Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Method for well fixation includes lowering drive pipe to it, injection to annular space cement mortar, formation of excess pressure in drive string and curing of cement mortar. The invention relates to construction of oil and gas wells and can be used at fixation of wells for increase of quality and reliability of fixation.
UA96041447A1996-04-111996-04-11Method for well fixation
UA28286A
(en)