US20040141811A1 - Ballast deployment apparatus and method for installing and retrieving said apparatus - Google Patents

Ballast deployment apparatus and method for installing and retrieving said apparatus Download PDF

Info

Publication number
US20040141811A1
US20040141811A1 US10/348,141 US34814103A US2004141811A1 US 20040141811 A1 US20040141811 A1 US 20040141811A1 US 34814103 A US34814103 A US 34814103A US 2004141811 A1 US2004141811 A1 US 2004141811A1
Authority
US
United States
Prior art keywords
chute
seabed
ballast
deployment
buoyancy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US10/348,141
Inventor
Karel Karal
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Aibel AS
Original Assignee
ABB Offshore Systems AS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ABB Offshore Systems AS filed Critical ABB Offshore Systems AS
Priority to US10/348,141 priority Critical patent/US20040141811A1/en
Assigned to ABB OFFSHORE SYSTEMS AS reassignment ABB OFFSHORE SYSTEMS AS ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: KARAL, KAREL
Publication of US20040141811A1 publication Critical patent/US20040141811A1/en
Assigned to J.P. MORGAN EUROPE LIMITED, AS SECURITY AGENT reassignment J.P. MORGAN EUROPE LIMITED, AS SECURITY AGENT SECURITY AGREEMENT Assignors: ABB OFFSHORE SYSTEMS INC.
Abandoned legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/30Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B22/00Buoys
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/28Arrangement of ship-based loading or unloading equipment for cargo or passengers of chutes

