US103350A - Improvement in tubular submarine viaducts - Google Patents

Improvement in tubular submarine viaducts Download PDF

Info

Publication number
US103350A
US103350A US103350DA US103350A US 103350 A US103350 A US 103350A US 103350D A US103350D A US 103350DA US 103350 A US103350 A US 103350A
Authority
US
United States
Prior art keywords
tubular
submarine
sections
viaducts
improvement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
Publication date
Application granted granted Critical
Publication of US103350A publication Critical patent/US103350A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/063Tunnels submerged into, or built in, open water
    • E02D29/073Tunnels or shuttering therefor assembled from sections individually sunk onto, or laid on, the water-bed, e.g. in a preformed trench

Definitions

  • the sections should be built in convenient lengths, say from one hundred (100) feet to f three hundred (3 00) feet each, so as to adapt i them to any irregularity at the bottom which might exist.
  • cradle of wrought or plate iron such as is used for iron-plated ships, of sufficient thickness-say from one (l) to two (2) inches-.this inner skin of iron to be covered before launching with an outer coating composed of brick, concrete, hydraulic cement, artificial stone, or
  • K is a shaft sunk from the surface near. the water, through which is lowered a iirst short tubular section, A, which is pushed forward-into KKto within a few feet of the stream or arm ⁇ of the sea to be traversed, separated from the water lby a bank of earth, M M.
  • This irst section being made water-tight at its outer extremity by a removable bulk-head, E, as hereinafter more fully described, will be walled in at L L with. hydraulic cement, so as to prelvent the subsequent introduction of any water into KK by leakage.
  • the portion of earth M M, separating A from the sea, will then be removed from the outside by'a suitable dredging apparatus, and a diver will be advantageously employed to clean the L exterior surface of A and remove any particles of earth adhering to the same. rate and minute survey of the bottom of the l
  • the workmen who are to make the joint bejing stationed in the inside of A, another sec- 1tion,B, willthen be lowered from the surface by any convenient arrangement of ropes and ⁇ l pulleys, that arrangement shown in Fig. 1 being preferred...
  • thesection about to be laid is lowered down in such a way that one end will be conducted by the pulleys F and F', Fig. 2, to the outer end of section already la-id, and, by the aid of a diver, will be made to t accurately into a hood or shoe, D, extending around the lower extremity of A.
  • Section B when thus lowered from the surface, is closed hermetically at each end by removable bulk-heads E E, Figs. 2 and 3, which are firmly secured by small screws J J and made water-tight by india-rubber packings around the edges, these bulk-heads to be made in piecesclosely fitting to each other, so as to be more easily removed.
  • Fig. 2 represents the sectionB in the act of being lowered from above, and being guided by ropes and pulleys and by a diver into the shoe D of A, so as to fit accurately into the enlarged extremity of A, and being thus held suspended from above, it will be violently pushed forward into A as far as H' bythe action of the steamer or other vessel from which it is suspended above, and held there until the joint is perfected between the two sections by the workmen stationed in A.
  • the smaller extremity of B thus ittin g into A, will necessarily be arrested at H H' by the vulcanized india-rubber cushions or packings O O, the chiefl object of which will be to prevent the possibility of leakage while the sections are held together and the joint is being perfected.
  • the sections are made to accommodate themselves in a great degree to any slight unevenness at the bottom on which it is desired to rest them, so as, if possible, to save the enormous cost of building piers or jetties.
  • a tubular submarine viaduct composed of sections so constructed that the viaduct shall be laid by forcing the small end of each section into the large end of the adjoining section, as described.

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Description

UNIT'EDSTATES PATENT OFFICE.
w. j GnAYsoN MANN, onl sAvANNAH, GEORGIA.
MPROVEMENT'IN lTUBULAR sUBMARlNE VIADUCTS.
Specificationforiuing part of Letters Patent No. 103,350, dated May 24, 1870.
To all whom it fmag/lcoacernr l. l l l Bezit known that I,` W; GRAYsoN` MANN, of
' Savannah, Georgia, have invented a new and 4my improved viaduotylliig, a`longitudinal sectionyshowing the manner of joining the sections together;- Fig. 1 3, a` longitudinal section, showing the joint when finished Fig. 4, a transverse section atthejoint.w
. `This inventionrelatestothatlclass of submarine `viaducts which are composed of i tubular sections;` l. .l 1
Before proceeding to build the; tubular sections it will be necessary to make amost accustream, Sac., whichv is to be crossed, and the lineadopted, as well as the soundings, should be carefully marked by anumber of `buoys,
placed at convenient` distancesV all; the way across.
The sections should be built in convenient lengths, say from one hundred (100) feet to f three hundred (3 00) feet each, so as to adapt i them to any irregularity at the bottom which might exist.
1n case of insufficient length or of great irregularity at the bottom, dredging would have to be resorted to in order to dig out a bed for the viaduct. l
, l The sections should be built on a slip or.
. cradle of wrought or plate iron, such as is used for iron-plated ships, of sufficient thickness-say from one (l) to two (2) inches-.this inner skin of iron to be covered before launching with an outer coating composed of brick, concrete, hydraulic cement, artificial stone, or
other convenient material, of sufficient thickness and weight to overcome the floating power of the water and sink and secure the viaduct firmly atr the bottom. This outer coating, hardening under water, will give great f solidity to the whole structure, and if not too porous will prevent the iron frame beneath from oxidizing.
In Fig. l of the annexed drawing, K K
: lrepresents one of the underground termini oi a proposed viaduct.
K is a shaft sunk from the surface near. the water, through which is lowered a iirst short tubular section, A, which is pushed forward-into KKto within a few feet of the stream or arm `of the sea to be traversed, separated from the water lby a bank of earth, M M. This irst section, being made water-tight at its outer extremity by a removable bulk-head, E, as hereinafter more fully described, will be walled in at L L with. hydraulic cement, so as to prelvent the subsequent introduction of any water into KK by leakage.
The portion of earth M M, separating A from the sea, will then be removed from the outside by'a suitable dredging apparatus, and a diver will be advantageously employed to clean the L exterior surface of A and remove any particles of earth adhering to the same. rate and minute survey of the bottom of the l The workmen who are to make the joint bejing stationed in the inside of A, another sec- 1tion,B, willthen be lowered from the surface by any convenient arrangement of ropes and `l pulleys, that arrangement shown in Fig. 1 being preferred... By it thesection about to be laid is lowered down in such a way that one end will be conducted by the pulleys F and F', Fig. 2, to the outer end of section already la-id, and, by the aid of a diver, will be made to t accurately into a hood or shoe, D, extending around the lower extremity of A.
Section B, when thus lowered from the surface, is closed hermetically at each end by removable bulk-heads E E, Figs. 2 and 3, which are firmly secured by small screws J J and made water-tight by india-rubber packings around the edges, these bulk-heads to be made in piecesclosely fitting to each other, so as to be more easily removed.
As will be seen by reference to the drawings, Figs. 2 and 3, the diameter of the extremity Gr of A is sufficiently enlarged to permit the easy introduction into it of the corresponding extremity G of B, the diameter of which is slightly diminished.
Fig. 2 represents the sectionB in the act of being lowered from above, and being guided by ropes and pulleys and by a diver into the shoe D of A, so as to fit accurately into the enlarged extremity of A, and being thus held suspended from above, it will be violently pushed forward into A as far as H' bythe action of the steamer or other vessel from which it is suspended above, and held there until the joint is perfected between the two sections by the workmen stationed in A. The smaller extremity of B, thus ittin g into A, will necessarily be arrested at H H' by the vulcanized india-rubber cushions or packings O O, the chiefl object of which will be to prevent the possibility of leakage while the sections are held together and the joint is being perfected. The two bulkheads E E being thus brought into close contiguity, and the water between them being in great measure expelled, the workmen in A will proceed to unscrew the small screws J J holding the bulk-head E in its place. They will then remove that bulk-head by pulling it toward them, and proceed to unscrew the screws J' J', fastening the bulk-head E of B,
and remove the same by pulling it into A. They will then complete the joint by closely calking the vacant spaces L L with hemp or other suitable material, and by driving and hammering lead into the same, so as totally to prevent the possibility of leakage, Fig. 3. The workmen will then firmly secure the two sections together by drillingnumerous screw-holes through the two overlapping iron extremities Gr G', into which they will insert the large screws I I, Fig. 3, which will give great solidity to the joints and enable them to bear a heavy strain.
This operation of making the joint will be repeated by the workmen whenever a new section is lowered and added. By removing the bulk-heads they will penetrate successively from one air-tight section to another until they reach the opposite shore, where the operation detailed in Fig. 1 will be repeated reversed.
In cases of great unevenness at the bottom, it may be necessary to build iron jetties or stands screwed to the sections, as in Fig. 1, on which they may rest when lowered to the bottom. To prevent the outer layer of brick or other material from breaking away, it will be necessary to rivet thin longitudinal iron stiii'- eners along the bottom of the sections outside.
By the mode of building a submarine vian duct above described, in addition to the great solidity and economy of the structure, the sections are made to accommodate themselves in a great degree to any slight unevenness at the bottom on which it is desired to rest them, so as, if possible, to save the enormous cost of building piers or jetties.
Having thus described my invention, what I claim as new, and desire to secure by Letters Patent, is-
I. The combination of a shoe, D, and the system of ropes and pulleys F F', substantially as described, for guiding and uniting the end of an additional section of a tubular viaduct to a section already laid, such sections being coated before immersion with an outside layer of brick, stone, or other material, to act as ballast.
2. A tubular submarine viaduct composed of sections so constructed that the viaduct shall be laid by forcing the small end of each section into the large end of the adjoining section, as described.
W. GRAYSON MANN.
Witnesses I WM. HARDEN, JOHN W. BURRoUGHs.
US103350D Improvement in tubular submarine viaducts Expired - Lifetime US103350A (en)

Publications (1)

Publication Number Publication Date
US103350A true US103350A (en) 1870-05-24

Family

ID=2172835

Family Applications (1)

Application Number Title Priority Date Filing Date
US103350D Expired - Lifetime US103350A (en) Improvement in tubular submarine viaducts

Country Status (1)

Country Link
US (1) US103350A (en)

Similar Documents

Publication Publication Date Title
US4306821A (en) Method and apparatus for restoring piling
US375464A (en) Method of and apparatus for laying submarine pipes
AU6546490A (en) Method and apparatus for constructing an artificial island and construction thus obtained
US20250188697A1 (en) Subsea Anchorage Installation System
US103350A (en) Improvement in tubular submarine viaducts
US131322A (en) Improvement in subaqueous tunnels
DE102015121769A1 (en) Robot for inspection and / or cleaning of pile foundations surrounded by water
US483697A (en) Dry-dock
US629133A (en) Subaqueous tunnel and method of constructing same.
US730135A (en) Method of building subaqueous tunnels.
US439841A (en) Sectional tubular tunnel
KR101759316B1 (en) Inside strengthening method for water tank
NL8200232A (en) TOWER FOR FORMING A DRILLING AND / OR EXTRACTION ISLAND.
US843355A (en) Dock.
US522222A (en) Subaqueous tunnel
US657980A (en) Pile-holder for pile-driving machines.
US311656A (en) Apparatus for laying submarine tunnels and tubes
US124045A (en) Improvement in constructing submarine tunnels
US1275894A (en) Sea-mine of steel-concrete.
US1018578A (en) Method of tunnel construction.
US431920A (en) Apparatus for sinking well-pipes
MORGAN THE DESIGN OF WHARVES ON SOFT GROUND.
US408748A (en) Buoyant subaqueous tunnel for railways
US9290902B2 (en) Mobile dry setting element and installation, process for using same and use thereof
WO2019149945A2 (en) A method for submerging a modular tunnel