Joist hanging apparatus, and associated method for mounting joists Download PDFInfo
- Publication number
- US20070193193A1 US20070193193A1 US11/339,768 US33976806A US2007193193A1 US 20070193193 A1 US20070193193 A1 US 20070193193A1 US 33976806 A US33976806 A US 33976806A US 2007193193 A1 US2007193193 A1 US 2007193193A1
- Authority
- US
- United States
- Prior art keywords
- joist
- region
- rigid body
- support
- support beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000000034 method Methods 0.000 title claims abstract description 15
- 230000002441 reversible effect Effects 0.000 claims description 6
- 230000000284 resting effect Effects 0.000 claims description 5
- 239000002184 metal Substances 0.000 claims description 4
- 230000008878 coupling Effects 0.000 claims description 3
- 238000010168 coupling process Methods 0.000 claims description 3
- 238000005859 coupling reaction Methods 0.000 claims description 3
- 238000009434 installation Methods 0.000 description 7
- 239000002131 composite material Substances 0.000 description 4
- 239000000463 material Substances 0.000 description 3
- 238000005452 bending Methods 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 230000000903 blocking effect Effects 0.000 description 1
- 238000001125 extrusion Methods 0.000 description 1
- 238000007373 indentation Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000007665 sagging Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/26—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of wood
- E04B1/2604—Connections specially adapted therefor
- E04B1/2612—Joist hangers
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/02—Load-carrying floor structures formed substantially of prefabricated units
- E04B5/12—Load-carrying floor structures formed substantially of prefabricated units with wooden beams
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/18—Adjusting tools; Templates
- E04G21/1891—Cut-marking templates for rafters; Templates used for assembling building frameworks
Definitions
- Hanging joists is an integral and important step in constructing a floor, ceiling, roof or deck. As the joists are load-carrying members, they must be hung straight and level in order to properly support the overlying floor, ceiling, roof or deck. Crooked, twisted or non-level joists may lead to problems such as squeaky floors, uneven ceilings, a wavy appearance of composite decking, sagging roofs and even structural instability.
- the process of hanging joists includes the installation of joist hangers.
- Builders frequently draw one or more lines on a ledger or rim joist (hereinafter, “ledger” or “rim”) to mark the desired position of the hanger, and the hanger may be installed directly.
- a builder installing hangers in this manner must take care to insure that the hanger is installed accurately—at the proper level on the ledger or rim—or the surfaces of the joist and the ledger or rim will not be level.
- the builder must further insure that joist hangers are installed at the accurate width, to provide a snug fit for the joist hung therein.
- builders may temporarily insert a block of joist material into a hanger, hold the hanger and the joist material up to the ledger or rim, such that the applicable surfaces of the joist material and the ledger or rim are flush, and then nail the joist hanger into position. While this method may reduce the need to remove and re-install hangers, it is nonetheless awkward and inaccurate, given that one hand must support both the hanger and the joist while the other must wield a nail gun or hammer. Where a hammer is used, the hand supporting the hanger and the joist must also hold a nail in its proper place. A builder's hands may easily shift while attempting to install hangers in this manner, thus resulting in crooked or non-level joists.
- a further method for installing joists is to hold a joist in its proper position and drive a temporary nail diagonally through the top or side of the joist into the ledger or rim.
- the nail is then removed after the joist hanger is installed around the joist, or is hammered home prior to installation of the hanger.
- This method is also problematic and prone to failure, since the builder (or builders) must both hold the joist in place and drive in a nail. The joist may easily shift during this process, resulting in inaccurately installed hangers.
- the builder must take care to drive the nail far enough into the ledger or rim to securely fasten the joist thereto. Further, removing the nail often results in splitting of the joist end.
- the system and method for mounting joists and joist hangers disclosed herein may increase the accuracy and efficiency of joist installation.
- a joist hanging apparatus has a rigid body forming a support region, a joist contact region, and a first pair of opposing flanges.
- the flanges and the joist contact region form a first U-shaped region, for positioning a joist therebetween.
- An edge of the joist coupled to the contact region is level with a support beam, when the support region rests on the support beam.
- an apparatus for coupling a joist to a joist hanger and a support beam includes: a rigid body forming a support region, a joist contact region, and a first pair of opposing flanges.
- the flanges and the joist contact region form a first U-shaped region for positioning a joist therebetween.
- a method for mounting joists includes mounting a top edge of a joist within a U-shaped region formed by a monolithic rigid body, and resting an end of the monolithic rigid body on top of a support beam, with the top edge of the joist level with a top of the support beam and a first end of the joist flush with a side of the support beam.
- a joist hanger is mounted with the support beam and around a bottom edge of the joist, at the first end, and the monolithic rigid body is removed from the joist and the support beam.
- FIG. 1 is a perspective view of one joist hanging apparatus, in accord with an embodiment.
- FIG. 2 is a top construction view of the apparatus of FIG. 1 .
- FIG. 3 is a side view of the apparatus of FIG. 1 , with exemplary dimensions
- FIG. 4 is a front view of the apparatus of FIG. 1 , with exemplary dimensions.
- FIG. 5 is a perspective view of the apparatus of FIG. 1 , coupled with a joist and positioned on a support beam
- FIG. 6 is a flow chart illustrating one method for mounting a joist, in accord with an embodiment.
- FIG. 1 is a perspective view of a joist hanging apparatus 100 having a rigid body 102 .
- Rigid body 102 is for example a metal or durable plastic body forming a joist contact region 104 A, a first pair of opposing flanges 106 A and a support region 104 B.
- Joist contact region 104 A and support region 104 B for example form opposing first and second flat surfaces 105 A, 105 B of rigid body 102 , with opposing flanges 106 A extending away from first flat surface 105 A and forming a U-shaped region 108 A (see also FIG. 4 ) with the joist contact region 104 A.
- U-shaped region 108 A is sized to fit a joist therein (see, e.g., FIG. 5 ).
- Opposing flanges 106 A for example facilitate mounting of a joist to joist contact region 104 A by preventing side-to-side movement once the joist is fit within U-shaped region 108 A.
- At least one attachment point 110 A is provided with rigid body 102 , for attaching an edge of the joist within U-shaped region 108 A to joist contact region 104 A.
- Attachment point 110 A is for example a hole, sized to accommodate a fastener 112 A, which couples a top edge of a joist (e.g., joist 500 , FIG.
- Fastener 112 A is shown in FIG. 1 as a screw 112 A; however, it is to be understood that other fasteners such as clamps, nails and the like, may be employed to attach apparatus 100 to a joist.
- Attachment point 110 A may thus be a marking to indicate a proper point for such an alternate fastener.
- Apparatus 100 may alternately incorporate a clamp, for example formed by opposing flanges 106 A, to secure a joist within U-shaped region 108 A via a pressure fit.
- one or more support region markings 114 facilitate alignment of the joist with body 102 , for mounting with a support beam. Markings 114 are for example disposed upon one or both of opposing flanges 106 A, and indicative of distance to a first end 116 of rigid body 102 . A user for example aligns an end of the joist with the desired support region marking 114 , and an edge of the joist within U-shaped region 108 A. A fastener such as screw 112 A is aligned with attachment point 110 A and screwed into the joist until the joist is securely fastened against joist contact region 104 A.
- Apparatus 100 may be functionally reversible; in this embodiment a second pair of opposing flanges 106 B extends from body 102 to form a second U-shaped region 108 B (see FIG. 4 ) with support region 104 B. Second pair of opposing flanges 106 B extends from rigid body 102 in a direction opposite the direction in which first pair of opposing flanges 106 A extend from rigid body 102 . Opposing flanges 106 B for example point up when opposing flanges 106 A point down.
- rigid body 102 may be a monolithic rigid body 102 .
- First pair of opposing flanges 106 A are for example formed by bending flanges 106 A downwards, where indicated by dotted lines 200
- second pair of opposing flanges 106 B are for example formed by bending flanges 106 B upwards along dotted line 200 .
- monolithic rigid body 102 is poured or otherwise molded to form apparatus 100 in its intended shape.
- One or both of opposing flanges 106 A for example include one or more joist contact region markings 118 , indicating a distance or distances to a second end 120 of rigid body 102 .
- FIG. 2 shows support and contact region markings 114 , 118 as single extrusions; however, markings 114 , 118 may also be notches, indentations.
- laser-cut or painted markings 114 , 118 may be provided.
- support region 104 B includes at least one attachment point, for example a hole 110 B, sized to accommodate a screw 112 B.
- apparatus 100 may be turned over and positioned with an edge of a joist between opposing flanges 106 B (within second U-shaped region 108 B) and against support region 104 B.
- An end of the joist may be aligned with a joist contact region marking 118 , at a desired distance from second end 120 of rigid body 102 , prior to attaching the joist to rigid body 102 via one or both attachment points 110 A, 110 B and respective fasteners 12 A, 112 B.
- Markings 114 , 118 may indicate a length to end (l e ) 116 , 120 , respectively, for example about one inch; however, additional markings 114 , 118 provide additional measurements to ends 116 , 120 .
- FIG. 3 is a simplified side view, showing exemplary dimensions of apparatus 100 .
- apparatus 100 has a total length (l T ) of about 12 inches (about 305 mm), with joist contact and support regions 104 A, 104 B having equal lengths (l A ) and (l B ), respectively) of about six inches (about 153 mm).
- First and second pairs of opposing flanges 106 A, 106 B may have equal heights (h A ) and (h B ), each extending about 5 ⁇ 8 inch (about 16 mm) from first and second flat surfaces 105 A, 105 B of rigid body 102 (see also FIG. 4 ).
- first pair of opposing flanges 106 A extends from first flat surface 105 A, to height h A
- second pair of opposing flanges 106 B extend from second flat surface 105 B to height h B
- U-shaped regions 108 A, 108 B thus have depths (d A ) and (d B ) of about 5 ⁇ 8 inch (about 25 mm).
- Rigid body 102 has a thickness (t b ) of for example 1 ⁇ 4 inch (about 6 mm), lending to a total height (h T ) of about 13 ⁇ 8 inch, or about 35 mm, for apparatus 100 .
- t b , h A , h B and thus h T may vary as a matter of design preference, for example to vary the weight, size and/or load-bearing capacity of apparatus 102 .
- Widths w A , w B of respective U-shaped regions 108 A, 108 B are sized at about two inches, to securely fit an edge of most joists, regardless of joist length or height.
- FIG. 5 shows a perspective view of apparatus 100 coupled with a joist 500 .
- Joist 500 is shown with an edge 502 positioned within U-shaped region 108 A and between first pair of opposing flanges 106 A. Since joist contact region 104 A and support region 104 B form flat surfaces, joist 500 coupled to apparatus 100 is flush with the entirety of first flat surface 105 A (see FIG. 4 ) and joist contact region 104 A. An end 506 of joist 500 is aligned with a support region markings 114 . Joist contact region 104 A and support region 104 B for example form a flat surface, such that joist 500 is also flush with support region 104 B, when fastened to joist contact region 104 A. Screws 112 A, 112 B fasten rigid body 102 to joist 500 , via attachment points 110 A, 110 B.
- Apparatus 100 and joist 500 are for example positioned upon a support beam 508 , with support region 104 B resting on a top surface 510 of beam 508 , and end 506 flush with a side 512 of the support beam.
- Edge 502 is level with top surface 510 when support region 106 B rests upon support beam 108 .
- Support beam 508 is for example a ledger, rim joist, header or a previously-installed standard joist (e.g., where joist 500 is a piece of blocking).
- joist hangers 514 are for example positioned about a second edge 516 of joist 500 and attached to support beam 508 .
- Apparatus 100 thus allows joist 500 to be positioned in place prior to installing joist hangers 514 , for example facilitating one-time placement of hangers 514 at the correct width and height.
- a second apparatus 100 is attached to an opposite end (not shown) of joist 500 and positioned in its place on a second support beam (not shown) that is parallel to support beam 508 , a user is free of the need to support the joist while placing hangers. Wobbling or shifting of the joist during hanger installation may thus be eliminated, and level installation of the joist insured.
- Apparatus 100 is durable and reusable with multiple joists, and may thus be attached to the next joist to be hung.
- apparatus 100 may be functionally reversible; thus, a joist may also be positioned within second U-shaped region 108 B, between opposing flanges 106 B, and in contact with support region 104 B.
- apparatus 100 When apparatus 100 is functionally reversible, it may be flipped over such that first and second pairs of opposing flanges 106 A, 106 B, first and second U-shaped regions 108 A, 108 B, attachment points 110 and joist contact region 104 A and support region 104 B are interchangeable.
- FIG. 6 illustrates a method of mounting joists.
- Method 600 commences in step 602 with the mounting of a top edge of a joist within a U-shaped region formed by a rigid body.
- the rigid body is for example a monolithic rigid body having at least a first pair of opposing flanges forming the u-shaped region, e.g., rigid body 102 , first pair of opposing flanges 106 A, U-shaped region 108 A.
- the joist e.g., joist 500
- screws 112 A, 112 B secure the joist to the rigid body.
- the joist and rigid body are positioned on a support beam such as a header beam, ledger or rim joist, in step 606 .
- the joist is for example positioned with its top level with the top of the support beam, and with a first end flush against a side of the header beam.
- the monolithic body is then rested on the support beam, in step 608 .
- the monolithic body for example extends beyond the end of the joist to provide a support region for resting on the support beam.
- a joist hanger is mounted with the support beam, around a bottom edge of the joist, in step 610 .
- the joist is already in its optimal, level position relative to the support beam.
- the joist hanger may thus be secured in the correct position while the joist is in place, eliminating the need for re-placement of crooked hangers, or chiseling or shimming a joist to fit incorrectly spaced hangers.
- the rigid body is removed from the joist, in step 612 .
- mounting joists may be facilitated if the two workers perform steps 606 , 608 at more or less the same time, at opposite ends of the joist.
- Steps 602 - 604 and 610 - 612 may likewise be performed substantially simultaneously, or at different times.
- straight and level mounting of joists may be further facilitated by performing steps 602 - 608 with one rigid body, e.g., apparatus 100 , at a first end of a joist, and then performing steps 602 - 608 with a second rigid body (e.g., apparatus 100 ) at a second end of the joist.
- hangers may be quickly and easily secured in their proper position. Joist installation is for example expedited because a single user can hang joists of any dimension at their optimal position, on the first attempt.
- apparatus 100 may be formed with a composite or metal joist, for example during manufacture.
- steps 602 , 604 are unnecessary, and joist installation may commence with step 606 .
- the rigid body is for example re-used with another joist.
- Utilizing the same steps 602 - 612 with subsequent joists may insure that the joists are not only hung level with the support beam, but also with one another. This may eliminate problems such as squeaky floors, popped nails, raised screw heads and “wavy” appearance of composite decking, all of which are associated with crooked or non-level joists.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Mechanical Engineering (AREA)
- Floor Finish (AREA)
Abstract
A joist hanging apparatus includes a rigid body forming a support region, a joist contact region and a first pair of opposing flanges. The flanges and joist contact region form a first U-shaped region for positioning a joist therebetween, wherein an edge of the joist coupled to the contact region is level with a support beam when the support region rests on the support beam. In a related method for mounting joists, a top edge of a joist is mounted within a U-shaped region formed by a monolithic rigid body. An end of the rigid body rests upon a support beam, the top edge of the joist level with the top of the support beam, and an end of the joist flush with a side of the beam. A joist hanger is mounted with the support beam, around a bottom edge of the joist, and the rigid body is removed from the joist and the support beam.
Description
- Hanging joists is an integral and important step in constructing a floor, ceiling, roof or deck. As the joists are load-carrying members, they must be hung straight and level in order to properly support the overlying floor, ceiling, roof or deck. Crooked, twisted or non-level joists may lead to problems such as squeaky floors, uneven ceilings, a wavy appearance of composite decking, sagging roofs and even structural instability.
- The process of hanging joists includes the installation of joist hangers. Builders frequently draw one or more lines on a ledger or rim joist (hereinafter, “ledger” or “rim”) to mark the desired position of the hanger, and the hanger may be installed directly. A builder installing hangers in this manner must take care to insure that the hanger is installed accurately—at the proper level on the ledger or rim—or the surfaces of the joist and the ledger or rim will not be level. The builder must further insure that joist hangers are installed at the accurate width, to provide a snug fit for the joist hung therein. If opposing flanges of a joist hanger are too closely spaced, the joist will not fit, and the builder must either remove and re-install the hangers, or chisel the joist, which may weaken it. If the flanges are too far apart, they will not offer the necessary support to the joist, as the joist may shift or tilt in the hangers. A hanger that is too wide should also be removed and re-installed.
- In an effort to reduce the incidence of improperly installed hangers, builders may temporarily insert a block of joist material into a hanger, hold the hanger and the joist material up to the ledger or rim, such that the applicable surfaces of the joist material and the ledger or rim are flush, and then nail the joist hanger into position. While this method may reduce the need to remove and re-install hangers, it is nonetheless awkward and inaccurate, given that one hand must support both the hanger and the joist while the other must wield a nail gun or hammer. Where a hammer is used, the hand supporting the hanger and the joist must also hold a nail in its proper place. A builder's hands may easily shift while attempting to install hangers in this manner, thus resulting in crooked or non-level joists.
- A further method for installing joists is to hold a joist in its proper position and drive a temporary nail diagonally through the top or side of the joist into the ledger or rim. The nail is then removed after the joist hanger is installed around the joist, or is hammered home prior to installation of the hanger. This method is also problematic and prone to failure, since the builder (or builders) must both hold the joist in place and drive in a nail. The joist may easily shift during this process, resulting in inaccurately installed hangers. In addition, the builder must take care to drive the nail far enough into the ledger or rim to securely fasten the joist thereto. Further, removing the nail often results in splitting of the joist end.
- The system and method for mounting joists and joist hangers disclosed herein may increase the accuracy and efficiency of joist installation.
- In one embodiment, a joist hanging apparatus has a rigid body forming a support region, a joist contact region, and a first pair of opposing flanges. The flanges and the joist contact region form a first U-shaped region, for positioning a joist therebetween. An edge of the joist coupled to the contact region is level with a support beam, when the support region rests on the support beam.
- In one embodiment, an apparatus for coupling a joist to a joist hanger and a support beam includes: a rigid body forming a support region, a joist contact region, and a first pair of opposing flanges. The flanges and the joist contact region form a first U-shaped region for positioning a joist therebetween. When the support region rests on the support beam, an edge of the joist that is coupled to the contact region is level with the support beam.
- In one embodiment, a method for mounting joists, includes mounting a top edge of a joist within a U-shaped region formed by a monolithic rigid body, and resting an end of the monolithic rigid body on top of a support beam, with the top edge of the joist level with a top of the support beam and a first end of the joist flush with a side of the support beam. A joist hanger is mounted with the support beam and around a bottom edge of the joist, at the first end, and the monolithic rigid body is removed from the joist and the support beam.
-
FIG. 1 is a perspective view of one joist hanging apparatus, in accord with an embodiment. -
FIG. 2 is a top construction view of the apparatus ofFIG. 1 . -
FIG. 3 is a side view of the apparatus ofFIG. 1 , with exemplary dimensions -
FIG. 4 is a front view of the apparatus ofFIG. 1 , with exemplary dimensions. -
FIG. 5 is a perspective view of the apparatus ofFIG. 1 , coupled with a joist and positioned on a support beam -
FIG. 6 is a flow chart illustrating one method for mounting a joist, in accord with an embodiment. - Before proceeding with the detailed description, it is to be appreciated that the present teaching is by way of example, not limitation. The illustrations herein are not limited to use or application with a specific type of system for mounting joists and joist hangers. Thus, although the instrumentalities described herein are for the convenience of explanation, shown and described with respect to exemplary embodiments, it will be appreciated that the principals herein may be equally applied in other systems for mounting joists and joist hangers.
-
FIG. 1 is a perspective view of a joist hangingapparatus 100 having arigid body 102.Rigid body 102 is for example a metal or durable plastic body forming ajoist contact region 104A, a first pair ofopposing flanges 106A and asupport region 104B. Joistcontact region 104A andsupport region 104B for example form opposing first and secondflat surfaces rigid body 102, withopposing flanges 106A extending away from firstflat surface 105A and forming aU-shaped region 108A (see alsoFIG. 4 ) with thejoist contact region 104A. U-shapedregion 108A is sized to fit a joist therein (see, e.g.,FIG. 5 ). Opposingflanges 106A for example facilitate mounting of a joist to joistcontact region 104A by preventing side-to-side movement once the joist is fit within U-shapedregion 108A. At least oneattachment point 110A is provided withrigid body 102, for attaching an edge of the joist within U-shapedregion 108A to joistcontact region 104A.Attachment point 110A is for example a hole, sized to accommodate afastener 112A, which couples a top edge of a joist (e.g.,joist 500,FIG. 5 ) to joistcontact region 104B. Fastener 112A is shown inFIG. 1 as ascrew 112A; however, it is to be understood that other fasteners such as clamps, nails and the like, may be employed to attachapparatus 100 to a joist.Attachment point 110A may thus be a marking to indicate a proper point for such an alternate fastener.Apparatus 100 may alternately incorporate a clamp, for example formed byopposing flanges 106A, to secure a joist within U-shapedregion 108A via a pressure fit. - As further described with respect to
FIG. 5 , herein below, one or moresupport region markings 114 facilitate alignment of the joist withbody 102, for mounting with a support beam.Markings 114 are for example disposed upon one or both ofopposing flanges 106A, and indicative of distance to afirst end 116 ofrigid body 102. A user for example aligns an end of the joist with the desired support region marking 114, and an edge of the joist within U-shapedregion 108A. A fastener such asscrew 112A is aligned withattachment point 110A and screwed into the joist until the joist is securely fastened againstjoist contact region 104A. -
Apparatus 100 may be functionally reversible; in this embodiment a second pair ofopposing flanges 106B extends frombody 102 to form asecond U-shaped region 108B (seeFIG. 4 ) withsupport region 104B. Second pair ofopposing flanges 106B extends fromrigid body 102 in a direction opposite the direction in which first pair ofopposing flanges 106A extend fromrigid body 102. Opposingflanges 106B for example point up when opposingflanges 106A point down. - As shown in the top, construction view of
FIG. 2 ,rigid body 102 may be a monolithicrigid body 102. First pair ofopposing flanges 106A are for example formed by bendingflanges 106A downwards, where indicated bydotted lines 200, and second pair ofopposing flanges 106B are for example formed by bendingflanges 106B upwards along dottedline 200. Alternately, monolithicrigid body 102 is poured or otherwise molded to formapparatus 100 in its intended shape. - One or both of opposing
flanges 106A for example include one or more joistcontact region markings 118, indicating a distance or distances to asecond end 120 ofrigid body 102.FIG. 2 shows support andcontact region markings markings markings - Where
apparatus 100 is functionally reversible,support region 104B includes at least one attachment point, for example ahole 110B, sized to accommodate ascrew 112B. In this embodiment thereforeapparatus 100 may be turned over and positioned with an edge of a joist between opposingflanges 106B (within secondU-shaped region 108B) and againstsupport region 104B. An end of the joist may be aligned with a joist contact region marking 118, at a desired distance fromsecond end 120 ofrigid body 102, prior to attaching the joist torigid body 102 via one or both attachment points 110A, 110B andrespective fasteners 12A, 112B.Markings additional markings -
FIG. 3 is a simplified side view, showing exemplary dimensions ofapparatus 100. In one embodiment,apparatus 100 has a total length (lT) of about 12 inches (about 305 mm), with joist contact andsupport regions flanges flat surfaces FIG. 4 ). For example, as shown inFIG. 4 , first pair of opposingflanges 106A extends from firstflat surface 105A, to height hA, and second pair of opposingflanges 106B extend from secondflat surface 105B to height hB - As shown in the simplified front view of
FIG. 4 ,U-shaped regions Rigid body 102 has a thickness (tb) of for example ¼ inch (about 6 mm), lending to a total height (hT) of about 1⅜ inch, or about 35 mm, forapparatus 100. However, tb, hA, hB and thus hT may vary as a matter of design preference, for example to vary the weight, size and/or load-bearing capacity ofapparatus 102. Widths wA, wB of respectiveU-shaped regions -
FIG. 5 shows a perspective view ofapparatus 100 coupled with ajoist 500.Joist 500 is shown with anedge 502 positioned withinU-shaped region 108A and between first pair of opposingflanges 106A. Sincejoist contact region 104A andsupport region 104B form flat surfaces,joist 500 coupled toapparatus 100 is flush with the entirety of firstflat surface 105A (seeFIG. 4 ) andjoist contact region 104A. Anend 506 ofjoist 500 is aligned with asupport region markings 114.Joist contact region 104A andsupport region 104B for example form a flat surface, such thatjoist 500 is also flush withsupport region 104B, when fastened tojoist contact region 104A.Screws rigid body 102 tojoist 500, via attachment points 110A, 110B. -
Apparatus 100 andjoist 500 are for example positioned upon asupport beam 508, withsupport region 104B resting on atop surface 510 ofbeam 508, and end 506 flush with aside 512 of the support beam.Edge 502 is level withtop surface 510 whensupport region 106B rests upon support beam 108.Support beam 508 is for example a ledger, rim joist, header or a previously-installed standard joist (e.g., wherejoist 500 is a piece of blocking). - Once positioned upon
support beam 508,joist hangers 514 are for example positioned about asecond edge 516 ofjoist 500 and attached to supportbeam 508.Apparatus 100 thus allowsjoist 500 to be positioned in place prior to installingjoist hangers 514, for example facilitating one-time placement ofhangers 514 at the correct width and height. When asecond apparatus 100 is attached to an opposite end (not shown) ofjoist 500 and positioned in its place on a second support beam (not shown) that is parallel to supportbeam 508, a user is free of the need to support the joist while placing hangers. Wobbling or shifting of the joist during hanger installation may thus be eliminated, and level installation of the joist insured. - Once
hanger 514 is installed,screws 112A and/or 112B may be unscrewed andapparatus 100 removed fromjoist 500.Apparatus 100 is durable and reusable with multiple joists, and may thus be attached to the next joist to be hung. As previously noted,apparatus 100 may be functionally reversible; thus, a joist may also be positioned within secondU-shaped region 108B, between opposingflanges 106B, and in contact withsupport region 104B. Whenapparatus 100 is functionally reversible, it may be flipped over such that first and second pairs of opposingflanges U-shaped regions joist contact region 104A andsupport region 104B are interchangeable. -
FIG. 6 illustrates a method of mounting joists.Method 600 commences instep 602 with the mounting of a top edge of a joist within a U-shaped region formed by a rigid body. The rigid body is for example a monolithic rigid body having at least a first pair of opposing flanges forming the u-shaped region, e.g.,rigid body 102, first pair of opposingflanges 106A,U-shaped region 108A. The joist, e.g.,joist 500, is secured to the rigid body, instep 604. For example, one or both ofscrews - The joist and rigid body are positioned on a support beam such as a header beam, ledger or rim joist, in step 606. The joist is for example positioned with its top level with the top of the support beam, and with a first end flush against a side of the header beam. The monolithic body is then rested on the support beam, in
step 608. The monolithic body for example extends beyond the end of the joist to provide a support region for resting on the support beam. - A joist hanger is mounted with the support beam, around a bottom edge of the joist, in
step 610. Advantageously, the joist is already in its optimal, level position relative to the support beam. The joist hanger may thus be secured in the correct position while the joist is in place, eliminating the need for re-placement of crooked hangers, or chiseling or shimming a joist to fit incorrectly spaced hangers. When the joist hangers have been secured in place, the rigid body is removed from the joist, instep 612. - When two workers are installing joists together, mounting joists may be facilitated if the two workers perform
steps 606, 608 at more or less the same time, at opposite ends of the joist. Steps 602-604 and 610-612 may likewise be performed substantially simultaneously, or at different times. Where one person is hanging joists alone, straight and level mounting of joists may be further facilitated by performing steps 602-608 with one rigid body, e.g.,apparatus 100, at a first end of a joist, and then performing steps 602-608 with a second rigid body (e.g., apparatus 100) at a second end of the joist. Once the joist is resting upon two support beams (one at either end of the joist), hangers may be quickly and easily secured in their proper position. Joist installation is for example expedited because a single user can hang joists of any dimension at their optimal position, on the first attempt. - It will be appreciated that
apparatus 100 may be formed with a composite or metal joist, for example during manufacture. When a metal or composite joist is formed with anapparatus 100,steps - Upon completion of
step 612, the rigid body, is for example re-used with another joist. Utilizing the same steps 602-612 with subsequent joists may insure that the joists are not only hung level with the support beam, but also with one another. This may eliminate problems such as squeaky floors, popped nails, raised screw heads and “wavy” appearance of composite decking, all of which are associated with crooked or non-level joists. - Changes may be made in the above systems and structures without departing from the scope thereof. It should thus be noted that the matter contained in the above description and/or shown in the accompanying drawings should be interpreted as illustrative and not in a limiting sense. The following claims are intended to cover all generic and specific features described herein, as well as all statements of the scope of the present method, system and structure, which, as a matter of language, might be said to fall therebetween.
Claims (24)
1. Joist hanging apparatus, comprising: a rigid body forming a support region, a joist contact region, and a first pair of opposing flanges, the flanges and joist contact region forming a first U-shaped region for positioning a joist therebetween, wherein an edge of the joist coupled to the contact region is level with a support beam when the support region rests on the support beam.
2. Apparatus of claim 1 , the joist contact region forming at least one hole for coupling the edge with the joist contact region.
3. Apparatus of claim 1 , the flanges facilitating mounting of the joist to the joist contact region by preventing side-to-side movement of the joist within the U-shaped region.
4. Apparatus of claim 1 , wherein the support region and joist contact region form a flat surface.
5. Apparatus of claim 1 , the support region comprising one or more support region markings for aligning an end of the joist for mounting with the support beam.
6. Apparatus of claim 5 , wherein the support region markings indicate a distance to an end of the rigid body.
7. Apparatus of claim 1 , the support beam comprising a header, a ledger or a rim joist.
8. Apparatus of claim 1 , the rigid body being reusable with multiple joists.
9. Apparatus of claim 1 , the rigid body comprising metal.
10. Apparatus of claim 1 , further comprising a second pair of opposing flanges forming a second U-shaped region with the support region, the second pair of flanges extending away from the rigid body in a direction that is opposite extension of the first pair of flanges away from the rigid body.
11. Apparatus of claim 10 , wherein the rigid body is functionally reversible.
12. Apparatus of claim 10 , the support region forming at least one hole for mounting an edge of the joist within the second U-shaped region.
13. Apparatus of claim 10 , wherein the rigid body is a monolithic rigid body.
14. Apparatus of claim 10 , the joist contact region comprising one or more contact region markings for aligning an end of the joist for mounting with a support beam.
15. Apparatus of claim 14 , wherein the contact region markings indicate a distance to a second end of the rigid body.
16. Apparatus of claim 14 , wherein one or both of the support region markings and the joist contact markings are disposed on the first or second pair of flanges.
17. Apparatus for coupling a joist to a joist hanger and a support beam, comprising a rigid body forming a support region, a joist contact region, and a first pair of opposing flanges, the flanges and joist contact region forming a first U-shaped region for positioning a joist therebetween, wherein an edge of the joist coupled to the contact region is level with a support beam when the support region rests on the support beam.
18. Apparatus of claim 17 , further comprising a second pair of opposing flanges forming a second U-shaped region, for positioning a joist therebetween, with the support region, the second pair of flanges extending away from the rigid body in a direction that is opposite extension of the first pair of flanges away from the rigid body.
19. Apparatus of claim 18 , wherein the rigid body is functionally reversible.
20. Apparatus of claim 19 , the rigid body forming at least one hole for mounting the joist within the first or the second U-shaped region.
21. Apparatus of claim 18 , one or both of the support region and the joist contact region comprising at least one marking for aligning an end of the joist for mounting with the support beam.
22. The apparatus of claim 17 , wherein the apparatus is reusable.
23. A method for mounting joists, comprising:
mounting a top edge of a joist within a U-shaped region formed by a monolithic rigid body;
resting an end of the monolithic rigid body on top of a support beam, with the top edge of the joist level with a top of the support beam and a first end of the joist flush with a side of the support beam;
mounting a joist hanger with the support beam and around a bottom edge of the joist, at the first end; and
removing the monolithic rigid body from the joist and the support beam.
24. The method of claim 23 , the monolithic rigid body comprising:
a support region comprising the end of the monolithic body;
a joist contact region; and
a first pair of opposing flanges, the flanges and joist contact region forming the U-shaped region for positioning the joist therebetween.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US11/339,768 US20070193193A1 (en) | 2006-01-25 | 2006-01-25 | Joist hanging apparatus, and associated method for mounting joists |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US11/339,768 US20070193193A1 (en) | 2006-01-25 | 2006-01-25 | Joist hanging apparatus, and associated method for mounting joists |
Publications (1)
Publication Number | Publication Date |
---|---|
US20070193193A1 true US20070193193A1 (en) | 2007-08-23 |
Family
ID=38426733
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US11/339,768 Abandoned US20070193193A1 (en) | 2006-01-25 | 2006-01-25 | Joist hanging apparatus, and associated method for mounting joists |
Country Status (1)
Country | Link |
---|---|
US (1) | US20070193193A1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9200446B1 (en) * | 2006-02-21 | 2015-12-01 | The Steel Network, Inc. | Bridging member |
US11920359B2 (en) | 2020-08-12 | 2024-03-05 | William Stuart Duncan | Framing buddy deck framing tool |
US12031343B2 (en) | 2019-12-16 | 2024-07-09 | Billy Dandurand | Joist alignment tool |
Citations (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US813253A (en) * | 1905-06-15 | 1906-02-20 | John H Sullivan | Mold. |
US4015809A (en) * | 1975-04-24 | 1977-04-05 | Buril Robert T | Hanger device |
US4165869A (en) * | 1976-05-19 | 1979-08-28 | Curtis Williams | T clamp |
US4264063A (en) * | 1980-02-01 | 1981-04-28 | Halula Paul R | Joist hanger aid |
US4753014A (en) * | 1987-03-18 | 1988-06-28 | Nick Vrajich | Joist hanger gage and holding device |
US4920725A (en) * | 1989-02-14 | 1990-05-01 | Truswal Systems Corporation | Self-gripping hanger device |
US4947616A (en) * | 1989-05-22 | 1990-08-14 | Sorton Steven W | Tool for use in mounting a joist hanger |
US4997172A (en) * | 1990-04-04 | 1991-03-05 | Mumm Richard A | Joist positioning tool |
US5054755A (en) * | 1990-08-16 | 1991-10-08 | Hawkes Lester K | Joist hanger mounting tool |
US5312095A (en) * | 1993-03-08 | 1994-05-17 | Rennie Robert J | Joist hangar installation tool |
USD353754S (en) * | 1993-01-05 | 1994-12-27 | Carlisle Anthony L | Floor joist lifter and positioner |
US5383320A (en) * | 1993-06-01 | 1995-01-24 | Sorton; Steven W. | Tool for positioning joist hanger on header |
US5746421A (en) * | 1996-08-29 | 1998-05-05 | Bowerman; Dean E. | Board holding device |
US6161824A (en) * | 1998-05-08 | 2000-12-19 | Gustavson; Ido H. | Wallboard installation facilitating tool |
US6301855B1 (en) * | 2000-03-13 | 2001-10-16 | Construction Solutions, Inc. | Temporary joist hanger |
US20020134036A1 (en) * | 1998-11-25 | 2002-09-26 | Daudet Larry Randall | Joist support apparatus |
US6488438B1 (en) * | 2000-02-16 | 2002-12-03 | Glenn J. Tebo | Board leveling apparatus and method |
US20030062664A1 (en) * | 2001-02-14 | 2003-04-03 | Richard Buitenhuis | Board holder assembly |
US20030159393A1 (en) * | 2001-12-20 | 2003-08-28 | Joe Piscione | Joist-positioning device |
US20040237460A1 (en) * | 2001-07-25 | 2004-12-02 | Andrew Green | Apparatus for laying decking |
US20050166484A1 (en) * | 2000-11-27 | 2005-08-04 | Richmond Frank M. | Device and method for installing building material |
US20050212314A1 (en) * | 2004-03-26 | 2005-09-29 | Donald Howard Haines | Hanger hoister tool |
US20050247019A1 (en) * | 2004-04-27 | 2005-11-10 | Res-Q-Jack, Inc. | Adjustable joist gripper |
-
2006
- 2006-01-25 US US11/339,768 patent/US20070193193A1/en not_active Abandoned
Patent Citations (24)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US813253A (en) * | 1905-06-15 | 1906-02-20 | John H Sullivan | Mold. |
US4015809A (en) * | 1975-04-24 | 1977-04-05 | Buril Robert T | Hanger device |
US4165869A (en) * | 1976-05-19 | 1979-08-28 | Curtis Williams | T clamp |
US4264063A (en) * | 1980-02-01 | 1981-04-28 | Halula Paul R | Joist hanger aid |
US4753014A (en) * | 1987-03-18 | 1988-06-28 | Nick Vrajich | Joist hanger gage and holding device |
US4920725A (en) * | 1989-02-14 | 1990-05-01 | Truswal Systems Corporation | Self-gripping hanger device |
US4947616A (en) * | 1989-05-22 | 1990-08-14 | Sorton Steven W | Tool for use in mounting a joist hanger |
US4997172A (en) * | 1990-04-04 | 1991-03-05 | Mumm Richard A | Joist positioning tool |
US5054755A (en) * | 1990-08-16 | 1991-10-08 | Hawkes Lester K | Joist hanger mounting tool |
USD353754S (en) * | 1993-01-05 | 1994-12-27 | Carlisle Anthony L | Floor joist lifter and positioner |
US5312095A (en) * | 1993-03-08 | 1994-05-17 | Rennie Robert J | Joist hangar installation tool |
US5383320A (en) * | 1993-06-01 | 1995-01-24 | Sorton; Steven W. | Tool for positioning joist hanger on header |
US5746421A (en) * | 1996-08-29 | 1998-05-05 | Bowerman; Dean E. | Board holding device |
US6161824A (en) * | 1998-05-08 | 2000-12-19 | Gustavson; Ido H. | Wallboard installation facilitating tool |
US20020134036A1 (en) * | 1998-11-25 | 2002-09-26 | Daudet Larry Randall | Joist support apparatus |
US20040074178A1 (en) * | 1998-11-25 | 2004-04-22 | Daudet Larry Randall | Joist support apparatus |
US6488438B1 (en) * | 2000-02-16 | 2002-12-03 | Glenn J. Tebo | Board leveling apparatus and method |
US6301855B1 (en) * | 2000-03-13 | 2001-10-16 | Construction Solutions, Inc. | Temporary joist hanger |
US20050166484A1 (en) * | 2000-11-27 | 2005-08-04 | Richmond Frank M. | Device and method for installing building material |
US20030062664A1 (en) * | 2001-02-14 | 2003-04-03 | Richard Buitenhuis | Board holder assembly |
US20040237460A1 (en) * | 2001-07-25 | 2004-12-02 | Andrew Green | Apparatus for laying decking |
US20030159393A1 (en) * | 2001-12-20 | 2003-08-28 | Joe Piscione | Joist-positioning device |
US20050212314A1 (en) * | 2004-03-26 | 2005-09-29 | Donald Howard Haines | Hanger hoister tool |
US20050247019A1 (en) * | 2004-04-27 | 2005-11-10 | Res-Q-Jack, Inc. | Adjustable joist gripper |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9200446B1 (en) * | 2006-02-21 | 2015-12-01 | The Steel Network, Inc. | Bridging member |
US12031343B2 (en) | 2019-12-16 | 2024-07-09 | Billy Dandurand | Joist alignment tool |
US11920359B2 (en) | 2020-08-12 | 2024-03-05 | William Stuart Duncan | Framing buddy deck framing tool |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10480177B2 (en) | Wall panel blocking bracket and method of using same | |
US7681324B2 (en) | Prefabricated jig to position and align roof trusses | |
US7445192B2 (en) | Shear wall template | |
US8667765B1 (en) | Method of supporting drywall | |
US9228339B2 (en) | Wall sheathing, siding and roof decking hangers | |
US8132774B1 (en) | Concrete forming screed aids | |
US20090205267A1 (en) | Stair stringer assembly | |
US6523315B2 (en) | Attachments and devices for straightening, squaring and aligning support members to receive exterior finishing members and methods therefor | |
US7360627B2 (en) | Support bracket securable to an upwardly extending wall stud | |
US5884447A (en) | Panel support device | |
US20040237443A1 (en) | Brackets for supporting and aligning wall members for attachment | |
US4709460A (en) | Panel installation tool and method | |
US7578101B2 (en) | Support bracket to suspend sheet material for a wall | |
US20070193193A1 (en) | Joist hanging apparatus, and associated method for mounting joists | |
US20070245681A1 (en) | Building-siding hanger and support device | |
US20200318365A1 (en) | Method and apparatus for supporting sheeting materials | |
AU2016311384B2 (en) | Hanger for bracing panel | |
CA2552260C (en) | Multiple spacing portable framing jig | |
US7270356B2 (en) | Hanger hoister tool | |
US20010011440A1 (en) | Facia rack | |
US20040237450A1 (en) | Framing jig | |
US4775131A (en) | Device for assembly of stair forms | |
JP3098214U (en) | Large flutter | |
CA2857605C (en) | Sheathing and siding hangers | |
JPH0453405Y2 (en) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |