US1127957A - Process of laying concrete floors and the like. - Google Patents

Process of laying concrete floors and the like. Download PDF

Info

Publication number
US1127957A
US1127957A US68061012A US1912680610A US1127957A US 1127957 A US1127957 A US 1127957A US 68061012 A US68061012 A US 68061012A US 1912680610 A US1912680610 A US 1912680610A US 1127957 A US1127957 A US 1127957A
Authority
US
United States
Prior art keywords
wearing
layer
cement
concrete
laying
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US68061012A
Inventor
Preston Martin Bruner
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US68061012A priority Critical patent/US1127957A/en
Application granted granted Critical
Publication of US1127957A publication Critical patent/US1127957A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/005Methods or materials for repairing pavings
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10STECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10S264/00Plastic and nonmetallic article shaping or treating: processes
    • Y10S264/43Processes of curing clay and concrete materials
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10STECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10S264/00Plastic and nonmetallic article shaping or treating: processes
    • Y10S264/57Processes of forming layered products

Definitions

  • rll ⁇ his invention relatesmore especially to the provision for an improved wearing surfacel of cement on top of old concrete floors, and especially on those constructed of reinforced concrete.
  • the primary object of this invention is to provide an improved floor of this character which will have a minimum degree of porosity and sponginess, and which will not become sandy or crumble away in the manner which is so prevalent at the present time.
  • Figure l is a vertical section of a Hoor constructed according to my -improved process.
  • Fig. 2 is a top plan view of the same, showing the various strata broken away to more clearly illustrate the idea.
  • reinforced concrete itself does not form a satisfactory wearing surface for a floor under any circumstances. It has, therefore, become customary either to con- -struct a wooden floor above the concrete, or
  • aA heavy stratum is employed to obtain the necessary strength without depending so ymuch upon its adhesion. to the con crete stratum therebelow. Even a thin layer of this character is more or less subject to becoming dusty or sandy on top when in use.
  • my improved process contemplates laying such coat upon the conc-rete below after the under concrete has been previously prepared in such la ⁇ manner as to cause the upper layer tocombine with it -to form an integral :partthereof, so as to partake of its inherent strength and solidity.
  • my .process contemplates lthe elimination of all excess moisture while the cement is being compressed sufficiently so that the wearing layer is, vin avery short space of time, A prepared to be finished smoothly and of sufiicientstiness to be walked upon.
  • a wearing coat can be readily placed on the desired level or evenness, andthen manipulated to-a perifeetlnish without disturbing the adhesion between it and the under ying concrete Y structure.
  • the entire other water-tight material is first of all thoroughly cleaned, so that all loose, soft material, mortar, dust, and dirt is removed; and if the top surface of the same is undel sirably smooth, or glassy, it is first roughen'ed, thus providing it with projections and indentations, indicated at 3 in Fig. l.
  • a thin slush 5 see Fig.
  • a fabric or netting such as woven burlap, cheesecloth, or the like, so as to cover the entire surface.
  • a dry layer of any suitable water-absorbing material 7 such as Portland cement with suitable aggregates or Sorel cement with suitable aggregates is .placedrfor the purpose of taking up quickly the excess of water which is present 1n the wearing stratum 4, and which had been placed in such wearing stratum for the purpose of meeting the requirements connected with laying such surface.
  • this absorbent materlal is composed ef the same material used as a wearingsurface, but dry, and this is afterward used to form the Wearing coat or topping of the next portion of the work.
  • this absorbent layer is imme' diate andl rapid,and prepares. the wearing ⁇ stratum to be' nally finished within the space of from ten to fifteen minutes after the same has been'deposited. .
  • TheI liquid absorbed out of the-first batch is Vthus transferred as part ofthe water required for plasticity of the topping which is to form the next batch.y
  • The'damp material is therevfore taken v,up and -put in the mixing box and worked to a thin paste by the addition of a vlittle more liquid, after which it is spread -the prevalent method of constructing the wearing strata ordinarily involves a long delay in the finishing, often for hours, to permit the excess of liquid to become sufiiciently absorbed preliminary to the finishing operations which must then be carried qn so hurriedly and violently that the cement bond between the strata land 4 is commonly ruptured and ruined.
  • the incipient crystallization of the top of the wearing coat is broken up and partly ruined if disturbed so long after the same

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Floor Finish (AREA)

Description

, P. M. BRUNER.
PROCESS 0F LAYING CONCRETE FLOORS AND THE LIKE.
APPLICATION FILED PEB. 29, 1912. 4 LQKQW. Patented Feb. 9, 1915.
PRESTON MARTN BRUNER, 01E ST. LOUIS, MISSOURI.
PROCESS OF'LYING- CONCRETE FLOORS ANI? THE LIKE.
Specilcation` of LettersA Patent. j
Patented `web. 9, MM5..
Application 'ledFebruary 29, 1912.v Serial No. 680,610.
To all whom t may concern Be it known that I, PRESTON M. BRUNER, a lcitizen of the United Statesh the\ci`ty of St. Louis and State of Missouri, have invented certain new yand `useful llmprovements in Processes of Laying Concrete Floors and the like, of which the `following is a specification.
rll`his invention relatesmore especially to the provision for an improved wearing surfacel of cement on top of old concrete floors, and especially on those constructed of reinforced concrete.
The primary object of this invention is to provide an improved floor of this character which will have a minimum degree of porosity and sponginess, and which will not become sandy or crumble away in the manner which is so prevalent at the present time.
Other and further objects will appear in the specication and be specifically pointed out in the appended claims, reference being had to the accompanying drawings exemplifying the invention, and in which,
Figure l is a vertical section of a Hoor constructed according to my -improved process. Fig. 2 is a top plan view of the same, showing the various strata broken away to more clearly illustrate the idea.
Obviously, reinforced concrete itself does not form a satisfactory wearing surface for a floor under any circumstances. It has, therefore, become customary either to con- -struct a wooden floor above the concrete, or
to cover the reinforced concrete with an independent layer of a strong concrete mixture from three to four inches thick. In doing this, a dead load of from forty to ift-y pounds per square foot is placed on the Hoors 'of-a building merely to provlde a satisfactory wearing surface. Even aside from this serious drawback, there are numerous other objections to heavy cement ioors which are laid according to present well-known processes. Thus,v in laying such a Hoor, the cement must be deposited in -a very moist condition in order to be readily molded into the desired form, after which, considerable time must elapse to permit the material to dry out suiliciently ito adapt it to v properly receive the finishing manipulations. This consideration oftentimes necessita'tes the idleness of a considerable I' ang of men who must be on hand and rea -y vto Aperfect the finishing operation upon the residing in floor within a short space of time, commencing with a certain critical moment in the setting of the cement.. As la result, contractors for this class of Work are subjected to much annoyance and considerable expense. Moreover, method generally become porous and spon so that even the mere sweeping of the floor detaches considerable dust and line particles, which are very injurious to machinery, merchandise, etc., and moreover cause the rapid deterioration of the floor. The floor, in fact, becomes sandy, is easily broken, and as a rule crumbles readily. 0f shifts-for overcoming these difficulties, the employment l0f paints to cover, or harden, as been one form, and the use of various nostrums, mixed with the concrete, has been resorted to 4with the idea of binding the top surface'securely, and forming a hardtop surface. Where a thin wearing stratum maybe laid, we overcome the objections to the yheavy cement floor, but this thin layer is not adapted to withstand the ordinary blows or strains to which it is sure to be floors constructed by thisv the make-- subjected, unless it is combined thoroughly if with the concrete below it and thus is made an integral part in respect to the strength and solidity of the original structure. 10bviously, aA heavy stratum is employed to obtain the necessary strength without depending so ymuch upon its adhesion. to the con crete stratum therebelow. Even a thin layer of this character is more or less subject to becoming dusty or sandy on top when in use.
To eliminate all of the above mentioned ditlioulties and objections with thin or heavy' coats, my improved process contemplates laying such coat upon the conc-rete below after the under concrete has been previously prepared in such la `manner as to cause the upper layer tocombine with it -to form an integral :partthereof, so as to partake of its inherent strength and solidity. In doing this, my .process contemplates lthe elimination of all excess moisture while the cement is being compressed sufficiently so that the wearing layer is, vin avery short space of time, A prepared to be finished smoothly and of sufiicientstiness to be walked upon. Accordi-ng to :this method, a wearing coat can be readily placed on the desired level or evenness, andthen manipulated to-a perifeetlnish without disturbing the adhesion between it and the under ying concrete Y structure. Most important of all, the entire other water-tight material, is first of all thoroughly cleaned, so that all loose, soft material, mortar, dust, and dirt is removed; and if the top surface of the same is undel sirably smooth, or glassy, it is first roughen'ed, thus providing it with projections and indentations, indicated at 3 in Fig. l. When -this operation has been completed, a thin slush 5 (see Fig. l) of rich fresh cementing material, made alkaline with potash or soda lye, is poured thereon and swept Vback and forth until itis thoroughly/'worked into the pores of the old concrete. While this slush is yet in `the slushy and wet state, I place thereover a layer 4 of self-hardening material, or wearing surface.
After the wearing stratum has been properly laid, I lay thereon a fabric or netting, such as woven burlap, cheesecloth, or the like, so as to cover the entire surface. On this fabric or webbing 6,-a dry layer of any suitable water-absorbing material 7 such as Portland cement with suitable aggregates or Sorel cement with suitable aggregates is .placedrfor the purpose of taking up quickly the excess of water which is present 1n the wearing stratum 4, and which had been placed in such wearing stratum for the purpose of meeting the requirements connected with laying such surface. After the dry layer 7 has absorbed ,th-.e excess ofl Water from the wearing stratum 4, said layer 7 is removed from the wearing stratum by lifting the fabric 6. Preferably, this absorbent materlal is composed ef the same material used as a wearingsurface, but dry, and this is afterward used to form the Wearing coat or topping of the next portion of the work.
The action of this absorbent layer is imme' diate andl rapid,and prepares. the wearing `stratum to be' nally finished within the space of from ten to fifteen minutes after the same has been'deposited. .TheI liquid absorbed out of the-first batch is Vthus transferred as part ofthe water required for plasticity of the topping which is to form the next batch.y The'damp material is therevfore taken v,up and -put in the mixing box and worked to a thin paste by the addition of a vlittle more liquid, after which it is spread -the prevalent method of constructing the wearing strata ordinarily involves a long delay in the finishing, often for hours, to permit the excess of liquid to become sufiiciently absorbed preliminary to the finishing operations which must then be carried qn so hurriedly and violently that the cement bond between the strata land 4 is commonly ruptured and ruined. Moreover, the incipient crystallization of the top of the wearing coat is broken up and partly ruined if disturbed so long after the same was placed.
What I claim is:
l. The herein described process of laying cement which consists in applying, upon a suitable foundation, a wet plastic layer of material, and then applying thereover a dry- .ing layer of finely divided absorbent material with an intervening sheet of porous fabric adapted to keep the drying layer physically separate from the plastic material while leavin it in drying relation thereto, and therea tei` removing the sheet and drying layer. y
2. The herein described process of laying cement in sections which consists in applying, upon one section of a suitable foundation, a wet plastic layer of material consisting of a self hardening binder and suitable filler, and then applying over said section a drying layer of finely divided absorbent material composed of the said self-hardening binder material and said filler with an intervening sheet of porous fabric adapted to keep the drying layer physically separate from the plastic material while leaving it in drying relation thereto, permitting such dryingrelation to exist until the drying layer absorbs requisite moisture from the plastic section and then mixing the material of the drying layer with more moisture to produce the plastlc topping material for the next section.
PRESTON MARTIN BRUNER. In presenc of- M. C. AMMER,
H. G. FLETCHER..
US68061012A 1912-02-29 1912-02-29 Process of laying concrete floors and the like. Expired - Lifetime US1127957A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US68061012A US1127957A (en) 1912-02-29 1912-02-29 Process of laying concrete floors and the like.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US68061012A US1127957A (en) 1912-02-29 1912-02-29 Process of laying concrete floors and the like.

Publications (1)

Publication Number Publication Date
US1127957A true US1127957A (en) 1915-02-09

Family

ID=3196100

Family Applications (1)

Application Number Title Priority Date Filing Date
US68061012A Expired - Lifetime US1127957A (en) 1912-02-29 1912-02-29 Process of laying concrete floors and the like.

Country Status (1)

Country Link
US (1) US1127957A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3230843A (en) * 1962-06-29 1966-01-25 Chevron Res Method of compacting resinous overlays
US5339589A (en) * 1993-02-12 1994-08-23 Thrower John H Aggregate floor and method for forming same

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3230843A (en) * 1962-06-29 1966-01-25 Chevron Res Method of compacting resinous overlays
US5339589A (en) * 1993-02-12 1994-08-23 Thrower John H Aggregate floor and method for forming same

Similar Documents

Publication Publication Date Title
US4339289A (en) Concrete overlay construction
US20140000214A1 (en) Decorative aggregate concrete surface preparation process
US2806277A (en) Wall-forming process
US2798822A (en) Method of forming a surface covering
US2109719A (en) Wall construction
US4049853A (en) Terrazzo structure having a sub-surface and an intermediate impermeable sheet
US1127957A (en) Process of laying concrete floors and the like.
US5643509A (en) Method for forming a roller compacted concrete industrial floor slab
US2229742A (en) Tile floor and method of producing
US2315732A (en) Porous concrete construction and method of making the same
KR101724030B1 (en) Method for installing floor covering of building using felt and crack prevention mortar
US1955421A (en) Concrete structure and method of
US2032852A (en) Insulated wall
US2853928A (en) Method for curing concrete
GB338247A (en) Improvements in materials for roads and ways, floors, dampcoursing, and other purposes
US1778727A (en) Composite coating material
US3246057A (en) Process for laying terrazzo
Miller Adobe or sun-dried brick for farm buildings
US1347654A (en) Process of making monolithic pavements
US1705066A (en) Construction of roads
US1705067A (en) Construction of roads for heavy traffic and having alpha foundation course of sand
US1651072A (en) Building construction
KR101724029B1 (en) Floor covering structure of building using felt and crack prevention mortar
US1641874A (en) Method of applying cement hardener and waterproofing to the main body and face of a concrete brick
US1348610A (en) Concrete floor