Definitions

  • This invention relates to the field of subsea operations. More specifically, the invention relates to an apparatus for the deployment of ballast material to a subsea location, preferably onto a structure or structures on the seabed, and a method for installing and retrieving said apparatus.
  • ballast materials which in most cases comprise rocks or gravel, for a number of reasons, such as increasing the weight (and thus stability), preventing scour, enhancing the seabed capacity, providing a permeable layer, and/or for mitigating environmental impacts on shipping and fisheries.
  • ballast materials are to cover pipelines on the seabed in order to protect them and increase stability.
  • One problem associated with deployment of ballast materials is to accurately control that it is deposited in the desired location.
  • ballast material In order to ensure accurate deployment of ballast materials in very deep waters, one of today's techniques is to lower the ballast material in large “baskets,” which is a time-consuming and costly operation, and often requires a separate vessel in addition to the ballast deployment vessel.
  • the present invention solves that need, in that it provides a novel apparatus for the deployment of ballast material to the seabed, and an associated installation and retrieval method.
  • an apparatus for controlled deployment of ballast material to a subsea location, preferably onto a subsea structure, comprising
  • At least one chute for conveying said ballast material, said chute having a first end and a second end;
  • At least one buoyancy element associated with the chute such that the chute may assume a generally vertical orientation in the water, supported by said buoyancy element;
  • a support element associated with said chute and adapted for cooperation with an installation weight.
  • the method for installing the apparatus according to the invention comprises:
  • FIG. 1 is a sectional drawing, showing the principles of the invented apparatus during deployment of ballast materials
  • FIG. 2 is a sectional drawing, showing the invented apparatus used in a combination with a standard ballast deployment equipment, such that the depth is extended beyond present limits;
  • FIG. 3 shows the apparatus being transported to an offshore installation site
  • FIG. 4 shows a cross-section of the chute in an optional arrangement that is introduced for transport/tow under special conditions (e.g. extensive wave action, long towing distances);
  • FIG. 5 is an illustration of the first stage of installing the invented chute
  • FIGS. 6, 7 and 8 are sectional drawings, showing the installation of the apparatus in deep water
  • FIG. 9 shows a typical chute joint (optional).
  • FIG. 10 is essentially similar to FIG. 5, but illustrates the chute having one joint.
  • FIG. 1 shows one embodiment of the invented ballast deployment apparatus 1 in an installed position over a structure 3 on a subsea location on the bed 4 under the surface 19 of a body of water, in the process of deploying ballast material 2 on the structure 3 .
  • the ballast deployment apparatus 1 comprises a chute 5 and any number of buoyancy elements 6 .
  • the chute 5 has a first end and a second end.
  • the chute 5 is shown displayed with a “cut line” to give an impression that the chute length normally is considerably greater than what is illustrated. Such “cut lines” also appear in FIGS. 2, 6, 7 and 8 .
  • the first end which is the upper end when the apparatus is in the installed position, may have a funnel shape in order to ease the filling of ballast material 2 into the chute.
  • the buoyancy elements 6 are generally attached near the chute's first end, may be of any number and have any suitable shape. In the described embodiment, only two buoyancy elements are shown for clarity of illustration.
  • the overall buoyancy of the buoyancy elements 6 is greater that the overall submerged weight of the ballast deployment apparatus 1 , so that the excessive buoyancy can be applied for station-keeping of the apparatus, in an alternative embodiment of the invention, as shown in FIG. 2.
  • the station-keeping at the desired depth is achieved by a tether 7 that connects the apparatus 1 to a structure 3 on the seabed location.
  • the tether 7 is preferably attached to or near the chute's second end, in a known fashion and method to be described below.
  • the connection between the chute and the buoyancy element is moment free in the vertical plane so that upending of the buoyancy element, if desirable, is achieved by weight from the chute only. This is achieved by hinging the chute to the buoyancy element in a point distant from the center of buoyancy of the element in its initial position, i.e. before upending.
  • FIG. 2 also illustrates the use of the invented ballast deployment apparatus 1 in combination with a standard ballasting (rock dumping) vessel 8 equipped with a standard chute 9 that conveys ballast material 2 into the chute 5 .
  • This arrangement allows using conventional equipment and reaching deep waters.
  • FIG. 3 is an illustration of how the ballast deployment apparatus 1 may be towed to an offshore installation site by a tug 10 and a towline 20 .
  • the chute 5 is sealed at both ends by suitable end caps (not shown). Water is thus prevented to ingress the chute interior and the entire chute remains buoyant for the transportation.
  • FIG. 4 shows an optional arrangement in which at least one buoyancy pipe 11 is fixed to the ballast deployment apparatus 1 and its chute 5 by known means; e.g. straps 12 .
  • the chute 5 is not sealed and thus in all phases flooded and the buoyancy pipe 11 is gas-filled (e.g. air) during tow.
  • the buoyancy pipe 11 may be opened and closed selectively, such that displacing of water from the pipe is feasible. Hence, positive buoyancy of the apparatus can be regained, resulting in emerging of the apparatus to the surface and assuming a horizontal position suitable for removal of the apparatus upon completion of the ballasting operation.
