US20060272111A1 - Fiber reinforced plastics bearing deck module having integrated shear connector and concrete composite bearing deck using the same - Google Patents
Fiber reinforced plastics bearing deck module having integrated shear connector and concrete composite bearing deck using the same Download PDFInfo
- Publication number
- US20060272111A1 US20060272111A1 US11/442,162 US44216206A US2006272111A1 US 20060272111 A1 US20060272111 A1 US 20060272111A1 US 44216206 A US44216206 A US 44216206A US 2006272111 A1 US2006272111 A1 US 2006272111A1
- Authority
- US
- United States
- Prior art keywords
- frp
- bearing deck
- shear connector
- deck
- upper flange
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 229920002430 Fibre-reinforced plastic Polymers 0.000 title claims abstract description 90
- 239000011151 fibre-reinforced plastic Substances 0.000 title claims abstract description 90
- 239000002131 composite material Substances 0.000 title claims abstract description 30
- 239000000835 fiber Substances 0.000 claims abstract description 13
- 230000003014 reinforcing effect Effects 0.000 claims description 14
- 238000009751 slip forming Methods 0.000 claims description 6
- 239000000853 adhesive Substances 0.000 description 4
- 230000001070 adhesive effect Effects 0.000 description 4
- 238000004519 manufacturing process Methods 0.000 description 3
- VYPSYNLAJGMNEJ-UHFFFAOYSA-N Silicium dioxide Chemical compound O=[Si]=O VYPSYNLAJGMNEJ-UHFFFAOYSA-N 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 2
- 230000010354 integration Effects 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 239000011248 coating agent Substances 0.000 description 1
- 238000000576 coating method Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 239000000377 silicon dioxide Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/12—Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
- E01D19/125—Grating or flooring for bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
- E01D2101/26—Concrete reinforced
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
- E01D2101/26—Concrete reinforced
- E01D2101/266—Concrete reinforced with fibres other than steel or glass
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/40—Plastics
Definitions
- the present invention relates to a fiber reinforced plastics bearing deck module having integrated a shear connector and a concrete composite bearing deck using the same, and more particularly to a novel fiber reinforced plastics (hereinafter, referred to as “FRP”) bearing deck module having integrated a shear connector so that a concrete slab is integrated with a FRP bearing deck module so as to form a structural integration of the concrete slab and a FRP deck panel from the manufacture of the FRP bearing deck module, when the FRP bearing deck modules are assembled to form the FRP deck panel and then the concrete slab is integrally connected to the deck panel to manufacture a bearing deck, and a concrete composite bearing deck using the module.
- FRP novel fiber reinforced plastics
- FIG. 11 is a schematic perspective view of a concrete composite bearing deck disclosed in a Korean patent application No. 10-2002-40869 which was filed by the applicant.
- the concrete composite bearing deck 1 comprises a deck panel 10 and a concrete slab 20 having a thickness and integrally connected to an upper part of the deck panel 10 .
- the deck panel 10 can be made of FRP and includes an upper flange 11 and a lower flange 12 which are separated from each other by a predetermined height, and a plurality of hollow portions 14 formed by side webs 13 between the upper flange 11 and the lower flange 12 are continuously formed in a line in a longitudinal direction (for example, bridge direction).
- Each of the hollow portions 14 is lengthwise formed in a transverse direction (for example, direction perpendicular to the bridge) to constitute a tubular shape.
- the deck panel 10 is structured by assembling FRP bearing deck modules having the several hollow portions 14 , and the concrete slab 20 is integrally connected on the deck panel 10 .
- the upper flange 11 of the deck panel 10 is used as a molding flask and the concrete is poured therein by a predetermined height to form the concrete slab 20 .
- a method may be considered to attach a separate shear connector to the upper flange 11 with an adhesive.
- it has not been known how to attach what kind of the shear connector.
- the shear connector could be attached to the upper flange 11 with the adhesive, the attachment work is troublesome because each of the shear connectors should be attached one by one.
- shear stress may be concentrated on the connection area of the shear connector and the upper flange 11 . In this case, even if the shear connector and the upper flange 11 are connected with the adhesive, the connection area may be easily damaged due to the concentrated stress.
- An object of the invention is to provide a FRP bearing deck module having a new structure capable of achieving a firm structural composite of a FRP deck panel and a concrete slab with less cost and works, and a concrete composite bearing deck using the same.
- a fiber reinforced plastics (FRP) bearing deck module forming a deck panel of a concrete composite bearing deck, comprising: an upper flange and a lower flange separated from each other by a predetermined height; a side web provided between the upper flange and the lower flange and forming a hollow portion longitudinally extended in a transverse direction to constitute a tubular shape; a shear connector protruded in a transverse direction and integrated to an upper part of the upper flange when draw-forming the FRP bearing deck module; and a fiber continuously arranged along an inside of the shear connector.
- FRP fiber reinforced plastics
- the shear connector may have a web protruded upwardly which may be continuously formed in a transverse direction and the web may be formed with a through-hole.
- a concrete composite bearing deck of a fiber reinforced plastics deck panel consisting of plural FRP bearing deck modules assembled and a concrete slab thereon, each of the FRP bearing deck modules comprising: an upper flange and a lower flange separated from each other by a predetermined height; a side web provided between the upper flange and the lower flange and forming a hollow portion longitudinally extended in a transverse direction to constitute a tubular shape; a shear connector protruded in a transverse direction and integrated to an upper part of the upper flange when draw-forming the FRP bearing deck module; and a fiber continuously arranged along an inside of the shear connector.
- the shear connector may have a web protruded upwardly which may be continuously formed in a transverse direction and the web may be formed with a through-hole.
- the concrete slab may be provided with a reinforcing rod which is arranged through the through-hole.
- FIG. 1 is a schematic perspective view showing a concrete composite bearing deck according to an embodiment of the invention laid on a girder;
- FIG. 2 is a schematic perspective view showing a preferred embodiment of a FRP bearing deck module according to the invention constituting a FRP deck panel of the concrete composite bearing deck shown in FIG. 1 ;
- FIG. 3 is a schematic perspective view showing another preferred embodiment of a FRP bearing deck module of the invention.
- FIG. 4 is a enlarged view showing a fiber arrangement in a part of a FRP bearing deck module of the invention where a shear connector is formed;
- FIG. 5 is a partially enlarged perspective view of a FRP bearing deck module, which shows a preferred example of a shear connector provided to the FRP bearing deck module of the invention
- FIG. 6 is a partially enlarged perspective view of a FRP bearing deck module, which shows another preferred example of a shear connector provided to the FRP bearing deck module of the invention
- FIG. 7 is a partially enlarged perspective view of a FRP bearing deck module, which shows still another preferred example of a shear connector provided to the FRP bearing deck module of the invention.
- FIG. 8 is a partially enlarged perspective view of a FRP bearing deck module, which shows still another preferred example of a shear connector provided to the FRP bearing deck module of the invention.
- FIG. 9 is a partially enlarged perspective view which schematically shows a preferred arrangement form of a reinforcing rod of a concrete slab under state that a shear connector is embedded in the concrete slab in a bearing deck of the invention
- FIG. 10 is a partially enlarged perspective view which schematically shows another preferred arrangement form of a reinforcing rod of a concrete slab under state that a shear connector is embedded in the concrete slab in a bearing deck of the invention.
- FIG. 11 is a perspective view schematically showing a concrete composite bearing deck according to the prior art.
- FIG. 1 is a schematic perspective view showing a concrete composite bearing deck 100 according to an embodiment of the invention laid on a girder 400
- FIG. 2 is a schematic perspective view showing a preferred embodiment of a FRP bearing deck module 200 according to the invention constituting a FRP deck panel 110 of the concrete composite bearing deck 100
- FIG. 3 is a schematic perspective view showing another preferred example of the FRP bearing deck module 200 of the invention.
- the concrete composite bearing deck 100 comprises a FRP deck panel 110 and a concrete slab 120 having a thickness and integrally connected to an upper part of the deck panel 110 .
- the FRP deck panel 110 may consist of the plural FRP bearing deck modules assembled.
- the FRP bearing deck module 200 comprises an upper flange 201 and a lower flange 202 separated from each other by a predetermined height, and hollow portions 204 formed by side webs 203 provided between the upper flange 201 and the lower flange 202 .
- the hollow portions 204 are continuously formed in a line in a longitudinal direction (for example, bridge direction) while being longitudinally formed in a transverse direction (for example, direction perpendicular to the bridge) to constitute a tubular shape.
- the FRP bearing deck module 200 is formed with a shear connector 205 integrated to the upper flange 201 .
- the FRP bearing deck module 200 is manufactured by a draw-forming in a transverse direction, wherein the shear connector 205 is integrally draw-formed while being protruded from the upper flange 201 .
- the shear connector 205 integrated to the upper flange 201 comprises, as shown in FIGS. 2 and 3 , a web 215 and an upper flange 225 and the web 215 is integrated to the upper flange 201 .
- FIG. 4 is an enlarged view showing a fiber arrangement in a part of the FRP bearing deck module 200 of the invention where the shear connector 205 is formed.
- the fiber 300 constituting the FRP is continuously arranged over the shear connector 205 and the side web 203 .
- the fiber 300 is formed into a mat-type having a lattice shape.
- the fiber 300 may extend to the lower flange 202 beyond the shear connector 205 and the side web 203 , and may be continuously arranged over the shear connector 205 and the upper flange 201 .
- the continuous arrangements of the fiber 300 may be combined each other.
- the FRP bearing deck module 200 when draw-formed, it is manufactured with the shear connector 200 being integrated to the upper flange 01 . Therefore, contrary to the prior art, a troublesome work is not necessary where a separate shear connector should be later equipped to the upper flange.
- the shear connector 205 and the FRP bearing deck module 200 are firmly integrated.
- the shear connector 205 can exhibit sufficient shear rigidity.
- the shear connector 205 since the shear connector 205 is formed into a beam shape and provided to the FRP bearing deck module in a transverse direction, it serves as a reinforcement member for the concrete composite bearing deck 100 in the transverse direction thereof (direction perpendicular to the bridge), thereby remarkable increasing the transverse rigidity of the concrete composite bearing deck 100 .
- the assembly structure of the FRP bearing deck module itself has a protrusion 240 formed on a side of the FRP bearing deck module 200 and a recess 242 formed on the other side thereof, so that the protrusion 240 of the one FRP bearing deck module 200 can be received in the recess 242 ′ of the neighboring FRP bearing deck module 200 ′, as shown in FIG. 2 .
- connection structure of the neighboring FRP bearing deck modules 200 can be modified in various manners.
- recesses 218 , 218 ′ are provided to each of the lower flanges 202 , 202 ′ of the neighboring FRP bearing deck modules 200 , 200 ′ so that they are connected to each other, the side webs 203 , 203 ′ of the neighboring FRP bearing deck modules 200 , 200 ′ are adhered with an adhesive and then a connection plate 216 is adhered to the recesses 218 , 218 ′.
- FIGS. 5 to 8 are partially enlarged perspective views of the FRP bearing deck module, which show modified examples of the shear connector 205 .
- FIG. 5 if through-holes 235 are formed in the web 215 of the shear connector 205 , the concrete is cured with flowing between the through-holes 235 when the shear connector 205 is embedded in the concrete slab 120 (see FIG. 1 ). Accordingly, it is possible to achieve the firmer mechanical composite and shear connection between the concrete slab 120 and the deck panel 110 (see FIG. 1 ), so that the structural integration is further enhanced.
- the shape of the shear connector 205 may be modified in such a way that the upper flange 225 is formed in one direction only as shown in FIG. 6 , or the upper flange 225 is omitted as shown in FIG. 7 and FIG. 8 .
- FIGS. 9 and 10 are partially enlarged perspective views schematically showing that reinforcing rods 121 of the concrete slab 120 are arranged using the shear connector 205 under state that the shear connector 205 is embedded in the concrete slab 120 .
- the shear connector 205 can be used as a support member for the reinforcing rods 121 .
- the reinforcing rods 121 are arranged to pass through the through-holes 235 .
- the structure of inserting the reinforcing rods 121 into the through-holes 235 of the web 215 can be applied to the shear connector having the upper flange.
- the structure of laying the reinforcing rods 121 on the shear connector can be applied to a shear connector having no upper flange, in addition to the embodiment shown in FIG. 9 .
- the FRP bearing deck modules 200 integrated with the shear connector 205 are assembled each other to constitute the FRP deck panel 110 , and the concrete slab 120 is poured so that the shear connector 205 is integrally embedded above the FRP deck panel 110 with the FRP deck panel 110 being equipped to the girder, thereby forming the concrete composite bearing deck 100 .
- the upper surface of the FRP deck panel 110 is preferably coarsened by coating silica sands, for example.
- the FRP bearing deck module is draw-formed under state that the FRP shear connector is integrally provided to the upper surface of the FRP bearing deck module constituting the FRP deck panel. Accordingly, contrary to the prior art, a troublesome work is not necessary where a separate shear connector should be later equipped to the FRP deck panel.
- shear connector is integrally provided from the manufacture of the FRP bearing deck module, it is possible to achieve the firm structural composite between the FRP deck panel and the concrete slab without the troublesome work and the costs.
- the shear connector is integrally provided in the transverse direction of the FRP deck panel, the transverse rigidity of the concrete composite bearing deck is further increased.
- the shear connector can be very usefully used as the means for supporting the reinforcing rods when the reinforcing rods are arranged in the concrete slab.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
A fiber reinforced plastics (FRP) bearing deck module having integrated a shear connector and a concrete composite bearing deck using the same are provided. The FRP bearing deck module has an upper flange and a lower flange separated from each other by a predetermined height; a side web provided between the upper flange and the lower flange and forming a hollow portion longitudinally extended in a transverse direction to constitute a tubular shape; a shear connector protruded in a transverse direction and integrated to an upper part of the upper flange when draw-forming the FRP bearing deck module; and a fiber continuously arranged along an inside of the shear connector.
Description
- This application claims all benefits of Korean Patent Application No. 2005-47435 filed on Jun. 2, 2005 in the Korean Intellectual Property Office, the disclosures of which are incorporated herein by reference.
- 1. Field of the Invention
- The present invention relates to a fiber reinforced plastics bearing deck module having integrated a shear connector and a concrete composite bearing deck using the same, and more particularly to a novel fiber reinforced plastics (hereinafter, referred to as “FRP”) bearing deck module having integrated a shear connector so that a concrete slab is integrated with a FRP bearing deck module so as to form a structural integration of the concrete slab and a FRP deck panel from the manufacture of the FRP bearing deck module, when the FRP bearing deck modules are assembled to form the FRP deck panel and then the concrete slab is integrally connected to the deck panel to manufacture a bearing deck, and a concrete composite bearing deck using the module.
- 2. Description of the prior art
- A composite of a reinforcing rod concrete slab and a FRP deck panel has been suggested as a bearing deck used for an engineering structure such as bridge.
FIG. 11 is a schematic perspective view of a concrete composite bearing deck disclosed in a Korean patent application No. 10-2002-40869 which was filed by the applicant. The concrete composite bearing deck 1 comprises adeck panel 10 and aconcrete slab 20 having a thickness and integrally connected to an upper part of thedeck panel 10. Thedeck panel 10 can be made of FRP and includes anupper flange 11 and alower flange 12 which are separated from each other by a predetermined height, and a plurality ofhollow portions 14 formed byside webs 13 between theupper flange 11 and thelower flange 12 are continuously formed in a line in a longitudinal direction (for example, bridge direction). Each of thehollow portions 14 is lengthwise formed in a transverse direction (for example, direction perpendicular to the bridge) to constitute a tubular shape. - In general, the
deck panel 10 is structured by assembling FRP bearing deck modules having the severalhollow portions 14, and theconcrete slab 20 is integrally connected on thedeck panel 10. Theupper flange 11 of thedeck panel 10 is used as a molding flask and the concrete is poured therein by a predetermined height to form theconcrete slab 20. - In the mean time, in the concrete composite bearing deck consisting of the
deck panel 10 and theconcrete slab 20, it is very important to firmly combine thedeck panel 10 with theconcrete slab 20. In order to combine thedeck panel 10 with theconcrete slab 20, it has been conventionally suggested that asteel stud 15 is screwed on an upper surface of theupper flange 11 of thedeck panel 10 as a shear connector. However, this method is not preferred since the different materials (steel/FRP) are connected. Further, since a screw hole should be formed in theupper flange 11 of thedeck panel 10 so as to screw the stud, further works and costs are correspondingly required. - In the mean time, a method may be considered to attach a separate shear connector to the
upper flange 11 with an adhesive. However, it has not been known how to attach what kind of the shear connector. In addition, even if the shear connector could be attached to theupper flange 11 with the adhesive, the attachment work is troublesome because each of the shear connectors should be attached one by one. In particular, shear stress may be concentrated on the connection area of the shear connector and theupper flange 11. In this case, even if the shear connector and theupper flange 11 are connected with the adhesive, the connection area may be easily damaged due to the concentrated stress. - Accordingly, it is needed a novel technology capable of achieving a firm structural composite of the
deck panel 10 and the upper concrete slab 20 with less cost and works. - Accordingly, the present invention has been made to solve the above problems. An object of the invention is to provide a FRP bearing deck module having a new structure capable of achieving a firm structural composite of a FRP deck panel and a concrete slab with less cost and works, and a concrete composite bearing deck using the same.
- In order to achieve the above object, there is provided a fiber reinforced plastics (FRP) bearing deck module forming a deck panel of a concrete composite bearing deck, comprising: an upper flange and a lower flange separated from each other by a predetermined height; a side web provided between the upper flange and the lower flange and forming a hollow portion longitudinally extended in a transverse direction to constitute a tubular shape; a shear connector protruded in a transverse direction and integrated to an upper part of the upper flange when draw-forming the FRP bearing deck module; and a fiber continuously arranged along an inside of the shear connector.
- According to an embodiment of the invention, the shear connector may have a web protruded upwardly which may be continuously formed in a transverse direction and the web may be formed with a through-hole.
- According to the invention, there is provided a concrete composite bearing deck of a fiber reinforced plastics deck panel consisting of plural FRP bearing deck modules assembled and a concrete slab thereon, each of the FRP bearing deck modules comprising: an upper flange and a lower flange separated from each other by a predetermined height; a side web provided between the upper flange and the lower flange and forming a hollow portion longitudinally extended in a transverse direction to constitute a tubular shape; a shear connector protruded in a transverse direction and integrated to an upper part of the upper flange when draw-forming the FRP bearing deck module; and a fiber continuously arranged along an inside of the shear connector.
- According to an embodiment of the invention, the shear connector may have a web protruded upwardly which may be continuously formed in a transverse direction and the web may be formed with a through-hole.
- According to an embodiment of the invention, the concrete slab may be provided with a reinforcing rod which is arranged through the through-hole.
- The above and other objects, features and advantages of the present invention will be more apparent from the following detailed description taken in conjunction with the accompanying drawings, in which:
-
FIG. 1 is a schematic perspective view showing a concrete composite bearing deck according to an embodiment of the invention laid on a girder; -
FIG. 2 is a schematic perspective view showing a preferred embodiment of a FRP bearing deck module according to the invention constituting a FRP deck panel of the concrete composite bearing deck shown inFIG. 1 ; -
FIG. 3 is a schematic perspective view showing another preferred embodiment of a FRP bearing deck module of the invention; -
FIG. 4 is a enlarged view showing a fiber arrangement in a part of a FRP bearing deck module of the invention where a shear connector is formed; -
FIG. 5 is a partially enlarged perspective view of a FRP bearing deck module, which shows a preferred example of a shear connector provided to the FRP bearing deck module of the invention; -
FIG. 6 is a partially enlarged perspective view of a FRP bearing deck module, which shows another preferred example of a shear connector provided to the FRP bearing deck module of the invention; -
FIG. 7 is a partially enlarged perspective view of a FRP bearing deck module, which shows still another preferred example of a shear connector provided to the FRP bearing deck module of the invention; -
FIG. 8 is a partially enlarged perspective view of a FRP bearing deck module, which shows still another preferred example of a shear connector provided to the FRP bearing deck module of the invention; -
FIG. 9 is a partially enlarged perspective view which schematically shows a preferred arrangement form of a reinforcing rod of a concrete slab under state that a shear connector is embedded in the concrete slab in a bearing deck of the invention; -
FIG. 10 is a partially enlarged perspective view which schematically shows another preferred arrangement form of a reinforcing rod of a concrete slab under state that a shear connector is embedded in the concrete slab in a bearing deck of the invention; and -
FIG. 11 is a perspective view schematically showing a concrete composite bearing deck according to the prior art. - Hereinafter, a preferred embodiment of the present invention will be described with reference to the accompanying drawings. In the following description of the present invention, a detailed description of known functions and configurations incorporated herein will be omitted when it may make the subject matter of the present invention rather unclear.
-
FIG. 1 is a schematic perspective view showing a concretecomposite bearing deck 100 according to an embodiment of the invention laid on agirder 400,FIG. 2 is a schematic perspective view showing a preferred embodiment of a FRPbearing deck module 200 according to the invention constituting aFRP deck panel 110 of the concretecomposite bearing deck 100, andFIG. 3 is a schematic perspective view showing another preferred example of the FRP bearingdeck module 200 of the invention. - As shown in
FIG. 1 , the concretecomposite bearing deck 100 according to an embodiment of the invention comprises aFRP deck panel 110 and aconcrete slab 120 having a thickness and integrally connected to an upper part of thedeck panel 110. For convenience sake, theconcrete slab 120 is shown with a dot-dash line inFIG. 1 . TheFRP deck panel 110 may consist of the plural FRP bearing deck modules assembled. According to the invention, as shown inFIGS. 2 and 3 , the FRP bearingdeck module 200 comprises anupper flange 201 and alower flange 202 separated from each other by a predetermined height, andhollow portions 204 formed byside webs 203 provided between theupper flange 201 and thelower flange 202. Thehollow portions 204 are continuously formed in a line in a longitudinal direction (for example, bridge direction) while being longitudinally formed in a transverse direction (for example, direction perpendicular to the bridge) to constitute a tubular shape. - In the invention, the FRP bearing
deck module 200 is formed with ashear connector 205 integrated to theupper flange 201. The FRP bearingdeck module 200 is manufactured by a draw-forming in a transverse direction, wherein theshear connector 205 is integrally draw-formed while being protruded from theupper flange 201. Specifically, theshear connector 205 integrated to theupper flange 201 comprises, as shown inFIGS. 2 and 3 , aweb 215 and anupper flange 225 and theweb 215 is integrated to theupper flange 201. - At this time, in order for the
shear connector 205 to be integrated to the other parts of the FRP bearingdeck module 200, including theupper flange 201, afiber 300 arranged to the FRP bearingdeck module 200 is continuously arranged over theshear connector 205 and theside web 203.FIG. 4 is an enlarged view showing a fiber arrangement in a part of the FRP bearingdeck module 200 of the invention where theshear connector 205 is formed. As shown inFIG. 4 , thefiber 300 constituting the FRP is continuously arranged over theshear connector 205 and theside web 203. At this time, it is preferred that thefiber 300 is formed into a mat-type having a lattice shape. Thefiber 300 may extend to thelower flange 202 beyond theshear connector 205 and theside web 203, and may be continuously arranged over theshear connector 205 and theupper flange 201. The continuous arrangements of thefiber 300 may be combined each other. - Like this, according to the invention, when the FRP bearing
deck module 200 is draw-formed, it is manufactured with theshear connector 200 being integrated to the upper flange 01. Therefore, contrary to the prior art, a troublesome work is not necessary where a separate shear connector should be later equipped to the upper flange. In particular, as described above, since thefiber 300 arranged to the FRP bearing deck module is continuously arranged over theshear connector 205 and theside web 203 and/or theupper flange 201 and/or thelower flange 202, theshear connector 205 and the FRP bearingdeck module 200 are firmly integrated. Accordingly, .even though the shear stress is concentrated on a connection part of theshear connector 205 and the FRP bearingdeck module 200, theshear connector 205 can exhibit sufficient shear rigidity. In addition, in the above embodiment of the invention, since theshear connector 205 is formed into a beam shape and provided to the FRP bearing deck module in a transverse direction, it serves as a reinforcement member for the concretecomposite bearing deck 100 in the transverse direction thereof (direction perpendicular to the bridge), thereby remarkable increasing the transverse rigidity of the concretecomposite bearing deck 100. - In the mean time, according to the invention, the assembly structure of the FRP bearing deck module itself has a
protrusion 240 formed on a side of the FRP bearingdeck module 200 and arecess 242 formed on the other side thereof, so that theprotrusion 240 of the one FRPbearing deck module 200 can be received in therecess 242′ of the neighboring FRP bearingdeck module 200′, as shown inFIG. 2 . As a consequence, it is possible to continuously assemble the plural FRP bearingdeck modules 200 through such manner. - In addition to the above structure, the connection structure of the neighboring FRP bearing
deck modules 200 can be modified in various manners. For example, as shown inFIG. 3 , recesses 218, 218′ are provided to each of thelower flanges deck modules side webs deck modules connection plate 216 is adhered to therecesses - FIGS. 5 to 8 are partially enlarged perspective views of the FRP bearing deck module, which show modified examples of the
shear connector 205. As shown inFIG. 5 , if through-holes 235 are formed in theweb 215 of theshear connector 205, the concrete is cured with flowing between the through-holes 235 when theshear connector 205 is embedded in the concrete slab 120 (seeFIG. 1 ). Accordingly, it is possible to achieve the firmer mechanical composite and shear connection between theconcrete slab 120 and the deck panel 110 (seeFIG. 1 ), so that the structural integration is further enhanced. - In addition to the embodiment wherein the
web 215 and theupper flange 225 are provided, the shape of theshear connector 205 may be modified in such a way that theupper flange 225 is formed in one direction only as shown inFIG. 6 , or theupper flange 225 is omitted as shown inFIG. 7 andFIG. 8 . - In the mean time, according to the invention, the
shear connector 205 is very usefully used to equip the reinforcing rod to theconcrete slab 120.FIGS. 9 and 10 are partially enlarged perspective views schematically showing that reinforcingrods 121 of theconcrete slab 120 are arranged using theshear connector 205 under state that theshear connector 205 is embedded in theconcrete slab 120. - As shown in
FIG. 9 , when the reinforcingrods 121 are arranged in theconcrete slab 120, theshear connector 205 can be used as a support member for the reinforcingrods 121. In addition, as shown inFIG. 10 , in case that the through-holes 235 are formed in theweb 215 of theshear connector 205, the reinforcingrods 121 are arranged to pass through the through-holes 235. For reference, although the upper flange is not provided to theshear connector 205 inFIG. 10 , the structure of inserting the reinforcingrods 121 into the through-holes 235 of theweb 215 can be applied to the shear connector having the upper flange. Likewise, the structure of laying the reinforcingrods 121 on the shear connector can be applied to a shear connector having no upper flange, in addition to the embodiment shown inFIG. 9 . - According to the invention, the FRP bearing
deck modules 200 integrated with theshear connector 205 are assembled each other to constitute theFRP deck panel 110, and theconcrete slab 120 is poured so that theshear connector 205 is integrally embedded above theFRP deck panel 110 with theFRP deck panel 110 being equipped to the girder, thereby forming the concretecomposite bearing deck 100. At this time, in order to further enhance the connection between theconcrete slab 120 and the upper surface of theFRP deck panel 110, the upper surface of theFRP deck panel 110 is preferably coarsened by coating silica sands, for example. - As described above, according to the invention, the FRP bearing deck module is draw-formed under state that the FRP shear connector is integrally provided to the upper surface of the FRP bearing deck module constituting the FRP deck panel. Accordingly, contrary to the prior art, a troublesome work is not necessary where a separate shear connector should be later equipped to the FRP deck panel.
- In addition, since the shear connector is integrally provided from the manufacture of the FRP bearing deck module, it is possible to achieve the firm structural composite between the FRP deck panel and the concrete slab without the troublesome work and the costs.
- Additionally, according to the invention, since the shear connector is integrally provided in the transverse direction of the FRP deck panel, the transverse rigidity of the concrete composite bearing deck is further increased.
- In particular, the shear connector can be very usefully used as the means for supporting the reinforcing rods when the reinforcing rods are arranged in the concrete slab.
- While the invention has been shown and described with reference to certain preferred embodiments thereof, it will be understood by those skilled in the art that various changes in form and details may be made thereto without departing from the spirit and scope of the invention as defined by the appended claims.
Claims (7)
1. A fiber reinforced plastics (FRP) bearing deck module forming a deck panel of a concrete composite bearing deck, the module comprising:
an upper flange and a lower flange separated from each other by a predetermined height;
a side web provided between the upper flange and the lower flange and forming a hollow portion longitudinally extended in a transverse direction to constitute a tubular shape;
a shear connector protruded in a transverse direction and integrated to an upper part of the upper flange when draw-forming the FRP bearing deck module; and
a fiber continuously arranged along an inside of the shear connector.
2. The FRP bearing deck module as claimed in claim 1 , wherein the shear connector is provided with a protrusion web on the upper flange and the web is continuously formed in a transverse direction.
3. The FRP bearing deck module as claimed in claim 2 , wherein the protrusion web of the shear connector is formed with a through-hole.
4. A concrete composite bearing deck of a fiber reinforced plastics (FRP) deck panel and a concrete slab thereon,
the FRP deck panel comprising plural FRP bearing deck modules assembled,
each of the FRP bearing deck modules comprising:
an upper flange and a lower flange separated from each other by a predetermined height;
a side web provided between the upper flange and the lower flange and forming a hollow portion longitudinally extended in a transverse direction to constitute a tubular shape;
a shear connector protruded in a transverse direction and integrated to an upper part of the upper flange when draw-forming the FRP bearing deck module; and
a fiber continuously arranged along an inside of the shear connector.
5. The concrete composite bearing deck as claimed in claim 4 , wherein the shear connector is provided with a protrusion web on the upper flange and the web is continuously formed in a transverse direction.
6. The concrete composite bearing deck as claimed in claim 5 , wherein the protrusion web of the shear connector is formed with a through-hole.
7. The concrete composite bearing deck as claimed in claim 6 , wherein the concrete slab comprises a reinforcing rod arranged through the through-hole.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2005-0047435 | 2005-06-02 | ||
KR1020050047435A KR100641607B1 (en) | 2005-06-02 | 2005-06-02 | Fiber reinforced plastics deck module having integrated shear connector and concrete composite deck using thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
US20060272111A1 true US20060272111A1 (en) | 2006-12-07 |
Family
ID=37492650
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US11/442,162 Abandoned US20060272111A1 (en) | 2005-06-02 | 2006-05-30 | Fiber reinforced plastics bearing deck module having integrated shear connector and concrete composite bearing deck using the same |
Country Status (2)
Country | Link |
---|---|
US (1) | US20060272111A1 (en) |
KR (1) | KR100641607B1 (en) |
Cited By (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8321985B2 (en) * | 2010-07-05 | 2012-12-04 | John Reginald Newton | Support platform and method of construction thereof |
WO2013145726A1 (en) * | 2012-03-27 | 2013-10-03 | 国立大学法人大阪大学 | Flooring and path surface flooring structure in which flooring is combined |
CN103643633A (en) * | 2013-12-26 | 2014-03-19 | 黄海林 | Manufacturing method for ribbed FRP members |
CN103835234A (en) * | 2014-03-30 | 2014-06-04 | 黄海林 | FRP component with ribs and construction method for combination between FRP component and concrete |
CN103967272A (en) * | 2014-03-19 | 2014-08-06 | 哈尔滨工程大学 | FRP permanent formwork and FRP formwork and concrete combined floor |
CN104805767A (en) * | 2015-05-06 | 2015-07-29 | 山东大学 | Prefabricated assembly FRP-reinforcing steel-bar-concrete combined bridge deck and construction method |
US20160160457A1 (en) * | 2014-12-03 | 2016-06-09 | National Applied Research Laboratories | Light-Weight Temporary Bridge System and Building Method thereof |
CN106337361A (en) * | 2016-08-29 | 2017-01-18 | 东南大学 | Separated fiber reinforced plastic (FRP)-concrete-steel composite girder bridge structure and construction method thereof |
JP2017020199A (en) * | 2015-07-08 | 2017-01-26 | 三菱樹脂インフラテック株式会社 | Construction/civil engineering structure and bridge |
US20170058517A1 (en) * | 2015-08-29 | 2017-03-02 | Clark Pacific Precast, Llc | Integrated access floor system |
JP6166005B1 (en) * | 2017-03-30 | 2017-07-19 | 株式会社シラヤマ | Road bridge cover widening unit |
US9739022B1 (en) * | 2015-05-18 | 2017-08-22 | Patrick Revenew | Bridge assembly and method |
US9995365B1 (en) * | 2017-03-28 | 2018-06-12 | SK Commercial Construction, Inc. | Method and system for improved semiconductor processing equipment vibration isolation and reduction |
CN108454136A (en) * | 2018-04-20 | 2018-08-28 | 任换锋 | A kind of glass-fiber reinforced plastic grille automated production equipment |
US10060501B1 (en) * | 2017-03-28 | 2018-08-28 | SK Commercial Construction, Inc. | Method for improved semiconductor processing equipment tool pedestal/pad vibration isolation and reduction |
US10113610B2 (en) * | 2017-03-28 | 2018-10-30 | SK Commercial Construction, Inc. | Method for improved semiconductor processing equipment tool pedestal / pad vibration isolation and reduction |
US10309068B2 (en) * | 2017-06-06 | 2019-06-04 | Contech Engineered Solutions LLC | Prefabricated bridge including steel abutments |
US10480611B2 (en) * | 2017-03-28 | 2019-11-19 | SK Commercial Construction, Inc. | Method for improved semiconductor processing equipment tool pedestal / pad vibration isolation and reduction |
US20200032465A1 (en) * | 2018-07-30 | 2020-01-30 | TrueNorth Steel, Inc. | Bridge decking and installation |
ES2795835A1 (en) * | 2019-05-24 | 2020-11-24 | Univ Catalunya Politecnica | HYBRID STRUCTURAL ELEMENT (Machine-translation by Google Translate, not legally binding) |
CN114657876A (en) * | 2022-04-27 | 2022-06-24 | 合肥工业大学 | FRP bridge deck connecting structure and connecting method |
US11840812B1 (en) * | 2022-09-29 | 2023-12-12 | Fuzhou University | Steel-concrete composite bridge deck slab with steel tube-prefobond rib shear connectors and method for constructing same |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100811203B1 (en) | 2007-01-12 | 2008-03-07 | 휘선건설(주) | Prestressed composite beam |
KR101047426B1 (en) * | 2008-07-14 | 2011-07-08 | 한국건설기술연구원 | Steel composite bridge construction method by mortar bonding and steel composite bridge obtained by using |
CN112252184A (en) * | 2020-03-06 | 2021-01-22 | 重庆大学 | FRP-UHPC combined bridge deck with opening stiffening ribs |
KR20240106722A (en) | 2022-12-29 | 2024-07-08 | 한국철도기술연구원 | FRP Deck Struture and Its Installation Method for Concrete Track Installation |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3496691A (en) * | 1968-08-02 | 1970-02-24 | Bethlehem Steel Corp | Concrete forms |
US5339475A (en) * | 1991-05-30 | 1994-08-23 | The Queen In Right Of Ontario As Represented By The Ministry Of Transportation | Load supporting structure |
US5457840A (en) * | 1994-05-24 | 1995-10-17 | Derechin; Joshua | Fatigue resistant shear connector |
US5463786A (en) * | 1994-09-12 | 1995-11-07 | Grate-Lok Co., Inc. | Weldless grating for bridge decks |
US5664378A (en) * | 1995-12-07 | 1997-09-09 | Bettigole; Robert A. | Exodermic deck system |
US5809722A (en) * | 1997-02-06 | 1998-09-22 | Keith M. Wright | Girder supported reinforced concrete slab building structures with shearing connectors, and methods of constructing the building structures and connectors |
US6145270A (en) * | 1997-06-24 | 2000-11-14 | Hillman; John | Plasticon-optimized composite beam system |
US6170105B1 (en) * | 1999-04-29 | 2001-01-09 | Composite Deck Solutions, Llc | Composite deck system and method of construction |
US6357191B1 (en) * | 2000-02-03 | 2002-03-19 | Epic Metals Corporation | Composite deck |
US6455131B2 (en) * | 1997-06-02 | 2002-09-24 | West Virginia University | Modular fiber reinforced polymer composite deck system |
US6591567B2 (en) * | 2000-12-09 | 2003-07-15 | West Virginia University | Lightweight fiber reinforced polymer composite modular panel |
US20040128939A1 (en) * | 2002-07-12 | 2004-07-08 | Kim Byung Suk | Composite bearing deck comprising deck panel and concrete |
US7131161B2 (en) * | 2004-09-06 | 2006-11-07 | Sung Woo Lee | Fiber reinforced polymer composite bridge deck of tubular profile having vertical snap-fit connection |
-
2005
- 2005-06-02 KR KR1020050047435A patent/KR100641607B1/en not_active IP Right Cessation
-
2006
- 2006-05-30 US US11/442,162 patent/US20060272111A1/en not_active Abandoned
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3496691A (en) * | 1968-08-02 | 1970-02-24 | Bethlehem Steel Corp | Concrete forms |
US5339475A (en) * | 1991-05-30 | 1994-08-23 | The Queen In Right Of Ontario As Represented By The Ministry Of Transportation | Load supporting structure |
US5457840A (en) * | 1994-05-24 | 1995-10-17 | Derechin; Joshua | Fatigue resistant shear connector |
US5463786A (en) * | 1994-09-12 | 1995-11-07 | Grate-Lok Co., Inc. | Weldless grating for bridge decks |
US5664378A (en) * | 1995-12-07 | 1997-09-09 | Bettigole; Robert A. | Exodermic deck system |
US5809722A (en) * | 1997-02-06 | 1998-09-22 | Keith M. Wright | Girder supported reinforced concrete slab building structures with shearing connectors, and methods of constructing the building structures and connectors |
US6455131B2 (en) * | 1997-06-02 | 2002-09-24 | West Virginia University | Modular fiber reinforced polymer composite deck system |
US6145270A (en) * | 1997-06-24 | 2000-11-14 | Hillman; John | Plasticon-optimized composite beam system |
US6170105B1 (en) * | 1999-04-29 | 2001-01-09 | Composite Deck Solutions, Llc | Composite deck system and method of construction |
US6357191B1 (en) * | 2000-02-03 | 2002-03-19 | Epic Metals Corporation | Composite deck |
US6591567B2 (en) * | 2000-12-09 | 2003-07-15 | West Virginia University | Lightweight fiber reinforced polymer composite modular panel |
US20040128939A1 (en) * | 2002-07-12 | 2004-07-08 | Kim Byung Suk | Composite bearing deck comprising deck panel and concrete |
US7131161B2 (en) * | 2004-09-06 | 2006-11-07 | Sung Woo Lee | Fiber reinforced polymer composite bridge deck of tubular profile having vertical snap-fit connection |
Cited By (24)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8321985B2 (en) * | 2010-07-05 | 2012-12-04 | John Reginald Newton | Support platform and method of construction thereof |
WO2013145726A1 (en) * | 2012-03-27 | 2013-10-03 | 国立大学法人大阪大学 | Flooring and path surface flooring structure in which flooring is combined |
CN103643633A (en) * | 2013-12-26 | 2014-03-19 | 黄海林 | Manufacturing method for ribbed FRP members |
CN103967272A (en) * | 2014-03-19 | 2014-08-06 | 哈尔滨工程大学 | FRP permanent formwork and FRP formwork and concrete combined floor |
CN103835234A (en) * | 2014-03-30 | 2014-06-04 | 黄海林 | FRP component with ribs and construction method for combination between FRP component and concrete |
US20160160457A1 (en) * | 2014-12-03 | 2016-06-09 | National Applied Research Laboratories | Light-Weight Temporary Bridge System and Building Method thereof |
CN104805767A (en) * | 2015-05-06 | 2015-07-29 | 山东大学 | Prefabricated assembly FRP-reinforcing steel-bar-concrete combined bridge deck and construction method |
USRE48256E1 (en) * | 2015-05-18 | 2020-10-13 | Patrick Revenew | Bridge assembly and method |
US9739022B1 (en) * | 2015-05-18 | 2017-08-22 | Patrick Revenew | Bridge assembly and method |
JP2017020199A (en) * | 2015-07-08 | 2017-01-26 | 三菱樹脂インフラテック株式会社 | Construction/civil engineering structure and bridge |
US20170058517A1 (en) * | 2015-08-29 | 2017-03-02 | Clark Pacific Precast, Llc | Integrated access floor system |
CN106337361A (en) * | 2016-08-29 | 2017-01-18 | 东南大学 | Separated fiber reinforced plastic (FRP)-concrete-steel composite girder bridge structure and construction method thereof |
US9995365B1 (en) * | 2017-03-28 | 2018-06-12 | SK Commercial Construction, Inc. | Method and system for improved semiconductor processing equipment vibration isolation and reduction |
US10060501B1 (en) * | 2017-03-28 | 2018-08-28 | SK Commercial Construction, Inc. | Method for improved semiconductor processing equipment tool pedestal/pad vibration isolation and reduction |
US10113610B2 (en) * | 2017-03-28 | 2018-10-30 | SK Commercial Construction, Inc. | Method for improved semiconductor processing equipment tool pedestal / pad vibration isolation and reduction |
US10480611B2 (en) * | 2017-03-28 | 2019-11-19 | SK Commercial Construction, Inc. | Method for improved semiconductor processing equipment tool pedestal / pad vibration isolation and reduction |
JP6166005B1 (en) * | 2017-03-30 | 2017-07-19 | 株式会社シラヤマ | Road bridge cover widening unit |
US10309068B2 (en) * | 2017-06-06 | 2019-06-04 | Contech Engineered Solutions LLC | Prefabricated bridge including steel abutments |
CN108454136A (en) * | 2018-04-20 | 2018-08-28 | 任换锋 | A kind of glass-fiber reinforced plastic grille automated production equipment |
US20200032465A1 (en) * | 2018-07-30 | 2020-01-30 | TrueNorth Steel, Inc. | Bridge decking and installation |
US10920382B2 (en) * | 2018-07-30 | 2021-02-16 | TrueNorth Steel, Inc. | Bridge decking and installation |
ES2795835A1 (en) * | 2019-05-24 | 2020-11-24 | Univ Catalunya Politecnica | HYBRID STRUCTURAL ELEMENT (Machine-translation by Google Translate, not legally binding) |
CN114657876A (en) * | 2022-04-27 | 2022-06-24 | 合肥工业大学 | FRP bridge deck connecting structure and connecting method |
US11840812B1 (en) * | 2022-09-29 | 2023-12-12 | Fuzhou University | Steel-concrete composite bridge deck slab with steel tube-prefobond rib shear connectors and method for constructing same |
Also Published As
Publication number | Publication date |
---|---|
KR100641607B1 (en) | 2006-11-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20060272111A1 (en) | Fiber reinforced plastics bearing deck module having integrated shear connector and concrete composite bearing deck using the same | |
CN102317154B (en) | A kind of method and system of composite structural truss | |
KR101834006B1 (en) | Roll forming steel plates built-up beam and steel frame using the same | |
KR101036175B1 (en) | Joint structure of PC beam for use in construction of building using PRC integrating method | |
KR101636246B1 (en) | Steel-PC hybrid beam and manufacturing method thereof | |
JP2010265696A (en) | Structure and method for reinforcing concrete floor slab | |
JP4915894B2 (en) | Loading platform floor mounting method and loading platform floor mounting structure | |
US20050000186A1 (en) | Method of manufacturing structural units | |
KR101642110B1 (en) | Stripping Deck Plate | |
KR100502584B1 (en) | structural members made by fiber reinforced plastic | |
KR101001526B1 (en) | Hybrid fiber reinforced polymer panel and temporary structure construction method using the same | |
KR101654699B1 (en) | Shear connector and girder having the same | |
JP2008280747A (en) | Earthquake resisting wall | |
KR101492077B1 (en) | Construction method for cable bridge using transverse prestressed girder | |
KR101189024B1 (en) | Core and Slab Module Made of Fiber Reinforced Plastic using the same | |
KR100568903B1 (en) | Composite Deck having Shear Connector using Hybrid Fiber Reinforced Plastics | |
KR100638165B1 (en) | Structure and Method for Fiber Reinforced Plastics Deck-to-Girder Simple Connections | |
KR100980797B1 (en) | Structure reinfocing method using hybrid reinforced member | |
KR20180022483A (en) | Stripper-type insulating deck | |
KR100787317B1 (en) | Longitudinal connections of slab module made of fiber reinforced plastic | |
KR20100019187A (en) | Beam for gantry used in device manufacturing flat display panel and, dispenser with the same | |
KR101358639B1 (en) | Girder and consturuction method for girder using the same | |
JP4702337B2 (en) | Reinforcing structure and method for reinforcing object having opening | |
KR101103299B1 (en) | Hybrid reinforced member | |
JP4686146B2 (en) | Bonding structure of fiber reinforced plastic member and concrete member |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: KOREA INSTITUTE OF CONSTRUCTION TECHNOLOGY, KOREA, Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:KIM, BYUNG-SUK;CHO, KEUN H.;CHO, JEONG R.;AND OTHERS;REEL/FRAME:017942/0446 Effective date: 20060504 |
|
STCB | Information on status: application discontinuation |