US1858976A - Dike - Google Patents

Dike Download PDF

Info

Publication number
US1858976A
US1858976A US458996A US45899630A US1858976A US 1858976 A US1858976 A US 1858976A US 458996 A US458996 A US 458996A US 45899630 A US45899630 A US 45899630A US 1858976 A US1858976 A US 1858976A
Authority
US
United States
Prior art keywords
pile
dike
piles
river
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US458996A
Inventor
Joseph H Thornley
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US458996A priority Critical patent/US1858976A/en
Application granted granted Critical
Publication of US1858976A publication Critical patent/US1858976A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/02Stream regulation, e.g. breaking up subaqueous rock, cleaning the beds of waterways, directing the water flow

Definitions

  • the present invention relates to dikes and has particular relation to such structures erected in a river bed'for controlling the channel thereof.
  • a further object of the invention is to provide a structure which will develop an enormous resistance to uplift so that there will be no possibility of the piles being raised by the lifting of ice caps due to rising water.
  • a further object is to avoid the destructive sawing and battering by ice pans or Hoes impinging against the dike.
  • the steel and concrete construction of the present dike is proof against this action.
  • Figure 2 is an end or profile view of the dike structure, illustrating one of the A frames which are located at spaced points outwardly along the length of the dike, and
  • Figure 3 is a fragmentary side view of a portion of the dike structure, illustrating the inter-connection between the frames.
  • the dilres 6 may be extended out into the river varying distances, in some instances to a half mile or more, depending upon the particular conditions. As previously described, these dikes function as a barrier which brushes up with an accumulation of driftwood and other dbris until there has been sufficient retardation of the current to cause a sedimentary deposit sufficient to make a bar which narrows the channel of the river.
  • the lower portions of said frame bars are embedded in concrete shafts or columns 13 and 14, each of which terminates at its lower end in mushroom or pedestal base portion l5 and 16 into which the frame bars 9 and l0 also extend.
  • a casing is first driven down into the river bed at the desired angle for one of the legs, through the operation of a specially constructed pile driver arranged for performing driving operations on the incline.
  • the frame bar After sinking this casing to the desired depth, which will vary with conditions but will probably be generally in the neighborhood of thirty feet below the river bottom for a fifteen foot high water level, the frame bar is lowered into the casing and concrete is then poured into the casing to form the outer concrete sheath 13 or 14 enclosing the frame bar.
  • the enlarged mushroom portion l5 or 16 can be made by the performance of the method disclosed in my prior Patent No. 1,775,217, granted September 9, 1930, it being noted that the steel bar 9 or 10 extends into and is anchored in this mushroom base.
  • the casing is then Withdrawn and the derrick structure is moved to again drive or sink the casing at the desired reverse angle for the other leg of the frame structure, the same operation being repeated for this leg.
  • one leg may be o'set slightly with respect to the other to facilitate the connection of the intersecting upper ends of the bars 9 and 10, through the gusset plate 12, but this offset relation is not essential owing to the lateral give in the long lengths of the legs which enables the intersecting upper ends of the bars to be'spread to opposite sides of the gusset plate, substantially as shown.
  • the concrete may be conned to the lower portion of each leg or only to the pedestal forming charge 15 and 16.'
  • a frames are erected at spaced points along the intended line of the dike at distances to meet local conditions but probably ranging anywhere from eighteen to forty feet apart. Because the calculated resistance value of one of these A frames equals that of approximately sixty average wood piles it will be evident that these A frames can be spaced much further apart than wood pile groups.
  • connecting members for-the purpose of intercepting brush and other debris, such connecting members preferably consisting of I-beam or channel stringers 18. These stringers are bolted or otherwise1 suitably joined to the frame bars 9 and 10 and to the gusset plate 12.
  • Stringer bars may be disposed either on the upstream or downstream legs of the A frame, although in the preferred arrangement shown I dispose some of these stringers on both legs but on the downstream side of the front leg 9 so as to permit ice to slide upwardly over this leg easier. Hog wire or thelike may also be used in lieu of or with the stringere, if desired. According to my improved method of progressively building the desired depth of bar a certain amount each year, I propose screening only the lower portions of the A frames the first year, that is, the stringers 18 are only applied to a limited height, say in the neighborhood of three or four feet.
  • the screening is carried progressively igher each year or other time interval by the addition of higher stringers 18, until the full height of the required sedimentary bar has been deposited.
  • This progressive method greatly reduces the action of scour because at no one time is there a very large differential between the water levels on the up stream and down stream sides of the dike.
  • the existence of a large differential between levels sets up a considerable waterfall on the back side of the dike, creating a turbulence, cross currents and eddys which frequently tendv to scour out the soil along the line of the dikes.
  • extension portions 22 which may be secured in place in the initial erection of the frames or which may be added later for continuing the sedimentary bar up to a greater height.
  • extension members also preferably consist of bars of standard section, such as I-beams or channels, and are bolted to the projecting upper portions 12 of the gusset plates 12. In localities subjected to ice conditions it is of advantage to dispose this extension member 22 at a rearwardly extending angle, such as, for example, (3o-extensive with the inclined front leg 9 of the frame.
  • This tension value in the front leg together with the high compression value in the rear leg, establishes a resistance moment normal to the plane of the stream, of a value which cannot possibly be obtained by cantilever reaction in any structure of moderate or permissible dimensions. Moreover ⁇ this resistance moment is practically unaffected by the depth of the water, wherea s in the ordinary cantilever reaction pile this depth is a vital factor when it increases the distance between the fulcrum and the load. Another important load bearing value arises Jfrom the rigidity of the connection between the upper portions of the piles. As previously described.
  • the gusset plate 12 rigidly joins both piles together, which gusset plate may be of any area, and the pile beams 9 and 10 may also be lapped and bolted t0- gcther.
  • the rigidity of this connection compels all of the parts of the A frame to act as a rigid unit in resisting any rotative tipping tendency.
  • the force of the stream has a tendency to tilt the dike backwardly with a rocking motion about a fulcrnm point corresponding substantially to the expanded pedestal portion 16 of the rearward pile 10.
  • any upward movement of either of the spread-foot anchorages 15 or 16 requires not only that the soil immediately above that anchorage must be displaced but also requires that all of the superposed soil. between the upwardly extending critical angles of the soil must be displaced. This is best illustrated by reference to the critical angles extending downwardly from each spread-foot anchorage when that anchorage is resisting downward forces. It is well known that the load bearing pressure is not confined to that vertically defined section of soil immediately beneath the anchorage but that this pressure is distributed downwardly and outwardly along inclined lines, so that the pressure is distributed over a conical section of soil defined between lines radiating outwardly and downwardly from the sides of the anchorage.
  • the 4angle of this conical section over which the load bearing ⁇ pressures are distributed is approximately the critical angle for that particular soil.
  • any upwardly acting force on one of the spread-foot anchorages is resisted by a conical section of earth defined between the critical angles radiating ⁇ outwardly and upwardly from the sides of the anchorage, and this conical section must be displaced in any upward movement of that anchorage.
  • the fore and aft spacing illustrated between the front and rear footings 15 and 16 in 2 establishes the wedge shaped inclination of the two legs 9 and 10, as previously described, and, in addition, this spacing avoids interference between the lcritical angles radiating upwardly from the two footings of each frame.
  • each A frame Since there is no interference between the critical angles extending upwardly from the two ancnorages of each A frame and since there is no interference between the critical angles at adja-l cent frame, each A frame has maximum tension value both for resisting straight upheaval stresses caused by ice and for resisting rocking stresses tending to tip the :trame backwardly by rocking the front pile upwardly. Also, the spacing illustrated between the front and rear ootings l5 and 16 of each A frame, resists this backward rocling force exerted on the frame by interposing a suiiicient span of soil between the two footings so that there can be no tendency for the soil to shift or migrate from the space under the downwardly pressing rear footing to the space under the upwardly pulling front footing. Y
  • a dike for creating a sedimentary control bar in a river including a plurality of I-shaned frame structures spaced laterally from each other along the line of the dike, each frame structure comprisingl front and rear steel piles having the major portions of their lengths extending into the soil below the river, said front pile being inclined with its upper end sloping downstream to react in tension, and said rear pile being inclined with its upper end sloping upstream to react in compression, an enlarged concrete pedestal portion on the lower portion of said front pile engaging in the river bed for resisting tension forces in said front pile, an enlarged concrete pedestal portion on the lower portion of said rear pile engaging in the river bed for resisting compression forces in said rear pile, concrete sheaths encasing both of said steel piles above said pedestal portions,-
  • a dike tor creating a sedimentary control bar in a river including aseries of shaped frame structures disposed in the general plane of the current at longitudinally spaced points along the length or' the dike, each oic said frame structures comprising a front pile having its upper endf inclined downstream and a rear pile having its upper end inclined upstream whereby said piles act respectively in tension and compression in resisting the force of the current, each ot' said piles comprisinga ianged steel bar and a shaft of concrete encasing the'lower portion of the bai ⁇ and being expanded outwardly at the lower end of the pile to form an enlarged mushroom base, the greater-part of the length of each pile extending below the bed of the river, the upper portions of said front and rear bars overlapping in angular relation, a gusset plate connected with the upper portions of both bars, and Stringer bars connected with the successive frame structures along the line of the dike to intercept brush and other dbris in the current.
  • a dike for creating a sedimentary control bar in a river including a series of A frame structures spaced laterally from each other along the line of the dike, each 'frame structure comprising a front pile inclined downstream to react in tension and a rear pile inclined upstream to react in compression, concrete sheaths encasing the major portions of both piles, enlarged concrete pedestal bases at the lower ends of both piles, the greater part of the length of each pile including the concrete sheath and pedestal base thereof being disposed below the bed of the .r ⁇ ver whereby said A frame structure is firm- 00' ly anchored against tension and compression.
  • means including a gusset plate rigidly joining the upper ends of said piles together whereby any tendency of the force of the stream to tilt the dike backwardly around the pedestal base of the rear pile as a ulcrum is resisted by the necessity of the front pile rotating forwardly and upwardly through its anchoring soil in any such tiltinv ⁇ action, and connecting means extending transversely between the upper portions oi' said :trame structures to intercept dbris in the stream.
  • a dike Jior creating a sedimentary control bar in a river including a series of A frame structures spaced laterally from each other along the line or" the dike, each frame structure comprising a front pile inclined downstream to react in tension and a rear pile inclined upstream to react in compression, enlarged concrete pedestal bases at the lower ends 01"' both piles, the greater part of the length of each pile including the pedestal base thereof being disposed below the bed of the river whereby said A frame is iirmly anchored against tension and compression, with the center of thereof considerably below the river bed, means rigidly joining the upper portions of said piles together whereby any tendency of the stream to tilt the frame structure backwardly around the pedestal base of the rear pile as a i'ulcrum is resisted by the necessity of the front pile rotating forwardly and upwardly through its anchoring soil in any such tilting action, and connecting means extending transversely between said i'rame structures to intercept dbris in the stream.
  • a dike for creating a sedimentary control bar in a river including a series of A frame structures spaced laterally from each other along the line of the dike, each frame structure comprising a front pile inclined downstream to react in tension and a rear pile inclined upstream to react in compression, concrete sheaths encasing the maj or portions o both piles, enlarged concrete pedestal bases at the lower ends of both piles, the greater part ot the length of each pile including the concrete sheath and pedestal base thereof being disposed below the bed of the river whereby said frame structure is rmly anchored against compression and tension, with the center of mass thereof disposed below the river bed, means rigidly joining the upper portions of said piles together whereby any tendency of the force of the stream to tilt the frame structure backwardly about the lower portion of the rear pile as a fulcrum is resisted by the necessity of the front pile rotating forwardly and upwardly through its anchoring soil in any such tilting action, connecting means extending transversely between said 'frame structures above the river bed to
  • a dike for creating a sedimentary control bar in a rive; ⁇ including a plurality of A-shaped frame structures spaced laterally from each other along the line of the dike by such intervals as to develop substantially the full strength of the anchorages of each frame structure, each frame structure comprising front and rear piles having their major portions extending into the soil below the river, said front pile being inclined downstream to react in tension and having an enlarged concrete pedestal portion on the lower portion thereof engaging in the river bed and providing an anchorage for resisting tension forces in said front pile, said rear 1;-, pile being inclined upstream to react in compression and having a bearing the value of which is as great as or greater than the value of the anchorage of said front pile, the lower ends of the piles of each A frame structure zo being disposed far enough apart to avoid interference between the reactions of said lower ends upon the river bed in which they are disposed, means rigidly joining the upper portions of said front and rear piles together,
  • a dike for creating a sedimentary control bar in a river including a plurality of 3H A-shaped frame structures spaced laterally from each other along the line of the dike by such intervals as to develop substantially the full strength of the anchorages of each frame structure, each frame structure' comprising front and rear piles having their major portions extending into the soil below the river, said front pile being inclined downstream to react in tension and having means projecting laterally from the lower portion .so thereof for establishing a tension resisting anchorage of said front pile in the river bed, said rear pile being inclined upstream to react in compression and having a bearing value as great as or greater than the anchorage value of said front pile, means rigidly joining the upper portions of said front and rear piles together, and connecting means extending transversely between said frame structures to intercept dbris in the stream. so In witness whereof I hereunto subscribe my name this 27th day of May, 1930.

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Description

May 1-7, 1932 J. H. THORNLEY 1,858,976
DIKE
VFiled June 2, 1950 f' 2527/022 20?".- @gnk/275W@ Patented May 17, 1932 STATES DIKE Application led June 2, 1930. Serial No. 458,996.
The present invention relates to dikes and has particular relation to such structures erected in a river bed'for controlling the channel thereof.
In a considerable part of the control work which has been carrie-d on thus far along rivers such as the Missouri and Mississippi, which inundate vast areas of the surrounding country and also shift their beds at high water levels, eorts are being made to crowd the river into a comparatively narrow channel so as to increase the rate of flow to the point where Va scour action will occur which will tend to deepen the channel and will largely eliminate the formation-of migratory bars or Shoals. The method now being used to narrow the channel is to extend dikes or jetties out from the bank of the river to the edge of the desired channel with the view to having these dike structures silt up from soil and dbris deposited by the river so as to form a control bar extending out approximately to the edge of the desired channel. This practice is followed most extensively at bends or curves of the river, where the dikes are eX- tended out from the convex side of the bend, and the opposite side is usually built up with a revetment. `Wherever the dilres silt up from the deposit of the river and form a bar the desired result is usually effected, but in a considerable proportion of cases the dike is swept out by floods or caried away by the ice before the required bar is formed.
The general practice is to construct these dikes of upright wood piles driven into the river bottom. In the group type of dike a group of piles, usually three in number, is driven, the piles being spaced four or i'ive feet between centers. After they have been driven the tops are drawn close together and bound with cables. The groups are spaced from ten to twenty feet apa-rt and the intermediate space usually is baiiled by stretching hog wire from group to group. In high water periods the baffled dike collects the dbris carried down by the floods and forms a more or less continuous Wing dam. As the Velocity of the current decreases this dam causes the deposit of silt, thus forming a bar. In the trussed type of dike the piles, generally four in number, are driven one behind the other in the general direction of the current, and the upper ends are connected together by horizontal and diagonal reenforcing members arranged like trestle bents. These trussed piles are then connected together transversely of the river current by hog wire, spans of cable or other dbris collecting means in substantially the same manner as .in the case of group dikes. ln erecting thesediles it is necessary in almost all cases to place mats of large area on the river bottom, usually directly behind the line of piles or pile groups, so as to prevent the current from scouring the soil out behind the piles during the early stages offorming the bars. 7
These methods of constructing dikes would be generally satisfactory if it were not for the large percentage of failures which occur before the necessary sedimentation has taken place to'fo'rm the desiredA bar. Failures of these wood pile dikes occur in various ways: (l) The piles act in cantilever and break at the fulcrum'point. The resistance value of Wood piles acting in cantilever under the condition described is small, whether they act singly or in groups.v
(2) rlhe trussed series of piles act as a unit and the tension pilesare pulled out. VIt will be evident that if the trussed groups are to act as a unit they must depend on a tension value in the forward piles. This is an incalculable value for a tapered pile in the silt of a river bottom, and is usually a small value. (3) Ice caps and flood Water raise the piles. If ice forms around the vpiles and is then lifted by rising water, the piles again depend on the tension value, which is generally small Vfor a tapered Wood pile, particularly in the silt and soft soil of a river bottom.l
(4) The piles are frequently sawed or out off by ice. If rough pans of ice are driven against wood piles at high velocity by flood water they will frequently chew or saw the piles off. VVood, particularly soft Wood, has poor resistance against this action.
(5)` Piles deteriorate by exposure and break under load. Wood piles, exposed as river dike piles are bound to be, to alternate wetting and drying, lose their strength very of the dike and so clear the structure.
rapidly. It is usually specified that a wood pile will not be accepted for driving if it has been cut more than three months.
Considerable experiment with these structures has demonstrated that if a wood pile dike has not filled by sedimentation within the first twelve months it has a greatly reduced chance 0f withstanding the second flood period. Generally by the end of the first year rubbish and drift will have screened the dike. A screened dike in fifteen feet or more of water is taking a tremendous load, if it has brushed up by the accumulation of rubbish and drift before there is any considerable sedimentation around the pile to support the dike. If the dike brushes up without filling it will act as al wing dam in the river. Cross currents will inevitably follow, scour will occur and the dike will go out. I have pointed out in considerable detail the structures of these prior river control dikes, and the causes of their failure, in order more effectively to show the requirements of such dike structures and the manner in which I overcome these prior difliculties.
One of the principal objectsof my invention is to provide a control dike which does not depend solely on a cantilever reaction in resisting flood conditions. The members of my improved dike act in direct tension and compression. In prior dikes with wood piles depending on a cantilever reaction for developing their movement of resistance there was always an uncertainty as to the depth of the center of fulcrum reaction but in the present type of dike structure herein disclosed this is no longer of any importance. The effect of scour, which in the previous dikes will cause the lowering of the fulcrum point with the resultant failure, is negligible in the present construction unless it goes to so great a depth as to destroy the bearing value ofthe piles, which would be a very exceptional condition. In the prior dikes the depth of water has a direct effect on the resistance of the dike because in those constructions the distance between the fulcrum and the load is the vital factor, but in my improved construction the depth of water has practically no effect on the resistance value of the dike.
A further object of the invention is to provide a structure which will develop an enormous resistance to uplift so that there will be no possibility of the piles being raised by the lifting of ice caps due to rising water.
A further objectis to avoid the destructive sawing and battering by ice pans or Hoes impinging against the dike. The steel and concrete construction of the present dike is proof against this action. In this regard, it is a further object to provide a structure which will tend to Vclear itself of the force of a heavy jam of ice, by tending to cause the ice to mount over the obstruction It will be evident that Jhe steel and concrete construction of my improved dike will be proof against rapid deterioration from .alternate exposure to wetting and drying. Such construction will last for many years even without painting or other attention, and in far less time than that the dike will have formed a bar and so served its purpose.
It is a further object of my invention to provide improved method by which the sedimentary bar can be built higher each year in a progressive operation until the full height of the required bar has been deposited. The danger of scour is thereby reduced to a minimum.
Other objects and features of my invention will be apparent from the following detailed description of a preferred embodiment thereof, taken in connection with the accompanying drawings, in which:
Figure 1 illustrates a typical river control project with the dilres extending outwardly from the bank on the convex side of a curve in the river.
Figure 2 is an end or profile view of the dike structure, illustrating one of the A frames which are located at spaced points outwardly along the length of the dike, and
Figure 3 is a fragmentary side view of a portion of the dike structure, illustrating the inter-connection between the frames.
In the typical installation represented in Figure l, the dilres 6 may be extended out into the river varying distances, in some instances to a half mile or more, depending upon the particular conditions. As previously described, these dikes function as a barrier which brushes up with an accumulation of driftwood and other dbris until there has been sufficient retardation of the current to cause a sedimentary deposit sufficient to make a bar which narrows the channel of the river.
In constructing these dilies I propose erecting at spaced points along the intended line of the dike a series of frame structures 8 having outwardly and downwardly inclined legs, resembling an it frame. Both of these legs 9 .and 10 consist of heavy steel bars, preferably of standard section, such as beams. Both of these beams are set edgewise to the current for maximum strength and their intersecting upper ends are lapped and joined together by a gusset plate 12 to which both beams are bolted.
The lower portions of said frame bars are embedded in concrete shafts or columns 13 and 14, each of which terminates at its lower end in mushroom or pedestal base portion l5 and 16 into which the frame bars 9 and l0 also extend. In erecting each of these A frame structures, a casing is first driven down into the river bed at the desired angle for one of the legs, through the operation of a specially constructed pile driver arranged for performing driving operations on the incline.
' the form of an A frame.
After sinking this casing to the desired depth, which will vary with conditions but will probably be generally in the neighborhood of thirty feet below the river bottom for a fifteen foot high water level, the frame bar is lowered into the casing and concrete is then poured into the casing to form the outer concrete sheath 13 or 14 enclosing the frame bar. The enlarged mushroom portion l5 or 16 can be made by the performance of the method disclosed in my prior Patent No. 1,775,217, granted September 9, 1930, it being noted that the steel bar 9 or 10 extends into and is anchored in this mushroom base. The casing is then Withdrawn and the derrick structure is moved to again drive or sink the casing at the desired reverse angle for the other leg of the frame structure, the same operation being repeated for this leg. If desired, one leg may be o'set slightly with respect to the other to facilitate the connection of the intersecting upper ends of the bars 9 and 10, through the gusset plate 12, but this offset relation is not essential owing to the lateral give in the long lengths of the legs which enables the intersecting upper ends of the bars to be'spread to opposite sides of the gusset plate, substantially as shown. It is preferable to lap the upper ends of these bars for the greater strength thereby afforded, but if desired the bars might terminate short of their intersection and be joined by a triangular gusset plate connected with both barsV below their upper ends.V The result is two inclined piles joined together in It is preferable to extend the encasing shaft of concrete 13 or 14 up to approximately the bed of the river, thereby increasing the weight of each leg,
but, if desired, the concrete may be conned to the lower portion of each leg or only to the pedestal forming charge 15 and 16.'
These A frames are erected at spaced points along the intended line of the dike at distances to meet local conditions but probably ranging anywhere from eighteen to forty feet apart. Because the calculated resistance value of one of these A frames equals that of approximately sixty average wood piles it will be evident that these A frames can be spaced much further apart than wood pile groups. As successive frames are erected they are joined together by suitable connecting members for-the purpose of intercepting brush and other debris, such connecting members preferably consisting of I-beam or channel stringers 18. These stringers are bolted or otherwise1 suitably joined to the frame bars 9 and 10 and to the gusset plate 12. These Stringer bars may be disposed either on the upstream or downstream legs of the A frame, although in the preferred arrangement shown I dispose some of these stringers on both legs but on the downstream side of the front leg 9 so as to permit ice to slide upwardly over this leg easier. Hog wire or thelike may also be used in lieu of or with the stringere, if desired. According to my improved method of progressively building the desired depth of bar a certain amount each year, I propose screening only the lower portions of the A frames the first year, that is, the stringers 18 are only applied to a limited height, say in the neighborhood of three or four feet. After the sedimentary bar has been deposited to this depth at the end of the first year or other time re uired, the screening is carried progressively igher each year or other time interval by the addition of higher stringers 18, until the full height of the required sedimentary bar has been deposited. This progressive method greatly reduces the action of scour because at no one time is there a very large differential between the water levels on the up stream and down stream sides of the dike. The existence of a large differential between levels sets up a considerable waterfall on the back side of the dike, creating a turbulence, cross currents and eddys which frequently tendv to scour out the soil along the line of the dikes. Heretofore, in attempting to overcome this scouring action it has been the practice to place mats of large area, composed of interwoven wood strips or the like, along the line of the dike in immediate proximity to the piles. These mats are an item of considerable expense to make and lay, and it will be evident that their eiiicacy is limited solely to the soil below the mats because any sedimentary deposit above the mat is just as susceptible to being scoured out as if the mat were not there. nthe case of the ordinary wood-piles it is of decided importance to prevent this scour because vof the relatively close proximity of the fulcrum point of each pile to the bed of the river and the decided weakening of the resistance value of the pile as soil is scoured out in rear of the pile down toward this fulcrum point. Because the pile structure of my invention does not depend on a cantilever reaction there is a much wider latitude, of permissible scouring action, being only limited by a depth of scour which would destroy the bearing values of the piles. Hence, the provision of these mats is not of such importance with my type of dike, and particularly if the sedimentary bar is built up progressively a limited amount each year. Where it is desirable to use such mats they are preferably disposed in front and in rear of the pile structures, substantially as indicated at 21 in Figure 2 and, if desired, small portions of mats may be disposed or extended in the space between the inclined legs 9 and l0.
Because of its metallic construction the present A frame pile structure is readily adapted to the provision of extension portions 22 which may be secured in place in the initial erection of the frames or which may be added later for continuing the sedimentary bar up to a greater height. These extension members also preferably consist of bars of standard section, such as I-beams or channels, and are bolted to the projecting upper portions 12 of the gusset plates 12. In localities subjected to ice conditions it is of advantage to dispose this extension member 22 at a rearwardly extending angle, such as, for example, (3o-extensive with the inclined front leg 9 of the frame. By virtue of this rearward inclination of the front frame bar 9, and of the extension 22 where the latter is used, there will be a tendency to deflect heavy jams of ice in an upward direction so that the ice can mount over the top of the dike and so clear the structure. Of course, with the addition or these extension inembers 22, supplementary stringers 18 will be secured thereto so that brush and dbris will be intercepted at the greater height of the extensions.
It will be evident that under ordinary conditions of resistance the upstream leg 9 of eacn A frame will be acting in tension and the downstream leg 10 will be acting in compression. In a composite steel and concrete construction such as I have shown the limiting factor .will not be the strength of the structure but rather the bearing and tensile values of the anchorages. These values will, however, inherently be very high without requiring objectionably large dimensions of frame structure or anchorages, as will be evidenced from the fact that under average conditions a pile having a thirty inch mushroom base will withstand an uplift tension in excess of ifty tons. This tension value in the front leg, together with the high compression value in the rear leg, establishes a resistance moment normal to the plane of the stream, of a value which cannot possibly be obtained by cantilever reaction in any structure of moderate or permissible dimensions. Moreover` this resistance moment is practically unaffected by the depth of the water, wherea s in the ordinary cantilever reaction pile this depth is a vital factor when it increases the distance between the fulcrum and the load. Another important load bearing value arises Jfrom the rigidity of the connection between the upper portions of the piles. As previously described. the gusset plate 12 rigidly joins both piles together, which gusset plate may be of any area, and the pile beams 9 and 10 may also be lapped and bolted t0- gcther. The rigidity of this connection compels all of the parts of the A frame to act as a rigid unit in resisting any rotative tipping tendency. For example, the force of the stream has a tendency to tilt the dike backwardly with a rocking motion about a fulcrnm point corresponding substantially to the expanded pedestal portion 16 of the rearward pile 10. However, because of the rigid, reinforced connection between the upper portions of the piles, the rearward pile cannot rock baclrwardly about said fulcrum point 16 without also swinging the front pile 9 about this same fulcrum point in a forward and upward direction. Obviously, such swinging motion of the front pile can only occur by displacing a large mass of soil in front of and above the pile, which would be impossible even under the most extreme conditions. Stability of anchorage of each A frame is also assured by reason of the fact that the center of mass of the combined weights of the pile beams, the concrete sheaths 13, 1li, and the concrete pedestals 15, 16 is considerably below the bed of the river, being in relatively close proximity to the pedestal ends 15, 16 because of the greater weight of the concrete. The resistance of the present piles to being raised by the lifting action of ice caps due to rising water is also very high. At this time the tension values of both pedestal bases and 16 are effective for resisting such lifting, but even in the absence oi t ese enlarged pedestal portions lifting would be almost impossible owing to the wedge-shaped inclination of the two legs tied togetherat their upper ends.
Attention is also directed to the fact that any upward movement of either of the spread-foot anchorages 15 or 16 requires not only that the soil immediately above that anchorage must be displaced but also requires that all of the superposed soil. between the upwardly extending critical angles of the soil must be displaced. This is best illustrated by reference to the critical angles extending downwardly from each spread-foot anchorage when that anchorage is resisting downward forces. It is well known that the load bearing pressure is not confined to that vertically defined section of soil immediately beneath the anchorage but that this pressure is distributed downwardly and outwardly along inclined lines, so that the pressure is distributed over a conical section of soil defined between lines radiating outwardly and downwardly from the sides of the anchorage. The 4angle of this conical section over which the load bearing` pressures are distributed is approximately the critical angle for that particular soil. In like manner any upwardly acting force on one of the spread-foot anchorages is resisted by a conical section of earth defined between the critical angles radiating` outwardly and upwardly from the sides of the anchorage, and this conical section must be displaced in any upward movement of that anchorage. The fore and aft spacing illustrated between the front and rear footings 15 and 16 in 2 establishes the wedge shaped inclination of the two legs 9 and 10, as previously described, and, in addition, this spacing avoids interference between the lcritical angles radiating upwardly from the two footings of each frame. That is to say, there is no appreciable, overlap of the conical sections above each footing, which would otherwise diminish the tension resisting values of the two iootings of each A frame. Likewise, in the plane of the dike, as viewed in Fig. 3, the individual A framesare spaced relatively far apart and hence there is no interference between the critical angles of the ootings of adjacent A frames, i. e., there is no overlap of the upwardly extending conical section of soil at one A frame with the conical section of soil at the next A frame. Since there is no interference between the critical angles extending upwardly from the two ancnorages of each A frame and since there is no interference between the critical angles at adja-l cent frame, each A frame has maximum tension value both for resisting straight upheaval stresses caused by ice and for resisting rocking stresses tending to tip the :trame backwardly by rocking the front pile upwardly. Also, the spacing illustrated between the front and rear ootings l5 and 16 of each A frame, resists this backward rocling force exerted on the frame by interposing a suiiicient span of soil between the two footings so that there can be no tendency for the soil to shift or migrate from the space under the downwardly pressing rear footing to the space under the upwardly pulling front footing. Y
It will be seen from the foregoing that I have provided a dike structure which opposes immeasurably greater resistance to the de-y structive action of flood water, ice, scour, etc. than the wood pile structure now employed.
L` This is of extreme importance because in some localities it has not been uncommon for a high percentage of the wood pile structures to be swept out by the second season?s iiood water or ice, through the failure of the dike to silt up an adequate height of bar during the iirst season following erection. With these wood pile structures every effort must be made to silt u a high control bar during the rst season lby providing a maximum depth of screening, and it this screening should brush up with dbris without depositing sufficient sediment the pile structure is subjected to very high pressures and to 1ntense scouring.
Because of the ability of the present dyke to withstand iinmeasurably greater forces the percentage of failures will be reduced to a minimum and it will not be of such importance to have the dike silt up during the lirst year. In fact, as I have described above, it may be desirable in some instances intentionally to build the control bar by small accretions of sediment successively deposited over several years, through progressive raising of the=height of screening.
While I have disclosed what I regard to bel the preferred form of my invention and what I `regard to be the best manner of carrying it into eect, it will vbe understood that such are merely exemplary and that numerous otlierstructures and practices may be adopted witho ut departing from the inhert features o j prising ront and rear piles having their major portions extending into the soil below f the river, said front pile being inclined downstream to react in tension andsaid rear pile being inclined upstream to `react in compression, means projecting laterally from the lower portion or' each front pile :tor establishing a tension resisting anchorage of said front pile in the river bed, means projecting laterally from the lower port-ion or each rear pile for establishing a compression resisting anchorage o said rear pile in the river bed, saidancnorages or' the piles or each A frame structure being disposed far enough apart to avoid interference between them, `means rigidly joining the upper portions of said iront and rear piles together, and connecting means extending transversely between said iframe structures to brace the same and to intercept dbris in the stream.
2. A dike for creating a sedimentary control bar in a river including a plurality of I-shaned frame structures spaced laterally from each other along the line of the dike, each frame structure comprisingl front and rear steel piles having the major portions of their lengths extending into the soil below the river, said front pile being inclined with its upper end sloping downstream to react in tension, and said rear pile being inclined with its upper end sloping upstream to react in compression, an enlarged concrete pedestal portion on the lower portion of said front pile engaging in the river bed for resisting tension forces in said front pile, an enlarged concrete pedestal portion on the lower portion of said rear pile engaging in the river bed for resisting compression forces in said rear pile, concrete sheaths encasing both of said steel piles above said pedestal portions,-
means rigidly joining the upper portionsy of said front and rear piles together, and connecting means extending transversely between i said frame structures to intercept dbris inthe stream, said concrete pedestal portions being spaced far enough from each other in alldirections substantially to avoid interference. l
" 3. The method of constructing and anchoring van A frame structure in the bed of ariver which comprises sinking a casing into the river bed at the desired angle to the vertical for one of the legs of the A frame structure,
- introducing concrete into said casing and forciblv expanding the concrete outwardly below the end of the casing to form an expanded pedestal portion, joining the lower end of a pile to said expanded pedestal portion, and sinking a casing into the river bed at a reverse inclination to the vertical for the otherpile and at an angle causing said latter pile to intersectthe line of the irst pile, introducingconcrete into said casing and forcibly expanding the concrete outwardly below the end of the casing to Jform an expanded pedestal portion, joining the lower end of a second pile toV said latter pedestal portion, and rigidly joining the upper port-ions or' said first and second piles together.
' el. A dike tor creating a sedimentary control bar in a river including aseries of shaped frame structures disposed in the general plane of the current at longitudinally spaced points along the length or' the dike, each oic said frame structures comprising a front pile having its upper endf inclined downstream and a rear pile having its upper end inclined upstream whereby said piles act respectively in tension and compression in resisting the force of the current, each ot' said piles comprisinga ianged steel bar and a shaft of concrete encasing the'lower portion of the bai` and being expanded outwardly at the lower end of the pile to form an enlarged mushroom base, the greater-part of the length of each pile extending below the bed of the river, the upper portions of said front and rear bars overlapping in angular relation, a gusset plate connected with the upper portions of both bars, and Stringer bars connected with the successive frame structures along the line of the dike to intercept brush and other dbris in the current. y
5. A dike for creating a sedimentary control bar in a river including a series of A frame structures spaced laterally from each other along the line of the dike, each 'frame structure comprising a front pile inclined downstream to react in tension and a rear pile inclined upstream to react in compression, concrete sheaths encasing the major portions of both piles, enlarged concrete pedestal bases at the lower ends of both piles, the greater part of the length of each pile including the concrete sheath and pedestal base thereof being disposed below the bed of the .r`ver whereby said A frame structure is firm- 00' ly anchored against tension and compression. with the center of mass thereof disposed considerably below the bed of the river, means including a gusset plate rigidly joining the upper ends of said piles together whereby any tendency of the force of the stream to tilt the dike backwardly around the pedestal base of the rear pile as a ulcrum is resisted by the necessity of the front pile rotating forwardly and upwardly through its anchoring soil in any such tiltinv` action, and connecting means extending transversely between the upper portions oi' said :trame structures to intercept dbris in the stream.
6. A dike Jior creating a sedimentary control bar in a river including a series of A frame structures spaced laterally from each other along the line or" the dike, each frame structure comprising a front pile inclined downstream to react in tension and a rear pile inclined upstream to react in compression, enlarged concrete pedestal bases at the lower ends 01"' both piles, the greater part of the length of each pile including the pedestal base thereof being disposed below the bed of the river whereby said A frame is iirmly anchored against tension and compression, with the center of thereof considerably below the river bed, means rigidly joining the upper portions of said piles together whereby any tendency of the stream to tilt the frame structure backwardly around the pedestal base of the rear pile as a i'ulcrum is resisted by the necessity of the front pile rotating forwardly and upwardly through its anchoring soil in any such tilting action, and connecting means extending transversely between said i'rame structures to intercept dbris in the stream.
7. A dike for creating a sedimentary control bar in a river including a series of A frame structures spaced laterally from each other along the line of the dike, each frame structure comprising a front pile inclined downstream to react in tension and a rear pile inclined upstream to react in compression, concrete sheaths encasing the maj or portions o both piles, enlarged concrete pedestal bases at the lower ends of both piles, the greater part ot the length of each pile including the concrete sheath and pedestal base thereof being disposed below the bed of the river whereby said frame structure is rmly anchored against compression and tension, with the center of mass thereof disposed below the river bed, means rigidly joining the upper portions of said piles together whereby any tendency of the force of the stream to tilt the frame structure backwardly about the lower portion of the rear pile as a fulcrum is resisted by the necessity of the front pile rotating forwardly and upwardly through its anchoring soil in any such tilting action, connecting means extending transversely between said 'frame structures above the river bed to intercept dbris inthe stream, and extension bars secured to said frame structures and projecting upwardly therefrom for receiving an additional height of dbris intercepting means.
8. A dike for creating a sedimentary control bar in a rive;` including a plurality of A-shaped frame structures spaced laterally from each other along the line of the dike by such intervals as to develop substantially the full strength of the anchorages of each frame structure, each frame structure comprising front and rear piles having their major portions extending into the soil below the river, said front pile being inclined downstream to react in tension and having an enlarged concrete pedestal portion on the lower portion thereof engaging in the river bed and providing an anchorage for resisting tension forces in said front pile, said rear 1;-, pile being inclined upstream to react in compression and having a bearing the value of which is as great as or greater than the value of the anchorage of said front pile, the lower ends of the piles of each A frame structure zo being disposed far enough apart to avoid interference between the reactions of said lower ends upon the river bed in which they are disposed, means rigidly joining the upper portions of said front and rear piles together,
- and connecting means extending transversely between said frame structures to brace the same and to intercept dbris in the stream.
9. A dike for creating a sedimentary control bar in a river including a plurality of 3H A-shaped frame structures spaced laterally from each other along the line of the dike by such intervals as to develop substantially the full strength of the anchorages of each frame structure, each frame structure' comprising front and rear piles having their major portions extending into the soil below the river, said front pile being inclined downstream to react in tension and having means projecting laterally from the lower portion .so thereof for establishing a tension resisting anchorage of said front pile in the river bed, said rear pile being inclined upstream to react in compression and having a bearing value as great as or greater than the anchorage value of said front pile, means rigidly joining the upper portions of said front and rear piles together, and connecting means extending transversely between said frame structures to intercept dbris in the stream. so In witness whereof I hereunto subscribe my name this 27th day of May, 1930.
JOSEPH H. THORNLEY.
US458996A 1930-06-02 1930-06-02 Dike Expired - Lifetime US1858976A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US458996A US1858976A (en) 1930-06-02 1930-06-02 Dike

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US458996A US1858976A (en) 1930-06-02 1930-06-02 Dike

Publications (1)

Publication Number Publication Date
US1858976A true US1858976A (en) 1932-05-17

Family

ID=23822955

Family Applications (1)

Application Number Title Priority Date Filing Date
US458996A Expired - Lifetime US1858976A (en) 1930-06-02 1930-06-02 Dike

Country Status (1)

Country Link
US (1) US1858976A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3309876A (en) * 1964-02-13 1967-03-21 John M Potter Erosion prevention apparatus
US3333420A (en) * 1964-10-05 1967-08-01 Kenneth W Henson Method and system for controlling the course of a river
US3469403A (en) * 1966-03-16 1969-09-30 Yawata Seitetsu Kk Buttress type steel dam for collecting debris
US5015121A (en) * 1990-03-19 1991-05-14 Perret Gentil Hubert B Offshore erosion protection assembly

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3309876A (en) * 1964-02-13 1967-03-21 John M Potter Erosion prevention apparatus
US3333420A (en) * 1964-10-05 1967-08-01 Kenneth W Henson Method and system for controlling the course of a river
US3469403A (en) * 1966-03-16 1969-09-30 Yawata Seitetsu Kk Buttress type steel dam for collecting debris
US5015121A (en) * 1990-03-19 1991-05-14 Perret Gentil Hubert B Offshore erosion protection assembly

Similar Documents

Publication Publication Date Title
US5697736A (en) Seawalls and shoreline reinforcement systems
JP6473826B2 (en) Retaining wall method of precast block to prevent landslide
US3844125A (en) Anti-erosion device
US4728225A (en) Method of rehabilitating a waterfront bulkhead
US3802205A (en) Sea wall construction
DE102008020261A1 (en) Flood water and coastal protection device, has fastening unit fixing set of elastic plates in position to be protected, where plates with thickness of specified range consist of rubber and inserts that are made up of textile fabrics
US1858976A (en) Dike
US2138037A (en) Earth retainer
US3613382A (en) Sea wall construction
US3469403A (en) Buttress type steel dam for collecting debris
CN113202058A (en) Quick levee breach plugging device that landing stage and steel sheet pile combined together
CN210562017U (en) Mud-rock flow flexible blocking net and mud-rock flow flexible blocking dam
DE2062477A1 (en) Method and device for protecting and / or stabilizing inclined surfaces
WO2002053842A1 (en) Method for soil erosion control works or shore protection works and structure for soil protection or shore protection
CN216041229U (en) Anti-slide pile structure for slope support
JP2016156147A (en) Construction method of anti-gigantic tsunami seacoast earth structure with highly rigid geosynthetic reinforced earth retaining wall having rigid integral wall surface
US3548603A (en) Braced frame bulkhead
US1968993A (en) Slope-retainer
US3854294A (en) Method for producing a pile support arrangement
CN208545740U (en) A kind of high cutting Prestressed Anchor Cable Poling Board Wall protective device
US1880838A (en) Sand trap for protection of shores, beaches, etc.
JP2020117959A (en) Levee body reinforcement structure
JP3702438B2 (en) Structure of resistance to ground lateral flow pressure of structure foundation
CN219992388U (en) Be applied to simple and easy dirt blocking dam in mountain area nature river course
DE2917994B1 (en) Process for the production of a building pit lining or support wall from reinforced concrete for incisions in the terrain