Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Oleksandr Mykolaiovy ZhuchenkofiledCriticalOleksandr Mykolaiovy Zhuchenko
Priority to UA2001106693ApriorityCriticalpatent/UA50120C2/en
Publication of UA50120C2publicationCriticalpatent/UA50120C2/en
Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes
(AREA)
Abstract
Reinforced concrete tie has embedded to concrete with the tail part anchors, and installed in between of the walls of two neighboring anchors plates. Length of the plate between neighboring anchors is1.25 - 1.5 of the length of the part of the plate under the base of the rail at the tie work in the track. Width of the wall of the anchor in the place of contact with the tie is 0.56 - 0.75 of the width of the upper surface of the tie in that place.
UA2001106693A2001-10-012001-10-01Reinforced-concrete tie
UA50120C2
(en)