time values T 1 , T 2 , T 3 . . . and the predetermined times t 1 , t 2 , t 3 . . . referenced to an absolute time standard of the phasor estimation of FIG. 4 , according to an embodiment of the invention.
- FIG. 6A is a functional block diagram of an exemplary phasor adjustment block of FIG. 4 , according to an embodiment of the invention.
- FIG. 6B is a functional block diagram of another exemplary phasor adjustment block of FIG. 4 , according to an embodiment of the invention.
- FIG. 7 is a functional block diagram of another IED of FIG. 1 that may be used in conjunction with remote acquisition devices, according to an embodiment of the invention.
- FIG. 8 is a functional block diagram of yet another IED of FIG. 1 , according to an embodiment of the invention.
- FIG. 9 is a functional block diagram of a phasor estimation of FIG. 8 , according to an embodiment of the invention.
- FIG. 10 is a functional block diagram of an exemplary interpolate block of the phasor estimation of FIG. 9 , according to an embodiment of the invention.
- FIG. 11 is a functional block diagram of a correct block of FIG. 8 , according to an embodiment of the invention.
- FIG. 12 is a functional block diagram of yet another IED of FIG. 1 , according to an embodiment of the invention.
- the present invention provides a calculation of synchronized phasors at predetermined times referenced to an absolute time standard, in a manner that eliminates the need for further time alignment, and allowing correlation to all synchronized phasors in the system, even when they are acquired from multiple electric power system locations with varying states and differing frequencies.
- the sampling interval rate is variable, based on the varying frequency of the local power system signal and can furthermore be based on an exact multiple of the frequency of the local power system signal. No corrections for frequency deviations are required. It provides synchronized phasors which are further processed for power system protection applications requiring sampling intervals also based on a multiple of the local power system frequency.
- the invention does not require sampling to be synchronized or based on the same frequency between measuring devices (e.g. IEDs) which are estimating the synchronized phasors. Control of the sampling interval is not based on an absolute time reference.
- the invention is simple in implementation and is computationally inexpensive. It allows the predetermined absolute time reference moment to be uniformly determined between the IEDs utilizing the phasors, or to be independently locally determined. It provides for the synchronized phasors to be referenced to a phasor of predetermined phase and frequency. Applications can provide signals for protection, monitoring, recording, metering, control, analyzing, or further processing due to the absolute time reference moment providing a common scale against which the signals can be compared.
- FIG. 1 is a single line schematic diagram of a power system 10 that may be utilized in a typical wide area.
- the power system 10 includes, among otherthings, three synchronous generators 11 , 12 and 13 , configured to generate three-phase sinusoidal waveforms such as 12 kV sinusoidal waveforms, three step-up power transformers 14 a , 14 b and 14 c , configured to increase the generated waveforms to a higher voltage sinusoidal waveforms such as 138 kV sinusoidal waveforms and a number of circuit breakers 18 .
- the step-up power transformers 14 a , 14 b , 14 c operate to provide the higher voltage sinusoidal waveforms to a number of long distance transmission lines such as the transmission lines 20 a , 20 b , 20 c and 20 d .
- a first substation 16 may be defined to include the two synchronous generators 11 and 12 , the two step-up power transformers 14 a and 14 b and associated circuit breakers 18 , all interconnected via a first bus 19 .
- a second substation 35 may be defined to include the synchronous generator 13 , the step-up power transformer 14 c and associated circuit breakers 18 , all interconnected via a second bus 25 .
- a third substation 22 may be defined to include two step-down power transformers 24 a and 24 b configured to transform the higher voltage sinusoidal waveforms to lower voltage sinusoidal waveforms (e.g., 15 kV) suitable for distribution via one or more distribution lines 26 to loads such as a load 32 .
- the second substation 35 also includes two step-down power transformers 24 c and 24 d to transform the higher voltage sinusoidal waveforms, received via the second bus 25 , to lower voltage sinusoidal waveforms suitable for use by respective loads 30 and 34 .
- IED intelligent electronic devices
- an IED can be configured to perform one or more of power system protection (e.g., a line current differential protection), automation (e.g., reclosing a circuit breaker), control (e.g., capacitor bank switching) and metering (e.g., power consumption calculation).
- power system protection e.g., a line current differential protection
- automation e.g., reclosing a circuit breaker
- control e.g., capacitor bank switching
- metering e.g., power consumption calculation.
- FIG. 2 is a block diagram of the power system 10 and the IED 100 in conjunction with a time source 108 configured to deliver an absolute time to the IED 100 .
- FIG. 2 also includes a second IED 110 and a monitoring and control system 112 operatively coupled the IED 100 via a communications network 107 .
- the network 107 may be any suitable network adapted to enable transmission between the various interconnected devices of FIG. 2 .
- the network 107 may be configured as an Ethernet based local area network or wide area network, etc., and may include a number of universal asynchronous receiver transmitters.
- the monitoring and control system 112 is configured to, among other things, provide SCADA (Supervisory Control and Data Acquisition) and EMS (Energy Management System) functions by applying synchrophasor information received from additional devices of the power system 10 .
- SCADA Supervisory Control and Data Acquisition
- EMS Electronicgy Management System
- the IED 100 is configured to estimate synchronized phasors at predetermined time instants that are based on an absolute time reference and, in some embodiments, referencing to a phasor with predetermined phase and frequency.
- the IED 100 has an input configured to receive an input analog signal 102 , and a bidirectional signal configured to provide a system control signal 104 to the power system 10 (e.g., a signal to the open circuit breaker 18 to isolate a portion of the first substation 16 from the remainder of the power system 10 ).
- the system control signal 104 may also provide control information to IED 100 .
- the input analog signal 102 which may be representative of one or more local voltages (e.g., an A-phase to ground voltage, B-phase to ground voltage and a C-phase to ground voltage) and/or one or more local currents (e.g., an A-phase current, B-phase current and C-phase current), is received by IED 100 via voltage and/or current transformers connected to one or more phases of the power system 10 .
- the input analog signal 102 may be representative of a remote voltage and/or a current signal received by the IED 100 from a remote acquisition device monitoring the power system 10 .
- a time source 108 provides an absolute time reference 101 to the IED 100 where the absolute time 101 is a synchronized to an absolute time standard such as UTC, and distributed using GPS, preferably formatted in an Inter Range Instrumentation Group time code standard (IRIG) signal for receipt by IED 100 . Additional formats, distribution schemes, and time standards may also be utilized.
- UTC absolute time standard
- IRIG Inter Range Instrumentation Group time code standard
- the input analog signal 102 received from the power system 10 is filtered, multiplexed, sampled and digitized to form a signal of analog instantaneous samples suitable for use by a microcontroller 103 of the IED 100 .
- the microcontroller 103 includes a CPU, or a microprocessor, a program memory (e.g., a Flash EPROM) and a parameter memory (e.g., an EEPROM).
- a program memory e.g., a Flash EPROM
- a parameter memory e.g., an EEPROM
- the microcontroller 103 executes a protection function and/or an automation function and/or a control function and/or a metering function. Further, the microprocessor 103 executes a computer program or control logic scheme to estimate the synchronized phasors 111 at predetermined times referenced to an absolute time standard, discussed below in connection with FIGS. 3-11 , according to an embodiment of the invention.
- the computer program or control logic scheme to estimate synchronized phasors is referred to herein as a synchronized phasor estimation method that may or may not be in addition to a protection function and/or an automation function and/or a control function and/or a metering function of the IED 100 .
- FIG. 3 is a functional block diagram of the IED 100 , according to an embodiment of the invention. Although discussed as functional blocks, it should be understood that the IED 100 may be implemented in hardware, software, firmware or a combination thereof.
- the IED 100 includes an analog filter 140 having an input for receiving the input analog signal 102 and an output for providing a filtered analog instantaneous signal 142 to an analog-to-digital converter (ADC) 144 .
- ADC analog-to-digital converter
- the filtered analog instantaneous signal 142 is sampled at a rate determined by a frequency of the input analog signal 102 to generate a sampled analog instantaneous signal 146 .
- the series of filtered signal samples representative of the filtered analog instantaneous signal 142 can be generated at a frequency associated with an integer multiple of the input analog signal 102 .
- the IED 100 also includes a digital filter 148 having an input for receiving the sampled analog instantaneous signal 146 .
- the digital filter 148 rejects unwanted signal characteristics such as harmonic distortion, thermal noise, and exponentially decaying DC offsets, from the sampled analog instantaneous signal 146 in order to provide a filtered signal 150 via its output.
- the filtered signal 150 represents digitized, filtered instantaneous samples of the input analog signal 102 , where the instantaneous samples of the input analog signal 102 are taken at a frequency of the input analog signal 102 .
- a typical impulse response of the digital filter 148 is a full-cycle cosine waveform response or a half-cycle cosine waveform response.
- the filtered signal 150 is provided to a phasor calculator 152 where a series of instantaneous phasors 154 are calculated based on the filtered signal 150 .
- the phasor calculator 152 may include a 90 degree phase shift function in order to provide a quadrature representation suitable for the calculation of magnitudes and phase angles.
- each of the instantaneous phasors 154 is expressed in polar coordinate form to include an instantaneous phasor magnitude 154 a and an instantaneous phasor phase angle 154 b .
- a representation as a complex value may be utilized, depending on the nature of the IED function 156 .
- each of the instantaneous phasors 154 is expressed as an instantaneous phasor real component 154 a and an instantaneous phasor imaginary component 154 b .
- an instantaneous phasor or in general as a phasor.
- the instantaneous phasor phase angle 154 b is referenced to, for example, (one of) the input analog signal(s) 102 .
- the phasor calculator 152 may also include calculation of sequence values such as positive sequence, negative sequence, or zero sequence. These additional quantities may also be part of instantaneous phasors 154 .
- An IED function 156 is configured to receive the instantaneous phasors 154 , and utilizing an algorithm or equivalent, perform the appropriate IED function (e.g., protection, automation, control, metering) to determine a status of the power system 10 . Based on the determined status, the system control signal 104 is provided to the power system 10 , other IEDs, etc. The system control signal 104 may be transmitted directly to an actuating device associated with the IED 100 , or may be transmitted via the network 107 where it is coordinated with other control signals for further decoding and processing by a remote actuating device.
- the IED function 156 is also configured to utilize the synchronized phasors 111 to perform power system functions, such as causing a breaker to trip.
- the IED function 156 may also include a link to the network 107 in order to transmit and receive various data related to protection, monitoring, automation and control, and to receive synchronized phasors 111 from other IEDs coupled to the power system 10 .
- the IED 100 includes a sample controller 160 having an input for receiving the filtered analog instantaneous signal 142 .
- the sample controller 160 also includes two outputs; a first output for providing a control signal stream 162 to the ADC 144 and a time controller 166 , and a second output configured to provide a local frequency 164 to a phasor estimation 200 .
- the sample controller 160 has no control input based on the absolute time 101 and therefore does not provide a control signal stream 162 to the ADC 144 based on the absolute time 101 .
- the local frequency 164 is representative of a frequency (e.g., 60.2 Hz) of the input analog signal 102 .
- the local frequency 164 is derived from the filtered analog instantaneous signal 142 using one of any number of well-known methods. For example, an interval between two or more zero crossings of the filtered analog instantaneous signal 142 may be measured as a sinusoidal period. The interval(s) between the zero crossings can be filtered to reduce noise, harmonics and other undesirable distortions. The local frequency 164 may then be calculated as a reciprocal of the sinusoidal period.
- the local frequency 164 may also be derived from one of the filtered analog instantaneous signal 142 , the input analog signal 102 , the sampled analog instantaneous signal 146 , the filtered signal 150 and/or the instantaneous phasors 154 .
- each period may include 8 sampling instants yielding nominally 480 sampling instants of the filtered analog instantaneous signal 142 per second for a local frequency of 60 Hz.
- sampling instants of the control signal stream 162 are based on the local frequency.
- the sample controller 160 operates to generate a series of the sampling instants at the local sampling interval rate, herein referred to as the control signal stream 162 , where the sampling instants are an integer number multiple of the frequency of the input analog signal 102 .
- the sampling instants may be based on other multiples of the frequency of the input analog signal 102 .
- the control signal stream 162 may be viewed as a pulse train of sampling instants. In general however, the control signal stream 162 may be configured in one of any number of signal configurations adapted to control analog multiplexers, gain circuits, sample and hold switches, programmable logic, and other devices.
- the time controller 166 includes an input for receiving the absolute time 101 .
- the absolute time 101 is a time referenced to an absolute time standard and communicated via a protocol such as IRIG.
- the time controller 166 utilizes the absolute time 101 to generate a series of instantaneous time values 168 where each is denoted as T.
- Each instantaneous time value 168 is representative of one decoded instant of the absolute time 101 , and is updated periodically (e.g., once per second), depending on the absolute time standard and the nature of the implementation.
- the absolute time 101 is formatted in using an IRIG-B protocol
- a single bit stream of 100 pulses per second is transmitted. This means that 100 bits of information, representing one data frame of time information, are transmitted every second.
- Each one-second data frame contains information about the day of the year (1-366), hours, minutes, and seconds (e.g., Aug. 17, 2005 at 4:13.000000 PM).
- the instantaneous time value 168 is representative of one decoded instant of the absolute time 101 , and is updated once per second.
- the time controller 166 uses the time information provided by the absolute time 101 to form the acquisition time value stream 170 having a series of acquisition time values denoted as T 1 , T 2 , T 3 , . . . .
- Each acquisition time value is associated with one sampling instant of the analog input signal and is therefore associated with one instantaneous phasor magnitude 154 a and one instantaneous phasor phase angle 154 b.
- the acquisition time value stream 170 may be a series of time values coinciding with the time of the leading edge of each pulse, yielding an acquisition time value stream 170 having a number of acquisition time values per second as determined by the local frequency 164 .
- the acquisition time value T 2 may occur approximately 2 milliseconds (ms) after the acquisition time value T 1
- the acquisition time value T 3 may occur approximately 2 ms after the acquisition time value T 2 or approximately 4 ms after the acquisition time value T 1
- the acquisition time value T 4 may occur approximately 2 ms after the acquisition time value T 3 or approximately 6 ms after the acquisition time value T 1
- each acquisition time values encodes the value of the sampling instant of the filtered analog instantaneous signal.
- a time offset from the absolute time 101 may be used to express each of the acquisition time values T 1 , T 2 , T 3 . . .
- the time controller 166 may record the interval from the absolute time 101 to the time of a next control signal stream 162 pulse, and then add this recorded interval to the absolute time 101 to generate each of the acquisition time values T 1 , T 2 , T 3 , . . . of the acquisition time stream 170 .
- the phasor estimation 200 is configured to generate synchronized phasors 111 indicative of the input analog signal 102 .
- the synchronized phasors 111 are magnitude adjusted and phase-aligned to the absolute time 101 , and in some embodiments further phase aligned to reference to a phasor with predetermined phase and frequency.
- FIG. 4 is a functional block diagram of the phasor estimation 200 , according to an embodiment of the invention.
- the phasor estimation 200 operates to generate the synchronized phasors 111 in response to receipt of a series of the instantaneous phasor magnitudes 154 a , a corresponding series of instantaneous phasor phase angles 154 b , the local frequency 164 , the instantaneous time values 168 and the acquisition time value stream 170 .
- the phasor estimation 200 may be implemented in hardware, software, firmware or a combination thereof.
- the phasor estimation 200 includes a generate predetermined time function 202 and a phasor adjustment block 214 operatively coupled to the generate predetermined time function 202 .
- the generate predetermined time function 202 has a first input for receiving the instantaneous time values 168 T and a second input for receiving the acquisition time values T 1 , T 2 , T 3 , . . . of the acquisition time value stream 170 .
- the phasor estimation 200 also has a first output for providing predetermined times t 1 , t 2 , t 3 . . . referenced to the absolute time standard 111 a .
- the predetermined times t 1 , t 2 , t 3 . . . referenced to the absolute time standard 111 a are the desired time values at which the magnitudes and phase angles of the synchronized phasors 111 are to be estimated from the magnitudes and phase angles of phasors calculated at known times (e.g., the acquisition time values T 1 , T 2 , T 3 , . . . ).
- the generate predetermined time function 202 further has a second output for providing a time value pair stream 206 configured as a series of pairs of corresponding time values to the phase adjustment block 214 .
- Each of the corresponding time value pairs includes one predetermined time referenced to the absolute time standard 111 a and a corresponding selected acquisition time value from a series of selected acquisition time values T a , T b , T c . . . .
- Each of the selected acquisition time values T a , T b , T c . . . corresponds to one of the acquisition time values T 1 , T 2 , T 3 , . . .
- the selected acquisition time values T a , T b , T c . . . are a subset of the acquisition time values T 1 , T 2 , T 3 , . . . of the acquisition time value stream 170 .
- T c T 504 , and so on, depending on the occurrence of the predetermined times t 1 , t 2 , t 3 . . . referenced to the absolute time standard 111 a with respect to the occurrence of the acquisition time values T 1 , T 2 , T 3 , . . . of the acquisition time value stream 170 .
- each of the selected acquisition time values T a , T b , T c . . . corresponds to one of the acquisition value T 1 , T 2 , T 3 , . . . of the acquisition time value stream 170 that directly precedes an occurrence of one of the predetermined times t 1 , t 2 , t 3 . . . referenced to the absolute time standard 111 a .
- FIG. 5 is an exemplary timeline 250 illustrating the relationship between the series of selected acquisition time values T a , T b , T c . . . , the acquisition time values T 1 , T 2 , T 3 , . . .
- the instantaneous time values T are selected to occur once every second
- the predetermined times t 1 , t 2 , t 3 . . . referenced to the absolute time standard 111 a are selected to occur every 250 ms
- the acquisition time values T 1 , T 2 , T 3 , . . . of the acquisition time value stream 170 occur approximately every 2 1/12 ms (based on 8 sampling instants per period of a local frequency of 60 Hz), however other time intervals are possible.
- each acquisition time value T 1 , T 2 , T 3 , . . . correlates to the control signal stream 162 which, in one embodiment, correlates to an integer multiple of the frequency of the input analog signal 102 .
- the predetermined time t 1 upon an occurrence of a predetermined time of the predetermined times t 1 , t 2 , t 3 . . . , for example, the predetermined time t 1 , an acquisition time value T 1 , T 2 , T 3 , . . . of the acquisition time value stream 170 immediately preceding the predetermined time t 1 , for example, the acquisition time value T 4 , is assigned a selected acquisition time value, for example T a , and so on.
