UA67284A - Method for development of ore beds - Google Patents
Method for development of ore bedsInfo
- Publication number
- UA67284A UA67284A UA2003087826A UA2003087826A UA67284A UA 67284 A UA67284 A UA 67284A UA 2003087826 A UA2003087826 A UA 2003087826A UA 2003087826 A UA2003087826 A UA 2003087826A UA 67284 A UA67284 A UA 67284A
- Authority
- UA
- Ukraine
- Prior art keywords
- chamber
- ore
- inter
- ceiling
- broken
- Prior art date
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Method for development of ore beds comprises the division of the bed to floors and blocks with making preparatory workings, with ore extraction by chambers, drilling and explosion of wells, formation of ceilings, floors and inter-chamber blocks, withextraction of the chamber ore stocks under protection of the ceiling and the inter-chamber block, with bringing down the ceiling and the bottom of the upper floor and inter-chamber block after ore discharge from the chamber, with discharge of the broken ore stock of the ceiling and the bottom of the upper floor and inter-chamber clock under the broken rocks. After extraction of the chamber stock of ore under protection of the ceiling and the inter-chamber ceiling under the broken ceiling and the bottom of the upper floor there is formed a bulk of broken before ore stock of the inter-chamber clock, with enough width, with formation over it of horizontal compensation space with minimum possible height for the broken ore stock of the ceiling and the bottom of the upper floor fall, enough for the loosening given by the condition of the ore discharge. The needed width of the broken ore stock of the inter-chamber block is determined by formula. The needed width of the broken ore stock of the of the inter-chamber block is compared to the calculated width, and at increase over the needed calculated width, at the same time with braking the ore stock of the inter-chamber block, one brakes the drilled before part of the massif at the opposite side of the chamber. Enough width of that part of the massif is determined by formula.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
UA2003087826A UA67284A (en) | 2003-08-19 | 2003-08-19 | Method for development of ore beds |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
UA2003087826A UA67284A (en) | 2003-08-19 | 2003-08-19 | Method for development of ore beds |
Publications (1)
Publication Number | Publication Date |
---|---|
UA67284A true UA67284A (en) | 2004-06-15 |
Family
ID=34518244
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
UA2003087826A UA67284A (en) | 2003-08-19 | 2003-08-19 | Method for development of ore beds |
Country Status (1)
Country | Link |
---|---|
UA (1) | UA67284A (en) |
-
2003
- 2003-08-19 UA UA2003087826A patent/UA67284A/en unknown
Similar Documents
Publication | Publication Date | Title |
---|---|---|
MX2007002363A (en) | Method for an autonomous loading shovel. | |
RU2293182C1 (en) | Method for extraction of thin and averagely thick steep formations of mineral resource with backfill of extracted space | |
UA67284A (en) | Method for development of ore beds | |
RU2304218C1 (en) | Method for coal excavation from thick steep bed | |
US2846205A (en) | Mining method for supporting geological structures | |
RU2277170C1 (en) | Development method for composite formations having gob interlayers | |
RU2296859C1 (en) | Method for extracting flat-lying and inclined impact-hazardous beds | |
RU2285799C1 (en) | Method for medium-thickness steep mineral seam development along with goaf filling | |
RU2790648C1 (en) | Method for underground development of steeping ore bodies in descenting order with chamber system | |
RU2287688C1 (en) | Method for extracting thick flat-lying coal beds | |
SU1689646A1 (en) | Method for erecting rock support | |
RU2415267C1 (en) | Development method of blind ore deposits | |
RU2386031C1 (en) | Development method of steeply-dipping ore bodies | |
SU1460273A1 (en) | Method of combination mining of mineral deposits | |
RU2122116C1 (en) | Method of safeguard of mine workings in beds | |
RU2157890C2 (en) | Method of mining of thick steep coal seams | |
UA84122C2 (en) | Method for filling chamber | |
SU1571249A1 (en) | Method of making artificial roof coal of chamber | |
RU2065963C1 (en) | Method for cutting thick flat and inclined orebodies | |
RU2473806C1 (en) | Method to mine steep beds by well hydraulic production with ancillary mining of methane | |
SU827791A1 (en) | Method of working thick mineral deposits | |
RU2309251C1 (en) | Mining method for complex seams having gob interlayers | |
ZA202204238B (en) | New method for predicting development height of water-conducting fracture zone in overlying rock in multi-layer mining of extra-thick coal seams | |
UA94891C2 (en) | Method for open-pit development of mineral beds | |
RU99101464A (en) | METHOD FOR DEVELOPING POWERFUL COAL STRESSES |