US20020154724A1 - Control system of nuclear power plant, and control method thereof - Google Patents

Control system of nuclear power plant, and control method thereof Download PDF

Info

Publication number
US20020154724A1
US20020154724A1 US09/345,737 US34573799A US2002154724A1 US 20020154724 A1 US20020154724 A1 US 20020154724A1 US 34573799 A US34573799 A US 34573799A US 2002154724 A1 US2002154724 A1 US 2002154724A1
Authority
US
United States
Prior art keywords
heat generation
generation rate
maximum linear
linear heat
automatic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
US09/345,737
Other versions
US6477218B1 (en
Inventor
Yukihisa Fukasawa
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi GE Nuclear Energy Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Assigned to HITACHI, LTD. reassignment HITACHI, LTD. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: FUKASAWA, YUKIHISA
Priority to US10/038,616 priority Critical patent/US6553090B2/en
Publication of US20020154724A1 publication Critical patent/US20020154724A1/en
Application granted granted Critical
Publication of US6477218B1 publication Critical patent/US6477218B1/en
Assigned to HITACHI-GE NUCLEAR ENERGY, LTD. reassignment HITACHI-GE NUCLEAR ENERGY, LTD. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: HITACHI, LTD.
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21CNUCLEAR REACTORS
    • G21C17/00Monitoring; Testing ; Maintaining
    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21DNUCLEAR POWER PLANT
    • G21D3/00Control of nuclear power plant
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Plasma & Fusion (AREA)
  • General Engineering & Computer Science (AREA)
  • High Energy & Nuclear Physics (AREA)
  • Monitoring And Testing Of Nuclear Reactors (AREA)

Abstract

A control system, and a control method, of a nuclear power plant capable of easily executing automatic output regulation by an automatic power regulator system even when a maximum linear heat generation rate and a minimum critical power ratio are determined in a short cycle by using brief calculation. While a core monitoring system does not calculate a maximum linear heat generation rate and a minimum critical power ratio, they are determined by utilizing the maximum linear heat generation rate and the minimum critical power ratio calculated by the core monitoring system as well as plant data, and the maximum linear heat generation rate and the minimum critical power ratio so determined are compared with thermal limit values set in advance for them. The automatic power regulator system holds a control signal when at least one of the maximum linear heat generation rate and the minimum critical power ratio exceeds the thermal limit values.

Description

    BACKGROUND OF THE INVENTION
  • Thermal limit values of fuel loaded into the core of a boiling water nuclear power plant include two thermal limit values, that is, the thermal limit values for a maximum linear heat generation rate and a minimum critical power ratio. The linear heat generation rate represents an output per unit length of a fuel rod in a fuel assembly and the critical power ratio represents a ratio of a fuel assembly output (critical output), when boiling transition takes place, to an actual fuel assembly output. Both can be calculated with high accuracy by using the calculation result of a three-dimensional power distribution inside the core by a core monitoring system. Generally, the core monitoring system is activated by operators in a one-hour cycle or on an on-demand basis. The operators monitor whether or not the maximum linear heat generation rate and the minimum critical power ratio exceed the respective thermal limit values on the basis of the calculation result by the core monitoring system, judge whether or not the control rod operation and the core flow rate operation should be continued, and control the reactor output. [0001]
  • Recently, needs have been increasing for the use of an automatic power regulator system so as to save power involved in the reactor operation and for high-speed activation to improve economy. When the high-speed operation is executed by using the automatic power regulator system, an automatic thermal limit monitor for monitoring the thermal limit values in a short cycle is necessary as back-up means for the operators. An example of the conventional automatic thermal limit monitors is described in JP-A-51-67898. This reference describes a method of monitoring the thermal limit values by the steps of calculating an output distribution in a prescribed area inside a core by a one-dimensional neutron diffusion model, comparing and collating the one-dimensional neutron diffusion result with an indication value of a local power range monitor and executing a corrected one-dimensional calculation which adds a correction to the boundary condition. Whether or not the maximum linear heat generation rate and the minimum critical power ratio satisfy the respective thermal limit values is judged by such an automatic thermal limit monitor, and when they are judged as exceeding the thermal limit values, an automatic operation exclusion instruction is outputted to the automatic power regulator system. Incidentally, the term “automatic operation exclusion” means the stop of the operation of the automatic power regulator system, and the automatic power regulator system must be activated once again to re-start the automatic operation. [0002]
  • According to the prior art technology described above, the maximum linear heat generation rate and the minimum critical power ratio can be calculated in a shorter cycle (about 10 seconds) than the calculation cycle (generally, one hour) of the core monitoring system for executing a three-dimensional power distribution calculation. To improve reliability, however, duplexing and further reduction of the cycle (to one second or below) are necessary in the monitoring operation of the thermal limit values by the automatic power regulator system. Because the processes for this purpose are complicated and troublesome, duplexing and further reduction of the cycle have not yet been achieved by this prior art technology. [0003]
  • To further shorten the calculation cycle of the maximum linear heat generation rate and the minimum critical power ratio, therefore, it may be possible to employ an automatic thermal limit monitor which calculates the maximum linear heat generation rate and the minimum critical power ratio in the following way while the core monitoring system is executing its calculation. In other words, it may be possible to correct the maximum linear heat generation rate and the minimum critical power ratio as the calculation result of the core monitoring system by utilizing the values of the plant data (for example, the output of a local power range monitor) at the time when calculation is made by the core monitoring system and the plant data at the present moment and thus to briefly calculate the maximum linear heat generation rate and the minimum critical power ratio at the present moment. [0004]
  • When such an automatic thermal limit monitor is employed, duplexing for improving reliability can be achieved easily because the process is simple, and the cycle can be shortened, as well. Nonetheless, this method involves the problem that calculation accuracy of the maximum linear heat generation rate and the minimum critical power ratio is low. For this reason, the calculation error increases as the time passes from the calculation by the core monitoring system. In other words, calculation accuracy gradually gets deteriorated from immediately after the calculation by the core monitoring system, the calculation error reaches the maximum immediately before the next calculation by the core monitoring system and is again improved immediately after the next calculation by the core monitoring system. [0005]
  • Let's assume hereby the case where the automatic thermal limit monitor is used to judge whether or not the maximum linear heat generation rate and the minimum critical power ratio satisfy the thermal limit values, and the automatic operation exclusion instruction is outputted to the automatic power regulator system when they exceed the thermal limit values. Because calculation accuracy of the brief calculation of the maximum linear heat generation rate and the minimum critical power ratio by the automatic thermal limit monitor is low as described above, the maximum linear heat generation rate and the minimum critical power ratio exceed the respective thermal limit values in many cases under such a core condition where the maximum linear heat generation rate and the minimum critical power ratio exist in the proximity of the thermal limit values. In order to briefly calculate the maximum linear heat generation rate and the minimum critical power ratio, the automatic thermal limit monitor is designed in such a fashion that the calculation result becomes rather conservative. Therefore, the possibility that the maximum linear heat generation rate and the minimum critical power ratio exceed the thermal limit values is high when the core condition is in the proximity of the thermal limit values, or when the control rod operation quantity is great during the period in which the core monitoring system executes the calculation. [0006]
  • The automatic power regulator system is stopped when the maximum linear heat generation rate and the minimum critical power ratio exceed the thermal limit values. However, because calculation accuracy of the maximum linear heat generation rate and the minimum critical power ratio by the automatic thermal limit monitor is low as described above, they are judged in many cases as exceeding the thermal limit values although they do not actually exceed the thermal limit values. In such cases, the automatic power regulator system must be repeatedly stopped and re-activated. Re-activation of the automatic power regulator system is very complicated and troublesome to practice because the links with other systems such as the control rod control system, the re-circulation flow control systems, etc., must be established once again. Consequently, it is difficult by the method described above to virtually use the automatic power regulator system. [0007]
  • SUMMARY OF THE INVENTION
  • It is an object of the present invention to provide a control system of a nuclear power plant, and a control method therefor, capable of easily executing automatic power regulation by an automatic power regulator system even when a maximum linear heat generation rate and a minimum critical power ratio are determined in a short cycle by a brief calculation. [0008]