- the predetermined time t 1 , and the selected acquisition time value T a form a corresponding time value pair t 1 , T a of the time value pair stream 206 .
- the corresponding time value pair for example t 1 , T a , is then forwarded to the phasor adjustment block 214 .
- the corresponding time value pair t 2 , T b , the time value pair t 3 , T c and so on are forwarded to the phasor adjustment block 214 as they are generated.
- each acquisition time value T 1 , T 2 , T 3 , . . . of the acquisition time value stream 170 is associated with an instantaneous phasor magnitude 154 a and an instantaneous phasor phase angle 154 b .
- each of the selected acquisition time values T a , T b , T c . . . correspond to one instantaneous phasor magnitude 154 a and one instantaneous phasor phase angle 154 b.
- phasor adjustment block 214 is configured to adjust or realign the instantaneous phasor magnitude 154 a and the instantaneous phasor phase angle 154 b in order to generate the synchronized phasor 111 , shown as referenced phasor magnitude stream 111 b and referenced phasor phase angle stream 111 c or 111 d , suitable for use, for example, in the protection function 156 .
- the instantaneous phasor magnitude 154 a and the instantaneous phasor phase angle 154 b of the instantaneous phasor 154 occurring at the time of one of the acquisition time value T 1 , T 2 , T 3 , . .
- phase angle of the synchronized phasor 111 may further be referenced to a phasor of predetermined phase and frequency in order to compare to other similarly generated referenced phasors.
- the generate predetermined time function 202 generates an acquisition time value control signal 208 that operates to enable selected receipt of the instantaneous phasor magnitude 154 a by an interpolate function of the phasor adjustment block 214 , and to enable selected receipt of the instantaneous phasor phase angle 154 b by a rotate block of the phasor adjustment block 214 .
- Selected receipt is enabled upon an occurrence of each of the selected acquisition time values T a , T b , T c . . . .
- the acquisition time value control signal 208 may cause any suitable action that selectively enables the instantaneous phasor magnitude 154 a and the instantaneous phasor phase angle 154 b to be provided to the phasor adjustment block 214 upon an occurrence of a selected acquisition time value of the series of selected acquisition time values T a , T b , T c . . . .
- a magnitude line 260 illustrates a series of instantaneous phasor magnitudes 154 a (represented as dots) where each of the series of instantaneous phasor magnitudes 154 a corresponds to an occurrence of an acquisition time value T 1 , T 2 , T 3 , . . .
- a phase angle line 262 is aligned to the magnitude line 260 to illustrate a series of instantaneous phasor phase angle 154 b (represented as dots) where each of the series of instantaneous phasor phase angles 154 b corresponds to an occurrence of an acquisition time value. T 1 , T 2 , T 3 .
- an instantaneous phasor magnitude 154 a occurring at the acquisition time value T 1 is denoted as X M (T 1 ) 264 while an instantaneous phasor phase angle 154 b occurring at the acquisition time value T 1 is denoted as X A (T 1 ) 266 .
- the synchronized phasor 111 may be similarly illustrated in FIG. 5 as a referenced phasor magnitude X M (t 1 ) of a referenced phasor magnitude stream 111 b denoted as X M (t 1 , t 2 , t 3 , . . . ), and a referenced phasor phase angle X A (t 1 ) of a referenced phasor phase angle stream 111 c denoted as X A (t 1 , t 2 , t 3 , . . . ).
- the phase angles of the referenced phasor phase angle stream 111 c are further processed to reference them to a phasor with predetermined phase and frequency.
- a phase angle associated with fixed frequency reference phasor having a pre-selected reference frequency e.g., 60.0 Hz
- the resulting phase angles are referenced to a phasor with predetermined phase and frequency to form an adjusted referenced phasor phase angle stream 111 d .
- each referenced phasor phase angle can be further processed to remove a fixed frequency such that a resulting adjusted referenced phasor phase angle is estimated with respect to an associated time t 1 , t 2 , t 3 . . . referenced to the absolute time standard 111 a and a phasor with predetermined phase and frequency.
- a fixed frequency reference phasor line 265 is shown.
- a referenced phasor phase angle is located at the intersection of the phase angle line 262 and a bisecting line corresponding to the time value t 1 , and is denoted as X A (t 1 ) 111 c .
- the fixed frequency 265 is subtracted from the referenced phasor phase angle, resulting in an adjusted referenced phasor angle denoted as X A (t 1 ) ADJ 111 d .
- the subtraction is performed modulo the phase angle range of the referenced phasor phase angle 111 c . For example, if the referenced phasor phase angle 111 c is in range zero to 360 degrees, then the subtraction is computed modulo 360.
- the conversion to the phasor with predetermined phase and frequency is accomplished without further processing. This is due to the fact that the subtraction operation is always subtracting a value of zero and therefore does not need to be explicitly computed.
- FIG. 6A is a functional block diagram of an exemplary phasor adjustment block 214 , according to an embodiment of the invention.
- each resulting synchronized phasor includes a predetermined time t 1 , t 2 , t 3 . . . referenced to the absolute time standard 111 a , a referenced phasor magnitude of the referenced phasor magnitude stream 111 b and an adjusted referenced phasor phase angle of the adjusted referenced phasor phase angle stream 111 d .
- the phasor adjustment block 214 may be implement in one of any number of ways to provide interpolation of the instantaneous phasor magnitude 154 a and rotation of the instantaneous phasor phase angle 154 b to form the referenced phasor magnitude 111 b and the referenced phasor phase angle 111 c of the synchronized phasor 111 .
- the phasor adjustment block 214 includes a first adder 302 configured to subtract the instantaneous phasor magnitude at the selected acquisition time value X M (T a ) 268 from the next instantaneous phasor magnitude at the selected acquisition time value X M (T a +dT) 284 to generate a phasor magnitude difference 301 , where T a +dT represents the time of the next acquisition time value following the selected acquisition time value T a .
- the selected acquisition time value X M (T a +dT) 284 is simply available from the series of instantaneous phasor magnitudes 154 a and does not imply anticausal processing.
- the phasor magnitude difference 301 represents a difference in the magnitude between two sequential instantaneous phasor magnitudes.
- the phasor adjustment block 214 also includes a second adder 308 configured to subtract the selected acquisition time value T a of the series of selected acquisition time values T a , T b , T c , . . . from the predetermined time t 1 referenced to an absolute time standard 111 a in order to generate a time value difference 310 .
- the phasor adjustment block 214 further includes a divider 306 configured to divide the time value difference 310 by an acquisition time value delta dT 274 to generate a first proportionality factor 307 .
- the time value difference 310 represents the difference in time from the selected acquisition time value T a 271 to the time value referenced to an absolute time standard t 1
- the acquisition time value delta dT 274 represents a time between the sampling instants of the control signal stream 162 provided by the sample controller 160 .
- a first multiplier 304 is configured to multiply the phasor magnitude difference 301 by the first proportionality factor 307 to generate an intermediate magnitude difference signal 305 .
- the phasor adjustment block 214 further includes a third adder 328 configured to add the instantaneous phasor magnitude at the selected acquisition time value X M (T a ) 268 to the intermediate magnitude difference signal 305 to form an uncalibrated referenced phasor magnitude 311 .
- a first operator 312 and a second operator 316 are also included in the phasor adjustment block 214 .
- the first operator 312 is configured to multiply the local frequency 164 by the time value difference 310 , followed by conversion from unity units to phase angle units by multiplication with a constant value representative of the conversion factor, to form a second proportionality factor 313 .
- the second operator 316 is configured to multiply a fixed frequency 324 of the phasor with predetermined phase and frequency by the predetermined time value t 1 referenced to an absolute time standard 111 a , followed similarly by unit conversion to generate a third proportionality factor 309 .
- the second operator 316 uses the fact that phase values remain within a fixed range (e.g. zero to 360 degrees) to convert the predetermined time value t 1 referenced to an absolute time standard 111 a to a small range of values prior to multiplication.
- the predetermined time value t 1 referenced to an absolute time standard 111 a can be converted to a range of zero to one second prior to multiplication by fixed frequency 324 .
- the range for this example simply remove the rest of the time information, according to the representation of the predetermined time value t 1 referenced to an absolute time standard 111 a , for example the year, day, hours, and minutes information can be removed, along with subtracting an integer number of seconds from the predetermined time value t 1 referenced to an absolute time standard 111 a so that the resulting range is zero to one second.
- the phasor adjustment block 214 also includes a third and a fourth operator 314 and 318 , where the third operator 314 is configured to substract the instantaneous phasor phase angle at the selected acquisition time value X A (T a ) 270 to the second proportionality factor 313 , followed by modulo conversion to the desired phase angle range, to form a pre-aligned referenced phasor 315 .
- the fourth operator 318 is configured to add the pre-aligned referenced phasor 315 to the third proportionality factor 309 , followed by modulo conversion to the desired phase angle range to form an adjusted uncalibrated referenced phasor phase angle 319 .
- Implementation magnitude distortion can be approximated and removed via a Mag Implement Correction 330 configured to receive the local frequency 164 and remove any implementation distortion to form a magnitude correction factor 321 using one of a number of techniques.
- Such implementation distortion may be introduced via IED components such as the analog filter 140 distorting the filtered analog instantaneous signal 142 with gain compression as a function of the local frequency. This is because each filter has a specific magnitude and phase response which varies as a function of the frequency content of the signal upon which it acts. It is not the purpose of Mag Implement Correction 330 to correct for off-nominal sampling errors. This is because the invention samples as a function of the varying frequency of the local signal (e.g.
- mag Implement Correction 330 includes use of a look-up table containing the distortion compensating values as a function of the instantaneous phasor magnitude 154 a . Furthermore, the compensation can be included with the interpolation operation by further adjusting the time value referenced to an absolute time standard according to the amount of effective time shift required to compensate for phase shifts of the, for example, analog filter 140 .
- phase angle distortion or shift can be approximated and removed via an Angle Implement Correction 332 configured to receive the local frequency 164 and remove any implementation distortion to form a phase correction factor 317 , using one of a number of techniques.
- Such implementation distortion may be caused by phase shifts introduced by IED components such as the analog filter 140 .
- One technique that may be employed by the Angle Implement Correction 332 includes use of a pre-selected constant or a parameter such as a look-up table containing the distortion compensating values as a function of the instantaneous phasor magnitude 154 a.
- a second multiplier of the phasor adjustment block 214 is configured to multiply the uncalibrated referenced phasor magnitude 311 with the magnitude correction factor 321 to form the referenced phasor magnitude X M (t 1 ) of the referenced phasor magnitude stream 111 b .
- a fifth operator 322 of the phasor adjustment block 214 is configured to add the adjusted uncalibrated referenced phasor phase angle 319 to the phase correction factor 317 to form the adjusted referenced phasor phase angle X M (t 1 ) ADJ of the adjusted referenced phasor phase angle stream 111 d .
- synchronized phasors 111 are estimated at predetermined times referenced to the absolute time standard in an electrical system and referenced to a phasor with predetermined phase and frequency.
- the Phasor Estimation 200 can use selected acquisition time values T a , T b , T c . . . which correspond to existing sample instants that immediately precede an associated predetermined time t 1 , t 2 , t 3 . . . referenced to an absolute time standard 111 a in conjunction with the time next time values T a +dT, T b +dT, T+dT c . . . (immediately subsequent to a predetermined time t 1 , t 2 , t 3 . . .
- the alternate embodiment interpolation utilizes the instantaneous phasor phase angle 154 b sampled on either side of a predetermined time, for example t 1 , to determine the referenced phasor phase angle of the referenced phasor phase angle stream 111 c (see FIG. 5 ).
- a representation of the phasors as complex real and imaginary components can be similarly converted from the selected acquisition time values T a , T b , T c . . . to predetermined times t 1 , t 2 , t 3 . .
- complex multiplication of the phasor by the phasor with predetermined phase and frequency is sufficient to convert a referenced phasor phase angle of the referenced phasor phase angle stream 111 c to an adjusted referenced phasor phase angle of the adjusted referenced phasor phase angle stream 111 d.
- FIG. 6B is a functional block diagram of another exemplary phasor adjustment block 214 , according to an embodiment of the invention.
- referencing to a phasor with predetermined phase and frequency is not performed such that each resulting synchronized phasor includes a predetermined time t 1 , t 2 , t 3 . . . referenced to an absolute time standard 111 a , a referenced phasor magnitude of the referenced phasor magnitude stream 111 b and a referenced phasor phase angle of the referenced phasor phase angle stream 111 c .
- the exemplary phasor block of FIG. 6B is configured and operational as described in FIG.
- the referenced phasor phase angle stream 111 c is generated rather than the adjusted referenced phasor phase angle stream 111 d.
- FIG. 7 is a functional block diagram of another IED 400 that may be used in conjunction with one or more remote devices, according to an embodiment of the invention.
- the remote device (not separately illustrated) converts its input analog signal 102 into a digital format suitable for transmission to the IED 400 .
- a digitized input analog signal 402 is therefore received by the IED 400 .
- the IED 400 includes a channel decode 404 configured to decode the digitized input analog signal 402 received from another IED, and a resample block 406 .
- the digitized input analog signal 402 may be received via one of any number of mediums including wired and wireless.
- the digitized input analog signal 402 may be encoded using well-known methods to ensure transmission security, reduce unwanted effects of noise, reduce multipath signal interference and burst errors, and the like, and may be decoded using one of any number of well-known suitable formats, depending on the IED implementation and/or the encoding scheme.
- the digitized input analog signal 402 is decoded to form a decoded instantaneous signal 405 .
- the decoded instantaneous signal 405 includes the instantaneous amplitude of the remote analog input signal as well as information regarding a remote data acquisition time value.
- the remote data acquisition time value indicates an instant at which the power system signal was sampled by the remote device to acquire its analog input signal, where the sampling instant is referenced to an absolute time standard (e.g., UTC).
- the decoded instantaneous signal 405 may further include additional data such as a power system frequency measured by the remote device (remote frequency), although such frequency information may be derived by the IED 400 from the instantaneous amplitude of the decoded instantaneous signal 405 and the remote data acquisition timestamp, using well-known methods.
- additional data such as a power system frequency measured by the remote device (remote frequency), although such frequency information may be derived by the IED 400 from the instantaneous amplitude of the decoded instantaneous signal 405 and the remote data acquisition timestamp, using well-known methods.
- the resample block 406 is configured to generate signal samples representative of the input analog signal 102 received by the remote device.
- the decoded instantaneous signal 405 is adjusted from the remote sampling interval to an interval which is representative of the remote frequency.
- the sampled analog instantaneous signal 146 (representative of the input analog signal 102 received by the remote device) is provided to the digital filter 148 .
- the remaining components (e.g., sample controller 160 ) of FIG. 7 are substantially configured and operable as described in connection with FIGS. 3-6 to provide synchronized phasors 111 indication of the power system 10 referenced to the absolute time instants.
- FIG. 8 is a functional block diagram of yet another IED 500 , according to an embodiment of the invention.
- the IED 500 converts the input analog signal 102 to synchronized phasors 111 prior to performing the appropriate protection, automation, control, metering function by the IED function 156 to determine the status of the power system 10 .
- the IED 500 includes a phasor estimation 502 coupled to the IED function 156 such that the synchronized phasors 111 are first calculated and then forwarded for use by the IED function 156 .
- the IED 500 includes the analog filter 140 , the ADC 144 , the digital filter 148 , the sample controller 160 and the time controller 166 , operating as described in connection with FIGS. 3-6 .
- the phasor estimation 502 of the IED 500 includes the functionality of the phase calculator 152 (without the 90 degree phase shift functionality), and utilizes a separate 90 degree shift in conjunction with an interpolation to adjust the phase angle of the filtered signal 150 and form the referenced phasor magnitude stream 111 b and the referenced phasor phase angle stream 111 c and/or the adjusted referenced phasor phase angle stream 111 d of the synchronized phasors 111 .
- FIG. 9 is a functional block diagram of the phasor estimation 502 of the IED 500 , according to an embodiment of the invention.
- the phasor estimation 502 includes a 90 degree shift block 504 having an input for receiving the filtered signal 150 .
- the filtered signal 150 is representative of the input analog signal 102 and is generated in response to the sampling instants of the control signal stream 162 .
- the filtered signal 150 may therefore be denoted as A(T 1 , T 2 , T 3 , . . . ) where each of T 1 , T 2 , T 3 , . . . is an acquisition time value of a corresponding sample of the filtered signal 150 , and where A is an instantaneous amplitude.
- the 90 degree shift block 504 Upon receipt of the filtered signal 150 , the 90 degree shift block 504 operates to shift the filtered signal 150 by 90 degrees to form a shifted filtered signal 503 .
- the 90 degree shift may be accomplished by delaying each of the samples forming the filtered signal 150 by 1 ⁇ 4 cycle, according to the local frequency 164 . In one embodiment, the samples of the filtered signal are taken at an integer multiple sixteen times the local frequency 164 .
- the shifted filtered signal 503 may be denoted as A(T 1 ⁇ kdT, T 2 ⁇ kdT, T 3 ⁇ kdT, . . .
- the phasor estimation 502 also includes an interpolate block 506 having a first input for receiving the filtered signal 150 , having a second input for receiving the shifted filtered signal 503 , having a third input for receiving the acquisition time values T 1 , T 2 , T 3 , . . . of the acquisition time value stream 170 , and having a fourth input for receiving time value pair stream 513 , which includes the predetermined times t 1 , t 2 , t 3 . . . referenced to the absolute time standard 111 a along with the selected acquisition time values T a , T b , T c , . . . .
- FIG. 10 is a functional block diagram of one example of the interpolate block 506 of the phasor estimation 502 , according to an embodiment of the invention. Although illustrated using a number of multipliers, adders, and operators as described below, it is contemplated that the interpolate block 502 may be implemented in one of any number of ways to provide adjustment from the remote sampling interval to the interval which is representative of the remote frequency.
- the sample amplitude difference 508 represents a difference in the amplitude between two sequential instantaneous sample magnitudes of the filtered signal 150 .
- the interpolate block 506 also includes the second adder 308 configured to subtract a selected acquisition time value of the selected acquisition time value stream 170 , for example, T a from a predetermined time referenced to an absolute time standard 111 a , for example t 1 , to generate the time value difference 310 .
- the divider 306 of FIG. 10 is configured to divide the time value difference 310 by the acquisition time value delta dT 274 to generate the first proportionality factor 307 (see, FIGS. 5 and 6 ).
- the time value difference 310 represents a difference in time between the selected acquisition time value T a to the predetermined time t 1 referenced to the absolute time standard 111 a
- the acquisition time value delta dT 274 represents a time between the sampling instants of the control signal stream 162 .