  • the apparatus In a case when the buoyancy pipe 11 is not used, such as in a recovery scenario, the apparatus is towed between two tugs where the towline from the leading tug is connected to the lower end of the chute while the towing line from the trailing tug is connected to the upper end.
  • a chute with hinge(s) on the apparatus is towed by one tug with the towline connected to the lower end.
  • the buoyancy pipe 11 may extend the entire length of the chute 5 as one piece, or may comprise a number of buoyancy pipes 11 fixed to the chute 5 at given intervals.
  • FIG. 5 shows upending of the ballast deployment apparatus 1 as shown in FIGS. 1 and 2, for example, as the first stage of its installation.
  • the chute 5 is opened at both ends (e.g. by removing said end caps), whereby the chute 5 is flooded by water.
  • the ballast deployment apparatus 1 gradually rotates about a support (hinge) on the buoyancy elements 6 , which remain floating (on or near the water surface) and take the submerged weight of the chute 5 . In the final equilibrium position the ballast deployment apparatus 1 is generally vertical, free-hanging down into the water.
  • FIGS. 6, 7 and 8 illustrate further steps of the installation procedure in the embodiment where the deployment apparatus is to be installed at a certain depth.
  • the ballast deployment apparatus 1 is hanging freely in the water, generally in a vertical orientation.
  • An installation weight (e.g. a chain) 14 is being lowered into the chute.
  • a support element 13 is installed at a convenient location in the chute 5 , between the buoyancy elements 6 and the chute's second end.
  • This support element 13 which will support the installation weight (chain) 14 but allow the ballast material 2 to pass by, may conveniently be in the form of a grating or other such device.
  • FIG. 7 shows how the continued feeding of the installation chain 14 into the chute causes the chain to accumulate on the support element (grating) 13 , which in turn causes the ballast deployment apparatus 1 to descend further down into the water.
  • the chain may also be fitted with a plug (not shown) that stops the chain when in contact with a recess in the chute located at the desirable depth
  • the ballast deployment apparatus 1 has reached a position above the seabed 4 , said position being controlled by the installation chain in relation to the buoyancy elements 6 .
  • the structure 3 on the seabed is equipped with a tether 7 that is tensioned by a float 15 .
  • This tether-and-float combination may be any suitable element or elements associated with the seabed.
  • the tether itself is buoyant, thus abolishing the need for the float 15 .
  • the structure 3 is intended to be covered by ballast material.
  • the ballast deployment apparatus 1 with buoyancy elements 6 is lowered and positioned above the structure 3 so that a free end of the tether 7 may be attached to the chute second end in a known manner, automatically or manually, by a remotely operated vehicle 16 or other equipment or diver. Upon completion of this operation, the installation chain 14 is retracted and retrieved, and the ballast deployment apparatus 1 is ready for the use.
  • the installation chain is lowered back into the chute 5 , the tether 7 unloaded and disconnected, and the entire ballast deployment apparatus 1 may be moved, by means of the installation chain 14 , to another structure/location for deployment of ballast material. Finally, the ballast deployment apparatus 1 can be retrieved to floating in upright orientation by removing the installation chain from the chute.
  • chute 5 may be divided into two or more sections ( 5 a , 5 b ), and joined by a corresponding number of joints 17 . This is illustrated in FIGS. 9 and 10.
  • the joints 17 may be covered by a flexible cladding 18 .
  • Such jointed chute arrangement facilitates the use of longer chutes 5 , thus achieving greater water depths in which the ballasting deployment can be performed.
  • the bending moments are proportional to the square of the length between the ends of the joints, the use of one of several joints efficiently increases the feasible depth.
  • Another constraint for the practical length may be related to the length of the available facilities for fabrication and launching into floating in water.
  • the ballast material 2 is shown as a granulate material, such as rock or gravel.
  • the invented ballast deployment apparatus 1 is, however, also suitable for subsea deployment of other materials, such as concrete or any fluid. Also, while the ballast material is shown as falling to the structure on the seabed due to gravity, the invented ballast deployment apparatus 1 is also suitable for situations where the deployment of materials is effected in part or completely by means of an applied pressure.
  • the invented apparatus is suitable as a component in a power plant in open oceans, the chute extracting energy from temperature differential between cold water in deep water and warm water in surface (in tropic areas). Cold water flows in the chute to the surface for heat exchange with warm water.
  • the invented apparatus may find use for transmission of free gas to the surface and controlled discharge, e.g. during blow-out or natural seepage of hydrocarbon gases, from the seabed.
  • a guide funnel on the lower end of the chute may be necessary.
  • the structure 3 may be of any shape or form, e.g. circular in the case of a pipeline.
  • the structure may be resting on or partially into (trenched) the seabed 4 .
  • the support element 13 in the described embodiment is shown as a grating inside the chute, and the installation weight 14 is shown as a chain to be lowered onto the grating, the support element may have other forms and shapes, and may be mounted on the chute exterior. Similarly, the installation weight should not be restricted to a chain, but may comprise any device for transferring weight onto the support element.
  • the invention is not limited to any particular dimension.
  • the chute 5 may any suitable length, the buoyancy elements 6 are equally dimensioned to suit the particular application.
  • the chute 5 is shown with a circular cross section, a person skilled in the art will understand that the invention is not limited to chutes having a such shape.

Abstract

An apparatus for controlled deployment of ballast material onto a subsea location, preferably a subsea structure, comprising at least one chute for conveying said ballast material, said chute having a first end and a second end; at least one buoyancy element associated with the chute such that the chute may assume a generally vertical orientation in the water, supported by said buoyancy element; a support element associated with said chute and adapted for cooperation with an installation weight, said chute second end being adapted for connection to an element associated with the seabed. A method for installation of said apparatus comprising bringing the chute into a generally vertical orientation in the water above said subsea location, lowering portions of said installation weight onto said support element, causing said ballast deployment apparatus to move towards the seabed, until said apparatus has reached a desired depth in the water; connecting said chute second end to said element associated with the seabed; and withdrawing said installation weight from said support element, whereupon deployment of ballast material through said chute may commence.

Description

    BACKGROUND OF THE INVENTION
  • 1. Field of the Invention [0001]
  • This invention relates to the field of subsea operations. More specifically, the invention relates to an apparatus for the deployment of ballast material to a subsea location, preferably onto a structure or structures on the seabed, and a method for installing and retrieving said apparatus. [0002]
  • 2. Description of the Related Art [0003]
  • Installation of structures on the seabed, such as for example laying of subsea pipelines in connection with exploitation of hydrocarbons, often require deployment of ballast materials onto these structures. These structures may require ballast materials, which in most cases comprise rocks or gravel, for a number of reasons, such as increasing the weight (and thus stability), preventing scour, enhancing the seabed capacity, providing a permeable layer, and/or for mitigating environmental impacts on shipping and fisheries. One particular application of ballast materials is to cover pipelines on the seabed in order to protect them and increase stability. One problem associated with deployment of ballast materials, is to accurately control that it is deposited in the desired location. [0004]
  • Deployment of ballast material is today normally accomplished from vessels dumping the material directly into the sea, or (in deeper waters) through chutes in order to better control where the ballast material actually lands. Known techniques and equipment have practical limits. Today's chutes are not practical for very deep waters, as the chute's free end is susceptible to moving considerably due to water currents and other perturbations and due to the considerable length and weight of such chutes. The known chute therefore limits the depth to which this method is feasible or economical. [0005]
  • In order to ensure accurate deployment of ballast materials in very deep waters, one of today's techniques is to lower the ballast material in large “baskets,” which is a time-consuming and costly operation, and often requires a separate vessel in addition to the ballast deployment vessel. [0006]
  • Thus, there is a need for a method and an apparatus which extend the depth limits without a significant cost increase and allows the use of less specialized vessels to perform the operation, thus also reducing the associated costs. [0007]
  • The present invention solves that need, in that it provides a novel apparatus for the deployment of ballast material to the seabed, and an associated installation and retrieval method. Brief Summary Of Certain Inventive Aspects [0008]
  • These and other objects and features of the invention are provided by an apparatus for controlled deployment of ballast material to a subsea location, preferably onto a subsea structure, comprising [0009]
  • at least one chute for conveying said ballast material, said chute having a first end and a second end; [0010]
  • at least one buoyancy element associated with the chute such that the chute may assume a generally vertical orientation in the water, supported by said buoyancy element; and [0011]
  • a support element associated with said chute and adapted for cooperation with an installation weight. [0012]
  • Alternative embodiments of the invented apparatus are defined by dependent claims [0013] 2-12.
  • The method for installing the apparatus according to the invention, comprises: [0014]
  • bringing the chute into a generally vertical orientation in the water above the subsea location, said first end being on or near the surface of the water and said second end pointing towards the subsea location; [0015]
  • lowering portions of said installation weight onto said support element, causing said ballast deployment apparatus to move towards the seabed, until said apparatus has reached a desired depth in the water; [0016]
  • connecting said chute second end to said element associated with the seabed; and [0017]
  • withdrawing said installation weight from said support element, [0018]
  • whereupon deployment of ballast material through said chute may commence. [0019]
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • An embodiment of the invention will now be described in more detail, with reference to the accompanying schematic drawings, where like parts have been given like reference numbers. [0020]
  • FIG. 1 is a sectional drawing, showing the principles of the invented apparatus during deployment of ballast materials; [0021]
  • FIG. 2 is a sectional drawing, showing the invented apparatus used in a combination with a standard ballast deployment equipment, such that the depth is extended beyond present limits; [0022]