  • To accomplish the object described above, the present invention provides a control system of a nuclear power plant which comprises a core monitoring system for determining a maximum linear heat generation rate and a minimum critical power ratio in a certain time interval; an automatic thermal limit monitor for determining a maximum linear heat generation rate and a minimum critical power ratio by utilizing the maximum linear heat generation rate and the minimum critical power ratio determined by the core monitoring system and plant data when the core monitoring system does not execute the calculation of the maximum linear heat generation rate and the minimum critical power ratio, comparing the maximum linear heat generation rate and the minimum critical power ratio so determined with thermal limit values set in advance for them, and outputting an operation hold instruction when at least one of the maximum linear heat generation rate and the minimum critical power ratio exceeds the thermal limit values; and an automatic power regulator system for outputting control signals to a re-circulation flow control system for controlling the re-circulation flow rate in a reactor and to a control rod control system for controlling the positions of control rods in the reactor, and holding the control signals when the operation hold instruction is outputted from the automatic thermal limit monitor. [0009]
  • The automatic power control system holds the control signals to the control rod control system and to the re-circulation flow control system when at least one of the maximum linear heat generation rate and the minimum critical power ratio determined by the automatic thermal limit monitor exceeds the thermal limit value. Therefore, when the actual maximum linear heat generation rate and the actual minimum critical power ratio are below the thermal limit values, the automatic power regulator system need not be re-activated, and the control of the control rods and the re-circulation flow rate can be started again smoothly. Even when the maximum linear heat generation rate and the minimum critical power ratio are determined in a short cycle by the brief calculation, therefore, automatic power regulation can be easily carried out by the automatic power regulator system. The present invention is effective for the continuation of the automatic operation particularly when the core condition exists in the proximity of the thermal limit values. [0010]
  • When the automatic power regulator system holds the control signal when it receives the operation hold instruction from the automatic thermal limit monitor, the present invention compares the maximum linear heat generation rate and the minimum critical power ratio determined by the core monitoring system with the thermal limit values, and stops the holding operation of the control signal by the automatic power regulator system when the maximum linear heat generation rate and the minimum critical power ratio are below the thermal limit values. [0011]
  • Because holding of the control signal by the automatic power regulator system is stopped when the maximum linear heat generation rate and the minimum critical power ratio that are determined highly accurately by the core monitoring system are below the thermal limit values, the automatic output regulating operation can be continued when the actual maximum linear heat generation rate and the actual minimum critical power ratio are below the set values. [0012]
  • When the automatic power regulator system holds the control signal as it receives the operation hold instruction from the automatic thermal limit monitor, the maximum linear heat generation rate and the minimum critical power ratio that are determined by the core monitoring system are compared with the thermal limit values, and when at least one of the maximum linear heat generation rate and the minimum critical power ratio exceeds the thermal limit values, the output of the control signal by the automatic power regulator system is stopped. [0013]
  • Because the output of the control signal by the automatic power regulator system is stopped when at least one of the maximum linear heat generation rate and the minimum critical power ratio that are determined highly accurately by the core monitoring system exceeds the thermal limit values, the automatic power regulating operation can be stopped when the actual maximum linear heat generation rate and the actual minimum critical power ratio exceed the thermal limit values.[0014]
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1 is a structural view of a control system of a nuclear power plant according to a preferred embodiment of the present invention; [0015]
  • FIG. 2 is a schematic view showing an LPRM that is utilized for calculating an LPRM mean value when a maximum linear heat generation rate is calculated by an automatic thermal limit monitor; [0016]
  • FIG. 3 is a flowchart showing a process in the automatic thermal limit monitor; [0017]
  • FIG. 4 is a schematic view showing the LPRM that is utilized for calculating the LPRM mean value when a minimum critical power ratio is calculated by the automatic thermal limit monitor; [0018]
  • FIG. 5 is a graph showing an example of the change, with time, of the maximum linear heat generation rate calculated by a core monitoring system and the maximum linear heat generation rate calculated by the automatic thermal limit monitor; and [0019]
  • FIG. 6 is a flowchart showing a process in an automatic power regulator system. [0020]
  • DESCRIPTION OF THE EMBODIMENT
  • A preferred embodiment of the present invention will be described in detail with reference to the accompanying drawings. [0021]
  • FIG. 1 shows a control system of a nuclear power plant according to a preferred embodiment of the present invention. A core [0022] 2 inside a reactor pressure vessel 1 comprises hundreds of fuel bundles. The output of a reactor is controlled by a core flow rate that depends on an insertion ratio of control rods 3 into the core and on the number of revolution of an internal pump 8. The control rods 3 are driven by a control rod drive 5, a motor 6 for activating the control rod drive 5 and a motor control circuit 7 for controlling the motor 6. The number of revolution of the internal pump 8 is controlled by a motor 9 and a motor speed control circuit 10. A local power range monitor 4 (hereinafter called the “LPRM” 4) for detecting the neutron bundles inside the reactor and a flow rate detector 17 for detecting the core flow rate are disposed inside the core 2 and their detection results are outputted to an automatic thermal limit monitor 11, respectively. The control rod drive 5 is provided with a control rod position detector 18, and the detection result of this detector 18 is outputted to the automatic thermal limit monitor 11.
  • The [0023] LPRMs 4 are disposed inside LPRM strings 40 as shown in FIG. 2. Generally, four LPRMs 4 are disposed inside one LPRM string 40. The portions of each LPRM 4 are called “A, “B”, “C” and “D” levels from the bottom in an axial direction. The LPRM strings 40 are uniformly disposed inside the core and four LPRM strings 40 encompass sixteen fuel bundles.
  • Referring to FIG. 1, the [0024] core monitoring system 12 calculates every ten minutes the maximum linear heat generation rate and the minimum critical power ratio and outputs them to the automatic thermal limit monitor 11. Though the maximum linear heat generation rate and the minimum critical power ratio are calculated every ten minutes in this embodiment, the calculation cycle is not particularly limited and may be an hour, for example. Needless to say, however, the shorter the calculation cycle, the higher becomes reliability of the thermal limit monitor value.
  • The automatic [0025] thermal limit monitor 11 will be explained hereby in detail. FIG. 3 is a flowchart showing the processing content in this automatic thermal limit monitor 11. At the first step 301, the automatic thermal limit monitor 11 judges whether or not both maximum linear heat generation rate and minimum critical power ratio are calculated afresh by the core monitoring system 12. The flow then proceeds to the step 302 when the monitor 11 judges that the calculation is done afresh, and to the step 305 when it judges that the calculation is not done afresh. The maximum linear heat generation rate and the minimum critical power ratio as the calculation results of the core monitoring system 12 are fetched from the core monitoring system 12 at the step 302. At the next step 303, the maximum linear heat generation rate and the minimum critical power ratio are compared respectively with the thermal limit values that are set in advance for them, and whether or not the maximum linear heat generation rate and the minimum critical power ratio exceed the thermal limit values is judged. The flow proceeds to the step 304 when at least one of the maximum linear heat generation rate and the minimum critical power ratio exceeds the corresponding thermal limit value, and to the step 305 if neither of them is judged as exceeding the respective thermal limit value. An automatic operation exclusion instruction is outputted to the automatic power regulator system 13 at the step 304. The detection result of the LPRM 4 and plant data such as the control rod position information are fetched at the step 305. At the next step 306 is made a brief calculation of the maximum linear heat generation rate and the minimum critical power ratio on the basis of the plant data, the maximum linear heat generation rate and the minimum critical power ratio that are so fetched. The maximum linear heat generation rate and the minimum critical power ratio, that are determined by the brief calculation at the step 306, are then compared with the thermal limit values that are set beforehand for them, respectively, and whether or not these maximum linear heat generation rate and minimum critical power ratio exceed the respective thermal limit values is judged at the next step 307. The flow proceeds to the step 308 if at least one of the maximum linear heat generation rate and the minimum critical power ratio is judged as exceeding the thermal limit value, and to the step 309 if neither of them is judged as exceeding the thermal limit values. At the step 308, an operation hold instruction is outputted to the automatic power regulator system 13. Incidentally, the automatic power regulator system 13 enters the operation hold mode when the operation hold instruction is inputted thereto. Whether or not the automatic power regulator system 13 is in the operation hold mode is judged at the step 309. The flow proceeds to the step 310 if the automatic power regulator system 13 is judged as being in the operation hold mode. After the operation hold release instruction is outputted to the automatic power regulator system 13 at the step 310, the flow then returns to the step 301. If the automatic power regulator system 13 is not judged as being in the operation hold mode, the flow returns as such to the step 301.
  • Next, the calculation method of the maximum linear heat generation rate and the minimum critical power ratio at the [0026] step 306 will be explained in detail. To calculate the maximum linear heat generation rate, the area comprising the sixteen fuel bundles (with the index being defined as “M”) is divided into four segments (with the index being defined as “K”) in the A, B, C and D levels of the LPRM 4 in the axial direction, and the maximum linear heat generation rate ALHGR (K, M) inside each divided area is calculated. The maximum linear heat generation rate of the core is the greatest value among the maximum linear heat generation rates ALHGR (K, M) determined for each area. The maximum linear heat generation rate ALHGR (K, M) in the area (K, M) is obtained by correcting the maximum linear heat generation rate CLHGR (K, M) inside the area (K, M) calculated by the core monitoring system, on the basis of the mean value ALPRM (K, M) of the present LPRM of the area (K, M) and on the basis of the CLPRM (K, M) of the mean value of the LPRM, when the core monitoring system calculates the area (K, M), and also by executing the correction B (K, M) in accordance with the change of the control rod position from the start of the calculation by the core monitoring system. The calculation formula of the maximum linear heat generation rate by the automatic thermal limit monitor 11 is given by the following expression (1):
  • ALHGR(K, M)=CLHGR(K, MALPRM(K, M)/CLPRM(K, M)/B(K, M)  (1)
  • Here, the LPRM mean values ALPRM (K, M) and CLPRM (K, M) are the mean of the four LPRM indication values of each level of the height A, B, C and D in the LPRM axial direction as shown in FIG. 2. [0027]
  • When the minimum critical power ratio is calculated, the minimum critical power ratio inside each area comprising the sixteen fuel bundles is calculated, and the minimum critical power ratio of the core is the smallest value among the minimum critical power ratios ACPR(M) calculated for each area. The minimum critical power ratio inside the area M is calculated by correcting the minimum critical output ratio CCPR(M) of the area M, that is calculated by the core monitoring system, by the mean value ALPRM(M) of the present LPRM of the area M and the LPRM mean value CLPRM(M) at the time of calculation of the area M by the core monitoring system, and by executing also the correction AC(M) in accordance with the change of the control rod position from the start of the calculation of the core monitoring system as well as the change in the core flow rate. The calculation formula of the minimum critical power ratio by the automatic thermal limit monitor is represented by the following expression (2):[0028]
  • ACPR(M)=CCPR(MCLPRM(M)/ALPRM(MAC(MAF(M)  (2)
  • Here, the LPRM mean values ALPRM(M) and CLPRM(M) are the mean values of twelve LPRMs other than the LPRM of the A level as shown in FIG. 4. [0029]
  • FIG. 5 shows an example of the changes, with time, of the maximum linear heat generation rate calculated by the [0030] core monitoring system 12 and the maximum linear heat generation rate calculated by the automatic thermal limit monitor 11. Though the maximum linear heat generation rate will be explained hereinafter, the explanation holds true of the minimum critical power ratio. In FIG. 5, the core monitoring system 12 calculates the maximum linear heat generation rate in the 10-minute cycle, and the automatic thermal limit monitor 11 executes the brief calculation of the maximum linear heat generation rate between the calculations by the core monitoring system 12. As can be understood from FIG. 5, calculation accuracy of the maximum linear heat generation rate, that is briefly calculated by the automatic thermal limit monitor 11, gets gradually deteriorated immediately after the calculation by the core monitoring system 12. The calculation error reaches the maximum immediately before the next calculation by the core monitoring system 12 and calculation accuracy is again improved immediately after this calculation.
  • As shown in FIG. 5, the automatic thermal limit monitor [0031] 11 is designed in such a fashion that the calculation value of the maximum linear heat generation rate becomes conservative. Therefore, a smaller value is set to the automatic thermal limit monitor 11 so as to secure a certain margin with respect to the practical thermal limit value. For this reason, the maximum linear heat generation rate calculated by the automatic thermal limit monitor 11 is likely to exceed the thermal limit value when the core condition exists in the proximity of the thermal limit value, or when the operation quantity of the fuel rods is great during the calculation by the core monitoring system 12.
  • When the maximum linear heat generation rate reaches the thermal limit value as indicated by the point A in the drawing, the automatic thermal limit monitor [0032] 11 judges that the maximum linear heat generation rate exceeds the thermal limit value and outputs the operation hold instruction to the automatic power regulator system 13 ( steps 307 and 308 in FIG. 3). Thereafter, when the calculation result by the core monitoring system 12 does not exceed the thermal limit value as indicated by the point B, the automatic thermal limit monitor 11 outputs the operation hold release instruction to the automatic power regulator system 13 ( steps 303, 309 and 310). Incidentally, when the calculation result by the core monitoring system 12 exceeds the thermal limit value, the automatic thermal limit monitor 11 outputs the automatic operation exclusion instruction to the automatic power regulator system 13 (steps 303 and 304).
  • As described above, the operation hold instruction, the operation hold release instruction and the automatic operation exclusion instruction outputted from the automatic thermal limit monitor [0033] 11 are all outputted to the automatic power regulator system 13. Incidentally, a plant activation collective monitoring system 14 instructs at each break point a target electric output and an electric output change ratio to the automatic power regulator system 13 as shown in FIG. 1.
  • FIG. 6 is a flowchart showing the processing content of the automatic [0034] power regulator system 13. At the first step 601, whether or not the automatic operation exclusion instruction is inputted from the automatic thermal limit monitor 11 is judged, and the flow proceeds to the step 602 when the automatic operation exclusion instruction is inputted, and to the step 603 when it is not inputted. The link of the automatic power regulator system 13 with the control rod control system 15 and with the re-circulation flow control system 16 is cut off at the step 602. When the link is cut off, the control rod control system 15 and the re-circulation flow control system 16 cannot be controlled any longer from the automatic power regulator system 13. To execute again the automatic power regulation by the automatic power regulator system 13, the link of the automatic power regulator system 13 with the control rod control system 15 and with the re-circulation flow control system 16 must be established once again, and the intervention of the operators becomes necessary.
  • At the [0035] step 603, whether or not the operation hold instruction is inputted from the automatic thermal limit monitor 11 is judged, and the flow proceeds to the step 605 when the operation hold instruction is inputted and to the step 604 when it is not. When the flow proceeds from the step 603 to the step 604, the present electric output data are fetched from the plant. Next, a PI process is executed at the next step 606 by using the error between the present electric output so fetched and the target electric output inputted from the plant activation collective monitor system 14. The control rod operation or the re-circulation flow rate operation is carried out at the next step 607 on the basis of the result of the PI process of the step 606 so that the output can rise from the present electric output to the target electric output at a given electric output change ratio. The control rod operation is carried out by outputting the rod pull-out instruction/rod insertion instruction to the control rod control system 15, while the re-circulation flow rate operation is carried out by outputting a flow rate set value to the re-circulation flow control system 16.
  • When the flow proceeds from the [0036] step 603 to the step 605, the instructions from the automatic power regulator system 13 to the control rod control system 15 and to the re-circulation flow control system 16 are held. In this holding state, the link of the automatic power regulator system 13 with the control rod control system 15 and with the re-circulation flow control system 16 remains established. At the next step 608, whether or not the operation hold release instruction is inputted from the automatic thermal limit monitor 11 is judged. The flow proceeds to the step 609 when the operation hold release instruction is inputted, and the hold state is released at this step 609. When the operation hold release instruction is not judged as being inputted at the step 608, on the other hand, the process of the step 608 is repeated until the operation hold release instruction is inputted.
  • After the hold state is released at the [0037] step 609, the present electric output data is fetched from the plant at the step 610. A tie-back process (initialization process) is executed at the next step 611. Because the process returns to the normal PI control by the tie-back process, the control of the control rod and the re-circulation flow rate is started once again.
  • The control [0038] rod control system 15 controls the control rods by controlling the motor drive control circuit 7 in accordance with the rod pull-out instruction/insertion instruction that is inputted, and the re-circulation flow control system 16 controls the motor speed control circuit 10 on the basis of the inputted flow rate set value. The motor drive control circuit 7 and the motor speed control circuit 10 control the control rods 3 and the internal pump 8, respectively.
  • In the embodiment described above, when at least one of the maximum linear heat generation rate and the minimum critical power ratio determined by the brief calculation exceeds the thermal limit value, the control signal is held while the link of the automatic [0039] power regulator system 13 with the control rod control system 15 and the re-circulation flow control system 16 remains established. Therefore, this embodiment can prevent the increase of the reactor output and can smoothly start once again the control of the control rods and the re-circulation flow rate without the necessity for re-establishing the link when the calculation result of the maximum linear heat generation rate and the minimum critical power ratio obtained subsequently by the core monitoring system 12 is below the thermal limit values. In other words, this embodiment can easily execute the automatic output regulation by the automatic power regulator system 13 even when the maximum linear heat generation rate and the minimum critical power ratio are determined by the brief calculation in a short cycle. Particularly when the core condition is in the proximity of the limit values, the possibility of the occurrence of the phenomena described above is high, and this embodiment is effective for continuation of the automatic operation.
  • If the maximum linear heat generation rate and the minimum critical power ratio that are determined accurately by the [0040] core monitoring system 12 are below the thermal limit values while the automatic power regulator system 13 is holding the control signal, automatic output regulation can be continued by stopping the holding operation of the control signal by the automatic power regulator system 13 if the actual maximum linear heat generation rate and the actual minimum critical power ratio are below the set values.
  • Furthermore, if at least one of the maximum linear heat generation rate and the minimum critical power ratio that are accurately determined by the [0041] core monitoring system 12 exceeds the thermal limit value while the automatic power regulator system 13 is holding the control signal, automatic output regulation can be stopped by stopping the output of the control signal in the automatic power regulator system 13 when the actual maximum linear heat generation rate and the actual minimum critical power ratio exceed the thermal limit values.
  • To quickly stop the control of the control rod and the core flow rate when exclusion of the automatic operation is required, the automatic thermal limit monitor [0042] 11 may directly output the operation stop signal to the control rod control system 15 and to the re-circulation flow control system 16.
  • When the [0043] LPRM 4 as one of the means for detecting the plant data gets out of order such as short-circuit, the automatic thermal limit monitor 11 cannot calculate the maximum linear heat generation rate and the minimum critical power ratio. Therefore, the operation hold instruction may be given to the automatic power regulator system 13 in this case, too. If the calculation result by the core monitoring system 12 does not exceed the thermal limit value after bypassing the LPRM 4 which is out of order, the operation hold release instruction may be given to the automatic power regulator system 13.
  • In this embodiment, the calculation of the maximum linear heat generation rate and the minimum critical power ratio in the [0044] core monitoring system 12 is made periodically (every 10 minutes). However, it is also possible to output a signal that requests the calculation of the maximum linear heat generation rate and the minimum critical power ratio to the core monitoring system 12 when the automatic thermal limit monitor 11 outputs the operation hold instruction to the automatic power regulator system 13, and to calculate the maximum linear heat generation rate and the minimum critical power ratio by the core monitoring system 12 upon receiving this request signal. Since it becomes possible by so doing to immediately judge whether or not the automatic output regulation is to be continued in the hold state of the automatic power regulator system 13, the automatic output regulation can be executed more smoothly.

Claims (13)

1. A control system of a nuclear power plant comprising:
a core monitoring system for determining a maximum linear heat generation rate and a minimum critical power ratio in a certain time interval;
an automatic thermal limit monitor for determining said maximum linear heat generation rate and said minimum critical power ratio by utilizing said maximum linear heat generation rate and said minimum critical power ratio determined by said core monitoring system when calculation of said maximum linear heat generation rate and said minimum critical power ratio by said core monitoring system is not effected, comparing said maximum linear heat generation rate and said minimum critical power ratio so determined with thermal limit values set in advance for them, respectively, and outputting an operation hold instruction when at least one of said maximum linear heat generation rate and said minimum critical power ratio exceeds said thermal limit values; and
an automatic power regulator system for outputting control signals to a re-circulation flow control system for controlling a re-circulation flow rate of a reactor and to a control rod control system for controlling the positions of control rods, and holding said control signals when said automatic thermal limit monitor outputs said operation hold instruction.
2. A control system of a nuclear power plant according to claim 1, wherein said automatic thermal limit monitor compares said maximum linear heat generation rate and said minimum critical power ratio determined by said core monitoring system with said thermal limit values, respectively, and outputs an operation hold release instruction when said maximum linear heat generation rate and said minimum critical power ratio are below said thermal limit values, and said automatic power regulator system stops the holding operation of said control signals when said automatic thermal limit monitor outputs said operation hold release instruction.
3. A control system of a nuclear power plant according to claim 1, wherein said automatic thermal limit monitor compares said maximum linear heat generation rate and said minimum critical power ratio determined by said core monitoring system with said thermal limit values, respectively, after said operation hold instruction is outputted, and outputs an automatic operation exclusion instruction when at least one of said maximum linear heat generation rate and said minimum critical power ratio exceeds said thermal limit value, and said automatic power regulator system stops the output of said control signals when said automatic thermal limit monitor outputs said automatic operation exclusion instruction.
4. A control system of a nuclear power plant according to claim 1, wherein said automatic thermal limit monitor compares said maximum linear heat generation rate and said minimum critical power ratio determined by said core monitoring system with said thermal limit values, respectively, after said operation hold instruction is outputted, and outputs an operation stop instruction to said re-circulation flow control system and to said control rod control system when at least one of said maximum linear heat generation rate and said minimum critical power ratio is below said thermal limit values.
5. A control system of a nuclear power plant according to claim 1, wherein said automatic thermal limit monitor judges whether or not said plant data is abnormal, outputs an operation hold instruction to said automatic power regulator system when said plant data is judged as abnormal, and outputs an operation hold release instruction to said automatic power regulator system when abnormality of said plant data is thereafter restored, or when said plant data is bypassed and moreover, when said maximum linear heat generation rate and said minimum critical power ratio determined by said core monitoring system are below said thermal limit values.
6. A control system of a nuclear power plant according to claim 2, wherein said automatic thermal limit monitor judges whether or not said plant data is abnormal, outputs an operation hold instruction to said automatic power regulator system when said plant data is judged as abnormal, and outputs an operation hold release instruction to said automatic power regulator system when abnormality of said plant data is thereafter restored, or when said plant data is bypassed and moreover, when said maximum linear heat generation rate and said minimum critical power ratio determined by said core monitoring system are below said thermal limit values.
7. A control system of a nuclear power plant according to claim 3, wherein said automatic thermal limit monitor judges whether or not said plant data is abnormal, outputs an operation hold instruction to said automatic power regulator system when said plant data is judged as abnormal, and outputs an operation hold release instruction to said automatic power regulator system when abnormality of said plant data is thereafter restored, or when said plant data is bypassed and moreover, when said maximum linear heat generation rate and said minimum critical power ratio determined by said core monitoring system are below said thermal limit values.
8. A control system of a nuclear power plant according to claim 4, wherein said automatic thermal limit monitor judges whether or not said plant data is abnormal, outputs an operation hold instruction to said automatic power regulator system when said plant data is judged as abnormal, and outputs an operation hold release instruction to said automatic power regulator system when abnormality of said plant data is thereafter restored, or when said plant data is bypassed and moreover, when said maximum linear heat generation rate and said minimum critical power ratio determined by said core monitoring system are below said thermal limit values.
9. A control system of a nuclear power plant according to claim 1, wherein said automatic thermal limit monitor outputs a signal requesting the calculation of said maximum linear heat generation rate and said minimum critical power ratio to said core monitoring system when it outputs said operation hold instruction to said automatic power regulator system.
10. A method of controlling a nuclear power plant comprising the steps of:
determining a maximum linear heat generation rate and a minimum critical power ratio by a core monitoring system;
determining a maximum linear heat generation rate and a minimum critical power ratio by utilizing said maximum linear heat generation rate and said minimum critical power ratio determined by said core monitoring system and plant data when the calculation of said maximum linear heat generation rate and said minimum critical power ratio is not effected by said core monitoring system;
comparing said maximum linear heat generation rate and said minimum critical power ratio so determined with thermal limit values set in advance for them, respectively; and
holding a control signal outputted from an automatic power regulator system to a re-circulation flow control system and to a control rod control system when at least one of said maximum linear heat generation rate and said minimum critical power ratio exceeds said thermal limit values.
11. A method of controlling a nuclear power plant according to claim 10, further comprising the steps of:
determining said maximum linear heat generation rate and said minimum critical power ratio by said core monitoring system under the state where said control signal outputted from said automatic power regulator system is held;
comparing said maximum linear heat generation rate and said minimum critical power ratio so determined with said thermal limit values; and
stopping holding of said control signal in said automatic power regulator system when said maximum linear heat generation rate and said minimum critical power ratio are below said thermal limit values.
12. A method of controlling a nuclear power plant according to claim 10, further comprising the steps of:
determining said maximum linear heat generation rate and said minimum critical power ratio by said core monitoring system under the state where said control signal outputted from said automatic power regulator system is held;
comparing said maximum linear heat generation rate and said minimum critical power ratio so determined with said thermal limit values; and
stopping the output of said control signal in said automatic output regulator system when at least one of said maximum linear heat generation rate and said minimum critical power ratio exceeds said thermal limit values.
13. A program for use in a control method of a nuclear power plant, comprising:
a process portion for determining a maximum linear heat generation rate and a minimum critical power ratio by a core monitoring system;
a process portion for determining a maximum linear heat generation rate and a minimum critical power ratio by utilizing said maximum linear heat generation rate and said minimum critical power ratio determined by said core monitoring system and plant data when the calculation of said maximum linear heat generation rate and said minimum critical power ratio by said core monitoring system is not effected;
a process portion for comparing said maximum linear heat generation rate and said minimum critical power ratio so determined with thermal limit values set in advance for them, respectively; and
a process portion for holding a control signal outputted from an automatic power regulator system to a re-circulation flow control system and to a control rod control system when at least one of said maximum linear heat generation rate and said minimum critical power ratio exceeds said thermal limit values.
US09/345,737 1998-07-02 1999-07-01 Control system of nuclear power plant, and control method thereof Expired - Lifetime US6477218B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US10/038,616 US6553090B2 (en) 1998-07-02 2002-01-08 Control system of nuclear power plant, and control method thereof

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP18713598A JP3924932B2 (en) 1998-07-02 1998-07-02 Nuclear plant control system
JP10-187135 1998-07-02

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US10/038,616 Division US6553090B2 (en) 1998-07-02 2002-01-08 Control system of nuclear power plant, and control method thereof

Publications (2)

Publication Number Publication Date
US20020154724A1 true US20020154724A1 (en) 2002-10-24
US6477218B1 US6477218B1 (en) 2002-11-05

Family

ID=16200748

Family Applications (2)

Application Number Title Priority Date Filing Date
US09/345,737 Expired - Lifetime US6477218B1 (en) 1998-07-02 1999-07-01 Control system of nuclear power plant, and control method thereof
US10/038,616 Expired - Lifetime US6553090B2 (en) 1998-07-02 2002-01-08 Control system of nuclear power plant, and control method thereof

Family Applications After (1)

Application Number Title Priority Date Filing Date
US10/038,616 Expired - Lifetime US6553090B2 (en) 1998-07-02 2002-01-08 Control system of nuclear power plant, and control method thereof

Country Status (2)

Country Link
US (2) US6477218B1 (en)
JP (1) JP3924932B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030128793A1 (en) * 2001-09-27 2003-07-10 Kabushiki Kaisha Toshiba Incore monitoring method and incore monitoring equipment
US20120140864A1 (en) * 2004-04-23 2012-06-07 Farawila Yousef M Protection of reactor cores from unstable density wave oscillations
US9570203B2 (en) 2010-05-28 2017-02-14 Kabushiki Kaisha Toshiba Nuclear reactor power monitor

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7177383B2 (en) * 2004-02-02 2007-02-13 James Hardy Method and system for safety regulation in nuclear power regulating systems
US7804929B2 (en) * 2004-12-23 2010-09-28 Global Nuclear Fuel-Americas, Llc Method and system for calculating rod average criteria
US8811563B2 (en) * 2004-12-30 2014-08-19 General Electric Company Method and system for assessing failures of fuel rods
US7633531B2 (en) 2006-12-31 2009-12-15 General Electric Company Systems and methods for quantitatively assessing the quality of an image produced by an imaging system
US20080219394A1 (en) * 2007-03-08 2008-09-11 Mccord Richard D Method and system for calculating an adjusted peak nodal power in a nuclear reactor
SE532185C2 (en) * 2007-04-10 2009-11-10 Westinghouse Electric Sweden Method of operating a reactor at a nuclear plant
JP5502509B2 (en) 2010-01-28 2014-05-28 株式会社東芝 Core thermal limit value monitoring apparatus, core monitoring system, and core thermal limit value monitoring method
US20110311013A1 (en) * 2010-06-21 2011-12-22 Lockheed Martin Corporation System and apparatus for plant monitoring and control
CN102298979A (en) * 2011-07-19 2011-12-28 中广核工程有限公司 Signal default value verification method for digital instrument control system of nuclear power plant and system
JP6139074B2 (en) * 2012-08-13 2017-05-31 三菱重工業株式会社 Reactor monitoring device and reactor control device
CN106710651B (en) * 2015-11-16 2018-05-08 大亚湾核电运营管理有限责任公司 A kind of method and system for showing nuclear power station center accident condition transition

Family Cites Families (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5427520B2 (en) 1974-12-11 1979-09-10
JPS51117295A (en) * 1975-04-07 1976-10-15 Hitachi Ltd Process of operating a nuclear reactor
US4079236A (en) * 1976-03-05 1978-03-14 Westinghouse Electric Corporation Method and apparatus for monitoring the axial power distribution within the core of a nuclear reactor, exterior of the reactor
JPS5552997A (en) 1978-10-13 1980-04-17 Tokyo Shibaura Electric Co Reactor control device
JPS5552998A (en) * 1978-10-16 1980-04-17 Hitachi Ltd Reactor recirculation flow rate control device
JPS55149900A (en) * 1979-05-11 1980-11-21 Hitachi Ltd Power control device for bwr type reactor
JPS5739395A (en) * 1980-08-22 1982-03-04 Hitachi Ltd Method and device for operating safely nuclear reactor
JPS59155791A (en) 1983-02-25 1984-09-04 日本原子力事業株式会社 Reactor thermal margin monitoring device
JPS6076689A (en) 1983-10-03 1985-05-01 日本原子力事業株式会社 Reactor thermal allowance diagnostic device
US4707324A (en) * 1984-12-27 1987-11-17 Westinghouse Electric Corp. Controlling the response of a pressurized water reactor to rapid fluctuations in load
US4678622A (en) * 1985-08-20 1987-07-07 General Electric Company Transient monitor for nuclear reactor
US4774049A (en) * 1986-04-10 1988-09-27 Westinghouse Electric Corp. Two and three dimensional core power distribution monitor and display
JPS63121794A (en) 1986-11-11 1988-05-25 株式会社東芝 Thermal allowance monitor device for nuclear reactor
US5009833A (en) * 1989-01-11 1991-04-23 Westinghouse Electric Corp. Expert system for surveillance, diagnosis and prognosis of plant operation
US5091139A (en) * 1989-06-26 1992-02-25 General Electric Company Automated thermal limit monitor
JPH0760195B2 (en) * 1989-08-25 1995-06-28 株式会社日立製作所 Nuclear power plant operation control system
JP2931658B2 (en) 1990-10-18 1999-08-09 株式会社東芝 Thermal limit monitor
US5174946A (en) 1991-01-22 1992-12-29 General Electric Company Oscillation power monitoring system and method for nuclear reactors
JP2670400B2 (en) * 1991-11-11 1997-10-29 株式会社東芝 Monitoring equipment for nuclear power plants
JPH063476A (en) 1992-06-23 1994-01-11 Toshiba Corp Regulating equipment of reactor power
US5309485A (en) * 1992-07-06 1994-05-03 General Electric Company Core automated monitoring system
TW227064B (en) * 1992-12-02 1994-07-21 Combustion Eng
JPH07294679A (en) 1994-04-28 1995-11-10 Toshiba Corp Reactor recirculation flow controller
US5528639A (en) * 1994-08-01 1996-06-18 General Electric Company Enhanced transient overpower protection system
US5555279A (en) * 1994-11-16 1996-09-10 Nir; Israel System for monitoring and controlling nuclear reactors
JPH08179078A (en) 1994-12-19 1996-07-12 Toshiba Corp Nuclear power plant monitoring device
JPH09159794A (en) 1995-12-07 1997-06-20 Toshiba Corp Reactor output controller in bwr nuclear power plant
US5912933A (en) * 1997-12-04 1999-06-15 General Electric Company Method and system for direct evaluation of operating limit minimum critical power ratios for boiling water reactors

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030128793A1 (en) * 2001-09-27 2003-07-10 Kabushiki Kaisha Toshiba Incore monitoring method and incore monitoring equipment
US6744840B2 (en) * 2001-09-27 2004-06-01 Kabushiki Kaisha Toshiba Incore monitoring method and incore monitoring equipment
US20120140864A1 (en) * 2004-04-23 2012-06-07 Farawila Yousef M Protection of reactor cores from unstable density wave oscillations
US8576975B2 (en) * 2004-04-23 2013-11-05 Areva Np Inc. Protection of reactor cores from unstable density wave oscillators
US9570203B2 (en) 2010-05-28 2017-02-14 Kabushiki Kaisha Toshiba Nuclear reactor power monitor

Also Published As

Publication number Publication date
US20020067790A1 (en) 2002-06-06
US6477218B1 (en) 2002-11-05
JP3924932B2 (en) 2007-06-06
US6553090B2 (en) 2003-04-22
JP2000019287A (en) 2000-01-21

Similar Documents

Publication Publication Date Title
US6477218B1 (en) Control system of nuclear power plant, and control method thereof
US5268939A (en) Control system and method for a nuclear reactor
US4440715A (en) Method of controlling nuclear power plant
US5293411A (en) Nuclear reactor power control method and device
US20120140864A1 (en) Protection of reactor cores from unstable density wave oscillations
EP3046111B1 (en) Nuclear reactor power regulator and method
US9099207B2 (en) System, method, and program for monitoring reactor core
JP3304856B2 (en) Control rod control method and control rod automatic controller
JP2007232541A (en) Reactor power controller and its method
JP4707826B2 (en) Boiling water reactor monitoring and control system
JPS63217299A (en) Method of detecting falling of anti-reaction element in nuclear reactor for nuclear power plant and nuclear power plant having protective means to said falling
JPH05256978A (en) Nuclear reactor protection device
JP2627524B2 (en) Water supply control device for nuclear power plant
GB2573608A (en) Load following and frequency control system and nuclear power plant having such system
JPH102987A (en) Reactor core monitor for nuclear reactor
JPH0415439B2 (en)
JP2022142929A (en) Nuclear reactor monitor method and nuclear reactor monitor device
JPH053557B2 (en)
JPS5810718B2 (en) How to control the operation of a nuclear reactor
JPS5916674B2 (en) Reactor power control device
JPS61134699A (en) Load follow-up controller for boiling water type nuclear power plant
JPS61295401A (en) Controller for feed pump
JPH0432799A (en) Nuclear reactor operation area limiting device
JPH04208899A (en) Reactor scram device
JPS61223697A (en) Output controller for nuclear reactor in nuclear power plant

Legal Events

Date Code Title Description
AS Assignment

Owner name: HITACHI, LTD., JAPAN

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:FUKASAWA, YUKIHISA;REEL/FRAME:010089/0628

Effective date: 19990618

STCF Information on status: patent grant

Free format text: PATENTED CASE

FEPP Fee payment procedure

Free format text: PAYOR NUMBER ASSIGNED (ORIGINAL EVENT CODE: ASPN); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

FPAY Fee payment

Year of fee payment: 4

AS Assignment

Owner name: HITACHI-GE NUCLEAR ENERGY, LTD., JAPAN

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:HITACHI, LTD.;REEL/FRAME:019881/0466

Effective date: 20070907

FEPP Fee payment procedure

Free format text: PAYER NUMBER DE-ASSIGNED (ORIGINAL EVENT CODE: RMPN); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

FPAY Fee payment

Year of fee payment: 8

FPAY Fee payment

Year of fee payment: 12