US20030111510A1 - Concentric, insulated tubular conduits and method for assembly - Google Patents

Concentric, insulated tubular conduits and method for assembly Download PDF

Info

Publication number
US20030111510A1
US20030111510A1 US10/357,611 US35761103A US2003111510A1 US 20030111510 A1 US20030111510 A1 US 20030111510A1 US 35761103 A US35761103 A US 35761103A US 2003111510 A1 US2003111510 A1 US 2003111510A1
Authority
US
United States
Prior art keywords
tube
assembly
larger
lifting device
centralizers
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US10/357,611
Inventor
Layton Bull
Douglas Trosclair
Terron Adams
Roy Blanchard
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Vam USA LLC
V&M TCA LP
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US10/357,611 priority Critical patent/US20030111510A1/en
Publication of US20030111510A1 publication Critical patent/US20030111510A1/en
Assigned to GRANT PRIDECO, INC. reassignment GRANT PRIDECO, INC. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: ADAMS, TERRON A., BLANCHARD, ROY J., BULL, LAYTON R., TROSCLAIR, DOUGLAS J.
Assigned to GRANT PRIDECO, L.P. reassignment GRANT PRIDECO, L.P. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: GRANT PRIDECO, INC.
Assigned to WELLS FARGO BANK reassignment WELLS FARGO BANK SECURITY AGREEMENT Assignors: GRANT PRIDECO, INC.
Priority to US11/361,760 priority patent/US8365775B2/en
Assigned to GRANT PRIDECO, INC. reassignment GRANT PRIDECO, INC. RELEASE OF PATENT SECURITY AGREEMENT Assignors: WELLS FARGO BANK
Assigned to V&M TCA, LP reassignment V&M TCA, LP ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: GRANT PRIDECO, INC., GRANT PRIDECO, L.P.
Assigned to V&M ATLAS BRADFORD, LP reassignment V&M ATLAS BRADFORD, LP ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: GRANT PRIDECO, INC., GRANT PRIDECO, L.P.
Abandoned legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • B23K37/04Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
    • B23K37/053Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work aligning cylindrical work; Clamping devices therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C37/00Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape
    • B21C37/06Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape of tubes or metal hoses; Combined procedures for making tubes, e.g. for making multi-wall tubes
    • B21C37/15Making tubes of special shape; Making tube fittings
    • B21C37/154Making multi-wall tubes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • B23K37/04Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
    • B23K37/053Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work aligning cylindrical work; Clamping devices therefor
    • B23K37/0531Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work aligning cylindrical work; Clamping devices therefor internal pipe alignment clamps
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B36/00Heating, cooling, insulating arrangements for boreholes or wells, e.g. for use in permafrost zones
    • E21B36/003Insulating arrangements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K2101/00Articles made by soldering, welding or cutting
    • B23K2101/04Tubular or hollow articles
    • B23K2101/06Tubes
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10STECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10S414/00Material or article handling
    • Y10S414/123Hollow cylinder handlers

Definitions

  • the present invention relates to methods for fabricating insulated, concentric tubular bodies and the bodies fabricated by such methods.
  • Insulated tubulars or pipe of this type are sometimes referred to as “pipe-in-pipe” or “tube-in-tube” fluid conduits.
  • Insulated, concentric tubular fluid conduits are employed in well completions, pipelines, refineries, and other processing installations.
  • the tube-in-tube insulated pipe employed in oil and gas wells is typically joined together end-to-end by threaded connections.
  • the threads must be formed on the tubing after the concentric pipe bodies have been assembled.
  • the typical insulated section employs a threaded external tube surrounding a shorter, smaller diameter tube that is welded into the larger tube.
  • the assembly may also be heat treated after the inner tube is installed.
  • the threads are preferably formed on the outer tube after the inner tube is installed and the assembly is heat treated.
  • Threading speeds 150 rpm or more are common. Relative movement between the inner and outer pipe bodies as the assembly is rotated can cause harsh vibration and other undesired mechanical movement that interferes with the threading process.
  • the relative radial position of the inner and outer tubes can be fixed by employing multiple rigid spacers in the annulus between the two tubes.
  • One commonly employed technique is to provide a hinged metal stamping with raised ears to close the gap between the inner and outer tubes. Because of the use of sheet stock as the spacer material, the contacting ears form a flat surface engaging the inside surface of the surrounding tube.
  • Another technique employed to fix the inner and outer tubes is to employ a square stock that has been cut to short lengths and welded onto the outside surface of the inner pipe. Because the spacer is cut from square stock, the contact ends form a flat surface contacting the inside surface of the inner pipe.
  • the shape, size, and distribution of the centralizers also affect the assembly process of inserting the inner tube into the outer tube.
  • Multilayer wrappings of insulating material are often disposed over the smaller diameter tube between the axially spaced centralizers. It is typical to insert the inner tube, equipped with centralizers and insulation material, into the larger tube while the inner and outer tubes are horizontally oriented. As this is done, the inner tube slides along the internal bottom wall of the outer tube. This sliding movement can damage the centralizers and the insulation material. Horizontal insertion may also be made difficult when the internal surface of the outer tubular body is coarse or irregular such that the centralizers and insulation are abraded or hang up on the surface irregularities.
  • the desired spacing could be achieved by welding temporary lugs or retaining members to the inner or outer pipe at appropriate locations to form a stop that would fix the inner pipe lengthwise within the outer pipe. Such a procedure would require an additional welding step and also introduces an additional point for the introduction of measurement errors.
  • Centralizing rings having specially configured contact surfaces are affixed to the external surface of the inner tube forming the concentric insulated tubular assembly.
  • the centralizers are provided with a curving cross-section along their radially outermost contact surface to make circumferential line contact with the internal surface of the overlying tubular body to minimize heat transfer between the tubes.
  • Recesses are formed circumferentially about the external diameter of the centralizing rings to minimize the total contact area between the rings and the surrounding tubing.
  • the centralizing rings are disposed circumferentially about the inner tube such that the recesses in adjacent centralizing rings are offset circumferentially to preclude axially extending, aligned contact surfaces that enhance heat transfer.
  • the centralizing rings provide a minimum amount of surface contact with the overlying tube while rigidly occupying the annular space formed between the inner and outer tubular bodies to prevent any relative radial displacement between the bodies.
  • the firm line contact engagement provided by the centralizing rings minimizes the heat transfer between the inner and outer tubes and also permits the concentric tubular assembly to be rotated at high speeds during the threading process without experiencing excessive vibration or other undesired mechanical movement.
  • the damage normally occurring when insulating tubes are assembled horizontally is avoided with the use of a lifting device of the present invention that permits the inner and outer tubes to be assembled vertically in a recessed assembly well.
  • the lifting device permits the inner tube to be raised vertically and aligned concentrically with the vertically disposed outer tube.
  • the lifting device employed to lower the centralizer-equipped, insulation-wrapped inner tube vertically into the outer tube automatically centers the inner tube within the surrounding outer tube. Spring-loaded legs carried by the lifting device automatically spring radially outwardly once they clear the bottom of the larger diameter tubing.
  • An upward pull exerted on the lifting device brings detents in the legs against the base of the outer tube so that the outer tube is supported by the lifting device and the inner and outer tubes are precisely positioned axially.
  • the combined assembly may then be raised vertically from the assembly well and returned to horizontal position for subsequent working.
  • an important object of the present invention is to provide a method and apparatus for assembling concentric tubular bodies whereby the bodies are rigidly affixed radially relative to each other to prevent vibration or other undesired motion as the bodies are rotated during the threading of the ends of the tubular bodies.
  • Yet another object of the present invention is to provide a centralizer ring that can be positioned in the annular space between concentric tubulars to securely fix the tubulars radially relative to each other while minimizing the amount of heat transfer between the tubulars.
  • Another object of the present invention is to provide a centralizing ring disposed in the annulus between two concentric tubular bodies wherein the centralizing ring forms an interrupted line contact with the surrounding tubular body to minimize the heat transfer between the two tubular bodies.
  • a related object of the present invention is to provide a curving surface on the external circumferential area of a centralizing ring whereby the ring forms a line contact with the inner surface of a surrounding tubular body.
  • An important object of the present invention is to provide a centralizing ring that may be employed in the vertical assembly of concentric tubular components whereby the radially outer surface of such centralizing ring engages the internal surface of the surrounding tubular and is configured to freely advance axially along such surface.
  • An important object of the present invention is to provide a lifting device that permits a tubular body equipped with annular centralizing rings to be lifted from a horizontal orientation, vertically oriented in a position coaxially with a larger tubular within which is to be received, lowered centrally through the larger tubular, and positioned axially at the correct axial location relative to the surrounding tubular.
  • a related object of the present invention is to provide an annular shoulder and radial end surfaces on the lifting device whereby the lower end of the smaller tubular rests on the annular shoulder while the radial end surfaces centralize the smaller tubular as it is lowered through the larger tubular.
  • An object of the present invention is to provide a lifting device that can support an outer tubular body and an inner-tubular body and automatically position the two bodies axially relative to each other while the bodies are vertically oriented.
  • FIG. 1 is a vertical elevation schematically illustrating the initial horizontal disposition of the individual tubular components of the insulated tubing of the present invention in the work area;
  • FIG. 2 is a vertical elevation schematically illustrating the repositioning of the larger tubular body from horizontal to vertical orientation in the assembly of the insulated tubing of the present invention
  • FIG. 3 is a vertical elevation schematically illustrating the vertical alignment of the larger and smaller tubing components of the assembly just prior to inserting the smaller tubular body into the larger tubular body;
  • FIG. 4 is a vertical elevation schematically illustrating the two tubular bodies concentrically disposed in an assembly recess
  • FIG. 5 is a vertical elevation schematically illustrating the assembled insulated tubing bodies removed from the assembly recess and repositioned horizontally in the work area;
  • FIG. 6 is a vertical elevation, partially in section, illustrating a lifting device of the present invention
  • FIG. 7 is a vertical elevation, partially in section, illustrating a lifting device of the present invention engaging the bases of concentric inner and outer tubular bodies as the assembled bodies are being lifted from the assembly recess;
  • FIG. 8 is a plan view of a centralizing ring of the present invention.
  • FIG. 9 is an elevation taken along the line 9 - 9 of FIG. 8 illustrating an annular centralizer of the present invention
  • FIG. 10 is a vertical cross-section taken along the line 10 - 10 of FIG. 8 illustrating details in the configuration of the centralizing ring of the present invention.
  • FIG. 11 is a vertical cross-section illustrating a completed insulated tubing assembly of the present invention.
  • FIG. 1 illustrates an assembly procedure employed in manufacturing the insulated tubing of the present invention.
  • the process requires that an insulated tubular body 11 be inserted into a longer, larger diameter tubular body 12 to form a double-wall, concentric composite body.
  • It is conventional in prior art processes to assemble the insulated tubing by inserting the smaller tube into the larger tube while both tubes are reclining horizontally as illustrated in FIG. 1.
  • This procedure can damage the centralizing rings and insulating material carried around the external body of the inner tube.
  • Interior surface projections and coarse finishes on the internal wall of the outer tube may also hang up with the centralizing rings and insulation material to prevent the inner tube from being freely received within the larger surrounding tube.
  • the larger tubular body 12 is first elevated from its horizontal position in the work area and aligned vertically over a recessed assembly well 13 .
  • the work area may comprise a shop floor or an elevated table surface upon which the tubular bodies are initially positioned prior to being assembled.
  • a vertical hoist mechanism 14 is employed for lifting the tubular body 12 from its horizontal position in the work area into vertical alignment with the assembly well 13 .
  • the tube 12 is lifted by first securing a suitable clamp 15 about the external surface of the outer body 12 .
  • the clamp 15 is attached to a lift line 16 connecting with the hoisting mechanism 14 .
  • the vertically oriented tube 12 is lowered into the assembly well 13 and anchored in place in a chuck 13 a or other suitable device to support the tube 12 vertically above the bottom 17 of the assembly well.
  • the inner tube 11 which has been previously equipped with centralizers and insulating material, as will hereinafter be described, is then lifted with a hoisting mechanism 18 from its horizontal position in the work area into a vertically aligned position above the tube 12 as illustrated in FIG. 3.
  • a line 19 from the hoist 18 is threaded through the tube 11 and secured to a lifting device 20 , as will hereinafter be more fully described.
  • the lifting device 20 engages the base of the tube to hold the tube in place on the hoist line 19 .
  • the lifting device 20 carries spring-loaded legs 21 and 22 that are manually retracted before the lifting device engages the top of the tube 12 , allowing the lifting device to be received within the larger tube as the smaller tube 11 is lowered vertically.
  • the line 19 from the hoist 18 is reeled out until the spring-loaded legs 21 and 22 at the bottom of the tube 11 have been lowered sufficiently to clear the bottom of the tube 12 .
  • the legs 21 and 22 spring radially outwardly, as illustrated in FIG. 4.
  • FIG. 7 illustrates the lifting device 20 secured to the bottom of the inner tube 11 and the outer tube 12 in preparation for extracting the assembly from the assembly well.
  • the axial end or base of the tube 12 is seen to be supported by a lift surface in the form of detents 38 and 39 , providing support for the outer tube 12 .
  • the lift plate 28 is illustrated supporting the base of the inner tube 11 on the annular lip 29 .
  • the circumferential end surface 30 provides a centralizing radially outer surface dimensioned to closely engage the internal wall of the surrounding tube 12 to ensure centralization of the tube 11 .
  • the insulated tube of the present invention includes annular centralizing rings 40 that are secured along the external surface of the tube 11 to maintain proper spacing between the inner and outer tubes.
  • Alternating projections 41 and radially recessed areas 42 formed along the external surface of the centralizing ring 40 provide structural support with a minimum amount of surface contact to minimize heat transfer while maintaining adequate structural support between the two tubes.
  • a gap 43 is provided in the centralizing ring to assist in positioning the ring about the inner tube 11 .
  • the ring 40 is provided with a curving external surface contour on the projections 41 to provide a line contact between the centralizing ring and the internal surface of the surrounding tube 12 .
  • a design clearance of approximately 0.030 inch is provided between the outside diameter of the centralizing ring and the internal diameter of the surrounding tube 12 .
  • the centralizing rings and insulating material are applied to the inner tube 11 while the tube is horizontally oriented in the work area, as illustrated in FIG. 1.
  • the centralizing rings are positioned at axially spaced locations along the length of the tube 11 and are welded to the tube 11 at the desired axial positions. In one embodiment of the invention, three such centralizing rings are disposed intermediate the ends of the tube 11 .
  • the tube 11 is provided with annular upsets or radial projections 50 at each tube end to function as centralizers for the tube 11 .
  • the upsets 50 may also be provided by welding an annular ring or other suitable body to the end of the tube and machining the body down to the desired dimension.
  • Insulating material 51 is wrapped around the tube 11 between the centralizing rings 40 and the upsets 50 to a diameter slightly less than the outside diameter of the upsets and centralizing rings.
  • the insulation in one embodiment is formed by wrapping alternating layers of aluminum foil and fiber cloth mesh. Getter material may also be included in the composition of the material applied to the external surface of the tube 11 .
  • the tube 11 is precisely positioned at the desired location within the tube 12 by the operation of the lifting device 20 .
  • the axial spacing between the detents 38 and 39 and the top of the lip 29 precisely limits the axial position of the inner tube 11 relative to the outer tube 12 .
  • the illustrated axial position is the desired final welding position for the two tubes.

