US20030085482A1 - Repair of structural members - Google Patents

Repair of structural members Download PDF

Info

Publication number
US20030085482A1
US20030085482A1 US10/261,587 US26158702A US2003085482A1 US 20030085482 A1 US20030085482 A1 US 20030085482A1 US 26158702 A US26158702 A US 26158702A US 2003085482 A1 US2003085482 A1 US 2003085482A1
Authority
US
United States
Prior art keywords
sleeve
filler
interspace
pile
expansive
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US10/261,587
Inventor
Paul Sincock
Andrew Potts
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
AMOG TECHNOLOGIES Pty Ltd
Original Assignee
AMOG TECHNOLOGIES Pty Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from AUPO6665A external-priority patent/AUPO666597A0/en
Application filed by AMOG TECHNOLOGIES Pty Ltd filed Critical AMOG TECHNOLOGIES Pty Ltd
Priority to US10/261,587 priority Critical patent/US20030085482A1/en
Assigned to AMOG TECHNOLOGIES PTY LTD. reassignment AMOG TECHNOLOGIES PTY LTD. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: POTTS, ANDREW ELMHURST, SINCOCK, PAUL
Publication of US20030085482A1 publication Critical patent/US20030085482A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/64Repairing piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/60Piles with protecting cases

Definitions

  • This invention relates to the repair of structural members and relates particularly to improved methods and apparatus for effecting repairs of structures such as piles in situ.
  • Piles such as those used to support jetties, wharves, piers, offshore structures such as steel jacket platforms and similar structures are subject to damage caused by erosion, corrosion and related chemical or electro-chemical erosion, and by impact such as from marine vessels and the like.
  • Piles which are immersed in water, particularly sea water are generally subject to most corrosion on that area of the pile between tide levels. That portion of the pile is periodically immersed in water and then exposed to atmosphere causing accelerated corrosion as compared to other parts of the pile.
  • a full sleeve may be formed by welding two half sleeves to the pile along longitudinal and end edges thereof thus effectively adding an outer skin to the damaged pile.
  • the repair sleeve or part sleeve must extend substantially beyond the damaged area to provide the necessary strength to effect a proper repair, it is generally necessary to effect the welding of such sleeves in the tidal zone or underwater.
  • Such welding is relatively expensive and time consuming, may require special equipment, and 1-0 the welds so made, unless carried out with great skill, can be less than perfect, thus, compromising the structural integrity of the repaired pile.
  • Australian Patent Specification No 59285/86 discloses a method of repairing a concrete pile by using a steel sleeve and filling the space between the sleeve with a grout.
  • the method includes removing damaged concrete from the pile before placing the sleeve.
  • the specification discloses the method in relation to a square pile and the sleeve is provided with internal, integral metal spacers formed as part of the sleeve and which bear on the surfaces of the pile.
  • U.S. Pat. No. 4,306,821 discloses a method for reconditioning structural piles whereby a building filler is placed into a space between a flexible sheet form and the damaged piling.
  • the filler provides a protective and structural coating to the damaged piling.
  • the strength of the repaired pile is dependent solely on the strength of the filler material, which is preferably an epoxy material and on the adhesive interface with the pile. Therefore, the amount of filler required is that amount necessary to provide the desired strength to the pile.
  • U.S. Pat. No. 4,697,649 discloses a method of reinforcing a damaged post in the ground by providing a split casing having helical threads at one end which are driven into the ground by a casing rotary drive mechanism. An annulus between the casing and the post is filled with a suitable filler material.
  • this system is designed for above ground posts and not for underwater piles. Further, the driving mechanism is relatively complex and expensive and adds substantially to the repair costs.
  • U.S. Pat. No. 4,439,070 relates to a method of restoring an under waterpile which uses a flexible jacket placed around the pile and filling the formed annular space between the pile and the jacket with an appropriate epoxy resin compound. Upper and lower seals are provided between the jacket and the pile and the jacket has inlet ports for injection of the epoxy resin and outlet ports for venting water from the annular space. Again, the strength of the repaired pile is dependent on the strength and amount of epoxy resin and on the adhesive interface with the pile, and the system relies on the effective operation of the seals at each end to form the closed annular space. A similar system is shown in Swiss Patent No 573520.
  • a method of increasing the structural strength of a load bearing member including, inter alia, the steps of fitting a rigid, structural sleeve to the member, the sleeve having internal dimensions greater than the external dimensions of the member to provide a continuous interspace from the member to the sleeve, supporting the sleeve so that it is spaced from the member, sealing the continuous interspace, filling the space between the sleeve and the member with an expansive filler, allowing the filler to set, cure and expand within the confines of the continuous interspace to generate an expansive pressure of at least 3 MPa which imparts at least radial prestress forces on the member and tensile hoop stresses in the sleeve, whereby the generated forces effect a transition of loading forces from one section to another of the load bearing member through the sleeve and expansive filler.
  • the sleeve may be a single piece sleeve for those applications where a single piece sleeve is able to be engaged with the member. Otherwise, the sleeve may be formed of two or more parts which are interconnected, as by welding, bolts or other mechanical connectors, by clipping, by adhesion or chemical bonding, by the use of hinge means or by a combination of these.
  • the sleeve is spaced from the member by the use of spacer means, which may include spacing tabs, indentations or other deformations of the sleeve material or separate spacers including spacers formed of synthetic plastic or rubber materials or the like attached to the inner surfaces of the sleeve.
  • spacer means may be attached to the member prior to engagement of the sleeve thereon or spacer means may be inserted between the member and the sleeve after the engagement of the sleeve on the member.
  • an apparatus for increasing the structural strength of a load bearing member including a rigid, structural sleeve formed of one, two or more elongate sections to be fastened about a load bearing member, a plurality of spacers adapted to space the sleeve from the member to form a continuous interspace and a set or cured expansive filler prestressed to at least 3 MPa to fill the continuous interspace which generates and imparts at least radial prestress on the member an sleeve such as to set up compressive hoop stresses in the member and tensile hoop stresses in the sleeve, the filler forming a rigid interface between the member and the sleeve.
  • a seal is provided between the lower edge of the sleeve and the member to seal the continuous interspace between the sleeve and the member at the lower end thereof.
  • a second seal may also be provided spaced from the first seal, and preferably at the upper edge of the sleeve.
  • the seal or seals act to retain the expansive filler within the space between the sleeve and the member before the filler has set and expanded.
  • seals may also be used between the parts of the sleeve, depending on the means of fixing the sleeve parts together.
  • the expansive filler may comprise a grout, such as a cementitious grout to which an expansive agent is added so that the grout sets and expands on curing.
  • the expansive filler may be a calcium-sulpho-aluminate or lime based mixture.
  • the expansive agent used to cause the grout to increase in volume begins to react within the grout. This causes a build up of pressure within the annulus and hence creates a prestress between the structure under repair and the outer sleeve. This pressure or prestress creates an outward force or tensile hoop stresses on the sleeve and an inward or compressive force on the structure under repair. These forces cause extra frictional forces that allow for increased overall capacity of the joint.
  • an apparatus for increasing the structural strength of a load bearing member including a rigid, structural sleeve formed on one, two or more elongate sections to be fastened about a load bearing member, a plurality of spacers adapted to space the sleeve from the member to form a continuous interspace and a set or cured expansive filler prestressed to at least 3 MPa to fill the continuous interspace which generates and imparts at least radial prestress on the member and sleeve such as to set up compressive hoop stresses in the member and tensile hoop stresses in the sleeve, the filler forming a rigid interface between the member and the sleeve.
  • shear keys are provided to positively and rigidly connect the sleeve with the expansive filler and to connect the filler with the member.
  • shear keys may be engaged with the pile prior to the engagement of the sleeve.
  • the shear keys may comprise studs, bolts, including coach bolts or the like fastened to the member.
  • the sleeve itself may also have inwardly extending shear keys formed by any suitable means including bolts, punched or pressed deformations of the sleeve, welded pins or the like.
  • the shear keys may be preformed so as to also constitute the or some of the spacer means.
  • the sleeve having an axial length and being secured so as to extend beyond the area of damage in both directions;
  • FIG. 1 is a part sectional view of a jetty pile and an encasing repair sleeve in accordance with the present invention
  • FIG. 2 is a cross-sectional plan view of a cylindrical, tubular pile and an encasing sleeve in accordance with one embodiment of the invention
  • FIG. 3 is a part cross-sectional elevational view of a lower end of an encasing sleeve in accordance with a further embodiment of the invention.
  • FIG. 4 is a schematic, perspective view of a further form of sleeve of the invention.
  • FIG. 5 is a view of a part sleeve illustrating a further embodiment of a sleeve seal in accordance with the invention.
  • FIG. 6 is a cross-sectional plan view of a timber pile and encasing sleeve in accordance with another embodiment of the invention.
  • FIGS. 1 to 5 are designed particularly for the repair of a cylindrical, tubular pile 12 such as those used for jetties and the like.
  • FIG. 1 illustrates a jetty superstructure 14 supported by a pile 12 in a sea water environment.
  • the sea water 15 has, over a period of time, caused corrosive damage 16 to the pile 12 over an area on the pile 12 generally corresponding to the tidal limits.
  • the repair is effected by locating the sleeve 17 about the pile 12 and spacing the sleeve 17 from the pile to form a substantially annular space 18 .
  • the space 18 is then filled with an expansive grout 19 which expands when it sets thereby tensioning the sleeve 17 and forming a substantially firm or rigid interface between the pile 12 and the sleeve 17 .
  • a seal 21 is provided at least around the lower edge of the sleeve 17 to extend between the sleeve and the pile 12 .
  • the seal shown in FIG. 1 is formed by a flexible, deformable rubber ring separated at a location to allow the separated 1 . 0 ends to be spaced to engage the ring or the pile.
  • the seal 21 may be formed by any suitable means or material, including synthetic plastic material, mastic or the like.
  • a second seal 22 is provided at the upper end of the annular space 18 to maintain the grout within that annular space during the initial setting and expanding period.
  • Such a seal 22 is fitted in place after the grout has been conveyed into the annular space 18 and all water and air expelled, otherwise, provision needs to be made to allow the water and air to escape.
  • the sleeve 17 which may be formed of two or more parts, is, when assembled, a load bearing member which is able to carry at least part of the load on the pile.
  • the expansive grout must also be of a material which, on setting, is able to apply a prestress of at least 3 MPa and facilitates load transfer between the pile and the sleeve.
  • the preferred grout for use in this invention is a cementitious grout mixture having as an expansive agent a calcium-sulpho-aluminate formulation.
  • Such a formulation has an initial setting period during which the grout hardens.
  • the initial setting period is followed by a curing period during which the grout expands and generates radial prestress forces of at least 3 MPa resulting in tensile hoop stresses in the sleeve 17 and compressive hoop stresses in the pile 12 .
  • the level of prestress that builds between the sleeve and the repaired structure reaches a maximum value.
  • Grout that experiences constant forces often suffers from loss of strength over time. There are several reasons for the loss of grout strength over time, they include shrinkage of the grout and thus relaxation in any prestress that may exist, creep of the grout due to the applied load and other factors that may occur during the life of the structure.
  • the inner surface of the sleeve 17 by roughening the inner surface of the sleeve 17 , a greater degree of resistance to slip-between the grout and the sleeve is achieved.
  • the surface roughness may be increased by any suitable means including machining, stamping, shot blasting or the like.
  • a sleeve 17 is illustrated formed of two parts 17 a and 17 b which are held together with two axially extending rows of bolts 24 which engage threaded holes 26 or captive nuts in the opposed sleeve half.
  • the sleeve 17 is assembled around the pile 12 and is spaced therefrom by a series of internal deformable rubber spacers 27 which are fixed to the inside surface of each sleeve part 17 a and 17 b, such as by adhesive or mechanical fastening.
  • the spacers 27 are provided at several locations along the length of the sleeve parts whereby, when the sleeve parts are connected as illustrated, the spacers act to centre the sleeve 17 on the pile 12 so that a substantially annular space 18 exists between the sleeve 17 and the pile 12 .
  • This space is then filled with the expansive grout mixture aforesaid which, on setting, expands and produces tensile stresses in the sleeve 17 and compressive stresses in the pile 12 , the grout being of a material which facilitates load transfer between the pile and the sleeve.
  • spacer 28 which comprises a part cylindrical ring 28 formed of a flexible material, such as a spring steel or the like, and which is able to be clipped around the pile 12 .
  • the ring 28 has a number of depending, inwardly extending legs 29 the inner edges of which are adapted to engage the surface of the pile so that the body of the ring 28 is spaced therefrom.
  • the ring 28 engages over the lower end of the sleeve 17 thereby supporting that end such that the sleeve 17 is evenly spaced from the pile 12 .
  • FIG. 3 also illustrates a lower seal 21 formed of one or more pockets 31 of a flexible material, such as rubber, synthetic plastic material, fabric or the like.
  • the pockets 31 are open at their upper end and are secured to the lower edge portion of the sleeve 17 by bonding or by any other suitable fastening means.
  • the grout fills the pockets 31 causing the inner face thereof 32 to engage and seal against the outer surface of the pile 12 .
  • the grouted pockets 31 thus form a seal preventing the expansive grout 1 . 9 passing downwardly and out of the annular space 18 .
  • the sleeve 17 is formed of two or more interconnected part circular parts such as is shown in FIG. 2, the pockets 31 are provided on each of the individual sleeve parts and end pockets abut each other when the sleeve parts are interconnected.
  • a modified form of sleeve 17 is illustrated.
  • the sleeve 17 is formed of two parts 17 a and 17 b connected together with a continuous hinge 33 which is fixed to the sleeve parts by rivets 34 or welding or other suitable fastening means.
  • the sleeve 17 of this embodiment is able to engage over the pile 12 by opening the sleeve parts about the hinge axis and then closing and securing the parts by means of fastening bolts 24 .
  • Appropriate spacers 27 are provided to space the sleeve 17 from the pile 12 and a seal 21 is located at the lower end of the annular space 18 to enable that space to be filled with an expansive filler material, preferably the aforesaid cementitious grout mixture containing an expansive agent which causes the grout to expand on setting.
  • FIG. 5 there is illustrated a further embodiment of the invention in which the sleeve part 17 a is provided with an active seal 21 at its lower end which comprises a bag structure or bladder 36 of substantially toroidal shape attached to the inner surface of the sleeve part 17 a by bonding with adhesive, or by fastening means 37 .
  • the bag structure or bladder 36 is flexible and is therefore able to conform to the surface of the pile 12 to which the sleeve part 17 a is to be fitted.
  • a grout line 38 extends from an upper end of the sleeve part 17 a to the bag structure 36 and through which the bag 36 is adapted to be filled with grout.
  • the sleeve 17 a is connected with a corresponding sleeve (not shown) about a pile 12 , the two parts being secured together by bolts passing through the holes 25 .
  • Grout is introduced into the opening 39 of the grout line 38 and fills the bag structure 36 thus forming a close fitting seal against the pile. Adjacent ends of the bag structures of the co-operating sleeve parts abut when the sleeve parts are assembled and the respective bag structures 36 are filled with grout material.
  • any suitable seal may be provided at the lower end of the annular space 18 to support the expansive grout within that space until such time as the grout has set.
  • a seal may be formed of any suitable material, including synthetic plastic material, foamed plastics material, or even welding.
  • the upper end of the annular interspace 18 may be sealed 1 . 0 by welding (in the case of a steel pile 12 ) or other sealing means.
  • the features of the invention can be applied to piles or other structures of non-circular cross-section.
  • the shape of the sleeve 17 may, if desired, be made to correspond to the shape of the structural member and to provide a space there between into which an expansive filler material can be introduced.
  • the sleeve 17 illustrated is used to repair a damaged timber pile 12 .
  • shear keys 42 are embedded in the pile 12 and extend into the substantially annular interspace 18 .
  • the sleeve parts 17 a and 17 b may also be formed with internally extending shear key formations 43 . It will be understood that such shear keys 42 and 43 may be used in the embodiments of FIGS. 1 to 5 .
  • the sleeve 17 is spaced from the pile 12 by deformable spacers 27 , and a seal, similar to that shown in FIG. 5, is used to seal the lower end of the interspace.
  • the filler material 19 is introduced into the interspace 18 through the upper end thereof.
  • the filler may be introduced through one or more tubes or pipes 44 which can extend to the lower end of the interspace to ensure delivery of the filler 19 to that lower end. Any water or air in the interspace 18 is displaced by the filler 19 as it is delivered thereto.
  • the interspace When filled, the interspace may be sealed at its upper end to retain the filler during setting or curing.
  • the filler on curing or setting over a period of time such as between five (5) minutes and twelve (12) hours, generates tensile hoop stress in the sleeve and corresponding compressive stress in the member. These stresses enhance the load transfer between the member and the sleeve which is primarily effected by friction across the interfaces.
  • the capacity of the present invention is from the bond between the grout and the sleeve and the friction caused by the application of the prestress. If there were no prestress applied, or if it was at a level such that it may deteriorate to no prestress, the capacity of the joint would be from the bond alone, there would be no contribution from the extra frictional forces from the expansive grout.
  • the capacity of the joint is also dependent on the length of the sleeve.
  • the capacity of the present invention is greater than that for other such repairs as the prestress developed in the sleeve allows for significant increases in the overall capacity of the connection.
  • OTH 88 283 from Department of Energy section 1.8.7 pg 56
  • the required length of the sleeve using the present invention is approximately ⁇ fraction (1/26) ⁇ th of that required for a grouted repair with no prestress

Abstract

A method of increasing the structural strength of a load bearing member such as a pile (12), particularly for the purpose of repairing a damaged pile, includes the steps of securing a rigid, structural sleeve (17) around the pile (12) and spaced therefrom to form an interspace (18), filling the interspace (18) with an expansive filler (19), and allowing the filler (19) to set and expand in the interspace (18) to a prestress of at least 3 MPa and impose tensile hoop stresses in the sleeve (17) and corresponding compressive hoop stresses in the pile (12) to enhance the load transfer between the pile (12) and the sleeve (17).

Description

    BACKGROUND OF THE INVENTION
  • 1. Field of the Invention [0001]
  • This invention relates to the repair of structural members and relates particularly to improved methods and apparatus for effecting repairs of structures such as piles in situ. [0002]
  • The invention will be described with particular reference to effecting repairs of structures such as piles, but it will be understood that the invention has wider application to maintenance, protection and repair of a wide range of structural members including steel jacket offshore structures, structural members on bridges or the like, tubular and non-tubular posts of all types, columns, poles and pillars. [0003]
  • The invention will also be described particularly with reference to cylindrical metal piles although it will be understood that the invention is applicable to other forms of structures, including concrete piles, timber piles and the like. [0004]
  • 2. Description of the Prior Art [0005]
  • Piles, such as those used to support jetties, wharves, piers, offshore structures such as steel jacket platforms and similar structures are subject to damage caused by erosion, corrosion and related chemical or electro-chemical erosion, and by impact such as from marine vessels and the like. Piles which are immersed in water, particularly sea water, are generally subject to most corrosion on that area of the pile between tide levels. That portion of the pile is periodically immersed in water and then exposed to atmosphere causing accelerated corrosion as compared to other parts of the pile. As the structural integrity of the jetty, wharf, pier, bridge, offshore structure or the like can be substantially impaired by damage to the piles, it is necessary to repair or replace any piles which suffer substantial damage. [0006]
  • Heretofore, the repair of hollow, steel tubular piles has been effected by welding full or part sleeves to the pile so that the sleeves overlie the affected damaged portion. [0007]
  • A full sleeve may be formed by welding two half sleeves to the pile along longitudinal and end edges thereof thus effectively adding an outer skin to the damaged pile. However, as most damage to piles occurs in the area between maximum and minimum water levels, and as the repair sleeve or part sleeve must extend substantially beyond the damaged area to provide the necessary strength to effect a proper repair, it is generally necessary to effect the welding of such sleeves in the tidal zone or underwater. Such welding is relatively expensive and time consuming, may require special equipment, and 1-0 the welds so made, unless carried out with great skill, can be less than perfect, thus, compromising the structural integrity of the repaired pile. [0008]
  • Australian Patent Specification No 59285/86 discloses a method of repairing a concrete pile by using a steel sleeve and filling the space between the sleeve with a grout. The method includes removing damaged concrete from the pile before placing the sleeve. The specification discloses the method in relation to a square pile and the sleeve is provided with internal, integral metal spacers formed as part of the sleeve and which bear on the surfaces of the pile. [0009]
  • Such sleeves are relatively expensive and need to be custom made for each different type, shape and dimension of pile. [0010]
  • U.S. Pat. No. 4,306,821 discloses a method for reconditioning structural piles whereby a building filler is placed into a space between a flexible sheet form and the damaged piling. The filler provides a protective and structural coating to the damaged piling. With this method, the strength of the repaired pile is dependent solely on the strength of the filler material, which is preferably an epoxy material and on the adhesive interface with the pile. Therefore, the amount of filler required is that amount necessary to provide the desired strength to the pile. [0011]
  • U.S. Pat. No. 4,697,649 discloses a method of reinforcing a damaged post in the ground by providing a split casing having helical threads at one end which are driven into the ground by a casing rotary drive mechanism. An annulus between the casing and the post is filled with a suitable filler material. However, this system is designed for above ground posts and not for underwater piles. Further, the driving mechanism is relatively complex and expensive and adds substantially to the repair costs. [0012]
  • U.S. Pat. No. 4,439,070 relates to a method of restoring an under waterpile which uses a flexible jacket placed around the pile and filling the formed annular space between the pile and the jacket with an appropriate epoxy resin compound. Upper and lower seals are provided between the jacket and the pile and the jacket has inlet ports for injection of the epoxy resin and outlet ports for venting water from the annular space. Again, the strength of the repaired pile is dependent on the strength and amount of epoxy resin and on the adhesive interface with the pile, and the system relies on the effective operation of the seals at each end to form the closed annular space. A similar system is shown in Swiss Patent No 573520. [0013]
  • DESCRIPTION OF THE INVENTION
  • It is therefore desirable to provide an improved method and apparatus which enables a repair of a damaged pile to be efficiently and effectively carried out. [0014]
  • It is also desirable to provide a method for effecting the repair of a damaged pile which obviates the need for tidal zone or underwater welding. [0015]
  • It is also desirable to provide a method and apparatus for carrying out the repair of a damaged pile which can be used in a wide variety of applications and in respect of a wide variety of piles, columns, posts and the like as referred to above. [0016]
  • It is also desirable to provide a method and apparatus for repairing piles which is relatively inexpensive and which enables the repair to be carried out relatively quickly and economically. [0017]
  • It is also desirable to provide an improved method and apparatus for carrying out the repair of piles which can be used by relatively unskilled personnel. [0018]
  • SUMMARY OF THE INVENTION
  • In accordance with one aspect of the invention there is provided a method of increasing the structural strength of a load bearing member, such as a pile, including, inter alia, the steps of fitting a rigid, structural sleeve to the member, the sleeve having internal dimensions greater than the external dimensions of the member to provide a continuous interspace from the member to the sleeve, supporting the sleeve so that it is spaced from the member, sealing the continuous interspace, filling the space between the sleeve and the member with an expansive filler, allowing the filler to set, cure and expand within the confines of the continuous interspace to generate an expansive pressure of at least 3 MPa which imparts at least radial prestress forces on the member and tensile hoop stresses in the sleeve, whereby the generated forces effect a transition of loading forces from one section to another of the load bearing member through the sleeve and expansive filler. [0019]
  • The sleeve may be a single piece sleeve for those applications where a single piece sleeve is able to be engaged with the member. Otherwise, the sleeve may be formed of two or more parts which are interconnected, as by welding, bolts or other mechanical connectors, by clipping, by adhesion or chemical bonding, by the use of hinge means or by a combination of these. [0020]
  • The sleeve is spaced from the member by the use of spacer means, which may include spacing tabs, indentations or other deformations of the sleeve material or separate spacers including spacers formed of synthetic plastic or rubber materials or the like attached to the inner surfaces of the sleeve. Alternatively, spacer means may be attached to the member prior to engagement of the sleeve thereon or spacer means may be inserted between the member and the sleeve after the engagement of the sleeve on the member. [0021]
  • In a further aspect of the invention there is provided, an apparatus for increasing the structural strength of a load bearing member including a rigid, structural sleeve formed of one, two or more elongate sections to be fastened about a load bearing member, a plurality of spacers adapted to space the sleeve from the member to form a continuous interspace and a set or cured expansive filler prestressed to at least 3 MPa to fill the continuous interspace which generates and imparts at least radial prestress on the member an sleeve such as to set up compressive hoop stresses in the member and tensile hoop stresses in the sleeve, the filler forming a rigid interface between the member and the sleeve. [0022]
  • In the above form of the invention, a seal is provided between the lower edge of the sleeve and the member to seal the continuous interspace between the sleeve and the member at the lower end thereof. A second seal may also be provided spaced from the first seal, and preferably at the upper edge of the sleeve. The seal or seals act to retain the expansive filler within the space between the sleeve and the member before the filler has set and expanded. When the sleeve is composed of two or more parts, seals may also be used between the parts of the sleeve, depending on the means of fixing the sleeve parts together. [0023]
  • The expansive filler may comprise a grout, such as a cementitious grout to which an expansive agent is added so that the grout sets and expands on curing. For a cementitious grout, the expansive filler may be a calcium-sulpho-aluminate or lime based mixture. The applicant has found that after the expansive filler is applied to the continuous interspace between the member and the sleeve it begins to cure. The expansive agent used to cause the grout to increase in volume begins to react within the grout. This causes a build up of pressure within the annulus and hence creates a prestress between the structure under repair and the outer sleeve. This pressure or prestress creates an outward force or tensile hoop stresses on the sleeve and an inward or compressive force on the structure under repair. These forces cause extra frictional forces that allow for increased overall capacity of the joint. [0024]
  • Due to losses in prestress through creep and shrinkage over time, the applicant has found an initial minimum level of prestress of 3 MPa is necessary to ensure that the beneficial effects of the application of prestress according to the invention are not negated. This ensures that the generated forces are imparted throughout the lifetime of the sleeve applied to the load bearing member. Depending on the expansive material used, a prestress of 12 Mpa or more is achievable. [0025]
  • In a further aspect of the invention, there is provided, an apparatus for increasing the structural strength of a load bearing member including a rigid, structural sleeve formed on one, two or more elongate sections to be fastened about a load bearing member, a plurality of spacers adapted to space the sleeve from the member to form a continuous interspace and a set or cured expansive filler prestressed to at least 3 MPa to fill the continuous interspace which generates and imparts at least radial prestress on the member and sleeve such as to set up compressive hoop stresses in the member and tensile hoop stresses in the sleeve, the filler forming a rigid interface between the member and the sleeve. [0026]
  • In one form of the invention, shear keys are provided to positively and rigidly connect the sleeve with the expansive filler and to connect the filler with the member. Where the member is a timber pile, shear keys may be engaged with the pile prior to the engagement of the sleeve. The shear keys may comprise studs, bolts, including coach bolts or the like fastened to the member. The sleeve itself may also have inwardly extending shear keys formed by any suitable means including bolts, punched or pressed deformations of the sleeve, welded pins or the like. The shear keys may be preformed so as to also constitute the or some of the spacer means. [0027]
  • According to another aspect of the invention there is provided a method of repairing a pile having a damage area including the steps of: [0028]
  • (a) securing a sleeve which has inner dimensions greater than outer dimensions of the pile around the pile; [0029]
  • the sleeve having an axial length and being secured so as to extend beyond the area of damage in both directions; [0030]
  • (b) providing spacers to space the sleeve from the pile to form a continuous interspace from the pile to the sleeve; [0031]
  • (c) sealing a lower end of the continuous interspace; [0032]
  • (d) introducing an expansive filler through the upper end of the continuous interspace, displacing any water or air in the continuous interspace, to thereby fill the interspace with the expansive filler; and [0033]
  • (e) permitting the filler to set or cure and to expand within the confines of the continuous interspace to generate an expansive pressure of at least 3 MPa and imparts at least radial prestress forces which tension the sleeve and apply compressive forces to the pile and produce compressive hoop stresses in the pile and tensile hoop stresses in the sleeve, whereby the filler facilitates load transfer primarily by friction across the filler-to-pile and filler-to-sleeve interfaces.[0034]
  • In order that the invention may be more readily understood, embodiments thereof will now be described with reference to the accompanying drawings wherein. [0035]
  • FIG. 1 is a part sectional view of a jetty pile and an encasing repair sleeve in accordance with the present invention; [0036]
  • FIG. 2 is a cross-sectional plan view of a cylindrical, tubular pile and an encasing sleeve in accordance with one embodiment of the invention; [0037]
  • FIG. 3 is a part cross-sectional elevational view of a lower end of an encasing sleeve in accordance with a further embodiment of the invention; [0038]
  • FIG. 4 is a schematic, perspective view of a further form of sleeve of the invention; [0039]
  • FIG. 5 is a view of a part sleeve illustrating a further embodiment of a sleeve seal in accordance with the invention; and [0040]
  • FIG. 6 is a cross-sectional plan view of a timber pile and encasing sleeve in accordance with another embodiment of the invention.[0041]
  • Referring to the drawings, the embodiments illustrated in FIGS. [0042] 1 to 5 are designed particularly for the repair of a cylindrical, tubular pile 12 such as those used for jetties and the like. FIG. 1 illustrates a jetty superstructure 14 supported by a pile 12 in a sea water environment. The sea water 15 has, over a period of time, caused corrosive damage 16 to the pile 12 over an area on the pile 12 generally corresponding to the tidal limits.
  • In order to effect a proper repair and reinstate the integrity of the [0043] pile 12, and to provide protection against corrosion, it is necessary to secure a sleeve 17 to the pile 12 so that the sleeve can carry at least part of the load on the pile 12. In accordance with the present invention, the repair is effected by locating the sleeve 17 about the pile 12 and spacing the sleeve 17 from the pile to form a substantially annular space 18. The space 18 is then filled with an expansive grout 19 which expands when it sets thereby tensioning the sleeve 17 and forming a substantially firm or rigid interface between the pile 12 and the sleeve 17.
  • In order that the grout is retained in the [0044] annular space 18 before setting, a seal 21 is provided at least around the lower edge of the sleeve 17 to extend between the sleeve and the pile 12. The seal shown in FIG. 1 is formed by a flexible, deformable rubber ring separated at a location to allow the separated 1.0 ends to be spaced to engage the ring or the pile. However, the seal 21 may be formed by any suitable means or material, including synthetic plastic material, mastic or the like.
  • Preferably, a [0045] second seal 22 is provided at the upper end of the annular space 18 to maintain the grout within that annular space during the initial setting and expanding period. Such a seal 22 is fitted in place after the grout has been conveyed into the annular space 18 and all water and air expelled, otherwise, provision needs to be made to allow the water and air to escape.
  • It will be appreciated that the [0046] sleeve 17, which may be formed of two or more parts, is, when assembled, a load bearing member which is able to carry at least part of the load on the pile. Further, the expansive grout must also be of a material which, on setting, is able to apply a prestress of at least 3 MPa and facilitates load transfer between the pile and the sleeve. The preferred grout for use in this invention is a cementitious grout mixture having as an expansive agent a calcium-sulpho-aluminate formulation.
  • Such a formulation has an initial setting period during which the grout hardens. The initial setting period is followed by a curing period during which the grout expands and generates radial prestress forces of at least 3 MPa resulting in tensile hoop stresses in the [0047] sleeve 17 and compressive hoop stresses in the pile 12. After approximately 28 days from the time of application of the grout the level of prestress that builds between the sleeve and the repaired structure reaches a maximum value. Grout that experiences constant forces often suffers from loss of strength over time. There are several reasons for the loss of grout strength over time, they include shrinkage of the grout and thus relaxation in any prestress that may exist, creep of the grout due to the applied load and other factors that may occur during the life of the structure.
  • If the grout is allowed to cure in the air, the water within the grout will be lost and the size of the grout will be reduced. In the case of a grouted connection, the losses due to shrinkage will be lower than other fully exposed grouted structures. By applying an expansion agent to the grout the present invention overcomes this shrinkage problem. [0048]
  • With the constant application of load to the grout some increase in strain, hence movement in the grout, or relaxation in prestress may be expected. Depending on the type of grout and the way in which the load is applied the phenomenon of creep can manifest itself in many different ways. By allowing for a high enough level of prestress the present invention overcomes any possible losses due to creep and ensures that more than a negligable level of prestress remains throughout the life of the repair. [0049]
  • Further, by roughening the inner surface of the [0050] sleeve 17, a greater degree of resistance to slip-between the grout and the sleeve is achieved. The surface roughness may be increased by any suitable means including machining, stamping, shot blasting or the like.
  • Referring to FIG. 2, a [0051] sleeve 17 is illustrated formed of two parts 17 a and 17 b which are held together with two axially extending rows of bolts 24 which engage threaded holes 26 or captive nuts in the opposed sleeve half. The sleeve 17 is assembled around the pile 12 and is spaced therefrom by a series of internal deformable rubber spacers 27 which are fixed to the inside surface of each sleeve part 17 a and 17 b, such as by adhesive or mechanical fastening. The spacers 27 are provided at several locations along the length of the sleeve parts whereby, when the sleeve parts are connected as illustrated, the spacers act to centre the sleeve 17 on the pile 12 so that a substantially annular space 18 exists between the sleeve 17 and the pile 12. This space is then filled with the expansive grout mixture aforesaid which, on setting, expands and produces tensile stresses in the sleeve 17 and compressive stresses in the pile 12, the grout being of a material which facilitates load transfer between the pile and the sleeve.
  • Referring to FIG. 3, there is illustrated an alternate form of [0052] spacer 28 which comprises a part cylindrical ring 28 formed of a flexible material, such as a spring steel or the like, and which is able to be clipped around the pile 12. The ring 28 has a number of depending, inwardly extending legs 29 the inner edges of which are adapted to engage the surface of the pile so that the body of the ring 28 is spaced therefrom. The ring 28 engages over the lower end of the sleeve 17 thereby supporting that end such that the sleeve 17 is evenly spaced from the pile 12.
  • FIG. 3 also illustrates a [0053] lower seal 21 formed of one or more pockets 31 of a flexible material, such as rubber, synthetic plastic material, fabric or the like. The pockets 31 are open at their upper end and are secured to the lower edge portion of the sleeve 17 by bonding or by any other suitable fastening means.
  • In use, when the [0054] expansive grout 19 is introduced into the annular space 18 from the upper end, the grout fills the pockets 31 causing the inner face thereof 32 to engage and seal against the outer surface of the pile 12. The grouted pockets 31 thus form a seal preventing the expansive grout 1.9 passing downwardly and out of the annular space 18. It will be understood that when the sleeve 17 is formed of two or more interconnected part circular parts such as is shown in FIG. 2, the pockets 31 are provided on each of the individual sleeve parts and end pockets abut each other when the sleeve parts are interconnected.
  • Referring to FIG. 4, a modified form of [0055] sleeve 17 is illustrated. The sleeve 17 is formed of two parts 17 a and 17 b connected together with a continuous hinge 33 which is fixed to the sleeve parts by rivets 34 or welding or other suitable fastening means. The sleeve 17 of this embodiment is able to engage over the pile 12 by opening the sleeve parts about the hinge axis and then closing and securing the parts by means of fastening bolts 24. Appropriate spacers 27 are provided to space the sleeve 17 from the pile 12 and a seal 21 is located at the lower end of the annular space 18 to enable that space to be filled with an expansive filler material, preferably the aforesaid cementitious grout mixture containing an expansive agent which causes the grout to expand on setting.
  • Referring to FIG. 5 there is illustrated a further embodiment of the invention in which the [0056] sleeve part 17 a is provided with an active seal 21 at its lower end which comprises a bag structure or bladder 36 of substantially toroidal shape attached to the inner surface of the sleeve part 17 a by bonding with adhesive, or by fastening means 37. The bag structure or bladder 36 is flexible and is therefore able to conform to the surface of the pile 12 to which the sleeve part 17 a is to be fitted.
  • A [0057] grout line 38 extends from an upper end of the sleeve part 17 a to the bag structure 36 and through which the bag 36 is adapted to be filled with grout. In use, the sleeve 17 a is connected with a corresponding sleeve (not shown) about a pile 12, the two parts being secured together by bolts passing through the holes 25. Grout is introduced into the opening 39 of the grout line 38 and fills the bag structure 36 thus forming a close fitting seal against the pile. Adjacent ends of the bag structures of the co-operating sleeve parts abut when the sleeve parts are assembled and the respective bag structures 36 are filled with grout material.
  • It will be appreciated that any suitable seal may be provided at the lower end of the [0058] annular space 18 to support the expansive grout within that space until such time as the grout has set. Such a seal may be formed of any suitable material, including synthetic plastic material, foamed plastics material, or even welding. Similarly, the upper end of the annular interspace 18 may be sealed 1.0 by welding (in the case of a steel pile 12) or other sealing means.
  • It will also be appreciated that the features of the invention can be applied to piles or other structures of non-circular cross-section. In this case, the shape of the [0059] sleeve 17 may, if desired, be made to correspond to the shape of the structural member and to provide a space there between into which an expansive filler material can be introduced.
  • Referring to FIG. 6, the [0060] sleeve 17 illustrated is used to repair a damaged timber pile 12. In this embodiment, shear keys 42 are embedded in the pile 12 and extend into the substantially annular interspace 18. If desired, the sleeve parts 17 a and 17 b may also be formed with internally extending shear key formations 43. It will be understood that such shear keys 42 and 43 may be used in the embodiments of FIGS. 1 to 5.
  • The [0061] sleeve 17 is spaced from the pile 12 by deformable spacers 27, and a seal, similar to that shown in FIG. 5, is used to seal the lower end of the interspace.
  • The [0062] filler material 19 is introduced into the interspace 18 through the upper end thereof. The filler may be introduced through one or more tubes or pipes 44 which can extend to the lower end of the interspace to ensure delivery of the filler 19 to that lower end. Any water or air in the interspace 18 is displaced by the filler 19 as it is delivered thereto. When filled, the interspace may be sealed at its upper end to retain the filler during setting or curing.
  • The filler, on curing or setting over a period of time such as between five (5) minutes and twelve (12) hours, generates tensile hoop stress in the sleeve and corresponding compressive stress in the member. These stresses enhance the load transfer between the member and the sleeve which is primarily effected by friction across the interfaces. [0063]
  • EXAMPLE 1
  • Due to the uncertainty in the expected behaviour of the grout within the sleeve the best method for prediction of the possible losses in prestress is from observation of experimental results. From recent research by Yee Teck Lee, (Yee Teck Lee, Masters Thesis, “[0064] Grouted Sleeve Connections of Circular Hollow Steel Members Under Large Deformation Cyclic Loading,” Monash University, 2002), the loss of prestress in grouted sleeves occur in the first 10 to 20 weeks. Further losses appear to be insignificant beyond this time. The average loss of prestress observed in Yee Teck Lee's research was approximately 2.6 MPa, this confirms that a prestress greater than 3 MPa would allow for this expected loss.
  • EXAMPLE 2
  • A method for calculating the capacity of a stressed grouted connection is given in the UK Department of Energy, Offshore Technology Report on Grouted and Mechanical Strengthening and Repair of Tubular Steel Offshore Structures. (R G Harwood, E P Shuttleworth, Department of Energy, “[0065] Grouted And Mechanical Strengthening and Repair of Tubular Steel Offshore Strucutres,” Offshore Technical Report, 1988) These equations have been applied (see below) to determine the strength of the present invention for several different configurations. It can be seen from these calculations that if the initial prestress is 3 MPa and this prestress reduces to 0.4 MPa over the joints lifetime the capacity of the section is twice the capacity of the same section without the application of prestress.
  • The capacity of the present invention is from the bond between the grout and the sleeve and the friction caused by the application of the prestress. If there were no prestress applied, or if it was at a level such that it may deteriorate to no prestress, the capacity of the joint would be from the bond alone, there would be no contribution from the extra frictional forces from the expansive grout. [0066]
  • As can be seen in the calculations the capacity of the joint is also dependent on the length of the sleeve. The longer the sleeve the larger the area of contact with the area under repair. If the length of the sleeve is reduced it is necessary to increase the contact force in some way so as to maintain the capacity. By increasing the prestress the contact force increases, this increases the capacity of the joint, therefore the length of the sleeve required can be reduced to maintain a similar capacity, thus decreasing the cost of the repair. [0067]
  • The capacity of the present invention is greater than that for other such repairs as the prestress developed in the sleeve allows for significant increases in the overall capacity of the connection. [0068]
  • It will be understood that features described in relation to any one of the described embodiments may be used in the other of the embodiments. [0069]
  • by Martin Hewitt [0070]
  • Sep. 24, 2002. [0071]
  • from “Grouted and Mechanical Strengthening of Tubular Steel Offhsore Structures”[0072]
  • Offshore Technology Report (OTR) OTH 88 283 from Department of Energy section 1.8.7 pg 56 [0073]
  • EXAMPLE 3 (a)
  • Static Strength of Stressed Grouted Connections: [0074]
  • Assess Static Strength with no prestress. Resistance provided by surface friction [0075] P p := 0.22 · ( F n · C s Γμ + 1.75 · 10 - 3 · A · C s Γ b ) · [ 1 + 33 · ( D T ) - 1 ] Eqn . 1.8 .3 OTR report
    Figure US20030085482A1-20030508-M00001
  • EXAMPLE 3(b)
  • Assess Static Strength with 1 MPa prestress. Assume 3 MPa with 2.6 MPa loss over 1 year see Yee Teck Lee “Grouted Sleeve Connection of Circular Hollow Steel Members Under Large Deformation Cyclic Loading”. [0076] P p := 0.22 · ( F n · C s Γμ + 1.75 · 10 - 3 · A · C s Γ b ) · [ 1 + 33 · ( D T ) - 1 ] Eqn . 1.8 .3 OTR report
    Figure US20030085482A1-20030508-M00002
  • Therefore application of a prestress of 3 MPa with a subsequent 2.6 MPa loss of prestress results in a doubling of the capacity. [0077]
  • EXAMPLE 4(a)
  • Assess Static Strength of the present invention grouted connection with 10 MPa Prestress and length of 1 D [0078] P p := 0.22 · ( F n · C s Γμ + 1.75 · 10 - 3 · A · C s Γ b ) · [ 1 + 33 · ( D T ) - 1 ] Eqn . 1.8 .3 OTR report
    Figure US20030085482A1-20030508-M00003
  • EXAMPLE 4(b)
  • Assess required Length to create similar capacity with no prestress. [0079] P p := 0.22 · ( F n · C s Γμ + 1.75 · 10 - 3 · A · C s Γ b ) · [ 1 + 33 · ( D T ) - 1 ] Eqn . 1.8 .3 OTR report
    Figure US20030085482A1-20030508-M00004
  • Therefore for an equivalent permissible load, the required length of the sleeve using the present invention is approximately {fraction (1/26)}[0080] th of that required for a grouted repair with no prestress

Claims (18)

The claims defining the invention are as follows:
1. A method of increasing the structural strength of a load bearing member including the steps of:
(a) fitting a rigid, structural sleeve to the member, with the sleeve having internal dimensions greater than the external dimensions of the member;
(b) supporting the sleeve so that it is spaced from the member whereby to provide a continuous interspace from the member to the sleeve;
(c) sealing the continuous interspace at its lower end;
(d) filling the continuous interspace with an expansive filler; and
(e) allowing the filler to set, or cure, and expand within the confines of the continuous interspace to generate an expansive pressure of at least 3 MPa which imparts at least radial prestress forces on the member and tensile hoop stresses in the sleeve, whereby the generated forces effect a transition of loading forces from one section to another of the load bearing member through the sleeve and expansive filler.
2. A method according to claim 1 including the step of securing two or more parts together to form the sleeve about the member.
3. A method according to claim 1 wherein the interspace is filled from its upper end.
4. A method according to claim 1 including the step of providing spacers to evenly space the sleeve from the member.
5. A method according to claim 1 including the steps of providing at least one toroidal bladder attached to the lower end of the sleeve with a filler tube extending to the upper end of the sleeve, and filling the bladder with expansive filler through the filler tube before filling the interspace.
6. A method according to claim 1 including the step of sealing the interspace at its upper end.
7. A method according to claim 1 wherein the step of filling the interspace with an expansive filler comprises filling the space with a cementitious grout containing an expansive agent of a calcium-sulpho-aluminate structure.
8. A method according to claim 1 including the step of providing shear keys on either or both the member and the sleeve to key into the filler.
9. A method according to claim 1 wherein the step of filling the interspace with an expansive material results in direct contact between the filler and the member and between the filler and the sleeve.
10. Apparatus for increasing the structural strength of a load bearing member including a rigid, structural sleeve formed of one, two or more elongate sections to be fastened about a load bearing member, a plurality of spacers adapted to space the sleeve from the member to form a continuous interspace from the member to the sleeve, a seal around the lower end of the continuous interspace, and a set or cured expansive filler to fill the continuous interspace which generates and imparts at least radial prestress compressive forces of at least 3 MPa on the member and the sleeve such as to set up compressive hoop stresses in the member and tensile hoop stresses in the sleeve, the filler forming a rigid interface between the member and the sleeve.
11. Apparatus according to claim 10 wherein the sleeve is formed of two parts adapted to be connected together.
12. Apparatus according to claim 10 wherein said seal comprises at least one flexible toroidal bladder attached to the lower end of the respective sleeve part and adapted to be filled with said filler, the bladder having a filler line or tube extending from an upper end of the respective sleeve part.
13. Apparatus according to claim 10 wherein said sleeve is formed of two parts hinged together along one longitudinal edge and adapted to be fastened together along another longitudinal edge.
14. Apparatus according to claim 10 wherein the expansive filler is a cementitious grout containing an expansive agent of a calcium-sulpho-aluminate structure.
15. A method of repairing a pile having a damaged area including the steps of:
(a) securing a sleeve which has inner dimensions greater than outer dimensions of the pile around the pile, the sleeve having an axial length to, and being secured so as to, extend beyond the area of damage in both directions;
(b) providing spacers to space the sleeve from the pile to form a continuous interspace from the pile to the sleeve;
(c) sealing a lower end of the continuous interspace;
(d) introducing an expansive filler through the upper end of the continuous interspace, displacing any water or air in the continuous interspace, to thereby fill the interspace with the expansive filler;
(e) permitting the filler to set, or cure, and to expand within the confines of the continuous interspace to generate a compressive pressure of at least 3 MPa and impart at least radial prestress forces which tension the sleeve and apply compressive forces to the pile and produce compressive hoop stresses in the pile and tensile hoop stresses in the sleeve, whereby the filler facilitates load transfer primarily by friction across the filler-to-pile and filler-to-sleeve interfaces.
16. A method according to claim 15 wherein the expansive filler is a cementitous grout containing an expansive agent of a calcium-sulpho-aluminate structure or a lime based agent.
17. A method according to claim 15 wherein the lower end of the interspace is sealed by at least one flexible bladder attached to the lower end of the sleeve and having a filler line or tube extending from an upper end of the respective sleeve, the bladder being filled with the expansive filler or grout so as to expand and seal against the pile and retain said filler in the interspace.
18. A method according to claim 15 wherein the lower end of the interspace is sealed by a plurality of pocket seals attached to the sleeve at its lower end, the pockets seals being open at their upper end to receive the filler introduced into the interspace, the filler filling the pockets causing inner edges thereof to engage and seal against the pile.
US10/261,587 1997-05-07 2002-10-02 Repair of structural members Abandoned US20030085482A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US10/261,587 US20030085482A1 (en) 1997-05-07 2002-10-02 Repair of structural members

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
AUPO6665A AUPO666597A0 (en) 1997-05-07 1997-05-07 Repair of tubular structural members
AUPO6665 1997-05-07
US42321000A 2000-01-21 2000-01-21
US10/261,587 US20030085482A1 (en) 1997-05-07 2002-10-02 Repair of structural members

Related Parent Applications (2)

Application Number Title Priority Date Filing Date
PCT/AU1998/000331 Continuation-In-Part WO1998050640A1 (en) 1997-05-07 1998-05-07 Repair of structural members
US09423210 Continuation-In-Part 2000-01-21

Publications (1)

Publication Number Publication Date
US20030085482A1 true US20030085482A1 (en) 2003-05-08

Family

ID=25645416

Family Applications (1)

Application Number Title Priority Date Filing Date
US10/261,587 Abandoned US20030085482A1 (en) 1997-05-07 2002-10-02 Repair of structural members

Country Status (1)

Country Link
US (1) US20030085482A1 (en)

Cited By (46)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070224002A1 (en) * 2006-03-23 2007-09-27 Richard Scholl Assembly and method for protecting a pier and a post combination
US7300229B1 (en) * 2005-11-18 2007-11-27 Fyfe Edward R Repair jacket for pilings and method
US20080121151A1 (en) * 2006-08-04 2008-05-29 Gerald Hallissy Shielding for structural support elements
US20090269145A1 (en) * 2008-04-24 2009-10-29 William James Castle Method and Apparatus for Repairing Piles
WO2010130009A1 (en) * 2009-05-15 2010-11-18 Norman Ross Watt Pile assembly and method of forming same
US20110072960A1 (en) * 2007-11-16 2011-03-31 Composite Technologies Armor shielding
US20110131914A1 (en) * 2009-04-27 2011-06-09 Richardson George David Methods and apparatus for restoring, repairing, reinforcing and/or protecting structures using concrete
US20120213591A1 (en) * 2011-02-18 2012-08-23 Burkhardt Gregory B Method for repairing support pilings, in situ
US20130014467A1 (en) * 2011-07-14 2013-01-17 Ehsani Mohammad R Reconstruction methods for structural elements
US8793953B2 (en) 2009-02-18 2014-08-05 Cfs Concrete Forming Systems Inc. Clip-on connection system for stay-in-place form-work
US8844241B2 (en) 2007-04-02 2014-09-30 Cfs Concrete Forming Systems Inc. Methods and apparatus for providing linings on concrete structures
US9080337B2 (en) 2007-11-09 2015-07-14 Cfs Concrete Forming Systems Inc. Connector components for form-work systems and methods for use of same
USD737997S1 (en) 2013-10-31 2015-09-01 Boswell Engineering, Inc. Collar for marine pile repair
US9206614B2 (en) 2011-11-24 2015-12-08 Cfs Concrete Forming Systems Inc. Stay-in-place formwork with engaging and abutting connections
US20160010297A1 (en) * 2013-08-12 2016-01-14 Richard Tavella Pilaster repair device and method for repairing seawalls
WO2016007503A1 (en) * 2014-07-07 2016-01-14 Advantic Llc Reinforced syntactic structure
WO2016008006A1 (en) * 2014-07-14 2016-01-21 Joinlock Pty Ltd Jacket assembly
US9273479B2 (en) 2009-01-07 2016-03-01 Cfs Concrete Forming Systems Inc. Methods and apparatus for restoring, repairing, reinforcing and/or protecting structures using concrete
US9303382B2 (en) 2013-10-31 2016-04-05 Boswell Engineering, Inc. Collar for marine pile repair and method of using the same
US9315987B2 (en) 2012-01-05 2016-04-19 Cfs Concrete Forming Systems Inc. Systems for restoring, repairing, reinforcing, protecting, insulating and/or cladding structures with locatable stand-off components
US20160237632A1 (en) * 2015-02-18 2016-08-18 Can-Traffic Services Ltd. Films and methods for protecting roadside poles
US9441365B2 (en) 2011-11-24 2016-09-13 Cfs Concrete Forming Systems Inc. Stay-in-place formwork with anti-deformation panels
US9453345B2 (en) 2012-01-05 2016-09-27 Cfs Concrete Forming Systems Inc. Panel-to-panel connections for stay-in-place liners used to repair structures
JP2017503101A (en) * 2014-01-15 2017-01-26 シービージェイ(香港) オーシャン エンジニアリング リミテッドCbj(Hong Kong) Ocean Engineering Limited Water structure fixing roll and its construction method
CN106812167A (en) * 2017-03-08 2017-06-09 中交第三航务工程局有限公司宁波分公司 The method that pile foundation is repaired
US9783991B2 (en) 2013-12-06 2017-10-10 Cfs Concrete Forming Systems Inc. Structure cladding trim components and methods for fabrication and use of same
WO2018071690A1 (en) * 2016-10-12 2018-04-19 University Of Utah Research Foundation Elongate member reinforcement with a studded collar
US9976315B2 (en) 2013-08-08 2018-05-22 University Of Utah Research Foundation Elongate member reinforcement
US9982444B2 (en) 2014-04-04 2018-05-29 Cfs Concrete Forming Systems Inc. Liquid and gas-impermeable connections for panels of stay-in-place form-work systems
US10022825B2 (en) 2010-07-06 2018-07-17 Cfs Concrete Forming Systems Inc. Method for restoring, repairing, reinforcing, protecting, insulating and/or cladding a variety of structures
US10151119B2 (en) 2012-01-05 2018-12-11 Cfs Concrete Forming Systems Inc. Tool for making panel-to-panel connections for stay-in-place liners used to repair structures and methods for using same
US20190032346A1 (en) * 2017-07-31 2019-01-31 Mohammad Reza Ehsani On-Site Construction and Repair of Structural Elements and Pipes of any Desired Diameter with Reusable Materials
US10227786B2 (en) 2013-08-08 2019-03-12 University Of Utah Research Foundation Elongate member reinforcement with a studded collar
US10480207B1 (en) * 2018-12-22 2019-11-19 Gary P. Webster Post guard
CN110565633A (en) * 2019-10-08 2019-12-13 南昌大学 Annular positioning device for underwater glass fiber sleeve
US10731333B2 (en) 2015-12-31 2020-08-04 Cfs Concrete Forming Systems Inc. Structure-lining apparatus with adjustable width and tool for same
US11180915B2 (en) 2017-04-03 2021-11-23 Cfs Concrete Forming Systems Inc. Longspan stay-in-place liners
CN114150669A (en) * 2021-12-15 2022-03-08 中国水利水电第五工程局有限公司 Construction platform for quickly cutting pile head of underwater steel pipe pile and construction method thereof
USD953843S1 (en) * 2019-09-25 2022-06-07 Dale Clayton Miller Pile system
NL2027765B1 (en) * 2021-03-17 2022-09-29 Sustech B V Method for renovating a retaining wall, a retaining renovation sleeve and a combination of a retaining wall and a retaining renovation sleeve
CN115305909A (en) * 2022-09-06 2022-11-08 杭州联力地空建筑科技有限公司 Stirring drilling rod for reinforcing defective pile in soft foundation construction
US11512483B2 (en) 2017-12-22 2022-11-29 Cfs Concrete Forming Systems Inc. Snap-together standoffs for restoring, repairing, reinforcing, protecting, insulating and/or cladding structures
US11674322B2 (en) 2019-02-08 2023-06-13 Cfs Concrete Forming Systems Inc. Retainers for restoring, repairing, reinforcing, protecting, insulating and/or cladding structures
US11788246B2 (en) 2020-12-14 2023-10-17 Dale Clayton Miller Micropile connection for supporting a vertical pile
US20230366169A1 (en) * 2022-05-14 2023-11-16 Zhejiang University Construction method for reinforcing and repairing steel pipe pile for offshore wind power
US11828038B2 (en) 2020-07-10 2023-11-28 Dale Clayton Miller Pile connection for horizontally fixing an elongated beam for a foundation support system

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1947413A (en) * 1933-08-14 1934-02-13 Coastal Contracting Co Inc Apparatus for forming a covering or sleeve of plastic material upon a wooden pile
US3504497A (en) * 1966-07-27 1970-04-07 Lee A Turzillo Method of producing cast-in-place piles or like bodies in a situs
US3878687A (en) * 1973-07-19 1975-04-22 Western Co Of North America Grouting of offshore structures
US4068483A (en) * 1976-12-22 1978-01-17 Papworth Charles A Protective sheath for water-eroded wood piling
US4306821A (en) * 1978-06-20 1981-12-22 Moore Charles D Method and apparatus for restoring piling
US4439070A (en) * 1981-07-23 1984-03-27 Dimmick Floyd E Method for restoring an underwater piling and an underwater jacket used therewith
US4644722A (en) * 1984-10-16 1987-02-24 Scott Bader Company Limited Repairing utility poles
US4779389A (en) * 1987-03-02 1988-10-25 Landers Phillip G Method and apparatus for insitu reinforcement, repair and safety enhancement of wooden poles
US4892601A (en) * 1987-08-13 1990-01-09 Scott Bader Company Limited Pole repair system
US5435667A (en) * 1986-02-20 1995-07-25 Slickbar Products Corp. Protection of piles
US5591265A (en) * 1991-05-10 1997-01-07 Colebrand Limited Protective coating
US6219991B1 (en) * 1990-08-06 2001-04-24 Hexcel Corporation Method of externally strengthening concrete columns with flexible strap of reinforcing material

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1947413A (en) * 1933-08-14 1934-02-13 Coastal Contracting Co Inc Apparatus for forming a covering or sleeve of plastic material upon a wooden pile
US3504497A (en) * 1966-07-27 1970-04-07 Lee A Turzillo Method of producing cast-in-place piles or like bodies in a situs
US3878687A (en) * 1973-07-19 1975-04-22 Western Co Of North America Grouting of offshore structures
US4068483A (en) * 1976-12-22 1978-01-17 Papworth Charles A Protective sheath for water-eroded wood piling
US4306821A (en) * 1978-06-20 1981-12-22 Moore Charles D Method and apparatus for restoring piling
US4439070A (en) * 1981-07-23 1984-03-27 Dimmick Floyd E Method for restoring an underwater piling and an underwater jacket used therewith
US4644722A (en) * 1984-10-16 1987-02-24 Scott Bader Company Limited Repairing utility poles
US5435667A (en) * 1986-02-20 1995-07-25 Slickbar Products Corp. Protection of piles
US4779389A (en) * 1987-03-02 1988-10-25 Landers Phillip G Method and apparatus for insitu reinforcement, repair and safety enhancement of wooden poles
US4892601A (en) * 1987-08-13 1990-01-09 Scott Bader Company Limited Pole repair system
US6219991B1 (en) * 1990-08-06 2001-04-24 Hexcel Corporation Method of externally strengthening concrete columns with flexible strap of reinforcing material
US5591265A (en) * 1991-05-10 1997-01-07 Colebrand Limited Protective coating

Cited By (72)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7300229B1 (en) * 2005-11-18 2007-11-27 Fyfe Edward R Repair jacket for pilings and method
US7470091B2 (en) * 2006-03-23 2008-12-30 Richard Scholl Assembly and method for protecting a pier and a post combination
US20070224002A1 (en) * 2006-03-23 2007-09-27 Richard Scholl Assembly and method for protecting a pier and a post combination
US20080121151A1 (en) * 2006-08-04 2008-05-29 Gerald Hallissy Shielding for structural support elements
US7748307B2 (en) * 2006-08-04 2010-07-06 Gerald Hallissy Shielding for structural support elements
US7849780B1 (en) * 2006-08-04 2010-12-14 Gerald Hallissy Shielding for structural support elements
US20100319522A1 (en) * 2006-08-04 2010-12-23 Gerald Hallissy Shielding for structural support elements
US8844241B2 (en) 2007-04-02 2014-09-30 Cfs Concrete Forming Systems Inc. Methods and apparatus for providing linings on concrete structures
US10280636B2 (en) 2007-11-09 2019-05-07 Cfs Concrete Forming Systems Inc. Connector components for form-work systems and methods for use of same
US9080337B2 (en) 2007-11-09 2015-07-14 Cfs Concrete Forming Systems Inc. Connector components for form-work systems and methods for use of same
US20110072960A1 (en) * 2007-11-16 2011-03-31 Composite Technologies Armor shielding
US7926407B1 (en) 2007-11-16 2011-04-19 Gerald Hallissy Armor shielding
US8070390B2 (en) 2008-04-24 2011-12-06 W. J. Castle, P.E. & Associates, P.C. Method and apparatus for repairing piles
US20090269145A1 (en) * 2008-04-24 2009-10-29 William James Castle Method and Apparatus for Repairing Piles
US10662661B2 (en) 2009-01-07 2020-05-26 Cfs Concrete Forming Systems Inc. Methods and apparatus for restoring, repairing, reinforcing and/or protecting structures using concrete
US9359780B2 (en) * 2009-01-07 2016-06-07 Cfs Concrete Forming Systems Inc. Methods and apparatus for restoring, repairing, reinforcing and/or protecting structures using concrete
US9273479B2 (en) 2009-01-07 2016-03-01 Cfs Concrete Forming Systems Inc. Methods and apparatus for restoring, repairing, reinforcing and/or protecting structures using concrete
US20150191924A1 (en) * 2009-01-07 2015-07-09 Cfs Concrete Forming Systems Inc. Methods and apparatus for restoring, repairing, reinforcing and/or protecting structures using concrete
US9879436B2 (en) 2009-01-07 2018-01-30 Cfs Concrete Forming Systems Inc Methods and apparatus for restoring, repairing, reinforcing and/or protecting structures using concrete
US11512484B2 (en) 2009-01-07 2022-11-29 Cfs Concrete Forming Systems Inc. Methods and apparatus for restoring, repairing, reinforcing and/or protecting structures using concrete
US8793953B2 (en) 2009-02-18 2014-08-05 Cfs Concrete Forming Systems Inc. Clip-on connection system for stay-in-place form-work
US9273477B2 (en) 2009-02-18 2016-03-01 Cfs Concrete Forming Systems Inc. Clip-on connection system for stay-in-place form-work
US8943774B2 (en) * 2009-04-27 2015-02-03 Cfs Concrete Forming Systems Inc. Methods and apparatus for restoring, repairing, reinforcing and/or protecting structures using concrete
US20110131914A1 (en) * 2009-04-27 2011-06-09 Richardson George David Methods and apparatus for restoring, repairing, reinforcing and/or protecting structures using concrete
WO2010130009A1 (en) * 2009-05-15 2010-11-18 Norman Ross Watt Pile assembly and method of forming same
US10022825B2 (en) 2010-07-06 2018-07-17 Cfs Concrete Forming Systems Inc. Method for restoring, repairing, reinforcing, protecting, insulating and/or cladding a variety of structures
US20120213591A1 (en) * 2011-02-18 2012-08-23 Burkhardt Gregory B Method for repairing support pilings, in situ
US8790042B2 (en) * 2011-02-18 2014-07-29 Gregory B. Burkhardt Method for repairing support pilings, in situ
US20130014467A1 (en) * 2011-07-14 2013-01-17 Ehsani Mohammad R Reconstruction methods for structural elements
US8650831B2 (en) * 2011-07-14 2014-02-18 Mohammad R. Ehsani Reconstruction methods for structural elements
US9441365B2 (en) 2011-11-24 2016-09-13 Cfs Concrete Forming Systems Inc. Stay-in-place formwork with anti-deformation panels
US9206614B2 (en) 2011-11-24 2015-12-08 Cfs Concrete Forming Systems Inc. Stay-in-place formwork with engaging and abutting connections
US9315987B2 (en) 2012-01-05 2016-04-19 Cfs Concrete Forming Systems Inc. Systems for restoring, repairing, reinforcing, protecting, insulating and/or cladding structures with locatable stand-off components
US10151119B2 (en) 2012-01-05 2018-12-11 Cfs Concrete Forming Systems Inc. Tool for making panel-to-panel connections for stay-in-place liners used to repair structures and methods for using same
US9453345B2 (en) 2012-01-05 2016-09-27 Cfs Concrete Forming Systems Inc. Panel-to-panel connections for stay-in-place liners used to repair structures
US9784005B2 (en) 2012-01-05 2017-10-10 Cfs Concrete Forming Systems Inc. Systems for restoring, repairing, reinforcing, protecting, insulating and/or cladding structures with locatable stand-off components
US9790681B2 (en) 2012-01-05 2017-10-17 Cfs Concrete Forming Systems Inc. Panel-to-panel connections for stay-in-place liners used to repair structures
US10227786B2 (en) 2013-08-08 2019-03-12 University Of Utah Research Foundation Elongate member reinforcement with a studded collar
US9976315B2 (en) 2013-08-08 2018-05-22 University Of Utah Research Foundation Elongate member reinforcement
USD889692S1 (en) 2013-08-12 2020-07-07 Richard Tavella Combined seawall and pilaster repair device
US20160010297A1 (en) * 2013-08-12 2016-01-14 Richard Tavella Pilaster repair device and method for repairing seawalls
US9303382B2 (en) 2013-10-31 2016-04-05 Boswell Engineering, Inc. Collar for marine pile repair and method of using the same
USD737997S1 (en) 2013-10-31 2015-09-01 Boswell Engineering, Inc. Collar for marine pile repair
US9783991B2 (en) 2013-12-06 2017-10-10 Cfs Concrete Forming Systems Inc. Structure cladding trim components and methods for fabrication and use of same
JP2017503101A (en) * 2014-01-15 2017-01-26 シービージェイ(香港) オーシャン エンジニアリング リミテッドCbj(Hong Kong) Ocean Engineering Limited Water structure fixing roll and its construction method
US10450763B2 (en) 2014-04-04 2019-10-22 Cfs Concrete Forming Systems Inc. Liquid and gas-impermeable connections for panels of stay-in-place form-work systems
US9982444B2 (en) 2014-04-04 2018-05-29 Cfs Concrete Forming Systems Inc. Liquid and gas-impermeable connections for panels of stay-in-place form-work systems
WO2016007503A1 (en) * 2014-07-07 2016-01-14 Advantic Llc Reinforced syntactic structure
US10119238B2 (en) 2014-07-07 2018-11-06 Cornerstone Research Group, Inc. Reinforced syntactic structure
WO2016008006A1 (en) * 2014-07-14 2016-01-21 Joinlock Pty Ltd Jacket assembly
US20160237632A1 (en) * 2015-02-18 2016-08-18 Can-Traffic Services Ltd. Films and methods for protecting roadside poles
US10731333B2 (en) 2015-12-31 2020-08-04 Cfs Concrete Forming Systems Inc. Structure-lining apparatus with adjustable width and tool for same
US11053676B2 (en) 2015-12-31 2021-07-06 Cfs Concrete Forming Systems Inc. Structure-lining apparatus with adjustable width and tool for same
US11499308B2 (en) 2015-12-31 2022-11-15 Cfs Concrete Forming Systems Inc. Structure-lining apparatus with adjustable width and tool for same
WO2018071690A1 (en) * 2016-10-12 2018-04-19 University Of Utah Research Foundation Elongate member reinforcement with a studded collar
CN106812167A (en) * 2017-03-08 2017-06-09 中交第三航务工程局有限公司宁波分公司 The method that pile foundation is repaired
US11180915B2 (en) 2017-04-03 2021-11-23 Cfs Concrete Forming Systems Inc. Longspan stay-in-place liners
US11821204B2 (en) 2017-04-03 2023-11-21 Cfs Concrete Forming Systems Inc. Longspan stay-in-place liners
US10808412B2 (en) * 2017-07-31 2020-10-20 Mohammad Reza Ehsani Spacers for repair of columns and piles
US20190032346A1 (en) * 2017-07-31 2019-01-31 Mohammad Reza Ehsani On-Site Construction and Repair of Structural Elements and Pipes of any Desired Diameter with Reusable Materials
US11761220B2 (en) 2017-12-22 2023-09-19 Cfs Concrete Forming Systems Inc. Snap-together standoffs for restoring, repairing, reinforcing, protecting, insulating and/or cladding structures
US11512483B2 (en) 2017-12-22 2022-11-29 Cfs Concrete Forming Systems Inc. Snap-together standoffs for restoring, repairing, reinforcing, protecting, insulating and/or cladding structures
US10480207B1 (en) * 2018-12-22 2019-11-19 Gary P. Webster Post guard
US11674322B2 (en) 2019-02-08 2023-06-13 Cfs Concrete Forming Systems Inc. Retainers for restoring, repairing, reinforcing, protecting, insulating and/or cladding structures
USD953843S1 (en) * 2019-09-25 2022-06-07 Dale Clayton Miller Pile system
CN110565633A (en) * 2019-10-08 2019-12-13 南昌大学 Annular positioning device for underwater glass fiber sleeve
US11828038B2 (en) 2020-07-10 2023-11-28 Dale Clayton Miller Pile connection for horizontally fixing an elongated beam for a foundation support system
US11788246B2 (en) 2020-12-14 2023-10-17 Dale Clayton Miller Micropile connection for supporting a vertical pile
NL2027765B1 (en) * 2021-03-17 2022-09-29 Sustech B V Method for renovating a retaining wall, a retaining renovation sleeve and a combination of a retaining wall and a retaining renovation sleeve
CN114150669A (en) * 2021-12-15 2022-03-08 中国水利水电第五工程局有限公司 Construction platform for quickly cutting pile head of underwater steel pipe pile and construction method thereof
US20230366169A1 (en) * 2022-05-14 2023-11-16 Zhejiang University Construction method for reinforcing and repairing steel pipe pile for offshore wind power
CN115305909A (en) * 2022-09-06 2022-11-08 杭州联力地空建筑科技有限公司 Stirring drilling rod for reinforcing defective pile in soft foundation construction

Similar Documents

Publication Publication Date Title
US20030085482A1 (en) Repair of structural members
US10544581B2 (en) Prestressed tube section structure and construction method thereof
US20210054583A1 (en) A precast segmental pier reinforced with both frp bars and conventional steel bars
CN114622481B (en) Double-column type self-resetting pier structure with buckling restrained brace and construction method thereof
WO1998050640A1 (en) Repair of structural members
US20110206920A1 (en) Structure reinforcement wrap
US11319706B1 (en) FRP splice system for joining structural elements
JP5273663B2 (en) Anchor structure using anticorrosion PC strand, construction method thereof, and composite anchor member
AU742802B2 (en) Repair of structural members
WO2000050697A1 (en) Repair of hollow tubular structures
US3483707A (en) Method for reinforcing steel pipe piling in situ and the resultant piling
US11000987B2 (en) Reinforcement of structures using 3D-fabric wrap
AU2784500A (en) Repair of hollow tubular structures
US5740753A (en) Method of fabricating buoyant prestressed concrete building modules, resulting modules, and assembly thereof
Benmokrane et al. Behavior of grouted anchors subjected to repeated loadings in field
US11629473B2 (en) Multiple friction joint pile system
KR100686964B1 (en) Encasement method for repairing or reinforcing structures in the water and a repairing or reinforcing member used therein
JP2004211315A (en) Seismic reinforcing structure and seismic reinforcing construction method, using steel-framed brace with frame
JP7453090B2 (en) Reinforcement device for cylindrical precast concrete members and concrete floating structure in floating offshore wind power generation equipment using the same
CN211973475U (en) Precast pile and pile splicing structure
CN216947823U (en) Sectional assembly type anti-seismic self-resetting pier structure
KR200356036Y1 (en) FRP form
US20220205207A1 (en) Polymer Composite Timber Pile and Methods
Ragab et al. Strengthening steel-concrete composite girders using FRPs: state-of-the-art
JPS6367311A (en) Jointed block structure and its constructing method

Legal Events

Date Code Title Description
AS Assignment

Owner name: AMOG TECHNOLOGIES PTY LTD., AUSTRALIA

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:SINCOCK, PAUL;POTTS, ANDREW ELMHURST;REEL/FRAME:013537/0820

Effective date: 20021010

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO PAY ISSUE FEE