US1010735A - Dam construction. - Google Patents

Dam construction. Download PDF

Info

Publication number
US1010735A
US1010735A US65425011A US1911654250A US1010735A US 1010735 A US1010735 A US 1010735A US 65425011 A US65425011 A US 65425011A US 1911654250 A US1911654250 A US 1911654250A US 1010735 A US1010735 A US 1010735A
Authority
US
United States
Prior art keywords
rods
deck
buttresses
series
extending
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US65425011A
Inventor
Charles F Doebler
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NATIONAL HYDRAULIC CONSTRUCTION Co
NAT HYDRAULIC CONSTRUCTION Co
Original Assignee
NAT HYDRAULIC CONSTRUCTION Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NAT HYDRAULIC CONSTRUCTION Co filed Critical NAT HYDRAULIC CONSTRUCTION Co
Priority to US65425011A priority Critical patent/US1010735A/en
Application granted granted Critical
Publication of US1010735A publication Critical patent/US1010735A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/02Fixed barrages
    • E02B7/04Dams across valleys
    • E02B7/08Wall dams
    • E02B7/14Buttress dams

Definitions

  • My invention relates to dam' construction and the object of my invention is to provide a hollow dam of concrete or other suitable material of like nature which can be molded,
  • a deck which is preferably ⁇ formed integra-l with the buttresses and which is reinforced with metalA rods ex tending longitudinally in such a manner as to form a cantaliver construction by arranging a series of upper and lower rods, one series extending from buttress to buttress within the deck and he'other series extending across the buttr sses and above the ends of the 'lower rods.
  • A.furtl1er series of rods may be used extending from the bottom to the topv of the -deck and preferably located about half way between the upper and lower surfaces of the 'deckfand between the buttresses only, the object being to strengthen the deckto .a suiiicient degree to 'form a safe structure with as few rods -as possible. Corbels may be used to further strengthen and support the deck and by rods may be reduced. l
  • Figure 1 is a cross sectional view of my dam taken on line ⁇ 1c-w of Fig. 3 and on a reduced scale.
  • Fig. 1 is a cross sectional view of my dam taken on line ⁇ 1c-w of Fig. 3 and on a reduced scale.
  • FIG. 2 is a plan. view of a portion of the deck.
  • Fig. 3 is a longitudinal-sectional view of a portion of the dam
  • FIG. 4 is an exterior view of a portion of the dam on a reduced scale rfrom Fig. 3 fromjthe down-stream side.
  • Fig. 5 is, a rear sectional view of a dam constructed without theiuse of corbels. f
  • A indicates the buttresses which extend Vpractically in' alinement with the flow of the stream and may rest Ona natural or Y artificial foundation. In the drawings they are shown as resting directly on the earth.
  • A indicate corbels which arelocated on each side of the buttresses at their tops
  • B indicates the deck which extends at an angle to the base as shown and is usually formed integral with the buttressesand corbels.
  • tresses and corbels are rods E-E etc.
  • buttresses are spaced apart the same distance as'shown in Fig. 3, but
  • the corbels are omitted and' therefore [the lower rods are made longer to extendto 'or nearly to the buttresses and the upper rods f are l also made longer lto extend vfarther across the space between the buttresses to support the deck. l Y
  • the deck will expand and ⁇ contract evenly, and noportion of the deck' is liable to give way under the stresses set ⁇ up bythe and extending from the bottoni of the deck toward the top thereof, and a series of cross rods embedded in the deck below said rstnamed rods and between said buttresses, and a series of lcross rods embedded in said deck and 4,extending across said buttresses with their ends above said last rods andv located above said first rods.
  • a hollow gravity dam embodylng buttresses spaced apart from /each other and a deck formed integral therewith and .provided with a series of rods embedded therein and extending-from the bottom of the ydeck toward the top thereof, and a series of cross rods embedded in the deck below said first named rods and between said buttresses,
  • a hollow gravity dam embodying but tresses'spaced apart from each other ⁇ and provided with corbels which extend along the top of the buttresses, and a deck formed integral therewith and provided with a series of rods embedded therein and extending from the bottom of the deck toward the top thereof, and a series of cross rods embedded in the deck below said first named rods and between said buttresses, and a series of cross rods embedded in said deck and extending across said buttresses and corbels,
  • a hollow gravity dam embodying buttresses ⁇ 'spaced apart from each other and provided with corbels which extend along the top of the buttresses, and a deck formed integral therewith l and provided with a series of rods embedded therein and extending from the bottom of the deck toward the top thereof, and a series of cross rods. embedded in the deck below Asaid first named rods and between said buttresses, and a series of crossrods embedded in said deck and extending across said buttresses with theirends above said last rods and located above said first rods, and extending over the first mentioned rods-v which are located adjacent to said corbels.
  • a hollow gravity dam embodying but- 'extending in a line with'the stream thereby providing spaces of even distancesv between said buttresses, and a deck formed integral therewith and provided withla series f rods embedded therein and extending from the bottom ofthe deck toward the top thereof, and a multitude's of cross rods embedded in the deck below said irst named rods and between said buttresses, and a series of cross .rods embedded in said deck and extending across said buttresses with their ends above saiid last rods and located above said first ro s.
  • a hollow gravitydam embodying buttresses spaced apart from each other and extending in a line with the stream. thereby providing spaces of even distances between said buttresses, and a deck formed integral therewith and provided with a series of rods embedded therein and extending from the bottom of the deck toward the top thereof above saidspaces, and a series of cross rods embedded in the deck below said first namedirods and between said buttresses, and a series of cross rods embedded in said deck and spanning said spaces and extending across said buttresses with their ends above said last rods and located above said rst rods.
  • a hollow gravity dam embodying outtresses 'spaced apart from each other and a deck supported by said buttressesand provided with a series of rods embedded 4therein andextending from the botitdm of the deck 'tresses spaced apart from each other and said buttresses, and a deck formed integral therewith and provided with a series of rods.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Floor Finish (AREA)

Description

lC. 1E'. 4-D0FBL13R., DAM CONSTINIC'IFION.l PPLIOATION FILED oofr. 11, 1910, Mmmm 001'. 11. 1911.
APatented Dec. 5, 1911.
`a sanne-slum 1;
C. vI'. DOBBLBR. DAM GONSTRUGTION. A APPLIUM'ION FILED 001.11, 1910. RBNBWBD 001.11. 1911. 1,010,735.
Patgn'ted Dec. '5, 1911.
2 SHEETS-SHEET 2.
`. viewed Vfrom t-he down-stream side, vin which UNITED lsTATEs PATENT oEEIoE.
CHARLES F. DOEBLER, or' NEW .YORx, N. Y., AssICNoR To NATIONAL.7 HYDRAULIC CONSTRUCTION COMPANY, A CORPORATION or NEW YORK DAM` CONSTRUCTION.
Application filed- October 11, 1910, Serial No.V 586,583. Renewed October 11, 1911. Serial No. 654,250.A
ments in Dam Constructionsyof which theI Yfollowing is .a specification.
My invention relates to dam' construction and the object of my invention is to provide a hollow dam of concrete or other suitable material of like nature which can be molded,
and to provide a deck which is preferably` formed integra-l with the buttresses and which is reinforced with metalA rods ex tending longitudinally in such a manner as to form a cantaliver construction by arranging a series of upper and lower rods, one series extending from buttress to buttress within the deck and he'other series extending across the buttr sses and above the ends of the 'lower rods. A.furtl1er series of rods may be used extending from the bottom to the topv of the -deck and preferably located about half way between the upper and lower surfaces of the 'deckfand between the buttresses only, the object being to strengthen the deckto .a suiiicient degree to 'form a safe structure with as few rods -as possible. Corbels may be used to further strengthen and support the deck and by rods may be reduced. l
Referring to the drawings which form a their use the length of thelower series of' part of this specification, Figure 1 is a cross sectional view of my dam taken on line {1c-w of Fig. 3 and on a reduced scale. Fig.
2 is a plan. view of a portion of the deck.
shown partly in section to disclose the strengthening rods. Fig. 3 is a longitudinal-sectional view of a portion of the dam,
the corbel construction is em'bodied.
4 is an exterior view of a portion of the dam on a reduced scale rfrom Fig. 3 fromjthe down-stream side. Fig. 5 is, a rear sectional view of a dam constructed without theiuse of corbels. f
A, indicates the buttresses which extend Vpractically in' alinement with the flow of the stream and may rest Ona natural or Y artificial foundation. In the drawings they are shown as resting directly on the earth.
Patented Dees, 1911.
A indicate corbels which arelocated on each side of the buttresses at their tops, and
B indicates the deck which extends at an angle to the base as shown and is usually formed integral with the buttressesand corbels.
Embedded 'in the deck betweenQ-he but? tresses and extending from the bot'tom'to the' top of the dam are4 rods etc., the number depending on the'weight of water to be supported and Athe distanc'e'the buttresses are spaced apart, the proper y number and sizebeing determinedby 'anengineer in this line.
Located below the rods C-lC--Cketd 'are cross rods D-D etc. which extend from i 'corbel to corbel across'the spaces between* the buttresses, and extending across the but.-
tresses and corbels are rods E-E etc. the
and above and 2. v
In- Fig. 5
them as illustrated in Figs. f1.l
the buttresses are spaced apart the same distance as'shown in Fig. 3, but
the corbels are omitted and' therefore [the lower rods are made longer to extendto 'or nearly to the buttresses and the upper rods f are l also made longer lto extend vfarther across the space between the buttresses to support the deck. l Y
' By the arrangement of the rods as above described the deck will expand and `contract evenly, and noportion of the deck' is liable to give way under the stresses set` up bythe and extending from the bottoni of the deck toward the top thereof, anda series of cross rods embedded in the deck below said rstnamed rods and between said buttresses, and a series of lcross rods embedded in said deck and 4,extending across said buttresses with their ends above said last rods andv located above said first rods. l
' 2. A hollow gravity dam e bodying buttresses spaced apart from each other and provided with corbels which'extend along the top of the buttresses, and a. deck formed integral therewith and provided with a series of rods embedded therein and extending from the botto'm ofthe deck toward the top thereof, and a series of-cross rods embedded in the deck below said'first named rods and between said buttresses, and a series of cross rods embedded in said deck and extending across said `buttresses with theirends above said last rods and located above said rst rods.
3. A hollow gravity dam embodylng buttresses spaced apart from /each other and a deck formed integral therewith and .provided with a series of rods embedded therein and extending-from the bottom of the ydeck toward the top thereof, and a series of cross rods embedded in the deck below said first named rods and between said buttresses,
and a series of cross rods' embedded in said` deck and extending across said buttresses with their ends above said lastrods and located above said irst rods, and extending over said' first rods which are located 'adjacent to said buttresses.
4. A hollow gravity dam embodying but tresses'spaced apart from each other `and provided with corbels which extend along the top of the buttresses, and a deck formed integral therewith and provided with a series of rods embedded therein and extending from the bottom of the deck toward the top thereof, and a series of cross rods embedded in the deck below said first named rods and between said buttresses, and a series of cross rods embedded in said deck and extending across said buttresses and corbels,
and their ends resting above the ends of said second named rods.
` 5. A hollow gravity dam embodying buttresses `'spaced apart from each other and provided with corbels which extend along the top of the buttresses, and a deck formed integral therewith l and provided with a series of rods embedded therein and extending from the bottom of the deck toward the top thereof, and a series of cross rods. embedded in the deck below Asaid first named rods and between said buttresses, and a series of crossrods embedded in said deck and extending across said buttresses with theirends above said last rods and located above said first rods, and extending over the first mentioned rods-v which are located adjacent to said corbels.
6. A hollow gravity dam embodying but- 'extending in a line with'the stream thereby providing spaces of even distancesv between said buttresses, and a deck formed integral therewith and provided withla series f rods embedded therein and extending from the bottom ofthe deck toward the top thereof, and a serie's of cross rods embedded in the deck below said irst named rods and between said buttresses, and a series of cross .rods embedded in said deck and extending across said buttresses with their ends above saiid last rods and located above said first ro s.
7. A hollow gravity dam'embodyng buttresses spaced apart from each other and extending in a line with the stream thereby providing spaces 'of even distances between embedded therein and extending from the bottom of the deck toward the top thereof above said spaces, and a series of cross rods embedded in the deck below said iirst named rods and between said buttresses, and a series of cross rods embedded in said deck and extending across said buttresses with/their ends above said last rods and located above said first rods.
8. A hollow gravitydam embodying buttresses spaced apart from each other and extending in a line with the stream. thereby providing spaces of even distances between said buttresses, anda deck formed integral therewith and provided with a series of rods embedded therein and extending from the bottom of the deck toward the top thereof above saidspaces, and a series of cross rods embedded in the deck below said first namedirods and between said buttresses, and a series of cross rods embedded in said deck and spanning said spaces and extending across said buttresses with their ends above said last rods and located above said rst rods.
9. 'A hollow gravity dam embodying buttresses spaced apart from each other and extending in a line with the stream' thereby providing spaces of even distances between said buttresses, and a deck supported by said buttresses and-provided'with a series of rods bottom Vof the deck toward the top thereof above said spaces, and a series of cross rods embedded in the deck below said iirst named rods and between said buttresses, and a series of cross rods embedded in said deck and extending across said buttresses with their ends above said last rods and located above said first rods.
10. A hollow gravity dam embodying outtresses 'spaced apart from each other and a deck supported by said buttressesand provided with a series of rods embedded 4therein andextending from the botitdm of the deck 'tresses spaced apart from each other and said buttresses, and a deck formed integral therewith and provided with a series of rods.
embedded therein and extending from the toward the top thereof, and a series of cross Signed at `Newl York city, in the coimty rods embeddedin the deck below said Erst of New York Aand State of New York this named rods and betweenisaid buttresses,l and *i 26th day of August A. D. 1910.
a series 'of cross rods' embedded in said deck -CHARLES F.l DOEBLER. 5 and extending across said buttresses with Witnessesz' their ends above said last rods andlocated' l1v1" RANK M..AS,HL1?:Y2
above said first rods. Y MI'NNm'S.
Copies of this patent may be obtained for lve cents each,- byaddrvessing the Com'msuqner othtentl,
Washington, D. CR
US65425011A 1911-10-11 1911-10-11 Dam construction. Expired - Lifetime US1010735A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US65425011A US1010735A (en) 1911-10-11 1911-10-11 Dam construction.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US65425011A US1010735A (en) 1911-10-11 1911-10-11 Dam construction.

Publications (1)

Publication Number Publication Date
US1010735A true US1010735A (en) 1911-12-05

Family

ID=3079045

Family Applications (1)

Application Number Title Priority Date Filing Date
US65425011A Expired - Lifetime US1010735A (en) 1911-10-11 1911-10-11 Dam construction.

Country Status (1)

Country Link
US (1) US1010735A (en)

Similar Documents

Publication Publication Date Title
US1010735A (en) Dam construction.
US422901A (en) Territory
US868092A (en) System of construction for foundations, dams, sea-walls, and the like.
US788885A (en) Dam.
US2138071A (en) Dam
US2396226A (en) Floatable substructural caissons and the like
US1047501A (en) Dam.
US1030496A (en) Dock or bulkhead construction.
US1846839A (en) Dam
US1556080A (en) Dam constsuction
US923985A (en) Dam and method of building the same.
US460856A (en) eerguson
US1808904A (en) Dam and method of constructing the same
US1846840A (en) Dam
US988764A (en) Pillar for bridges.
US1852431A (en) Dam
US310341A (en) Well-curb
US630457A (en) Ship-canal.
US878291A (en) Shell-dam.
US764916A (en) Concrete dam.
US170832A (en) Improvement in mattresses for forming embankments
US2407952A (en) Dam structure
US680738A (en) Means for damming torrents.
US2666296A (en) Dam
RU2278206C1 (en) Floating gate