US20080245524A1 - Tubular running tool and method of using same - Google Patents
Tubular running tool and method of using same Download PDFInfo
- Publication number
- US20080245524A1 US20080245524A1 US12/079,988 US7998808A US2008245524A1 US 20080245524 A1 US20080245524 A1 US 20080245524A1 US 7998808 A US7998808 A US 7998808A US 2008245524 A1 US2008245524 A1 US 2008245524A1
- Authority
- US
- United States
- Prior art keywords
- tubular
- elevator
- tubular segment
- string
- appreciated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000000034 method Methods 0.000 title description 13
- 238000007789 sealing Methods 0.000 claims description 4
- 229920001971 elastomer Polymers 0.000 claims description 2
- 239000005060 rubber Substances 0.000 claims description 2
- 241000239290 Araneae Species 0.000 abstract description 16
- 238000005553 drilling Methods 0.000 abstract description 9
- 230000033001 locomotion Effects 0.000 description 10
- 239000012530 fluid Substances 0.000 description 4
- 238000003466 welding Methods 0.000 description 4
- 238000004519 manufacturing process Methods 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 230000006835 compression Effects 0.000 description 2
- 238000007906 compression Methods 0.000 description 2
- 230000008878 coupling Effects 0.000 description 2
- 238000010168 coupling process Methods 0.000 description 2
- 238000005859 coupling reaction Methods 0.000 description 2
- 230000006378 damage Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000007246 mechanism Effects 0.000 description 2
- 229920006311 Urethane elastomer Polymers 0.000 description 1
- 208000027418 Wounds and injury Diseases 0.000 description 1
- 230000000712 assembly Effects 0.000 description 1
- 238000000429 assembly Methods 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 231100001261 hazardous Toxicity 0.000 description 1
- 208000014674 injury Diseases 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000004033 plastic Substances 0.000 description 1
- 229920003023 plastic Polymers 0.000 description 1
- 229920003225 polyurethane elastomer Polymers 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/08—Apparatus for feeding the rods or cables; Apparatus for increasing or decreasing the pressure on the drilling tool; Apparatus for counterbalancing the weight of the rods
- E21B19/087—Apparatus for feeding the rods or cables; Apparatus for increasing or decreasing the pressure on the drilling tool; Apparatus for counterbalancing the weight of the rods by means of a swinging arm
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/02—Rod or cable suspensions
- E21B19/06—Elevators, i.e. rod- or tube-gripping devices
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B3/00—Rotary drilling
- E21B3/02—Surface drives for rotary drilling
- E21B3/022—Top drives
Definitions
- This invention relates to well drilling operations and more particularly to a device for assisting in the assembly of tubular strings, such as, but not limited to, casing, drill pipe strings, production tubing, and the like.
- FIG. 1 illustrates a conventional drilling rig, known in the prior art, utilizing a spider to hold a lowered casing string in position;
- FIG. 2 illustrates an elevated side view, partially in cross-section, of an embodiment of the running tool according to the present invention
- FIG. 3 illustrates an elevated side view, partially in cross-section, of an embodiment of the running tool with a single joint elevator and tong portion swung away according to the present invention
- FIG. 3 a illustrates a top view of an embodiment of a yoke type attachment of the running tool arm according to the present invention
- FIG. 4 illustrates in greater detail the single joint elevator portion of the running tool according to the present invention
- FIG. 5 illustrates an elevated side view, partially in cross-section, of another embodiment of the running tool according to the present invention
- FIG. 6 illustrates an elevated side view, partially in cross-section, of another embodiment of the running tool with a single joint elevator and tong portion swung away according to the present invention
- FIG. 6 a illustrates an elevated side view of an embodiment of the running tool detailing the pivoting connections of the pick up elevator according to the present invention
- FIG. 7 illustrates a hydraulically energized packer according to the present invention
- FIG. 8 illustrates an elevated side view, partially in cross-section, of an another embodiment of the running tool according to the present invention.
- FIG. 9 illustrates an elevated side view, partially in cross-section, of an another embodiment of the running tool according to the present invention.
- tubular strings such as casing, drill pipe, production tubing, and the like, each of which comprises a plurality of elongated tubular segments extending downwardly from a rig into the well bore.
- strings may comprise large diameter tubulars, and therefore very heavy tubular segments.
- the conventional manner in which plural tubular segments are coupled together to form a tubular string is a labor intensive method, typically involving the use of a stabber and casing tongs.
- the stabber may be a person or may be a manually controlled device to insert a segment of tubular into the upper end of an existing tubular string.
- the tongs are designed to engage and rotate the segment to threadedly connect to the tubular string. While such a method is effective, it is very cumbersome, labor intensive, relatively inefficient, and therefore costly.
- the procedure is typically done manually, includes a casing crew, and is extremely dangerous to the personnel performing such method.
- using casing tongs may require a setting up of scaffolding and other like structures, thus adding to the inefficiency.
- FIG. 1 illustrates a conventional drilling rig 2 in the process of assembling a tubular string and lowering such string downhole into a borehole or wellbore 13 .
- the tubular assembly and lowering operation involves an elevator 26 which lowers the tubular string 3 , a traveling block 11 which allows the elevator to travel in a vertical direction, and a drive unit 10 , which can provide any desired rotation to the tubular string 3 .
- the drive unit 10 may be a conventional rotary type drive or may be conventional top drive unit or any other type of drive unit.
- a conventional sequence for assembling a tubular string 3 may be as follows. A lowered tubular string 3 is suspended by the spider 14 .
- a new tubular section 50 is lifted onto the rig floor 12 and is positioned so as to be attached to the elevator 26 or prior to the attachment of the elevator 26 to be stabbed into the existing tubular string 3 .
- tongs or other rotatable tools (not illustrated), rotate the new tubular segment 50 until it is threadedly engaged with the existing tubular string 3 being held and supported by the spider 14 .
- the elevator 26 grips the new tubular segment 50 , now threadedly engaged into the tubular sting 3 .
- the spider 14 then releases the grip on the tubular string 3 .
- the elevator 26 lowers the tubular string 3 to a certain level, at which point the spider 14 again grips the tubular string 3 and then the process is repeated.
- FIGS. 2 , 3 , and 8 are primarily to illustrate how the various parts of the running tool 6 are put together.
- arm 22 is mounted so as to extend out from between the bails B 1 , B 2 .
- arm 22 pivots about pivot point 24 so as to move out from the page or back into the page.
- FIGS. 5 and 6 illustrate the correct orientation of the running tool 6 with respect to the bails B 1 , B 2 .
- FIGS. 5 and 6 show the position of bail, B 1 with respect to the running tool 6 .
- the connection point or pivot point 24 for arm 22 is preferably a yoke type assembly as illustrated in FIG. 3A .
- various other methods of connections should not be viewed as a limitation thereof.
- an improved running tool is shown attached below the drive unit 11 .
- running tool should not be viewed as a limitation of this tool and that the present running tool can be utilized for running casing, tubing, drill pipe, and a variety of other tubulars.
- the drive unit 11 can be a conventional top drive, a rotary drive, or any other type of rig drive mechanism. It should be further understood, by those in the art, that when connecting the running tool 6 to the drive unit 11 , further connections are provided to allow the flow of drilling fluid through the subs which connect the drive unit 11 and the running tool 6 and further through the running tool 6 and into the tubular string 3 being lowered into the well bore 13 .
- running tool 6 comprises a pipe sub 20 which supports the pickup arm 22 .
- Pickup arm 22 is preferably hingedly attached to pipe sub 20 .
- the pickup arm 22 and the pipe sub 20 are assembled away from the rig.
- the place of assembly should not be viewed as a limitation herein.
- the pickup arm 22 is movably attached so as to allow rotation of the arm 22 about a pivot connection 24 , so as to align with the elevator 26 , in a vertical relationship, or to move out of alignment, with elevator 26 to allow unobstructed vertical movement of the elevator 26 .
- the pickup arm 22 can be attached by conventional attachments, such as, pins, bolts, welding, clamps, bearings, and any other feature that would allow a pivotable moveable attachment.
- the pickup arm 22 is preferably actuated through the use of hydraulic pistons 28 .
- the pistons 28 may be hydraulic, pneumatic, electric, or any combination thereof. If should further be understood that the movement of pickup arm 22 can be achieved by means other than the pistons illustrated herein and should not be viewed as a limitation thereof.
- elevator 26 is, at least indirectly, connected to the top drive 11 by bales B 1 , B 2 . It should be further appreciated that any other conventional attachment of the elevator 26 to a rig top drive can be utilized. It should still further be appreciated, from the figures, that the arm 22 forms a substantially channel like shape from the pivot point 24 to the distal end of the elevator 32 . It should be understood that this distinctive shape is still utilized in alternative embodiments such as illustrated in FIGS. 5 and 6 and whether the running tool 6 comprises an integral tong 34 or not.