  • FIG. 3 shows the apparatus being transported to an offshore installation site; [0023]
  • FIG. 4 shows a cross-section of the chute in an optional arrangement that is introduced for transport/tow under special conditions (e.g. extensive wave action, long towing distances); [0024]
  • FIG. 5 is an illustration of the first stage of installing the invented chute; [0025]
  • FIGS. 6, 7 and [0026] 8 are sectional drawings, showing the installation of the apparatus in deep water;
  • FIG. 9 shows a typical chute joint (optional); [0027]
  • FIG. 10 is essentially similar to FIG. 5, but illustrates the chute having one joint. [0028]
  • DETAILED DESCRIPTION OF CERTAIN EMBODIMENTS OF THE INVENTION
  • FIG. 1 shows one embodiment of the invented [0029] ballast deployment apparatus 1 in an installed position over a structure 3 on a subsea location on the bed 4 under the surface 19 of a body of water, in the process of deploying ballast material 2 on the structure 3. The ballast deployment apparatus 1 comprises a chute 5 and any number of buoyancy elements 6. The chute 5 has a first end and a second end. For illustration purposes, the chute 5 is shown displayed with a “cut line” to give an impression that the chute length normally is considerably greater than what is illustrated. Such “cut lines” also appear in FIGS. 2, 6, 7 and 8. The first end, which is the upper end when the apparatus is in the installed position, may have a funnel shape in order to ease the filling of ballast material 2 into the chute. The buoyancy elements 6 are generally attached near the chute's first end, may be of any number and have any suitable shape. In the described embodiment, only two buoyancy elements are shown for clarity of illustration.
  • The overall buoyancy of the [0030] buoyancy elements 6 is greater that the overall submerged weight of the ballast deployment apparatus 1, so that the excessive buoyancy can be applied for station-keeping of the apparatus, in an alternative embodiment of the invention, as shown in FIG. 2. In this embodiment, the station-keeping at the desired depth is achieved by a tether 7 that connects the apparatus 1 to a structure 3 on the seabed location. The tether 7 is preferably attached to or near the chute's second end, in a known fashion and method to be described below. The connection between the chute and the buoyancy element is moment free in the vertical plane so that upending of the buoyancy element, if desirable, is achieved by weight from the chute only. This is achieved by hinging the chute to the buoyancy element in a point distant from the center of buoyancy of the element in its initial position, i.e. before upending.
  • FIG. 2 also illustrates the use of the invented [0031] ballast deployment apparatus 1 in combination with a standard ballasting (rock dumping) vessel 8 equipped with a standard chute 9 that conveys ballast material 2 into the chute 5. This arrangement allows using conventional equipment and reaching deep waters.
  • FIG. 3 is an illustration of how the [0032] ballast deployment apparatus 1 may be towed to an offshore installation site by a tug 10 and a towline 20. In this position, the chute 5 is sealed at both ends by suitable end caps (not shown). Water is thus prevented to ingress the chute interior and the entire chute remains buoyant for the transportation.
  • It is also in principle conceivable to transport such chute on a reel aboard a vessel, and deploy the chute by conventional off-reeling techniques. [0033]
  • FIG. 4 shows an optional arrangement in which at least one [0034] buoyancy pipe 11 is fixed to the ballast deployment apparatus 1 and its chute 5 by known means; e.g. straps 12. In this arrangement the chute 5 is not sealed and thus in all phases flooded and the buoyancy pipe 11 is gas-filled (e.g. air) during tow.
  • The [0035] buoyancy pipe 11 may be opened and closed selectively, such that displacing of water from the pipe is feasible. Hence, positive buoyancy of the apparatus can be regained, resulting in emerging of the apparatus to the surface and assuming a horizontal position suitable for removal of the apparatus upon completion of the ballasting operation.
  • In a case when the [0036] buoyancy pipe 11 is not used, such as in a recovery scenario, the apparatus is towed between two tugs where the towline from the leading tug is connected to the lower end of the chute while the towing line from the trailing tug is connected to the upper end. In another scenario, if no re-use is planned, or in a case of a short/light chute, a chute with hinge(s) on the apparatus is towed by one tug with the towline connected to the lower end.
  • The [0037] buoyancy pipe 11 may extend the entire length of the chute 5 as one piece, or may comprise a number of buoyancy pipes 11 fixed to the chute 5 at given intervals.
  • FIG. 5 shows upending of the [0038] ballast deployment apparatus 1 as shown in FIGS. 1 and 2, for example, as the first stage of its installation. The chute 5 is opened at both ends (e.g. by removing said end caps), whereby the chute 5 is flooded by water. The ballast deployment apparatus 1 gradually rotates about a support (hinge) on the buoyancy elements 6, which remain floating (on or near the water surface) and take the submerged weight of the chute 5. In the final equilibrium position the ballast deployment apparatus 1 is generally vertical, free-hanging down into the water.
  • FIGS. 6, 7 and [0039] 8 illustrate further steps of the installation procedure in the embodiment where the deployment apparatus is to be installed at a certain depth.
  • In FIG. 6, the [0040] ballast deployment apparatus 1 is hanging freely in the water, generally in a vertical orientation. An installation weight (e.g. a chain) 14 is being lowered into the chute. At a convenient location in the chute 5, between the buoyancy elements 6 and the chute's second end, a support element 13 is installed. This support element 13, which will support the installation weight (chain) 14 but allow the ballast material 2 to pass by, may conveniently be in the form of a grating or other such device.
  • FIG. 7 shows how the continued feeding of the [0041] installation chain 14 into the chute causes the chain to accumulate on the support element (grating) 13, which in turn causes the ballast deployment apparatus 1 to descend further down into the water. In another embodiment, the chain may also be fitted with a plug (not shown) that stops the chain when in contact with a recess in the chute located at the desirable depth
  • In FIG. 8, the [0042] ballast deployment apparatus 1 has reached a position above the seabed 4, said position being controlled by the installation chain in relation to the buoyancy elements 6. The structure 3 on the seabed is equipped with a tether 7 that is tensioned by a float 15. This tether-and-float combination may be any suitable element or elements associated with the seabed. In one embodiment, the tether itself is buoyant, thus abolishing the need for the float 15. The structure 3 is intended to be covered by ballast material.
  • The [0043] ballast deployment apparatus 1 with buoyancy elements 6 is lowered and positioned above the structure 3 so that a free end of the tether 7 may be attached to the chute second end in a known manner, automatically or manually, by a remotely operated vehicle 16 or other equipment or diver. Upon completion of this operation, the installation chain 14 is retracted and retrieved, and the ballast deployment apparatus 1 is ready for the use.
  • Upon completion of the ballast deployment operation, the installation chain is lowered back into the [0044] chute 5, the tether 7 unloaded and disconnected, and the entire ballast deployment apparatus 1 may be moved, by means of the installation chain 14, to another structure/location for deployment of ballast material. Finally, the ballast deployment apparatus 1 can be retrieved to floating in upright orientation by removing the installation chain from the chute.
  • One constraint in installing very long chutes [0045] 5 (for large water depths) is the bending moment that is generated during the upending and/or retrieval of the chute (see FIG. 5). In order to eliminate this constraint, the chute 5 may be divided into two or more sections (5 a, 5 b), and joined by a corresponding number of joints 17. This is illustrated in FIGS. 9 and 10. In order to prevent disruptions of the ballast material deployment, the joints 17 may be covered by a flexible cladding 18.
  • Such jointed chute arrangement facilitates the use of [0046] longer chutes 5, thus achieving greater water depths in which the ballasting deployment can be performed. As the bending moments are proportional to the square of the length between the ends of the joints, the use of one of several joints efficiently increases the feasible depth. Another constraint for the practical length may be related to the length of the available facilities for fabrication and launching into floating in water.
  • In the described embodiment, the [0047] ballast material 2 is shown as a granulate material, such as rock or gravel. The invented ballast deployment apparatus 1 is, however, also suitable for subsea deployment of other materials, such as concrete or any fluid. Also, while the ballast material is shown as falling to the structure on the seabed due to gravity, the invented ballast deployment apparatus 1 is also suitable for situations where the deployment of materials is effected in part or completely by means of an applied pressure.
  • Also the invented apparatus is suitable as a component in a power plant in open oceans, the chute extracting energy from temperature differential between cold water in deep water and warm water in surface (in tropic areas). Cold water flows in the chute to the surface for heat exchange with warm water. [0048]
  • Furthermore, the invented apparatus may find use for transmission of free gas to the surface and controlled discharge, e.g. during blow-out or natural seepage of hydrocarbon gases, from the seabed. In this case, a guide funnel on the lower end of the chute may be necessary. [0049]
  • Although the figures show the [0050] structure 3 as a flat element, it should be understood that the structure may be of any shape or form, e.g. circular in the case of a pipeline. The structure may be resting on or partially into (trenched) the seabed 4.
  • Although the [0051] support element 13 in the described embodiment is shown as a grating inside the chute, and the installation weight 14 is shown as a chain to be lowered onto the grating, the support element may have other forms and shapes, and may be mounted on the chute exterior. Similarly, the installation weight should not be restricted to a chain, but may comprise any device for transferring weight onto the support element.
  • It should be understood that the invention is not limited to any particular dimension. For example, the [0052] chute 5 may any suitable length, the buoyancy elements 6 are equally dimensioned to suit the particular application. Furthermore, although the chute 5 is shown with a circular cross section, a person skilled in the art will understand that the invention is not limited to chutes having a such shape.
  • The foregoing description and the embodiments of the present invention are to be construed as mere illustrations of the application of the principles of the invention. The foregoing is not intended to limit the scope of the claims, but the true spirit and scope of present invention is defined by the claims. [0053]

Claims (17)

What is claimed is:
1. An apparatus for controlled deployment of ballast material to a subsea location, comprising
at least one chute for conveying said ballast material, said chute having a first end and a second end;
at least one buoyancy element associated with the chute such that the chute may assume a generally vertical orientation in the water, supported by said buoyancy element; and
a support element associated with said chute and adapted for cooperation with an installation weight.
2. The apparatus of claim 1, wherein said support element is fixed to the chute interior below the location of said buoyancy elements.
3. The apparatus of claim 2, wherein said support element comprises a grating or similar element which does not prevent the conveyance of said ballast material while supporting the installation weight.
4. The apparatus of claim 1, wherein said ballast elements are located at or near said first end.
5. The apparatus of claim 1, wherein said chute first end has a funnel-shape.
6. The apparatus of claim 1, wherein the chute is associated with at least one buoyancy pipe generally oriented parallel to said chute.
7. The apparatus of claim 6, wherein the buoyancy pipe extends the length of said chute.
8. The apparatus of claim 1, wherein a plurality of chutes are joined by flexible joints.
9. The apparatus of claim 8, wherein said joints are covered by a flexible cladding.
10. The apparatus of claim 1, wherein said chute second end is adapted for connection to an element associated with the seabed.
11. The apparatus of claim 10, wherein said element associated with the seabed is a tether connected to a subsea structure.
12. The apparatus of claim 10, wherein said element associated with the seabed is a separate mooring on the seabed.
13. A method for installing an apparatus for the controlled deployment of ballast material to a subsea location, said apparatus comprising
at least one chute for conveying said ballast material, said chute having a first end and a second end;
at least one buoyancy element associated with the chute such that the chute may assume a generally vertical orientation in the water, supported by said buoyancy element;
a support element associated with said chute and adapted for cooperation with an installation weight. and
said chute second end being adapted for connection to an element associated with the seabed,
said method comprising the steps of:
bringing the chute into a generally vertical orientation in the water above said subsea location, said first end being on or near the surface of the water and said second end pointing towards the subsea location;
lowering portions of said installation weight onto said support element, causing said ballast deployment apparatus to move towards the seabed, until said apparatus has reached a desired depth in the water;—connecting said chute second end to said element associated with the seabed; and
withdrawing said installation weight from said support element,
whereupon deployment of ballast material through said chute may commence.
14. The method of claim 13, wherein said portions of said installation weight is lowered into said chute, onto said support element which is fixed inside the chute.
15. The method of claim 14, wherein said installation weight is lowered into a grating or similar element which does not prevent the conveyance of said ballast material, but supports the installation weight.
16. The method of claim 13, wherein said element associated with the seabed is a tether connected to a subsea structure.
18. The method of claim 13, wherein said element associated with the seabed is a separate mooring on the seabed.
US10/348,141 2003-01-20 2003-01-20 Ballast deployment apparatus and method for installing and retrieving said apparatus Abandoned US20040141811A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US10/348,141 US20040141811A1 (en) 2003-01-20 2003-01-20 Ballast deployment apparatus and method for installing and retrieving said apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US10/348,141 US20040141811A1 (en) 2003-01-20 2003-01-20 Ballast deployment apparatus and method for installing and retrieving said apparatus

Publications (1)

Publication Number Publication Date
US20040141811A1 true US20040141811A1 (en) 2004-07-22

Family

ID=32712490

Family Applications (1)

Application Number Title Priority Date Filing Date
US10/348,141 Abandoned US20040141811A1 (en) 2003-01-20 2003-01-20 Ballast deployment apparatus and method for installing and retrieving said apparatus

Country Status (1)

Country Link
US (1) US20040141811A1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101013229B1 (en) * 2008-12-08 2011-02-10 (주)제스솔라 Dry etching apparatus for manufacturing of solar cell
EP2492184A1 (en) * 2011-02-28 2012-08-29 Tideway B.V. Device and method for depositing rocks at a defined location on the bottom of a water mass
US20180141622A1 (en) * 2015-07-06 2018-05-24 Jianhui Zhou Universal offshore platform, and buoyancy regulation method and stable power generation method thereof
EP3268296B1 (en) * 2015-03-11 2018-08-15 Van Oord Dredging And Marine Contractors B.V. Marine fall pipe system, and marine vessel comprising such fall pipe system
EP3839311A1 (en) * 2019-12-20 2021-06-23 Technip France Mechanical protection of subsea pipes

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4129008A (en) * 1975-05-28 1978-12-12 Kajima Kensetsu Kabushiki Kaisha Tremie tube
US4338043A (en) * 1977-12-23 1982-07-06 Commissariat A L'energie Atomique Method for depositing material on the ocean bed and apparatus for performing the same
US4400115A (en) * 1978-12-20 1983-08-23 Commissariat A L'energie Atomique Method for depositing material on the ocean bed and apparatus for performing the same
US4407606A (en) * 1979-11-13 1983-10-04 Larsen Ole J F Method and apparatus for producing and laying a ballasted mat for ground stabilization

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4129008A (en) * 1975-05-28 1978-12-12 Kajima Kensetsu Kabushiki Kaisha Tremie tube
US4338043A (en) * 1977-12-23 1982-07-06 Commissariat A L'energie Atomique Method for depositing material on the ocean bed and apparatus for performing the same
US4400115A (en) * 1978-12-20 1983-08-23 Commissariat A L'energie Atomique Method for depositing material on the ocean bed and apparatus for performing the same
US4407606A (en) * 1979-11-13 1983-10-04 Larsen Ole J F Method and apparatus for producing and laying a ballasted mat for ground stabilization

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101013229B1 (en) * 2008-12-08 2011-02-10 (주)제스솔라 Dry etching apparatus for manufacturing of solar cell
EP2492184A1 (en) * 2011-02-28 2012-08-29 Tideway B.V. Device and method for depositing rocks at a defined location on the bottom of a water mass
NL2006315C2 (en) * 2011-02-28 2012-08-29 Tideway B V DEVICE AND METHOD FOR PILLING STONES TO A DEFINED PLACE ON THE BOTTOM OF A WATER MASS.
EP3268296B1 (en) * 2015-03-11 2018-08-15 Van Oord Dredging And Marine Contractors B.V. Marine fall pipe system, and marine vessel comprising such fall pipe system
US20180141622A1 (en) * 2015-07-06 2018-05-24 Jianhui Zhou Universal offshore platform, and buoyancy regulation method and stable power generation method thereof
US10442506B2 (en) * 2015-07-06 2019-10-15 Quanzhou Dingwei Construction Technology Co., Ltd Universal offshore platform, and buoyancy regulation method and stable power generation method thereof
EP3839311A1 (en) * 2019-12-20 2021-06-23 Technip France Mechanical protection of subsea pipes

Similar Documents

Publication Publication Date Title
KR101980221B1 (en) A disconnectable method and system for seafloor mining
CA2777464C (en) Mooring system for floating arctic vessel
US5582252A (en) Hydrocarbon transport system
US4907912A (en) Submersible production storage barge and method for transporting and installing a jack-up rig in a body of water
US6309269B1 (en) Variable buoyancy buoy for mooring mobile offshore drilling units
US7377225B2 (en) Spar-type offshore platform for ice flow conditions
US8734055B2 (en) Method for assembling an operating rig for a fluid in a body of water and associated operating rig
EP0494497A1 (en) Method and apparatus for production of subsea hydrocarbon formations
CA1068558A (en) Mooring system
US20060140726A1 (en) Riser installation vessel and method of using the same
JPS619387A (en) Mooring arrangement for ship
WO2008136926A1 (en) Shallow/intermediate water multipurpose floating platform for arctic environments
MX2012013123A (en) Undersea leak remediation device and method.
US8784011B2 (en) Marine-equipment installation method and apparatus
CN102562009B (en) Efficient open water riser deployment
US6106198A (en) Method for installation of tension-leg platforms and flexible tendon
US9340942B2 (en) Method for installing a device for recovering hydrocarbons
US20040141811A1 (en) Ballast deployment apparatus and method for installing and retrieving said apparatus
EP0170698A4 (en) Oil storage and transfer facility.
US8882390B2 (en) Method for installing an operating rig for a fluid in a body of water with a traction unit
US3754404A (en) Method for bending and laying pipe under water
US20070003374A1 (en) Subsea structure and methods of construction and installation thereof
KR101903390B1 (en) Floating type fluid offloading apparatus
JPH06219372A (en) Mooring method for floatable and sinkable floating body
WO2021054839A1 (en) Subsea mounting of ancillary equipment on an elongate member

Legal Events

Date Code Title Description
AS Assignment

Owner name: ABB OFFSHORE SYSTEMS AS, NORWAY

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:KARAL, KAREL;REEL/FRAME:013956/0968

Effective date: 20030321

AS Assignment

Owner name: J.P. MORGAN EUROPE LIMITED, AS SECURITY AGENT, UNI

Free format text: SECURITY AGREEMENT;ASSIGNOR:ABB OFFSHORE SYSTEMS INC.;REEL/FRAME:015215/0872

Effective date: 20040712

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION