Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Раг АкциенгезельшафтfiledCriticalРаг Акциенгезельшафт
Priority to UAA201009881ApriorityCriticalpatent/UA96526C2/en
Publication of UA96526C2publicationCriticalpatent/UA96526C2/en
Disclosed is a method for the controlled maintaining of a mechanically favorable distance (33) between the roof and the face in longwall coal mining operations comprising a face conveyor (20), at least one extraction machine (22), and a hydraulic shield support. In said method, the inclination of the top canopy (13) and the floor skid (11) in the mining direction is determined by means of inclination sensors (17) mounted on at least three of the four main components of each shield support frame (10), such as the floor skid (11), the gob shield (14), the supporting connection rods (16), and in the gob zone of the top canopy (13) the effects on the distance (33) between the roof and the face are determined in a computer unit on the basis of the measured data when the angle of inclination of the top canopy (13) changes, and the parameters that are crucial for the working cycle of the shield support frame (10) are automatically adjusted, said working cycle consisting of a retracting, advancing, and setting process.
UAA201009881A2008-02-192008-02-19Method for controlled maintaining of a gap between the roof and face in longwall mining operations
UA96526C2
(en)