Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Анатолий Васильевич Сирота, Николай Дмитриевич ЧерномызfiledCriticalАнатолий Васильевич Сирота
Priority to UAU201115126UpriorityCriticalpatent/UA70871U/en
Publication of UA70871UpublicationCriticalpatent/UA70871U/en
Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
Y02E10/00—Energy generation through renewable energy sources
Y02E10/70—Wind energy
Abstract
A method for construction of a high-rise turbine tower on the upper section of which one mounts a rotary wind-driven electric power plant that first includes formation in a light design variant of support elements of the tower that are quickly mounted, and on those one then forms the wind-driven electric power plant that is brought into operation. Electric energy produced by the station is used to mount and build all the other complex of structural elements of the tower.
UAU201115126U2011-12-212011-12-21Method for construction of a high-rise turbine tower
UA70871U
(en)
Method for controlling the operation of a photovoltaic power plant, which comprises providing a plurality of solar cells, converting direct current of the cells into alternating current by inverters, generating global setpoint of reactive energy with a grid controller, receiving the point of adjustment in a plurality of interpreters, converting each interpreter the global set point into a set point for a particular group of investors; alternative methods
Procedure for controlling a wind power installation, which comprises a generator for the supply of electrical energy to an electricity supply network, but which is not yet connected to the electricity supply network, said method comprises the steps of producing electrical energy with the generator, and feed the electrical elements of the wind power installation with the energy produced; wind power installation.