US20050109537A1 - Drilling rig - Google Patents
Drilling rig Download PDFInfo
- Publication number
- US20050109537A1 US20050109537A1 US10/513,080 US51308004A US2005109537A1 US 20050109537 A1 US20050109537 A1 US 20050109537A1 US 51308004 A US51308004 A US 51308004A US 2005109537 A1 US2005109537 A1 US 2005109537A1
- Authority
- US
- United States
- Prior art keywords
- module
- tubular
- drilling
- mud
- drilling rig
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000005553 drilling Methods 0.000 title claims abstract description 80
- 238000003860 storage Methods 0.000 claims abstract description 17
- 239000012530 fluid Substances 0.000 claims abstract description 15
- 230000000712 assembly Effects 0.000 claims abstract description 10
- 238000000429 assembly Methods 0.000 claims abstract description 10
- 239000013535 sea water Substances 0.000 claims abstract description 4
- 239000004020 conductor Substances 0.000 claims description 14
- 238000005520 cutting process Methods 0.000 claims description 14
- 230000007246 mechanism Effects 0.000 claims description 7
- 238000012546 transfer Methods 0.000 claims description 3
- 230000001131 transforming effect Effects 0.000 claims description 3
- 230000009189 diving Effects 0.000 claims 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 14
- 238000005204 segregation Methods 0.000 abstract 1
- 238000009844 basic oxygen steelmaking Methods 0.000 description 10
- 238000007667 floating Methods 0.000 description 5
- 238000000034 method Methods 0.000 description 5
- 238000004519 manufacturing process Methods 0.000 description 4
- 230000033001 locomotion Effects 0.000 description 3
- 230000032258 transport Effects 0.000 description 3
- 206010019233 Headaches Diseases 0.000 description 2
- 230000009471 action Effects 0.000 description 2
- 238000011109 contamination Methods 0.000 description 2
- 229930195733 hydrocarbon Natural products 0.000 description 2
- 150000002430 hydrocarbons Chemical class 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 230000002093 peripheral effect Effects 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 239000003643 water by type Substances 0.000 description 2
- FAPWRFPIFSIZLT-UHFFFAOYSA-M Sodium chloride Chemical compound [Na+].[Cl-] FAPWRFPIFSIZLT-UHFFFAOYSA-M 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 230000009977 dual effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 239000003129 oil well Substances 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 238000005070 sampling Methods 0.000 description 1
- 239000013049 sediment Substances 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 238000005303 weighing Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B15/00—Supports for the drilling machine, e.g. derricks or masts
- E21B15/02—Supports for the drilling machine, e.g. derricks or masts specially adapted for underwater drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/12—Underwater drilling
- E21B7/124—Underwater drilling with underwater tool drive prime mover, e.g. portable drilling rigs for use on underwater floors
Definitions
- the present invention relates to a drilling rig that can be used underwater.
- Drilling wells including their completion and workover, is a well established practice on land; and also offshore, on platforms, jack-ups, barges, semi-submersibles and drill ships. Subsea, however, although there are some small seabed core sampling machines, drilling for hydrocarbons has not been carried out by a rig that is located totally underwater.
- a drilling rig which comprises (i) a stinger that can access stored tubulars and can convey mud into the string, (ii) a storage system for all tubulars and tubular assemblies, (iii) a drilling mast that carries the stinger and is able to move laterally between the well bore centre and the storage location of each tubular or tubular assembly in the storage system (iv) a continuous circulation coupler which is able to segregate the seawater from the drilling fluids and can make and break the tool joint connections, under pressure and (v) an assembly means which can launch and retrieve the rig from a rig support vessel and can assemble and disassemble the rig at the seabed.
- the rig is in the form of a modular system to enable the seabed rig to be easily launched and retrieved from a rig support vessel and easily assembled and disassembled at the seabed.
- ROTs remotely operated tools
- ROVs remotely operated vehicles
- ROT and ROV umbilicals and cables autonomous underwater vehicles
- the rig is assembled and controlled from a rig vessel which can include the drilling control centre, mud storage and pumps, pipe storage and handling, drilling power supply, heave compensated umbilical handling systems, 100 ton heave compensated cranes, gantry, ROT, ROV and AUV Davits etc.
- an automated, programmed or remotely controlled handling device such as the stinger, to locate, penetrate and grip a particular tubular or tubular assembly.
- the stinger preferably provides internal support for a tubular to guide it and/or centralise it when entering a well bore, drilling equipment or storage location and the stinger can grip a tubular or tubular assembly from the inside, while another tubular, such as the top drive sub, is connected and torqued up.
- the stinger resists the internal pressure of a well bore or drilling equipment, while a tubular is slid off the stinger into the said well bore or drilling equipment, thus greatly reducing the snubbing force that is typically required.
- This enables the top drive to snub a stand of pipe into a wellbore, or drilling equipment, without exceeding the limited maximum snubbing force available from a conventional top drive, or risking the buckling of the stand of pipe.
- a device for gripping the top of the pipe by a stinger is described in GB Patent Application 0207908.5.
- the storage system preferably comprises containers for the tubulars and preferably there are one or more containers that serve to store most or all the tubulars and/or tubular assemblies such that each said tubular and/or tubular assembly is allocated a designated storage location.
- the containers accord with the International ISO standards such that the said containers may be transported as ISO containers by road, rail and sea. In use the containers are adapted to perform their function in the vertical or at any other angle in addition to their conventional horizontal orientation or aspect
- the containers are adapted so that they can be connected to each other such that one container can support the weight of another full container, when both are parallel but not in the conventional substantially horizontal plane.
- the containers can be 10, 20 30 or 40 feet in length and also otherwise conform to standard ISO container specification.
- the assembled rig on the seabed preferably comprises a wellhead module mounted on a foundation conductor which has been driven or drilled into the seabed.
- the wellhead module supports, laterally, a power module and a mud module and there are pipe modules which are also mounted adjacent to the wellhead module which can store tubulars and tubular assemblies.
- the mast module can be attached directly on top of the wellhead module such that the stinger can be moved in and out of a tubular by a carriage or mechanism mounted on the mast.
- both the stinger and top drive are mounted on the mast such that the mud supply is to the stinger and the top drive seals to the exterior surface of the stinger.
- the mast In use the mast can be moved laterally such that it can be made to line up with a tubular or tubular assembly that may or may not be on the centre line of the well bore.
- the foundation conductor is driven into the seabed by a driving module, with a power module attached and extra lengths of conductor may be connected using the ROTs. Alternatively, the conductor may be jetted in or drilled in using the mast module with power module attached.
- the mast moving means moves the mast over a tubular storage module and the stinger penetrates and grips the selected tubular.
- the top drive lowers and screws the top drive sub into the tubular, after which the stinger releases the tubular and the top drive withdraws the tubular onto the stinger.
- the mast is then moved over the drill string and the tubular connected using the continuous circulation coupler and drilling continued. To remove a tubular the process is reversed.
- the rig can access a stored tubular or tubular assembly by penetrating it with the stinger, remove it from storage, move it laterally, line it up with a well bore, insert it into a well bore or drilling equipment, and drill with it, or connect it to a tubular string and then drill with it, or connect it to a tubular string and then release it to fetch another tubular or tubular assembly to add to the string.
- the rig can connect a tubular to a top drive or top drive sub before inserting it into the well bore or drilling equipment and can remove a tubular or tubular assembly from the well bore centre line and place it in storage before untorquing and unscrewing the tubular or tubular assembly from the top drive or top drive sub using a stinger to grip the pipe.
- a submerged mud module that contains a choke or machine which can reduce the pressure of the fresh mud supply before it enters the drill string and/or a booster pump or machine that increases the pressure of the returning mud and cuttings before it returns to the rig vessel.
- a submerged power module that provides electrical and/or hydraulic power to all other modules by transferring and transforming electrical power from the electric cable from the rig vessel.
- the rig can be connected to the rig vessel by flexible umbilicals, or flexible risers, to transfer all of the necessary power, mud and instrumentation between the rig vessel and the seabed rig, to enable the seabed rig to drill full sized conventional wells for oil and gas without the need for rigid risers of any sort.
- the rig can operate without any connection with a rig vessel at all, provided power is supplied by a submerged generator or a power pack that is regularly replaced, mud is reconditioned for re-use on the seabed, cuttings are containerised and regularly removed and the pipe modules and supply of fresh drilling fluids are regularly flown in by AUVs.
- the rig can have any or all of its modules, conforming to the ISO standards for corners, dimensions or specifications.
- the method provides supplying mud, at the appropriate pressure in the immediate vicinity of the tubular connection that is about to be broken such that the flow of mud so provided overlaps with flow of mud from the top drive; as the tubular separates from the drill string the flow of mud to the separated tubular is stopped e.g. by the action of a blind ram or other preventer or other closing device such as a gate valve.
- the separated tubular can then be flushed out e.g. with air or water (if under water) depressured, withdrawn, disconnected from the top drive and removed.
- the action of the preventer is to divide the tubular connection into two parts e.g. by dividing the pressure chamber of the connector connecting the tubular to the drill string.
- the drill string continues to be circulated with mud at the required pressure.
- a tubular can be added using a clamping means which comprises a coupler and the top end of the drill string is enclosed in and gripped by the lower section of the coupler, in which coupler there is a blind preventer which separates the upper and lower sections of the coupler.
- the tubular is then added to the upper section of the coupler and is sealed by an annular preventer and the blind preventer is opened and the lower end of the tubular and upper end of the drill string joined together.
- the lower section of the coupler below the blind preventer will already enclose the upper end of the drill stand before the tubular is lowered and when the tubular is lowered into the coupler the upper section of the coupler above the blind preventer will enclose the lower end of the tubular.
- the tubular can be added to the drill string by attaching the lower section of the coupler to the top of the rotating drill string with the blind preventer in the closed position preventing escape of mud or drilling fluid.
- the tubular is lowered from substantially vertically above into the upper section of the coupler and the rotating tubular is then sealed in by a seal so that all the drilling fluid is contained.
- the blind preventer is then opened and the tubular and the drill stand brought into contact and joined together with the grips bringing the tubular and drill string to the correct torque.
- the lower end of the tubular stand and the upper end of the drill string are separated by the blind preventer such that the tubular stand can be sealed in by an upper annular preventer so that when the blind preventer is opened there is substantially no escape of mud or drilling fluid and the tubular stand and drill string can then be brought together and made up to the required torque.
- the tubular spool or saver sub under the top drive penetrates the upper part of the pressure chamber, is flushed out with mud and pressured up; the blind ram opens allowing the top drive to provide circulating mud and the spool and to connect to and to torque up the into the drill string.
- the pressure vessel can then be depressured, flushed with air (or water if under water) and the drill string raised until the next join is within the pressure chamber, the slips and grips' closed, the pressure chamber flushed with mud and pressured up and the cycle repeated.
- the coupler includes rotating slips which support the drill string while the top drive is raised up to accept and connect another driver.
- the making and breaking of joints can be carried out using conventional rotating slips or grips which can be outside the coupler but preferably are within the coupler.
- the clamping means preferably comprises clamps which comprise substantially two semi-circular clamps which can be positioned at either side of a tubular and driven inwards, e.g. hydraulically until their ends meet and the tubular is firmly clamped and the tool joint or connection between the tubulars completely enclosed.
- the mud, drilling fluids or other circulating fluids can be kept segregated from the environment there is the capacity to reduce pollution and this is particularly advantageous as in the present invention where it reduces the risk of contamination of the sea-water, particularly with oil based muds which will not be able to enter the marine environment and no water can contaminate the mud or reach sensitive well bores.
- the foundation conductor is spudded in by the driving module and is then driven into the seabed.
- the foundation casing can be held vertical, or at whatever angle is preferred, by the thrusters of a remotely operated tug (ROT) connected, for the purpose, to the top of the driving module. Additional lengths can be added to the foundation casing and piled, as is normal practice.
- ROT remotely operated tug
- the driving module is removed and replaced by the mast module mounted on the base module.
- the mud and power modules connected to the rig vessel by their umbilicals, are connected to the base module and a pipe module is also attached to the base module.
- the foundation casing is then drilled out with mud or water, returning the drill cuttings to the rig vessel if necessary.
- the foundation casing may be further reinforced by installing an inner casing and cementing the annulus. This is particularly necessary when the laterally unsupported depth to firm consolidated sediment is considerable.
- the mast module mounted on the base module, with mud, power and pipe modules attached can initiate the hole.
- the base module can be supported on the seabed by a gimballed base to hold its lateral location and to resist rotation.
- the whole drilling assembly can be held at the required angle by the thrusters of an ROT attached to the top of the mast module. If the base of the base module is unable to gain purchase on the seabed, then rotation of the seabed rig can be resisted by using the ROT thrusters to counter the torque of the mast module.
- the mast module moves aside and the foundation casing can be inserted and secured either mechanically or by cementing, using the mud circulation circuit.
- the seabed rig drills ahead, using standard drill pipe, returning all cuttings to the rig vessel and installs casing as normal.
- the base module contains a range of slips to support and grip whatever string is hanging in the hole. All joints of drill string or casing are transported to the seabed rig in pipe modules and are accessed and extracted by the mast module.
- the base module is replaced by the 183 ⁇ 4′′ diverter module, through which all further drilling for, and installation of, casings down to and including 133 ⁇ 8′′ is carried out by the same seabed rig assembly.
- Producing hydrocarbons to surface requires at least one of the two umbilicals to be rated at a differential of 5,000 psi, or, preferably, for a third special riser to be connected to transport produced fluids to a floating production vessel, while the well is still under control of the rig vessel.
- the mud module receives fresh mud from the inlet mud header and passes return mud and drill cuttings to the outlet mud header. Both headers run through the mud module, diverter or stack modules, and power module, so that, either umbilical can be connected to either header. On board the rig vessel are standard mud pumps and standard cuttings retrieval and mud cleaning equipment.
- the inlet mud can be choked to control the inlet pressure at the seabed.
- the low pressure of the returning mud at seabed requires boosting to return it to the rig vessel.
- the ‘choke’ is a ‘pressure let down’ machine, reciprocating pump or turbine that can contribute power to the ‘booster pump’.
- the inlet mud is choked at the seabed to achieve the required inlet pressure and flow at the seabed.
- the booster pump is also controlled to achieve the required pressure and flow of the returning mud and cuttings in the annulus at the seabed.
- Both well head pressures and flows can be prescribed by a bore hole pressure model, which simulates the bore hole, real time, as the well is being drilled and allows the required downhole pressure at the bit to be achieved and maintained.
- Inlet mud within the mud module is switched between the stinger in the drilling mast and the coupler, as the tool joint connections are made, to maintain continuous circulation.
- the mud system is the same as on a conventional rig.
- the power requirement on the seabed rig is similar to that of a conventional rig except that the mud pumps remain on the floating vessel.
- the typical power requirement for a 30,000 ft hole is 1,100 HP for Top Drive, 2,000 HP for Drawworks and 4,000 HP for the mud pumps.
- the typical power requirement for the seabed rig will be 1,100 HP for the top drive, 1,500 HP for the Drawworks and some 500 HP for the mud choking and boosting system, tubular handling, BOP Stack and coupler actuation, subsea connections, lighting and cameras, instrumentation and communications, totalling some 3,000 HP.
- the maximum operational combination is estimated to be of the order of 2,700 HP, or some 2 Mw. At a depth of 10,000 ft to 20,000 ft it is probably most economic to run the power down the umbilicals at 6.6 Kv, and transform down within the power module.
- the seabed rig In the event of sudden loss of power from the rig vessel, the seabed rig will follow a pre-programmed sequence to shut in the well bore using a combination of stored energy, including hydraulic and/or battery power.
- pipe modules will be of a mass of less than 50 to 75 tons.
- Those few pipe modules carrying heavy tubulars such as drill collars or extra heavy drill pipe or tubular assemblies may be part loaded to limit the total mass to 50 to 75 tons.
- the mud module containing the seabed chokes and booster pumps, the power module, containing transformers, switch gear and reserve power supply, the mast module, and the diverter module, containing an 183 ⁇ 4′′ BOP/Diverter, may all be limited to 50 to 75 tons.
- the wellhead module though, is likely to be considerably more than 75 tons but can be split into 2 or 3 sections of about 50 to 75 tons each.
- the design could be:
- the ROTs can attach to and guide all modules.
- the advantage of using the rig vessel's cranes for transportation is speed, in that the weight of the module can assist in the descent and crane power can assist in the ascent. This leaves the ROT's power to be used to compensate for sea currents and control the final positioning.
- the possibility of combining the lifting, power supply and control signals in a single ROT umbilical cable is possible, at least for moderate water depths.
- the rig comprises a central unit, mounted on the foundation conductor, which is either a base module, a diverter module or a wellhead module.
- the base module is used to drill for and install casing of 183 ⁇ 4′′ and larger and consists of:
- a connector that latches onto the foundation conductor; a large annulus to contain and retrieve the returning mud and cuttings, which is piped to the mud headers; a means for piping fresh mud from the mud headers to the Drilling Mast; an internal rotary slips to support and grip a short drill string and the casing strings; power drives from the power module to the mast module; and instrument, electrical and hydraulic connections between all peripheral modules.
- the base module is replaced by the diverter module, which is the same as the base module but contains an 183 ⁇ 4′′ BOP stack or diverter, to contain and control shallow gas or water.
- the diverter module is replaced by the wellhead module, which contains:
- the drilling mast module includes:
- a stinger that grips the inside of each tubular drives to the stinger for axial motion and gripping; a travelling carriage on which the stinger is mounted; a modified top drive; drives to the top drive for axial and rotary motion; a travelling carriage on which the top drive is mounted; mechanical drive; mud supply, instrument, electrical and hydraulic connections to the module beneath, which may be the base, diverter or wellhead module.
- the whole assembly can be mobilised in modules weighing less than 75 tons from a floating vessel and be assembled, in a water depth of up to 20,000 feet or more, into a Seabed Drilling Rig capable of drilling a full sized conventional oil well from the seabed.
- FIG. 1 shows underwater drilling using the invention
- FIG. 2 shows a front elevation of the rig
- FIG. 3 shows a side elevation of the rig
- FIG. 4 shows a plan view of the rig
- FIG. 5 shows a detailed view of the mast moving means
- FIGS. 6 to 10 show the sequence of constructing the well
- the modules forming the seabed rig are transported from the rig vessel ( 9 ) to the seabed rig ( 1 ) by remotely operated tools ( 10 ) and monitored by autonomous underwater vehicles ( 15 ).
- the rig vessel ( 9 ) is connected to the seabed rig ( 1 ) via two or more umbilicals ( 8 ) to the power module ( 4 ) and mud module ( 5 ) ( FIG. 2 ).
- the two umbilicals ( 8 ) shown can transport either mud or mud and cuttings, or any other drilling fluid, to or from the seabed rig ( 1 ) and both carry electric power, control and instrumentation signals.
- power and mud, plus other services may require separate umbilicals, thus increasing the number of umbilicals to three or four.
- FIGS. 2, 3 and 4 which show the rig in position when drilling normally and FIG. 2 is a view with module 6 a of FIG. 4 removed
- a wellhead module ( 3 ) is mounted directly on a foundation conductor ( 2 ) and a power module ( 4 ) and mud module ( 5 ) connect directly to the wellhead module ( 3 ) and up to six pipe modules ( 6 ) are each connected to the adjacent stack module, power module or mud module, three on one side ( 6 ) and three on the other side ( FIG. 4 ).
- the pipe modules hold the tubulars to be added to a drill string during continuous drilling or to store tubulars when tubulars are removed from the drill string.
- mast module ( 7 ) mounted on the top of the wellhead module ( 3 ) but can extend laterally to access any tubular, or tubular assembly, stored within any of the pipe modules ( 6 ).
- the mast ( 7 ) comprises a structure consisting of two torsion tubes ( 21 ) between which travel the two carriages ( 16 ) and ( 18 ) on which are mounted the stinger ( 17 ) and top drive ( 19 ) respectively.
- Beneath the top drive ( 19 ) is the top drive sub ( 20 ).
- the top drive ( 19 ) and the top drive sub ( 20 ) encircle and slide on the outer surface of the stinger ( 17 ).
- the top drive ( 19 ) seals against the outer surface of the stinger ( 17 ).
- the top drive ( 19 ) includes a rotary seal between the top drive ( 19 ) and rotating sub ( 20 ) and an axial seal between the top drive ( 19 ) and the stinger ( 17 ).
- the mast module ( 7 ) is shown displaced laterally from the centre line of the well bore by the hydraulic mechanism ( 22 ) in order to access a tubular in the far side of a pipe module ( 6 ).
- the stinger ( 17 ) and stinger carriage ( 16 ) will move downwards by some 6 feet to penetrate and grip the selected tubular from the inside.
- the top drive ( 19 ) and top drive carriage ( 18 ) will also move downwards to screw the top drive sub ( 20 ) into the tubular.
- the stinger ( 17 ) will release its grip on the tubular and the top drive ( 19 ) and top drive carriage ( 18 ) will rise up to the top of the mast module ( 7 ) pulling the tubular onto the stinger ( 17 ), which, is also raised to its top position.
- the mechanism ( 22 ) will then return the whole mast assembly ( 7 ) to the centre line of the well bore and the top drive ( 19 ) can then insert the tubular into the coupler within the top of the well head module (or the diverter module or the base module).
- the coupler will then effect the connection between the tubular and the string as described in any one of patent applications PCT/GB97/02815, PCT/GB99/03411 and PCT/GB01/04803.
- FIGS. 6 to 10 show the sequence of constructing the well, starting with the installation of the foundation conductor:
- the conductor ( 2 ) is either driven in by the driving module ( 11 ), with the power module ( 4 ) attached and maintained in the required orientation by the ROT ( 10 ), or drilled in by the mast module ( 7 ) mounted on the base module ( 23 ) with the power module ( 4 ) and a pipe module ( 6 ) attached and maintained in the required orientation by the gimballed base ( 24 ) and the ROT ( 10 ).
- the base module ( 23 ) is mounted on the installed foundation conductor ( 2 ) and the mast module ( 7 ), mounted on the base module ( 23 ), drills and installs casings down to a diameter of 183 ⁇ 4′′.
- the power module ( 4 ), mud module ( 5 ) and pipe modules ( 6 ) are preferably attached to the base module ( 23 ).
- the base module ( 23 ) is placed by the diverter module ( 12 ), which contains a large bore BOP (probably of 183 ⁇ 4′′ size) to contain any shallow gas or water that may be found during the initial drilling.
- the diverter module ( 12 ) transports fresh mud from the mud module ( 5 ) to the mast module ( 7 ) and the returning mud and cuttings back to the mud module ( 5 ).
- the diverter module ( 12 ) also transmits power and instrumentation and control signals between the surrounding modules and the drilling mast.
- the diverter module ( 12 ) is replaced by the wellhead module ( 3 ), which contains the smaller BOP stack ( 13 ) (probably 135 ⁇ 8′′) and coupler ( 14 ).
- the switch from the diverter module ( 12 ) to the wellhead module ( 3 ) can take place at a larger diameter than 133 ⁇ 8′′ if the particular field requires it, provided the internal diameter of the wellhead module ( 3 ) is increased.
- the assembly shown in FIG. 10 is capable of installing, testing and completing the well provided all of the tubular assemblies including downhole production assemblies are delivered to the seabed rig stored in the appropriately sectioned pipe modules ( 6 ).
- the wellhead production tree, controls and flowline connections can all be flown to the wellhead and connected by the ROTs, monitored by ROVs and/or AUVs as is now state of the art in subsea production technology.
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Fluid Mechanics (AREA)
- Environmental & Geological Engineering (AREA)
- Physics & Mathematics (AREA)
- Geochemistry & Mineralogy (AREA)
- Mechanical Engineering (AREA)
- Earth Drilling (AREA)
- Steroid Compounds (AREA)
- Organic Low-Molecular-Weight Compounds And Preparation Thereof (AREA)
- Superconductors And Manufacturing Methods Therefor (AREA)
- Ceramic Products (AREA)
- Glass Compositions (AREA)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US11/654,343 US7584796B2 (en) | 2002-04-30 | 2007-01-17 | Drilling rig |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GBGB0209861.4A GB0209861D0 (en) | 2002-04-30 | 2002-04-30 | Drilling rig |
GB0209861.4 | 2002-04-30 | ||
PCT/GB2003/001828 WO2003093625A2 (en) | 2002-04-30 | 2003-04-29 | Underwater drilling rig |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US11/654,343 Continuation US7584796B2 (en) | 2002-04-30 | 2007-01-17 | Drilling rig |
Publications (1)
Publication Number | Publication Date |
---|---|
US20050109537A1 true US20050109537A1 (en) | 2005-05-26 |
Family
ID=9935791
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US10/513,080 Abandoned US20050109537A1 (en) | 2002-04-30 | 2003-04-29 | Drilling rig |
US11/654,343 Expired - Fee Related US7584796B2 (en) | 2002-04-30 | 2007-01-17 | Drilling rig |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US11/654,343 Expired - Fee Related US7584796B2 (en) | 2002-04-30 | 2007-01-17 | Drilling rig |
Country Status (7)
Country | Link |
---|---|
US (2) | US20050109537A1 (de) |
EP (1) | EP1507952B1 (de) |
AT (1) | ATE331117T1 (de) |
AU (1) | AU2003229958A1 (de) |
DE (1) | DE60306374D1 (de) |
GB (1) | GB0209861D0 (de) |
WO (1) | WO2003093625A2 (de) |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070196180A1 (en) * | 2005-07-05 | 2007-08-23 | Seabed Rig As | Drilling Rig Placed on the Sea Bed and Equipped for Drilling of Oil and Gas Wells |
US20080093082A1 (en) * | 2006-10-19 | 2008-04-24 | Adel Sheshtawy | Underwater seafloor drilling rig |
US20080149342A1 (en) * | 2004-12-23 | 2008-06-26 | Fred.Olsen Energy Asa | Device For Storage Of Tubulars, Apparatus For Handling Tubulars And A Method For Disassembling A Pipe String |
US20080156530A1 (en) * | 2006-03-20 | 2008-07-03 | Seabed Rig As | Separation Device for Material from a Drilling Rig Situated on the Seabed |
US20080267716A1 (en) * | 2007-04-30 | 2008-10-30 | D Souza Richard | Shallow/intermediate water multipurpose floating platform for arctic environments |
US20080271922A1 (en) * | 2006-03-20 | 2008-11-06 | Seabed Rig As | Tool Handling Device in a Drillrig That is Situated on the Sea Bed |
US20090014213A1 (en) * | 2006-03-20 | 2009-01-15 | Per Olav Haughom | Separation Device for Material from a Power Tong on a Drilling Rig Situated on the Sea Bed |
EP2063067A1 (de) | 2007-10-08 | 2009-05-27 | Gebr. van Leeuwen Harmelen B.V. | Unterwasserbohrvorrichtung und Verfahren zur Durchführung einer Unterwasserbohrung, insbesondere zum Anbringen einer Unterwasserverankerung |
US20090200036A1 (en) * | 2006-03-22 | 2009-08-13 | Ltrec B.V. | Method for Subsea Hydrocarbon Recovery |
US20110272194A1 (en) * | 2009-11-17 | 2011-11-10 | Bauer Maschinen Gmbh | Underwater drilling arrangement and method for introducing a tubular foundation element into the bed of a body of water |
US20180108270A1 (en) * | 2016-10-18 | 2018-04-19 | Zhejiang Ocean University | Oceaneering Test Platform Device for Simulating Oceaneering Working Conditions |
CN109944548A (zh) * | 2019-02-23 | 2019-06-28 | 中国石油大学(华东) | 海底钻机钻井系统及方法 |
US20190268571A1 (en) * | 2018-02-28 | 2019-08-29 | Schlumberger Technology Corporation | CCTV System |
CN111577119A (zh) * | 2019-01-31 | 2020-08-25 | 中交二公局第一工程有限公司 | 结合旋挖钻与冲击钻协同成孔装置及方法 |
Families Citing this family (27)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20060016621A1 (en) * | 2004-06-09 | 2006-01-26 | Placer Dome Technical Services Limited | Method and system for deep sea drilling |
NO324989B1 (no) * | 2006-05-02 | 2008-01-14 | Seabed Rig As | Anordning ved borerigg på havbunnen |
NO336821B1 (no) * | 2007-02-14 | 2015-11-09 | Robotic Drilling Systems As | Fremgangsmåte og anordning for å bygge opp en borerigg på havbunnen |
NO20072021L (no) * | 2007-04-20 | 2008-10-21 | Seabed Rig As | Fremgangsmate og anordning for intervensjon i en undervanns produksjonsbronn |
US7380614B1 (en) * | 2007-05-11 | 2008-06-03 | Williamson & Associates, Inc. | Remotely operated water bottom based drilling system using cable for auxiliary operations |
NO326427B1 (no) | 2007-05-30 | 2008-12-01 | Wellquip As | Anordning ved toppdrevet boremaskin for kontinuerlig sirkulasjon av borevaeske |
WO2009048319A2 (en) * | 2007-10-10 | 2009-04-16 | Itrec B.V. | Installing an expandable tubular in a subsea wellbore |
US7717193B2 (en) * | 2007-10-23 | 2010-05-18 | Nabors Canada | AC powered service rig |
US20090178848A1 (en) * | 2008-01-10 | 2009-07-16 | Perry Slingsby Systems, Inc. | Subsea Drilling System and Method for Operating the Drilling System |
US20090255728A1 (en) * | 2008-04-14 | 2009-10-15 | Tgh (Us), Inc. | Wireline System |
WO2011079321A2 (en) | 2009-12-24 | 2011-06-30 | Wright David C | Subsea fluid separator |
AU2010356823B2 (en) * | 2010-06-30 | 2016-03-03 | Marl Technologies Inc. | Remotely operable underwater drilling system and drilling method |
US8464752B2 (en) | 2010-06-30 | 2013-06-18 | Hydril Usa Manufacturing Llc | External position indicator of ram blowout preventer |
EP2466065B1 (de) * | 2010-12-17 | 2013-05-15 | Welltec A/S | Bohrlochabschluss |
CN103498638B (zh) * | 2013-09-11 | 2015-10-28 | 宝鸡石油机械有限责任公司 | 一种用于深层连续取芯的水下顶驱装置 |
US20150197989A1 (en) * | 2014-01-16 | 2015-07-16 | Conocophillips Company | Underwater drilling rig assembly and method of operating the underwater drilling rig assembly |
KR101671472B1 (ko) * | 2014-09-25 | 2016-11-01 | 대우조선해양 주식회사 | 해저 머드 순환 시스템 |
KR101695888B1 (ko) * | 2014-09-25 | 2017-01-23 | 대우조선해양 주식회사 | 해저 드릴링 시스템 |
KR101671473B1 (ko) * | 2014-09-25 | 2016-11-01 | 대우조선해양 주식회사 | 파이프 핸들링 시스템 |
NO20141277A1 (no) * | 2014-10-27 | 2016-04-28 | Rc Tools As | Container |
CA3006703A1 (en) * | 2014-11-18 | 2016-05-26 | Aarbakke Innovation A.S. | Subsea slanted wellhead system and bop system with dual injector head units |
CA2996894A1 (en) * | 2015-08-31 | 2017-03-09 | Ihc Marine And Mineral Projects (Proprietary) Limited | Vibration generator for a drilling installation, underwater drilling installation and underwater drilling system |
US9945187B2 (en) | 2016-01-06 | 2018-04-17 | Caterpillar Global Mining America Llc | Surface drill modular mast |
US11512535B2 (en) * | 2018-05-24 | 2022-11-29 | Benthic Usa Llc | Dual rotary elevating geotechnical drill |
EP3942147B1 (de) * | 2019-03-20 | 2023-10-18 | Rigtec Wellservice As | System und verfahren für unterwasserbohrlochoperation |
CN114198024B (zh) * | 2021-11-02 | 2024-03-15 | 长江岩土工程有限公司 | 深水钻孔套管定位装置 |
CN114961563B (zh) * | 2022-06-10 | 2023-03-24 | 中国石油大学(华东) | 一种深水海底连续管钻机 |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2937006A (en) * | 1957-05-17 | 1960-05-17 | Sun Oil Co | Underwater drilling rig |
US3491842A (en) * | 1967-05-08 | 1970-01-27 | Inst Francais Du Petrole | Apparatus for underwater drilling and coring loose sediments |
US3670830A (en) * | 1969-04-09 | 1972-06-20 | Conrad & Hijsch Nv | Drilling apparatus |
US3741320A (en) * | 1971-07-12 | 1973-06-26 | Atlas Copco Ab | Subsea drilling assembly |
US4043407A (en) * | 1975-02-06 | 1977-08-23 | Taywood Seltrust Offshore | Drilling sampling/testing equipment |
US4165690A (en) * | 1976-12-17 | 1979-08-28 | Rock Fall Company Limited | Drill units for drilling and charge laying operations and method of carrying out the operations |
US4255068A (en) * | 1978-07-04 | 1981-03-10 | Techniques Industrielles Et Minieres | Method and a device for undersea drilling |
US6138774A (en) * | 1998-03-02 | 2000-10-31 | Weatherford Holding U.S., Inc. | Method and apparatus for drilling a borehole into a subsea abnormal pore pressure environment |
US6397955B1 (en) * | 1996-12-18 | 2002-06-04 | Racal Geodia (S.A.) | Apparatus for exploring the subsoil |
Family Cites Families (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BE531166A (de) * | 1953-08-14 | |||
US2781185A (en) * | 1954-06-02 | 1957-02-12 | Robbins Davis | Drilling apparatus |
US3493061A (en) * | 1967-05-02 | 1970-02-03 | Ingersoll Rand Co | Apparatus for storing and handling drill rods |
FR1589400A (de) * | 1968-03-29 | 1970-03-31 | ||
FR2088734A5 (de) * | 1970-04-23 | 1972-01-07 | Cocean | |
SE378877B (de) * | 1973-12-21 | 1975-09-15 | Atlas Copco Ab | |
US4348920A (en) * | 1980-07-31 | 1982-09-14 | Varco International, Inc. | Well pipe connecting and disconnecting apparatus |
US5174389A (en) * | 1991-07-12 | 1992-12-29 | Hansen James E | Carousel well rig |
AUPO857197A0 (en) * | 1997-08-15 | 1997-09-04 | Benthic Geotech Pty Ltd | Improved methods for seabed piston coring |
US6095259A (en) * | 1998-04-03 | 2000-08-01 | Keyes; Robert C. | Core sampler apparatus with specific attachment means |
WO2001033029A2 (en) * | 1999-11-02 | 2001-05-10 | Halliburton Energy Services, Inc. | Sub sea bottom hole assembly change out system and method |
IT1314808B1 (it) * | 2000-03-08 | 2003-01-16 | Casagrande Spa | Caricatore automatico per aste di perforazione |
US6488093B2 (en) * | 2000-08-11 | 2002-12-03 | Exxonmobil Upstream Research Company | Deep water intervention system |
WO2004018826A1 (en) * | 2002-08-22 | 2004-03-04 | Hansen, Henning | Subsea drilling module for use in drilling of oil and gas wells |
NO323508B1 (no) * | 2005-07-05 | 2007-05-29 | Seabed Rig As | Borerigg plassert på havbunnen og utstyrt for boring av olje- og gassbrønner |
NO324989B1 (no) * | 2006-05-02 | 2008-01-14 | Seabed Rig As | Anordning ved borerigg på havbunnen |
US7703534B2 (en) * | 2006-10-19 | 2010-04-27 | Adel Sheshtawy | Underwater seafloor drilling rig |
NO336821B1 (no) * | 2007-02-14 | 2015-11-09 | Robotic Drilling Systems As | Fremgangsmåte og anordning for å bygge opp en borerigg på havbunnen |
NO20072021L (no) * | 2007-04-20 | 2008-10-21 | Seabed Rig As | Fremgangsmate og anordning for intervensjon i en undervanns produksjonsbronn |
-
2002
- 2002-04-30 GB GBGB0209861.4A patent/GB0209861D0/en not_active Ceased
-
2003
- 2003-04-29 US US10/513,080 patent/US20050109537A1/en not_active Abandoned
- 2003-04-29 AT AT03722797T patent/ATE331117T1/de not_active IP Right Cessation
- 2003-04-29 AU AU2003229958A patent/AU2003229958A1/en not_active Abandoned
- 2003-04-29 WO PCT/GB2003/001828 patent/WO2003093625A2/en not_active Application Discontinuation
- 2003-04-29 DE DE60306374T patent/DE60306374D1/de not_active Expired - Lifetime
- 2003-04-29 EP EP03722797A patent/EP1507952B1/de not_active Expired - Lifetime
-
2007
- 2007-01-17 US US11/654,343 patent/US7584796B2/en not_active Expired - Fee Related
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2937006A (en) * | 1957-05-17 | 1960-05-17 | Sun Oil Co | Underwater drilling rig |
US3491842A (en) * | 1967-05-08 | 1970-01-27 | Inst Francais Du Petrole | Apparatus for underwater drilling and coring loose sediments |
US3670830A (en) * | 1969-04-09 | 1972-06-20 | Conrad & Hijsch Nv | Drilling apparatus |
US3741320A (en) * | 1971-07-12 | 1973-06-26 | Atlas Copco Ab | Subsea drilling assembly |
US4043407A (en) * | 1975-02-06 | 1977-08-23 | Taywood Seltrust Offshore | Drilling sampling/testing equipment |
US4165690A (en) * | 1976-12-17 | 1979-08-28 | Rock Fall Company Limited | Drill units for drilling and charge laying operations and method of carrying out the operations |
US4255068A (en) * | 1978-07-04 | 1981-03-10 | Techniques Industrielles Et Minieres | Method and a device for undersea drilling |
US6397955B1 (en) * | 1996-12-18 | 2002-06-04 | Racal Geodia (S.A.) | Apparatus for exploring the subsoil |
US6138774A (en) * | 1998-03-02 | 2000-10-31 | Weatherford Holding U.S., Inc. | Method and apparatus for drilling a borehole into a subsea abnormal pore pressure environment |
Cited By (24)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7814992B2 (en) * | 2004-12-23 | 2010-10-19 | Fred. Olsen Energy Asa | Device for storage of tubulars, apparatus for handling tubulars and a method for disassembling a pipe string |
US20080149342A1 (en) * | 2004-12-23 | 2008-06-26 | Fred.Olsen Energy Asa | Device For Storage Of Tubulars, Apparatus For Handling Tubulars And A Method For Disassembling A Pipe String |
US20070196180A1 (en) * | 2005-07-05 | 2007-08-23 | Seabed Rig As | Drilling Rig Placed on the Sea Bed and Equipped for Drilling of Oil and Gas Wells |
US20100021239A1 (en) * | 2005-07-05 | 2010-01-28 | Seabed Rig As | Drilling rig placed on the sea bed and equipped for drilling of oil and gas wells |
US7600570B2 (en) * | 2005-07-05 | 2009-10-13 | Seabed Rig As | Drilling rig placed on the sea bed and equipped for drilling of oil and gas wells |
US20090014213A1 (en) * | 2006-03-20 | 2009-01-15 | Per Olav Haughom | Separation Device for Material from a Power Tong on a Drilling Rig Situated on the Sea Bed |
US20080156530A1 (en) * | 2006-03-20 | 2008-07-03 | Seabed Rig As | Separation Device for Material from a Drilling Rig Situated on the Seabed |
US20080271922A1 (en) * | 2006-03-20 | 2008-11-06 | Seabed Rig As | Tool Handling Device in a Drillrig That is Situated on the Sea Bed |
US7644768B2 (en) * | 2006-03-20 | 2010-01-12 | Seabed Rig As | Separation device for material from a drilling rig situated on the seabed |
US20090200036A1 (en) * | 2006-03-22 | 2009-08-13 | Ltrec B.V. | Method for Subsea Hydrocarbon Recovery |
US20080093082A1 (en) * | 2006-10-19 | 2008-04-24 | Adel Sheshtawy | Underwater seafloor drilling rig |
US7703534B2 (en) * | 2006-10-19 | 2010-04-27 | Adel Sheshtawy | Underwater seafloor drilling rig |
US7628224B2 (en) | 2007-04-30 | 2009-12-08 | Kellogg Brown & Root Llc | Shallow/intermediate water multipurpose floating platform for arctic environments |
US20080267716A1 (en) * | 2007-04-30 | 2008-10-30 | D Souza Richard | Shallow/intermediate water multipurpose floating platform for arctic environments |
EP2063067A1 (de) | 2007-10-08 | 2009-05-27 | Gebr. van Leeuwen Harmelen B.V. | Unterwasserbohrvorrichtung und Verfahren zur Durchführung einer Unterwasserbohrung, insbesondere zum Anbringen einer Unterwasserverankerung |
US20110272194A1 (en) * | 2009-11-17 | 2011-11-10 | Bauer Maschinen Gmbh | Underwater drilling arrangement and method for introducing a tubular foundation element into the bed of a body of water |
US8668028B2 (en) * | 2009-11-17 | 2014-03-11 | Bauer Maschinen Gmbh | Underwater drilling arrangement and method for introducing a tubular foundation element into the bed of a body of water |
US20180108270A1 (en) * | 2016-10-18 | 2018-04-19 | Zhejiang Ocean University | Oceaneering Test Platform Device for Simulating Oceaneering Working Conditions |
US10431114B2 (en) * | 2016-10-18 | 2019-10-01 | Zhejiang Ocean University | Oceaneering test platform device for simulating oceaneering working conditions |
US20190268571A1 (en) * | 2018-02-28 | 2019-08-29 | Schlumberger Technology Corporation | CCTV System |
US10623703B2 (en) * | 2018-02-28 | 2020-04-14 | Schlumberger Technology Corporation | CCTV system |
US11095859B2 (en) * | 2018-02-28 | 2021-08-17 | Schlumberger Technology Corporation | CCTV system |
CN111577119A (zh) * | 2019-01-31 | 2020-08-25 | 中交二公局第一工程有限公司 | 结合旋挖钻与冲击钻协同成孔装置及方法 |
CN109944548A (zh) * | 2019-02-23 | 2019-06-28 | 中国石油大学(华东) | 海底钻机钻井系统及方法 |
Also Published As
Publication number | Publication date |
---|---|
EP1507952A2 (de) | 2005-02-23 |
AU2003229958A1 (en) | 2003-11-17 |
US20070119622A1 (en) | 2007-05-31 |
DE60306374D1 (de) | 2006-08-03 |
US7584796B2 (en) | 2009-09-08 |
GB0209861D0 (en) | 2002-06-05 |
ATE331117T1 (de) | 2006-07-15 |
WO2003093625A3 (en) | 2004-01-08 |
AU2003229958A8 (en) | 2003-11-17 |
EP1507952B1 (de) | 2006-06-21 |
WO2003093625A2 (en) | 2003-11-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7584796B2 (en) | Drilling rig | |
US10954749B2 (en) | Bidirectional downhole isolation valve | |
AU2018202882B2 (en) | Bidirectional downhole isolation valve | |
US6659180B2 (en) | Deepwater intervention system | |
US7703534B2 (en) | Underwater seafloor drilling rig | |
US5533574A (en) | Dual concentric string high pressure riser | |
AU2001282979A1 (en) | Subsea intervention system | |
WO2000034618A1 (en) | Deep ocean drilling system | |
WO1998016716A1 (en) | Continuous circulation drilling method | |
US20140190701A1 (en) | Apparatus and method for subsea well drilling and control | |
US6367554B1 (en) | Riser method and apparatus | |
WO2008100149A1 (en) | Method and device for erecting a drill rig on a sea bed | |
CN114961563B (zh) | 一种深水海底连续管钻机 | |
CN202360053U (zh) | 一种用于深水钻井的工具传送装置 | |
CN102505925B (zh) | 用于深水钻井的工具传送装置 | |
Ayling et al. | Seabed located drilling rig-ITF pioneer project |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: MARIS INTERNATIONAL LTD., UNITED KINGDOM Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:AYLILNG, LAURENCE J.;REEL/FRAME:016235/0251 Effective date: 20041022 |
|
AS | Assignment |
Owner name: MARIS INTERNATIONAL LIMITED, UNITED KINGDOM Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:AYLING, LAWRENCE JOHN;REEL/FRAME:018137/0254 Effective date: 20041022 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |