US1067950A - Filled-in construction. - Google Patents

Filled-in construction. Download PDF

Info

Publication number
US1067950A
US1067950A US75611613A US1913756116A US1067950A US 1067950 A US1067950 A US 1067950A US 75611613 A US75611613 A US 75611613A US 1913756116 A US1913756116 A US 1913756116A US 1067950 A US1067950 A US 1067950A
Authority
US
United States
Prior art keywords
deck
filled
construction
filling
bulkhead
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US75611613A
Inventor
William M Torrance
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US75611613A priority Critical patent/US1067950A/en
Application granted granted Critical
Publication of US1067950A publication Critical patent/US1067950A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/025Retaining or protecting walls made up of similar modular elements stacked without mortar

Definitions

  • infilled-in constructions and particularly to improvements in structures in which earth or other filling material is to be confined.
  • permanent pier constructions for .the sides and ends of piers between slips; and wharf bulkheads for retaining a wharf line in front of filled orpaved areas in harbors andso constructed as to enable a sufficient depth of water to be maintained in front of the wharfline for the proper maintain in the immediate proximity therer of a depth of clear water suflicient for the reception of boats (or forany other purpose);
  • wharf bulkheads for retaining a wharf line in front of filled orpaved areas in harbors andso constructed as to enable a sufficient depth of water to be maintained in front of the wharfline for the proper maintain in the immediate proximity therer of a depth of clear water suflicient for the reception of boats (or forany other purpose);
  • This solid wall is so constructed as to sup- 40 port and retain a solid filling of earth or other material, with which the space immediately behind this solid masonry
  • An object of this invention is to provide a filled-in construction which will beabsolutely permanent and rigid and which will' represent a large saving in first cost' over filled-in constructions built according to methods heretofore followed.
  • a structure of this type embodying the present invention will require a less total number of piling, a less amount of masonry construction an. a less amount of filling and will possess increased stiffness and rigidity. (1) by reason of the absence of any substantial forward thrusting action from the earthfill behind the masonry structure and (2) by reason of the increased horizontal depth of the masonry construction itself.
  • cementitious material such as reinforced concrete
  • the main object of such material being to have no perishable parts above the water; but I do not desire to be understood as limiting myself to the use of cementitious gmaterial, although as I now believe and contemplate, the best results in practising this invention will be ob tainedby the use of reinforced concrete or other equally premanent material in the construction.
  • Figure 1 is a .front view 'of such a bulkhead embodying this invention, the view being taken from the water side thereof;
  • Fig. 2 is a vertical section on'the line AA of'Fig. 1 and shows the use of reinforced concrete and the method of placing the same on the piling;
  • Fig. 3 isahorizontal section on the line BB of Fig. 2 and shows the method of construct-ion.
  • the bulkhead a is supported upon piles 1 which may be of wood, concrete or other suitablematcrial and which are driven into or set in the bed 2 of the harbor.
  • TlllS p11- substantially .to be supported by the ing l is so arranged as as support a system of deck-supporting walls 3 which run head line from rear to front of the structure (Figs. 2 and 3).
  • These walls 3 in turn support a deck 4 which is so constructed as to carry the superimposed load of earth and paving 5, forming the paved area of the wharf, together with the merchandise or other load material which is wharf safely from wall to Wall of the series of walls 3.
  • An important feature of this invention is the downward inclination of the deck 4 toward the rear, which inclination is given thereto in order to eliminate any tendency on the part of the bulkhead to slide forward because of the weight of the superimposed material.
  • This downward inclination to the rear is always less than the angle of repose of the filling material when the same is loaded.
  • fender piles 7 which are suitably fastened to horizontal beams 7 forming thereby a fender system.
  • a curb 8 is provided for confining the pavement of the wharf.
  • sheet piling 11 is driven for the purpose of retalning the earth in case the river-bed should change, as indicated by the dotted line 2, for example.
  • the inclination to the iorizonta-l of the main portion of the top of the deck 4 is less than the angle of repose of the filling material when loaded with the paving or other roadbed material, from which it results that the filling will at right angles to the bulk- I 'rest on the deck with substantially no tendency to slip and with only the vertical gravity resultant force coming into play or acting against the deck.
  • the transverse reinforcin members 10 give stiffness and stability to the structure and to prevent buckling of the same in case the structure is subjected to forces actingin the direction of the bulkhead line, such as the stresses occasioned by the striking or rubbing of vessels in coming alongside the structure.
  • the deck-supporting walls 3 may be omitted and the piles 1 (in this case preferably of concrete or in the form of concrete columns) extended upward until they take the load off and support the deck 4; or other suitable ways of supporting the deck 4 may be provided.
  • a filled-in construction comprising an inclined deck; means supporting the same; and filling supported by the deck.
  • a filled-in construction comprising an inclined deck; piling supporting the same; and filling supported by the dec 3.
  • a filled-in constructionv comprising an inclined deck; piling supporting the same; walls interposed between the piling and deck; and filling supported by the deck.
  • a filled-in construction comprising an inclined deck; and filling supported by the same; the inclination of the deck to the horizontal being less than the angle of repose of the filling.
  • a filled-in construction comprising an inclined deck; filling supported by the same; and retaining means forpreventing the displacement of the filling by the shifting of the bedof the body of water in front of the construction.
  • a filled-in construction comprising an inclined deck;'and means for resisting the forward movement of the same; said means lying wholly within the area covered by the deck.
  • a filled-in construction comprising an inclined deck; and battered piles for resisting the forward movement of the same; said piles lying wholly within the area covered by the deck,

Description

W. M. TORRANGE. FILLED-IN CON STRUGTION. APPLICATION rnnn mn.2 z,191a.
1,067,950. Patented July 22, 1913.
w i/imamo: vwe wto'a UNITED STATES PATENT OFFICE.
WILLIAM M. 'I'ORRANCE, OF EAST ORANGE, NEW JERSEY, ASSIGNOR 0F ONE-HALF TO WAYNE CUNNINGHAM, 0F SAVANNAH, GEORGIA.
FILLED-IN CONSTRUCTION.
Specification of Letters Patent. v
Patented July 22,1913.
Application filed March 22, 1913. Serial No. 756,116.
infilled-in constructions and particularly to improvements in structures in which earth or other filling material is to be confined. As examples of such structures one may mention permanent pier constructions for .the sides and ends of piers between slips; and wharf bulkheads for retaining a wharf line in front of filled orpaved areas in harbors andso constructed as to enable a sufficient depth of water to be maintained in front of the wharfline for the proper maintain in the immediate proximity therer of a depth of clear water suflicient for the reception of boats (or forany other purpose); In the construction of filled bulkheads the approved practice heretofore in use This solid wall is so constructed as to sup- 40 port and retain a solid filling of earth or other material, with which the space immediately behind this solid masonry wall is also filled. In this construction the foremost or most advanced piling, which is of the greatest length, receives the heaviest load, which load is due not only to the great weight of the masonry wall but results also from the fact that the thrust of the earth which is filled in behind the latter tends to tip the same over toward' the front.
An important feature of this invention mainly attributable to the fact that a a weight at the front where the channel depth is the greatest and-is of no greater weight at the rear' than is the approved type of filled bulkhead heretofore in common use.
An object of this invention is to provide a filled-in construction which will beabsolutely permanent and rigid and which will' represent a large saving in first cost' over filled-in constructions built according to methods heretofore followed. A structure of this type embodying the present invention will require a less total number of piling, a less amount of masonry construction an. a less amount of filling and will possess increased stiffness and rigidity. (1) by reason of the absence of any substantial forward thrusting action from the earthfill behind the masonry structure and (2) by reason of the increased horizontal depth of the masonry construction itself.
In carrying out my invention I prefer to use cementitious material, such as reinforced concrete, the main object of such material being to have no perishable parts above the water; but I do not desire to be understood as limiting myself to the use of cementitious gmaterial, although as I now believe and contemplate, the best results in practising this invention will be ob tainedby the use of reinforced concrete or other equally premanent material in the construction.
I shall now proceed to explain this invention as applied to and embodied in a wharf bulkhead.
In the drawings illustrating the-principle of this invention and the best mode now known to me of applying that principle in a wharf bulkhead, Figure 1 is a .front view 'of such a bulkhead embodying this invention, the view being taken from the water side thereof; Fig. 2 is a vertical section on'the line AA of'Fig. 1 and shows the use of reinforced concrete and the method of placing the same on the piling; and Fig. 3 isahorizontal section on the line BB of Fig. 2 and shows the method of construct-ion.
The bulkhead a is supported upon piles 1 which may be of wood, concrete or other suitablematcrial and which are driven into or set in the bed 2 of the harbor. TlllS p11- substantially .to be supported by the ing l is so arranged as as support a system of deck-supporting walls 3 which run head line from rear to front of the structure (Figs. 2 and 3). These walls 3 in turn support a deck 4 which is so constructed as to carry the superimposed load of earth and paving 5, forming the paved area of the wharf, together with the merchandise or other load material which is wharf safely from wall to Wall of the series of walls 3.
An important feature of this invention is the downward inclination of the deck 4 toward the rear, which inclination is given thereto in order to eliminate any tendency on the part of the bulkhead to slide forward because of the weight of the superimposed material. This downward inclination to the rear is always less than the angle of repose of the filling material when the same is loaded. With a deck so constructed there will be practically no tendency upon the part of the bulkhead to move forward or toward the water with the load in position;
,but in order to safeguard the bulkhead against any such tendency however slight in degree inclined or battered piles 6 are provided (Fig. 2). The upper ends of these piles 6 support a chock beam 6 which ex- .tends along and within the back wall 4' of the deck; and the piles 6 are so driven that they do not encroach in the least upon the depth of clear water immediately in front p the upper ends of of the bulkhead.
In order to prevent a boat when coming alongside the bulkhead from rubbing against the forward ends of the deck-supporting walls 3 or the front edge of the deck 4, there are provided fender piles 7 which are suitably fastened to horizontal beams 7 forming thereby a fender system. Atthe front edge of the deck 4 a curb 8 is provided for confining the pavement of the wharf. In rear of the back wall 4 of the deck, sheet piling 11 is driven for the purpose of retalning the earth in case the river-bed should change, as indicated by the dotted line 2, for example.
Projecting forwardly from the rear wall 4 of the deck 4 and formed integral therewith are concrete caps 4 which lie above the battered piles 6. The deck 4 is reinforced,the lengthwise-extendlng reinforcing members being marked 9 and the transverse reinforcing members being marked 10. a
As hereinbefore stated the inclination to the iorizonta-l of the main portion of the top of the deck 4 is less than the angle of repose of the filling material when loaded with the paving or other roadbed material, from which it results that the filling will at right angles to the bulk- I 'rest on the deck with substantially no tendency to slip and with only the vertical gravity resultant force coming into play or acting against the deck.
The transverse reinforcin members 10 give stiffness and stability to the structure and to prevent buckling of the same in case the structure is subjected to forces actingin the direction of the bulkhead line, such as the stresses occasioned by the striking or rubbing of vessels in coming alongside the structure.
The deck-supporting walls 3 may be omitted and the piles 1 (in this case preferably of concrete or in the form of concrete columns) extended upward until they take the load off and support the deck 4; or other suitable ways of supporting the deck 4 may be provided.
'I claim:
1. A filled-in construction comprising an inclined deck; means supporting the same; and filling supported by the deck.
2. A filled-in construction comprising an inclined deck; piling supporting the same; and filling supported by the dec 3. A filled-in constructionv comprising an inclined deck; piling supporting the same; walls interposed between the piling and deck; and filling supported by the deck.
4. A filled-in construction comprising an inclined deck; and filling supported by the same; the inclination of the deck to the horizontal being less than the angle of repose of the filling.
5. A filled-in construction comprising an inclined deck; filling supported by the same; and retaining means forpreventing the displacement of the filling by the shifting of the bedof the body of water in front of the construction.
6. A filled-in construction comprising an inclined deck;'and means for resisting the forward movement of the same; said means lying wholly within the area covered by the deck.
7. A filled-in construction comprising an inclined deck; and battered piles for resisting the forward movement of the same; said piles lying wholly within the area covered by the deck,
8., A filled-in construction eomprisingan inclined deck having transverse reinforcing members; filling supported by the deck; and means for supporting the deck.
Signed at New York city, this twentieth day of March, A. D. 1913, in the presence of the two undersigned witnesses.
EMMA I. MCCARTHY, JAMES HAMILTON.
Copies 0! this patent may be obtained for the cents each, by addressing the Commissioner of Patents,
US75611613A 1913-03-22 1913-03-22 Filled-in construction. Expired - Lifetime US1067950A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US75611613A US1067950A (en) 1913-03-22 1913-03-22 Filled-in construction.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US75611613A US1067950A (en) 1913-03-22 1913-03-22 Filled-in construction.

Publications (1)

Publication Number Publication Date
US1067950A true US1067950A (en) 1913-07-22

Family

ID=3136191

Family Applications (1)

Application Number Title Priority Date Filing Date
US75611613A Expired - Lifetime US1067950A (en) 1913-03-22 1913-03-22 Filled-in construction.

Country Status (1)

Country Link
US (1) US1067950A (en)

Similar Documents

Publication Publication Date Title
CN107700423A (en) A kind of deep water soft soil foundation quay wall structure and its construction method
US975665A (en) Shoring.
US1067950A (en) Filled-in construction.
US786059A (en) Subway structure.
US1422821A (en) Sheet-piling wall construction
US592738A (en) judson
US1693311A (en) Sea wall and method of making same
US231957A (en) Submarine and surface wall
US981822A (en) Concrete-piling retaining-wall structure.
US1013584A (en) Spring-fender for docks.
US1294556A (en) Concrete substructure-caisson.
US969343A (en) Composite piling.
US905771A (en) Retaining-wall.
US630457A (en) Ship-canal.
US982698A (en) Retaining-wall.
KR101362918B1 (en) Caisson with soil pressure dispersedand friction increased, and harbor facilities
US1985795A (en) Sheet piling
US982697A (en) Bulkhead.
US2200550A (en) Wharf
US705732A (en) Retaining-wall.
US850497A (en) Sheet-piling.
US820304A (en) Metal piling.
US1298101A (en) Bulkhead.
US693235A (en) Piling.
US1414620A (en) Reenforced concrete construction for piers, bulkheads, sea walls, and dry docks