Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Частное Акционерное Общество "Азовэлектросталь", Публичное Акционерное Общество "Азовгальмаш"filedCriticalЧастное Акционерное Общество "Азовэлектросталь"
Priority to UAU201115129UpriorityCriticalpatent/UA71681U/en
Publication of UA71681UpublicationCriticalpatent/UA71681U/en
A bridge of a ladle crane comprises at least two main span beams and two end beams. Each main span beam is made from at least three sections, in the areas of joining of which released belts and stiffeners are installed. From the outside of lateral walls of end beams the tables are mounted with possibility of increase of the stroke of a small trolley for a value of ΔL and jacking the bridge.
An elevation scenario that has a main stage with a steel base structure, fixed guide means arranged at both ends of the structure and drive means composed of symmetrically arranged hydraulic cylinders and hydraulic conductors, also has lifting sub-scenarios and a system Main control
Handle assembly for a mining excavator, where the excavator includes a traction rope and a bucket, where the handle assembly comprises a handle to be coupled to the bucket, a compensator that includes a mounting block; bucket assembly.