- the first multiplier 304 is configured to multiply the sample amplitude difference 508 by the first proportionality factor 307 to generate an intermediate amplitude difference signal 512 .
- the interpolate block 506 further includes the third adder 328 configured to add the first sample 507 of the filtered signal 150 to the intermediate amplitude difference signal 512 to form an uncalibrated referenced sample amplitude A(t 1 ) 514 .
- a shifted uncalibrated referenced sample amplitude A(t 1 ⁇ kdT) 516 is equivalently formed via the interpolation block 506 .
- the implementation of ⁇ kdT can be simply selecting a value that is k samples previous to the present value.
- each of the uncalibrated referenced sample amplitudes 514 for example A(t 1 )
- each of the shifted uncalibrated referenced sample amplitudes 516 are received by a phasor calculator 153 .
- the phasor calculator 153 is configured to calculate a series of uncalibrated referenced phasor magnitudes 518 from the uncalibrated referenced sample amplitudes 514 and the shifted uncalibrated referenced sample amplitudes 516 .
- the phasor calculator 153 is configured to calculate a corresponding series of prealigned referenced phasor phase angles 520 from the uncalibrated referenced sample amplitudes 514 and the shifted uncalibrated referenced sample amplitudes 516 . Accordingly, each uncalibrated referenced phasor magnitude 518 has a corresponding prealigned referenced phasor phase angle 520 .
- the details of calculating a phasor magnitude and angle representation from a real and imaginary representation is well known, and furthermore can include the well known calculation of sequence quantities such as positive sequence, negative sequence, and zero sequence.
- the real component is represented by the uncalibrated referenced sample amplitude 514 and the imaginary component is represented by the shifted uncalibrated referenced sample amplitudes 516 .
- the phasor estimation 502 also includes a correct block 522 configured to remove implementation artifacts and distortion from the uncalibrated referenced phasor magnitudes 518 and the prealigned referenced phasor phase angles 520 to form corresponding referenced phasor magnitudes of the referenced phasor magnitude stream 111 b and referenced phasor phase angles of the referenced phasor phase angles stream 111 c , and/or to form corresponding adjusted referenced phasor magnitudes of the referenced phasor magnitude stream 111 b and corresponding adjusted referenced phasor phase angles of the adjusted referenced phasor phase angles stream 111 d.
- a correct block 522 configured to remove implementation artifacts and distortion from the uncalibrated referenced phasor magnitudes 518 and the prealigned referenced phasor phase angles 520 to form corresponding referenced phasor magnitudes of the referenced phasor magnitude stream 111 b and referenced phasor phase angles
- FIG. 11 is a functional block diagram of an exemplary correct block 522 , according to an embodiment of the invention.
- referencing to a phasor with predetermined phase and frequency is performed such that each resulting referenced phasor includes a referenced phasor magnitude of the referenced phasor magnitude stream 111 b and an adjusted referenced phasor phase angle of the adjusted referenced phasor phase angle stream 111 d , at a predetermined time t 1 , t 2 , t 3 . . . referenced to an absolute time standard 111 a . It is contemplated however, that like the phasor adjustment block of FIG.
- each resulting referenced phasor includes a referenced phasor magnitude of the referenced phasor magnitude stream 111 b and a referenced phasor phase angle of the referenced phasor phase angle stream 111 c at a predetermined time t 1 , t 2 , t 3 . . . referenced to an absolute time standard 111 a.
- the correct block 522 includes a first input for receiving the uncalibrated referenced phasor magnitude 518 , a second input for receiving the local frequency 164 , a third input for receiving the predetermined time value stream 111 a , and a fourth input for receiving the prealigned referenced phasor phase angle 520 .
- the correct block 522 also includes the second operator 316 configured to multiply the reference frequency 324 of the fixed frequency reference phasor by a time value of the predetermined time value stream 111 a , for example, the time value t 1 , followed similarly by unit conversion, to generate the third proportionality factor 309 .
- the correct block 522 further includes the fourth operator 318 configured to add the prealigned referenced phasor phase angle 520 to the third proportionality factor 309 , followed by modulo conversion to the desired phase angle range to form an uncalibrated referenced phasor phase angle 526 .
- Implementation magnitude distortion can be approximated and removed via the Mag Implement Correction 330 configured to receive the local frequency 164 and remove any implementation distortion to form the magnitude correction factor 321 using one of a number of techniques as described in connection with FIGS. 6A and B.
- implementation phase angle distortion or shift can be approximated and removed via the Angle Implement Correction 332 configured to receive the local frequency 164 and remove any implementation distortion to form the angle correction factor 317 using one of a number of techniques as described in connection with FIGS. 6A and B.
- the second multiplier 320 of the correct block 522 is configured to multiply the uncalibrated referenced phasor magnitude 518 with the magnitude correction factor 321 to form the referenced phasor magnitudes of the referenced phasor magnitude stream 111 b .
- the fifth operator 322 of the correct block 522 is configured to add the uncalibrated referenced phasor phase angle 526 to the angle correction factor 317 to form the referenced phasor phase angles of the referenced phasor phase angle stream 111 d . In this way, referenced phasors are accurately estimated at time values referenced to an absolute time standard in an electrical system.
- the uncalibrated referenced phasor magnitude 518 and the prealigned referenced phasor phase angle 520 may be representative of values at times slightly different than the predetermined time t 1 , t 2 , t 3 . . . referenced to an absolute time standard 111 a and this difference is corrected by the magnitude correction factor 321 and the phase correction factor 317 .
- the uncalibrated referenced phasor magnitude 518 can be corrected by an interpolation step in place of the second multiplier 320 .
- the present method may be implemented as a computer process, a computing system or as an article of manufacture such as a computer program product or computer readable media.
- the computer program product may be a computer storage media readable by a computer system and encoding a computer program of instructions for executing a computer process.
- the computer program product may also be a propagated signal on a carrier readable by a computing system and encoding a computer program of instructions for executing a computer process.
- FIG. 12 is a functional block diagram of yet another IED 600 that may be used in conjunction with one or more remote devices, according to an embodiment of the invention.
- the remote device (not separately illustrated) converts its input analog signal 102 into a digital format suitable for transmission to the IED 600 .
- a digitized input analog signal 602 is therefore received by the IED 600 .
- the IED 400 includes channel decode block 604 configured to decode the digitized input analog signal 602 received from a remote IED, and a resample block 406 .
- the digitized input analog signal 602 may be received via one of any number of mediums including wired and wireless.
- the digitized input analog signal 602 may be encoded using well-known methods to ensure transmission security, reduce unwanted effects of noise, reduce multipath signal interference and burst errors, and the like, and may be decoded using one of any number of well-known suitable formats, depending on the IED implementation and/or the encoding scheme.
- the digitized input analog signal 602 is decoded to form a decoded instantaneous signal 405 .
- the decoded instantaneous signal 405 includes the instantaneous amplitude of the remote analog input signal as well as information regarding a remote data acquisition time value.
- the remote data acquisition time value indicates an instant at which the power system signal was sampled by the remote device to acquire its analog input signal, where the sampling instant is referenced to an absolute time standard (e.g., UTC).
- the decoded instantaneous signal 405 may further include additional data such as power system frequency measured by the remote device (remote frequency), although such frequency information may be derived by the IED 400 from the instantaneous amplitude of the decoded instantaneous signal 405 and the remote data acquisition timestamp, using well-known methods.
- additional data such as power system frequency measured by the remote device (remote frequency), although such frequency information may be derived by the IED 400 from the instantaneous amplitude of the decoded instantaneous signal 405 and the remote data acquisition timestamp, using well-known methods.
- the resample block 606 is configured to generate signal samples representative of the input analog signal 602 received by the remote device.
- the decoded instantaneous signal 405 is adjusted from the remote sampling interval to an interval which is representative of the remote frequency.
- the sampled analog instantaneous signal 146 (representative of the input analog signal 602 received by the remote device) is provided to the digital filter 148 .
- the remaining components (e.g., sample controller 160 ) of FIG. 12 are substantially configured and operable as described in connection with FIG. 8 to provide synchronized phasors 111 indication of the power system 10 referenced to the absolute time instants.
- the logical operations of the present method are implemented (1) as a sequence of computer implemented acts or program modules running on a computing system and/or (2) as interconnected machine logic circuits or circuit modules within the computing system.
- the implementation is a matter of choice dependent on the performance requirements of the computing system implementing the invention. Accordingly, the logical operations making up the embodiments of the present invention described herein are referred to variously as operations, structural devices, acts or modules. It will be recognized by one skilled in the art that these operations, structural devices, acts and modules may be implemented in software, in firmware, in special purpose digital logic, and any combination thereof without deviating from the spirit and scope of the present invention as recited within the claims attached hereto.
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Emergency Protection Circuit Devices (AREA)
- Synchronisation In Digital Transmission Systems (AREA)
Abstract
An apparatus and method estimates a plurality of synchronized phasors at predetermined times referenced to an absolute time standard in an electrical power system. The method includes acquiring and determining a frequency of a power system signal, sampling the power system signal at a sampling interval rate based on a frequency of the power system signal to form signal samples, and generating a plurality of acquisition time values based on an occurrence of each of the signal samples at a corresponding plurality of different times referenced to the absolute time standard. The method further includes adjusting a phasor of each of the signal samples based on a time difference between a corresponding selected acquisition time value and a predetermined time referenced to an absolute time standard to form the plurality of synchronized phasors.
Description
- This application is a continuation application of co-pending U.S. patent application Ser. No. 11/504,788 filed on Aug. 15, 2006 and entitled “Apparatus and Method for Estimating Synchronized Phasors at Predetermined Times Referenced to an Absolute Time Standard in an Electrical System, which claims benefit under 35 U.S.C. §119(e) of U.S. Provisional Application entitled “Method of Phasor Estimation at Predetermined Time Instants”, filed on Oct. 18, 2005, having Ser. No. 60/727,764, naming Gregary C. Zweigle, Armando Guzman-Casillas, and Luther Scott Anderson as inventors, the complete disclosure thereof being incorporated by reference.
- The present invention generally relates to monitoring, metering, protection and control of electrical systems, and more specifically, to an apparatus and method for estimating synchronized phasors at predetermined times referenced to an absolute time standard in an electrical system.
- Knowledge of the state of an electrical network is important in order to recognize and understand disturbances in the electrical network, provide protection functionality, provide metering, monitor the electrical network, and determine control actions. This is especially true for critical electrical networks such as an electric power system or grid where energy is generated and transported from the generating facilities to locations and loads requiring the energy. Electrical power systems include a variety of power system elements such as electrical generators, electrical motors, power transformers, power transmission lines, buses and capacitors, to name a few. The electric power systems also include various monitoring devices, control devices, metering devices, and protective devices (e.g. protective relays). In most cases, these devices are microprocessor-based or “intelligent” electronic devices (IEDs), that utilize phasors (i.e., a constant complex number representing a sinusoidal function of time) to perform their respective function(s). The phasors are derived from local or shared remote measurements sampled from currents and/or voltages of the electric power system.
- Regardless of whether the phasors are derived from local or remote measurements, the accuracy of such measurements is of paramount importance when achieving a desired level of electrical power system performance. Such accuracy is predicated on both the accuracy of the measurement itself and the accuracy of the knowledge of the acquisition time of the measurement.
- Acquisition time accuracy has been addressed via time-keeping systems that distribute highly accurate time, referenced to an absolute time standard, which have been used to drive the acquisition time of a voltage or current measurement. The absolute time standard typically includes one of the coordinated universal time (UTC) or international atomic time (TAI), distributed by the Global Positioning System (GPS) and then with a time protocol such as the Inter Range Instrumentation Group time code standard (IRIG) or over Ethernet. Systems employing absolute time reference schemes utilize voltage and/or current measurements that are sampled from analog voltage and/or current signal(s) with respect to the absolute time. As a result, both the measurement value and the time at which the measurement value is acquired can be obtained, processed, stored, and/or transported with high accuracy.
- In applications such as power system state determination, it is desirable to sample voltage and/or current signals at many points across the electric power system at the same moment. In that case, using an absolute time standard, the voltages and/or current signals are sampled at a coordinated time instant to allow synchronization of the acquisition across the network. The resulting voltage and/or current measurements are processed to form “synchronized phasors” which are then utilized to enable new applications for the monitoring, metering, protection, and control of the electric power generation, transmission, and distribution network of the electric power system. The synchronized phasors may also be stored for subsequent use in analyzing a fault or other anomalous electrical power system condition.
- Real-time monitoring of the present state of the electrical power system is often accomplished using a state-estimation algorithm. In general, the state-estimation algorithm utilizes measured voltage and power measurements that are collected from monitored points or nodes in the electric power system. The measured quantities are then used to estimate the state of the electric power system. One inherent limitation of state-estimation algorithms however is the time delay introduced as a result of the estimation of the power system state. It is therefore desirable to minimize the delay due to determination of the estimated state values, as well as any delay between the determination of the estimated state values and any subsequent control action (i.e. a control latency).
- An electric power system utilizing the synchronized phasors can aid in reducing the control latency inherent in state-estimation algorithms. Because each synchronized phasor represents a present state value of the power system, derivation of estimated state values is not required, and the mechanisms which determine the control action are able to act more quickly. A further application for the use of synchronized phasors includes the dynamic or continuous recording of the variable electric power system magnitude and phase angle. Utilizing such a dynamic recording enables subsequent analysis of changes in the electric power system due to, for example, opening or closing a line, equilibrium differences between generation and load, or unstable power swings. A number of types of protection functions such as those found in protective relays may also benefit from the use of synchronized phasors. For example, synchronized phasors may be used to improve detection of the loss of electric power system synchronization when generators begin operation at different speeds. When the loss of synchronization is detected, a remedial action scheme can be quickly employed to “island” a portion(s) of the electric power system or shed a load.
- As mentioned above, phasors are calculated from stepped-down analog voltage and current signals of the electric power system. When received from respective voltage and current transformers, the analog voltage and/or current signals are filtered, sampled with respect to the local power system frequency (e.g., 60 Hz) and processed to form phasors suitable for use by a microprocessor or other intelligent device. Synchronous phasors are similarly calculated except that they are sampled with respect to an absolute time standard and derived with respect to a coordinated time instant.
- For example, one method of computing the synchronized phasor is described in U.S. Pat. Nos. 6,845,333 and 6,662,124 assigned to Schweitzer Engineering Laboratories, Inc. In one embodiment, the absolute time reference is generated via GPS, transmitting time and location information that is used by local receivers of the intelligent electronic devices. The acquisition may be based on deriving each sample instant from the absolute time reference, and recording the time at which the sample is taken.
- To be meaningful, a synchronized phasor or phasor quantity must be referenced to a standard to allow correlation to other synchronized phasors even when the synchronized phasors are acquired from multiple electric power system locations with varying states and frequencies. One method known in the art that may be used to reference a synchronized phasor includes correlating an associated sampled voltage or current signal to a phasor with a frequency equal to the nominal power system frequency and with a predetermined phase that has been set in all of the IEDs or measuring devices. Alternatively, a single analog quantity can be chosen as the reference for all IEDs communicating and sharing the synchronized phasors. For example, the frequency at one point in the distribution scheme is sometimes chosen as a reference for all devices computing synchronized phasors. In some cases a feature of a reference signal, such as a zero crossing, can provide the reference for the phase value.
- In accordance with an embodiment of the invention, an apparatus estimates a plurality of synchronized phasors at predetermined times referenced to an absolute time standard in an electrical power system. The apparatus includes a sample controller configured to determine a frequency of a power system signal acquired at each location of the electrical power system where the synchronized phasors are calculated, a sampling means configured to sample the power system signal at a sampling interval rate based on a frequency of the power system signal to form a plurality of signal samples, a time controller configured to generate a plurality of acquisition time values based on an occurrence of each of the plurality signal samples at a corresponding plurality of different times referenced to the absolute time standard. Each of the plurality of acquisition time values is associated with a phasor magnitude and a phasor phase angle derived from each of the plurality of signal samples. The apparatus also includes a phasor estimator configured to adjust the phasor magnitude and the phasor phase angle for each of the plurality of signal samples based on a time difference between a corresponding selected acquisition time value of the plurality of acquisition time values and a predetermined time of the predetermined times referenced to the absolute time standard to form the plurality of synchronized phasors.
- In accordance with another embodiment of the invention, a method estimates a plurality of synchronized phasors at predetermined times referenced to an absolute time standard in an electrical power system. The method includes acquiring a power system signal at a location of the electrical power system, determining a frequency of the power system signal, sampling the power system signal at a sampling interval rate based on a frequency of the power system signal to form a plurality of signal samples, and generating a plurality of acquisition time values based on an occurrence of each of the plurality signal samples at a corresponding plurality of different times referenced to the absolute time standard. Each of the plurality of acquisition time values is associated with a phasor magnitude and a phasor phase angle derived from each of the plurality of signal samples. For each of the plurality of signal samples, the method further includes adjusting the phasor magnitude and the phasor phase angle based on a time difference between a corresponding selected acquisition time value of the plurality of acquisition time values and a predetermined time of the predetermined times referenced to the absolute time standard to form the plurality of synchronized phasors. According to one aspect of the invention, the location of the power system is local and the power system signal is a local analog input signal. According to another aspect of the invention, the location of the power system is remote and the power system signal is a digitized remote analog input signal.
- In accordance with a further embodiment of the invention, a method estimates a plurality of synchronized phasors at predetermined times referenced to an absolute time standard in an electrical power system. The method includes acquiring a power system signal at a location of the electrical power system, determining a frequency of the power system signal, sampling the power system signal at a sampling interval rate based on a frequency of the power system signal to form a plurality of signal samples, and generating a plurality of acquisition time values based on an occurrence of each of the plurality signal samples at a corresponding plurality of different times referenced to the absolute time standard, each of the plurality of acquisition time values associated with a phasor magnitude and a phasor phase angle derived from each of the plurality of signal samples. For each of the plurality of signal samples, the method further includes interpolating the phasor magnitude and rotating phasor phase angle to form a corresponding plurality of referenced phasor magnitudes and referenced phasor phase angles of the plurality of synchronized phasors based on a time difference between a corresponding selected acquisition time value of the plurality of acquisition time values and a predetermined time of the predetermined times referenced to the absolute time standard.
- It should be understood that the present invention includes a number of different aspects and/or features which may have utility alone and/or in combination with other aspects or features. Accordingly, this summary is not an exhaustive identification of each such aspect or feature that is now or may hereafter be claimed, but represents an overview of certain aspects of the present invention to assist in understanding the more detailed description that follows. The scope of the invention is not limited to the specific embodiments described below, but is set forth in the claims now or hereafter filed.
-
FIG. 1 is a single line schematic of a power system that may be utilized in a typical wide area network. -
FIG. 2 is a block diagram of the power system and the IED ofFIG. 1 in conjunction with a time source configured to deliver an absolute time, according to an embodiment of the invention. -
FIG. 3 is a functional block diagram of the IED ofFIG. 1 , according to an embodiment of the invention. -
FIG. 4 is a functional block diagram of the phasor estimation ofFIG. 3 , according to an embodiment of the invention. -
FIG. 5 is an exemplary timeline illustrating the relationship between the selected acquisition time values Ta, Tb, Tc . . . , the acquisition time values T1, T2, T3 . . . and the predetermined times t1, t2, t3 . . . referenced to an absolute time standard of the phasor estimation ofFIG. 4 , according to an embodiment of the invention. -
FIG. 6A is a functional block diagram of an exemplary phasor adjustment block ofFIG. 4 , according to an embodiment of the invention. -
FIG. 6B is a functional block diagram of another exemplary phasor adjustment block ofFIG. 4 , according to an embodiment of the invention. -
FIG. 7 is a functional block diagram of another IED ofFIG. 1 that may be used in conjunction with remote acquisition devices, according to an embodiment of the invention. -
FIG. 8 is a functional block diagram of yet another IED ofFIG. 1 , according to an embodiment of the invention. -
FIG. 9 is a functional block diagram of a phasor estimation ofFIG. 8 , according to an embodiment of the invention. -
FIG. 10 is a functional block diagram of an exemplary interpolate block of the phasor estimation ofFIG. 9 , according to an embodiment of the invention. -
FIG. 11 is a functional block diagram of a correct block ofFIG. 8 , according to an embodiment of the invention. -
FIG. 12 is a functional block diagram of yet another IED ofFIG. 1 , according to an embodiment of the invention. - In contrast to existing systems, the present invention provides a calculation of synchronized phasors at predetermined times referenced to an absolute time standard, in a manner that eliminates the need for further time alignment, and allowing correlation to all synchronized phasors in the system, even when they are acquired from multiple electric power system locations with varying states and differing frequencies. The sampling interval rate is variable, based on the varying frequency of the local power system signal and can furthermore be based on an exact multiple of the frequency of the local power system signal. No corrections for frequency deviations are required. It provides synchronized phasors which are further processed for power system protection applications requiring sampling intervals also based on a multiple of the local power system frequency. It does not require sampling to be synchronized or based on the same frequency between measuring devices (e.g. IEDs) which are estimating the synchronized phasors. Control of the sampling interval is not based on an absolute time reference. The invention is simple in implementation and is computationally inexpensive. It allows the predetermined absolute time reference moment to be uniformly determined between the IEDs utilizing the phasors, or to be independently locally determined. It provides for the synchronized phasors to be referenced to a phasor of predetermined phase and frequency. Applications can provide signals for protection, monitoring, recording, metering, control, analyzing, or further processing due to the absolute time reference moment providing a common scale against which the signals can be compared.
-
FIG. 1 is a single line schematic diagram of apower system 10 that may be utilized in a typical wide area. As illustrated inFIG. 1 , thepower system 10 includes, among otherthings, threesynchronous generators power transformers circuit breakers 18. The step-uppower transformers transmission lines first substation 16 may be defined to include the twosynchronous generators power transformers circuit breakers 18, all interconnected via afirst bus 19. Asecond substation 35 may be defined to include thesynchronous generator 13, the step-uppower transformer 14 c and associatedcircuit breakers 18, all interconnected via asecond bus 25. At the end of the longdistance transmission lines third substation 22 may be defined to include two step-downpower transformers more distribution lines 26 to loads such as aload 32. Thesecond substation 35 also includes two step-downpower transformers second bus 25, to lower voltage sinusoidal waveforms suitable for use byrespective loads - A number of intelligent electronic devices (IED) are connected at various points in the
electric power system 10. For ease of discussion however, only oneIED 100 is shown operatively connected to thetransmission line 20 b via one transformer. In general, an IED can be configured to perform one or more of power system protection (e.g., a line current differential protection), automation (e.g., reclosing a circuit breaker), control (e.g., capacitor bank switching) and metering (e.g., power consumption calculation). -
FIG. 2 is a block diagram of thepower system 10 and theIED 100 in conjunction with atime source 108 configured to deliver an absolute time to theIED 100.FIG. 2 also includes asecond IED 110 and a monitoring andcontrol system 112 operatively coupled theIED 100 via acommunications network 107. Thenetwork 107 may be any suitable network adapted to enable transmission between the various interconnected devices ofFIG. 2 . For example, thenetwork 107 may be configured as an Ethernet based local area network or wide area network, etc., and may include a number of universal asynchronous receiver transmitters. The monitoring andcontrol system 112 is configured to, among other things, provide SCADA (Supervisory Control and Data Acquisition) and EMS (Energy Management System) functions by applying synchrophasor information received from additional devices of thepower system 10. - As discussed below in connection with a number of figures, the
IED 100 is configured to estimate synchronized phasors at predetermined time instants that are based on an absolute time reference and, in some embodiments, referencing to a phasor with predetermined phase and frequency. Referring toFIG. 2 , theIED 100 has an input configured to receive aninput analog signal 102, and a bidirectional signal configured to provide asystem control signal 104 to the power system 10 (e.g., a signal to theopen circuit breaker 18 to isolate a portion of thefirst substation 16 from the remainder of the power system 10). Thesystem control signal 104 may also provide control information toIED 100. Theinput analog signal 102, which may be representative of one or more local voltages (e.g., an A-phase to ground voltage, B-phase to ground voltage and a C-phase to ground voltage) and/or one or more local currents (e.g., an A-phase current, B-phase current and C-phase current), is received byIED 100 via voltage and/or current transformers connected to one or more phases of thepower system 10. Alternatively, theinput analog signal 102 may be representative of a remote voltage and/or a current signal received by theIED 100 from a remote acquisition device monitoring thepower system 10. - A
time source 108 provides anabsolute time reference 101 to theIED 100 where theabsolute time 101 is a synchronized to an absolute time standard such as UTC, and distributed using GPS, preferably formatted in an Inter Range Instrumentation Group time code standard (IRIG) signal for receipt byIED 100. Additional formats, distribution schemes, and time standards may also be utilized. - In general, the
input analog signal 102 received from thepower system 10 is filtered, multiplexed, sampled and digitized to form a signal of analog instantaneous samples suitable for use by amicrocontroller 103 of theIED 100. In one embodiment, themicrocontroller 103 includes a CPU, or a microprocessor, a program memory (e.g., a Flash EPROM) and a parameter memory (e.g., an EEPROM). As will be appreciated by those skilled in the art, other suitable microcontroller configurations may be utilized. Further, although discussed in terms of themicrocontroller 103, it should be noted that the embodiments presented and claimed herein may be practiced using an FPGA or other equivalent. - Depending on the
IED 100 configuration, themicrocontroller 103 executes a protection function and/or an automation function and/or a control function and/or a metering function. Further, themicroprocessor 103 executes a computer program or control logic scheme to estimate thesynchronized phasors 111 at predetermined times referenced to an absolute time standard, discussed below in connection withFIGS. 3-11 , according to an embodiment of the invention. For ease of discussion, the computer program or control logic scheme to estimate synchronized phasors is referred to herein as a synchronized phasor estimation method that may or may not be in addition to a protection function and/or an automation function and/or a control function and/or a metering function of theIED 100. -
FIG. 3 is a functional block diagram of theIED 100, according to an embodiment of the invention. Although discussed as functional blocks, it should be understood that theIED 100 may be implemented in hardware, software, firmware or a combination thereof. Referring toFIG. 3 , theIED 100 includes ananalog filter 140 having an input for receiving theinput analog signal 102 and an output for providing a filtered analoginstantaneous signal 142 to an analog-to-digital converter (ADC) 144. When received by theADC 144, the filtered analoginstantaneous signal 142 is sampled at a rate determined by a frequency of theinput analog signal 102 to generate a sampled analoginstantaneous signal 146. The series of filtered signal samples representative of the filtered analoginstantaneous signal 142 can be generated at a frequency associated with an integer multiple of theinput analog signal 102. - The
IED 100 also includes adigital filter 148 having an input for receiving the sampled analoginstantaneous signal 146. In operation, thedigital filter 148 rejects unwanted signal characteristics such as harmonic distortion, thermal noise, and exponentially decaying DC offsets, from the sampled analoginstantaneous signal 146 in order to provide a filteredsignal 150 via its output. The filteredsignal 150 represents digitized, filtered instantaneous samples of theinput analog signal 102, where the instantaneous samples of theinput analog signal 102 are taken at a frequency of theinput analog signal 102. A typical impulse response of thedigital filter 148 is a full-cycle cosine waveform response or a half-cycle cosine waveform response. - The filtered
signal 150 is provided to aphasor calculator 152 where a series ofinstantaneous phasors 154 are calculated based on the filteredsignal 150. Although not separately illustrated, thephasor calculator 152 may include a 90 degree phase shift function in order to provide a quadrature representation suitable for the calculation of magnitudes and phase angles. As noted above, for ease of subsequent calculations by themicrocontroller 103, each of theinstantaneous phasors 154 is expressed in polar coordinate form to include aninstantaneous phasor magnitude 154 a and an instantaneousphasor phase angle 154 b. Alternatively, a representation as a complex value may be utilized, depending on the nature of theIED function 156. In this case each of theinstantaneous phasors 154 is expressed as an instantaneous phasorreal component 154 a and an instantaneous phasorimaginary component 154 b. For ease of discussion, both versions, the magnitude and phase combination and the real part imaginary part combination, are referred to herein as an instantaneous phasor, or in general as a phasor. The instantaneousphasor phase angle 154 b is referenced to, for example, (one of) the input analog signal(s) 102. Thephasor calculator 152 may also include calculation of sequence values such as positive sequence, negative sequence, or zero sequence. These additional quantities may also be part ofinstantaneous phasors 154. - An
IED function 156 is configured to receive theinstantaneous phasors 154, and utilizing an algorithm or equivalent, perform the appropriate IED function (e.g., protection, automation, control, metering) to determine a status of thepower system 10. Based on the determined status, thesystem control signal 104 is provided to thepower system 10, other IEDs, etc. Thesystem control signal 104 may be transmitted directly to an actuating device associated with theIED 100, or may be transmitted via thenetwork 107 where it is coordinated with other control signals for further decoding and processing by a remote actuating device. TheIED function 156 is also configured to utilize thesynchronized phasors 111 to perform power system functions, such as causing a breaker to trip. TheIED function 156 may also include a link to thenetwork 107 in order to transmit and receive various data related to protection, monitoring, automation and control, and to receivesynchronized phasors 111 from other IEDs coupled to thepower system 10. - In addition to the signal processing functions described above, the
IED 100 includes asample controller 160 having an input for receiving the filtered analoginstantaneous signal 142. Thesample controller 160 also includes two outputs; a first output for providing acontrol signal stream 162 to theADC 144 and atime controller 166, and a second output configured to provide alocal frequency 164 to aphasor estimation 200. Thesample controller 160 has no control input based on theabsolute time 101 and therefore does not provide acontrol signal stream 162 to theADC 144 based on theabsolute time 101. - The
local frequency 164 is representative of a frequency (e.g., 60.2 Hz) of theinput analog signal 102. In one embodiment, thelocal frequency 164 is derived from the filtered analoginstantaneous signal 142 using one of any number of well-known methods. For example, an interval between two or more zero crossings of the filtered analoginstantaneous signal 142 may be measured as a sinusoidal period. The interval(s) between the zero crossings can be filtered to reduce noise, harmonics and other undesirable distortions. Thelocal frequency 164 may then be calculated as a reciprocal of the sinusoidal period. Thelocal frequency 164 may also be derived from one of the filtered analoginstantaneous signal 142, theinput analog signal 102, the sampled analoginstantaneous signal 146, the filteredsignal 150 and/or theinstantaneous phasors 154. - After deriving the
local frequency 164, an equal number of integer samples instants may be placed within each period to provide a basis for thecontrol signal stream 162. For example, each period may include 8 sampling instants yielding nominally 480 sampling instants of the filtered analoginstantaneous signal 142 per second for a local frequency of 60 Hz. Thus, sampling instants of thecontrol signal stream 162 are based on the local frequency. - In one embodiment the
sample controller 160 operates to generate a series of the sampling instants at the local sampling interval rate, herein referred to as thecontrol signal stream 162, where the sampling instants are an integer number multiple of the frequency of theinput analog signal 102. As appreciated by one skilled in the art, the sampling instants may be based on other multiples of the frequency of theinput analog signal 102. For ease of discussion, thecontrol signal stream 162 may be viewed as a pulse train of sampling instants. In general however, thecontrol signal stream 162 may be configured in one of any number of signal configurations adapted to control analog multiplexers, gain circuits, sample and hold switches, programmable logic, and other devices. - In addition to receiving the
control signal stream 162, thetime controller 166 includes an input for receiving theabsolute time 101. As described above, theabsolute time 101 is a time referenced to an absolute time standard and communicated via a protocol such as IRIG. Thetime controller 166 utilizes theabsolute time 101 to generate a series of instantaneous time values 168 where each is denoted as T. Eachinstantaneous time value 168 is representative of one decoded instant of theabsolute time 101, and is updated periodically (e.g., once per second), depending on the absolute time standard and the nature of the implementation. - For example, if the
absolute time 101 is formatted in using an IRIG-B protocol, a single bit stream of 100 pulses per second is transmitted. This means that 100 bits of information, representing one data frame of time information, are transmitted every second. Each one-second data frame contains information about the day of the year (1-366), hours, minutes, and seconds (e.g., Aug. 17, 2005 at 4:13.000000 PM). Accordingly, in one embodiment, theinstantaneous time value 168 is representative of one decoded instant of theabsolute time 101, and is updated once per second. - Using the time information provided by the
absolute time 101, thetime controller 166 also monitors thecontrol signal stream 162 to form the acquisitiontime value stream 170 having a series of acquisition time values denoted as T1, T2, T3, . . . . Each acquisition time value is associated with one sampling instant of the analog input signal and is therefore associated with oneinstantaneous phasor magnitude 154 a and one instantaneousphasor phase angle 154 b. - For example, if the
control signal stream 162 is a series of pulses where the leading edge of each pulse represents the beginning of one ADC operation of the filtered analoginstantaneous signal 142, the acquisitiontime value stream 170 may be a series of time values coinciding with the time of the leading edge of each pulse, yielding an acquisitiontime value stream 170 having a number of acquisition time values per second as determined by thelocal frequency 164. Thus the acquisition time value T2 may occur approximately 2 milliseconds (ms) after the acquisition time value T1, the acquisition time value T3 may occur approximately 2 ms after the acquisition time value T2 or approximately 4 ms after the acquisition time value T1, the acquisition time value T4 may occur approximately 2 ms after the acquisition time value T3 or approximately 6 ms after the acquisition time value T1, and so on, and each acquisition time values encodes the value of the sampling instant of the filtered analog instantaneous signal. Depending on the phase relationship between the sampling instants of thecontrol signal stream 162 and theabsolute time 101, a time offset from theabsolute time 101 may be used to express each of the acquisition time values T1, T2, T3 . . . of the acquisitiontime value stream 170. In this case, thetime controller 166 may record the interval from theabsolute time 101 to the time of a nextcontrol signal stream 162 pulse, and then add this recorded interval to theabsolute time 101 to generate each of the acquisition time values T1, T2, T3, . . . of theacquisition time stream 170. - In general, the
phasor estimation 200 is configured to generatesynchronized phasors 111 indicative of theinput analog signal 102. Thesynchronized phasors 111 are magnitude adjusted and phase-aligned to theabsolute time 101, and in some embodiments further phase aligned to reference to a phasor with predetermined phase and frequency.FIG. 4 is a functional block diagram of thephasor estimation 200, according to an embodiment of the invention. Thephasor estimation 200 operates to generate thesynchronized phasors 111 in response to receipt of a series of theinstantaneous phasor magnitudes 154 a, a corresponding series of instantaneousphasor phase angles 154 b, thelocal frequency 164, the instantaneous time values 168 and the acquisitiontime value stream 170. Although described as functional blocks, it should be understood that thephasor estimation 200 may be implemented in hardware, software, firmware or a combination thereof. - Referring to
FIG. 4 , thephasor estimation 200 includes a generatepredetermined time function 202 and aphasor adjustment block 214 operatively coupled to the generatepredetermined time function 202. The generatepredetermined time function 202 has a first input for receiving the instantaneous time values 168 T and a second input for receiving the acquisition time values T1, T2, T3, . . . of the acquisitiontime value stream 170. Thephasor estimation 200 also has a first output for providing predetermined times t1, t2, t3 . . . referenced to the absolute time standard 111 a. The predetermined times t1, t2, t3 . . . referenced to the absolute time standard 111 a may be a result of synchronization across all or a portion of the power system 10 (e.g., synchronized phasors), or may be specific to theIED 100, therefore generated and used locally only, depending on the desired application of thesynchronized phasors 111. In any case, the predetermined times t1, t2, t3 . . . referenced to the absolute time standard 111 a are the desired time values at which the magnitudes and phase angles of thesynchronized phasors 111 are to be estimated from the magnitudes and phase angles of phasors calculated at known times (e.g., the acquisition time values T1, T2, T3, . . . ). - The generate
predetermined time function 202 further has a second output for providing a timevalue pair stream 206 configured as a series of pairs of corresponding time values to thephase adjustment block 214. Each of the corresponding time value pairs includes one predetermined time referenced to the absolute time standard 111 a and a corresponding selected acquisition time value from a series of selected acquisition time values Ta, Tb, Tc . . . . Each of the selected acquisition time values Ta, Tb, Tc . . . corresponds to one of the acquisition time values T1, T2, T3, . . . of the acquisitiontime value stream 170, such that the selected acquisition time values Ta, Tb, Tc . . . are a subset of the acquisition time values T1, T2, T3, . . . of the acquisitiontime value stream 170. - For example, in one implementation Ta=T4, Tb=T254. Tc=T504, and so on, depending on the occurrence of the predetermined times t1, t2, t3 . . . referenced to the absolute time standard 111 a with respect to the occurrence of the acquisition time values T1, T2, T3, . . . of the acquisition
time value stream 170. - In summary, each of the selected acquisition time values Ta, Tb, Tc . . . corresponds to one of the acquisition value T1, T2, T3, . . . of the acquisition
time value stream 170 that directly precedes an occurrence of one of the predetermined times t1, t2, t3 . . . referenced to the absolute time standard 111 a.FIG. 5 is anexemplary timeline 250 illustrating the relationship between the series of selected acquisition time values Ta, Tb, Tc . . . , the acquisition time values T1, T2, T3, . . . of the acquisitiontime value stream 170 and the predetermined times t1, t2, t3 . . . referenced to the absolute time standard 111 a of thephasor estimation 200. As shown inFIG. 5 , the instantaneous time values T are selected to occur once every second, the predetermined times t1, t2, t3 . . . referenced to the absolute time standard 111 a are selected to occur every 250 ms and the acquisition time values T1, T2, T3, . . . of the acquisitiontime value stream 170 occur approximately every 2 1/12 ms (based on 8 sampling instants per period of a local frequency of 60 Hz), however other time intervals are possible. - Recall that, each acquisition time value T1, T2, T3, . . . correlates to the
control signal stream 162 which, in one embodiment, correlates to an integer multiple of the frequency of theinput analog signal 102. Referring toFIG. 5 , upon an occurrence of a predetermined time of the predetermined times t1, t2, t3 . . . , for example, the predetermined time t1, an acquisition time value T1, T2, T3, . . . of the acquisitiontime value stream 170 immediately preceding the predetermined time t1, for example, the acquisition time value T4, is assigned a selected acquisition time value, for example Ta, and so on. In this example, the predetermined time t1, and the selected acquisition time value Ta form a corresponding time value pair t1, Ta of the timevalue pair stream 206. The corresponding time value pair, for example t1, Ta, is then forwarded to thephasor adjustment block 214. Similarly, the corresponding time value pair t2, Tb, the time value pair t3, Tc and so on are forwarded to thephasor adjustment block 214 as they are generated. - As discussed above, each acquisition time value T1, T2, T3, . . . of the acquisition
time value stream 170 is associated with aninstantaneous phasor magnitude 154 a and an instantaneousphasor phase angle 154 b. As a result of being derived from one acquisition time value T1, T2, T3, . . . , each of the selected acquisition time values Ta, Tb, Tc . . . correspond to oneinstantaneous phasor magnitude 154 a and one instantaneousphasor phase angle 154 b. - Referring again to
FIG. 4 ,phasor adjustment block 214 is configured to adjust or realign theinstantaneous phasor magnitude 154 a and the instantaneousphasor phase angle 154 b in order to generate thesynchronized phasor 111, shown as referencedphasor magnitude stream 111 b and referenced phasorphase angle stream protection function 156. In general, theinstantaneous phasor magnitude 154 a and the instantaneousphasor phase angle 154 b of theinstantaneous phasor 154 occurring at the time of one of the acquisition time value T1, T2, T3, . . . is adjusted such that the resulting magnitude and phase angle are equal to a magnitude and phase angle of an equivalent phasor occurring at the time of the next occurring predetermined time t1, t2, t3 . . . referenced to an absolute time standard 111 a. As noted above, the phase angle of thesynchronized phasor 111 may further be referenced to a phasor of predetermined phase and frequency in order to compare to other similarly generated referenced phasors. - More specifically, the generate
predetermined time function 202 generates an acquisition timevalue control signal 208 that operates to enable selected receipt of theinstantaneous phasor magnitude 154 a by an interpolate function of thephasor adjustment block 214, and to enable selected receipt of the instantaneousphasor phase angle 154 b by a rotate block of thephasor adjustment block 214. Selected receipt is enabled upon an occurrence of each of the selected acquisition time values Ta, Tb, Tc . . . . Although illustrated as causing a switching action, the acquisition timevalue control signal 208 may cause any suitable action that selectively enables theinstantaneous phasor magnitude 154 a and the instantaneousphasor phase angle 154 b to be provided to thephasor adjustment block 214 upon an occurrence of a selected acquisition time value of the series of selected acquisition time values Ta, Tb, Tc . . . . - Referring again to
FIG. 5 , amagnitude line 260 illustrates a series ofinstantaneous phasor magnitudes 154 a (represented as dots) where each of the series ofinstantaneous phasor magnitudes 154 a corresponds to an occurrence of an acquisition time value T1, T2, T3, . . . Similarly, aphase angle line 262 is aligned to themagnitude line 260 to illustrate a series of instantaneousphasor phase angle 154 b (represented as dots) where each of the series of instantaneousphasor phase angles 154 b corresponds to an occurrence of an acquisition time value. T1, T2, T3. - For example, an
instantaneous phasor magnitude 154 a occurring at the acquisition time value T1 is denoted as XM(T1) 264 while an instantaneousphasor phase angle 154 b occurring at the acquisition time value T1 is denoted as XA(T1) 266. Similarly, directly preceding the predetermined time t1, aninstantaneous phasor magnitude 154 a occurring at the acquisition time value T4=T a 271 is denoted as XM (Ta) 268 while an instantaneousphasor phase angle 154 b occurring at the acquisition time value T4=Ta is denoted as XA(Ta) 270. It should be noted that inFIG. 5 , the relationship of T4=Ta and T5=Ta+dT with respect to t1 is used for illustrative purposes and that other alignments to t1 are possible depending on theIED 100 implementation. - The
synchronized phasor 111, derived at the predetermined time t1, may be similarly illustrated inFIG. 5 as a referenced phasor magnitude XM(t1) of a referencedphasor magnitude stream 111 b denoted as XM(t1, t2, t3, . . . ), and a referenced phasor phase angle XA(t1) of a referenced phasorphase angle stream 111 c denoted as XA(t1, t2, t3, . . . ). - In one embodiment, the phase angles of the referenced phasor
phase angle stream 111 c are further processed to reference them to a phasor with predetermined phase and frequency. By subtracting a phase angle associated with fixed frequency reference phasor having a pre-selected reference frequency (e.g., 60.0 Hz) from each of the phase angles (e.g., for a system instantaneously at 60.2 Hz) of the referenced phasorphase angle stream 111 c, the resulting phase angles are referenced to a phasor with predetermined phase and frequency to form an adjusted referenced phasorphase angle stream 111 d. In other words, each referenced phasor phase angle can be further processed to remove a fixed frequency such that a resulting adjusted referenced phasor phase angle is estimated with respect to an associated time t1, t2, t3 . . . referenced to the absolute time standard 111 a and a phasor with predetermined phase and frequency. - In the illustrated example of
FIG. 5 , a fixed frequencyreference phasor line 265 is shown. Prior to referencing to a phasor with predetermined phase andfrequency 265, a referenced phasor phase angle is located at the intersection of thephase angle line 262 and a bisecting line corresponding to the time value t1, and is denoted as XA(t1) 111 c. Subsequent to referencing to a phasor with predetermined phase and frequency, the fixedfrequency 265 is subtracted from the referenced phasor phase angle, resulting in an adjusted referenced phasor angle denoted as XA(t1)ADJ 111 d. The subtraction is performed modulo the phase angle range of the referencedphasor phase angle 111 c. For example, if the referencedphasor phase angle 111 c is in range zero to 360 degrees, then the subtraction is computed modulo 360. - If the predetermined times t1, t2, t3 . . . referenced to the absolute time standard 111 a are chosen appropriately to the time instants when the reference phasor with predetermined phase and frequency is at zero degrees, then the conversion to the phasor with predetermined phase and frequency is accomplished without further processing. This is due to the fact that the subtraction operation is always subtracting a value of zero and therefore does not need to be explicitly computed.
-
FIG. 6A is a functional block diagram of an exemplaryphasor adjustment block 214, according to an embodiment of the invention. In the exemplary phasor adjusted block ofFIG. 6A , each resulting synchronized phasor includes a predetermined time t1, t2, t3 . . . referenced to the absolute time standard 111 a, a referenced phasor magnitude of the referencedphasor magnitude stream 111 b and an adjusted referenced phasor phase angle of the adjusted referenced phasorphase angle stream 111 d. Although illustrated using a number of multipliers, adders, and operators as described below, it is contemplated that thephasor adjustment block 214 may be implement in one of any number of ways to provide interpolation of theinstantaneous phasor magnitude 154 a and rotation of the instantaneousphasor phase angle 154 b to form the referencedphasor magnitude 111 b and the referencedphasor phase angle 111 c of thesynchronized phasor 111. - Referring to
FIGS. 5 and 6A , thephasor adjustment block 214 includes afirst adder 302 configured to subtract the instantaneous phasor magnitude at the selected acquisition time value XM(Ta) 268 from the next instantaneous phasor magnitude at the selected acquisition time value XM(Ta+dT) 284 to generate aphasor magnitude difference 301, where Ta+dT represents the time of the next acquisition time value following the selected acquisition time value Ta. Note that the selected acquisition time value XM(Ta+dT) 284 is simply available from the series ofinstantaneous phasor magnitudes 154 a and does not imply anticausal processing. Thephasor magnitude difference 301 represents a difference in the magnitude between two sequential instantaneous phasor magnitudes. Thephasor adjustment block 214 also includes asecond adder 308 configured to subtract the selected acquisition time value Ta of the series of selected acquisition time values Ta, Tb, Tc, . . . from the predetermined time t1 referenced to an absolute time standard 111 a in order to generate atime value difference 310. Thephasor adjustment block 214 further includes adivider 306 configured to divide thetime value difference 310 by an acquisition timevalue delta dT 274 to generate afirst proportionality factor 307. Thetime value difference 310 represents the difference in time from the selected acquisitiontime value T a 271 to the time value referenced to an absolute time standard t1, and the acquisition timevalue delta dT 274 represents a time between the sampling instants of thecontrol signal stream 162 provided by thesample controller 160. Afirst multiplier 304 is configured to multiply thephasor magnitude difference 301 by thefirst proportionality factor 307 to generate an intermediatemagnitude difference signal 305. - The
phasor adjustment block 214 further includes athird adder 328 configured to add the instantaneous phasor magnitude at the selected acquisition time value XM(Ta) 268 to the intermediatemagnitude difference signal 305 to form an uncalibrated referencedphasor magnitude 311. Afirst operator 312 and asecond operator 316 are also included in thephasor adjustment block 214. Thefirst operator 312 is configured to multiply thelocal frequency 164 by thetime value difference 310, followed by conversion from unity units to phase angle units by multiplication with a constant value representative of the conversion factor, to form asecond proportionality factor 313. Thesecond operator 316 is configured to multiply a fixedfrequency 324 of the phasor with predetermined phase and frequency by the predetermined time value t1 referenced to an absolute time standard 111 a, followed similarly by unit conversion to generate athird proportionality factor 309. Thesecond operator 316 uses the fact that phase values remain within a fixed range (e.g. zero to 360 degrees) to convert the predetermined time value t1 referenced to an absolute time standard 111 a to a small range of values prior to multiplication. For example, if the phasor with predetermined phase and frequency is chosen such that the phase is always equal to zero at each exact multiple of one second, according to the absolute time standard, then the predetermined time value t1 referenced to an absolute time standard 111 a can be converted to a range of zero to one second prior to multiplication by fixedfrequency 324. To convert the range for this example, simply remove the rest of the time information, according to the representation of the predetermined time value t1 referenced to an absolute time standard 111 a, for example the year, day, hours, and minutes information can be removed, along with subtracting an integer number of seconds from the predetermined time value t1 referenced to an absolute time standard 111 a so that the resulting range is zero to one second. - The
phasor adjustment block 214 also includes a third and afourth operator third operator 314 is configured to substract the instantaneous phasor phase angle at the selected acquisition time value XA(Ta) 270 to thesecond proportionality factor 313, followed by modulo conversion to the desired phase angle range, to form a pre-aligned referencedphasor 315. Thefourth operator 318 is configured to add the pre-aligned referencedphasor 315 to thethird proportionality factor 309, followed by modulo conversion to the desired phase angle range to form an adjusted uncalibrated referencedphasor phase angle 319. - Implementation magnitude distortion can be approximated and removed via a Mag Implement
Correction 330 configured to receive thelocal frequency 164 and remove any implementation distortion to form amagnitude correction factor 321 using one of a number of techniques. Such implementation distortion may be introduced via IED components such as theanalog filter 140 distorting the filtered analoginstantaneous signal 142 with gain compression as a function of the local frequency. This is because each filter has a specific magnitude and phase response which varies as a function of the frequency content of the signal upon which it acts. It is not the purpose of Mag ImplementCorrection 330 to correct for off-nominal sampling errors. This is because the invention samples as a function of the varying frequency of the local signal (e.g. input analog signal 102) and therefore does not require corrections to compensate for sampling at a rate different than the local signal, such as fixed rates or rates based on the absolute time reference. One technique that may be employed by the Mag ImplementCorrection 330 includes use of a look-up table containing the distortion compensating values as a function of theinstantaneous phasor magnitude 154 a. Furthermore, the compensation can be included with the interpolation operation by further adjusting the time value referenced to an absolute time standard according to the amount of effective time shift required to compensate for phase shifts of the, for example,analog filter 140. - Similarly, phase angle distortion or shift can be approximated and removed via an Angle Implement
Correction 332 configured to receive thelocal frequency 164 and remove any implementation distortion to form aphase correction factor 317, using one of a number of techniques. Such implementation distortion may be caused by phase shifts introduced by IED components such as theanalog filter 140. It is not the purpose of Angle ImplementCorrection 332 to correct for off-nominal sampling errors. This is because the invention samples as a function of the varying frequency of the local signal (e.g. input analog signal 102) and therefore does not require corrections to compensate for sampling at a rate different than the local signal, such as fixed rates or rates based on the absolute time reference. One technique that may be employed by the Angle ImplementCorrection 332 includes use of a pre-selected constant or a parameter such as a look-up table containing the distortion compensating values as a function of theinstantaneous phasor magnitude 154 a. - A second multiplier of the
phasor adjustment block 214 is configured to multiply the uncalibrated referencedphasor magnitude 311 with themagnitude correction factor 321 to form the referenced phasor magnitude XM(t1) of the referencedphasor magnitude stream 111 b. Similarly, afifth operator 322 of thephasor adjustment block 214 is configured to add the adjusted uncalibrated referencedphasor phase angle 319 to thephase correction factor 317 to form the adjusted referenced phasor phase angle XM(t1)ADJ of the adjusted referenced phasorphase angle stream 111 d. In this way, synchronizedphasors 111 are estimated at predetermined times referenced to the absolute time standard in an electrical system and referenced to a phasor with predetermined phase and frequency. - In an alternate embodiment, the
Phasor Estimation 200 can use selected acquisition time values Ta, Tb, Tc . . . which correspond to existing sample instants that immediately precede an associated predetermined time t1, t2, t3 . . . referenced to an absolute time standard 111 a in conjunction with the time next time values Ta+dT, Tb+dT, T+dTc . . . (immediately subsequent to a predetermined time t1, t2, t3 . . . referenced to an absolute time standard 111 a) to interpolate the instantaneousphasor phase angle 154 b to form the referenced phasor phase angle of the referenced phasorphase angle stream 111 c, in a manner equivalent to the interpolation shown inFIG. 6A for the referenced phasor magnitude of the referencedphasor magnitude stream 111 b. Whereas the rotation of the instantaneousphasor phase angle 154 b of the above embodiment takes advantage of the known slope of phase change as a function of thelocal frequency 164, the alternate embodiment interpolation utilizes the instantaneousphasor phase angle 154 b sampled on either side of a predetermined time, for example t1, to determine the referenced phasor phase angle of the referenced phasorphase angle stream 111 c (seeFIG. 5 ). In the alternate embodiment, a representation of the phasors as complex real and imaginary components can be similarly converted from the selected acquisition time values Ta, Tb, Tc . . . to predetermined times t1, t2, t3 . . . referenced to the absolute time standard 111 a in a manner equivalent to the interpolation shown inFIG. 6A for each referenced phasor magnitude of the referencedphasor magnitude stream 111 b. In this case, referencing to a phasor with predetermined phase and frequency of the phase angles is performed in a manner shown by thesecond operator 316 and thefourth operator 318 ofFIG. 6A if the phasor is characterized as having a magnitude and phase angle. For phasors characterized as having a complex real and imaginary part, complex multiplication of the phasor by the phasor with predetermined phase and frequency is sufficient to convert a referenced phasor phase angle of the referenced phasorphase angle stream 111 c to an adjusted referenced phasor phase angle of the adjusted referenced phasorphase angle stream 111 d. -
FIG. 6B is a functional block diagram of another exemplaryphasor adjustment block 214, according to an embodiment of the invention. In the exemplary phasor adjusted block ofFIG. 6B , referencing to a phasor with predetermined phase and frequency is not performed such that each resulting synchronized phasor includes a predetermined time t1, t2, t3 . . . referenced to an absolute time standard 111 a, a referenced phasor magnitude of the referencedphasor magnitude stream 111 b and a referenced phasor phase angle of the referenced phasorphase angle stream 111 c. The exemplary phasor block ofFIG. 6B is configured and operational as described inFIG. 6A , except it excludes the second operator to multiply a fixed frequency by the time value referenced to the absolute time standard. As a result, the referenced phasorphase angle stream 111 c is generated rather than the adjusted referenced phasorphase angle stream 111 d. -
FIG. 7 is a functional block diagram of anotherIED 400 that may be used in conjunction with one or more remote devices, according to an embodiment of the invention. In this case, the remote device (not separately illustrated) converts itsinput analog signal 102 into a digital format suitable for transmission to theIED 400. A digitizedinput analog signal 402 is therefore received by theIED 400. - Referring to
FIG. 7 , rather than theanalog filter 140 and theADC 144 of theIED 100, theIED 400 includes achannel decode 404 configured to decode the digitizedinput analog signal 402 received from another IED, and aresample block 406. The digitizedinput analog signal 402 may be received via one of any number of mediums including wired and wireless. The digitizedinput analog signal 402 may be encoded using well-known methods to ensure transmission security, reduce unwanted effects of noise, reduce multipath signal interference and burst errors, and the like, and may be decoded using one of any number of well-known suitable formats, depending on the IED implementation and/or the encoding scheme. - When received by the
channel decode 404, the digitizedinput analog signal 402 is decoded to form a decodedinstantaneous signal 405. The decodedinstantaneous signal 405 includes the instantaneous amplitude of the remote analog input signal as well as information regarding a remote data acquisition time value. The remote data acquisition time value indicates an instant at which the power system signal was sampled by the remote device to acquire its analog input signal, where the sampling instant is referenced to an absolute time standard (e.g., UTC). The decodedinstantaneous signal 405 may further include additional data such as a power system frequency measured by the remote device (remote frequency), although such frequency information may be derived by theIED 400 from the instantaneous amplitude of the decodedinstantaneous signal 405 and the remote data acquisition timestamp, using well-known methods. - The resample block 406 is configured to generate signal samples representative of the
input analog signal 102 received by the remote device. Thus, upon receipt by the resample block 406, the decodedinstantaneous signal 405 is adjusted from the remote sampling interval to an interval which is representative of the remote frequency. As a result, the sampled analog instantaneous signal 146 (representative of theinput analog signal 102 received by the remote device) is provided to thedigital filter 148. The remaining components (e.g., sample controller 160) ofFIG. 7 are substantially configured and operable as described in connection withFIGS. 3-6 to providesynchronized phasors 111 indication of thepower system 10 referenced to the absolute time instants. -
FIG. 8 is a functional block diagram of yet anotherIED 500, according to an embodiment of the invention. In this case, theIED 500 converts theinput analog signal 102 tosynchronized phasors 111 prior to performing the appropriate protection, automation, control, metering function by theIED function 156 to determine the status of thepower system 10. In summary, rather than providing the series ofinstantaneous phasors 154 from the magnitude and phase angle calculator, along withsynchronized phasors 111 from thephasor estimation 200, to theIED function 156 as shown inFIG. 3 , theIED 500 includes aphasor estimation 502 coupled to theIED function 156 such that thesynchronized phasors 111 are first calculated and then forwarded for use by theIED function 156. - Like the IED of
FIG. 3 , theIED 500 includes theanalog filter 140, theADC 144, thedigital filter 148, thesample controller 160 and thetime controller 166, operating as described in connection withFIGS. 3-6 . Unlike the IED ofFIG. 3 however, thephasor estimation 502 of theIED 500 includes the functionality of the phase calculator 152 (without the 90 degree phase shift functionality), and utilizes a separate 90 degree shift in conjunction with an interpolation to adjust the phase angle of the filteredsignal 150 and form the referencedphasor magnitude stream 111 b and the referenced phasorphase angle stream 111 c and/or the adjusted referenced phasorphase angle stream 111 d of thesynchronized phasors 111. -
FIG. 9 is a functional block diagram of thephasor estimation 502 of theIED 500, according to an embodiment of the invention. Thephasor estimation 502 includes a 90 degree shift block 504 having an input for receiving the filteredsignal 150. The filteredsignal 150 is representative of theinput analog signal 102 and is generated in response to the sampling instants of thecontrol signal stream 162. The filteredsignal 150 may therefore be denoted as A(T1, T2, T3, . . . ) where each of T1, T2, T3, . . . is an acquisition time value of a corresponding sample of the filteredsignal 150, and where A is an instantaneous amplitude. - Upon receipt of the filtered
signal 150, the 90degree shift block 504 operates to shift the filteredsignal 150 by 90 degrees to form a shiftedfiltered signal 503. The 90 degree shift may be accomplished by delaying each of the samples forming the filteredsignal 150 by ¼ cycle, according to thelocal frequency 164. In one embodiment, the samples of the filtered signal are taken at an integer multiple sixteen times thelocal frequency 164. The shiftedfiltered signal 503 may be denoted as A(T1−kdT, T2−kdT, T3−kdT, . . . ) where each of the samples of the filteredsignal 150 is delayed by kdT, where k equals an integer value equal to ¼ of the total number of samples of the filteredsignal 150 included in a single analog waveform period T, in this case k=4, and where dT equals a time period between each sample of the filteredsignal 150. - The
phasor estimation 502 also includes aninterpolate block 506 having a first input for receiving the filteredsignal 150, having a second input for receiving the shiftedfiltered signal 503, having a third input for receiving the acquisition time values T1, T2, T3, . . . of the acquisitiontime value stream 170, and having a fourth input for receiving timevalue pair stream 513, which includes the predetermined times t1, t2, t3 . . . referenced to the absolute time standard 111 a along with the selected acquisition time values Ta, Tb, Tc, . . . . Theinterpolate block 506 is configured to adjust the time of each of the samples of the filteredsignal 150 and shifted filteredsignal 503 from an acquisition time value such as Ta=T4 to a time value referenced to the absolute time standard such as the predetermined time value t1 occurring between two of the acquisition time values such as T4 and T5 - For example,
FIG. 10 is a functional block diagram of one example of theinterpolate block 506 of thephasor estimation 502, according to an embodiment of the invention. Although illustrated using a number of multipliers, adders, and operators as described below, it is contemplated that theinterpolate block 502 may be implemented in one of any number of ways to provide adjustment from the remote sampling interval to the interval which is representative of the remote frequency. - Referring to
FIG. 10 , theinterpolate block 506 includes thefirst adder 302 configured to subtract afirst sample 507 of the filteredsignal 150 taken at a selected acquisition time value such as Ta=T4 from a correspondingnext sample 509 of the filteredsignal 150 taken at a an acquisition time value such as T5 to generate asample amplitude difference 508. Thesample amplitude difference 508 represents a difference in the amplitude between two sequential instantaneous sample magnitudes of the filteredsignal 150. Theinterpolate block 506 also includes thesecond adder 308 configured to subtract a selected acquisition time value of the selected acquisitiontime value stream 170, for example, Ta from a predetermined time referenced to an absolute time standard 111 a, for example t1, to generate thetime value difference 310. - Further, the
divider 306 ofFIG. 10 is configured to divide thetime value difference 310 by the acquisition timevalue delta dT 274 to generate the first proportionality factor 307 (see,FIGS. 5 and 6 ). In the illustrated example, thetime value difference 310 represents a difference in time between the selected acquisition time value Ta to the predetermined time t1 referenced to the absolute time standard 111 a, and the acquisition timevalue delta dT 274 represents a time between the sampling instants of thecontrol signal stream 162. Thefirst multiplier 304 is configured to multiply thesample amplitude difference 508 by thefirst proportionality factor 307 to generate an intermediateamplitude difference signal 512. - The
interpolate block 506 further includes thethird adder 328 configured to add thefirst sample 507 of the filteredsignal 150 to the intermediateamplitude difference signal 512 to form an uncalibrated referenced sample amplitude A(t1) 514. Although not separately illustrated, a shifted uncalibrated referenced sample amplitude A(t1−kdT) 516 is equivalently formed via theinterpolation block 506. The implementation of −kdT can be simply selecting a value that is k samples previous to the present value. - Referring again to
FIG. 9 , each of the uncalibrated referencedsample amplitudes 514, for example A(t1), and each of the shifted uncalibrated referencedsample amplitudes 516, for example A(t1−kdT), are received by aphasor calculator 153. Thephasor calculator 153 is configured to calculate a series of uncalibrated referencedphasor magnitudes 518 from the uncalibrated referencedsample amplitudes 514 and the shifted uncalibrated referencedsample amplitudes 516. Similarly, thephasor calculator 153 is configured to calculate a corresponding series of prealigned referencedphasor phase angles 520 from the uncalibrated referencedsample amplitudes 514 and the shifted uncalibrated referencedsample amplitudes 516. Accordingly, each uncalibrated referencedphasor magnitude 518 has a corresponding prealigned referencedphasor phase angle 520. The details of calculating a phasor magnitude and angle representation from a real and imaginary representation is well known, and furthermore can include the well known calculation of sequence quantities such as positive sequence, negative sequence, and zero sequence. InFIG. 9 the real component is represented by the uncalibrated referencedsample amplitude 514 and the imaginary component is represented by the shifted uncalibrated referencedsample amplitudes 516. - The
phasor estimation 502 also includes acorrect block 522 configured to remove implementation artifacts and distortion from the uncalibrated referencedphasor magnitudes 518 and the prealigned referencedphasor phase angles 520 to form corresponding referenced phasor magnitudes of the referencedphasor magnitude stream 111 b and referenced phasor phase angles of the referenced phasor phase angles stream 111 c, and/or to form corresponding adjusted referenced phasor magnitudes of the referencedphasor magnitude stream 111 b and corresponding adjusted referenced phasor phase angles of the adjusted referenced phasor phase angles stream 111 d. -
FIG. 11 is a functional block diagram of an exemplarycorrect block 522, according to an embodiment of the invention. In the exemplarycorrect block 522 ofFIG. 11 , referencing to a phasor with predetermined phase and frequency is performed such that each resulting referenced phasor includes a referenced phasor magnitude of the referencedphasor magnitude stream 111 b and an adjusted referenced phasor phase angle of the adjusted referenced phasorphase angle stream 111 d, at a predetermined time t1, t2, t3 . . . referenced to an absolute time standard 111 a. It is contemplated however, that like the phasor adjustment block ofFIG. 6A , referencing to a phasor with predetermined phase and frequency is not necessarily performed in the exemplarycorrect block 522 ofFIG. 11 such that each resulting referenced phasor includes a referenced phasor magnitude of the referencedphasor magnitude stream 111 b and a referenced phasor phase angle of the referenced phasorphase angle stream 111 c at a predetermined time t1, t2, t3 . . . referenced to an absolute time standard 111 a. - As illustrated, the
correct block 522 includes a first input for receiving the uncalibrated referencedphasor magnitude 518, a second input for receiving thelocal frequency 164, a third input for receiving the predeterminedtime value stream 111 a, and a fourth input for receiving the prealigned referencedphasor phase angle 520. Thecorrect block 522 also includes thesecond operator 316 configured to multiply thereference frequency 324 of the fixed frequency reference phasor by a time value of the predeterminedtime value stream 111 a, for example, the time value t1, followed similarly by unit conversion, to generate thethird proportionality factor 309. Thecorrect block 522 further includes thefourth operator 318 configured to add the prealigned referencedphasor phase angle 520 to thethird proportionality factor 309, followed by modulo conversion to the desired phase angle range to form an uncalibrated referencedphasor phase angle 526. - Implementation magnitude distortion can be approximated and removed via the Mag Implement
Correction 330 configured to receive thelocal frequency 164 and remove any implementation distortion to form themagnitude correction factor 321 using one of a number of techniques as described in connection withFIGS. 6A and B. Similarly, implementation phase angle distortion or shift can be approximated and removed via the Angle ImplementCorrection 332 configured to receive thelocal frequency 164 and remove any implementation distortion to form theangle correction factor 317 using one of a number of techniques as described in connection withFIGS. 6A and B. It is not the purpose of Mag ImplementCorrection 330 or Angle ImplementCorrection 332 to correct for off-nominal sampling errors. This is because the invention samples as a function of the varying frequency of the local signal (e.g. input analog signal 102) and therefore does not require corrections to compensate for sampling at a rate different than the local signal, such as fixed rates or rates based on the absolute time reference. - The
second multiplier 320 of thecorrect block 522 is configured to multiply the uncalibrated referencedphasor magnitude 518 with themagnitude correction factor 321 to form the referenced phasor magnitudes of the referencedphasor magnitude stream 111 b. Similarly, thefifth operator 322 of thecorrect block 522 is configured to add the uncalibrated referencedphasor phase angle 526 to theangle correction factor 317 to form the referenced phasor phase angles of the referenced phasorphase angle stream 111 d. In this way, referenced phasors are accurately estimated at time values referenced to an absolute time standard in an electrical system. The uncalibrated referencedphasor magnitude 518 and the prealigned referencedphasor phase angle 520 may be representative of values at times slightly different than the predetermined time t1, t2, t3 . . . referenced to an absolute time standard 111 a and this difference is corrected by themagnitude correction factor 321 and thephase correction factor 317. In some cases the uncalibrated referencedphasor magnitude 518 can be corrected by an interpolation step in place of thesecond multiplier 320. - The present method may be implemented as a computer process, a computing system or as an article of manufacture such as a computer program product or computer readable media. The computer program product may be a computer storage media readable by a computer system and encoding a computer program of instructions for executing a computer process. The computer program product may also be a propagated signal on a carrier readable by a computing system and encoding a computer program of instructions for executing a computer process.
-
FIG. 12 is a functional block diagram of yet anotherIED 600 that may be used in conjunction with one or more remote devices, according to an embodiment of the invention. In this case, the remote device (not separately illustrated) converts itsinput analog signal 102 into a digital format suitable for transmission to theIED 600. A digitizedinput analog signal 602 is therefore received by theIED 600. - Rather than the
analog filter 140 and theADC 144 of theIED 100, theIED 400 includeschannel decode block 604 configured to decode the digitizedinput analog signal 602 received from a remote IED, and aresample block 406. The digitizedinput analog signal 602 may be received via one of any number of mediums including wired and wireless. The digitizedinput analog signal 602 may be encoded using well-known methods to ensure transmission security, reduce unwanted effects of noise, reduce multipath signal interference and burst errors, and the like, and may be decoded using one of any number of well-known suitable formats, depending on the IED implementation and/or the encoding scheme. - When received by the
channel decode block 604, the digitizedinput analog signal 602 is decoded to form a decodedinstantaneous signal 405. The decodedinstantaneous signal 405 includes the instantaneous amplitude of the remote analog input signal as well as information regarding a remote data acquisition time value. The remote data acquisition time value indicates an instant at which the power system signal was sampled by the remote device to acquire its analog input signal, where the sampling instant is referenced to an absolute time standard (e.g., UTC). The decodedinstantaneous signal 405 may further include additional data such as power system frequency measured by the remote device (remote frequency), although such frequency information may be derived by theIED 400 from the instantaneous amplitude of the decodedinstantaneous signal 405 and the remote data acquisition timestamp, using well-known methods. - The resample block 606 is configured to generate signal samples representative of the
input analog signal 602 received by the remote device. Thus, upon receipt by the resample block 606, the decodedinstantaneous signal 405 is adjusted from the remote sampling interval to an interval which is representative of the remote frequency. As a result, the sampled analog instantaneous signal 146 (representative of theinput analog signal 602 received by the remote device) is provided to thedigital filter 148. The remaining components (e.g., sample controller 160) ofFIG. 12 are substantially configured and operable as described in connection withFIG. 8 to providesynchronized phasors 111 indication of thepower system 10 referenced to the absolute time instants. - In one embodiment, the logical operations of the present method are implemented (1) as a sequence of computer implemented acts or program modules running on a computing system and/or (2) as interconnected machine logic circuits or circuit modules within the computing system. The implementation is a matter of choice dependent on the performance requirements of the computing system implementing the invention. Accordingly, the logical operations making up the embodiments of the present invention described herein are referred to variously as operations, structural devices, acts or modules. It will be recognized by one skilled in the art that these operations, structural devices, acts and modules may be implemented in software, in firmware, in special purpose digital logic, and any combination thereof without deviating from the spirit and scope of the present invention as recited within the claims attached hereto.
- While this invention has been described with reference to certain illustrative aspects, it will be understood that this description shall not be construed in a limiting sense. Rather, various changes and modifications can be made to the illustrative embodiments without departing from the true spirit, central characteristics and scope of the invention, including those combinations of features that are individually disclosed or claimed herein. Furthermore, it will be appreciated that any such changes and modifications will be recognized by those skilled in the art as an equivalent to one or more elements of the following claims, and shall be covered by such claims to the fullest extent permitted by law.
Claims (73)
1-61. (canceled)
62. An apparatus for estimating a plurality of synchronized phasors at predetermined times referenced to a common time standard in an electrical power system, the apparatus comprising:
a sampling means configured to sample a power system signal at a selected sampling interval rate to form a plurality of signal samples;
a time controller configured to generate a plurality of acquisition time values based on an occurrence of each of the plurality signal samples at a corresponding plurality of sample times referenced to the common time standard, each of the plurality of acquisition time values associated with a phasor magnitude and a phasor phase angle of each of the plurality of signal samples; and
a phasor estimator configured to adjust the phasor magnitude and the phasor phase angle for each of the plurality of signal samples based on a time difference between a corresponding selected acquisition time value of the plurality of acquisition time values and a predetermined time of the predetermined times referenced to the common time standard to form the plurality of synchronized phasors.
63. The apparatus of claim 62 further comprising a sample controller configured to determine the selected sampling interval rate.
64. The apparatus of claim 62 wherein the selected sampling interval rate is a frequency of a power system signal acquired at a location of the electrical power system.
65. The apparatus of claim 62 wherein the selected sampling interval rate is based on a fixed interval.
66. The apparatus of claim 62 wherein the common time standard is an absolute time standard.
67. The apparatus of claim 62 , wherein each of the plurality of synchronized phasors comprises a corresponding plurality of referenced phasor magnitudes and referenced phasor phase angles.
68. The apparatus of claim 67 , wherein the phasor estimator is further configured to:
interpolate each of the plurality of phasor magnitudes to form each of the plurality of referenced phasor magnitudes; and
rotate each of the plurality of phasor phase angles to form each of the plurality of referenced phasor phase angles.
69. The apparatus of claim 67 , further comprising a digital filter to generate a plurality of filtered signals, wherein the phasor estimator is further configured to phase shift each of the plurality of filtered signals by 90 degrees and interpolate prior to calculating reference phasor magnitudes and referenced phasor phase angles.
70. The apparatus of claim 67 , further comprising a phasor calculator configured to calculate an uncalibrated referenced phasor magnitude and a prealigned referenced phasor phase angle of each of the plurality of signal samples at the plurality of acquisition time values prior to adjusting the phasor magnitude and the phasor phase angle to the corresponding plurality of referenced phasor magnitudes and referenced phasor phase angles.
71. The apparatus of claim 62 , wherein the time difference comprises a difference in time between an occurrence of a preceding selected acquisition time value of the plurality of acquisition time values and a predetermined time of the predetermined times referenced to the common time standard.
72. The apparatus of claim 62 , wherein the time difference comprises a difference in time between an occurrence of a predetermined time of the predetermined times referenced to the common time standard and a next selected acquisition time value of the plurality of acquisition time values.
73. The apparatus of claim 62 , wherein the predetermined times are synchronized across the electrical power system.
74. The apparatus of claim 62 , wherein the predetermined times are determined local to the apparatus.
75. The apparatus of claim 62 , wherein the phasor estimator is further configured to phase align each of the plurality of synchronized phasors to a reference phasor with a predetermined phase and frequency.
76. The apparatus of claim 75 , wherein the predetermined frequency comprises 60 Hz.
77. The apparatus of claim 75 , wherein the predetermined frequency comprises 50 Hz.
78. The apparatus of claim 62 , wherein the power system signal comprises a plurality of power system signals.
79. The apparatus of claim 62 , further comprising an analog filter configured to filter the power system signal prior to receipt by the sampling means.
