US132682A - Improvement in laying wood pavements - Google Patents

Improvement in laying wood pavements Download PDF

Info

Publication number
US132682A
US132682A US132682DA US132682A US 132682 A US132682 A US 132682A US 132682D A US132682D A US 132682DA US 132682 A US132682 A US 132682A
Authority
US
United States
Prior art keywords
blocks
improvement
pavement
pebbles
pavements
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
Publication date
Application granted granted Critical
Publication of US132682A publication Critical patent/US132682A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/52Apparatus for laying individual preformed surfacing elements, e.g. kerbstones

Definitions

  • My invention consists in a series of manipulations constituting a method for layin g ⁇ pavements, whereby time, labor, and expense in laying the pavement are saved, and it is rendered more easy to take up and replace in case of repair to the substructure ofthe streets, and more solid and durable.
  • the pavement is of that class in which rectangular blocks, separated by narrow7 channels packed with pebbles or gravel, form .the wearing part of the pavement; and the principal novelty in the whole method is the puddling77 or softening the earth foundation ofthe pavement after the blocks are laid and the channels partly packed with pebbles or gravel, before ramming.
  • the gravel or earth road-bed A is rst graded to the form required, and to a properv height to allow for the depth of the blocks when rammed.
  • the blocks B are set in the usual way of setting stone blocks.
  • a parting strip, C Upon the upper edges of the set blocks is hung a parting strip, C, by a bracket, c, projecting from one side.
  • This parting strip is shallower than the blocks, and is to be removed as the work progresses.
  • a second row of blocks is laid against the parting strip, and on the removal of the parting strip a channel, b, will remain between the two rows of blocks.
  • This channel is next filled about two-thirds full with pebbles or gravel D, poured in from a shovel or scoop or other proper tool.
  • the nozzle of a hose, pipe, or watering-pot, E is next introduced to the partially-filled channel, and sufcient water allowed to flow through among the pebble-packing to saturate the earth foundation or render it puddled or muddy.
  • the pebbles are then rammed by aid of an iron blade, F, such as is used in laying the Nicholson pavement, and subsequently the blocks are rammed into the foundation while it is still ⁇ puddled or muddy.
  • the channels are now iilled with pebbles or gravel, and the whole pavement covered with gravel or sand in the usual way.

Description

E. P. MoRoNG.
Improvement i-n Wood-Pqvements.
Pate'nt'edct. 29,'187'12.
. Wa'veawew.
fare/Mag' zQ/im Unrrnn Sterns hernan I(Drrrcn.
EDWARD l). 'MORONGQ OF BOSTON, MASSACHUSETTS.
IMPROVEMENT IN LAVING WOOD PAVEMENTS.
Specification forming part of Letters Patent No. 132,682, dated October 29, 1872.
To all whom it may concern:
Beit known that I, EDWARD l?. MORONG, of Boston, in the county of Suil'olk and State of Massachusetts, have invented certain new and useful Improvements in Method of Laying Pavements, and do hereby declare that the following is a full, clear, and exact description of the same, reference being had to the accompanying drawing making a part of this specification, in which- Figure l is a perspective view of a street in which a pavement is being laid by means of and in accordance with my improved method; and Fig. 2 is a section of the pavement upon a line with'the direction of the street.
Letters of like name and kind refer to like parts in each of the iigures.
My invention consists in a series of manipulations constituting a method for layin g` pavements, whereby time, labor, and expense in laying the pavement are saved, and it is rendered more easy to take up and replace in case of repair to the substructure ofthe streets, and more solid and durable.
The pavement is of that class in which rectangular blocks, separated by narrow7 channels packed with pebbles or gravel, form .the wearing part of the pavement; and the principal novelty in the whole method is the puddling77 or softening the earth foundation ofthe pavement after the blocks are laid and the channels partly packed with pebbles or gravel, before ramming.
No ooring of wood or other material need be prepared for this pavement, but the blocks are laid directly on the graded bed, and then partially embedded in the earth foundation while it is in a puddled or muddy condition.
The gravel or earth road-bed A is rst graded to the form required, and to a properv height to allow for the depth of the blocks when rammed. Upon this graded .earth foundation the blocks B are set in the usual way of setting stone blocks. Upon the upper edges of the set blocks is hung a parting strip, C, by a bracket, c, projecting from one side. This parting strip is shallower than the blocks, and is to be removed as the work progresses. A second row of blocks is laid against the parting strip, and on the removal of the parting strip a channel, b, will remain between the two rows of blocks. This channel is next filled about two-thirds full with pebbles or gravel D, poured in from a shovel or scoop or other proper tool. The nozzle of a hose, pipe, or watering-pot, E, is next introduced to the partially-filled channel, and sufcient water allowed to flow through among the pebble-packing to saturate the earth foundation or render it puddled or muddy. The pebbles are then rammed by aid of an iron blade, F, such as is used in laying the Nicholson pavement, and subsequently the blocks are rammed into the foundation while it is still `puddled or muddy. The channels are now iilled with pebbles or gravel, and the whole pavement covered with gravel or sand in the usual way.
I prefer at this stage to give a second ramming, but it is not absolutely essential.
In consolidating a road-bed or form77 preparatory to setting pavement it has not been unusual to sprinkle the soil with water and then roll or ram the earth so as to get a hard foundation, and, after thel blocks have been set and covered with a thin final sand dressing, Water has been applied to wash the sand into the in'terstices between the blocks.
But these uses of'water dii-fer from mine. I desire the road-bed to be in shape, but not hard, when the'blocks are set. I till the channels with' pebbles, and the blocks are thus braced on all sides and hold their position. I then soften the road-bed with the use ot' a profusion of water conducted and directed into the channels themselves; ram the pebbles so that they wedge against the blocks and form rude ratchets or pawls to hold and brace the rows of blocks against each other as the blocks are rammed down; and I then ram the blocks well into the muddy bed, where they all set when left aloneeach like a post in its post-hole-pwhile the mud also rises among the pebbles and interstices ofthe blocks, iormin g a sort of natural conglomerate in the channels.
The described parting strip I believe to be novel, and propose to patent in another application.
, Having thus fully set forth the nature and merits of my invention, what I claim as new 1S- The method of pnddling the foundation-bed of Wood pavements, and of giving to the latter a rm bearing, consisting in applying Wa- September, 1872. ter to said foundation after the blocks have been laid in position and the channels partly filled with pebbles or gravel, an@ afterward ramming said lling and blocks, substantially as speciied.
In testimony that I claim the foregoing I have hereunto set my hand this 5th day of EDWARD P. MORON Gr.
Witnesses:
GEO. S. PRINDLE, J oHN R. YOUNG.
US132682D Improvement in laying wood pavements Expired - Lifetime US132682A (en)

Publications (1)

Publication Number Publication Date
US132682A true US132682A (en) 1872-10-29

Family

ID=2202099

Family Applications (1)

Application Number Title Priority Date Filing Date
US132682D Expired - Lifetime US132682A (en) Improvement in laying wood pavements

Country Status (1)

Country Link
US (1) US132682A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4925336A (en) * 1988-03-22 1990-05-15 Riedel Omni Products, Inc. Pad for supporting a utility access conduit and method for installing same
US5030030A (en) * 1988-03-22 1991-07-09 Riedel Omni Products, Inc. Pad for supporting a utility access conduit and method for installing same

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4925336A (en) * 1988-03-22 1990-05-15 Riedel Omni Products, Inc. Pad for supporting a utility access conduit and method for installing same
US5030030A (en) * 1988-03-22 1991-07-09 Riedel Omni Products, Inc. Pad for supporting a utility access conduit and method for installing same

Similar Documents

Publication Publication Date Title
US132682A (en) Improvement in laying wood pavements
US510259A (en) Pavement
US511870A (en) Method of constructing roads
US374378A (en) Dam and reservoir construction
US176573A (en) Improvement in pavements
US119836A (en) Improvement in wood pavements
CN218203658U (en) Durable bituminous pavement structure
US223431A (en) Cornelius bremerkamp
US777524A (en) Combined curb and conduit.
US134404A (en) Henry m
US1199751A (en) Roadway.
US5475A (en) The graphic co
US134985A (en) Improvement in wood pavements
US113929A (en) Improvement in wood pavements
US247421A (en) John j
Gillette Economics of road construction
US568673A (en) Concrete bridge
Alder Cost and Construction of Macadam Roads
US88455A (en) Improved wooden pavement
US398074A (en) Combined curb and gutter
US421235A (en) Pavement and gutter
US164231A (en) Improvement in pavements
USRE11088E (en) Patrick griffin
US521364A (en) Road-pavement
Mackenzie et al. ACCOUNT OF THE BRIDGE OVER THE SEVERN, NEAR THE TOWN OF TEWKESBURY, IN THE COUNTY OF GLOUCESTER, DESIGNED BY THOMAS TELFORD, AND ERECTED UNDER HIS SUPERINTENDENCE.(INCLUDING PLATES).