- this channel like geometry allows the pickup arm 22 to align the gripped tubular segment 51 with the elevator 26 and the tubular string 3 (or the wellbore 13 ) substantially through only a vertical movement of the pickup arm 22 while pivoting about the pivot 24 .
- the pickup arm 22 preferably is constructed so as to telescope outwardly or downwardly and can be comprised of two or more substantially parallel arms (see FIG. 4 ).
- pickup arm 22 extends and retracts via one or more cylinders 30 .
- cylinders 30 can also be pneumatic, hydraulic, electronic, or any combination therein and further that the extension and retraction of the pickup arm 22 should not be viewed as being limited only to actuation by pistons.
- the pickup arm 22 can be of two sections or multiple sections, with each section or some of the sections telescoping. Near the lower end of the pickup arm 22 , distal from pipe sub 20 is preferably a hydraulic elevator 32 and below that a tong 34 .
- the pickup arm 22 may be used without the tong 34 . There may be preferences, among rig owners, operators, or even casing crews as to the use of a tong 34 integral to the pickup arm 22 or separate conventional tongs. It should be further appreciated that when a tong 34 is utilized, there may still exist a need for conventional backup tong (not illustrated). It should be appreciated that elevator 32 can also be a conventional single joint elevator. However, it should be further appreciated that if elevator 32 is a single joint elevator, the rotation of tubular segment 51 maybe with a great deal more friction than in the preferred hydraulic elevator 32 with cam followers 52 . Thus, making the hydraulic elevator 32 preferable for the makeup operation.
- a backup tong will not be required.
- other spider configurations may require the use of backup tongs particularly for the first several tubular joints being assembled until there is enough suspended tubular string weight to prevent the rotation of the tubular string while the next tubular segment is being coupled to the tubular string.
- pickup arm 22 is pivoted about pivot point 24 so as to pick up tubular segment 51 .
- tubular segment 51 is typically picked up from the V-door.
- Tubular segment 51 is picked up by the single joint elevator 32 from the V-door or other pipe positioning area or device.
- arm 22 is again pivoted and positioned such that tubular segment 51 is substantially aligned vertically with the tubular string 3 being held by the spider 14 .
- tong 34 when utilized, will be positioned so as to also grip the tubular segment 51 .
- Pickup arm 22 may then extend, retract, or pivot as necessary in order to stab tubular segment 51 into the tubular sting 3 being held in position by spider 14 .
- the stabbing operation of tubular segment 51 into the tubular string may be achieved in a variety of ways, including but not limited to, the telescoping extension of arm 22 or the lowering of arm 22 by the traveling block, such as the traveling block 11 of FIG. 1 .
- tong 34 will engage the tubular segment 51 and threadedly connect tubular segment 51 to the casing string 3 .
- FIG. 4 illustrates, in greater detail, the elevator 32 .
- elevator 32 comprises an attachment member 48 which attaches elevator 32 to pickup arm 22 .
- This attachment can be of any means including, but not limited to, welding, pinning, screwing, bolting, or other similar mechanical means as well as being integral with pickup arm 22 .
- Cylinders 46 will allow the elevator 32 to pivot at least in a horizontal plane with respect to the pickup arm 22 .
- two cylinders 46 will be utilized, however, the utilization of less than two cylinders 46 or the utilization of more than two cylinders 46 are within the scope of this invention.
- a linear actuator having a gear driven arm, may replace both of the cylinder(s) 46 and the attachment member 48 .
- the linear actuator would be connected by conventional means to arms 49 .
- Cylinders 46 are preferably hydraulic cylinders but may also be pneumatic, electric, hydroelectric or any combination thereof.
- the cylinders 46 will be attached to arms 49 and will allow the pivotation of the arms 49 .
- Arms 49 will be preferably attached to the elevator gripping body 32 a at connections 42 a .
- the elevator 32 is an assembly and that when reference, herein, is made to elevator 32 it is meant to include the elements of the elevator 32 although the actual tubular 3 , 51 gripping is within the elevator body 32 a.
- elevator 32 is connected so as to allow the elevator 32 to pivot.
- elevator 32 can pivot about connections 42 a and 42 b .
- the connections 42 a , 42 b are positioned so as to be slightly off the centerline CL of the elevator body 32 a , thus allowing the weight of the elevator 32 to cause the elevator 32 to pivot downwardly when elevator doors 40 are opened.
- the pivotal connection of elevator 32 can be by any means, including conventional means such as hinges, pins, and the like.
- elevator doors 40 are hydraulicly operated. When the doors 40 open, the weight of the doors 40 will cause the elevator 32 to pivot or swing downwardly.
- the hydraulic operation of the elevator doors 40 can be achieved through the use of pistons or other cylinders (not illustrated).
- doors 40 can also be pneumatic, electro pneumatic, electro hydraulic, electric, or any combination therein.
- elevator doors 40 will be open to allow elevator 32 to be positioned around tubular segment 51 .
- the elevator doors 40 are hinged about connections 44 a and 44 b .
- the hinged connections 44 a , 44 b can include, but not be limited to, pins, bolts, screws, rivets, pistons, and any other device that would allow the elevator doors 40 to pivot so as to create a large enough opening to allow the elevator 32 to substantially enclose and grip a tubular segment 51 .
- the elevator doors 40 can be closed to substantially enclose tubular segment 51 , either manually or automatically.
- Automatic closure could include hydraulic, pneumatic, electrical, or any combination thereof. It should be appreciated that although this embodiment illustrates and describes the elevator 32 as having two doors 40 , any equivalent structure, such as but not limited to, one door or some other mechanism that would allow the entry of a tubular segment 51 into the elevator 32 and retain such tubular segment 51 within the elevator 32 , can be substituted and is intended to be within the scope of this invention.
- the elevator 32 When the elevator doors 40 are closed, the elevator 32 will substantially enclose the tubular segment 51 and will grip the tubular 51 . Elevator 32 can then be pivoted back into the a position substantially perpendicular to a plane parallel to the pickup arm 22 . As the pickup arm 22 begins to move, the elevator 32 will more positively engage and grip the tubular segment 51 . The pickup arm 22 , as it is being lifted by the rig drive system, will begin to pivot in order to align the gripped tubular 51 with the wellbore 13 and the elevator 26 (see FIG. 3 —elevator 32 in position to grip and pick up the tubular 51 and FIG. 2 —elevator 32 aligning the picked up tubular 51 with the elevator 26 and the wellbore 13 ). It should be understood that elevator 32 is spring closed and hydraulically open. Therefore, even with a loss of hydraulic power, the elevator 22 will not drop the tubular segment 51 .
- the elevator 32 further comprises cam followers 52 , which allow for gripping the tubular segment 51 and allow the tubular segment 51 to rotate during coupling or uncoupling operations of the tongs.
- cam followers 52 are well known in the art, for example, in U.S. Pat. Nos. 6,330,911, 5,566,769, 5,291,808, and 5,144,868, and need not be further discussed here in.
- elevator 32 is described herein as a hydraulic elevator or a single joint elevator, any number of gripping devices can be used without being viewed as a limitation thereof.
- the pickup arm 22 can be attached to the drive unit 10 a . It should be appreciated that the pickup arm 22 , illustrated in FIGS. 5 and 6 could be longer than the pickup arm 22 illustrated in FIGS. 2 and 3 due to the attachment of the pickup arm 22 further above the elevator 26 . However, such length can also be compensated by telescoping of pickup arm 22 . It should be understood that when pipe segment 51 is a large diameter tubular, each tubular segment is very heavy, thus making the tubular string 3 heavy as well. In such a case, it may be preferable to use the top drive 10 instead of attaching the pickup arm 22 to sub 20 due to the heavy side load which occurs due to the heavy weight of a large diameter tubular segment 51 .
- FIGS. 5 and 6 may be preferred with the large diameter tubular segment 51 .
- this embodiment would be removably attached to the drive unit 10 a by an attachment support 41 .
- the attachment support 41 would include a mounting bracket 42 which supports the arm 22 .
- the pickup arm 22 would be attached to the mounting bracket 42 with a pivotally rotating connection 24 a .
- This connection 24 a would allow the pickup arm 22 to have substantially the same range of movement as described herein above when the pickup arm 22 is mounted to a sub 20 .
- the pickup arm 22 can be attached by conventional removable attachments, such as, pins, bolts, welding, clamps, bearings, and any other feature that would allow moveable attachment.
- the mounting bracket 42 can be attached to the drive unit 10 a in any conventional manner including, but not limited to, pins, bolts, welding, clamps, bearings, support bars/beams, and any other feature that would rigidly, yet removably allow attachment to the drive unit 10 a . It should be understood that although it is preferable that the pickup arm 22 be removably attached to the drive unit 10 a , a permanent attachment is likewise within the scope of the instant invention.