80. The apparatus of claim 62 , wherein the common time standard is based on a global positioning system signal communicated via an IRIG timecode protocol.
81. The apparatus of claim 62 , further comprising a digital filter configured to digitally filter each of the plurality of signal samples.
82. The apparatus of claim 64 , wherein the sampling interval rate is an integer multiple of the frequency of the power system signal.
83. The apparatus of claim 62 , further comprising utilizing one or more of the plurality of synchronized phasors to perform a power system function selected from the group consisting of: protection; automation; metering; control; and combinations thereof.
84. The apparatus of claim 63 , wherein the sample controller is further configured to generate a sample frequency signal based on the selected sampling interval rate, the sample frequency signal aligned with the plurality of acquisition time values and utilized to form the plurality of synchronized phasors.
85. The apparatus of claim 67 , wherein the phasor estimator is further configured to:
remove implementation magnitude distortion from the sample signal prior to forming each of the plurality of synchronized phasors; and
remove implementation phase angle distortion from the sample signal prior to forming each of the plurality of synchronized phasors.
86. The apparatus of claim 62 , wherein the location of the power system signal is local and the power system signal comprises a local analog input signal.
87. The apparatus of claim 62 , wherein the location of the power system signal is remote and the power system signal comprises a digitized remote analog input signal.
88. The apparatus of claim 62 , wherein each of the plurality of synchronized phasors comprises a corresponding plurality of referenced phasor sequence quantities.
89. A method for estimating a plurality of synchronized phasors at predetermined times referenced to a common time standard in an electrical power system, the method comprising:
sampling a power system signal at a sampling interval rate to form a plurality of signal samples;
generating a plurality of acquisition time values based on an occurrence of each of the plurality signal samples at a corresponding plurality of sample times referenced to the common time standard, each of the plurality of acquisition time values associated with a phasor magnitude and a phasor phase angle of each of the plurality of signal samples; and
for each of the plurality of signal samples, adjusting the phasor magnitude and the phasor phase angle based on a time difference between a corresponding selected acquisition time value of the plurality of acquisition time values and a predetermined time of the predetermined times referenced to the common time standard to form the plurality of synchronized phasors.
90. The method of claim 89 further comprising the step of determining the frequency at a location on the power system before the sampling step such that the sampling interval rate is based on the frequency of the power system.
91. The method of claim 89 wherein the sampling interval rate is based on a fixed sampling rate.
92. The method of claim 89 wherein the common time standard comprises an absolute time standard.
93. The method of claim 89 , wherein each of the plurality of synchronized phasors comprises a corresponding plurality of referenced phasor magnitudes and referenced phasor phase angles.
94. The method of claim 93 , further comprising interpolating each of the plurality of phasor magnitudes to form each of the plurality of referenced phasor magnitudes.
95. The method of claim 93 , further comprising the steps of filtering to generate a plurality of filtered signals; phase shifting each of the plurality of filtered signals by 90 degrees;
interpolating; and calculating reference phasor magnitudes and referenced phasor angles.
96. The method of claim 93 , further comprising the step of calculating an uncalibrated referenced phasor magnitude and a prealigned phasor phase angle of each of the plurality of signal samples at the plurality of acquisition time values prior to adjusting the phasor magnitude and the phasor phase angle to the corresponding plurality of referenced phasor magnitudes and referenced phasor phase angles.
97. The method of claim 93 , further comprising rotating each of the plurality of phasor phase angles to form each of the plurality of referenced phasor phase angles.
98. The method of claim 93 , further comprising calculating the phasor magnitude and phasor phase angle of each of the plurality of signal samples at the plurality of acquisition time values prior to adjusting the phasor magnitude and the phasor phase angle of each of the plurality of signal samples to the corresponding plurality of referenced phasor magnitudes and referenced phasor phase angles.
99. The method of claim 89 , wherein the time difference comprises a difference in time between an occurrence of a preceding selected acquisition time value of the plurality of acquisition time values and a predetermined time of the predetermined times referenced to the common time standard.
100. The method of claim 89 , wherein the time difference comprises a difference in time between an occurrence of a predetermined time of the predetermined times referenced to the common time standard and a next selected acquisition time value of the plurality of acquisition time values.
101. The method of claim 89 , wherein the predetermined times are synchronized across the electrical power system.
102. The method of claim 89 , wherein the predetermined times are determined at a location on the electrical power system local to the step of determining a frequency of the power system is performed.
103. The method of claim 89 , further comprising phase aligning each of the plurality of synchronized phasors to a reference phasor with predetermined phase and frequency.
104. The method of claim 103 , wherein the predetermined frequency comprises 60 Hz.
105. The method of claim 103 , wherein the predetermined frequency comprises 50 Hz.
106. The method of claim 89 , wherein the power system signal comprises a plurality of power system signals.
107. The method of claim 89 , further comprising analog filtering the power system signal prior to the step of sampling.
108. The method of claim 89 , wherein the common time standard is based on a global positioning system signal communicated via an IRIG timecode protocol.
109. The method of claim 89 , further comprising digitally filtering each of the plurality of signal samples.
110. The method of claim 90 , wherein the sampling interval rate is an integer multiple of the frequency of the power system signal.
111. The method of claim 89 , further comprising utilizing one or more of the plurality of synchronized phasors to perform a power system function selected from the group consisting of: protection, automation, metering, control, and combinations thereof.
112. The method of claim 90 , further comprising generating a sample frequency signal based on the sampling interval rate, the sample frequency signal aligned with the plurality of acquisition time values and utilized to form the plurality of synchronized phasors.
113. The method of claim 89 , further comprising removing implementation magnitude distortion from the sample signal prior to forming each of the plurality of synchronized phasors.
114. The method of claim 113 , further comprising removing implementation phase angle distortion from the sample signal prior to forming each of the plurality of synchronized phasors.
115. The method of claim 89 , wherein the power system signal comprises a local analog input signal.
116. The method of claim 89 , wherein the power system signal comprises a digitized remote analog input signal.
117. The method of claim 89 , wherein each of the plurality of synchronized phasors comprises a corresponding plurality of referenced phasor sequence quantities.
118. A method for estimating a plurality of synchronized phasors at predetermined times referenced to a common time standard in an electrical power system, the method comprising:
sampling a power system signal at a selected sampling interval rate to form a plurality of signal samples;
generating a plurality of acquisition time values based on an occurrence of each of the plurality signal samples at a corresponding plurality of different times referenced to the common time standard, each of the plurality of acquisition time values associated with a phasor magnitude and a phasor phase angle of each of the plurality of signal samples; and
for each of the plurality of signal samples, interpolating the phasor magnitude and rotating phasor phase angle to form a corresponding plurality of referenced phasor magnitudes and referenced phasor phase angles of the plurality of synchronized phasors based on a time difference between a corresponding selected acquisition time value of the plurality of acquisition time values and a predetermined time of the predetermined times referenced to the common time standard.
119. The method of claim 118 , further comprising the step of determining the frequency at a location of the power system before the sampling step such that the sampling interval rate is based on the frequency of the power system.
120. The method of claim 118 wherein the sampling interval rate is based on a fixed sampling rate.
121. The method of claim 118 wherein the common time standard is an absolute time standard.
122. The method of claim 118 , further comprising calculating the phasor magnitude and phasor phase angle of each of the plurality of signal samples at the plurality of acquisition time values prior to adjusting the phasor magnitude and the phasor phase angle of each of the plurality of signal samples to the corresponding plurality of referenced phasor magnitudes and referenced phasor phase angles.
123. The method of claim 118 , wherein the rotating phasor phase angle comprises a rotation of 90 degrees.
124. The method of claim 118 , further comprising the step of calculating an uncalibrated referenced phasor magnitude and a prealigned phasor phase angle of each of the plurality of signal samples at the plurality of acquisition time values prior to adjusting the phasor magnitude and the phasor phase angle to the corresponding plurality of referenced phasor magnitudes and referenced phasor phase angles.
125. The method of claim 118 , wherein the time difference comprises a difference in time between an occurrence of a preceding selected acquisition time value of the plurality of acquisition time values and a predetermined time of the predetermined times referenced to the common time standard.
126. The method of claim 118 wherein the time difference comprises a difference in time between an occurrence of a predetermined time of the predetermined times referenced to the common time standard and a next selected acquisition time value of the plurality of acquisition time values.
127. The method of claim 119 , wherein each of the plurality of synchronized phasors is further phase aligned to a reference phasor with predetermined phase and frequency.
128. The method of claim 127 , wherein the predetermined frequency comprises 60 Hz.
129. The method of claim 127 , wherein the predetermined frequency comprises 50 Hz.
130. The method of claim 118 , wherein the common time standard is based on a global positioning system signal communicated via an IRIG timecode protocol.
131. The method of claim 118 , wherein each of the plurality of synchronized phasors comprises a corresponding plurality of referenced phasor sequence quantities.
132. The method of claim 118 , wherein the power system signal comprises a digitized remote analog input signal.
133. The method of claim 118 , wherein the power system signal comprises a local analog input signal.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US12/114,898 US20080281540A1 (en) | 2005-10-18 | 2008-05-05 | Apparatus and method for estimating synchronized phasors at predetermined times referenced to a common time standard in an electrical system |
US12/963,331 US8494795B2 (en) | 2008-05-05 | 2010-12-08 | Apparatus and method for estimating synchronized phasors at predetermined times referenced to a common time standard in an electrical system |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US72776405P | 2005-10-18 | 2005-10-18 | |
US11/504,788 US7480580B2 (en) | 2005-10-18 | 2006-08-15 | Apparatus and method for estimating synchronized phasors at predetermined times referenced to an absolute time standard in an electrical system |
US12/114,898 US20080281540A1 (en) | 2005-10-18 | 2008-05-05 | Apparatus and method for estimating synchronized phasors at predetermined times referenced to a common time standard in an electrical system |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US11/504,788 Continuation US7480580B2 (en) | 2005-10-18 | 2006-08-15 | Apparatus and method for estimating synchronized phasors at predetermined times referenced to an absolute time standard in an electrical system |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US12/963,331 Continuation-In-Part US8494795B2 (en) | 2008-05-05 | 2010-12-08 | Apparatus and method for estimating synchronized phasors at predetermined times referenced to a common time standard in an electrical system |
Publications (1)
Publication Number | Publication Date |
---|---|
US20080281540A1 true US20080281540A1 (en) | 2008-11-13 |
Family
ID=37947919
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US11/504,788 Active 2026-12-11 US7480580B2 (en) | 2005-10-18 | 2006-08-15 | Apparatus and method for estimating synchronized phasors at predetermined times referenced to an absolute time standard in an electrical system |
US12/114,898 Abandoned US20080281540A1 (en) | 2005-10-18 | 2008-05-05 | Apparatus and method for estimating synchronized phasors at predetermined times referenced to a common time standard in an electrical system |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US11/504,788 Active 2026-12-11 US7480580B2 (en) | 2005-10-18 | 2006-08-15 | Apparatus and method for estimating synchronized phasors at predetermined times referenced to an absolute time standard in an electrical system |
Country Status (4)
Country | Link |
---|---|
US (2) | US7480580B2 (en) |
BR (1) | BRPI0617502A2 (en) |
CA (1) | CA2624604C (en) |
WO (1) | WO2007047861A2 (en) |
Cited By (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090125158A1 (en) * | 2007-10-09 | 2009-05-14 | Schweitzer Iii Edmund O | State and topology processor |
US20100002348A1 (en) * | 2007-10-09 | 2010-01-07 | Donolo Marcos A | Distributed bus differential protection using time-stamped data |
US20100125373A1 (en) * | 2007-10-09 | 2010-05-20 | Labuschagne Casper A | Minimizing circulating current using time-aligned data |
US20120053744A1 (en) * | 2010-08-24 | 2012-03-01 | Manson Scott M | Systems and Methods for Under-Frequency Blackout Protection |
US20120205987A1 (en) * | 2011-02-15 | 2012-08-16 | Raytheon Company | Electrical phase synchronization |
US8706309B2 (en) | 2010-04-10 | 2014-04-22 | Schweitzer Engineering Laboratories Inc | Systems and method for obtaining a load model and related parameters based on load dynamics |
US8792217B2 (en) | 2010-09-15 | 2014-07-29 | Schweitzer Engineering Laboratories Inc | Systems and methods for protection of components in electrical power delivery systems |
US8965592B2 (en) | 2010-08-24 | 2015-02-24 | Schweitzer Engineering Laboratories, Inc. | Systems and methods for blackout protection |
US9128130B2 (en) | 2011-09-15 | 2015-09-08 | Schweitzer Engineering Laboratories, Inc. | Systems and methods for synchronizing distributed generation systems |
US9128140B2 (en) | 2013-09-16 | 2015-09-08 | Schweitzer Engineering Laboratories, Inc. | Detection of a fault in an ungrounded electric power distribution system |
US9423434B2 (en) | 2011-02-15 | 2016-08-23 | Abb Technology Ag | Method and system for measuring electrical quantity in electrical network |
US9798342B2 (en) | 2015-02-23 | 2017-10-24 | Schweitzer Engineering Laboratories, Inc. | Detection and correction of fault induced delayed voltage recovery |
US9906041B2 (en) | 2016-03-16 | 2018-02-27 | Schweitzer Engineering Laboratories, Inc. | Decentralized generator control |
US9912158B2 (en) | 2016-03-16 | 2018-03-06 | Schweitzer Engineering Laboratories, Inc. | Decentralized generator control |
US10135250B2 (en) | 2016-05-25 | 2018-11-20 | Schweitzer Engineering Laboratories, Inc. | Inertia compensated load tracking in electrical power systems |
US10312694B2 (en) | 2017-06-23 | 2019-06-04 | Schweitzer Engineering Laboratories, Inc. | Mode-based output synchronization using relays and a common time source |
US10310480B2 (en) | 2010-08-24 | 2019-06-04 | Schweitzer Engineering Laboratories, Inc. | Systems and methods for under-frequency blackout protection |
US10381835B1 (en) | 2018-02-09 | 2019-08-13 | Schweitzer Engineering Laboratories, Inc. | Electric power generator selection, shedding, and runback for power system stability |
US10476268B2 (en) | 2018-02-09 | 2019-11-12 | Schweitzer Engineering Laboratories, Inc. | Optimized decoupling and load shedding |
WO2023075942A1 (en) * | 2021-10-27 | 2023-05-04 | S&C Electric Company | Improved accuracy for phasor measurement units (synchrophasors) in utility distribution applications |
Families Citing this family (56)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8280980B2 (en) * | 2006-10-16 | 2012-10-02 | The Boeing Company | Methods and systems for providing a synchronous display to a plurality of remote users |
US7684900B2 (en) * | 2007-02-20 | 2010-03-23 | Abb Research Ltd. | Adaptive provision of protection function settings of electrical machines |
JP4912994B2 (en) * | 2007-09-13 | 2012-04-11 | 株式会社東芝 | Protection control measurement system |
MX2010002165A (en) * | 2007-09-28 | 2010-06-02 | Schweitzer Engineering Lab Inc | Systems and methods for power swing and out-of- step detection using time stamped data. |
WO2009042964A1 (en) * | 2007-09-28 | 2009-04-02 | Schweitzer Engineering Laboratories, Inc. | Amplitude and phase comparators for line protection |
US8498832B2 (en) * | 2007-09-28 | 2013-07-30 | Schweitzer Engineering Laboratories Inc. | Method and device for assessing and monitoring voltage security in a power system |
US20090088990A1 (en) * | 2007-09-30 | 2009-04-02 | Schweitzer Iii Edmund O | Synchronized phasor processor for a power system |
WO2009048964A1 (en) * | 2007-10-09 | 2009-04-16 | Schweitzer Engineering Laboratories, Inc. | Real-time power system oscillation detection using modal analysis |
US7840544B2 (en) * | 2007-12-04 | 2010-11-23 | Cisco Technology, Inc. | Method for storing universal network performance and historical data |
US8108165B2 (en) * | 2008-04-04 | 2012-01-31 | Schweitzer Engineering Laboratories, Inc. | Acquiring phasors outside the frequency tracking range for power protective relays |
US20090265041A1 (en) * | 2008-04-18 | 2009-10-22 | Benjamin Daniel E | Power Distribution and Monitoring System |
US8494795B2 (en) * | 2008-05-05 | 2013-07-23 | Schweitzer Engineering Laboratories Inc | Apparatus and method for estimating synchronized phasors at predetermined times referenced to a common time standard in an electrical system |
CN102084569B (en) * | 2008-05-09 | 2014-02-19 | 埃森哲环球服务有限公司 | Method and system for managing a power grid |
US20110004446A1 (en) | 2008-12-15 | 2011-01-06 | Accenture Global Services Gmbh | Intelligent network |
FR2932028B1 (en) * | 2008-06-02 | 2012-12-14 | Areva T & D Prot Controle | METHOD AND SYSTEM FOR DIFFERENTIALLY PROTECTING AN ELECTRICAL CONNECTION IN A MEDIUM, HIGH OR VERY HIGH VOLTAGE NETWORK |
MX2011002467A (en) * | 2008-09-19 | 2011-04-05 | Schweitzer Engineering Lab Inc | Distributed bus differential protection using time-stamped data. |
US8140283B2 (en) * | 2008-12-24 | 2012-03-20 | Schweitzer Engineering Laboratories, Inc. | Independent frequency measurement and tracking |
US8103467B2 (en) | 2009-01-14 | 2012-01-24 | Accenture Global Services Limited | Determination of distribution transformer voltages based on metered loads |
US8103466B2 (en) * | 2009-01-14 | 2012-01-24 | Accenture Global Services Limited | Distribution system analysis using meter data |
US20100254225A1 (en) * | 2009-04-03 | 2010-10-07 | Schweitzer Iii Edmund O | Fault tolerant time synchronization |
US8346402B2 (en) * | 2009-05-11 | 2013-01-01 | Schweitzer Engineering Laboratories Inc | Islanding detection in an electrical power delivery system |
US8373309B2 (en) * | 2009-08-19 | 2013-02-12 | Schweitzer Engineering Laboratories Inc | Systems and methods for asynchronous sampling data conversion |
US8554385B2 (en) * | 2009-09-11 | 2013-10-08 | Schweitzer Engineering Laboratories Inc. | Systems and methods for monitoring and controlling electrical system stability |
US8154836B2 (en) * | 2009-09-17 | 2012-04-10 | Schweitzer Engineering Laboratories, Inc. | Line current differential protection upon loss of an external time reference |
CA2774517C (en) * | 2009-09-18 | 2015-01-27 | Schweitzer Engineering Laboratories, Inc. | Electrical power system phase and ground protection using an adaptive quadrilateral characteristic |
US9257827B2 (en) | 2009-09-18 | 2016-02-09 | Schweitzer Engineering Laboratories, Inc. | Electrical power system phase and ground protection using an adaptive quadrilateral characteristic |
US8476874B2 (en) | 2009-10-13 | 2013-07-02 | Schweitzer Engineering Laboratories, Inc | Systems and methods for synchronized control of electrical power system voltage profiles |
EP2312719B1 (en) * | 2009-10-16 | 2012-08-01 | ABB Research Ltd. | Investigating timing reliability in relation to control of a power transmission system |
WO2011140559A1 (en) * | 2010-05-07 | 2011-11-10 | Advanced Energy Industries, Inc. | Systems and methods for islanding detection |
JP5925774B2 (en) | 2010-07-30 | 2016-05-25 | アクセンチュア グローバル サービスィズ リミテッド | Intelligent core engine |
US9363068B2 (en) | 2010-08-03 | 2016-06-07 | Intel Corporation | Vector processor having instruction set with sliding window non-linear convolutional function |
RU2524383C1 (en) * | 2010-11-09 | 2014-07-27 | Абб Рисерч Лтд. | Synchronisation method for differential current protection |
US8812256B2 (en) | 2011-01-12 | 2014-08-19 | Schweitzer Engineering Laboratories, Inc. | System and apparatus for measuring the accuracy of a backup time source |
ES2746040T3 (en) | 2011-03-03 | 2020-03-04 | Abb Schweiz Ag | Control device to control a circuit breaker and corresponding methods |
WO2013054423A1 (en) * | 2011-10-13 | 2013-04-18 | 三菱電機株式会社 | Protective control device |
US9478378B2 (en) | 2013-01-04 | 2016-10-25 | Schweitzer Engineering Laboratories, Inc. | Preventing out-of-synchronism reclosing between power systems |
US9568513B2 (en) | 2013-02-14 | 2017-02-14 | Schweitzer Engineering Laboratories, Inc. | Systems and methods to detect poorly damped oscillation modes |
CN104569689B (en) * | 2015-01-22 | 2017-06-06 | 福州大学 | A kind of synchronous phase measuring in power system method based on polar coordinate system |
US9941684B2 (en) | 2015-05-12 | 2018-04-10 | Schweitzer Engineering Laboratories, Inc. | Phase and ground protection using tilt-limited adaptive quadrilateral characteristic |
US10312041B2 (en) | 2015-11-20 | 2019-06-04 | Schweitzer Engineering Laboratories, Inc. | Frequency measurement for electric power delivery system |
DE102016101468A1 (en) * | 2016-01-27 | 2017-07-27 | Wobben Properties Gmbh | Method for feeding electrical power into an electrical supply network |
EP3208622B1 (en) * | 2016-02-18 | 2021-01-20 | ABB Power Grids Switzerland AG | A method and a system for measuring power loss in a power transformer |
US9967135B2 (en) | 2016-03-29 | 2018-05-08 | Schweitzer Engineering Laboratories, Inc. | Communication link monitoring and failover |
US10170911B1 (en) * | 2016-08-25 | 2019-01-01 | Veritone Alpha, Inc. | Providing phase synchronization and harmonic harvesting |
KR101770926B1 (en) * | 2016-12-30 | 2017-08-23 | 엘에스산전 주식회사 | Method for detecting electrical disturbances by DC component |
US10644493B2 (en) | 2017-05-01 | 2020-05-05 | Schweitzer Engineering Laboratories, Inc. | Power system disturbance detection using power and frequency |
US10677834B2 (en) | 2018-09-14 | 2020-06-09 | Schweitzer Engineering Laboratories, Inc. | Distance protection of electric power delivery systems using time domain and frequency domain |
US11231449B2 (en) | 2018-09-21 | 2022-01-25 | Schweitzer Engineering Laboratories, Inc. | Frequency sensing systems and methods |
US10641815B2 (en) | 2018-09-27 | 2020-05-05 | Schweitzer Engineering Laboratories, Inc. | Secure distance protection of electric power delivery systems under transient conditions |
US12100958B2 (en) * | 2019-08-29 | 2024-09-24 | Hitachi Energy Ltd | Cloud-based hybrid state estimation |
US11035891B1 (en) | 2020-03-06 | 2021-06-15 | Schweitzer Engineering Laboratories, Inc. | Electric power system voltage monitoring and control with energy packets |
US20210285995A1 (en) * | 2020-03-13 | 2021-09-16 | University Of Tennessee Research Foundation | Time synchronization using power system synchrophasor measurements |
CN111654347B (en) * | 2020-05-15 | 2022-09-16 | 威胜信息技术股份有限公司 | Time synchronization method and system for distribution transformer terminal by using transient characteristic signal |
US20220137112A1 (en) * | 2020-10-30 | 2022-05-05 | University Of Tennessee Research Foundation | Alignment of synchronized phase angle measurements with presence of practical time shift |
US11735907B2 (en) | 2021-02-03 | 2023-08-22 | Schweitzer Engineering Laboratories, Inc. | Traveling wave overcurrent protection for electric power delivery systems |
US11381084B1 (en) | 2021-10-05 | 2022-07-05 | Schweitzer Engineering Laboratories, Inc. | Frequency measurement for load shedding and accurate magnitude calculation |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20060224336A1 (en) * | 2005-04-05 | 2006-10-05 | Charles Petras | System and method for transmitting power system data over a wide area network |
Family Cites Families (37)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4829298A (en) * | 1983-04-13 | 1989-05-09 | Fernandes Roosevelt A | Electrical power line monitoring systems, including harmonic value measurements and relaying communications |
DE3540212A1 (en) * | 1985-11-13 | 1987-05-14 | Standard Elektrik Lorenz Ag | DIRECTION DETECTING DEVICE |
US4821294A (en) * | 1987-07-08 | 1989-04-11 | California Institute Of Technology | Digital signal processor and processing method for GPS receivers |
US5006846A (en) * | 1987-11-12 | 1991-04-09 | Granville J Michael | Power transmission line monitoring system |
US5224011A (en) * | 1991-04-19 | 1993-06-29 | Gas Research Institute | Multifunction protective relay system |
US5369356A (en) * | 1991-08-30 | 1994-11-29 | Siemens Energy & Automation, Inc. | Distributed current and voltage sampling function for an electric power monitoring unit |
CA2106357A1 (en) * | 1993-07-07 | 1995-01-08 | Murty V. V. S. Yalla | Method for implementing selectable protective relay functions |
US5446682A (en) * | 1994-03-21 | 1995-08-29 | Square D Company | System for calibrating a line isolation monitor |
US6694270B2 (en) * | 1994-12-30 | 2004-02-17 | Power Measurement Ltd. | Phasor transducer apparatus and system for protection, control, and management of electricity distribution systems |
US6446682B1 (en) * | 1995-06-06 | 2002-09-10 | James P. Viken | Auto-loading fluid exchanger and method of use |
US5736961A (en) * | 1995-10-06 | 1998-04-07 | Novatel, Inc. | Dual Frequency global positioning system |
US6252863B1 (en) * | 1996-04-09 | 2001-06-26 | Trimble Navigation Limited | Multipath compensation for pseudorange signals |
US5963582A (en) * | 1996-05-24 | 1999-10-05 | Leica Geosystems Inc. | Mitigation of multipath effects in global positioning system receivers |
SE507227C2 (en) * | 1996-09-16 | 1998-04-27 | Ericsson Telefon Ab L M | Method and device for synchronizing time stamping |
US20030212512A1 (en) * | 1997-02-12 | 2003-11-13 | Power Measurement Ltd. | Apparatus and system for protection, control, and management of electricity distribution systems over a network |
US5995911A (en) * | 1997-02-12 | 1999-11-30 | Power Measurement Ltd. | Digital sensor apparatus and system for protection, control, and management of electricity distribution systems |
US6370569B1 (en) * | 1997-11-14 | 2002-04-09 | National Instruments Corporation | Data socket system and method for accessing data sources using URLs |
US6075987A (en) * | 1998-02-27 | 2000-06-13 | Ericsson Inc. | Stand alone global positioning system (GPS) and method with high sensitivity |
US6141196A (en) * | 1998-03-02 | 2000-10-31 | General Electric Company | Method and apparatus for compensation of phasor estimations |
JP3352411B2 (en) * | 1998-03-05 | 2002-12-03 | 株式会社東芝 | Control system, power system protection control system, and storage medium storing program |
US6127970A (en) * | 1998-09-25 | 2000-10-03 | Lin; Ching-Fang | Coupled real time emulation method for positioning and location system |
US6313934B1 (en) * | 1999-01-08 | 2001-11-06 | Agilent Technologies, Inc. | Chromatic dispersion measurement scheme for optical systems having remote access points |
US6429785B1 (en) * | 1999-01-08 | 2002-08-06 | Siemens Power Transmission & Distribution Inc. | Revenue meter having precision time clock |
DE60041385D1 (en) * | 2000-03-10 | 2009-03-05 | Abb Schweiz Ag | Method and device for assessing the stability of an electrical energy supply network |
US6735535B1 (en) * | 2000-05-05 | 2004-05-11 | Electro Industries/Gauge Tech. | Power meter having an auto-calibration feature and data acquisition capabilities |
US6735523B1 (en) * | 2000-06-19 | 2004-05-11 | American Gnc Corp. | Process and system of coupled real-time GPS/IMU simulation with differential GPS |
WO2002063328A2 (en) * | 2001-02-05 | 2002-08-15 | Clark Cohen | Low cost system and method for making dual band gps measurements |
JP3907998B2 (en) * | 2001-02-09 | 2007-04-18 | 株式会社東芝 | Substation protection control system |
US6859742B2 (en) * | 2001-07-12 | 2005-02-22 | Landis+Gyr Inc. | Redundant precision time keeping for utility meters |
US6745175B2 (en) * | 2001-08-02 | 2004-06-01 | National Instruments Corporation | System and method for a shared memory architecture for high speed logging and trending |
ATE326073T1 (en) | 2001-12-21 | 2006-06-15 | Abb Schweiz Ag | DETERMINATION OF THE OPERATING LIMIT VALUES IN AN ENERGY DISTRIBUTION NETWORK |
DE60108966D1 (en) | 2001-12-21 | 2005-03-24 | Abb Research Ltd | Determining the condition of an energy distribution network |
US6642700B2 (en) * | 2002-03-26 | 2003-11-04 | Avistar, Inc. | System, method, field unit, reference unit and computer program product for phase tracking of electrical conductors |
US6662124B2 (en) * | 2002-04-17 | 2003-12-09 | Schweitzer Engineering Laboratories, Inc. | Protective relay with synchronized phasor measurement capability for use in electric power systems |
US6983393B2 (en) * | 2002-12-11 | 2006-01-03 | National Instruments Corporation | Deterministically handling asynchronous events in a time triggered system |
US7552367B2 (en) * | 2004-08-03 | 2009-06-23 | General Electric Company | Fault recording and sequence of events recording device capable of recording communication-based signals related to electrical power systems |
US7444248B2 (en) * | 2005-04-29 | 2008-10-28 | General Electric Company | System and method for synchronized phasor measurement |
-
2006
- 2006-08-15 US US11/504,788 patent/US7480580B2/en active Active
- 2006-10-18 BR BRPI0617502-3A patent/BRPI0617502A2/en not_active IP Right Cessation
- 2006-10-18 CA CA2624604A patent/CA2624604C/en not_active Expired - Fee Related
- 2006-10-18 WO PCT/US2006/040923 patent/WO2007047861A2/en active Application Filing
-
2008
- 2008-05-05 US US12/114,898 patent/US20080281540A1/en not_active Abandoned
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20060224336A1 (en) * | 2005-04-05 | 2006-10-05 | Charles Petras | System and method for transmitting power system data over a wide area network |
Cited By (28)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8321162B2 (en) | 2007-10-09 | 2012-11-27 | Schweitzer Engineering Laboratories Inc | Minimizing circulating current using time-aligned data |
US20100002348A1 (en) * | 2007-10-09 | 2010-01-07 | Donolo Marcos A | Distributed bus differential protection using time-stamped data |
US20100125373A1 (en) * | 2007-10-09 | 2010-05-20 | Labuschagne Casper A | Minimizing circulating current using time-aligned data |
US7856327B2 (en) | 2007-10-09 | 2010-12-21 | Schweitzer Engineering Laboratories, Inc. | State and topology processor |
US20090125158A1 (en) * | 2007-10-09 | 2009-05-14 | Schweitzer Iii Edmund O | State and topology processor |
US8405944B2 (en) | 2007-10-09 | 2013-03-26 | Schweitzer Engineering Laboratories Inc | Distributed bus differential protection using time-stamped data |
US8706309B2 (en) | 2010-04-10 | 2014-04-22 | Schweitzer Engineering Laboratories Inc | Systems and method for obtaining a load model and related parameters based on load dynamics |
US20120053744A1 (en) * | 2010-08-24 | 2012-03-01 | Manson Scott M | Systems and Methods for Under-Frequency Blackout Protection |
US10310480B2 (en) | 2010-08-24 | 2019-06-04 | Schweitzer Engineering Laboratories, Inc. | Systems and methods for under-frequency blackout protection |
US8965592B2 (en) | 2010-08-24 | 2015-02-24 | Schweitzer Engineering Laboratories, Inc. | Systems and methods for blackout protection |
US9008850B2 (en) * | 2010-08-24 | 2015-04-14 | Schweitzer Engineering Laboratories, Inc. | Systems and methods for under-frequency blackout protection |
US8792217B2 (en) | 2010-09-15 | 2014-07-29 | Schweitzer Engineering Laboratories Inc | Systems and methods for protection of components in electrical power delivery systems |
US9898062B2 (en) | 2010-09-15 | 2018-02-20 | Schweitzer Engineering Laboratories, Inc. | Systems and methods for protection of components in electrical power delivery systems |
US9293924B2 (en) * | 2011-02-15 | 2016-03-22 | Raytheon Company | Electrical phase synchronization |
US20120205987A1 (en) * | 2011-02-15 | 2012-08-16 | Raytheon Company | Electrical phase synchronization |
US9423434B2 (en) | 2011-02-15 | 2016-08-23 | Abb Technology Ag | Method and system for measuring electrical quantity in electrical network |
US9128130B2 (en) | 2011-09-15 | 2015-09-08 | Schweitzer Engineering Laboratories, Inc. | Systems and methods for synchronizing distributed generation systems |
US9128140B2 (en) | 2013-09-16 | 2015-09-08 | Schweitzer Engineering Laboratories, Inc. | Detection of a fault in an ungrounded electric power distribution system |
US9798342B2 (en) | 2015-02-23 | 2017-10-24 | Schweitzer Engineering Laboratories, Inc. | Detection and correction of fault induced delayed voltage recovery |
US9906041B2 (en) | 2016-03-16 | 2018-02-27 | Schweitzer Engineering Laboratories, Inc. | Decentralized generator control |
US9912158B2 (en) | 2016-03-16 | 2018-03-06 | Schweitzer Engineering Laboratories, Inc. | Decentralized generator control |
US10135250B2 (en) | 2016-05-25 | 2018-11-20 | Schweitzer Engineering Laboratories, Inc. | Inertia compensated load tracking in electrical power systems |
US10312694B2 (en) | 2017-06-23 | 2019-06-04 | Schweitzer Engineering Laboratories, Inc. | Mode-based output synchronization using relays and a common time source |
US10381835B1 (en) | 2018-02-09 | 2019-08-13 | Schweitzer Engineering Laboratories, Inc. | Electric power generator selection, shedding, and runback for power system stability |
US10476268B2 (en) | 2018-02-09 | 2019-11-12 | Schweitzer Engineering Laboratories, Inc. | Optimized decoupling and load shedding |
WO2023075942A1 (en) * | 2021-10-27 | 2023-05-04 | S&C Electric Company | Improved accuracy for phasor measurement units (synchrophasors) in utility distribution applications |
US11874309B2 (en) | 2021-10-27 | 2024-01-16 | S&C Electric Company | Accuracy for phasor measurement units (synchrophasors) in utility distribution applications |
AU2022377184A1 (en) * | 2021-10-27 | 2024-04-04 | S&C Electric Company | Improved accuracy for phasor measurement units (synchrophasors) in utility distribution applications |
Also Published As
Publication number | Publication date |
---|---|
US20070086134A1 (en) | 2007-04-19 |
US7480580B2 (en) | 2009-01-20 |
BRPI0617502A2 (en) | 2011-07-26 |
CA2624604C (en) | 2012-10-30 |
WO2007047861A3 (en) | 2007-09-20 |
CA2624604A1 (en) | 2007-04-26 |
WO2007047861A8 (en) | 2007-11-01 |
WO2007047861A2 (en) | 2007-04-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7480580B2 (en) | Apparatus and method for estimating synchronized phasors at predetermined times referenced to an absolute time standard in an electrical system | |
US8494795B2 (en) | Apparatus and method for estimating synchronized phasors at predetermined times referenced to a common time standard in an electrical system | |
US7630863B2 (en) | Apparatus, method, and system for wide-area protection and control using power system data having a time component associated therewith | |
CA2482797C (en) | Protective relay with synchronized phasor measurement capability for use in electric power systems | |
CN103575980B (en) | System frequency measuring method, synchronous phasor measuring method and equipment | |
US8340931B2 (en) | Power grid with comparison of differences in remote phasor changes | |
US9488681B2 (en) | Convolution integral for synchronized phasor | |
CN108614155B (en) | Synchronous phasor measurement method and system for adding Hamming window | |
EP3610546B1 (en) | Floating neutral detection and localization system and methods | |
Seferi et al. | Review of PMU algorithms suitable for real-time operation with digital sampled value data | |
TWI409472B (en) | Producing a phasor representation of an electrical entity in a multiphase ac electric power system | |
Ghafari | Innovative numerical protection relay design on the basis of sampled measured values for smartgrids | |
Gajjar et al. | A proposal for distributed architecture for synchronized phasor measurement unit | |
Das et al. | A new algorithm to compute fault synchrophasor from transient state synchrophasor in PDC | |
US11906557B2 (en) | Processing sinewave signals of variable frequency in a device with fixed processing rates | |
Kitzig et al. | Using Mains Frequency Synchronously Sampled Data for Frequency and RoCoF Event Detection | |
Sharma et al. | A survey of wide area measurment technology in electrical networks | |
Santos et al. | Redundancy and Synchronization Improvement for Prevailing Phase Angle Estimation and Flicker Source location |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |