US1785023A - Bridge-building apparatus - Google Patents

Bridge-building apparatus Download PDF

Info

Publication number
US1785023A
US1785023A US424883A US42488330A US1785023A US 1785023 A US1785023 A US 1785023A US 424883 A US424883 A US 424883A US 42488330 A US42488330 A US 42488330A US 1785023 A US1785023 A US 1785023A
Authority
US
United States
Prior art keywords
bridge
cables
strand
cable
sheave
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US424883A
Inventor
Vere B Edwards
George F Wolfe
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DRAVO CONTRACTING Co
Original Assignee
DRAVO CONTRACTING Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DRAVO CONTRACTING Co filed Critical DRAVO CONTRACTING Co
Priority to US424883A priority Critical patent/US1785023A/en
Application granted granted Critical
Publication of US1785023A publication Critical patent/US1785023A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/14Towers; Anchors ; Connection of cables to bridge parts; Saddle supports

Definitions

  • the bridge cables are formed each of a plurality of strands, seven in number for example, although there maybe more or less; and each strand consists of a bundle of single wires gathered and bound, and ordinarily approximately circular in cross-sec- I tion.
  • the strands are made up, and after making up are brought to place from one end of the bridge over the towers to the other end, and each strand is separately anchored.
  • This invention has particularly to do with the bringing of the madesup cable strands to place.
  • Fig.1 is a diagram, showing in side elevation a suspension bridge in course of erection.
  • Figs. II and III are views to larger scale, showing in side elevation the anchorages at the two ends of. thebridge.
  • Figs. IV and V are views in front and side elevation, showing fragmentarily the upper portion of a bridge tower and .the false work upon the tower, employed in the placement of the cables.
  • Fig; Va is a view in side elevation of a detail, shifted aside from its place in Fig. V.
  • Figs. VI and VII are views to still larger scale, and Fig. VII to scale larger than Fig.
  • FIG. VI showing in side elevation and in transverse vertical section a certain guide which is included in the showhanging cables the accurately determined ing of Figs. IV and V.
  • Fig. VII a certain carriage is shown in position upon the guide.
  • Figs. VIII and IX are views showing in front and side elevation the carriage just alluded to, which carriage, provided in considerable numbers, is employed in bringing the cable strands to place.
  • FIG. I the anchorages on the opposite river banks are indicated at. 1 and 2.
  • This particular bridge structure includes also a succession of piers '3 for carrying the roadway at one end, because at this end the anchorage is necessarily low, but it will be understood that such piers are not essential features of the bridge type.
  • the towers 4 and 5 of which in this case there are, as is usual, two.
  • the towers being erected, are held firmly in position to endure the particular and relaunderstood, are temporary and, when the "cables have been brought to place, they are'removed.
  • the dotted line 7 indicates the position to which the cable strands are initially brought, and the full line, 8 indicates the ultimate position of the bridge cables when completed and subjected to the load of the structure.
  • the tower 4 is shown to be surmounted with a saddle 9-,- in which, as is diagrammatically indicated 1n Fig. IV, the completed cable eventually rests. From the saddles 9 on the bridge towers the cables eventuall hang.
  • the false work erected upon the tower is a suitable framework in which are firmly carrled a palr of guides 10 and a pulley hoist 11.
  • the guides 10, as is best shown in Fig. IV, stand apart on either side of the vertical plane which is central with respect to saddle 9 and which is longitudinal of the bridge structure as a whole.
  • each guide 7 consists of two parallel plates 12 with arc-shaped upper edges, standing vertically, and spaced apart at an interval, and carrying journalled between them a succession of idly turning, grooved sheaves 13.
  • a block 14 is removably mounted, and in it a grooved sheave 15 is rotatably borne.
  • This block with its sheave is a temporary element, used in building, but ultimately removed with the other false work.
  • the carriage illustrated in Figs. VII,VIII, and IX, includes an essentially U-shaped frame 17
  • This frame carries, journalled externally upon its two arms at their upper ends, the sheaves 18, and preferably a sheave 19 also, which sheave 19 is journalled internally between its arms near the bendof the U.
  • the frame 17 is equipped with a clamp 20, by which engagement with a back-hauling line may be made and broken at will.
  • the groove-to-groove interval at which the sheaves 18 stand apart is the interval betweenthe grooved sheaves of the two parallel guides 10, 10.
  • the breadth of each sheave 18 is such as to span the space at which the two plates 12 of each guide stand apart.
  • proportions of the frame are such that when in the load-carrying position, which is the position shown in Fig. VIII, the load resting on sheave 19 is at very considerably lower level than the way-cable's 16, upon which the sheaves 18 make bearing.
  • the interval between the way-cables being 10 inches, more or less, the load is advantageously carried at an interval ,of 20 inches, more o'r less, below the way-cables. This interval last defined is somewhat less than the interval vertically at which the guides 10 stand above the sheave 15.
  • each cable strand is gathered and shaped and provided at'its ends with loops fitted withshoes for making it fast in the anchorages, and initially lies in its entirety .at the place of spinning, which is usually on the ground or above the ground at or near the river bank, as'
  • FIG. I An engine with a winding drum is stationed on the right or opposite bank of the river, and from this winding drum a messenger line 21 is carried over the sheaves 15 upon the towers and is secured to the looped end of the cable strand.
  • the cable strand is designated 22, and in Figs. II and III is indicated by a dotted line.
  • a back-hauling line 23 is secured to the messenger line 21, at the end to which the cable strand is secured.
  • the messenger line normally rests upon the sheaves 15, and the cable strand as it is being brought to place rests intermittently upon the sheaves 15, but, in haulage, as each carriage in turn approaches the tower, it raises the strand from engagement with sheave 15 and sustains it, hung from the guides 10. Accordingly, in the course of building, the cable strand at the high points is borne-alternately by sheaves 15, and by guides 10.
  • the backhauling line 23 is by suitable means drawn back from rightto left, and by such drawing back of the line'23 the messenger line 21'is returned across the river.
  • the carriages one by one, at the left-hand end ofthe gaged, and whenthe return of the back-hauling line has been completed thecable strand remains, supported from the blocks and the ,anchorages, entirly self-sustaining.
  • the el ain blocks in the tower superstructure's' bridge, are disenthen are lowered and; the. cable strand issheaves 15 and the false work over the towers are permanently removed.
  • Temporary supports 24 and 25 for the waycables 16, the latter equipped with a sheave 26 for the messenger line 21, are obviously advantageous.
  • the ultimate position of the anchored cable strand is in Figs. II and III- indicated by the-dotted line 27; and it will be apparent that, when the last cable strand has been placed and anchored, the messenger line 21, the back-hauling line 23, and the waycables 16 may be taken away, and that then these temporary supports 24 and 25 will be removed.
  • Bridge-building apparatus adapted for use in cooperation with bridge towersand two anchorages, such apparatus including adjustable doubleway-cables, a plurality of carriages movable upon said way-cables, each carriage adapted to receive a cable-strand and provided-with a clamp, a messenger line capable of being'drawn to and fro over the bridge towers'and adapted to engage at one end a cable strand and to draw the cable strand to position between the anchorages and upon the towers, and a back-hauling line adapted to be engaged by the carriage clamps.
  • Bridge-building apparatus adapted for use in co-operation with bridge towers and two anchorages, such apparatus including a sheave and a pair of guides borne by each bridge tower, the guides spaced above the sheave, a pair of adjustable way-cables borne by said guides, a plurality of carriages movable upon said way-cables, each carriage adapted to receive acable-strand and being provided with a clamp, a back-hauling line adapted to be engaged by the carriage clamps, and means for hauling a carriagesustained cable-strandto its position of rest with respect to the anchorages, and temporarily supported above the tower sheaves.
  • each guide including two vertically extendin plates with arc-shaped upper edges an sheaves journalled in the space between and presenting a bearing face at a lower level than the plate edges, and hoisting means adapted to move a load vertically in the aforementioned mid-plane of the sheave, together with a pair of way-cables resting on the sheaves within the guides and a plurality of strand carriages equipped each with a seat for a cable strand and with a pair of grooved traction wheels-spaced apartat an interval corresponding to that between the guides, the rims of each wheel being, spaced apart at a distance equal to the spacing apart of the plates of which each guide
  • Bridge-building apparatus adapted for use in cooperation with bridge towers and two anchorages, such apparatus including double way-cables, a plurality of carriages movable upon said way-cables, each carriage adapted to receive a cable-strand, a messenger line capable of being drawn to and fro over the bridge towers and adapted to engage at one end a cable strandand to drag the engaged cable strand to position between the anchorages and upon the towers, and a line engaged by said carriages.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Description

Deg. 16, 1930. V.I B. EDWARDS ET AL 1,735,023
BRIDGE BUILDING APPARATUS Filed Jan. 31, 1930 4 Sheets-Sheet l WITNESS INVENTORS I Z fibww 1 m m I INVENTORS Dec. 16, 1930.
v. B. EDWARDS ET AL B RI DGE BUILDING APPARATUS 4 Shts-Sheet 2 Fild Jan. 31, 1950 a any Wen/3.6m
Dec. 16, 1930. v. B. EDWARDS ET AL 1,735,023
BRIDGE BUILDING APPARATUS F'i-led Jan 31, 1950 4 Sheets-Sheet s wn'uss s 3 v. B. EDWARDS ETAL 1,735,023 I BRIDGE BUILDING APPARATUS 31, 1930 v 4 Sheets-Sheet 4 Filed Jan.
INVENTORS Patented Dec. 16, 1930 UNITED STATES PATENT OFFICE VERE 3. EDWARDS, OI MOON TOWNSHIP,'ALLEGHENY COUNTY, AND GEORGE F. WOLFE,
]? CORAOPOLIS, PENNSYLVANIA,
ASSIGNORS TO THE DRAVO CONTRACTING COI- PANY, A CORPORATION OF PENNSYLVANIA BRIDGR-BRILDING APPARATU S Application filed January 31, 1930. Serial No. 424,888.
them it is held and-sustained. The bridge cables, of which commonly there are two, although the number may be varied, are formed each of a plurality of strands, seven in number for example, although there maybe more or less; and each strand consists of a bundle of single wires gathered and bound, and ordinarily approximately circular in cross-sec- I tion. The strands are made up, and after making up are brought to place from one end of the bridge over the towers to the other end, and each strand is separately anchored. Theseven strands, more or less, of each'cable are assembled, squeezed to a compound bundle,-
which also in cross-section is approximately circular; and, at the end of the bridge-building operations, when the cables have been put under tension carrying the full weight of the structure, the cables are closely wrapped in wire. This invention has particularly to do with the bringing of the madesup cable strands to place.
In the accompanying drawings Fig.1 is a diagram, showing in side elevation a suspension bridge in course of erection. Figs. II and III are views to larger scale, showing in side elevation the anchorages at the two ends of. thebridge. Figs. IV and V are views in front and side elevation, showing fragmentarily the upper portion of a bridge tower and .the false work upon the tower, employed in the placement of the cables. Fig; Va is a view in side elevation of a detail, shifted aside from its place in Fig. V. Figs. VI and VII are views to still larger scale, and Fig. VII to scale larger than Fig. VI, showing in side elevation and in transverse vertical section a certain guide which is included in the showhanging cables the accurately determined ing of Figs. IV and V. In Fig. VII a certain carriage is shown in position upon the guide. Figs. VIII and IX are views showing in front and side elevation the carriage just alluded to, which carriage, provided in considerable numbers, is employed in bringing the cable strands to place.
Referring first to Fig. I, the anchorages on the opposite river banks are indicated at. 1 and 2. This particular bridge structure includes also a succession of piers '3 for carrying the roadway at one end, because at this end the anchorage is necessarily low, but it will be understood that such piers are not essential features of the bridge type. Between the two anchorages stand the towers 4 and 5 of which in this case there are, as is usual, two.
The towers, being erected, are held firmly in position to endure the particular and relaunderstood, are temporary and, when the "cables have been brought to place, they are'removed. InFig. I the dotted line 7 indicates the position to which the cable strands are initially brought, and the full line, 8 indicates the ultimate position of the bridge cables when completed and subjected to the load of the structure. In Figs. IV and V the tower 4 is shown to be surmounted with a saddle 9-,- in which, as is diagrammatically indicated 1n Fig. IV, the completed cable eventually rests. From the saddles 9 on the bridge towers the cables eventuall hang.
The false work erected upon the tower is a suitable framework in which are firmly carrled a palr of guides 10 and a pulley hoist 11. The guides 10, as is best shown in Fig. IV, stand apart on either side of the vertical plane which is central with respect to saddle 9 and which is longitudinal of the bridge structure as a whole.
Themore minute formation of each guide 7 will be understood on considering Figs. VI and VII. Each consists of two parallel plates 12 with arc-shaped upper edges, standing vertically, and spaced apart at an interval, and carrying journalled between them a succession of idly turning, grooved sheaves 13.
Upon the saddle 9 a block 14 is removably mounted, and in it a grooved sheave 15 is rotatably borne. This block with its sheave is a temporary element, used in building, but ultimately removed with the other false work.
Through the guides 10, from anchorage to anchorage, extend two parallel, temporary wa -cables 16, spaced apart at an interval delihed by the spacing of guides 10. Within the guides these way-cables rest upon the sheaves 13, as clearly appears inv Fig. VII. The way-cables are brought to place and secured and, subject to adjustment, remain in position until all the cable strands have been brought to place and secured, and then, but not until then, they are removed.
The carriage, illustrated in Figs. VII,VIII, and IX, includes an essentially U-shaped frame 17 This frame carries, journalled externally upon its two arms at their upper ends, the sheaves 18, and preferably a sheave 19 also, which sheave 19 is journalled internally between its arms near the bendof the U. Externally, at the bend of the U, the frame 17 is equipped with a clamp 20, by which engagement with a back-hauling line may be made and broken at will. The groove-to-groove interval at which the sheaves 18 stand apart is the interval betweenthe grooved sheaves of the two parallel guides 10, 10. The breadth of each sheave 18 is such as to span the space at which the two plates 12 of each guide stand apart. The
proportions of the frame are such that when in the load-carrying position, which is the position shown in Fig. VIII, the load resting on sheave 19 is at very considerably lower level than the way-cable's 16, upon which the sheaves 18 make bearing. In the case in hand, the interval between the way-cables being 10 inches, more or less, the load is advantageously carried at an interval ,of 20 inches, more o'r less, below the way-cables. This interval last defined is somewhat less than the interval vertically at which the guides 10 stand above the sheave 15.
In preparation for the placement of the cable strands, the false work is erected upon the towers, as shown in Figs. IV and 'V, and the way-cables are brought to position and secured attheir ends to the anchorages, as shown in Figs. II and III. Each cable strandis gathered and shaped and provided at'its ends with loops fitted withshoes for making it fast in the anchorages, and initially lies in its entirety .at the place of spinning, which is usually on the ground or above the ground at or near the river bank, as'
seen at the left inFig. I An engine with a winding drum is stationed on the right or opposite bank of the river, and from this winding drum a messenger line 21 is carried over the sheaves 15 upon the towers and is secured to the looped end of the cable strand. The cable strand is designated 22, and in Figs. II and III is indicated by a dotted line. By the winding of the messenger line upon the power-driven drum the cable strand is hauled to place. To the messenger line 21, at the end to which the cable strand is secured, a back-hauling line 23 is secured.
As the cable strand 22 advances from the bridge-end to the left, carriages are, by clamps 20, secured at intervals to the backhauling line 23, the sheaves 18 of each carriage bearing upon the way-cables 16, and the cable strand within the U-shaped frame and resting upon the sheave 19 of the carriage. This assembly will be manifest on comparing Figs. II and VIII, and it will be perceived that haulage upon messenger line 21 causes the string of carriages bearing the load of the cable strand to run along the way-cables.
The messenger line normally rests upon the sheaves 15, and the cable strand as it is being brought to place rests intermittently upon the sheaves 15, but, in haulage, as each carriage in turn approaches the tower, it raises the strand from engagement with sheave 15 and sustains it, hung from the guides 10. Accordingly, in the course of building, the cable strand at the high points is borne-alternately by sheaves 15, and by guides 10.
In passing the guides the sheaves 18 of the carriages, which elsewhere run upon the waycables 16, run upon the dges'of the plates 12 of the guides, while the way-cables, unburdened at that point, rest upon the sheaves 13 of the guides.
When a cable strand has been brought to position and its free ends have been secured to the anchorages on the two sides of the river, the strand is lifted .by the, chain blocks situated on the towers, as is indicated in Fig. V by the numeral 11, to allow the carriages 17 on their return to pass above the rollers 15. The way-cables 16 then are slackened, to such extent that the cable strandbecomes in part orentirely self-sustaining, with only sufficient load remaining on the carriages to prevent their overturning or with the strand in such position as to prevent overturning when they (the carriages) are returned from right to left. When thishas been done the backhauling line 23 is by suitable means drawn back from rightto left, and by such drawing back of the line'23 the messenger line 21'is returned across the river. As the back-hauling lineis drawn back from right to left across the river, the carriages one by one, at the left-hand end ofthe gaged, and whenthe return of the back-hauling line has been completed, thecable strand remains, supported from the blocks and the ,anchorages, entirly self-sustaining. The el ain blocks in the tower superstructure's' bridge, are disenthen are lowered and; the. cable strand issheaves 15 and the false work over the towers are permanently removed.
Temporary supports 24 and 25 for the waycables 16, the latter equipped with a sheave 26 for the messenger line 21, are obviously advantageous. The ultimate position of the anchored cable strand is in Figs. II and III- indicated by the-dotted line 27; and it will be apparent that, when the last cable strand has been placed and anchored, the messenger line 21, the back-hauling line 23, and the waycables 16 may be taken away, and that then these temporary supports 24 and 25 will be removed.
We claim as our invention:
1. Bridge-building apparatus adapted for use in cooperation with bridge towersand two anchorages, such apparatus including adjustable doubleway-cables, a plurality of carriages movable upon said way-cables, each carriage adapted to receive a cable-strand and provided-with a clamp, a messenger line capable of being'drawn to and fro over the bridge towers'and adapted to engage at one end a cable strand and to draw the cable strand to position between the anchorages and upon the towers, and a back-hauling line adapted to be engaged by the carriage clamps.
2. Bridge-building apparatus adapted for use in co-operation with bridge towers and two anchorages, such apparatus including a sheave and a pair of guides borne by each bridge tower, the guides spaced above the sheave, a pair of adjustable way-cables borne by said guides, a plurality of carriages movable upon said way-cables, each carriage adapted to receive acable-strand and being provided with a clamp, a back-hauling line adapted to be engaged by the carriage clamps, and means for hauling a carriagesustained cable-strandto its position of rest with respect to the anchorages, and temporarily supported above the tower sheaves.
3. In combination with a bridge tower I equipped with a cable-carrying saddle, false work borne by the tower including a strandcarrying sheave, apair of guides arranged at an interval above said sheave, and hoisting apparatus, a pair of way-cables resting in said guides, a plurality of strand carriages movable upon said way-cables, a back-haul line to which said carriages are removably' attachable, and means for hauling a carriageborne strand to place.
' 4. In. false work upon a bridge tower a 4 I sheave rotatable upon a horizontal axis arranged transversely upon the tower, a pair of guides arranged at an interval above said sheave spaced apart and symmetrically arranged with respect to the vertical mid-plane, perpendicular to the axis of the sheave, each guide including two vertically extendin plates with arc-shaped upper edges an sheaves journalled in the space between and presenting a bearing face at a lower level than the plate edges, and hoisting means adapted to move a load vertically in the aforementioned mid-plane of the sheave, together with a pair of way-cables resting on the sheaves within the guides and a plurality of strand carriages equipped each with a seat for a cable strand and with a pair of grooved traction wheels-spaced apartat an interval corresponding to that between the guides, the rims of each wheel being, spaced apart at a distance equal to the spacing apart of the plates of which each guide is composed, the vertical distance between the strand seat of the carriage and the running face of the traction wheels being less than the vertical distance between the sheave and the pair. of guides first mentioned.
5. Bridge-building apparatus adapted for use in cooperation with bridge towers and two anchorages, such apparatus including double way-cables, a plurality of carriages movable upon said way-cables, each carriage adapted to receive a cable-strand, a messenger line capable of being drawn to and fro over the bridge towers and adapted to engage at one end a cable strandand to drag the engaged cable strand to position between the anchorages and upon the towers, and a line engaged by said carriages.
6, In false work upon a bridge tower-a sheave rotatable upon a horizontal axis ar-,
ranged transversely upon the tower, a pair of guides arranged at an interval above said sheave, spaced apart, and symmetrically arranged with respect to the vertical mid-plane perpendicular to the axis of the sheave, a pair of wa -cables resting upon said guides, a plurality of strand carriages each including upper lateral sheaves adapted alternately to rest upon and to travel upon said pair of guides and said pair of way-cables and a lower central ,strand support, the vertical distance between the strand seat of the-carriages and the runnin faces of the upper lateral sheaves thereo being less'than the vertical distance between the said sheave upon the tower and the said uides arranged above the sheave, together Wlth a messenger In testimony whereof wel have hereunto I set our hands. 7
' 'VERE B. EDWARDS.
GEORGE F. WOLFE. 7
US424883A 1930-01-31 1930-01-31 Bridge-building apparatus Expired - Lifetime US1785023A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US424883A US1785023A (en) 1930-01-31 1930-01-31 Bridge-building apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US424883A US1785023A (en) 1930-01-31 1930-01-31 Bridge-building apparatus

Publications (1)

Publication Number Publication Date
US1785023A true US1785023A (en) 1930-12-16

Family

ID=23684267

Family Applications (1)

Application Number Title Priority Date Filing Date
US424883A Expired - Lifetime US1785023A (en) 1930-01-31 1930-01-31 Bridge-building apparatus

Country Status (1)

Country Link
US (1) US1785023A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3086232A (en) * 1960-10-12 1963-04-23 Colorado Fuel & Iron Corp Method of and apparatus for spinning cables for suspension bridges
US3531811A (en) * 1968-10-15 1970-10-06 Bethlehem Steel Corp Method for erecting parallel-wire bridge strand
US20070124876A1 (en) * 2005-12-01 2007-06-07 Tao Jian R Self-anchored suspension bridge
US20170138637A1 (en) * 2012-09-10 2017-05-18 Ahmed ADEL Holding device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3086232A (en) * 1960-10-12 1963-04-23 Colorado Fuel & Iron Corp Method of and apparatus for spinning cables for suspension bridges
US3531811A (en) * 1968-10-15 1970-10-06 Bethlehem Steel Corp Method for erecting parallel-wire bridge strand
US20070124876A1 (en) * 2005-12-01 2007-06-07 Tao Jian R Self-anchored suspension bridge
US7415746B2 (en) * 2005-12-01 2008-08-26 Sc Solutions Method for constructing a self anchored suspension bridge
US20170138637A1 (en) * 2012-09-10 2017-05-18 Ahmed ADEL Holding device
US10634386B2 (en) * 2012-09-10 2020-04-28 Ahmed Adel Holding device

Similar Documents

Publication Publication Date Title
CN101476293A (en) Non-stand construction method for large bridge arch rib
JP5812325B2 (en) Electric wire tension reduction device and electric wire tension reduction method
US1785023A (en) Bridge-building apparatus
KR20140065124A (en) Lifting gantry for girder erection works of suspension bridges
CN105586832A (en) Suspension type catwalk surface net mounting system
CN105645275A (en) Cable hoisting crane and construction method thereof
US2035107A (en) Cable crane
CN111874745A (en) High-speed rail trackless constant-tension contact line erecting technology and device
US2971255A (en) Method of spinning cables for suspension bridges
CN212358007U (en) Tie bar pocket hanging device without temporary cross beam
CN214656390U (en) Continuous small-stroke lowering device for bottom basket of hanging basket
CN209923793U (en) Ultra-wide overhanging combined guy rope hanging basket assembled on site by adopting prefabricated parts
US3531811A (en) Method for erecting parallel-wire bridge strand
CN110241736A (en) Suspension cable Fast Installation construction method
CN214467503U (en) River-crossing index system of hydrological flow measurement device
CN219670013U (en) Hoisting system suitable for long and narrow tunnel anchor hole with multiple dip angles
SU48665A1 (en) The method of rolling aerial wire high-voltage transmission threads
CN213205758U (en) Cable suspension pulley device
CN214989990U (en) Material conveying and lifting equipment for bridge construction in field of bridge engineering
CN212985289U (en) Down-hole air duct hanging device
CN212424976U (en) High-speed railway trackless constant tension contact line erecting device
CN113605237B (en) Box girder hogging moment prestress tensioning protection device
US3202110A (en) Method and means for adjusting a tramway cable tensioning device
CN114784708B (en) Composite cable installation method for newly-built jacket
CN113526187B (en) Method for laying belt at head of belt conveyor in limited space of transfer station into rolled belt