- the pickup arm 22 is pivoted about connection 24 a by one or more cylinders 28 a .
- the pistons 28 a may be hydraulic, pneumatic, electric, or any combination thereof. If should further be understood that the movement of pickup arm 22 can be achieved by means other than the pistons illustrated herein and should not be viewed as a limitation thereof.
- FIG. 6 illustrates the pickup arm 22 in a position to pickup and move the tubular 51 into alignment with the elevator 26 .
- FIG. 6 a illustrates an embodiment utilizing hinged connections H 1 , H 2 .
- cylinders C 1 and C 2 allow elevator 32 to pivot about hinged connections H 1 , H 2 . It should be appreciated that when the distance between the V-door and the mouse hole are very small, elevator 32 may need to pivot to be able to align with and positively grip tubular segment 51 in order to pick up tubular segment 51 .
- hinged connections H 1 , H 2 are conventional and will not be described further herein.
- cylinders C 1 , C 2 can be hydraulic cylinders, pneumatic cylinders, electro hydraulic cylinders, electro pneumatic cylinders, electric cylinders or any other conventional cylinders which will allow the elevator 32 to pivot about hinged connections H 1 , H 2 .
- Packer 36 can be a single piece or a multi-piece unit.
- packer 36 will comprise a support section 61 and a compressing section 60 . Between the support section 61 and the compressing section 60 is a compressible band 62 .
- the compressible band 62 is preferably a heavy duty urethane rubber. However, it should be appreciated that the compressible band 62 can be other polyurethane rubbers, rubbers, plastics, composites, and other malleable materials both metallic and non-metallic.
- a cylinder assembly 37 is preferably above the packer 36 .
- the cylinder assembly 37 could be a hydraulic cylinder, a pneumatic cylinder, an electro-hydraulic cylinder, an electro-pneumatic cylinder, an electrical compression system, a mechanical compression system, or any combination thereof. It should be further appreciated that the cylinder assembly 37 could be below packer 36 or located so as to use extensions or the like to transfer a force onto the packer elements 60 , 61 . It should still further be appreciated that the position of the compressing section 60 and the support section 61 can be reversed from that illustrated in the figures or for both sections 60 , 61 to transfer compressive forces onto the compressible band 62 .
- Cylinder assembly 37 further comprises at least two hydraulic connections 64 , 66 . It should be understood that if the power, other than hydraulic power is supplied to the connections 64 , 66 , the connections 64 , 66 could still be used to facilitate the actuation of the cylinder assembly 37 . They may be repositioned, or they may be eliminated depending on the exact type of power utilized for the cylinder 37 actuation. Preferably one of the connections 64 , 66 would be used to facilitate the actuation of cylinder assembly 37 and the other connection 64 , 66 would be utilized to deactivate the cylinder assembly 37 .
- the cylinder assembly 37 further comprises seals 67 , above connection 64 , and seals 69 below connection 66 .
- seals 67 , 69 are conventional seals used in cylinder/piston assemblies.
- a piston 68 will force the cylinder assembly 37 downward and exert a force on at least one of the packer elements 60 , 61 to compress the compressible band 62 .
- the compressible band 62 As the compressible band 62 is compressed it will expand to fit and seal against the internal bore of a tubular into which it is inserted.
- the present device may operate in the following sequence. However, it should be understood by those in the art that the steps described herein may be altered and should not be viewed as a limitation thereof.
- the pickup arm 22 is extended and pivoted such that elevator 32 can grip and pickup a tubular segment 51 .
- elevator 32 can pivot so as to enclose the tubular segment 51 regardless of the horizontal/vertical relationship between the elevator and the tubular segment 51 .
- the pickup arm 22 is moved in a substantially vertical direction away from the rig floor 12 . The upward movement of the pickup arm 22 and consequently elevator 32 , will cause elevator 32 to positively grip the tubular segment 51 .
- the pickup arm 22 As the pickup arm 22 moves upwardly, it will begin to pivot so as to position the tubular segment 51 in a substantially vertical position and into alignment with the borehole 13 and the elevator 26 .
- a tubular string is being held in place by a spider 14 .
- the tubular segment 51 is then aligned with the tubular string (which is in the borehole 13 ) and the elevator 26 .
- the pickup arm 22 and consequently the tubular segment 51 is manipulated, in an upwards and/or downwards direction to engage an end of the tubular segment 51 with the tubular string 3 .
- the tubular segment 51 is then engaged by tong 34 (or other conventional tongs if tong 34 is not utilized) and preferably is threadedly coupled to the tubular string 3 .
- elevator 26 is lowered to a position allowing it to grip the tubular segment 51 and thus the tubular string 3 now coupled to the tubular segment 51 .
- the pickup arm 22 preferably begins to pivot in a direction away from the centerline of the elevator 26 and the tubular segment 51 . It should be understood that this pivoting is necessary to move the pickup arm 22 so as to prevent any contact between the pickup arm 22 and any rig personnel or rig equipment.
- the guide 38 is inserted into tubular segment 51 . If the running tool is of an embodiment employing a packer 36 , the elevator 26 will lower to a position where the packer 36 is not fully inserted, or partially into the tubular segment 51 .
- packer 36 will be utilized to plug the tubular 51 top end when it is necessary to have fluid circulation during the tubular running operation.
- elevator 26 When elevator 26 has been lowered to a certain predetermined distance along the vertical axis of tubular segment 51 , elevator 26 will then grip tubular segment 51 .
- spider 14 will then release the tubular string 3 , which is threadedly engaged with tubular segment 51 .
- Tubular segment 51 and thus the tubular string 3 will be supported by elevator 26 .
- elevator 26 will lower the tubular string 3 and tubular segment 51 into the bore hole or well bore 13 .
- elevator 26 can be of a variety of conventional elevators including, but not limited to, internal elevators such as are exemplified in U.S. Pat. Nos. 6,309,002 and 6,431,626. Still further, it should be appreciated that any other elevators or gripping devices, not necessarily just conventional devices, can be used in place of, or in addition to, the elevator 26 without departing from the scope of this invention.
- the elevator 26 will be lowered so as to allow the packer 36 to be fully inserted, some predetermined distance into the tubular segment 51 . It should be appreciated that if circulation becomes necessary after the elevator 26 has gripped the tubular string 3 and begin lowering it, the spider 14 can again engage and grip the tubular string 3 and thus allow the elevator 26 to be lowered so as to position the packer 36 within the tubular segment 51 . The packer 36 may then be activated, thus sealing the bore of the upper end of the tubular string 3 (i.e. the connected tubular segment 51 ). This sealing of the tubular string bore, allows fluid to be pumped through the center bore 80 of the packer 36 into the tubular string 3 and circulated to wash out cuttings or otherwise help the tubular string 3 be lowered.
- the pickup arm 22 will guide/stab this initial tubular segment 51 directly into the spider 14 . At that point there will be no tong operation required and the pickup arm 22 can release its grip and allow the elevator 26 to be lowered over the tubular segment 51 as the pickup arm 22 is manipulated out of the way for the lowering elevator 26 .
- the elevator 26 may be an external or internal elevator. If utilizing a conventional internal elevator (not illustrated), the operation would be substantially the same except that the gripping of the tubular segment 51 , by the elevator 26 , would be from the inside diameter of the tubular segment 51 .
- the power controls for the cylinders which control the extension, retracting, pivoting, and other movements of the pickup arm 22 are preferably digital controls.
- the cylinders can be programmed with stops tailored for use on specific rigs. Therefore, the stops will prevent the pickup arm 22 from colliding with or contacting the rig or rig equipment.
- the drive unit 10 is disabled as to rotational capabilities, particularly when the apparatus is attached directly to a sub 20 .
- a special connection is utilized which would translate rotational power from the drive unit 10 directly to the tubular segment 51 (and the tubular string 3 when both are coupled together) without rotating the pickup arm 22 .
- sub 20 is prevented from rotating by anti-rotation plate 72 .
- the anti-rotation plate 72 can be connected to the bails or otherwise connected in a conventional manner so as to prevent any rotational movement of sub 20 .
- the top drive sub is then directly connected to pipe sub 73 . Pipe sub 73 passes through pipe sub 20 and is not directly connected to pipe sub 20 .
- a special pinned box connection 74 connects pipe sub 73 to the tubular segment 51 .
- This connection 74 allows sub 73 to transmit rotational power from the drive unit 10 directly to the tubular segment 51 and thus to the tubular string 3 .
- elevator 26 and spider 14 are open.
- the weight of the casing string 3 and the connected tubular segment 51 is being held by the top drive 10 .
- the whole tubular string 3 can rotate.
- this configuration can be used when drilling with casing. It should be appreciated that drilling with casing is well known in the art, and need not be further discussed herein.
- the use of the instant invention allows for a tubular segment 51 to be connected to the tubular string 3 and to drill with the tubular string without having to add or take away equipment during the addition of tubular segments 51 .
- the elevator 32 a is an internal elevator that grips the tubular segment 51 from a position within the internal bore of the tubular segment 51 .
- the hinged connections such as H 1 , H 2 , of FIG. 6A
- the remaining sequence of operation would be substantially the same in respect to moving the tubular section 51 into alignment with the elevator 26 , the tubular string 3 , and the borehole 13 . Examples of such internal elevators can be found exemplified in U.S. Pat. Nos. 6,309,002 and 6,431,626.
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Earth Drilling (AREA)
Abstract
An automated tubular running tool for use in drilling systems and the like allows for the picking up, positioning, stabbing and threadedly connecting a tubular segment to a tubular string being held by the rig by a spider. The tool comprises a pivoting arm, which can pickup, position, stab and threadedly connect the tubular segment. The tool further features an integral elevator, which then lowers the piping string tubing string into the well bore. This tubular running tool allows for the connection of tubular segments to a tubular string without the need of personnel.
Description
- This application is a divisional application related to U.S. patent application Ser. No. 11/124,471, filed on May 6, 2005, for Casing Running Tool and Method of Using Same, patented on Apr. 1, 2008 as U.S. Pat. No. 7,350,586.
- This invention relates to well drilling operations and more particularly to a device for assisting in the assembly of tubular strings, such as, but not limited to, casing, drill pipe strings, production tubing, and the like.
- For a further understanding of the nature and objects of the present invention, reference should be made to the following brief description, taken in conjunction with the accompanying drawings, in which like elements are given the same or analogous reference numbers.
-
FIG. 1 illustrates a conventional drilling rig, known in the prior art, utilizing a spider to hold a lowered casing string in position; -
FIG. 2 illustrates an elevated side view, partially in cross-section, of an embodiment of the running tool according to the present invention; -
FIG. 3 illustrates an elevated side view, partially in cross-section, of an embodiment of the running tool with a single joint elevator and tong portion swung away according to the present invention; -
FIG. 3 a illustrates a top view of an embodiment of a yoke type attachment of the running tool arm according to the present invention; -
FIG. 4 illustrates in greater detail the single joint elevator portion of the running tool according to the present invention; -
FIG. 5 illustrates an elevated side view, partially in cross-section, of another embodiment of the running tool according to the present invention; -
FIG. 6 illustrates an elevated side view, partially in cross-section, of another embodiment of the running tool with a single joint elevator and tong portion swung away according to the present invention; -
FIG. 6 a illustrates an elevated side view of an embodiment of the running tool detailing the pivoting connections of the pick up elevator according to the present invention; -
FIG. 7 illustrates a hydraulically energized packer according to the present invention; -
FIG. 8 illustrates an elevated side view, partially in cross-section, of an another embodiment of the running tool according to the present invention; and -
FIG. 9 illustrates an elevated side view, partially in cross-section, of an another embodiment of the running tool according to the present invention. - It is well known in the art that the drilling, completion, and production of wells typically involves assembling tubular strings, such as casing, drill pipe, production tubing, and the like, each of which comprises a plurality of elongated tubular segments extending downwardly from a rig into the well bore. These strings may comprise large diameter tubulars, and therefore very heavy tubular segments.
- The conventional manner in which plural tubular segments are coupled together to form a tubular string is a labor intensive method, typically involving the use of a stabber and casing tongs. The stabber may be a person or may be a manually controlled device to insert a segment of tubular into the upper end of an existing tubular string. The tongs are designed to engage and rotate the segment to threadedly connect to the tubular string. While such a method is effective, it is very cumbersome, labor intensive, relatively inefficient, and therefore costly. The procedure is typically done manually, includes a casing crew, and is extremely dangerous to the personnel performing such method. Furthermore, using casing tongs may require a setting up of scaffolding and other like structures, thus adding to the inefficiency. The entire operation of attaching tubular segments to the tubular string, the use of the casing tongs and the stabber produces a hazardous environment which has, at times, resulted in death or serious injury to the drilling rig personnel. Therefore, the industry and the art are in need of an efficient tool and/or method to assemble tubular strings together and lower such strings into a well bore utilizing a minimal amount of personnel in close contact or in the danger zone around the rig operation.
-
FIG. 1 illustrates aconventional drilling rig 2 in the process of assembling a tubular string and lowering such string downhole into a borehole orwellbore 13. Typically the tubular assembly and lowering operation involves anelevator 26 which lowers thetubular string 3, atraveling block 11 which allows the elevator to travel in a vertical direction, and adrive unit 10, which can provide any desired rotation to thetubular string 3. It should be noted that thedrive unit 10 may be a conventional rotary type drive or may be conventional top drive unit or any other type of drive unit. A conventional sequence for assembling atubular string 3 may be as follows. A loweredtubular string 3 is suspended by thespider 14. A newtubular section 50 is lifted onto therig floor 12 and is positioned so as to be attached to theelevator 26 or prior to the attachment of theelevator 26 to be stabbed into the existingtubular string 3. Once the newtubular segment 50 is stabbed into the existingtubular string 3, tongs or other rotatable tools (not illustrated), rotate the newtubular segment 50 until it is threadedly engaged with the existingtubular string 3 being held and supported by thespider 14. Next, theelevator 26 grips the newtubular segment 50, now threadedly engaged into thetubular sting 3. Thespider 14 then releases the grip on thetubular string 3. Theelevator 26 lowers thetubular string 3 to a certain level, at which point thespider 14 again grips thetubular string 3 and then the process is repeated. - It should be appreciated that
FIGS. 2 , 3, and 8 are primarily to illustrate how the various parts of therunning tool 6 are put together. However, in actuality,arm 22 is mounted so as to extend out from between the bails B1, B2. Thus, as illustrated in these figures,arm 22 pivots aboutpivot point 24 so as to move out from the page or back into the page. However,FIGS. 5 and 6 illustrate the correct orientation of therunning tool 6 with respect to the bails B1, B2.FIGS. 5 and 6 show the position of bail, B1 with respect to therunning tool 6. The connection point orpivot point 24 forarm 22 is preferably a yoke type assembly as illustrated inFIG. 3A . However, various other methods of connections should not be viewed as a limitation thereof. - Referring now to
FIG. 2 an improved running tool, general designated with thenumeral 6, is shown attached below thedrive unit 11. It should be understood that the term running tool should not be viewed as a limitation of this tool and that the present running tool can be utilized for running casing, tubing, drill pipe, and a variety of other tubulars. It should be appreciated that thedrive unit 11 can be a conventional top drive, a rotary drive, or any other type of rig drive mechanism. It should be further understood, by those in the art, that when connecting therunning tool 6 to thedrive unit 11, further connections are provided to allow the flow of drilling fluid through the subs which connect thedrive unit 11 and therunning tool 6 and further through therunning tool 6 and into thetubular string 3 being lowered into thewell bore 13. Preferably, runningtool 6 comprises apipe sub 20 which supports thepickup arm 22.Pickup arm 22 is preferably hingedly attached topipe sub 20. Preferably, thepickup arm 22 and thepipe sub 20 are assembled away from the rig. However, the place of assembly should not be viewed as a limitation herein. It should be appreciated that thepickup arm 22 is movably attached so as to allow rotation of thearm 22 about apivot connection 24, so as to align with theelevator 26, in a vertical relationship, or to move out of alignment, withelevator 26 to allow unobstructed vertical movement of theelevator 26. It should be appreciated that thepickup arm 22 can be attached by conventional attachments, such as, pins, bolts, welding, clamps, bearings, and any other feature that would allow a pivotable moveable attachment. Thepickup arm 22 is preferably actuated through the use ofhydraulic pistons 28. It should be understood that thepistons 28 may be hydraulic, pneumatic, electric, or any combination thereof. If should further be understood that the movement ofpickup arm 22 can be achieved by means other than the pistons illustrated herein and should not be viewed as a limitation thereof. - It should be appreciated that
elevator 26 is, at least indirectly, connected to thetop drive 11 by bales B1, B2. It should be further appreciated that any other conventional attachment of theelevator 26 to a rig top drive can be utilized. It should still further be appreciated, from the figures, that thearm 22 forms a substantially channel like shape from thepivot point 24 to the distal end of theelevator 32. It should be understood that this distinctive shape is still utilized in alternative embodiments such as illustrated inFIGS. 5 and 6 and whether the runningtool 6 comprises anintegral tong 34 or not. It should still further be understood that this channel like geometry allows thepickup arm 22 to align the grippedtubular segment 51 with theelevator 26 and the tubular string 3 (or the wellbore 13) substantially through only a vertical movement of thepickup arm 22 while pivoting about thepivot 24. - Still referring to
FIG. 2 , thepickup arm 22 preferably is constructed so as to telescope outwardly or downwardly and can be comprised of two or more substantially parallel arms (seeFIG. 4 ). Preferablypickup arm 22 extends and retracts via one ormore cylinders 30. It should be appreciated thatcylinders 30 can also be pneumatic, hydraulic, electronic, or any combination therein and further that the extension and retraction of thepickup arm 22 should not be viewed as being limited only to actuation by pistons. It should be further appreciated that thepickup arm 22 can be of two sections or multiple sections, with each section or some of the sections telescoping. Near the lower end of thepickup arm 22, distal frompipe sub 20 is preferably ahydraulic elevator 32 and below that atong 34. It should be appreciated that thepickup arm 22 may be used without thetong 34. There may be preferences, among rig owners, operators, or even casing crews as to the use of atong 34 integral to thepickup arm 22 or separate conventional tongs. It should be further appreciated that when atong 34 is utilized, there may still exist a need for conventional backup tong (not illustrated). It should be appreciated thatelevator 32 can also be a conventional single joint elevator. However, it should be further appreciated that ifelevator 32 is a single joint elevator, the rotation oftubular segment 51 maybe with a great deal more friction than in the preferredhydraulic elevator 32 withcam followers 52. Thus, making thehydraulic elevator 32 preferable for the makeup operation. - Typically, if a flush mounted spider is being used in conjunction with running the tubulars, a backup tong will not be required. However, other spider configurations may require the use of backup tongs particularly for the first several tubular joints being assembled until there is enough suspended tubular string weight to prevent the rotation of the tubular string while the next tubular segment is being coupled to the tubular string.
- Referring now to
FIG. 3 ,pickup arm 22 is pivoted aboutpivot point 24 so as to pick uptubular segment 51. It should be appreciated by those in the art, thattubular segment 51 is typically picked up from the V-door.Tubular segment 51 is picked up by the singlejoint elevator 32 from the V-door or other pipe positioning area or device. Afterelevator 32 has positively grippedtubular segment 51,arm 22 is again pivoted and positioned such thattubular segment 51 is substantially aligned vertically with thetubular string 3 being held by thespider 14. It should be appreciated that during the alignment process, oftubular segment 51,tong 34, when utilized, will be positioned so as to also grip thetubular segment 51.Pickup arm 22 may then extend, retract, or pivot as necessary in order to stabtubular segment 51 into thetubular sting 3 being held in position byspider 14. It should be appreciated by those in the art that the stabbing operation oftubular segment 51 into the tubular string may be achieved in a variety of ways, including but not limited to, the telescoping extension ofarm 22 or the lowering ofarm 22 by the traveling block, such as the travelingblock 11 ofFIG. 1 . Aftertubular segment 51 has been successfully stabbed into thecasing string 3,tong 34 will engage thetubular segment 51 and threadedly connecttubular segment 51 to thecasing string 3. -
FIG. 4 illustrates, in greater detail, theelevator 32. Preferably,elevator 32 comprises anattachment member 48 which attacheselevator 32 topickup arm 22. This attachment can be of any means including, but not limited to, welding, pinning, screwing, bolting, or other similar mechanical means as well as being integral withpickup arm 22.Cylinders 46 will allow theelevator 32 to pivot at least in a horizontal plane with respect to thepickup arm 22. Preferably twocylinders 46 will be utilized, however, the utilization of less than twocylinders 46 or the utilization of more than twocylinders 46 are within the scope of this invention. It should be appreciated that instead of utilizing cylinder orcylinders 46, a linear actuator, having a gear driven arm, may replace both of the cylinder(s) 46 and theattachment member 48. It should be further appreciated that in such an embodiment utilizing a linear actuator, the linear actuator would be connected by conventional means toarms 49.Cylinders 46 are preferably hydraulic cylinders but may also be pneumatic, electric, hydroelectric or any combination thereof. Preferably, thecylinders 46 will be attached toarms 49 and will allow the pivotation of thearms 49.Arms 49 will be preferably attached to theelevator gripping body 32 a atconnections 42 a. It should be understood that theelevator 32 is an assembly and that when reference, herein, is made toelevator 32 it is meant to include the elements of theelevator 32 although theactual tubular elevator body 32 a. - Preferably,
elevator 32 is connected so as to allow theelevator 32 to pivot. Preferably,elevator 32 can pivot aboutconnections connections elevator body 32 a, thus allowing the weight of theelevator 32 to cause theelevator 32 to pivot downwardly whenelevator doors 40 are opened. It should be appreciated that the pivotal connection ofelevator 32 can be by any means, including conventional means such as hinges, pins, and the like. Preferably,elevator doors 40 are hydraulicly operated. When thedoors 40 open, the weight of thedoors 40 will cause theelevator 32 to pivot or swing downwardly. The hydraulic operation of theelevator doors 40 can be achieved through the use of pistons or other cylinders (not illustrated). It should be appreciated that the hydraulic operation ofdoors 40 can also be pneumatic, electro pneumatic, electro hydraulic, electric, or any combination therein. Thus aselevator 32 pivots,elevator doors 40 will be open to allowelevator 32 to be positioned aroundtubular segment 51. Preferably, theelevator doors 40 are hinged aboutconnections connections elevator doors 40 to pivot so as to create a large enough opening to allow theelevator 32 to substantially enclose and grip atubular segment 51. Theelevator doors 40 can be closed to substantially enclosetubular segment 51, either manually or automatically. Automatic closure could include hydraulic, pneumatic, electrical, or any combination thereof. It should be appreciated that although this embodiment illustrates and describes theelevator 32 as having twodoors 40, any equivalent structure, such as but not limited to, one door or some other mechanism that would allow the entry of atubular segment 51 into theelevator 32 and retain suchtubular segment 51 within theelevator 32, can be substituted and is intended to be within the scope of this invention. - When the
elevator doors 40 are closed, theelevator 32 will substantially enclose thetubular segment 51 and will grip the tubular 51.Elevator 32 can then be pivoted back into the a position substantially perpendicular to a plane parallel to thepickup arm 22. As thepickup arm 22 begins to move, theelevator 32 will more positively engage and grip thetubular segment 51. Thepickup arm 22, as it is being lifted by the rig drive system, will begin to pivot in order to align the gripped tubular 51 with thewellbore 13 and the elevator 26 (see FIG. 3—elevator 32 in position to grip and pick up the tubular 51 and FIG. 2—elevator 32 aligning the picked up tubular 51 with theelevator 26 and the wellbore 13). It should be understood thatelevator 32 is spring closed and hydraulically open. Therefore, even with a loss of hydraulic power, theelevator 22 will not drop thetubular segment 51. - As illustrated in
FIG. 4 , theelevator 32 further comprisescam followers 52, which allow for gripping thetubular segment 51 and allow thetubular segment 51 to rotate during coupling or uncoupling operations of the tongs. It should be understood that the cam followers are well known in the art, for example, in U.S. Pat. Nos. 6,330,911, 5,566,769, 5,291,808, and 5,144,868, and need not be further discussed here in. It should be appreciated that althoughelevator 32 is described herein as a hydraulic elevator or a single joint elevator, any number of gripping devices can be used without being viewed as a limitation thereof. - In another embodiment, illustrated in
FIGS. 5 and 6 , thepickup arm 22 can be attached to thedrive unit 10 a. It should be appreciated that thepickup arm 22, illustrated inFIGS. 5 and 6 could be longer than thepickup arm 22 illustrated inFIGS. 2 and 3 due to the attachment of thepickup arm 22 further above theelevator 26. However, such length can also be compensated by telescoping ofpickup arm 22. It should be understood that whenpipe segment 51 is a large diameter tubular, each tubular segment is very heavy, thus making thetubular string 3 heavy as well. In such a case, it may be preferable to use thetop drive 10 instead of attaching thepickup arm 22 to sub 20 due to the heavy side load which occurs due to the heavy weight of a largediameter tubular segment 51. It should be appreciated that some rig owners or top drive owners may fear damage to the top drive from such a side load. Therefore, the embodiment illustrated herein inFIGS. 5 and 6 may be preferred with the largediameter tubular segment 51. Preferably, this embodiment would be removably attached to thedrive unit 10 a by anattachment support 41. Theattachment support 41 would include a mounting bracket 42 which supports thearm 22. Preferably, thepickup arm 22 would be attached to the mounting bracket 42 with a pivotally rotatingconnection 24 a. Thisconnection 24 a would allow thepickup arm 22 to have substantially the same range of movement as described herein above when thepickup arm 22 is mounted to asub 20. It should be appreciated that thepickup arm 22 can be attached by conventional removable attachments, such as, pins, bolts, welding, clamps, bearings, and any other feature that would allow moveable attachment. It should be further appreciated that the mounting bracket 42 can be attached to thedrive unit 10 a in any conventional manner including, but not limited to, pins, bolts, welding, clamps, bearings, support bars/beams, and any other feature that would rigidly, yet removably allow attachment to thedrive unit 10 a. It should be understood that although it is preferable that thepickup arm 22 be removably attached to thedrive unit 10 a, a permanent attachment is likewise within the scope of the instant invention. Preferably, thepickup arm 22 is pivoted aboutconnection 24 a by one ormore cylinders 28 a. It should be understood that thepistons 28 a may be hydraulic, pneumatic, electric, or any combination thereof. If should further be understood that the movement ofpickup arm 22 can be achieved by means other than the pistons illustrated herein and should not be viewed as a limitation thereof.FIG. 6 illustrates thepickup arm 22 in a position to pickup and move the tubular 51 into alignment with theelevator 26. -
FIG. 6 a illustrates an embodiment utilizing hinged connections H1, H2. Further illustrated, cylinders C1 and C2 allowelevator 32 to pivot about hinged connections H1, H2. It should be appreciated that when the distance between the V-door and the mouse hole are very small,elevator 32 may need to pivot to be able to align with and positively griptubular segment 51 in order to pick uptubular segment 51. It should be appreciated that hinged connections H1, H2 are conventional and will not be described further herein. It should be further appreciated that cylinders C1, C2 can be hydraulic cylinders, pneumatic cylinders, electro hydraulic cylinders, electro pneumatic cylinders, electric cylinders or any other conventional cylinders which will allow theelevator 32 to pivot about hinged connections H1, H2. - Referring now to
FIG. 7 , there is illustrated animproved packer 36 according to the present invention. It should be understood that this packer can be used with tools other than that described herein.Packer 36 can be a single piece or a multi-piece unit. Preferably,packer 36 will comprise asupport section 61 and acompressing section 60. Between thesupport section 61 and thecompressing section 60 is acompressible band 62. Thecompressible band 62 is preferably a heavy duty urethane rubber. However, it should be appreciated that thecompressible band 62 can be other polyurethane rubbers, rubbers, plastics, composites, and other malleable materials both metallic and non-metallic. Acylinder assembly 37 is preferably above thepacker 36. It should be appreciated that thecylinder assembly 37 could be a hydraulic cylinder, a pneumatic cylinder, an electro-hydraulic cylinder, an electro-pneumatic cylinder, an electrical compression system, a mechanical compression system, or any combination thereof. It should be further appreciated that thecylinder assembly 37 could be belowpacker 36 or located so as to use extensions or the like to transfer a force onto thepacker elements section 60 and thesupport section 61 can be reversed from that illustrated in the figures or for bothsections compressible band 62. -
Cylinder assembly 37 further comprises at least twohydraulic connections connections connections cylinder assembly 37. They may be repositioned, or they may be eliminated depending on the exact type of power utilized for thecylinder 37 actuation. Preferably one of theconnections cylinder assembly 37 and theother connection cylinder assembly 37. Thecylinder assembly 37 further comprisesseals 67, aboveconnection 64, and seals 69 belowconnection 66. It should be understood that theseals assembly 37 is activated, preferably, apiston 68 will force thecylinder assembly 37 downward and exert a force on at least one of thepacker elements compressible band 62. As thecompressible band 62 is compressed it will expand to fit and seal against the internal bore of a tubular into which it is inserted. - When it is desired to remove
packer 36 from the interior of a tubular joint such as a joint of casing, energy such as but not limited to, hydraulic power, is transmitted through one of theconnections connections cylinder assembly 37, the other connection would be used to deactivate thecylinder assembly 37. The compressive load is removed from thecompressible band 62. Thepacker 36 can then be removed from the tubular into which it has been inserted. It should be appreciated that when thecompressible band 62 is of a material with sufficient elastic memory, thecompressible band 62 will return to substantially the same configuration as it had been prior to the exertion of compressive forces by thecylinder assembly 37. It should be appreciated that other means of setting thepacker 36 including, but not limited to, a mechanical setting is within the scope of this invention. - In operation, the present device may operate in the following sequence. However, it should be understood by those in the art that the steps described herein may be altered and should not be viewed as a limitation thereof. As described hereinabove, the
pickup arm 22 is extended and pivoted such thatelevator 32 can grip and pickup atubular segment 51. Preferably,elevator 32 can pivot so as to enclose thetubular segment 51 regardless of the horizontal/vertical relationship between the elevator and thetubular segment 51. Thepickup arm 22 is moved in a substantially vertical direction away from therig floor 12. The upward movement of thepickup arm 22 and consequentlyelevator 32, will causeelevator 32 to positively grip thetubular segment 51. As thepickup arm 22 moves upwardly, it will begin to pivot so as to position thetubular segment 51 in a substantially vertical position and into alignment with theborehole 13 and theelevator 26. Preferably, a tubular string is being held in place by aspider 14. Thetubular segment 51 is then aligned with the tubular string (which is in the borehole 13) and theelevator 26. Thepickup arm 22 and consequently thetubular segment 51 is manipulated, in an upwards and/or downwards direction to engage an end of thetubular segment 51 with thetubular string 3. Thetubular segment 51 is then engaged by tong 34 (or other conventional tongs iftong 34 is not utilized) and preferably is threadedly coupled to thetubular string 3. It should be understood that while the tong spins thetubular segment 51, during the coupling operation,elevator 32 maintains a positive grip on thetubular segment 51 thus allowing the rotation, via thecam followers 52, but preventing any substantial vertical movement of thetubular segment 51. It should be appreciated that astubular segment 51 is threadedly coupled to thetubular string 3 that there must be compensation for the weight of thetubular segment 51 as it is being threaded together. Preferably, this weight compensation is achieved using controls on thetelescoping pistons 30. Preferably, a pressure gauge is connected by conventional means to cylinder(s) 30. Thus, as thetubular segment 51 is coupled to thetubular string 3 the pressure on the hydraulic gauge will rise as the threading of the joint of thetubular segment 51 creates an additional load on thearm 22 and thus on cylinder(s) 30. To compensate for this raise in pressure due to the load fromtubular segment 51, pressure should be bled off from one side of the cylinder(s) 30 to the other side, such that thearm 22 actually extends as thetubular segment 51 is threaded into thetubular string 3. It should also be understood that when using a conventional single joint elevator it is possible to utilize a conventional single joint compensator, which is well known in the art and will not be further discussed herein. After thetubular segment 51 has been threadedly engaged with the tubular string 3 (being gripped by the spider 14), theelevator 32 releases its grip of thetubular segment 51. - Next,
elevator 26 is lowered to a position allowing it to grip thetubular segment 51 and thus thetubular string 3 now coupled to thetubular segment 51. As theelevator 26 is being lowered, thepickup arm 22 preferably begins to pivot in a direction away from the centerline of theelevator 26 and thetubular segment 51. It should be understood that this pivoting is necessary to move thepickup arm 22 so as to prevent any contact between thepickup arm 22 and any rig personnel or rig equipment. As theelevator 26 is lowered overtubular segment 51, theguide 38 is inserted intotubular segment 51. If the running tool is of an embodiment employing apacker 36, theelevator 26 will lower to a position where thepacker 36 is not fully inserted, or partially into thetubular segment 51. It should be understood by those in the art, thatpacker 36 will be utilized to plug the tubular 51 top end when it is necessary to have fluid circulation during the tubular running operation. Whenelevator 26 has been lowered to a certain predetermined distance along the vertical axis oftubular segment 51,elevator 26 will then griptubular segment 51. Preferably,spider 14 will then release thetubular string 3, which is threadedly engaged withtubular segment 51.Tubular segment 51 and thus thetubular string 3 will be supported byelevator 26. At this point,elevator 26 will lower thetubular string 3 andtubular segment 51 into the bore hole or well bore 13. It should also be appreciated thatelevator 26 can be of a variety of conventional elevators including, but not limited to, internal elevators such as are exemplified in U.S. Pat. Nos. 6,309,002 and 6,431,626. Still further, it should be appreciated that any other elevators or gripping devices, not necessarily just conventional devices, can be used in place of, or in addition to, theelevator 26 without departing from the scope of this invention. - If fluid circulation is required during the lowering of the
