US1814539A - Method of mining sulphur - Google Patents

Method of mining sulphur Download PDF

Info

Publication number
US1814539A
US1814539A US326173A US32617328A US1814539A US 1814539 A US1814539 A US 1814539A US 326173 A US326173 A US 326173A US 32617328 A US32617328 A US 32617328A US 1814539 A US1814539 A US 1814539A
Authority
US
United States
Prior art keywords
sulphur
solution
water
density
strata
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US326173A
Inventor
Andrews Benjamin
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US326173A priority Critical patent/US1814539A/en
Application granted granted Critical
Publication of US1814539A publication Critical patent/US1814539A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/285Melting minerals, e.g. sulfur

Definitions

  • My invention relates to sulphur mining, but more particularly to the mining of subterranean deposits of sulphur by means of hot fluid which when forced into the sulphur bearing stratum through deep wells acts as a medium to fuse the sulphur which when melted is pumped to the surface in its liquid state.
  • the sulphur occurs in a water flooded porous lime and gypsum rock which becomes connected with the Water sands above through cavings incidental to the application of heat in the mining process.
  • Another object is to systematize the introduction of' the heated fluid into the strata so that the maximum heating effect is imparted to the sulphur.
  • Still another object is to employ a fluid having a density which will cause it to rise with respect to the ground water while it is heated, but such that as it becomes partially cooled it will be of greater density than the ground water and will sink to the lower surface of the sulphur strata.
  • the drawing herewith illustrates the various formations,-1 indicating alluviumvsoil, 2 a shale clay; 3 a water sand; 4 another shale 6 sulphur; and 7 a salt deosit.
  • the porous openings at 8 are usually Elled with the ground water which I have shown for purposes of illustration as divided into three zones A, B and C. Obviously as many zones may be created as desired depending on the size of the dome, the uantity and location of the sulphur an the temperature and-density of the ground water encountered.
  • the drawing also shows two wells as having been drilled into each zone as shown at A', A, B, B, C and C.
  • TheA sulphur deposit is in a mound formation of which I have shown approximately one half.
  • the various wells in order to reach the sulphur strata are therefore of different depths and it is due to the mound formation of the sulphur that I am enabled to practice the method about to be described.
  • the sulphur as found in the usual mounds is in yellow orthorombic crystalline formusually at a temperature of about 90 F., and when pure has a specific gravity about 2.06. F. and remains in a mobile liquid .form until a tem'- perature of 340 F. is reached whereupon it assumes a semi-solid gummy character passinginto an amorphous form which cannot be readily handled.
  • thesulphur must be heated to a temperature of at least 239 F. but may not be above 340 F. if satisfactor removal is to be obtained,
  • the ground water in the mines due to minerals and other substances in solution, has been found to have a specific gravity of about 1.01 and a temperature of about 90 F.
  • Pure water at a similar temperature has a specific gravity of .995; at 240 F. the specific gravity of pure water is .947 and at 340 is .896.
  • the ideal solution to be placed in the mine would be one which would rise from the point of introduction to contact the upper strata of sulphur and melt it.
  • heated solution say in the well A.
  • This solution will rise, melting theV adjacent sulphur which may then be withdrawn thru the usual eduction tube which is smaller and tion.
  • heated solution may next be introduced into well A and observations taken at A and B. This alternate observation and introduction of solution may progress over the entire strata from well to well.
  • the heating liquid might be introduced through any of the wells shown. If introduced at A the gravity of the heating liquid might be heavier than that found in the mine at B.
  • the heating liquid may be introduced at C or C and, as the point of discharge from these wells is lower than B the specific gravity of the heating liquid should be regulated to be lighter than that of the cold mine water, so that it will seek the higher levels at My obj ect is thus to determine the specilic gravity of the ground water and thus regulate the density of the hotwater to direct it to .the level de sired. i
  • a bleed well from which the accumulation of ground water, or mixture of water and solution may flow.
  • I may use any one of the series of wells for this purpose, depending upon whether I desire to discharge the cold ground water as at C or an accumulation of relatively warm fluid at A. This may very well vary with the amount of sulphur remaining to be mined or the location thereof.
  • a method of mining sulphur which comprises introducing into the mine a superheated solution having a density which is lighter at the time it is introduced than the density of the ground water present in the mine, but which upon cooling below the melting point of sulphur has a greater den-l sity than the ground water in the mine.
  • a method of mining sulphur which coniprises introducing into the mine a superheated solution having a density which is lighter at the time it is introduced than the density of the ground water present in the mine, whereby it will rise relative to said ground water melting the upper strata of sulphur, but which upon cooling below the melting point of sulphur has a greater ⁇ density than the ground water in the mine.
  • a method of mining sulphur which comprises introducing into the mine a superheated solution having a density which-is lighter at the time it is introduced than the density of the ground water present in the mine, but which upon cooling below the melting point of sulphur has a greater density than the ground .water in the mine whereby it will pre-heat the lower strata of sulphur.
  • the improvement which comprises introducing into the Vwell a heated solution of ,fluid of such specific gravity when introduced as to displace the existing y fluid contents of the strata by initially rising above the resident fluid and to subsequently increase the specific gravity upon cooling so as to sink below the said resident fluid.
  • the improvement which comprises introducing into the well a heated solution of fluid of such specific gravity as to displace the existing fluid contents of the Strata by initially rising above the resident fluid and which upon cooling will have a greater specific gravity so as vto Subsequently sink below the said resident fluid, thus supplying a melting heat to the upper sulphur strata and pre-heating the lower sulphur strata.
  • the improvement which comprises introducing into the well .a heated solution of a fluid which increases in specific gravity upon cooling and which is of such specific. gravity as to displace the existing fluid contents of the strata by initially rising above the resident fluid and subsequently sinking below the said resident fluid, thus supplying a melting heat to the upper sulphur strata and preheating the lower sulphur strata, and subsequently introducing a heated solution of a dierent density to melt the preheated strata.
  • a method of controlling theflow of a sulphur melting solution in sulphur mines comprising altering the density of the solution to control the flow thereof with-respect to the ground water in the well so that Ithe solution will contact with the sulphur at any desired level, and periodically observing the flow of the solution.
  • a method of controlling the flow of a sulphur melting solution in sulphur mines comprising altering the density of the solution to control the flow thereof with respect to the ground water in the well so that the solution will contact with the sulphur at any desired level.
  • a method of mining sulphur comprising heating a liquid above the melting point of sulphur and regulating its specific gravity relative to the ground water in the well, so that it will be directed to the desiredlevel in the well.

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Description

July 14, 1931- B. ANDREWS METHOD OF MINING SULPHUR Filed Deo. l5, 1928 UNITED STATES PATENT OFFICE BENJAMIN ANDREWS, OF HOUSTON, TEXAS METHOD or MINING sULPHUR Application filed December 15, 1928. Serial No. 326,173.
My invention relates to sulphur mining, but more particularly to the mining of subterranean deposits of sulphur by means of hot fluid which when forced into the sulphur bearing stratum through deep wells acts as a medium to fuse the sulphur which when melted is pumped to the surface in its liquid state.
The underground deposits of sulphur occurring particularly in the upper structures of the salt domes found in Louisiana and Texas, along the coast of the Gulf of Mexico, are located beneath water bearing sands. The sulphur occurs in a water flooded porous lime and gypsum rock which becomes connected with the Water sands above through cavings incidental to the application of heat in the mining process.
Methods heretofore in use have employed heated water under pressure, the melting point of sulphur being above the boiling point of water sufficient pressure had to be maintained toprevent the heated water from vaporizing. In actual experience with existing F mines the following has been found to occur:
Cold water has a greater density than hot Water. Due to this fact whenever hot water is pumped into the sulphur bearing zones the heavier cold Water present in the porous rock and the sands above immediately flow down into the sulphur cavity forcing the lighter hot water'out of the sulphur strata into the overlying sands entirelyliarren of sulphur. This migration of the Valuable sulphur melting r vehicle from the native site of the sulphur deposit almost entirely Vitiates the efforts to melt the sulphur. This makes the hot water process of heating` and fusing of the sulphur physically ineffectual and superlatively eX- pensive due to the waste of the predominant proportion of the thermal units which are carried oft by this water escaping into the upper sands. To secure workable results in maintaining any of the heated water in conr tact with the sulphur in the formation in the prevailing technique of mine operation it is found necessary to pump immense quantities of hot water into the mine and to depend more or less onl accident for results. In consequence of which, even in the best of recoveries, seldom if ever does the thermal efficiency of the cycle exceed 5%.
It is one of the objects of my invention to so regulate the specific gravity of and manipuf late the flow of the heated fluid in the mine so that it cannot be displaced by the cold ground water, and may be directed to the level desired'.
Another object is to systematize the introduction of' the heated fluid into the strata so that the maximum heating effect is imparted to the sulphur.
Still another object is to employ a fluid having a density which will cause it to rise with respect to the ground water while it is heated, but such that as it becomes partially cooled it will be of greater density than the ground water and will sink to the lower surface of the sulphur strata.
It is also an object to vary the density of the fluid used to'heat the sulphur strata in accordance with the density of the ground water already in this porous strata so that the fluid may reach the desired point, either at or bove or below the point of discharge of said uid.
I aim also to provide a plurality of adjacent test Wells whereby the density of the strata content can be constantly obtained and to thereb-y control the flow of the heated fluid being introduced and observe the operations which occur in the mine.
Other and further objects of my improved method and arrangement will be readily apparent to those skilled in the art to which it appertains when the following description is considered in connection with the drawing wherein h The figure shown illustrates a cross section of the geological formations usually encountered in sulphur bearing localities and showing the arrangement of the several wells and test openings which I contemplate using to carry out`my improved procedure.
This application is in the nature of a sub-A stitute for my prior application, Serial #28,020 filed May 4th, 1925, for a method of i mining sulphur. It also relates in some respects to the subject matter of my Patent clay; gypsum;
. The sulphur melts at about 239 ment over either of these disclosures.
The drawing herewith illustrates the various formations,-1 indicating alluviumvsoil, 2 a shale clay; 3 a water sand; 4 another shale 6 sulphur; and 7 a salt deosit. The porous openings at 8 are usually Elled with the ground water which I have shown for purposes of illustration as divided into three zones A, B and C. Obviously as many zones may be created as desired depending on the size of the dome, the uantity and location of the sulphur an the temperature and-density of the ground water encountered. The drawing also shows two wells as having been drilled into each zone as shown at A', A, B, B, C and C. TheA sulphur deposit is in a mound formation of which I have shown approximately one half. The various wells in order to reach the sulphur strata are therefore of different depths and it is due to the mound formation of the sulphur that I am enabled to practice the method about to be described.
The sulphur as found in the usual mounds is in yellow orthorombic crystalline formusually at a temperature of about 90 F., and when pure has a specific gravity about 2.06. F. and remains in a mobile liquid .form until a tem'- perature of 340 F. is reached whereupon it assumes a semi-solid gummy character passinginto an amorphous form which cannot be readily handled. Thus thesulphur must be heated to a temperature of at least 239 F. but may not be above 340 F. if satisfactor removal is to be obtained,
he boiling point of water at atmospheric pressure is Well known to be 212 F. Certain prior processes of obtaining sulphur Vrecommend raising the boiling point of water by the addition of.salt in an attempt to reach the melting point of sulphur. Standard tables however state that a saturated solution of. sodium chloride and water will have a boiling point of about 227 F. Thus it would seem to be obviously impossible to obtain a solution of salt and water .having a temperature of 239 F. which would melt the sulphur. It is also known that by placing .the water underA pressure any desired teinperature needed to melt thesulphur may be obtained, so that the common process now .em-
ployed in mining sulphur is to superw heat pure water and use no salt solution.
The superheated water under pressure is then forced into the strata, but with the ineiricient' results which I have heretofore set out. In my Patent No. 1,648,210, I disclose a method for the displacement of all the ground water in the strata by a heavy density fluid and then the gradual withdrawal of this fluid. This method, however, requires 'an enormous amount of heavy density fluid to-displace the resident ground water and I have, therefore, devised the present method of operation.
The ground water in the mines, due to minerals and other substances in solution, has been found to have a specific gravity of about 1.01 and a temperature of about 90 F. Pure water at a similar temperature has a specific gravity of .995; at 240 F. the specific gravity of pure water is .947 and at 340 is .896.
I contemplate introducing a solution of fluid which at high temperatures is lighter than the ground water, but which is heavier than the ground water as the solution is cooled.
There are Various fluids and materials which may be used to make up such a solution, but the most economical is a solution of water and sodium chloride.y I have found that a 13% salt solution has a den/sity about 10% greater than pure water at the same temperature and that a 7% solution is approximately of 5% greater density. `I contemplate introducing into the mine such solutions as these in a superheated condition under pressure and at a temperature of about 340 F. The ground water at 90 F. is approximately 5% heavier when the same water is heated to 240 F. and is about 10% heavier than at 340 F.
The ideal solution to be placed in the mine would be one which would rise from the point of introduction to contact the upper strata of sulphur and melt it. The water continuing to rise so long as it remained above a temperature of 240 F., but would have a density which would permit it to descend as soon as it cooled off to a temperature below 240 F. Thus it would then descend to the lower strata of sulphur which would be gradually heated for application later on of a hot Huid. In this manner the maximum heating of the sulphur would be obtained.
I have found that with solutions of salt and water varying from 5 to 13%, I am enabled lo obtain densities which will rise in the mine as long as they are above a temperature of 240 F. when co-mingled with ground Water, but which will gradually descend below the ground water as the temperature falls below 240. However, in order to be able to ascertain constantly the changing temperatures and densities of the ground water, solution introduced, and the mixture of the two, it is necessary to arrange a series of wells to take periodic tests for the information of the operator. By drilling a series of wells such tls-illustrated' in the drawing I am enabled to obtain the dip and strike of the strata. I then obtain the temperature and densities of the ground water at each well. With this information I can introduce a heated solution say in the well A. This solution will rise, melting theV adjacent sulphur which may then be withdrawn thru the usual eduction tube which is smaller and tion. At anlopportune period heated solution may next be introduced into well A and observations taken at A and B. This alternate observation and introduction of solution may progress over the entire strata from well to well.
In carrying out the operations of extracting the sulphur from a `mound equipped as indicated in the drawing, I regulate the specilic gravity of the heating vehicle according to the position at which it is desired in the sulphur stratum. Thus if ythe zone B is being mined the heating liquid might be introduced through any of the wells shown. If introduced at A the gravity of the heating liquid might be heavier than that found in the mine at B. However', the heating liquid may be introduced at C or C and, as the point of discharge from these wells is lower than B the specific gravity of the heating liquid should be regulated to be lighter than that of the cold mine water, so that it will seek the higher levels at My obj ect is thus to determine the specilic gravity of the ground water and thus regulate the density of the hotwater to direct it to .the level de sired. i
Obviously as the salt solution is pumped into the mine it will'mingle with the ground water gradually) increasing the density thereof, but by the observations constantly obtained I am enabled to vary the density of the solution accordingly, and by this means can control the How of the solution being introduced so that it may be applied to the area where the deposits of sulphur are to be found before vits melting heat has been dissipated. The fact that the solution I contemplate using may be varied so that it is at all times of greater density when below 240 F. that the density of the adj acentrground water as determined by the observations is an important feature of my procedure.
From the foregoing it will be readily apparent that I may conduct my method consecutively in either zones A,l B, C etc., or simultaneously or in any order, dependent upon the temperature and density of the ground water of that particular zone. If desired, the heated solution may be introduced say in well B", whereupon it rises and the melted, sulphur may be taken from well B. and as this solution sinks a small introduction of solution into well C will result in a material production of melted sulphur, due to the pre-heating it has obtained from the previous solution from well B.
It is usual in a sulphur dome to have what is termed a bleed well from which the accumulation of ground water, or mixture of water and solution may flow. Obviously, I may use any one of the series of wells for this purpose, depending upon whether I desire to discharge the cold ground water as at C or an accumulation of relatively warm fluid at A. This may very well vary with the amount of sulphur remaining to be mined or the location thereof.
It Vis kno-wn that the use of a salt solution in sulphur mining is not new but the application and manipulation of the solution de- .pendent upon the density and temperature of the ground Water or contents of the mine is believed to be distinctly novel.
Having described my invention, what I claim as new and desire to protect by Letters Patent is: I
l. A method of mining sulphur which comprises introducing into the mine a superheated solution having a density which is lighter at the time it is introduced than the density of the ground water present in the mine, but which upon cooling below the melting point of sulphur has a greater den-l sity than the ground water in the mine.
2. A method of mining sulphur which coniprises introducing into the mine a superheated solution having a density which is lighter at the time it is introduced than the density of the ground water present in the mine, whereby it will rise relative to said ground water melting the upper strata of sulphur, but which upon cooling below the melting point of sulphur has a greater `density than the ground water in the mine.
8. A method of mining sulphur which comprises introducing into the mine a superheated solution having a density which-is lighter at the time it is introduced than the density of the ground water present in the mine, but which upon cooling below the melting point of sulphur has a greater density than the ground .water in the mine whereby it will pre-heat the lower strata of sulphur.
4". A method of mining sulphur which com;
prises introducing into the mine a superheated solution -having a density which is lighter at the time it is introduced than the density ofthe ground water present in the mine, whereby it will rise relative to said ground water melting the upper strata of sulphur, but which upon'cooling below the melting point of sulphur has a greater density than the groundwater in the mine whereby it will preheat'the lower strata of sulphur.
5. In the mining of sulphur by means of a heated fluid, the improvement which comprises introducing into the Vwell a heated solution of ,fluid of such specific gravity when introduced as to displace the existing y fluid contents of the strata by initially rising above the resident fluid and to subsequently increase the specific gravity upon cooling so as to sink below the said resident fluid.v
6. In the mining of sulphur by means of a heated fluid, the improvement which comprises introducing into the well a heated solution of fluid of such specific gravity as to displace the existing fluid contents of the Strata by initially rising above the resident fluid and which upon cooling will have a greater specific gravity so as vto Subsequently sink below the said resident fluid, thus supplying a melting heat to the upper sulphur strata and pre-heating the lower sulphur strata.
7. In the mining of sulphur by means of a heated fluid, the improvement which comprises introducing into the well .a heated solution of a fluid which increases in specific gravity upon cooling and which is of such specific. gravity as to displace the existing fluid contents of the strata by initially rising above the resident fluid and subsequently sinking below the said resident fluid, thus supplying a melting heat to the upper sulphur strata and preheating the lower sulphur strata, and subsequently introducing a heated solution of a dierent density to melt the preheated strata.
8. In the art of mining sulphur, the steps of drilling a plurality of wells to enter the sulphur bearing strata at different elevations, introducing a sulphur melting solution in some of said wells, observing the flow of such solution in the strata from other of said wells and altering the density of the solution subsequently introduced to control the flow thereof and cause it to make contact with the sulphur in the mine, and observing the subsequent ow.
9. The process of obtaining sulphur from the earth comprising drilling a plurality of wells to enter the/sulphur strata at different elevations, introducing a heated sulphur meltipg solution into one or more4 of said wells, controlling the density of said solution to such an extent that it will rise above the ground-water in the well'so long as it retains a heat above 240o F. and will descend below the ground water when its temperature falls below 240 F.
10. A method of controlling theflow of a sulphur melting solution in sulphur mines, comprising altering the density of the solution to control the flow thereof with-respect to the ground water in the well so that Ithe solution will contact with the sulphur at any desired level, and periodically observing the flow of the solution.
11. A method of controlling the flow of a sulphur melting solution in sulphur mines, comprising altering the density of the solution to control the flow thereof with respect to the ground water in the well so that the solution will contact with the sulphur at any desired level.
12. A method of mining sulphur comprising heating a liquid above the melting point of sulphur and regulating its specific gravity relative to the ground water in the well, so that it will be directed to the desiredlevel in the well.
In testimony whereof I hereunto affix my signature this 11th day of December, A. D.
' BENJAMIN ANDREWS.
US326173A 1928-12-15 1928-12-15 Method of mining sulphur Expired - Lifetime US1814539A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US326173A US1814539A (en) 1928-12-15 1928-12-15 Method of mining sulphur

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US326173A US1814539A (en) 1928-12-15 1928-12-15 Method of mining sulphur

Publications (1)

Publication Number Publication Date
US1814539A true US1814539A (en) 1931-07-14

Family

ID=23271100

Family Applications (1)

Application Number Title Priority Date Filing Date
US326173A Expired - Lifetime US1814539A (en) 1928-12-15 1928-12-15 Method of mining sulphur

Country Status (1)

Country Link
US (1) US1814539A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2493413A (en) * 1944-06-29 1950-01-03 Freeport Sulphur Co Mining of sulfur
US2668464A (en) * 1945-07-28 1954-02-09 Aircraft Marine Prod Inc Wire cutting and stripping tool
US4869555A (en) * 1988-01-06 1989-09-26 Pennzoil Sulphur Company Apparatus for recovery of sulfur

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2493413A (en) * 1944-06-29 1950-01-03 Freeport Sulphur Co Mining of sulfur
US2668464A (en) * 1945-07-28 1954-02-09 Aircraft Marine Prod Inc Wire cutting and stripping tool
US4869555A (en) * 1988-01-06 1989-09-26 Pennzoil Sulphur Company Apparatus for recovery of sulfur

Similar Documents

Publication Publication Date Title
US1811560A (en) Method of and apparatus for recovering oil
US4101172A (en) In-situ methods of extracting bitumen values from oil-sand deposits
US3513914A (en) Method for producing shale oil from an oil shale formation
US2771954A (en) Treatment of petroleum production wells
US5407009A (en) Process and apparatus for the recovery of hydrocarbons from a hydrocarbon deposit
US2974937A (en) Petroleum recovery from carbonaceous formations
US3958636A (en) Production of bitumen from a tar sand formation
US3057404A (en) Method and system for producing oil tenaciously held in porous formations
US4099783A (en) Method for thermoshaft oil production
US3358756A (en) Method for in situ recovery of solid or semi-solid petroleum deposits
US4296969A (en) Thermal recovery of viscous hydrocarbons using arrays of radially spaced horizontal wells
US3848671A (en) Method of producing bitumen from a subterranean tar sand formation
US4489783A (en) Viscous oil recovery method
US3804169A (en) Spreading-fluid recovery of subterranean oil
US4635720A (en) Heavy oil recovery process using intermittent steamflooding
US3223158A (en) In situ retorting of oil shale
CA2822838C (en) Improved solution mining method with horizontal fluid injection
US4026359A (en) Producing shale oil by flowing hot aqueous fluid along vertically varied paths within leached oil shale
RU2663532C1 (en) Method for developing high-viscosity oil
US4227743A (en) Method of thermal-mine recovery of oil and fluent bitumens
CN104632164A (en) Method for breaking through interlayer in oil layer during double-horizontal-well SAGD exploiting
CN109356560B (en) In-situ mining method and in-situ mining well pattern
US5014787A (en) Single well injection and production system
US1634235A (en) Method of and apparatus for recovering oil
US3040809A (en) Process for recovering viscous crude oil from unconsolidated formations