Abstract

Concentric, tubular sections are assembled by first securing annular centralizers and insulation about the external surface of the smaller diameter tube while the tube is horizontally disposed. The larger tube is then vertically aligned and lowered into a recessed area formed below the assembly area work level. A lifting cable, secured at one end to a lifting device, is extended through the smaller diameter tube and attached to a hoisting arrangement that vertically orients the tube concentrically over the larger diameter tube. Spring-loaded legs on the lifting device are manually retracted radially to permit the smaller tube to be lowered concentrically through the larger tube. The inner tube is lowered until the legs spring radially outwardly to engage the base of the larger tube. The entire assembly may then be lifted as a unit by the hoist with the lifting device, establishing the axial positions of the two tubes relative to each other. The centralizers closely engage the internal surface of the larger tube to centralize the inner tube and to prevent relative radial movement between the tubes. The external surface of the centralizers is specially configured to provide an interrupted line contact with the external tube, and the centralizers are rotated relative to each other to circumferentially displace points of contact with the external tube to minimize heat transfer.

Description

  • This application is a divisional of U.S. patent application Ser. No. 09/912,053 filed Jul. 23, 2001 which is a divisional of U.S. patent application Ser. No. 09/481,619 filed Jan. 12, 2000 now U.S. Pat. No. 6,325,278 B1.[0001]
  • BACKGROUND OF THE INVENTION
  • 1. Field of the Invention [0002]
  • The present invention relates to methods for fabricating insulated, concentric tubular bodies and the bodies fabricated by such methods. Insulated tubulars or pipe of this type are sometimes referred to as “pipe-in-pipe” or “tube-in-tube” fluid conduits. Insulated, concentric tubular fluid conduits are employed in well completions, pipelines, refineries, and other processing installations. [0003]
  • 2. Prior Art Setting of the Invention [0004]
  • The tube-in-tube insulated pipe employed in oil and gas wells is typically joined together end-to-end by threaded connections. In the case of some of the designs employed in oil and gas wells, the threads must be formed on the tubing after the concentric pipe bodies have been assembled. The typical insulated section employs a threaded external tube surrounding a shorter, smaller diameter tube that is welded into the larger tube. The assembly may also be heat treated after the inner tube is installed. The threads are preferably formed on the outer tube after the inner tube is installed and the assembly is heat treated. [0005]
  • Conventional threading operations require that the pipe be rotated as threads are being cut into the end of the pipe. Threading speeds of 150 rpm or more are common. Relative movement between the inner and outer pipe bodies as the assembly is rotated can cause harsh vibration and other undesired mechanical movement that interferes with the threading process. [0006]
  • The relative radial position of the inner and outer tubes can be fixed by employing multiple rigid spacers in the annulus between the two tubes. One commonly employed technique is to provide a hinged metal stamping with raised ears to close the gap between the inner and outer tubes. Because of the use of sheet stock as the spacer material, the contacting ears form a flat surface engaging the inside surface of the surrounding tube. [0007]
  • Another technique employed to fix the inner and outer tubes is to employ a square stock that has been cut to short lengths and welded onto the outside surface of the inner pipe. Because the spacer is cut from square stock, the contact ends form a flat surface contacting the inside surface of the inner pipe. [0008]
  • In both of the described prior art spacing techniques, the design and volume of these spacers can significantly increase the heat transfer between the inner and outer conductors. Benefits of a more stable assembly for threading purposes are offset by the increases in heat transfer between the tubes. [0009]
  • The shape, size, and distribution of the centralizers also affect the assembly process of inserting the inner tube into the outer tube. Multilayer wrappings of insulating material are often disposed over the smaller diameter tube between the axially spaced centralizers. It is typical to insert the inner tube, equipped with centralizers and insulation material, into the larger tube while the inner and outer tubes are horizontally oriented. As this is done, the inner tube slides along the internal bottom wall of the outer tube. This sliding movement can damage the centralizers and the insulation material. Horizontal insertion may also be made difficult when the internal surface of the outer tubular body is coarse or irregular such that the centralizers and insulation are abraded or hang up on the surface irregularities. [0010]
  • Many of the problems associated with horizontal assembly of the inner and outer tubes may be avoided by orienting the two tubes vertically while the inner tube is inserted. While the vertical orientation technique can eliminate the described problems associated with dragging the inner tube along the internal bottom wall of the outer tube, vertical orientation introduces other assembly problems. In this regard, the relative axial position of the inner and outer tubular bodies must be closely controlled such that the mid-length of each conduit is coincident. Additionally, the inner tubular body is usually shorter than the surrounding outer body so that the lengthwise centering must be accomplished within the surrounding pipe. [0011]
  • The desired spacing could be achieved by welding temporary lugs or retaining members to the inner or outer pipe at appropriate locations to form a stop that would fix the inner pipe lengthwise within the outer pipe. Such a procedure would require an additional welding step and also introduces an additional point for the introduction of measurement errors. [0012]
  • SUMMARY OF THE INVENTION
  • Centralizing rings having specially configured contact surfaces are affixed to the external surface of the inner tube forming the concentric insulated tubular assembly. The centralizers are provided with a curving cross-section along their radially outermost contact surface to make circumferential line contact with the internal surface of the overlying tubular body to minimize heat transfer between the tubes. [0013]
  • Recesses are formed circumferentially about the external diameter of the centralizing rings to minimize the total contact area between the rings and the surrounding tubing. The centralizing rings are disposed circumferentially about the inner tube such that the recesses in adjacent centralizing rings are offset circumferentially to preclude axially extending, aligned contact surfaces that enhance heat transfer. [0014]
  • The centralizing rings provide a minimum amount of surface contact with the overlying tube while rigidly occupying the annular space formed between the inner and outer tubular bodies to prevent any relative radial displacement between the bodies. The firm line contact engagement provided by the centralizing rings minimizes the heat transfer between the inner and outer tubes and also permits the concentric tubular assembly to be rotated at high speeds during the threading process without experiencing excessive vibration or other undesired mechanical movement. [0015]
  • The damage normally occurring when insulating tubes are assembled horizontally is avoided with the use of a lifting device of the present invention that permits the inner and outer tubes to be assembled vertically in a recessed assembly well. The lifting device permits the inner tube to be raised vertically and aligned concentrically with the vertically disposed outer tube. The lifting device employed to lower the centralizer-equipped, insulation-wrapped inner tube vertically into the outer tube automatically centers the inner tube within the surrounding outer tube. Spring-loaded legs carried by the lifting device automatically spring radially outwardly once they clear the bottom of the larger diameter tubing. An upward pull exerted on the lifting device brings detents in the legs against the base of the outer tube so that the outer tube is supported by the lifting device and the inner and outer tubes are precisely positioned axially. The combined assembly may then be raised vertically from the assembly well and returned to horizontal position for subsequent working. [0016]
  • From the foregoing, it will be appreciated that an important object of the present invention is to provide a method and apparatus for assembling concentric tubular bodies whereby the bodies are rigidly affixed radially relative to each other to prevent vibration or other undesired motion as the bodies are rotated during the threading of the ends of the tubular bodies. [0017]
  • Yet another object of the present invention is to provide a centralizer ring that can be positioned in the annular space between concentric tubulars to securely fix the tubulars radially relative to each other while minimizing the amount of heat transfer between the tubulars. [0018]
  • Another object of the present invention is to provide a centralizing ring disposed in the annulus between two concentric tubular bodies wherein the centralizing ring forms an interrupted line contact with the surrounding tubular body to minimize the heat transfer between the two tubular bodies. [0019]
  • A related object of the present invention is to provide a curving surface on the external circumferential area of a centralizing ring whereby the ring forms a line contact with the inner surface of a surrounding tubular body. [0020]
  • An important object of the present invention is to provide a centralizing ring that may be employed in the vertical assembly of concentric tubular components whereby the radially outer surface of such centralizing ring engages the internal surface of the surrounding tubular and is configured to freely advance axially along such surface. [0021]
  • An important object of the present invention is to provide a lifting device that permits a tubular body equipped with annular centralizing rings to be lifted from a horizontal orientation, vertically oriented in a position coaxially with a larger tubular within which is to be received, lowered centrally through the larger tubular, and positioned axially at the correct axial location relative to the surrounding tubular. A related object of the present invention is to provide an annular shoulder and radial end surfaces on the lifting device whereby the lower end of the smaller tubular rests on the annular shoulder while the radial end surfaces centralize the smaller tubular as it is lowered through the larger tubular. [0022]
  • An object of the present invention is to provide a lifting device that can support an outer tubular body and an inner-tubular body and automatically position the two bodies axially relative to each other while the bodies are vertically oriented. [0023]
  • An object of the present invention is to provide a single assembly device for lowering a vertically oriented tubular through a larger surrounding tubular and subsequently raising both tubulars with a single lifting movement of the assembly device. [0024]
  • The foregoing, as well as other, objects, features, and advantages of the present invention will become more readily apparent and better understood from the following drawings, specification, and claims.[0025]
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1 is a vertical elevation schematically illustrating the initial horizontal disposition of the individual tubular components of the insulated tubing of the present invention in the work area; [0026]
  • FIG. 2 is a vertical elevation schematically illustrating the repositioning of the larger tubular body from horizontal to vertical orientation in the assembly of the insulated tubing of the present invention; [0027]
  • FIG. 3 is a vertical elevation schematically illustrating the vertical alignment of the larger and smaller tubing components of the assembly just prior to inserting the smaller tubular body into the larger tubular body; [0028]
  • FIG. 4 is a vertical elevation schematically illustrating the two tubular bodies concentrically disposed in an assembly recess; [0029]
  • FIG. 5 is a vertical elevation schematically illustrating the assembled insulated tubing bodies removed from the assembly recess and repositioned horizontally in the work area; [0030]
  • FIG. 6 is a vertical elevation, partially in section, illustrating a lifting device of the present invention; [0031]
  • FIG. 7 is a vertical elevation, partially in section, illustrating a lifting device of the present invention engaging the bases of concentric inner and outer tubular bodies as the assembled bodies are being lifted from the assembly recess; [0032]
  • FIG. 8 is a plan view of a centralizing ring of the present invention; [0033]
  • FIG. 9 is an elevation taken along the line [0034] 9-9 of FIG. 8 illustrating an annular centralizer of the present invention;
  • FIG. 10 is a vertical cross-section taken along the line [0035] 10-10 of FIG. 8 illustrating details in the configuration of the centralizing ring of the present invention; and
  • FIG. 11 is a vertical cross-section illustrating a completed insulated tubing assembly of the present invention.[0036]
  • DESCRIPTION OF THE ILLUSTRATED EMBODIMENTS
  • FIG. 1 illustrates an assembly procedure employed in manufacturing the insulated tubing of the present invention. The process requires that an insulated [0037] tubular body 11 be inserted into a longer, larger diameter tubular body 12 to form a double-wall, concentric composite body. It is conventional in prior art processes to assemble the insulated tubing by inserting the smaller tube into the larger tube while both tubes are reclining horizontally as illustrated in FIG. 1. This procedure can damage the centralizing rings and insulating material carried around the external body of the inner tube. Interior surface projections and coarse finishes on the internal wall of the outer tube may also hang up with the centralizing rings and insulation material to prevent the inner tube from being freely received within the larger surrounding tube.
  • In practicing the assembly process of the present invention, the larger [0038] tubular body 12 is first elevated from its horizontal position in the work area and aligned vertically over a recessed assembly well 13. The work area may comprise a shop floor or an elevated table surface upon which the tubular bodies are initially positioned prior to being assembled.
  • A vertical hoist [0039] mechanism 14 is employed for lifting the tubular body 12 from its horizontal position in the work area into vertical alignment with the assembly well 13. The tube 12 is lifted by first securing a suitable clamp 15 about the external surface of the outer body 12. The clamp 15 is attached to a lift line 16 connecting with the hoisting mechanism 14. The vertically oriented tube 12 is lowered into the assembly well 13 and anchored in place in a chuck 13 a or other suitable device to support the tube 12 vertically above the bottom 17 of the assembly well.
  • The [0040] inner tube 11, which has been previously equipped with centralizers and insulating material, as will hereinafter be described, is then lifted with a hoisting mechanism 18 from its horizontal position in the work area into a vertically aligned position above the tube 12 as illustrated in FIG. 3. In preparation for this hoisting procedure, a line 19 from the hoist 18 is threaded through the tube 11 and secured to a lifting device 20, as will hereinafter be more fully described. As the tube 11 is moved into a vertical position, the lifting device 20 engages the base of the tube to hold the tube in place on the hoist line 19.
  • The [0041] lifting device 20 carries spring-loaded legs 21 and 22 that are manually retracted before the lifting device engages the top of the tube 12, allowing the lifting device to be received within the larger tube as the smaller tube 11 is lowered vertically. The line 19 from the hoist 18 is reeled out until the spring-loaded legs 21 and 22 at the bottom of the tube 11 have been lowered sufficiently to clear the bottom of the tube 12. Once clear of the bottom of the tube 12, the legs 21 and 22 spring radially outwardly, as illustrated in FIG. 4.
  • Subsequent reeling in of the [0042] line 19 draws the extended legs 21 and 22 against the base of the tube 12 so that the lifting force of the hoist is transferred to the base of the tube 12. Continued retraction of the line 19 extracts the combined assembly of inner tube 11 and outer tube 12 from the assembly well 13. The concentric tubular assembly may then be returned to its horizontal position in the work area, as illustrated in FIG. 5.
  • FIG. 6 illustrates details in the construction and operation of the lifting device indicated generally at [0043] 20. The lifting device 20 employs a support structure in the form of a lifting eye 25 with a threaded shank 26 engaging an internally threaded nut member 27. A circular lift plate 28 is clamped in place between the nut 27 and the base of the body of the lifting eye 25. An annular lip 29 on the lift plate 28 provides a lift surface or support base for the lower axial end of the tube 11. The radially outer, circumferential end 30 of the lift plate 28 is dimensioned to closely clear the internal surface of the surrounding tube 12 to assist in centralizing the tube 11 as it is lowered into the larger outer tube. In one embodiment of the invention, the design clearance between radial end surface 30 and the internal wall of the surrounding tube 12 is approximately 0.030 inch.
  • The [0044] legs 21 and 22 are spring-biased to extend radially outwardly beyond the lateral limits of the radial end 30 of the lifting device 20. The spring bias force is provided by springs 33 and 34 that are mounted about the pivot points 35 and 36 of their respective legs in the manner illustrated in FIG. 6. As will be understood, radial inward movement of the legs 21 and 22 toward each other is resisted by the resilient force exerted by the springs 33 and 34, respectively. Detents 38 and 39 are provided at the external surfaces along the base of the legs 21 and 22. The detents 38 and 39 engage the base of the outer tubular body once the legs 21 and 22 spring outwardly after having cleared the bottom of the outer tube 12.
  • FIG. 7 illustrates the [0045] lifting device 20 secured to the bottom of the inner tube 11 and the outer tube 12 in preparation for extracting the assembly from the assembly well. The axial end or base of the tube 12 is seen to be supported by a lift surface in the form of detents 38 and 39, providing support for the outer tube 12. The lift plate 28 is illustrated supporting the base of the inner tube 11 on the annular lip 29. The circumferential end surface 30 provides a centralizing radially outer surface dimensioned to closely engage the internal wall of the surrounding tube 12 to ensure centralization of the tube 11.
  • As may best be seen by joint reference to FIGS. 7 through 11, the insulated tube of the present invention includes annular centralizing [0046] rings 40 that are secured along the external surface of the tube 11 to maintain proper spacing between the inner and outer tubes. Alternating projections 41 and radially recessed areas 42 formed along the external surface of the centralizing ring 40 provide structural support with a minimum amount of surface contact to minimize heat transfer while maintaining adequate structural support between the two tubes. A gap 43 is provided in the centralizing ring to assist in positioning the ring about the inner tube 11.
  • As may be seen by reference to the cross-section in FIG. 10, the [0047] ring 40 is provided with a curving external surface contour on the projections 41 to provide a line contact between the centralizing ring and the internal surface of the surrounding tube 12. In one embodiment of the invention, a design clearance of approximately 0.030 inch is provided between the outside diameter of the centralizing ring and the internal diameter of the surrounding tube 12. When the centralizing rings are assembled on the inner tube, the projections 41 are displaced circumferentially relative to similar projections on adjacent centralizing rings to reduce heat transfer between the two tubes.
  • The centralizing rings and insulating material are applied to the [0048] inner tube 11 while the tube is horizontally oriented in the work area, as illustrated in FIG. 1. The centralizing rings are positioned at axially spaced locations along the length of the tube 11 and are welded to the tube 11 at the desired axial positions. In one embodiment of the invention, three such centralizing rings are disposed intermediate the ends of the tube 11.
  • The [0049] tube 11 is provided with annular upsets or radial projections 50 at each tube end to function as centralizers for the tube 11. The upsets 50 may also be provided by welding an annular ring or other suitable body to the end of the tube and machining the body down to the desired dimension.
  • Insulating [0050] material 51 is wrapped around the tube 11 between the centralizing rings 40 and the upsets 50 to a diameter slightly less than the outside diameter of the upsets and centralizing rings. The insulation in one embodiment is formed by wrapping alternating layers of aluminum foil and fiber cloth mesh. Getter material may also be included in the composition of the material applied to the external surface of the tube 11.
  • The [0051] tube 11, as thus equipped with insulation and centralizing rings, is precisely positioned at the desired location within the tube 12 by the operation of the lifting device 20. Thus, as may be seen in FIG. 7, the axial spacing between the detents 38 and 39 and the top of the lip 29 precisely limits the axial position of the inner tube 11 relative to the outer tube 12. The illustrated axial position is the desired final welding position for the two tubes.
  • As illustrated in FIG. 11, with the assembly disposed horizontally in the work area, the lifting device and [0052] line 19 are removed, and the upsets 50 are welded, as indicated at 60, to the internal surface of the tube 12. Welding seals the annular area between the tubes 11 and 12 to enhance the insulation effect of the assembly. After the inner tube 11 is welded in place, the assembly of tubes 11 and 12, insulation 51, and centralizing rings 40 is heat treated, and threads 70 are machined onto each end of the tube 12. As will be appreciated, the threading is performed after all of the handling, welding, and heat treating are completed to eliminate damage and distortion of the threaded area that would otherwise be caused by these fabrication procedures.
  • While a preferred form of the present invention has been described in detail with respect to the illustrated embodiments, it will be understood that various additions, changes, and variations in the construction and operation of the present invention may be made without departing from the spirit and scope of the invention, which is more broadly defined in the following claims. [0053]

Claims (3)

What is claimed:
1. A centralizing ring for spacing an inner tube annularly from a surrounding outer tube comprising:
a curving external surface contour on said ring for forming a line contact with a cylindrical surface in said inner or outer tube; and
radially recessed areas in said external surface contour circumferentially spaced about said ring for circumferentially disrupting said line contact whereby heat transfer between said inner and outer tube is reduced.
2. A centralizing ring as defined in claim 1 wherein said external surface contour is carried on the radially outer surface of said ring.
3. A centralizing ring as defined in claim 2 wherein said ring includes a circumferential gap whereby said ring can be diametrically expanded for assembly onto an inner tube.
US10/357,611 2000-01-12 2003-02-04 Concentric, insulated tubular conduits and method for assembly Abandoned US20030111510A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
US10/357,611 US20030111510A1 (en) 2000-01-12 2003-02-04 Concentric, insulated tubular conduits and method for assembly
US11/361,760 US8365775B2 (en) 2000-01-12 2006-02-24 Concentric, insulated tubular conduits and method for assembly

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US09/481,619 US6325278B1 (en) 2000-01-12 2000-01-12 Concentric, insulated tubular conduits and method of assembly
US09/912,053 US6520732B1 (en) 2000-01-12 2001-07-23 Concentric, insulated tubular conduits and method of assembly
US10/357,611 US20030111510A1 (en) 2000-01-12 2003-02-04 Concentric, insulated tubular conduits and method for assembly

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
US09/912,053 Division US6520732B1 (en) 2000-01-12 2001-07-23 Concentric, insulated tubular conduits and method of assembly

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US11/361,760 Continuation US8365775B2 (en) 2000-01-12 2006-02-24 Concentric, insulated tubular conduits and method for assembly

Publications (1)

Publication Number Publication Date
US20030111510A1 true US20030111510A1 (en) 2003-06-19

Family

ID=23912690

Family Applications (4)

Application Number Title Priority Date Filing Date
US09/481,619 Expired - Lifetime US6325278B1 (en) 2000-01-12 2000-01-12 Concentric, insulated tubular conduits and method of assembly
US09/912,053 Expired - Lifetime US6520732B1 (en) 2000-01-12 2001-07-23 Concentric, insulated tubular conduits and method of assembly
US10/357,611 Abandoned US20030111510A1 (en) 2000-01-12 2003-02-04 Concentric, insulated tubular conduits and method for assembly
US11/361,760 Expired - Lifetime US8365775B2 (en) 2000-01-12 2006-02-24 Concentric, insulated tubular conduits and method for assembly

Family Applications Before (2)

Application Number Title Priority Date Filing Date
US09/481,619 Expired - Lifetime US6325278B1 (en) 2000-01-12 2000-01-12 Concentric, insulated tubular conduits and method of assembly
US09/912,053 Expired - Lifetime US6520732B1 (en) 2000-01-12 2001-07-23 Concentric, insulated tubular conduits and method of assembly

Family Applications After (1)

Application Number Title Priority Date Filing Date
US11/361,760 Expired - Lifetime US8365775B2 (en) 2000-01-12 2006-02-24 Concentric, insulated tubular conduits and method for assembly

Country Status (1)

Country Link
US (4) US6325278B1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105269211A (en) * 2015-11-20 2016-01-27 重庆天人汽车车身制造有限公司 Liner tube pressing mechanism
CN105269234A (en) * 2015-11-20 2016-01-27 重庆天人汽车车身制造有限公司 Liner tube compressing and positioning mechanism
CN105269235A (en) * 2015-11-20 2016-01-27 重庆天人汽车车身制造有限公司 Pneumatic dual-air-cylinder type liner positioning mechanism of automobile welding clamp
CN105269236A (en) * 2015-11-20 2016-01-27 重庆天人汽车车身制造有限公司 Liner tube positioning device
CN105382457A (en) * 2015-11-20 2016-03-09 重庆天人汽车车身制造有限公司 Liner tube clamping mechanism for rear axle assembly welding tool
CN106736826A (en) * 2016-12-07 2017-05-31 贵州黎阳航空动力有限公司 A kind of tensioner back-up ring

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2833195B1 (en) * 2001-12-07 2004-01-30 Giat Ind Sa PROCESS FOR FITTING A PROTECTIVE COATING ON THE INTERNAL WALL OF A TUBE, TUBE AND IN PARTICULAR WEAPON TUBE PRODUCED BY THIS PROCESS
SE529204C8 (en) * 2004-04-05 2007-07-10 Atlas Copco Rock Drills Ab Retaining
US7032280B1 (en) * 2005-06-02 2006-04-25 The Lisle Corporation Single brake spring tool and method
US20080173723A1 (en) * 2006-07-21 2008-07-24 Igor Zhadanovsky Steam-based hvac system
DE202013003788U1 (en) * 2013-04-23 2014-07-24 Leoni Bordnetz-Systeme Gmbh Cable set and winding tape, especially for such a cable set
CN106346155B (en) * 2016-09-20 2018-08-28 山东金城建设有限公司 The zinc-plated standpipe welding procedure method of small space
CN107378290B (en) * 2017-08-11 2019-04-02 中国化学工程第六建设有限公司 The installation and welding method for pipe-in-pipe of going into the well
CN107755955B (en) * 2017-11-06 2019-04-26 上海交通大学 Integral type for component inner support inner support chucking device free of demolition
CN112453821B (en) * 2021-01-26 2021-04-16 菲格瑞特(苏州)汽车科技有限公司 Clamping device for automobile parts

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2366579A (en) * 1943-08-02 1945-01-02 Ahrens Robert H Von Welding ring
US2382098A (en) * 1943-03-31 1945-08-14 Hawkins Hawkins Co Welding ring
US3151888A (en) * 1959-12-02 1964-10-06 R & B Wagner Inc Pipe railing connectors or welding rings
US4872655A (en) * 1988-02-16 1989-10-10 Seele Harold A Work-holding apparatus and method
US5052092A (en) * 1988-11-11 1991-10-01 Societa' Cavi Pirelli S.P.A. Apparatus for inserting a rigid support within a contractable sleeve for electric cable joints
US5915737A (en) * 1996-01-17 1999-06-29 Lycan; Goodwin A. Compressible pipe spacer used in welding
US6578801B2 (en) * 2000-03-06 2003-06-17 Delaware Capital Formation, Inc. Gripper mounting bracket

Family Cites Families (40)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3126918A (en) * 1964-03-31 Slip ring spacer for insulated conduit systems
US2041911A (en) * 1935-05-25 1936-05-26 Universal Insulation Company Heat insulation
US2512116A (en) * 1947-07-01 1950-06-20 William H Siebels Composite pipe structure
US2706495A (en) * 1950-11-18 1955-04-19 Dresser Ind Spacing device for concentric tubular units
US2714395A (en) * 1952-05-24 1955-08-02 Epstein Saul Inner spacer for double wall vent pipe
US2914090A (en) * 1959-01-13 1959-11-24 Alexander H Isenberg Insulated supporting spacer rings for conduits
US3213889A (en) * 1963-09-30 1965-10-26 Ric Wil Inc Pipe support
AT298590B (en) * 1968-06-01 1972-05-10 Kabel Metallwerke Ghh Spacers for coaxial pipe systems
US3628246A (en) * 1968-09-06 1971-12-21 Carrier Corp Apparatus for tube removal
US3670374A (en) * 1970-06-08 1972-06-20 Anbeck Corp Double acting slips
US3768132A (en) * 1971-11-02 1973-10-30 Sun Shipbuilding & Dry Dock Co Fabrication of heat exchanger tube bundles
US3875530A (en) * 1973-01-02 1975-04-01 Coherent Radiation Gaseous laser with improved means for supporting the discharge confining bore tube
US4036617A (en) * 1975-04-18 1977-07-19 Cryogenic Technology, Inc. Support system for an elongated cryogenic envelope
US4033381A (en) * 1975-06-27 1977-07-05 General Connectors Corporation Hot air duct
GB1554961A (en) * 1976-02-03 1979-10-31 Ansell Jones & Co Ltd Lifting devices
US4097084A (en) * 1977-03-18 1978-06-27 Russkraft, Inc. Lifting grab for cylindrical objects
US4233816A (en) * 1979-08-08 1980-11-18 Pennwalt Corporation Cryogenic fluid transfer line
US4507082A (en) * 1981-02-23 1985-03-26 Wardlaw Iii Louis J Preheating insert for heavy wall pipe
US4460540A (en) * 1981-04-30 1984-07-17 Westinghouse Electric Corp. Burnable poison rod for a nuclear reactor fuel assembly
US4453758A (en) * 1981-12-03 1984-06-12 Codner James H Pipe lifting hook having clamp assembly
US4531552A (en) * 1983-05-05 1985-07-30 Baker Oil Tools, Inc. Concentric insulating conduit
US4736976A (en) * 1986-03-03 1988-04-12 Berzenye Michael L Pipe hook
US4745245A (en) * 1986-10-31 1988-05-17 Fuji Electric Co., Ltd. Method and apparatus for the manufacture of a clad tube through use of induction heating
US4724750A (en) * 1986-12-04 1988-02-16 Van-Packer Company Double-walled chimney
US4896701A (en) * 1988-08-25 1990-01-30 Young Donald W Underground pipe support and spacer
US5018260A (en) * 1989-05-26 1991-05-28 Asahi/America, Inc. Supports for double-containment thermoplastic pipe assemblies
FR2649738B1 (en) * 1989-07-17 1993-06-11 Marcel Arteon ANCHOR IN PARTICULAR FOR CONCRETE PANEL
US5230461A (en) * 1992-09-08 1993-07-27 Robert Scheuerman Apparatus for connecting pipe sections
US5277242A (en) * 1992-10-05 1994-01-11 American Cast Iron Pipe Co. Pipe casting machine having improved pipe mold stabling rings
US5277463A (en) * 1993-01-08 1994-01-11 Ingersoll-Rand Company Drill pipe handling tool
US5503192A (en) * 1993-06-08 1996-04-02 Nibco Inc. Inductive welding of thermoplastic pipe
DE4343762A1 (en) * 1993-12-21 1995-06-22 Dsi Rohrleitungsbau Zubehoer Slideway ring and process for its manufacture
CH690344A5 (en) * 1994-03-30 2000-07-31 Electrovac Process for the production of an insulated metallic conductor
US6015015A (en) * 1995-06-20 2000-01-18 Bj Services Company U.S.A. Insulated and/or concentric coiled tubing
US5902656A (en) * 1996-06-21 1999-05-11 Minnesota Mining And Manufacturing Company Dampers for internal applications and articles damped therewith
TW347783U (en) * 1997-04-03 1998-12-11 Guo-An Li Single point type hanging device
US6082793A (en) * 1998-05-01 2000-07-04 Gagnon; Emile H. Thread-on collared yoke for power riser pipes
US6562401B2 (en) * 1999-02-05 2003-05-13 Davis-Lynch, Inc. Method for making a stand-off device to prevent an oilfield tubular from contacting the side of the wellbore
FR2830069B1 (en) * 2001-09-27 2005-06-24 Cit Alcatel DEVICE FOR FASTENING A TUBULAR ELEMENT IN AN INACCESSIBLE CAVITY
FR2859518B1 (en) * 2003-09-08 2006-09-22 Technip France SPACING AND CENTERING DEVICE FOR DOUBLE-ENVELOPED RIGID DUCT WITH LOW COEFFICIENT THERMAL TRANSFER

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2382098A (en) * 1943-03-31 1945-08-14 Hawkins Hawkins Co Welding ring
US2366579A (en) * 1943-08-02 1945-01-02 Ahrens Robert H Von Welding ring
US3151888A (en) * 1959-12-02 1964-10-06 R & B Wagner Inc Pipe railing connectors or welding rings
US4872655A (en) * 1988-02-16 1989-10-10 Seele Harold A Work-holding apparatus and method
US5052092A (en) * 1988-11-11 1991-10-01 Societa' Cavi Pirelli S.P.A. Apparatus for inserting a rigid support within a contractable sleeve for electric cable joints
US5915737A (en) * 1996-01-17 1999-06-29 Lycan; Goodwin A. Compressible pipe spacer used in welding
US6578801B2 (en) * 2000-03-06 2003-06-17 Delaware Capital Formation, Inc. Gripper mounting bracket

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105269211A (en) * 2015-11-20 2016-01-27 重庆天人汽车车身制造有限公司 Liner tube pressing mechanism
CN105269234A (en) * 2015-11-20 2016-01-27 重庆天人汽车车身制造有限公司 Liner tube compressing and positioning mechanism
CN105269235A (en) * 2015-11-20 2016-01-27 重庆天人汽车车身制造有限公司 Pneumatic dual-air-cylinder type liner positioning mechanism of automobile welding clamp
CN105269236A (en) * 2015-11-20 2016-01-27 重庆天人汽车车身制造有限公司 Liner tube positioning device
CN105382457A (en) * 2015-11-20 2016-03-09 重庆天人汽车车身制造有限公司 Liner tube clamping mechanism for rear axle assembly welding tool
CN106736826A (en) * 2016-12-07 2017-05-31 贵州黎阳航空动力有限公司 A kind of tensioner back-up ring

Also Published As

Publication number Publication date
US8365775B2 (en) 2013-02-05
US6325278B1 (en) 2001-12-04
US6520732B1 (en) 2003-02-18
US20060208031A1 (en) 2006-09-21

Similar Documents

Publication Publication Date Title
US8365775B2 (en) Concentric, insulated tubular conduits and method for assembly
AU761606B2 (en) System, apparatus, and method for installing control lines in a well
US6078031A (en) Method and device for joining oilfield tubulars
KR101538003B1 (en) A drilling system and a device for assembling and disassembling pipe stands
WO1993018883A1 (en) Liner hanger apparatus and method of manufacturing a wellbore tool
AU2010338125B2 (en) Device for supporting the connection tip of flexible pipe in an offshore facility
US4770336A (en) Well screen centralizer and method for constructing centralizer and for joining of well screens
US6361251B1 (en) Apparatus for and a method of supporting a tubular member
EP0396204B1 (en) Method and device for joining well tubulars
US20050001427A1 (en) Low profile connector
EP1373774B1 (en) Method of laying pipe-in-pipe structures and device for use therein
US5159982A (en) Double walled riser
US20050092500A1 (en) Large diameter flush-joint pipe handling system
US8141218B2 (en) Method for manufacturing a double walled pipeline
US4681161A (en) Well screen centralizer and method for constructing centralizer and for joining of well screens
US20120306199A1 (en) Tubular component for hydrocarbon well exploration
US2167896A (en) Plug for lining up and welding casing and line pipe
CN113714670B (en) Vertical butt joint lowering method for expansion pipe
CN112317918A (en) Cutting mechanical arm
US8585097B2 (en) Pipe stalk and method of assembling a pipeline therefrom
US2440009A (en) Drill pipe protector applying and installing apparatus
US20030047319A1 (en) Mechanical torque table and method
KR20230117112A (en) Fabrication of pipe-in-pipe (PiP) pipelines
CN210549181U (en) Seamless steel pipe convenient to installation
MXPA05005002A (en) Large diameter flush-joint pipe handling system.

Legal Events

Date Code Title Description
AS Assignment

Owner name: GRANT PRIDECO, INC., TEXAS

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:BULL, LAYTON R.;TROSCLAIR, DOUGLAS J.;ADAMS, TERRON A.;AND OTHERS;REEL/FRAME:016011/0309

Effective date: 20000124

AS Assignment

Owner name: GRANT PRIDECO, L.P., TEXAS

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:GRANT PRIDECO, INC.;REEL/FRAME:016047/0610

Effective date: 20000414

AS Assignment

Owner name: WELLS FARGO BANK, TEXAS

Free format text: SECURITY AGREEMENT;ASSIGNOR:GRANT PRIDECO, INC.;REEL/FRAME:016087/0610

Effective date: 20050512

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION

AS Assignment

Owner name: GRANT PRIDECO, INC., TEXAS

Free format text: RELEASE OF PATENT SECURITY AGREEMENT;ASSIGNOR:WELLS FARGO BANK;REEL/FRAME:018268/0732

Effective date: 20060831

AS Assignment

Owner name: V&M TCA, LP, TEXAS

Free format text: PATENTS AND PATENT APPLICATIONS;ASSIGNORS:GRANT PRIDECO, INC.;GRANT PRIDECO, L.P.;REEL/FRAME:020951/0839

Effective date: 20080516

Owner name: V&M ATLAS BRADFORD, LP, TEXAS

Free format text: PATENTS AND PATENT APPLICATIONS;ASSIGNORS:GRANT PRIDECO, INC.;GRANT PRIDECO, L.P.;REEL/FRAME:020951/0889

Effective date: 20080516

Owner name: V&M TCA, LP, TEXAS

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:GRANT PRIDECO, INC.;GRANT PRIDECO, L.P.;REEL/FRAME:020951/0839

Effective date: 20080516

Owner name: V&M ATLAS BRADFORD, LP, TEXAS

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:GRANT PRIDECO, INC.;GRANT PRIDECO, L.P.;REEL/FRAME:020951/0889

Effective date: 20080516