tubular string 3, theelevator 26 will be lowered so as to allow thepacker 36 to be fully inserted, some predetermined distance into thetubular segment 51. It should be appreciated that if circulation becomes necessary after theelevator 26 has gripped thetubular string 3 and begin lowering it, thespider 14 can again engage and grip thetubular string 3 and thus allow theelevator 26 to be lowered so as to position thepacker 36 within thetubular segment 51. Thepacker 36 may then be activated, thus sealing the bore of the upper end of the tubular string 3 (i.e. the connected tubular segment 51). This sealing of the tubular string bore, allows fluid to be pumped through the center bore 80 of thepacker 36 into thetubular string 3 and circulated to wash out cuttings or otherwise help thetubular string 3 be lowered. - It should be understood, by those skilled in the art, that if the
tubular segment 51 being picked up is the first segment of a tubular string, then thepickup arm 22 will guide/stab this initialtubular segment 51 directly into thespider 14. At that point there will be no tong operation required and thepickup arm 22 can release its grip and allow theelevator 26 to be lowered over thetubular segment 51 as thepickup arm 22 is manipulated out of the way for the loweringelevator 26. It should be appreciated that theelevator 26 may be an external or internal elevator. If utilizing a conventional internal elevator (not illustrated), the operation would be substantially the same except that the gripping of thetubular segment 51, by theelevator 26, would be from the inside diameter of thetubular segment 51. - It should be understood that the power controls for the cylinders which control the extension, retracting, pivoting, and other movements of the
pickup arm 22 are preferably digital controls. Thus, the cylinders can be programmed with stops tailored for use on specific rigs. Therefore, the stops will prevent thepickup arm 22 from colliding with or contacting the rig or rig equipment. - Preferably, when the instant running tool is employed, the
drive unit 10 is disabled as to rotational capabilities, particularly when the apparatus is attached directly to asub 20. In an alternative embodiment, as illustrated inFIG. 8 , a special connection is utilized which would translate rotational power from thedrive unit 10 directly to the tubular segment 51 (and thetubular string 3 when both are coupled together) without rotating thepickup arm 22. In thisconfiguration sub 20 is prevented from rotating byanti-rotation plate 72. Theanti-rotation plate 72 can be connected to the bails or otherwise connected in a conventional manner so as to prevent any rotational movement ofsub 20. The top drive sub is then directly connected topipe sub 73.Pipe sub 73 passes throughpipe sub 20 and is not directly connected topipe sub 20. A special pinnedbox connection 74, connectspipe sub 73 to thetubular segment 51. Thisconnection 74 allowssub 73 to transmit rotational power from thedrive unit 10 directly to thetubular segment 51 and thus to thetubular string 3. It should be appreciated in this configuration thatelevator 26 andspider 14 are open. Thus, the weight of thecasing string 3 and theconnected tubular segment 51 is being held by thetop drive 10. It should be further appreciated that in this configuration as the top drive supports the weight of thetubular string 3 and theconnected tubular segment 51, the wholetubular string 3 can rotate. Thus, this configuration can be used when drilling with casing. It should be appreciated that drilling with casing is well known in the art, and need not be further discussed herein. However, the use of the instant invention allows for atubular segment 51 to be connected to thetubular string 3 and to drill with the tubular string without having to add or take away equipment during the addition oftubular segments 51. - In another embodiment, illustrated in
FIG. 9 , theelevator 32 a is an internal elevator that grips thetubular segment 51 from a position within the internal bore of thetubular segment 51. It should be appreciated that when utilizing an embodiment, such as illustrated inFIG. 9 , that the hinged connections, such as H1, H2, ofFIG. 6A , may be modified or added to so as to allow the range of motion necessary to stab theelevator 32 a into the top internal bore of thetubular segment 51. It should be further appreciated that after theelevator 32 a has fully engaged and gripped thetubular section 51, the remaining sequence of operation would be substantially the same in respect to moving thetubular section 51 into alignment with theelevator 26, thetubular string 3, and theborehole 13. Examples of such internal elevators can be found exemplified in U.S. Pat. Nos. 6,309,002 and 6,431,626. - It will be understood that certain features and sub-combinations are of utility and may be employed without reference to other features and sub-combinations. This is contemplated by and is within the scope of the claims. It may be seen from the preceding description that a novel tubular running tool and method have been provided. Although specific examples may have been described and disclosed, the invention of the instant application is considered to comprise and is intended to comprise any equivalent structure and may be constructed in many different ways to function and operate in the general manner as explained hereinbefore. Accordingly, it is noted that the embodiments described herein in detail for exemplary purposes are of course subject to many different variations in structure, design, application and methodology. Because many varying and different embodiments may be made within the scope of the inventive concept(s) herein taught, and because many modifications may be made in the embodiment herein detailed in accordance with the descriptive requirements of the law, it is to be understood that the details herein are to be interpreted as illustrative and not in a limiting sense.
Claims (4)
14. A packer for sealing the internal bore of a tubular, comprising:
a compressible element;
said compressible element being positioned so as to receive a compressive force from at least one source; and
a compressive assembly positioned so as when actuated, to transmit said compressive force to said compressible element, thereby sealing said internal bore.
15. The packer of claim 14 , wherein the compressible element is rubber.
16. The packer of claim 14 , wherein the compressible element is non-metallic.
17. The packer of claim 14 , wherein the compressible element is metallic.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US12/079,988 US20080245524A1 (en) | 2005-05-06 | 2008-03-31 | Tubular running tool and method of using same |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US11/124,471 US7350586B2 (en) | 2005-05-06 | 2005-05-06 | Casing running tool and method of using same |
US12/079,988 US20080245524A1 (en) | 2005-05-06 | 2008-03-31 | Tubular running tool and method of using same |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US11/124,471 Continuation US7350586B2 (en) | 2005-05-06 | 2005-05-06 | Casing running tool and method of using same |
Publications (1)
Publication Number | Publication Date |
---|---|
US20080245524A1 true US20080245524A1 (en) | 2008-10-09 |
Family
ID=37393071
Family Applications (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US11/124,471 Active 2025-09-01 US7350586B2 (en) | 2005-05-06 | 2005-05-06 | Casing running tool and method of using same |
US12/080,023 Expired - Fee Related US7628200B2 (en) | 2005-05-06 | 2008-03-31 | Tubular running tool and method of using same |
US12/079,988 Abandoned US20080245524A1 (en) | 2005-05-06 | 2008-03-31 | Tubular running tool and method of using same |
Family Applications Before (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US11/124,471 Active 2025-09-01 US7350586B2 (en) | 2005-05-06 | 2005-05-06 | Casing running tool and method of using same |
US12/080,023 Expired - Fee Related US7628200B2 (en) | 2005-05-06 | 2008-03-31 | Tubular running tool and method of using same |
Country Status (5)
Country | Link |
---|---|
US (3) | US7350586B2 (en) |
EP (1) | EP1896686A4 (en) |
BR (1) | BRPI0612458A2 (en) |
CA (1) | CA2607289C (en) |
WO (1) | WO2006121928A2 (en) |
Families Citing this family (38)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7350586B2 (en) * | 2005-05-06 | 2008-04-01 | Guidry Mark L | Casing running tool and method of using same |
US7445050B2 (en) * | 2006-04-25 | 2008-11-04 | Canrig Drilling Technology Ltd. | Tubular running tool |
US20070251700A1 (en) * | 2006-04-28 | 2007-11-01 | Mason David B | Tubular running system |
US20080060818A1 (en) * | 2006-09-07 | 2008-03-13 | Joshua Kyle Bourgeois | Light-weight single joint manipulator arm |
US7552764B2 (en) * | 2007-01-04 | 2009-06-30 | Nabors Global Holdings, Ltd. | Tubular handling device |
US8356674B2 (en) * | 2007-04-13 | 2013-01-22 | National Oilwell Varco, L.P. | Tubular running tool and methods of use |
US8720541B2 (en) | 2008-06-26 | 2014-05-13 | Canrig Drilling Technology Ltd. | Tubular handling device and methods |
US8074711B2 (en) * | 2008-06-26 | 2011-12-13 | Canrig Drilling Technology Ltd. | Tubular handling device and methods |
US20100183418A1 (en) * | 2009-01-16 | 2010-07-22 | Premiere, Inc | Pipe manipulating apparatus |
CN101748978B (en) * | 2009-12-29 | 2012-01-11 | 中国石油天然气集团公司 | Tripping method for operation by adopting power swivel and tool |
US8240372B2 (en) * | 2010-04-15 | 2012-08-14 | Premiere, Inc. | Fluid power conducting swivel |
GB201101579D0 (en) | 2011-01-28 | 2011-03-16 | Saipem Spa | Pipe-laying vessel and method of laying a pipeline |
GB201101577D0 (en) | 2011-01-28 | 2011-03-16 | Saipem Spa | Clamp assembly for pipe-laying vessel and method of laying a pipeline |
AR083372A1 (en) * | 2011-10-11 | 2013-02-21 | Hot Hed S A | TRANSITORY SUPPORT DEVICE FOR PIPES OF OIL WELLS AND METHOD OF USE OF SUCH DEVICE |
US20130133899A1 (en) * | 2011-11-29 | 2013-05-30 | Keith A. Holliday | Top drive with automatic positioning system |
US9045952B2 (en) * | 2011-12-08 | 2015-06-02 | Tesco Corporation | Tubular compensator system and method |
US9803436B2 (en) | 2012-10-25 | 2017-10-31 | Warrior Rig Technologies Limited | Integrated casing drive |
CN104453741B (en) * | 2014-01-13 | 2016-03-23 | 中国石油化工股份有限公司 | A kind of mechanization workover treatment elevator conveyer method |
US9932785B2 (en) | 2014-12-01 | 2018-04-03 | Frank's International, Llc | System, apparatus, and method for dual-activity drilling |
US9732572B2 (en) | 2015-01-27 | 2017-08-15 | DW Rentals & Service L.P. | Compact bail supported fill up and circulation tool |
WO2016154253A1 (en) | 2015-03-23 | 2016-09-29 | T2 Tools And Design, Llc | Elevator roller insert system |
US9556690B1 (en) * | 2015-05-13 | 2017-01-31 | Alpha Dog Oilfield Tools | Elevator link extension systems |
NL2014988B1 (en) * | 2015-06-18 | 2017-01-23 | Itrec Bv | A drilling rig with a top drive sytem operable in a drilling mode and a tripping mode. |
CA3022888A1 (en) | 2016-05-12 | 2017-11-16 | Dreco Energy Services Ulc | System and method for offline standbuilding |
EP3475518B1 (en) | 2016-06-23 | 2022-01-12 | Frank's International, LLC | Clamp-on single joint manipulator for use with single joint elevator |
US11306549B2 (en) * | 2016-09-30 | 2022-04-19 | Schlumberger Technology Corporation | Handling tool for casing tongs |
US10689923B2 (en) | 2017-01-13 | 2020-06-23 | Cajun Services Unlimited, LLC | Compensating rig elevator |
AU2017393950B2 (en) | 2017-01-18 | 2022-11-24 | Minex Crc Ltd | Mobile coiled tubing drilling apparatus |
WO2019195651A1 (en) | 2018-04-05 | 2019-10-10 | National Oilwell Varco, L.P. | System for handling tubulars on a rig |
US11035183B2 (en) | 2018-08-03 | 2021-06-15 | National Oilwell Varco, L.P. | Devices, systems, and methods for top drive clearing |
US11891864B2 (en) | 2019-01-25 | 2024-02-06 | National Oilwell Varco, L.P. | Pipe handling arm |
US11988059B2 (en) * | 2019-02-22 | 2024-05-21 | National Oilwell Varco, L.P. | Dual activity top drive |
US11834914B2 (en) | 2020-02-10 | 2023-12-05 | National Oilwell Varco, L.P. | Quick coupling drill pipe connector |
US11274508B2 (en) | 2020-03-31 | 2022-03-15 | National Oilwell Varco, L.P. | Robotic pipe handling from outside a setback area |
WO2021226622A1 (en) | 2020-05-03 | 2021-11-11 | National Oilwell Varco, L.P. | Passive rotation disconnect |
US11365592B1 (en) | 2021-02-02 | 2022-06-21 | National Oilwell Varco, L.P. | Robot end-effector orientation constraint for pipe tailing path |
US11814911B2 (en) | 2021-07-02 | 2023-11-14 | National Oilwell Varco, L.P. | Passive tubular connection guide |
US11982139B2 (en) | 2021-11-03 | 2024-05-14 | National Oilwell Varco, L.P. | Passive spacer system |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2834414A (en) * | 1955-08-23 | 1958-05-13 | Jack E Edwards | Well packer |
US3018830A (en) * | 1958-03-10 | 1962-01-30 | Albert L Springer | Mechanical liner hanger |
US3282346A (en) * | 1964-03-09 | 1966-11-01 | Baker Oil Tools Inc | Subsurface well packers |
US6561227B2 (en) * | 1998-12-07 | 2003-05-13 | Shell Oil Company | Wellbore casing |
US20030178204A1 (en) * | 2002-03-19 | 2003-09-25 | Echols Ralph H. | System and method for creating a fluid seal between production tubing and well casing |
Family Cites Families (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3342520A (en) * | 1966-05-12 | 1967-09-19 | Dresser Ind | Pipe elevator |
US4489794A (en) * | 1983-05-02 | 1984-12-25 | Varco International, Inc. | Link tilting mechanism for well rigs |
US4793422A (en) * | 1988-03-16 | 1988-12-27 | Hughes Tool Company - Usa | Articulated elevator links for top drive drill rig |
US5294228A (en) * | 1991-08-28 | 1994-03-15 | W-N Apache Corporation | Automatic sequencing system for earth drilling machine |
US5297833A (en) * | 1992-11-12 | 1994-03-29 | W-N Apache Corporation | Apparatus for gripping a down hole tubular for support and rotation |
NO302774B1 (en) | 1996-09-13 | 1998-04-20 | Hitec Asa | Device for use in connection with feeding of feeding pipes |
GB2340859A (en) | 1998-08-24 | 2000-03-01 | Weatherford Lamb | Method and apparatus for facilitating the connection of tubulars using a top drive |
GB2340858A (en) * | 1998-08-24 | 2000-03-01 | Weatherford Lamb | Methods and apparatus for facilitating the connection of tubulars using a top drive |
US6309002B1 (en) | 1999-04-09 | 2001-10-30 | Frank's Casing Crew And Rental Tools, Inc. | Tubular running tool |
US6431626B1 (en) | 1999-04-09 | 2002-08-13 | Frankis Casing Crew And Rental Tools, Inc. | Tubular running tool |
US6679333B2 (en) * | 2001-10-26 | 2004-01-20 | Canrig Drilling Technology, Ltd. | Top drive well casing system and method |
US7140443B2 (en) * | 2003-11-10 | 2006-11-28 | Tesco Corporation | Pipe handling device, method and system |
US7350586B2 (en) * | 2005-05-06 | 2008-04-01 | Guidry Mark L | Casing running tool and method of using same |
-
2005
- 2005-05-06 US US11/124,471 patent/US7350586B2/en active Active
-
2006
- 2006-05-05 WO PCT/US2006/017536 patent/WO2006121928A2/en active Application Filing
- 2006-05-05 BR BRPI0612458-5A patent/BRPI0612458A2/en not_active IP Right Cessation
- 2006-05-05 CA CA2607289A patent/CA2607289C/en not_active Expired - Fee Related
- 2006-05-05 EP EP06752353A patent/EP1896686A4/en not_active Withdrawn
-
2008
- 2008-03-31 US US12/080,023 patent/US7628200B2/en not_active Expired - Fee Related
- 2008-03-31 US US12/079,988 patent/US20080245524A1/en not_active Abandoned
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2834414A (en) * | 1955-08-23 | 1958-05-13 | Jack E Edwards | Well packer |
US3018830A (en) * | 1958-03-10 | 1962-01-30 | Albert L Springer | Mechanical liner hanger |
US3282346A (en) * | 1964-03-09 | 1966-11-01 | Baker Oil Tools Inc | Subsurface well packers |
US6561227B2 (en) * | 1998-12-07 | 2003-05-13 | Shell Oil Company | Wellbore casing |
US20030178204A1 (en) * | 2002-03-19 | 2003-09-25 | Echols Ralph H. | System and method for creating a fluid seal between production tubing and well casing |
Also Published As
Publication number | Publication date |
---|---|
CA2607289C (en) | 2014-03-18 |
US7628200B2 (en) | 2009-12-08 |
BRPI0612458A2 (en) | 2012-04-17 |
WO2006121928A3 (en) | 2007-02-22 |
CA2607289A1 (en) | 2006-11-16 |
EP1896686A2 (en) | 2008-03-12 |
US20060249292A1 (en) | 2006-11-09 |
WO2006121928A2 (en) | 2006-11-16 |
US20080245575A1 (en) | 2008-10-09 |
US7350586B2 (en) | 2008-04-01 |
EP1896686A4 (en) | 2010-10-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7628200B2 (en) | Tubular running tool and method of using same | |
US9657539B2 (en) | Automated roughneck | |
CA2727954C (en) | Tubular handling device and methods | |
US8100187B2 (en) | Multipurpose tubular running tool | |
EP2066865B1 (en) | Light-weight single joint manipulator arm | |
US7707914B2 (en) | Apparatus and methods for connecting tubulars | |
EP2320024B1 (en) | Top drive apparatus and method for facilitating removal of an item connected to a main shaft of a top drive | |
US11613932B2 (en) | Pipe handling system and method | |
US20070251728A1 (en) | Automated arm for positioning of drilling tools such as an iron roughneck | |
US8443877B1 (en) | Drilling rig with top drive and inside blowout preventer | |
EP2013442A1 (en) | Apparatus and method for running tubulars | |
AU2014237338B2 (en) | Systems and methods for tubular engagement and manipulation | |
US10801280B2 (en) | Integrated tubular handling system and method | |
US11933117B2 (en) | Tubular compensation method | |
US20240367242A1 (en) | Retrieval of tubular strings from subterranean wells | |
US10519728B2 (en) | Standing pipe rack back system | |
WO2024228070A1 (en) | Retrieval of tubular strings from subterranean wells |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |