US20040194950A1 - Methods and apparatus for interconnecting well tool assemblies in continuous tubing strings - Google Patents

Methods and apparatus for interconnecting well tool assemblies in continuous tubing strings Download PDF

Info

Publication number
US20040194950A1
US20040194950A1 US10/827,186 US82718604A US2004194950A1 US 20040194950 A1 US20040194950 A1 US 20040194950A1 US 82718604 A US82718604 A US 82718604A US 2004194950 A1 US2004194950 A1 US 2004194950A1
Authority
US
United States
Prior art keywords
tubing
line
connector
well
tubing string
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US10/827,186
Inventor
Henry Restarick
John Gano
Patrick Laursen
Michael Connell
Nicida Maerefat
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US10/827,186 priority Critical patent/US20040194950A1/en
Publication of US20040194950A1 publication Critical patent/US20040194950A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/02Couplings; joints
    • E21B17/04Couplings; joints between rod or the like and bit or between rod and rod or the like
    • E21B17/041Couplings; joints between rod or the like and bit or between rod and rod or the like specially adapted for coiled tubing
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/20Flexible or articulated drilling pipes, e.g. flexible or articulated rods, pipes or cables
    • E21B17/206Flexible or articulated drilling pipes, e.g. flexible or articulated rods, pipes or cables with conductors, e.g. electrical, optical
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/02Couplings; joints
    • E21B17/028Electrical or electro-magnetic connections

Definitions

  • the present invention relates generally to operations performed and equipment utilized in conjunction with a subterranean well and, in an embodiment described herein, more particularly provides methods and apparatus for interconnecting well tool assemblies in continuous tubing strings.
  • Continuous tubing strings such as coiled tubing strings, have been used for many years in wells.
  • one problem with continuous tubing strings is how to interconnect well tool assemblies in the tubing strings.
  • FIBERSPAR composite coiled tubing available from Fiberspar Spoolable Products, Inc. of Houston, Tex.
  • the FIBERSPAR composite coiled tubing is a composite coiled tubing with eight conductors embedded in its sidewall. Making a connection between this tubing and a tool assembly at a wellsite, where the tubing is severed (i.e., there is no preexisting connector attached to the tubing), typically takes approximately 12 hours to accomplish.
  • One solution that has been proposed is to interconnect well tool assemblies in the tubing string, and then spool the well tool assemblies on a reel along with the tubing.
  • the reel is then delivered to the wellsite with the tool assemblies already interconnected therein, and the tubing string may be conveyed into the well, without having to make connections at the wellsite.
  • One problem with this approach is that the well tool assemblies may have an outer diameter greater than that of the tubing, in which case spooling the tool assemblies on the reel with the tubing may cause damaging stresses to be imparted to the tubing, and special injector heads are needed to convey the large diameter tool assemblies into the well.
  • Another problem is that many tool assemblies, such as well screens and packers, may be too long and inflexible to be spooled onto the reel.
  • a method which permits well tool assemblies to be rapidly interconnected in a continuous tubing string at a wellsite.
  • a method in which tool connectors are attached to a tubing string at respective predetermined downhole locations for tool assemblies.
  • the tubing string is wrapped onto a reel with the attached connectors.
  • the tubing string is then deployed into a well from the reel. As the tubing string is deployed, the tool assemblies are connected to the respective connectors.
  • a method which permits a line extending through a tubing string to be extended through a tool assembly interconnected into the tubing string.
  • Connectors are used which both connect the line at each end of the tool assembly and structurally attach the tool assembly to the tubing.
  • Such connectors are also used to connect between portions of the tubing.
  • a connector system in a further aspect of the invention, includes a gripping structure for grippingly engaging the tubing string, an internal seal structure for sealingly engaging an interior of the tubing string and an external seal structure for sealingly engaging an exterior of the tubing string.
  • the connector includes a line connector attached to the line in the tubing string.
  • a sensor apparatus in a still further aspect of the invention, includes sensors embedded in a sidewall material of a tubular body of the apparatus.
  • the sensors are connected to one or more lines also embedded in the sidewall material.
  • FIG. 1 is a schematic partially cross-sectional side view of an apparatus embodying principles of the present invention
  • FIG. 2 is an elevational view of a tubing reel utilized in the apparatus of FIG. 1;
  • FIGS. 3-5 are side elevational views of alternate connector systems utilized in the apparatus of FIG. 1;
  • FIG. 6 is a quarter-sectional view of a first connector embodying principles of the present invention.
  • FIG. 7 is a quarter-sectional view of a second connector embodying principles of the present invention.
  • FIG. 8 is an enlarged cross-sectional view of an alternate seal structure for use with the second connector
  • FIG. 9 is a partially cross-sectional view of a sensor apparatus embodying principles of the present invention.
  • FIG. 10 is a schematic partially cross-sectional side view of a variation of the apparatus of FIG. 1.
  • FIG. 1 Representatively illustrated in FIG. 1 is an apparatus 10 which embodies principles of the present invention.
  • directional terms such as “above”, “below”, “upper”, “lower”, etc., are used only for convenience in referring to the accompanying drawings. Additionally, it is to be understood that the various embodiments of the present invention described herein may be utilized in various orientations, such as inclined, inverted, horizontal, vertical, etc., and in various configurations, without departing from the principles of the present invention.
  • a continuous tubing string 12 is deployed into a well from a reel 14 . Since the tubing string 12 is initially wrapped on the reel 14 , such continuous tubing strings are commonly referred to as “coiled” tubing strings.
  • the term “continuous” means that the tubing string is deployed substantially continuously into a well, allowing for some interruptions to interconnect tool assemblies therein, as opposed to the manner in which segmented tubing is deployed piecemeal into a well in “joints” or in “stands” limited in length by the height of a rig at the well.
  • Tubing 16 comprises the vast majority of the tubing string 12 .
  • the tubing 16 may be made of a metallic material, such as steel, or it may be made of a nonmetallic material, such as a composite material.
  • the present invention also provides connectors which permit tool assemblies to be interconnected in the tubing string 12 where the tubing 16 is made of a composite material and has lines embedded in a sidewall thereof.
  • tool assemblies in a continuous tubing string have either been spliced into the tubing string just before being deployed into a well, or have been wrapped on a reel with the tubing, so that no splicing is needed when the tubing string is deployed into the well.
  • the former method is very time-consuming and inconvenient to perform at the well, especially in those cases where a composite tubing is used, or where lines extend through the tubing string.
  • the second method requires that the tool assemblies be wrapped on the reel, which may be impossible for very long or rigid assemblies, or for assemblies with diameters so large that they interfere with the wrapping of the tubing on the reel, and which requires special expandable injector heads, as described in U.S. Pat. No. 6,082,454, the disclosure of which is incorporated herein by this reference.
  • well tool assemblies 18 (a packer), 20 (a valve), 22 (a sensor apparatus), 24 (a well screen) and 26 (a spacer or blast joint) are interconnected in the tubing string 12 without requiring splicing of the tubing 16 at the well, and without requiring the tool assemblies to be wrapped on the reel 14 .
  • connectors 28 , 30 are provided in the tubing string 12 above and below, respectively, each of the tool assemblies 18 , 20 , 22 , 24 , 26 .
  • connectors 28 , 30 are incorporated into the tubing string 12 prior to, or as, it is being wrapped on the reel 14 , with each connector's position in the tubing string 12 on the reel 14 corresponding to a desired location for the respective tool assembly in the well.
  • the connectors 28 , 30 are placed in the tubing string 12 at appropriate positions, so that when the tool assemblies 18 , 20 , 22 , 24 , 26 are interconnected to the connectors 28 , 30 and the tubing string 12 is deployed into the well, the tool assemblies will be at their respective desired locations in the well.
  • the tubing string 12 with the connectors 28 , 30 is wrapped on the reel 14 prior to being transported to the well.
  • the tool assemblies 18 , 20 , 22 , 24 , 26 are interconnected between the connectors 28 , 30 as the tubing string 12 is deployed into the well from the reel 14 . In this manner, the tool assemblies 18 , 20 , 22 , 24 , 26 do not have to be wrapped on the reel 14 , and the tool assemblies do not have to be spliced into the tubing 16 at the well.
  • FIG. 2 a view of the reel 14 is depicted in which the connectors 28 , 30 are shown wrapped with the tubing 16 on the reel 14 .
  • the connectors 28 , 30 are interconnected to the tubing 16 prior to the tubing 16 being wrapped on the reel 14 .
  • the connectors 28 , 30 are positioned to correspond to desired locations of particular tool assemblies in a well. Placeholders 38 are used to substitute for the respective tool assemblies between the connectors 28 , 30 when the tubing 16 is wrapped on the reel 14 .
  • FIGS. 3-5 various alternate connector systems 32 , 34 , 36 are representatively illustrated.
  • both of the connectors 28 , 30 are male-threaded, and so a placeholder 40 used to connect the connectors 28 , 30 together while the tubing string 16 is on the reel 14 has opposing female threads.
  • the connector 28 has male threads
  • the connector 30 has female threads
  • a placeholder 42 has both male and female threads.
  • no placeholder is used. Instead, the male-threaded connector 28 is directly connected to the female-threaded connector 30 when the tubing 16 is wrapped on the reel 14 .
  • FIG. 6 a connector 44 embodying principles of the present invention is representatively illustrated.
  • the connector 44 may be used for the connector 28 or 30 in the apparatus 10 , or it may be used in other apparatus.
  • the connector 44 is configured for use with a composite tubing 46 , which has one or more lines 48 embedded in a sidewall thereof.
  • a slip, ferrule or serrated wedge 50 is used to grip an exterior surface of the tubing 46 .
  • the slip 50 is biased into gripping engagement with the tubing 46 by tightening a sleeve 58 onto a housing 60 .
  • a seal 52 seals between the exterior surface of the tubing 46 and the sleeve 58 .
  • Another seal 54 seals between an interior surface of the tubing 46 and the housing 60 .
  • a further seal 62 seals between the sleeve 58 and the housing 60 . In this manner, an end of the tubing 46 extending into the connector 44 is isolated from exposure to fluids inside and outside the connector.
  • a barb 56 or other electrically conductive member is inserted into the end of the tubing 46 , so that the barb 56 contacts the line 48 .
  • a potting compound 72 such as an epoxy, may be used about the end of the tubing 46 and the barb 56 to prevent the barb 56 from dislodging from the tubing 46 and/or to provide additional sealing for the electrical connection.
  • Another conductor 64 extends from the barb 56 through the housing 60 to an electrical contact 66 . The barb 56 , conductor 64 and contact 66 thus provide a means of transmitting electrical signals and/or power from the line 48 to the lower end of the connector 44 .
  • FIG. 6 Shown in dashed lines in FIG. 6 is a mating connector or tool assembly 68 , which includes another electrical contact 70 for transmitting the signals/power from the contact 66 to the connector or tool assembly 68 .
  • the line 48 has been described above as being an electrical line, it will be readily appreciated that modifications may be made to the connector 44 to accommodate other types of lines.
  • the line 48 could be a fiber optic line, in which case a fiber optic coupling may be used in place of the contact 66
  • the line 48 could be a hydraulic line, in which case a hydraulic coupling may be used in place of the contact 66 .
  • the line 48 could be used for various purposes, such as communication, chemical injection, electrical or hydraulic power, monitoring of downhole equipment and processes, and a control line for, e.g., a safety valve, etc.
  • any number of lines 48 may be used with the connector 44 , without departing from the principles of the present invention.
  • an upper connector 74 and a lower connector 76 embodying principles of the present invention are representatively illustrated. These connectors 74 , 76 may be used for the connectors 28 , 30 in the apparatus 10 , or they may be used in any other apparatus.
  • the connectors 74 , 76 are designed for use with a composite tubing 78 .
  • the tubing 78 has an outer wear layer 80 , a layer 82 in which one or more lines 84 is embedded, a structural layer 86 and an inner flow tube or seal layer 88 .
  • This tubing 78 is similar to the FIBERSPAR composite coiled tubing referred to above.
  • One or more lines 90 may also be embedded in the seal layer 88 .
  • the wear layer 80 provides abrasion resistance to the tubing 78 .
  • the structural layer 86 provides strength to the tubing 78 , but the structural layer 86 may be somewhat porous.
  • the layers 82 , 88 isolate the structural layer 86 from contact with fluids internal and external to the tubing 78 , and provide sealed pathways for the lines 84 , 90 in a sidewall of the tubing 78 .
  • the lines 84 , 90 are electrical conductors
  • the layers 82 , 88 provide insulation for the lines.
  • any type of line may be used for the lines 84 , 90 , without departing from the principles of the invention.
  • the upper connector 74 includes an outer housing 92 , a sleeve 94 threaded into the housing 92 , a mandrel 96 and an inner seal sleeve 98 .
  • the upper connector 74 is sealed to an end of the tubing 78 extending into the upper connector 74 by means of a seal assembly 100 , which is compressed between the sleeve 94 and the housing 92 , and by means of sealing material 102 carried externally on the inner seal sleeve 98 .
  • the mandrel 96 grips the structural layer 86 with multiple collets 104 (only one of which is visible in FIG. 7) having teeth formed on inner surfaces thereof. Multiple inclined surfaces are formed externally on each of the collets 104 , and these inclined surfaces cooperate with similar inclined surfaces formed internally on the housing 92 to bias the collets 104 inward into engagement with the structural layer 86 .
  • a pin 106 prevents relative rotation between the mandrel 96 and the tubing 78 .
  • the line 84 extends outward from the layer 82 and into the upper connector 74 .
  • the line 84 passes between the collets 104 and into a passage 108 formed through the mandrel 96 .
  • the line 84 is connected to a line connector 110 . If the line 90 is provided in the seal layer 88 , the line 90 may also extend through the passage 108 in the mandrel 96 to the line connector 110 , or to another line connector
  • the line connector 110 is depicted as being a pin-type connector, but it may be a contact, such as the contact 66 described above, or it may be any other type of connector.
  • the lines 84 , 90 are fiber optic or hydraulic lines, then the line connector 110 may be a fiber optic or hydraulic coupling, respectively.
  • Further tightening of a threaded collar 118 between the housing 92 and a housing 120 of the lower connector 76 eventually brings the line connector 110 into operative engagement with a mating line connector 122 (depicted in FIG. 7 as a socket-type connector) in the lower connector 76 , and then brings an annular projection 124 into sealing engagement with an annular seal 126 carried on an upper end of the housing 120 .
  • the seals 114 , 126 isolate the line connectors 110 , 122 (and the interiors of the connectors 74 , 76 ) from fluid internal and external to the connectors
  • both of the connectors 74 , 76 may be connected to tool assemblies, such as the tool assemblies 18 , 20 , 22 , 24 , 26 , so that connections to lines may be made on either side of each of the tool assemblies.
  • the lines 84 , 90 may extend through each of the tool assemblies from a connector above the tool assembly to a connector below the tool assembly. This functionality is also provided by the connector 44 described above
  • seal configuration 128 is representatively illustrated.
  • the seal configuration 128 may be used in place of either the projection 112 and seal 114 , or the projection 124 and seal 126 , of the connectors 74 , 76 .
  • the seal configuration 128 includes an annular projection 130 and an annular seal 132 .
  • the projection 130 and seal 132 are configured so that the projection 130 contacts shoulders 134 , 136 to either side of the seal 132 . This contact prevents extrusion of the seal 132 due to pressure, and also provides metal-to-metal seals between the projection 130 and the shoulders 134 , 136 .
  • FIG. 9 an example is representatively illustrated of a tool assembly 138 which may be interconnected in a continuous tubing string.
  • the tool assembly 138 is a sensor apparatus. It includes sensors 140 , 142 , 144 , 146 interconnected to lines 148 , 150 embedded in a sidewall material of a tubular body 152 of the tool assembly 138
  • the sensors 140 , 142 , 144 , 146 are also embedded in the sidewall material of the body 152 .
  • the sensors 140 , 142 , 144 sense parameters internal to the body 152
  • the sensor 146 senses one or more parameter external to the body 152 . Any type of sensor may be used for any of the sensors 140 , 142 , 144 , 146
  • pressure and temperature sensors may be used. It would be particularly advantageous to use a combination of types of sensors for the sensors 140 , 142 , 144 , 146 which would allow computation of values, such as multiple phase flow rates through the tool assembly 138
  • a seismic sensor for one or more of the sensors 140 , 142 , 144 , 146 . This would make available seismic information previously unobtainable from the interior of a sidewall of a tubing string.
  • the sidewall material is preferably a nonmetallic composite material, but other types of materials may be utilized, in keeping with the principles of the invention.
  • the body 152 could be a section of composite tubing, in which the sensors 140 , 142 , 144 , 146 have been installed and connected to the lines 148 , 150 .
  • the lines 148 , 150 may be any type of line, including electrical, hydraulic, fiber optic, etc. Additional lines (not shown in FIG. 9) may extend through or into the tool assembly 138 .
  • Connectors 154 , 156 permit the tool assembly 138 to be conveniently interconnected in a tubing string.
  • the connector 76 described above may be used for the connector 154
  • the connector 74 described above may be used for the connector 156 .
  • the lines 148 , 150 are connected to lines extending through tubing or other tool assemblies attached to each end of the tool assembly 138
  • the apparatus 10 is representatively illustrated wherein a tool assembly 160 is being interconnected into the tubing string 12 .
  • the tool assembly 160 is too long, too rigid, or too large in diameter to be wrapped on the reel 14 with the tubing 16 .
  • Connectors 28 , 30 are separated (and a placeholder 38 is removed, if necessary) prior to interconnecting the tool assembly 160 in the tubing string 12 .
  • the tool assembly 160 is connected to the lower connector 30 , the tubing string 12 is lowered, and then the tool assembly 160 is connected to the upper connector 28 .
  • the connectors 28 , 30 are provided already connected to the tubing 16 when the tubing 16 is wrapped on the reel 14 and transported to the well, so that when the tool assembly 160 is interconnected between the connectors 28 , 30 and the tubing string 12 is deployed into the well, the tool assembly 160 will be appropriately positioned in the well.
  • the tool assembly 160 is a spacer used to space out other equipment in the tubing string 12 .
  • An example of this use is shown in FIG. 1, wherein the tool assembly 26 may be used to correct or adjust the spacing between, e.g., the well screen 24 and perforations in the well.
  • Such corrections or adjustments in tool spacings in the tubing string 12 are conveniently made at the wellsite by means of the tool assembly 160 or 26 .
  • the tool assembly 160 or 26 is not necessarily too long, too rigid, or too large in diameter to be wrapped on the reel 14 with the tubing 16 .

Abstract

A well tool assembly interconnection method is provided. In a described embodiment, a continuous tubing string has connectors positioned corresponding to desired locations for tool assemblies in a well. The tubing string is wrapped on a reel and transported to a well. As the tubing string is deployed from the reel into the well, the tool assemblies are interconnected between the connectors. A tool assembly having sensors embedded in a sidewall thereof is also provided.

Description

    CROSS-REFERENCE TO RELATED APPLICATION
  • This application is a continuation of co-pending application Ser. No. 10/396,590 filed Mar. 25, 2003, which is a divisional of application Ser. No. 09/789,249 filed Feb. 20, 2001, now U.S. Pat. No. 6,561,278 B2.[0001]
  • BACKGROUND
  • The present invention relates generally to operations performed and equipment utilized in conjunction with a subterranean well and, in an embodiment described herein, more particularly provides methods and apparatus for interconnecting well tool assemblies in continuous tubing strings. [0002]
  • Continuous tubing strings, such as coiled tubing strings, have been used for many years in wells. However, one problem with continuous tubing strings is how to interconnect well tool assemblies in the tubing strings. [0003]
  • If a well tool assembly is to be interconnected in a continuous tubing string then, of course, the tubing string must be severed and connections must be made between the tool assembly and the tubing at each end of the tool assembly. With present methods and apparatus, this operation may require many hours to perform. [0004]
  • Continuous tubing strings having lines embedded in their sidewalls have recently become available for use in wells. An example is FIBERSPAR composite coiled tubing available from Fiberspar Spoolable Products, Inc. of Houston, Tex. The FIBERSPAR composite coiled tubing is a composite coiled tubing with eight conductors embedded in its sidewall. Making a connection between this tubing and a tool assembly at a wellsite, where the tubing is severed (i.e., there is no preexisting connector attached to the tubing), typically takes approximately 12 hours to accomplish. [0005]
  • One solution that has been proposed is to interconnect well tool assemblies in the tubing string, and then spool the well tool assemblies on a reel along with the tubing. The reel is then delivered to the wellsite with the tool assemblies already interconnected therein, and the tubing string may be conveyed into the well, without having to make connections at the wellsite. One problem with this approach is that the well tool assemblies may have an outer diameter greater than that of the tubing, in which case spooling the tool assemblies on the reel with the tubing may cause damaging stresses to be imparted to the tubing, and special injector heads are needed to convey the large diameter tool assemblies into the well. Another problem is that many tool assemblies, such as well screens and packers, may be too long and inflexible to be spooled onto the reel. [0006]
  • Therefore, it may be seen that there exists a need for improved methods and apparatus for interconnecting well tool assemblies in continuous tubing strings. [0007]
  • SUMMARY
  • In carrying out the principles of the present invention, in accordance with embodiments thereof, methods and apparatus are provided which solve the above problems in the art. In one embodiment, a method is provided which permits well tool assemblies to be rapidly interconnected in a continuous tubing string at a wellsite. [0008]
  • In one aspect of the invention, a method is provided in which tool connectors are attached to a tubing string at respective predetermined downhole locations for tool assemblies. The tubing string is wrapped onto a reel with the attached connectors. The tubing string is then deployed into a well from the reel. As the tubing string is deployed, the tool assemblies are connected to the respective connectors. [0009]
  • In another aspect of the invention, a method is provided which permits a line extending through a tubing string to be extended through a tool assembly interconnected into the tubing string. Connectors are used which both connect the line at each end of the tool assembly and structurally attach the tool assembly to the tubing. Such connectors are also used to connect between portions of the tubing. [0010]
  • In a further aspect of the invention, a connector system is provided. A connector of the system includes a gripping structure for grippingly engaging the tubing string, an internal seal structure for sealingly engaging an interior of the tubing string and an external seal structure for sealingly engaging an exterior of the tubing string. Where the tubing string has a line extending therethrough, the connector includes a line connector attached to the line in the tubing string. [0011]
  • In a still further aspect of the invention, a sensor apparatus is provided. The sensor apparatus includes sensors embedded in a sidewall material of a tubular body of the apparatus. The sensors are connected to one or more lines also embedded in the sidewall material. [0012]
  • These and other features, advantages, benefits and objects of the present invention will become apparent to one of ordinary skill in the art upon careful consideration of the detailed description of representative embodiments of the invention hereinbelow and the accompanying drawings.[0013]
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1 is a schematic partially cross-sectional side view of an apparatus embodying principles of the present invention; [0014]
  • FIG. 2 is an elevational view of a tubing reel utilized in the apparatus of FIG. 1; [0015]
  • FIGS. 3-5 are side elevational views of alternate connector systems utilized in the apparatus of FIG. 1; [0016]
  • FIG. 6 is a quarter-sectional view of a first connector embodying principles of the present invention; [0017]
  • FIG. 7 is a quarter-sectional view of a second connector embodying principles of the present invention; [0018]
  • FIG. 8 is an enlarged cross-sectional view of an alternate seal structure for use with the second connector; [0019]
  • FIG. 9 is a partially cross-sectional view of a sensor apparatus embodying principles of the present invention; and [0020]
  • FIG. 10 is a schematic partially cross-sectional side view of a variation of the apparatus of FIG. 1.[0021]
  • DETAILED DESCRIPTION
  • Representatively illustrated in FIG. 1 is an [0022] apparatus 10 which embodies principles of the present invention. In the following description of the apparatus 10 and other apparatus and methods described herein, directional terms, such as “above”, “below”, “upper”, “lower”, etc., are used only for convenience in referring to the accompanying drawings. Additionally, it is to be understood that the various embodiments of the present invention described herein may be utilized in various orientations, such as inclined, inverted, horizontal, vertical, etc., and in various configurations, without departing from the principles of the present invention.
  • In the [0023] apparatus 10, a continuous tubing string 12 is deployed into a well from a reel 14. Since the tubing string 12 is initially wrapped on the reel 14, such continuous tubing strings are commonly referred to as “coiled” tubing strings. As used herein, the term “continuous” means that the tubing string is deployed substantially continuously into a well, allowing for some interruptions to interconnect tool assemblies therein, as opposed to the manner in which segmented tubing is deployed piecemeal into a well in “joints” or in “stands” limited in length by the height of a rig at the well.
  • [0024] Tubing 16 comprises the vast majority of the tubing string 12. The tubing 16 may be made of a metallic material, such as steel, or it may be made of a nonmetallic material, such as a composite material. As described below, the present invention also provides connectors which permit tool assemblies to be interconnected in the tubing string 12 where the tubing 16 is made of a composite material and has lines embedded in a sidewall thereof.
  • In the past, tool assemblies in a continuous tubing string have either been spliced into the tubing string just before being deployed into a well, or have been wrapped on a reel with the tubing, so that no splicing is needed when the tubing string is deployed into the well. The former method is very time-consuming and inconvenient to perform at the well, especially in those cases where a composite tubing is used, or where lines extend through the tubing string. The second method requires that the tool assemblies be wrapped on the reel, which may be impossible for very long or rigid assemblies, or for assemblies with diameters so large that they interfere with the wrapping of the tubing on the reel, and which requires special expandable injector heads, as described in U.S. Pat. No. 6,082,454, the disclosure of which is incorporated herein by this reference. [0025]
  • In the [0026] present apparatus 10, well tool assemblies 18 (a packer), 20 (a valve), 22 (a sensor apparatus), 24 (a well screen) and 26 (a spacer or blast joint) are interconnected in the tubing string 12 without requiring splicing of the tubing 16 at the well, and without requiring the tool assemblies to be wrapped on the reel 14. Instead, connectors 28, 30 are provided in the tubing string 12 above and below, respectively, each of the tool assemblies 18, 20, 22, 24, 26. These connectors 28, 30 are incorporated into the tubing string 12 prior to, or as, it is being wrapped on the reel 14, with each connector's position in the tubing string 12 on the reel 14 corresponding to a desired location for the respective tool assembly in the well.
  • That is, the [0027] connectors 28, 30 are placed in the tubing string 12 at appropriate positions, so that when the tool assemblies 18, 20, 22, 24, 26 are interconnected to the connectors 28, 30 and the tubing string 12 is deployed into the well, the tool assemblies will be at their respective desired locations in the well. The tubing string 12 with the connectors 28, 30 is wrapped on the reel 14 prior to being transported to the well. At the well, the tool assemblies 18, 20, 22, 24, 26 are interconnected between the connectors 28, 30 as the tubing string 12 is deployed into the well from the reel 14. In this manner, the tool assemblies 18, 20, 22, 24, 26 do not have to be wrapped on the reel 14, and the tool assemblies do not have to be spliced into the tubing 16 at the well.
  • Referring additionally now to FIG. 2, a view of the [0028] reel 14 is depicted in which the connectors 28, 30 are shown wrapped with the tubing 16 on the reel 14. In this view it may be clearly seen that the connectors 28, 30 are interconnected to the tubing 16 prior to the tubing 16 being wrapped on the reel 14. As described above, the connectors 28, 30 are positioned to correspond to desired locations of particular tool assemblies in a well. Placeholders 38 are used to substitute for the respective tool assemblies between the connectors 28, 30 when the tubing 16 is wrapped on the reel 14.
  • Referring additionally now to FIGS. 3-5, various [0029] alternate connector systems 32, 34, 36 are representatively illustrated. In the system 32 depicted in FIG. 3, both of the connectors 28, 30 are male-threaded, and so a placeholder 40 used to connect the connectors 28, 30 together while the tubing string 16 is on the reel 14 has opposing female threads. In the system 34 depicted in FIG. 4, the connector 28 has male threads, the connector 30 has female threads, and so a placeholder 42 has both male and female threads. In the system 36 depicted in FIG. 5, no placeholder is used. Instead, the male-threaded connector 28 is directly connected to the female-threaded connector 30 when the tubing 16 is wrapped on the reel 14.
  • Thus, it may be clearly seen that a variety of methods may be used to provide the [0030] connectors 28, 30 in the tubing string 12. Of course, it is not necessary for the connectors 28, 30 to be threaded, or for any particular type of connector to be used. Any connector may be used in the apparatus 10, without departing from the principles of the present invention.
  • Referring additionally now to FIG. 6, a [0031] connector 44 embodying principles of the present invention is representatively illustrated. The connector 44 may be used for the connector 28 or 30 in the apparatus 10, or it may be used in other apparatus.
  • The [0032] connector 44 is configured for use with a composite tubing 46, which has one or more lines 48 embedded in a sidewall thereof. A slip, ferrule or serrated wedge 50, or multiple ones of these, is used to grip an exterior surface of the tubing 46. The slip 50 is biased into gripping engagement with the tubing 46 by tightening a sleeve 58 onto a housing 60.
  • A [0033] seal 52 seals between the exterior surface of the tubing 46 and the sleeve 58. Another seal 54 seals between an interior surface of the tubing 46 and the housing 60. A further seal 62 seals between the sleeve 58 and the housing 60. In this manner, an end of the tubing 46 extending into the connector 44 is isolated from exposure to fluids inside and outside the connector.
  • A [0034] barb 56 or other electrically conductive member is inserted into the end of the tubing 46, so that the barb 56 contacts the line 48. A potting compound 72, such as an epoxy, may be used about the end of the tubing 46 and the barb 56 to prevent the barb 56 from dislodging from the tubing 46 and/or to provide additional sealing for the electrical connection. Another conductor 64 extends from the barb 56 through the housing 60 to an electrical contact 66. The barb 56, conductor 64 and contact 66 thus provide a means of transmitting electrical signals and/or power from the line 48 to the lower end of the connector 44.
  • Shown in dashed lines in FIG. 6 is a mating connector or [0035] tool assembly 68, which includes another electrical contact 70 for transmitting the signals/power from the contact 66 to the connector or tool assembly 68.
  • Although the [0036] line 48 has been described above as being an electrical line, it will be readily appreciated that modifications may be made to the connector 44 to accommodate other types of lines. For example, the line 48 could be a fiber optic line, in which case a fiber optic coupling may be used in place of the contact 66, or the line 48 could be a hydraulic line, in which case a hydraulic coupling may be used in place of the contact 66. In addition, the line 48 could be used for various purposes, such as communication, chemical injection, electrical or hydraulic power, monitoring of downhole equipment and processes, and a control line for, e.g., a safety valve, etc. Of course, any number of lines 48 may be used with the connector 44, without departing from the principles of the present invention.
  • Referring additionally now to FIG. 7, an [0037] upper connector 74 and a lower connector 76 embodying principles of the present invention are representatively illustrated. These connectors 74, 76 may be used for the connectors 28, 30 in the apparatus 10, or they may be used in any other apparatus.
  • The [0038] connectors 74, 76 are designed for use with a composite tubing 78. The tubing 78 has an outer wear layer 80, a layer 82 in which one or more lines 84 is embedded, a structural layer 86 and an inner flow tube or seal layer 88. This tubing 78 is similar to the FIBERSPAR composite coiled tubing referred to above. One or more lines 90 may also be embedded in the seal layer 88.
  • The wear layer [0039] 80 provides abrasion resistance to the tubing 78. The structural layer 86 provides strength to the tubing 78, but the structural layer 86 may be somewhat porous. The layers 82, 88 isolate the structural layer 86 from contact with fluids internal and external to the tubing 78, and provide sealed pathways for the lines 84, 90 in a sidewall of the tubing 78. Thus, if the lines 84, 90 are electrical conductors, the layers 82, 88 provide insulation for the lines. Of course, any type of line may be used for the lines 84, 90, without departing from the principles of the invention.
  • The [0040] upper connector 74 includes an outer housing 92, a sleeve 94 threaded into the housing 92, a mandrel 96 and an inner seal sleeve 98. The upper connector 74 is sealed to an end of the tubing 78 extending into the upper connector 74 by means of a seal assembly 100, which is compressed between the sleeve 94 and the housing 92, and by means of sealing material 102 carried externally on the inner seal sleeve 98.
  • The [0041] mandrel 96 grips the structural layer 86 with multiple collets 104 (only one of which is visible in FIG. 7) having teeth formed on inner surfaces thereof. Multiple inclined surfaces are formed externally on each of the collets 104, and these inclined surfaces cooperate with similar inclined surfaces formed internally on the housing 92 to bias the collets 104 inward into engagement with the structural layer 86. A pin 106 prevents relative rotation between the mandrel 96 and the tubing 78.
  • The [0042] line 84 extends outward from the layer 82 and into the upper connector 74. The line 84 passes between the collets 104 and into a passage 108 formed through the mandrel 96. At a lower end of the mandrel 96, the line 84 is connected to a line connector 110. If the line 90 is provided in the seal layer 88, the line 90 may also extend through the passage 108 in the mandrel 96 to the line connector 110, or to another line connector
  • The [0043] line connector 110 is depicted as being a pin-type connector, but it may be a contact, such as the contact 66 described above, or it may be any other type of connector. For example, if the lines 84, 90 are fiber optic or hydraulic lines, then the line connector 110 may be a fiber optic or hydraulic coupling, respectively.
  • When the [0044] connectors 74, 76 are connected to each other, an annular projection 112 formed on a lower end of the inner seal sleeve 98 initially sealingly engages an annular seal 114 carried on an upper end of an inner sleeve 116 of the lower connector 76. Further tightening of a threaded collar 118 between the housing 92 and a housing 120 of the lower connector 76 eventually brings the line connector 110 into operative engagement with a mating line connector 122 (depicted in FIG. 7 as a socket-type connector) in the lower connector 76, and then brings an annular projection 124 into sealing engagement with an annular seal 126 carried on an upper end of the housing 120. The seals 114, 126 isolate the line connectors 110, 122 (and the interiors of the connectors 74, 76) from fluid internal and external to the connectors
  • Since the [0045] lower connector 76 is otherwise similarly configured to the upper connector 74, it will not be further described herein. Note that both of the connectors 74, 76 may be connected to tool assemblies, such as the tool assemblies 18, 20, 22, 24, 26, so that connections to lines may be made on either side of each of the tool assemblies. Thus, the lines 84, 90 may extend through each of the tool assemblies from a connector above the tool assembly to a connector below the tool assembly. This functionality is also provided by the connector 44 described above
  • Referring additionally now to FIG. 8, an [0046] alternate seal configuration 128 is representatively illustrated. The seal configuration 128 may be used in place of either the projection 112 and seal 114, or the projection 124 and seal 126, of the connectors 74, 76.
  • The [0047] seal configuration 128 includes an annular projection 130 and an annular seal 132. However, the projection 130 and seal 132 are configured so that the projection 130 contacts shoulders 134, 136 to either side of the seal 132. This contact prevents extrusion of the seal 132 due to pressure, and also provides metal-to-metal seals between the projection 130 and the shoulders 134, 136.
  • Referring additionally now to FIG. 9, an example is representatively illustrated of a [0048] tool assembly 138 which may be interconnected in a continuous tubing string. The tool assembly 138 is a sensor apparatus. It includes sensors 140, 142, 144, 146 interconnected to lines 148, 150 embedded in a sidewall material of a tubular body 152 of the tool assembly 138
  • The [0049] sensors 140, 142, 144, 146 are also embedded in the sidewall material of the body 152. The sensors 140, 142, 144 sense parameters internal to the body 152, and the sensor 146 senses one or more parameter external to the body 152. Any type of sensor may be used for any of the sensors 140, 142, 144, 146
  • [0050]
  • For example, pressure and temperature sensors may be used. It would be particularly advantageous to use a combination of types of sensors for the [0051] sensors 140, 142, 144, 146 which would allow computation of values, such as multiple phase flow rates through the tool assembly 138
  • As another example, it would be advantageous to use a seismic sensor for one or more of the [0052] sensors 140, 142, 144, 146. This would make available seismic information previously unobtainable from the interior of a sidewall of a tubing string.
  • Note that the sidewall material is preferably a nonmetallic composite material, but other types of materials may be utilized, in keeping with the principles of the invention. In particular, the [0053] body 152 could be a section of composite tubing, in which the sensors 140, 142, 144, 146 have been installed and connected to the lines 148,150.
  • The [0054] lines 148, 150 may be any type of line, including electrical, hydraulic, fiber optic, etc. Additional lines (not shown in FIG. 9) may extend through or into the tool assembly 138. Connectors 154, 156 permit the tool assembly 138 to be conveniently interconnected in a tubing string. For example, the connector 76 described above may be used for the connector 154, and the connector 74 described above may be used for the connector 156. Via the connectors 154, 156, the lines 148, 150 are connected to lines extending through tubing or other tool assemblies attached to each end of the tool assembly 138
  • Referring additionally now to FIG. 10, the [0055] apparatus 10 is representatively illustrated wherein a tool assembly 160 is being interconnected into the tubing string 12. The tool assembly 160 is too long, too rigid, or too large in diameter to be wrapped on the reel 14 with the tubing 16.
  • [0056] Connectors 28, 30 are separated (and a placeholder 38 is removed, if necessary) prior to interconnecting the tool assembly 160 in the tubing string 12. The tool assembly 160 is connected to the lower connector 30, the tubing string 12 is lowered, and then the tool assembly 160 is connected to the upper connector 28. As described above, the connectors 28, 30 are provided already connected to the tubing 16 when the tubing 16 is wrapped on the reel 14 and transported to the well, so that when the tool assembly 160 is interconnected between the connectors 28, 30 and the tubing string 12 is deployed into the well, the tool assembly 160 will be appropriately positioned in the well.
  • In one embodiment of the present invention, the [0057] tool assembly 160 is a spacer used to space out other equipment in the tubing string 12. An example of this use is shown in FIG. 1, wherein the tool assembly 26 may be used to correct or adjust the spacing between, e.g., the well screen 24 and perforations in the well. Such corrections or adjustments in tool spacings in the tubing string 12 are conveniently made at the wellsite by means of the tool assembly 160 or 26. Note that, when used in this manner, the tool assembly 160 or 26 is not necessarily too long, too rigid, or too large in diameter to be wrapped on the reel 14 with the tubing 16.
  • Of course, a person skilled in the art would, upon a careful consideration of the above description of representative embodiments of the invention, readily appreciate that many modifications, additions, substitutions, deletions, and other changes may be made to these specific embodiments, and such changes are contemplated by the principles of the present invention. Accordingly, the foregoing detailed description is to be clearly understood as being given by way of illustration and example only, the spirit and scope of the present invention being limited solely by the appended claims.[0058]

Claims (8)

What is claimed is:
1. A sensor apparatus for interconnection in a tubular string in a well, comprising:
a generally tubular body having a sidewall material;
at least one line embedded in the sidewall material; and
at least one sensor embedded in the sidewall material and operatively connected to the line.
2. The sensor apparatus according to claim 1 wherein the sidewall material is nonmetallic.
3. The sensor apparatus according to claim 1 wherein the sidewall material is a composite material.
4. The sensor apparatus according to claim 1 wherein the line is a selected one of a hydraulic line, an electrical line and a fiber optic line.
5. The sensor apparatus according to claim 1 wherein the line is a selected one of a communication line, a power line, a control line and a monitoring line.
6. The sensor apparatus according to claim 1 wherein the sensor senses a parameter internal to the tubular body.
7. The sensor apparatus according to claim 1 wherein the sensor senses a parameter external to the tubular body.
8. The sensor apparatus according to claim 1 wherein the sensor is a seismic sensor.
US10/827,186 2001-02-20 2004-04-19 Methods and apparatus for interconnecting well tool assemblies in continuous tubing strings Abandoned US20040194950A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US10/827,186 US20040194950A1 (en) 2001-02-20 2004-04-19 Methods and apparatus for interconnecting well tool assemblies in continuous tubing strings

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US09/789,249 US6561278B2 (en) 2001-02-20 2001-02-20 Methods and apparatus for interconnecting well tool assemblies in continuous tubing strings
US10/396,590 US6766853B2 (en) 2001-02-20 2003-03-25 Apparatus for interconnecting continuous tubing strings having sidewall-embedded lines therein
US10/827,186 US20040194950A1 (en) 2001-02-20 2004-04-19 Methods and apparatus for interconnecting well tool assemblies in continuous tubing strings

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
US10/396,590 Continuation US6766853B2 (en) 2001-02-20 2003-03-25 Apparatus for interconnecting continuous tubing strings having sidewall-embedded lines therein

Publications (1)

Publication Number Publication Date
US20040194950A1 true US20040194950A1 (en) 2004-10-07

Family

ID=25147045

Family Applications (3)

Application Number Title Priority Date Filing Date
US09/789,249 Expired - Lifetime US6561278B2 (en) 2001-02-20 2001-02-20 Methods and apparatus for interconnecting well tool assemblies in continuous tubing strings
US10/396,590 Expired - Lifetime US6766853B2 (en) 2001-02-20 2003-03-25 Apparatus for interconnecting continuous tubing strings having sidewall-embedded lines therein
US10/827,186 Abandoned US20040194950A1 (en) 2001-02-20 2004-04-19 Methods and apparatus for interconnecting well tool assemblies in continuous tubing strings

Family Applications Before (2)

Application Number Title Priority Date Filing Date
US09/789,249 Expired - Lifetime US6561278B2 (en) 2001-02-20 2001-02-20 Methods and apparatus for interconnecting well tool assemblies in continuous tubing strings
US10/396,590 Expired - Lifetime US6766853B2 (en) 2001-02-20 2003-03-25 Apparatus for interconnecting continuous tubing strings having sidewall-embedded lines therein

Country Status (6)

Country Link
US (3) US6561278B2 (en)
EP (2) EP1236860A3 (en)
AR (1) AR032715A1 (en)
BR (1) BR0200453A (en)
CA (1) CA2372835A1 (en)
NO (1) NO20020727L (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2436579A (en) * 2006-03-30 2007-10-03 Schlumberger Holdings Sand screen with sensor and inductive coupler
US20090066535A1 (en) * 2006-03-30 2009-03-12 Schlumberger Technology Corporation Aligning inductive couplers in a well
US7597142B2 (en) 2006-12-18 2009-10-06 Schlumberger Technology Corporation System and method for sensing a parameter in a wellbore
US20110017448A1 (en) * 2008-01-11 2011-01-27 Douglas Pipchuk Zonal testing with the use of coiled tubing
US8235127B2 (en) 2006-03-30 2012-08-07 Schlumberger Technology Corporation Communicating electrical energy with an electrical device in a well
US20120211231A1 (en) * 2010-10-18 2012-08-23 Zafer Erkol Segmented Fiber Optic Coiled Tubing Assembly
US8312923B2 (en) 2006-03-30 2012-11-20 Schlumberger Technology Corporation Measuring a characteristic of a well proximate a region to be gravel packed
US8839850B2 (en) 2009-10-07 2014-09-23 Schlumberger Technology Corporation Active integrated completion installation system and method
US8991492B2 (en) 2005-09-01 2015-03-31 Schlumberger Technology Corporation Methods, systems and apparatus for coiled tubing testing
US9175560B2 (en) 2012-01-26 2015-11-03 Schlumberger Technology Corporation Providing coupler portions along a structure
US9249559B2 (en) 2011-10-04 2016-02-02 Schlumberger Technology Corporation Providing equipment in lateral branches of a well
US9644476B2 (en) 2012-01-23 2017-05-09 Schlumberger Technology Corporation Structures having cavities containing coupler portions
US9938823B2 (en) 2012-02-15 2018-04-10 Schlumberger Technology Corporation Communicating power and data to a component in a well
US10036234B2 (en) 2012-06-08 2018-07-31 Schlumberger Technology Corporation Lateral wellbore completion apparatus and method
US11570435B2 (en) * 2019-01-16 2023-01-31 Telefonaktiebolaget Lm Ericsson (Publ) Video coding comprising uniform tile split with remainder

Families Citing this family (54)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6789621B2 (en) 2000-08-03 2004-09-14 Schlumberger Technology Corporation Intelligent well system and method
US6626244B2 (en) * 2001-09-07 2003-09-30 Halliburton Energy Services, Inc. Deep-set subsurface safety valve assembly
US6988556B2 (en) * 2002-02-19 2006-01-24 Halliburton Energy Services, Inc. Deep set safety valve
US20040184871A1 (en) * 2003-03-21 2004-09-23 Hans-Bernd Luft Composite low cycle fatigue coiled tubing connector
US7390032B2 (en) * 2003-08-01 2008-06-24 Sonstone Corporation Tubing joint of multiple orientations containing electrical wiring
US7226090B2 (en) 2003-08-01 2007-06-05 Sunstone Corporation Rod and tubing joint of multiple orientations containing electrical wiring
US7165892B2 (en) * 2003-10-07 2007-01-23 Halliburton Energy Services, Inc. Downhole fiber optic wet connect and gravel pack completion
US7228898B2 (en) * 2003-10-07 2007-06-12 Halliburton Energy Services, Inc. Gravel pack completion with fluid loss control fiber optic wet connect
US7191832B2 (en) * 2003-10-07 2007-03-20 Halliburton Energy Services, Inc. Gravel pack completion with fiber optic monitoring
US7210856B2 (en) * 2004-03-02 2007-05-01 Welldynamics, Inc. Distributed temperature sensing in deep water subsea tree completions
US7213657B2 (en) * 2004-03-29 2007-05-08 Weatherford/Lamb, Inc. Apparatus and methods for installing instrumentation line in a wellbore
US7252437B2 (en) * 2004-04-20 2007-08-07 Halliburton Energy Services, Inc. Fiber optic wet connector acceleration protection and tolerance compliance
US7641395B2 (en) 2004-06-22 2010-01-05 Halliburton Energy Serives, Inc. Fiber optic splice housing and integral dry mate connector system
US7219736B1 (en) * 2004-11-22 2007-05-22 Petrotechnologies, Inc. Externally testable redundant connections for subsea wells
US7373974B2 (en) * 2004-11-30 2008-05-20 Halliburton Energy Services, Inc. Downhole release tool and method
US7594763B2 (en) * 2005-01-19 2009-09-29 Halliburton Energy Services, Inc. Fiber optic delivery system and side pocket mandrel removal system
US7306044B2 (en) 2005-03-02 2007-12-11 Halliburton Energy Services, Inc. Method and system for lining tubulars
US20060243453A1 (en) * 2005-04-27 2006-11-02 Mckee L M Tubing connector
US20080073085A1 (en) * 2005-04-27 2008-03-27 Lovell John R Technique and System for Intervening in a Wellbore Using Multiple Reels of Coiled Tubing
US7543659B2 (en) * 2005-06-15 2009-06-09 Schlumberger Technology Corporation Modular connector and method
US7913774B2 (en) 2005-06-15 2011-03-29 Schlumberger Technology Corporation Modular connector and method
US7775289B2 (en) * 2005-09-27 2010-08-17 Schlumberger Technology Corporation Equipment for installing a spoolable connector in coiled tubing
US8839822B2 (en) 2006-03-22 2014-09-23 National Oilwell Varco, L.P. Dual containment systems, methods and kits
US7861776B2 (en) * 2006-08-22 2011-01-04 Schlumberger Technology Corporation System and method for forming a coiled tubing connection
US20090090513A1 (en) * 2006-08-22 2009-04-09 Harold Steven Bissonnette System and Method for Conveying a Wired Coiled Assembly
US7640989B2 (en) * 2006-08-31 2010-01-05 Halliburton Energy Services, Inc. Electrically operated well tools
US7748466B2 (en) * 2006-09-14 2010-07-06 Thrubit B.V. Coiled tubing wellbore drilling and surveying using a through the drill bit apparatus
US7510017B2 (en) * 2006-11-09 2009-03-31 Halliburton Energy Services, Inc. Sealing and communicating in wells
US7549471B2 (en) * 2006-12-28 2009-06-23 Thrubit, Llc Deployment tool for well logging instruments conveyed through the interior of a pipe string
US8038120B2 (en) 2006-12-29 2011-10-18 Halliburton Energy Services, Inc. Magnetically coupled safety valve with satellite outer magnets
US8919730B2 (en) 2006-12-29 2014-12-30 Halliburton Energy Services, Inc. Magnetically coupled safety valve with satellite inner magnets
US7677302B2 (en) * 2007-01-11 2010-03-16 Halliburton Energy Services, Inc. Spoolable connector
US7648179B2 (en) * 2007-01-17 2010-01-19 Halliburton Energy Services, Inc. Connector having offset radius grooves
US7708078B2 (en) * 2007-04-05 2010-05-04 Baker Hughes Incorporated Apparatus and method for delivering a conductor downhole
DE602008003209D1 (en) * 2007-04-12 2010-12-09 Shell Int Research DRILLING CIRCULAR ARRANGEMENT AND METHOD FOR CARRYING OUT OPERATION IN A DRILLING HOLE
US8264532B2 (en) * 2007-08-09 2012-09-11 Thrubit B.V. Through-mill wellbore optical inspection and remediation apparatus and methodology
US8496064B2 (en) * 2007-09-05 2013-07-30 Schlumberger Technology Corporation System and method for engaging completions in a wellbore
EP2212511A4 (en) * 2007-10-17 2015-04-01 Collin Morris Production tubing member with auxiliary conduit
US8316703B2 (en) * 2008-04-25 2012-11-27 Schlumberger Technology Corporation Flexible coupling for well logging instruments
CA2690926C (en) * 2009-01-23 2018-03-06 Fiberspar Corporation Downhole fluid separation
US8955599B2 (en) 2009-12-15 2015-02-17 Fiberspar Corporation System and methods for removing fluids from a subterranean well
US9206676B2 (en) 2009-12-15 2015-12-08 Fiberspar Corporation System and methods for removing fluids from a subterranean well
US8602658B2 (en) * 2010-02-05 2013-12-10 Baker Hughes Incorporated Spoolable signal conduction and connection line and method
US8397828B2 (en) * 2010-03-25 2013-03-19 Baker Hughes Incorporated Spoolable downhole control system and method
US8573304B2 (en) 2010-11-22 2013-11-05 Halliburton Energy Services, Inc. Eccentric safety valve
CA2881682C (en) 2012-08-10 2021-07-06 National Oilwell Varco, L.P. Composite coiled tubing connectors
US9052043B2 (en) 2012-11-28 2015-06-09 Baker Hughes Incorporated Wired pipe coupler connector
US8986028B2 (en) * 2012-11-28 2015-03-24 Baker Hughes Incorporated Wired pipe coupler connector
US9695652B2 (en) * 2013-04-22 2017-07-04 Baker Hughes Imcorporated System and method for splicing a non-spoolable tool anywhere along a coiled tubing string
RU2550992C1 (en) * 2014-06-02 2015-05-20 Ривенер Мусавирович Габдуллин Detachable joint of long-length flexible pipe
US9768546B2 (en) 2015-06-11 2017-09-19 Baker Hughes Incorporated Wired pipe coupler connector
WO2017122025A1 (en) * 2016-01-13 2017-07-20 Zilift Holdings Limited Method and apparatus for deploying wellbore pump on coiled tubing
WO2018013126A1 (en) * 2016-07-14 2018-01-18 Halliburton Energy Services, Inc. Modular coiled tubing bottom hole assembly
US20210010346A1 (en) * 2019-07-12 2021-01-14 Halliburton Energy Services, Inc. Hybrid Coiled Tubing System

Citations (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3217282A (en) * 1962-03-01 1965-11-09 Inst Francais Du Petrole Connector for reinforced flexible conduit
US4676563A (en) * 1985-05-06 1987-06-30 Innotech Energy Corporation Apparatus for coupling multi-conduit drill pipes
US4685516A (en) * 1986-01-21 1987-08-11 Atlantic Richfield Company Apparatus for operating wireline tools in wellbores
US4690212A (en) * 1982-02-25 1987-09-01 Termohlen David E Drilling pipe for downhole drill motor
US4799544A (en) * 1985-05-06 1989-01-24 Pangaea Enterprises, Inc. Drill pipes and casings utilizing multi-conduit tubulars
US4810010A (en) * 1986-02-18 1989-03-07 Vetco Gray Inc. Composite tubing connector assembly
US5330236A (en) * 1992-10-02 1994-07-19 Aerofit Products, Inc. Composite tube fitting
US5334801A (en) * 1989-11-24 1994-08-02 Framo Developments (Uk) Limited Pipe system with electrical conductors
US5392851A (en) * 1994-06-14 1995-02-28 Western Atlas International, Inc. Wireline cable head for use in coiled tubing operations
US5419188A (en) * 1991-05-20 1995-05-30 Otis Engineering Corporation Reeled tubing support for downhole equipment module
US5435395A (en) * 1994-03-22 1995-07-25 Halliburton Company Method for running downhole tools and devices with coiled tubing
US5469916A (en) * 1994-03-17 1995-11-28 Conoco Inc. System for depth measurement in a wellbore using composite coiled tubing
US5485745A (en) * 1991-05-20 1996-01-23 Halliburton Company Modular downhole inspection system for coiled tubing
US5524937A (en) * 1994-12-06 1996-06-11 Camco International Inc. Internal coiled tubing connector
US5944099A (en) * 1996-03-25 1999-08-31 Fiber Spar And Tube Corporation Infuser for composite spoolable pipe
US5988702A (en) * 1995-09-28 1999-11-23 Fiber Spar And Tube Corporation Composite coiled tubing end connector
US6065540A (en) * 1996-01-29 2000-05-23 Schlumberger Technology Corporation Composite coiled tubing apparatus and methods
US6068394A (en) * 1995-10-12 2000-05-30 Industrial Sensors & Instrument Method and apparatus for providing dynamic data during drilling
US6082454A (en) * 1998-04-21 2000-07-04 Baker Hughes Incorporated Spooled coiled tubing strings for use in wellbores
US6161622A (en) * 1998-11-02 2000-12-19 Halliburton Energy Services, Inc. Remote actuated plug method
US6199629B1 (en) * 1997-09-24 2001-03-13 Baker Hughes Incorporated Computer controlled downhole safety valve system
US6202749B1 (en) * 1999-02-04 2001-03-20 David L. Adams Well screen system
US6288975B1 (en) * 1999-10-29 2001-09-11 Litton Systems, Inc. Acoustic sensing system for downhole seismic applications utilizing an array of fiber optic sensors
US6332499B1 (en) * 1999-11-23 2001-12-25 Camco International, Inc. Deployment tubing connector having internal electrical penetrator
US6364368B1 (en) * 1999-10-20 2002-04-02 Marion D. Kilgore Internal flush coupling for composite coiled tubing

Patent Citations (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3217282A (en) * 1962-03-01 1965-11-09 Inst Francais Du Petrole Connector for reinforced flexible conduit
US4690212A (en) * 1982-02-25 1987-09-01 Termohlen David E Drilling pipe for downhole drill motor
US4676563A (en) * 1985-05-06 1987-06-30 Innotech Energy Corporation Apparatus for coupling multi-conduit drill pipes
US4799544A (en) * 1985-05-06 1989-01-24 Pangaea Enterprises, Inc. Drill pipes and casings utilizing multi-conduit tubulars
US4685516A (en) * 1986-01-21 1987-08-11 Atlantic Richfield Company Apparatus for operating wireline tools in wellbores
US4810010A (en) * 1986-02-18 1989-03-07 Vetco Gray Inc. Composite tubing connector assembly
US5334801A (en) * 1989-11-24 1994-08-02 Framo Developments (Uk) Limited Pipe system with electrical conductors
US5419188A (en) * 1991-05-20 1995-05-30 Otis Engineering Corporation Reeled tubing support for downhole equipment module
US5485745A (en) * 1991-05-20 1996-01-23 Halliburton Company Modular downhole inspection system for coiled tubing
US5330236A (en) * 1992-10-02 1994-07-19 Aerofit Products, Inc. Composite tube fitting
US5469916A (en) * 1994-03-17 1995-11-28 Conoco Inc. System for depth measurement in a wellbore using composite coiled tubing
US5435395A (en) * 1994-03-22 1995-07-25 Halliburton Company Method for running downhole tools and devices with coiled tubing
US5392851A (en) * 1994-06-14 1995-02-28 Western Atlas International, Inc. Wireline cable head for use in coiled tubing operations
US5524937A (en) * 1994-12-06 1996-06-11 Camco International Inc. Internal coiled tubing connector
US5988702A (en) * 1995-09-28 1999-11-23 Fiber Spar And Tube Corporation Composite coiled tubing end connector
US6068394A (en) * 1995-10-12 2000-05-30 Industrial Sensors & Instrument Method and apparatus for providing dynamic data during drilling
US6065540A (en) * 1996-01-29 2000-05-23 Schlumberger Technology Corporation Composite coiled tubing apparatus and methods
US5944099A (en) * 1996-03-25 1999-08-31 Fiber Spar And Tube Corporation Infuser for composite spoolable pipe
US6199629B1 (en) * 1997-09-24 2001-03-13 Baker Hughes Incorporated Computer controlled downhole safety valve system
US6082454A (en) * 1998-04-21 2000-07-04 Baker Hughes Incorporated Spooled coiled tubing strings for use in wellbores
US6161622A (en) * 1998-11-02 2000-12-19 Halliburton Energy Services, Inc. Remote actuated plug method
US6202749B1 (en) * 1999-02-04 2001-03-20 David L. Adams Well screen system
US6364368B1 (en) * 1999-10-20 2002-04-02 Marion D. Kilgore Internal flush coupling for composite coiled tubing
US6288975B1 (en) * 1999-10-29 2001-09-11 Litton Systems, Inc. Acoustic sensing system for downhole seismic applications utilizing an array of fiber optic sensors
US6332499B1 (en) * 1999-11-23 2001-12-25 Camco International, Inc. Deployment tubing connector having internal electrical penetrator

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8991492B2 (en) 2005-09-01 2015-03-31 Schlumberger Technology Corporation Methods, systems and apparatus for coiled tubing testing
US8312923B2 (en) 2006-03-30 2012-11-20 Schlumberger Technology Corporation Measuring a characteristic of a well proximate a region to be gravel packed
GB2436579A (en) * 2006-03-30 2007-10-03 Schlumberger Holdings Sand screen with sensor and inductive coupler
US9175523B2 (en) 2006-03-30 2015-11-03 Schlumberger Technology Corporation Aligning inductive couplers in a well
US7735555B2 (en) 2006-03-30 2010-06-15 Schlumberger Technology Corporation Completion system having a sand control assembly, an inductive coupler, and a sensor proximate to the sand control assembly
GB2436579B (en) * 2006-03-30 2010-12-29 Schlumberger Holdings Completion system having a sand control assembly
US20070227727A1 (en) * 2006-03-30 2007-10-04 Schlumberger Technology Corporation Completion System Having a Sand Control Assembly, An Inductive Coupler, and a Sensor Proximate to the Sand Control Assembly
US8056619B2 (en) 2006-03-30 2011-11-15 Schlumberger Technology Corporation Aligning inductive couplers in a well
US8235127B2 (en) 2006-03-30 2012-08-07 Schlumberger Technology Corporation Communicating electrical energy with an electrical device in a well
US20090066535A1 (en) * 2006-03-30 2009-03-12 Schlumberger Technology Corporation Aligning inductive couplers in a well
US7597142B2 (en) 2006-12-18 2009-10-06 Schlumberger Technology Corporation System and method for sensing a parameter in a wellbore
US20110017448A1 (en) * 2008-01-11 2011-01-27 Douglas Pipchuk Zonal testing with the use of coiled tubing
US9581017B2 (en) 2008-01-11 2017-02-28 Schlumberger Technology Corporation Zonal testing with the use of coiled tubing
US8763694B2 (en) 2008-01-11 2014-07-01 Schlumberger Technology Corporation Zonal testing with the use of coiled tubing
US8839850B2 (en) 2009-10-07 2014-09-23 Schlumberger Technology Corporation Active integrated completion installation system and method
US8875791B2 (en) * 2010-10-18 2014-11-04 Schlumberger Technology Corporation Segmented fiber optic coiled tubing assembly
US20120211231A1 (en) * 2010-10-18 2012-08-23 Zafer Erkol Segmented Fiber Optic Coiled Tubing Assembly
US9249559B2 (en) 2011-10-04 2016-02-02 Schlumberger Technology Corporation Providing equipment in lateral branches of a well
US9644476B2 (en) 2012-01-23 2017-05-09 Schlumberger Technology Corporation Structures having cavities containing coupler portions
US9175560B2 (en) 2012-01-26 2015-11-03 Schlumberger Technology Corporation Providing coupler portions along a structure
US9938823B2 (en) 2012-02-15 2018-04-10 Schlumberger Technology Corporation Communicating power and data to a component in a well
US10036234B2 (en) 2012-06-08 2018-07-31 Schlumberger Technology Corporation Lateral wellbore completion apparatus and method
US11570435B2 (en) * 2019-01-16 2023-01-31 Telefonaktiebolaget Lm Ericsson (Publ) Video coding comprising uniform tile split with remainder

Also Published As

Publication number Publication date
EP1505248A2 (en) 2005-02-09
NO20020727D0 (en) 2002-02-13
US6766853B2 (en) 2004-07-27
CA2372835A1 (en) 2002-08-20
EP1236860A3 (en) 2004-04-28
EP1505248A3 (en) 2005-02-23
AR032715A1 (en) 2003-11-19
US6561278B2 (en) 2003-05-13
EP1236860A2 (en) 2002-09-04
US20030181085A1 (en) 2003-09-25
NO20020727L (en) 2002-08-21
BR0200453A (en) 2002-10-29
US20020112861A1 (en) 2002-08-22

Similar Documents

Publication Publication Date Title
US6766853B2 (en) Apparatus for interconnecting continuous tubing strings having sidewall-embedded lines therein
US6761574B1 (en) Coiled tubing connector
US7226090B2 (en) Rod and tubing joint of multiple orientations containing electrical wiring
US7059881B2 (en) Spoolable composite coiled tubing connector
US7228898B2 (en) Gravel pack completion with fluid loss control fiber optic wet connect
US8091631B2 (en) Intelligent well system and method
CA2330402C (en) Method of providing hydraulic/fiber conduits adjacent bottom hole assemblies for multi-step completions
US20050023831A1 (en) Tubing joint of multiple orientations containing electrical wiring
EP2038511B1 (en) Downhole pressure balanced electrical connections
RU2579082C2 (en) Downhole tubular segment with embedded conductor
US8474520B2 (en) Wellbore drilled and equipped for in-well rigless intervention ESP
GB2409692A (en) Single trip completion with sand screen and control line
US6702015B2 (en) Method and apparatus for deploying power cable and capillary tube through a wellbore tool
US8783369B2 (en) Downhole pressure barrier and method for communication lines
US20210355797A1 (en) Outwardly threadless bulkhead for perforating gun
CA2214877C (en) Dual bore riser
US6545221B1 (en) Splice system for use in splicing coiled tubing having internal power cable
JP2003531320A (en) Coiled tube connector
US11255133B2 (en) Harness for intelligent completions
US6595292B2 (en) Method and apparatus for use with two or more hydraulic conduits deployed downhole
CA2395845C (en) Multiple conduit passage through a wellhead
CA1077081A (en) Pipe section for use in borehole operations and method of manufacturing the same
US20090084542A1 (en) Wellbore power and/or data transmission devices and methods
JPS6018793B2 (en) Pipe device for drilling work and its manufacturing method

Legal Events

Date Code Title Description
STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION