US20070003375A1 - Heave compensation system - Google Patents

Heave compensation system Download PDF

Info

Publication number
US20070003375A1
US20070003375A1 US10/545,551 US54555104A US2007003375A1 US 20070003375 A1 US20070003375 A1 US 20070003375A1 US 54555104 A US54555104 A US 54555104A US 2007003375 A1 US2007003375 A1 US 2007003375A1
Authority
US
United States
Prior art keywords
buoyant body
lever arm
compensation system
heave compensation
floating vessel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US10/545,551
Inventor
Hans Knutsen
Johan Andresen
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of US20070003375A1 publication Critical patent/US20070003375A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/08Apparatus for feeding the rods or cables; Apparatus for increasing or decreasing the pressure on the drilling tool; Apparatus for counterbalancing the weight of the rods
    • E21B19/09Apparatus for feeding the rods or cables; Apparatus for increasing or decreasing the pressure on the drilling tool; Apparatus for counterbalancing the weight of the rods specially adapted for drilling underwater formations from a floating support using heave compensators supporting the drill string
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • B63B35/4413Floating drilling platforms, e.g. carrying water-oil separating devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B39/00Equipment to decrease pitch, roll, or like unwanted vessel movements; Apparatus for indicating vessel attitude
    • B63B39/02Equipment to decrease pitch, roll, or like unwanted vessel movements; Apparatus for indicating vessel attitude to decrease vessel movements by displacement of masses

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Fluid Mechanics (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)
  • Rolls And Other Rotary Bodies (AREA)
  • Motorcycle And Bicycle Frame (AREA)

Abstract

The invention pertains to a heave compensation system for continuous operation on a floating vessel (1), the system comprising at least one buoyant body (11), at least one lever arm (10) for arrangement in a generally horizontal plane, pivotal means capable of limited rotation about a horizontal axis and arranged to connect one end of the lever arm to the buoyant body (11), at least one hinge (13) connected to an intermediate point on the lever arm (10) and capable of allowing limited rotational movement of the lever arm (10) in a vertical plane, means to attach the hinge (13) to the floating vessel (1), and at least one counterbalance weight (12) connected to the lever arm (10) on the side of the hinge (13) away from the buoyant body (11), whereby the inertia of the counterbalance weight (12) resists heave movements of the buoyant body (11) relative to the floating vessel.

Description

  • The invention pertains to a heave compensation system, a vessel fitted with a heave compensation system and a method for continuously compensating heave between a floating vessel and a buoyant body.
  • Floating vessel, as traditional floating platforms called semi submersible platforms has its limitations when it comes to being operable during large waves and harsh weather conditions. This has resulted in that drilling rigs for the i.e. Barents Sea have to be built very large and to a high cost to try to have acceptable operation time during these conditions. This lack of operability means large economic losses for the operator of the platform. Therefore has there for some time been a wish to provide good systems which may increase the operative time for a floating structure which.
  • Another aspect of the problem is that ordinary heave compensation systems generally are large in size and weight, which both factors, size and weight, are crucial for floating structures. An aim for the present invention is to provide a heave compensation system which provides large operational windows for the floating structure. Another aim is to provide a floating vessel which undergoes less heave motions, which for a floating oil/gas platform results in less variation in vertical forces in risers and eventual anchoring systems, and therefore reduced or eliminated use for other heave compensation systems specifically for instance for the risers. It is also an aim for the present invention to provide an improved heave compensation system usable for other floating structures than semi submersibles, as pontoons, foundations for cranes and offshore oil buoy loading systems, bridge foundations, riser hangoffs, turrets etc. It is an aim to provide a system that affects a drilling rig's ability to operate under harsh weather conditions.
  • The aims of the invention are obtained with a system, vessel and method as described in the following independent claims. Additional features of the invention are apparent from the dependent claims and the following description and drawings.
  • The invention pertains to a heave compensation system for continuous operation on a floating vessel. The system comprising at least one buoyant body, at least one lever arm for arrangement in a generally horizontal plane, pivotal means capable of limited rotation about a horizontal axis and arranged to connect one end of the lever arm to the buoyant body. The lever arm has also at least one hinge connected to an intermediate point on the lever arm and capable of allowing limited rotational movement of the lever arm in a vertical plane and means to attach the hinge to the floating vessel. On the lever arm there is at least one counterbalance weight connected to the lever arm on the side of the hinge away from the buoyant body, whereby the inertia of the counterbalance weight resists heave movements of the buoyant body relative to the floating vessel.
  • The heave compensation system is applicable to a large range of floating vessels as semi submersibles, pontoons, foundations for cranes, floating bridges etc. as this is the case is the description of the floating vessel made as a general description covering the different embodiments.
  • By connecting a drilling module of a floating platform to a guided buoyancy tank connected to the main floater of the platform via balance arm, will the drilling module get its own behaviour and heave period relative to the main floating object, i.e. the platform.
  • The system will for some applications only require one balance arm, for others many. Many may be used where the space is limited, i.e. inside vessels. The ballast will mainly consist of solids such as steel, but can also consist of a fluid, for instance water, if there is a need to have variable ballast.
  • The heave compensating system according to the invention will reduce the vertical forces in the buoyancy-support system and will under ideal conditions be +/−zero. A drilling rig has a normal heave compensation “stroke” of 48 feet (ca. 14.5 meter). The present invention may reduce this requirement or even make the whole existing compensations system redundant.
  • The buoyancy tank in the heave compensation system may be open in the centre, have a “moon pool” allowing sub sea equipment (i.e. BOP and sub sea production equipment) to be lifted to and from the seabed in a clam environment. For other applications, this opening will be limited or even zero.
  • The water plane inside the buoyancy tank can be altered by use of water pumps or compresses air. The buoyancy chamber may be partially or fully open in the bottom to reduce the effect of the “added mass” due to the exposure from the sea. The capacity of the buoyancy thank for the drilling rig purpose of a normal size today will have to be in the order of 200 to 400 tonnes. However, there will be different diameters and capacities for the various uses of the heave compensation system according to the invention.
  • In a preferred embodiment of the invention is the buoyancy tank in the heave compensation system guided by use of guiding means for instance rollers or gliders mounted in the mains structure. These guiding means should be mounted on at least two levels, one of these levels may be below the water surface. The system according to the invention will compensate the vertical forces acting on the system and maintain the module in a horizontal position. The lower guiding means may be operates by winches and or hydraulic cylinders and will constantly move the lower guiding means to keep the buoyancy tank vertical. The guide means are the elements which will connect the heave compensation system to the main floating structure.
  • The lever arm may in one embodiment comprise additional weights in form of for instance clumps. These weights may be used to alter the vertical support capacity of the lever arm.
  • There may in another embodiment of the invention be hydraulic cylinders used in addition to the lever arm, to improve the effect of the lever arm or improve the accuracy of the system.
  • The invention also comprises a vessel when fitted with a heave compensation system as described above. The vessel may as earlier mentioned be any kind of floating structure from a oil/gas platform to a foundation for a floating crane or bridge or used for parts of a system of floating structures.
  • The invention also comprises a method of continuously compensating heave between a floating vessel and a buoyant body comprising the steps of constraining the buoyant body for movement generally vertically with respect to the floating vessel, disposing at least one lever arm in a generally horizontal plane on the floating vessel with a hinge at an intermediate point on the lever arm which connects the lever arm to the floating vessel, so that the lever arm is capable of limited rotational movement in a vertical plane, connecting one end of the lever arm to the buoyant body to allow angular movement there between about a horizontal axis, and connecting a counterbalance weight to the lever arm on the side of the hinge away from the buoyant body, whereby vertical movement of the counterbalance weight resists heave movements of the buoyant body relative to the floating vessel.
  • The invention will now be explained in more detail with preferred embodiments, with references to the drawings where:
  • FIG. 1 shows a side sketch of the invention according to one embodiment in connection with a semi submersible platform,
  • FIG. 2 shows the embodiment of the invention as shown in FIG. 1 without the main parts of the platform,
  • FIG. 3 shows a side sketch of another embodiment of the invention with a floating vessel indicated with dotted lines,
  • FIG. 4 shows the embodiment in FIG. 3 seen from above.
  • FIG. 1 shows the invention for dampening the motion of a floating structure in the water in one embodiment, where the floating vessel 1 is a semi submersible platform with a buoyant body 2 a and several supporting columns 2 b supporting a main deck structure 2 c. On the deck structure is it arranged cranes, drilling derrick 4, flare booms 3 and other equipment necessary to perform the tasks of the semi submersible platform. The drilling derrick 4 with the main drilling area 4 a is in this embodiment arranged in the middle of the floating vessel. From the drilling area 4 a are there risers 5 running down through the body of water to the seabed, where they are connected to a manifold 6 and template 7. The drilling derrick 4 with connection of the risers 5 are arranged according to the invention in connection with a buoyant tank 11. The buoyant tank 11 may have ballast 11 a and buoyancy 11 b systems to regulate the buoyancy of the buoyant tank 11. In the embodiment shown in FIG. 1 has the tank 11 a moon pool 20 wherein the risers 5 are arranged. The buoyant tank 11 is in this embodiment in connection with two lever arms 10, through an interface point 14 at one end of the lever arms. The lever arms 10 have a mainly horizontal orientation, and may rotate about the interface point 14. At the opposite end of the lever arm is arranged a ballast tank 12, which work as counterweight. At a point between the ballast tank 12 and the interface point 14 is the lever arm 10 hinged to the floating vessel 1 through a hinge connection 13, around which the lever arm may rotate around a mainly horizontal axis. The buoyant tank 11 and the floating vessel 1 are to a certain extent free to move relatively to each other in the mainly vertical direction. The ballast tank 11 is normally affected by vertical guide system to keep its movement in relation to the floating vessel 1 mainly vertical. The guide system in this embodiment comprises guide rollers 17 arranged by an upper and lower part of the buoyancy tank 11. The guide rollers may be regulates by hydraulic cylinders, winches or other equipment to keep the buoyancy tank 11 constantly in the most vertical position as possibly. As one can see from this embodiment may the system comprise two lever arms 10 facing opposite directions, and it may be arranged beneath the floating vessel's 1 main deck structure 2 c.
  • As shown in FIG. 2 the heave compensation system according to the invention comprises at least one lever arm 10 connected to a buoyancy tank 11 at interface points 14. There is arranged a ballast tank 12 at the opposite end of the lever arm 10. The effect of the ballast tank 12 on the system may be changed either by changing the ballast itself or changing its position along the lever arm. The same is the case for the buoyancy tank which may comprise both ballast and buoyancy, which may be variable, with compressed air systems and or water pumps etc. (not shown in figures)
  • At an intermediate point between the interface point 14 and the ballast tank 12 is the lever arm 10 connected to the floating vessel 1 at a hinge connection 13.
  • There is shown another embodiment of the invention in FIGS. 3 and 4. The floating vessel 1 is shown with dotted lines, and shown as anchored to the seabed with mooring lines 9. According to the invention is the lever arm 10 connected to the buoyancy tank 11 at an interface point 14. The lever arm also comprises ballast tank 12, and is further equipped with extra clump weight 15. The lever arms 10, two shown in FIG. 3 is in this embodiment arranged above the main part of the floating vessel 1. There is also arranged an additional hydraulic cylinder 16 between the floating vessel 1 and the lever arm 11 at a distance from the hinge connection 13. The buoyancy tank 11 is further equipped with mooring lines 19 from the lower part of the tank 11 to subsea clump weights 18, arranged on the seabed. These clump weights 18 may be other kind of foundations or anchors and they may also be used for anchoring the floating vessel 1 as indicated with the mooring lines 9 running from the floating vessel 1 down to the weights 18. The mooring lines 19 helps keep the buoyancy tank 11 in its position. The vessel has in this embodiment also a moon pool 20 for the not shown risers, umbilicals drillstring etc.s
  • As shown in FIG. 4 which is the system shown in FIG. 3 see from above, comprises the heave compensation system in this embodiment two pairs of lever arms 10, arranged at 90 degrees intervals around the floating vessel.
  • The invention is now explained with embodiments showing details on how to implements the invention, but the invention should not be limited to those embodiments. A person skilled in the art will be able to perform a lot of alterations and other embodiments which are within the scope of the invention as defined in the following claims.

Claims (18)

1. A heave compensation system for continuous operation on a floating vessel, the system comprising at least one buoyant body, at least one lever arm for arrangement in a generally horizontal plane, pivotal means capable of limited rotation about a horizontal axis and arranged to connect one end of the lever arm to the buoyant body, at least one hinge connected to an intermediate point on the lever arm and capable of allowing limited rotational movement of the lever arm in a vertical plane, means to attach the hinge to the floating vessel, and at least one counterbalance weight connected to the lever arm on the side of the hinge away from the buoyant body, whereby the inertia of the counterbalance weight resists heave movements of the buoyant body relative to the floating vessel.
2. A heave compensation system as claimed in claim 1, wherein the hinge for the lever arm is arranged so that forces applied by the tendency of the buoyant body to move vertically with respect to the vessel are balanced by restraining forces arising from the counterbalance weight acting on the lever arm at a distance from the hinge, such that only minimal forces external forces are required to damp heave motions of the buoyant body.
3. A heave compensation system as claimed in claim 1, wherein two of the lever arms are aligned with and diametrically opposed to each other, and wherein the lever arms are attached to the buoyant body at their proximate ends, the hinges on the respective lever arms have means for attachment to the floating vessel, and respective counterbalance weights are connected to respective lever arms on the sides of the hinges away from the buoyant body.
4. A heave compensation system as claimed in claim 3, wherein two pairs of similar lever arms are aligned with and diametrically opposed to each other.
5. A heave compensation system as claimed in claim 4, wherein the two pairs of similar lever arms are at right angles to each other and/or several pairs of similar lever arms are positioned in equal distance to each other around in a circle.
6. A heave compensation system as claimed in claim 1, further comprising means to constrain the buoyant body for movement generally vertically with respect to the floating vessel, in which the means for instance are guides for association with the vessel to restrain the buoyant body for generally vertical movement.
7. A heave compensation system as claimed in claim 1, comprising mooring lines between low points on the buoyant body and the seabed to restrain the buoyant body for generally vertical movement.
8. A heave compensation system as claimed in claim 1, wherein the buoyant body is adjustably ballastable.
9. A heave compensation system as claimed in claim 8, wherein the buoyant body is ballastable with water.
10. A heave compensation system as claimed in claim 9, wherein the water may be expelled from the buoyant body by use of compressed air and/or water pumps.
11. A heave compensation system as claimed in claim 1 wherein the counterbalance weight is arranged to be above the wave effected zone in respect of the limiting wave height in which the system is intended to operate.
12. A heave compensation system as claimed in claim 1, wherein the counterbalance weight is adjustably ballastable.
13. A heave compensation system as claimed in claim 12, wherein the counterbalance weight is ballastable with water.
14. A heave compensation system as claimed in claim 1, wherein the effect of the counterbalance weight is supplemented by a hydraulic piston cylinder arrangement disposed between the lever arm and an attachment to the floating vessel.
15. A heave compensation system as claimed in claim 1, wherein the buoyant body has a throughway (moon pool) extending between upper and lower parts of the body.
16. A heave compensation system as claimed in claim 15, wherein the buoyant body is a drilling module.
17. A vessel when fitted with a heave compensation system as claimed in claim 1.
18. A method of continuously compensating heave between a floating vessel and a buoyant body comprising the steps of constraining the buoyant body for movement generally vertically with respect to the floating vessel, disposing at least one lever arm in a generally horizontal plane on the floating vessel with a hinge at an intermediate point on the lever arm which connects the lever arm to the floating vessel, so that the lever arm is capable of limited rotational movement in a vertical plane, connecting one end of the lever arm to the buoyant body to allow angular movement there between about a horizontal axis, and connecting a counterbalance weight to the lever arm on the side of the hinge away from the buoyant body, whereby vertical movement of the counterbalance weight resists heave movements of the buoyant body relative to the floating vessel.
US10/545,551 2003-02-17 2004-02-17 Heave compensation system Abandoned US20070003375A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
NO20030752 2003-02-17
NO20030752A NO20030752L (en) 2003-02-17 2003-02-17 Bolgedempningsanordning
PCT/NO2004/000047 WO2004071862A1 (en) 2003-02-17 2004-02-17 Heave compensation system

Publications (1)

Publication Number Publication Date
US20070003375A1 true US20070003375A1 (en) 2007-01-04

Family

ID=19914491

Family Applications (1)

Application Number Title Priority Date Filing Date
US10/545,551 Abandoned US20070003375A1 (en) 2003-02-17 2004-02-17 Heave compensation system

Country Status (6)

Country Link
US (1) US20070003375A1 (en)
EP (1) EP1597142A1 (en)
CA (1) CA2515376A1 (en)
EA (1) EA200501309A1 (en)
NO (1) NO20030752L (en)
WO (1) WO2004071862A1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060269362A1 (en) * 2003-05-21 2006-11-30 Henriksen Svein D Arrangement for anchoring a floating structure
US20110129304A1 (en) * 2009-11-27 2011-06-02 Jialiang Wu Support Leg and A Mobile Offshore Work Platform
US20130243531A1 (en) * 2010-09-22 2013-09-19 Sea Wind Towers, S.L. Process for installing an offshore tower
WO2014210537A1 (en) * 2013-06-27 2014-12-31 MINYARD, Charles, R. Systems and methods for performance of offshore well operations
CN104775766A (en) * 2015-04-29 2015-07-15 中原总机石油设备有限公司 Skid-mounted rotary tractor hoist
CN111439348A (en) * 2020-04-20 2020-07-24 中海油研究总院有限责任公司 Novel semi-submersible platform and mounting method thereof
US20210403293A1 (en) * 2018-11-13 2021-12-30 Nhlo Holding B.V. (heave) balancing device, hoisting system, method for hoisting and kit of parts for spring balancing a hoisting system

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102678107B (en) * 2012-05-21 2015-03-25 中国海洋石油总公司 Two-position rotation system of combustion arm
CN109098675A (en) * 2018-10-15 2018-12-28 西南石油大学 A kind of deep compensation device of passive type deep-sea liter for ocean platform drilling well

Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2889795A (en) * 1956-07-09 1959-06-09 Jersey Prod Res Co Stabilization of a floating platform
US3880102A (en) * 1974-02-19 1975-04-29 Offshore Technology Corp Method and apparatus for offshore submersible oil storage and drilling
US3943868A (en) * 1974-06-13 1976-03-16 Global Marine Inc. Heave compensation apparatus for a marine mining vessel
US3961490A (en) * 1973-12-21 1976-06-08 Compagnie Francaise Des Petroles Anchorage of floating structures
US4262380A (en) * 1978-06-09 1981-04-21 Single Buoy Moorings, Inc. Buoy including a mooring device
US4309955A (en) * 1980-02-29 1982-01-12 Amtel, Inc. Riser-to-vessel-mooring-terminal
US4468205A (en) * 1983-01-13 1984-08-28 Sofec, Inc. Apparatus for single point mooring
US4493282A (en) * 1983-03-18 1985-01-15 Exxon Production Research Co. Combination mooring system
US4501219A (en) * 1983-04-04 1985-02-26 Nl Industries, Inc. Tensioner apparatus with emergency limit means
US4567842A (en) * 1984-05-02 1986-02-04 Novacorp International Consulting Ltd. Weight type motion compensation system for a riser moored tanker
US4625673A (en) * 1984-02-13 1986-12-02 Novacorp International Consulting Ltd. Motion compensation means for a floating production system
US4784079A (en) * 1986-10-08 1988-11-15 Single Buoy Moorings Inc. Apparatus such as a working platform which by means of tension loaded tension member has been anchored and which has been provided with means for mooring a vessel
US4798155A (en) * 1983-05-03 1989-01-17 Single Buoy Moorings, Inc. Mooring device
US4813493A (en) * 1987-04-14 1989-03-21 Triten Corporation Hydraulic top drive for wells
US5931602A (en) * 1994-04-15 1999-08-03 Kvaerner Oil & Gas A.S Device for oil production at great depths at sea
US6343893B1 (en) * 1999-11-29 2002-02-05 Mercur Slimhole Drilling And Intervention As Arrangement for controlling floating drilling and intervention vessels
US6499418B1 (en) * 1999-03-16 2002-12-31 Single Buoy Moorings Inc. Method for installing a number of risers or tendons and vessel for carrying out said method
US7225877B2 (en) * 2005-04-05 2007-06-05 Varco I/P, Inc. Subsea intervention fluid transfer system
US20070177947A1 (en) * 2004-01-14 2007-08-02 Jack Pollack Bearing element

Patent Citations (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2889795A (en) * 1956-07-09 1959-06-09 Jersey Prod Res Co Stabilization of a floating platform
US3961490A (en) * 1973-12-21 1976-06-08 Compagnie Francaise Des Petroles Anchorage of floating structures
US3880102A (en) * 1974-02-19 1975-04-29 Offshore Technology Corp Method and apparatus for offshore submersible oil storage and drilling
US3943868A (en) * 1974-06-13 1976-03-16 Global Marine Inc. Heave compensation apparatus for a marine mining vessel
US4262380A (en) * 1978-06-09 1981-04-21 Single Buoy Moorings, Inc. Buoy including a mooring device
US4309955A (en) * 1980-02-29 1982-01-12 Amtel, Inc. Riser-to-vessel-mooring-terminal
US4468205A (en) * 1983-01-13 1984-08-28 Sofec, Inc. Apparatus for single point mooring
US4493282A (en) * 1983-03-18 1985-01-15 Exxon Production Research Co. Combination mooring system
US4501219A (en) * 1983-04-04 1985-02-26 Nl Industries, Inc. Tensioner apparatus with emergency limit means
US4798155A (en) * 1983-05-03 1989-01-17 Single Buoy Moorings, Inc. Mooring device
US4625673A (en) * 1984-02-13 1986-12-02 Novacorp International Consulting Ltd. Motion compensation means for a floating production system
US4567842A (en) * 1984-05-02 1986-02-04 Novacorp International Consulting Ltd. Weight type motion compensation system for a riser moored tanker
US4784079A (en) * 1986-10-08 1988-11-15 Single Buoy Moorings Inc. Apparatus such as a working platform which by means of tension loaded tension member has been anchored and which has been provided with means for mooring a vessel
US4813493A (en) * 1987-04-14 1989-03-21 Triten Corporation Hydraulic top drive for wells
US5931602A (en) * 1994-04-15 1999-08-03 Kvaerner Oil & Gas A.S Device for oil production at great depths at sea
US6499418B1 (en) * 1999-03-16 2002-12-31 Single Buoy Moorings Inc. Method for installing a number of risers or tendons and vessel for carrying out said method
US6718899B2 (en) * 1999-03-16 2004-04-13 Single Buoy Moorings Inc. Method for installing a number of risers or tendons and vessel for carrying out said method
US6343893B1 (en) * 1999-11-29 2002-02-05 Mercur Slimhole Drilling And Intervention As Arrangement for controlling floating drilling and intervention vessels
US20070177947A1 (en) * 2004-01-14 2007-08-02 Jack Pollack Bearing element
US7225877B2 (en) * 2005-04-05 2007-06-05 Varco I/P, Inc. Subsea intervention fluid transfer system

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060269362A1 (en) * 2003-05-21 2006-11-30 Henriksen Svein D Arrangement for anchoring a floating structure
US7438504B2 (en) * 2003-05-21 2008-10-21 Hydra Tidal Energy Technology As Arrangement for anchoring a floating structure
US20110129304A1 (en) * 2009-11-27 2011-06-02 Jialiang Wu Support Leg and A Mobile Offshore Work Platform
US20130243531A1 (en) * 2010-09-22 2013-09-19 Sea Wind Towers, S.L. Process for installing an offshore tower
US9890510B2 (en) * 2010-09-22 2018-02-13 Esteyco Energia, S.L. Process for installing an offshore tower
WO2014210537A1 (en) * 2013-06-27 2014-12-31 MINYARD, Charles, R. Systems and methods for performance of offshore well operations
CN104775766A (en) * 2015-04-29 2015-07-15 中原总机石油设备有限公司 Skid-mounted rotary tractor hoist
US20210403293A1 (en) * 2018-11-13 2021-12-30 Nhlo Holding B.V. (heave) balancing device, hoisting system, method for hoisting and kit of parts for spring balancing a hoisting system
CN111439348A (en) * 2020-04-20 2020-07-24 中海油研究总院有限责任公司 Novel semi-submersible platform and mounting method thereof

Also Published As

Publication number Publication date
CA2515376A1 (en) 2004-08-26
NO20030752D0 (en) 2003-02-17
EP1597142A1 (en) 2005-11-23
EA200501309A1 (en) 2006-02-24
NO20030752L (en) 2004-08-18
WO2004071862A1 (en) 2004-08-26

Similar Documents

Publication Publication Date Title
US6431107B1 (en) Tendon-based floating structure
US6517291B1 (en) Riser tensioning construction
US4473323A (en) Buoyant arm for maintaining tension on a drilling riser
US4272059A (en) Riser tensioner system
US4702321A (en) Drilling, production and oil storage caisson for deep water
US5269629A (en) Elastomeric swivel support assembly for catenary riser
US5421676A (en) Tension leg platform and method of instalation therefor
US20100021239A1 (en) Drilling rig placed on the sea bed and equipped for drilling of oil and gas wells
CN101657351B (en) Buoy platform
US4662786A (en) Dynamic load compensating system
US6431284B1 (en) Gimbaled table riser support system
CN104641067B (en) Top-tensioned riser systems
US4428702A (en) Sliding tension leg tower with pile base
US20070003375A1 (en) Heave compensation system
US20040182297A1 (en) Riser pipe support system and method
US4421438A (en) Sliding leg tower
GB2358032A (en) Heave compensation system for rough sea drilling
US4422806A (en) Sliding tension leg tower
CA1227380A (en) Motion compensation means for a floating production system
US9352808B2 (en) Offshore platform having SCR porches mounted on riser keel guide
US4431344A (en) Sliding leg tower with pile base
GB2070112A (en) A marine structure for production of natural resources
UA17860U (en) Device of compensation for horizontal displacements of floating drilling unit

Legal Events

Date Code Title Description
STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION