US1579021A - Railway-tie construction - Google Patents

Railway-tie construction Download PDF

Info

Publication number
US1579021A
US1579021A US42539A US4253925A US1579021A US 1579021 A US1579021 A US 1579021A US 42539 A US42539 A US 42539A US 4253925 A US4253925 A US 4253925A US 1579021 A US1579021 A US 1579021A
Authority
US
United States
Prior art keywords
ties
rails
railway
track
tie
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US42539A
Inventor
George W Muller
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US42539A priority Critical patent/US1579021A/en
Application granted granted Critical
Publication of US1579021A publication Critical patent/US1579021A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B3/00Transverse or longitudinal sleepers; Other means resting directly on the ballastway for supporting rails
    • E01B3/16Transverse or longitudinal sleepers; Other means resting directly on the ballastway for supporting rails made from steel
    • E01B3/22Longitudinal sleepers; Longitudinal sleepers integral or combined with tie-rods; Combined longitudinal and transverse sleepers

Definitions

  • the marked increase inthe weight ofthe struction requires a corresponding increase in the strength and stability-voftheroad bed, including the rails, ties andfthenjsupports therefor, and the improved structure herein disclosed isl designed togeiectually"accomv plish the above resultsand preventany tendency of the rails andties vto settle or work loose under the severe strains to which they are subjected.
  • the upper rails are the foneson which the,v
  • rolling stock moves, while the lowerrails are embedded in a oundationor bedding, pref- .5 erablyof lrock ballast, gravehhard clay, or
  • ybutl may, be 01": the usual broken l stone or gravel ballastand indicated conventionally atv 13.
  • v 1 the usual broken l stone or gravel ballastand indicated conventionally atv 13.
  • Vties 12 are in Figure 1, with each alternate pai Sanderstendu ing at gagreater distance Yfrom the'frail atV varranged in pairs, as shown so. Y
  • the joints of the single track .rail as or-r dinarilyconstructed are liable to deflection -u-nder heavy loads, and require constant adjustment.
  • Y I Y The lower rail materially increases the stillness and maintains the track in alignment, and' prevents it from lateral displacenien-t or working out of line, Vas" the lower rail being embedded in the foundation and firmlybolted to the ties and to the upper rail, eflectually prevents any lateral; displacevine-nt or creeping of the rails.
  • the whole track is firmly' tied together .and its weight materially increased which is essential, and the bearing surface oftheties also materially increased and maintains the bearings lfor the ties uniform andcarrying the load equally as the train passes over.
  • ballast will be'tainped under the ties. and between and under the rails and outside of the same, as illustrated inlfigurev, andthe track levelled up to line.
  • the lower supporting rails 11 may be old worn out rails, the two sets o'f-ra'i-ls being u-nited by clamp bolts 14 and clamp plates 15, as shown. y
  • railway* construction the ties arranged yin spaced pairs,each pair forming a vseparate unit, said units being arranged lin staggered relation.
  • groups of ties each group comprising a plurality of ties arranged lengthwise adjacent-one to another, each group of ties being spa-ced from a succeeding group, and each group having the ends ofthe ties arranged to extend to agreater distance beyond the track on one side and a lesser vdist-ance beyond the track on the otherA side, ⁇ and one'group of'ties Vhaving its greatest. extent on one side ofthe track and the succeeding group of ties having its greatest-"extent on the other side of.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Description

March 30 1926. 1,579,021
G. w. MULLER N @TI lH 51 RAILWAY TIE CONSTRUCTION i@ En @fel-QD 'di Mmmm E] MATTORNEY.
Y To all whom it 'may concern:
Patented Mar. 30, 1926.
UNITED surgi-:.3
GEORGE W.- MUL1EE,oEWasH1NGroN, nis'T'EIcTroF-GOLUMEIA.
l EAIEWAY-'TIE ooNsTEUCTIoNQ Application-inea vJuiyV 9,
v enable them4 to withstand` thev increased rolling stock.l of present 'day railway 'con- Weightof theinodern locomotive and other' rolling stock. Y Y
vide a construction including a sub-support beneath the ties and extending longitudinally of the rails and embedded in the foundation or road bed, and coupled to the Vrails through the ties. n
The marked increase inthe weight ofthe struction requires a corresponding increase in the strength and stability-voftheroad bed, including the rails, ties andfthenjsupports therefor, and the improved structure herein disclosed isl designed togeiectually"accomv plish the above resultsand preventany tendency of the rails andties vto settle or work loose under the severe strains to which they are subjected. Y n Y 1 ,n y l lVith the usual' construction of trackage, the constant pounding or hammering of the rolling stock, especially of the very heavy locomotives now used,soon produces anuneven surface over which the vehicles move, and thereby caused to quickly destroy the lroad bed units and materially-iV increase the cost of maintenance.y l In the usually constructed road bedwincluding the single wood tie at spacedinter-v vals, theties are liable to be embedded in' the ballast, especially where soft spots 'oc cur,y and cause 4the rails to settleand the trains thereby to run unevenly ,and materially increasing the severity of the pounding action. Because ofthe lightnessof the usual sizeof tie, the heavy locomotiveand the cars that follow, cause the unevenness of the trackto be accentuated and the locomotive and carsY tosway 'fromside to side, thus ma.- terially increasing the tendency of the rails and ties to be misplaced both vertically and transversely. To prevent the swaying of the rolling stock'due to theuneven track, the
method comprising thisginvention is to pracc i925. s'eriai'nb. 42,539., n
tically Widen and increase ithe ground area v included 11i-the spreadl and extentof the ties. 'VVhilefthis' applicanthas sho-Wn and described vthetiesyin pairs, .it isfbelieved to be Within the Apurview .of this ,invention to group' the ties 'in any desired number. Y
'Ihe improvedftie and its supports herein Idisclosed will` effectually overcome the objectionsfabove noted, andA hold the rails lin position Vand effectually resist any ,tendency to displacementeither laterally or vertically. The improved device is best illustrated in Figure l is-a planview of a section o'f-a Figures 4 and 5 aredetached perspective .A c the vaccompanying drawings, in which:V n Another objectV ofthe inventionis to prorailway track constructed in accordance with views from aboveand from beneath,yoffone of thevimproved tie plates.y
- .The main kornupp'er yrails'jare @Presented conventionally at l0 fand'thef` lower or sup` portingf'r'ails atlll, and. theties Aat `12,'th'e Vlatter being'disposed betweenltheuppe'r and` Y lower rails, 'as shown.
The upper rails are the foneson which the,v
rolling stock moves, while the lowerrails are embedded in a oundationor bedding, pref- .5 erablyof lrock ballast, gravehhard clay, or
the like, ybutlmay, be 01": the usual broken l stone or gravel ballastand indicated conventionally atv 13. v 1
The Vties 12 are in Figure 1, with each alternate paireiztendu ing at gagreater distance Yfrom the'frail atV varranged in pairs, as shown so. Y
one 'end'than the other, .-andtheremaining al- 'v ternate pairs likewise extendingfat a greater distance from the rail at one end than at the other, but reversely series of double ties. v c y y Inother words, the series of doubletijes are arranged in staggered,relation. V
By this means the transverse areaof the increasing the lengthof .theties v he widespread secured; bythe staggered arrangement of the doubleseries Vof ties materially increases the ground footing or spread, equal to nearly four times the ordi- 10o:y tie support is materiallyfincreased without los nary arrangement with the single tie, `and Will carry a'material increase of Weight of the rolling stock'without deflection. f
j' to the first mentioned y Theflower oryunder rail Vinaterially' iii-" `j;
creases the stiffness and stability of the structure and helps to carry the heavy lead of the train without vibration and holds up the top rail and relieves the bearing down load and strainv on the upper vrai-l at any one point, and inaddition holds up and supports the joints and ties of the upper rail, besides.
distributing the weight along the track in a similar manner to a truss carrying a load.A
The joints of the single track .rail as or-r dinarilyconstructed are liable to deflection -u-nder heavy loads, and require constant adjustment. Y I Y The lower rail materially increases the stillness and maintains the track in alignment, and' prevents it from lateral displacenien-t or working out of line, Vas" the lower rail being embedded in the foundation and firmlybolted to the ties and to the upper rail, eflectually prevents any lateral; displacevine-nt or creeping of the rails.
The whole track is firmly' tied together .and its weight materially increased which is essential, and the bearing surface oftheties also materially increased and maintains the bearings lfor the ties uniform andcarrying the load equally as the train passes over.
No single tie or pair of tiesca'n become embedded in the ballast at a' soft spot, nor to give way undery the load. y Y
After the ties and rails are bolted together, the ballast will be'tainped under the ties. and between and under the rails and outside of the same, as illustrated inlfigurev, andthe track levelled up to line.
The lower supporting rails 11 may be old worn out rails, the two sets o'f-ra'i-ls being u-nited by clamp bolts 14 and clamp plates 15, as shown. y
The jo-ints between the upper rails are reinforced by the usual fish or clamp plates lWhat is claimed and desired to be secured by Letters Patent is z Y 1. In railway construction the ties arranged in spaced pairs, the unitsl of each.
pair disposed side by side, with eaehalternate pair of ties lextended to greater distance from one rail than from the other, and the remaining` alternate pairs ofties'entendmaining alternate pairs of ties extended to a greater distance from said other rai-l than from the first mentioned rail, supports extending beneath the ties and in vet'ical alignment with the rails, and means for connecting the rails, ties and supports.
3. ln railway construction the ties .ary ranged in spaced pairs', the units of each pair ldisposed side by side with'each alte-rnat'e pair of ties extended to a greater distance from one rail than from the other.
d. ln railway* construction, the ties arranged yin spaced pairs,each pair forming a vseparate unit, said units being arranged lin staggered relation. n l Y* 5. In railway .tie construction, groups of ties, each group comprising a plurality of ties arranged lengthwise adjacent-one to another, each group of ties being spa-ced from a succeeding group, and each group having the ends ofthe ties arranged to extend to agreater distance beyond the track on one side and a lesser vdist-ance beyond the track on the otherA side, `and one'group of'ties Vhaving its greatest. extent on one side ofthe track and the succeeding group of ties having its greatest-"extent on the other side of.
the track.
f-(fl. In railway tie construction, groups-of Y ties, each group comprising a plurality or ties, andeach gro-uphaving the ends ofthe ties arranged to extend to a greater distance beyond the track on one side and 'a lesse-r distance beyond the track on the'other side, and `one group of ties having its greatest extent on one side of the track and the succeeding gro-up of ties having its greatest eX- tenten the other sidecf the track. i
7. In railway tie construction, a Vplurali-'ty of staggeredV groups of ties, rails supported thereby, and retaining means common to a plurality of ties ofv a group and toV the'ad- Y jacent rail.
8'. In a railway tieconstruction, a plurality of staggered groups `of connected ties.
9. ln a railway tie construction, a pluraliyty of staggered groups of connected ties, and rails supportedthereby.
In testimony whereof l afliXrrmy signature.
' ern-oase w. MULLER.
US42539A 1925-07-09 1925-07-09 Railway-tie construction Expired - Lifetime US1579021A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US42539A US1579021A (en) 1925-07-09 1925-07-09 Railway-tie construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US42539A US1579021A (en) 1925-07-09 1925-07-09 Railway-tie construction

Publications (1)

Publication Number Publication Date
US1579021A true US1579021A (en) 1926-03-30

Family

ID=21922479

Family Applications (1)

Application Number Title Priority Date Filing Date
US42539A Expired - Lifetime US1579021A (en) 1925-07-09 1925-07-09 Railway-tie construction

Country Status (1)

Country Link
US (1) US1579021A (en)

Similar Documents

Publication Publication Date Title
US2337497A (en) Railroad track construction
US2875953A (en) Railway track construction
US1579021A (en) Railway-tie construction
US1761147A (en) Arrangement of base plates on ties
US681567A (en) Railroad-track.
US1260736A (en) Means for securing railroad-rails to road-beds.
US1645514A (en) Railroad tie
US870255A (en) Composite railway-tie.
US1761148A (en) Railroad-track structure
US1425686A (en) Composite railway tie
US910559A (en) Railway.
US1250208A (en) Railroad construction.
US756962A (en) Railroad joint and chair.
US265538A (en) Railroad
US1705308A (en) Railroad-track structure
US853209A (en) Railway-rail.
US1121421A (en) Railway-track construction in paved streets.
US1436664A (en) Rail-joint supporter
US971132A (en) Railway-tie.
US870181A (en) Railway-track construction.
US917600A (en) Railroad-track construction.
US1577286A (en) Railway-bed structure
US1517793A (en) Composite railroad crosstie or sleeper for supporting the rails of a railroad track
US894360A (en) Railway-tie.
US1766796A (en) Roadbed